Documentos de Académico
Documentos de Profesional
Documentos de Cultura
CONTRATO
MODIFICATORIO
DESCRIPCION
DESCRIPCION
PRECIO
UNIDCANTIDAD UNITARIO
Bs
PRECIO
TOTAL
Bs
CANTIDAD
C.M.
PRECIO
TOTAL Bs.
800.00
1.07
856.00
800.00
856.00
1.00
1,479.86
1,479.86
1.00
1,479.86
4.00
117.67
470.68
4.00
470.68
10.00
352.57
3,525.70
10.00
3,525.70
15.00
229.88
3,448.20
15.00
3,448.20
1.00
2,194.61
2,194.61
1.00
2,194.61
3.00
245.39
736.17
3.00
736.17
Costo Modulo
12,711.22Costo Modulo
12,711.22
PRECIO
PRECIO
CANTIDAD
PRECIO
UNIDCANTIDAD UNITARIO TOTAL
C.M.
TOTAL Bs.
Bs
Bs
ML
PZA
PZA
PZA
PZA
GLB
PZA
17CB001
31BD003
93DB083
93GB012
93GB025
93GB20001
96FC151
M2
ESCALERA METALICA
ML
GLB
GLB
PINTURA LATEX
M2
M2
GLB
DESCRIPCION
2.10
134.03
3.00
288.72
1.00
6,339.97
1.00
1,602.86
360.00
30.78
356.50
93.14
1.00
276.18
Costo Modulo
PRECIO
UNIDCANTIDAD UNITARIO
Bs
281.46
2.10
866.16
3.00
6,339.97
1.00
1,602.86
1.00
11,080.80
204.25
33,204.41
266.11
276.18
1.00
53,651.84Costo Modulo
PRECIO
TOTAL
Bs
CANTIDAD
C.M.
281.46
866.16
6,339.97
1,602.86
6,286.82
24,785.49
276.18
40,438.94
PRECIO
TOTAL Bs.
03CA003
40DA035
40DB024
40IA001
40JA001
93FB395
93GB201
96CC185
DESCRIPCION
1.02
2,459.22
40.73
58,920.02
35.67
33,540.14
25.21
12,764.08
M3
18.53
24,348.42
ML
14.57
15,983.29
ML
0.20
482.20
ML
0.29
699.19
ML
1,199.30
64,762.20
PZA
5,325.87
5,325.87
GLB
722.35
80,903.20
PZA
PRECIO
PRECIO
UNIDCANTIDAD UNITARIO TOTAL
Bs
Bs
ML
M3
M3
2411.00
1446.60
940.29
506.31
1314.00
1097.00
2411.00
2411.00
54.00
1.00
112.00
2,355.38
501.10
180.15
356.37
3,074.53
345.48
3,055.38
3,055.38
80.00
1.00
127.00
CANTIDAD
C.M.
2,402.49
20,409.80
6,425.84
8,984.09
56,971.04
5,033.64
611.08
886.06
95,944.00
5,325.87
91,738.45
PRECIO
TOTAL Bs.
40DA003
93DB104 HIPOCLORADOR
DESCRIPCION
12.99
300.00
3,897.00
6,148.77
1.00
6,148.77
PZA
4,056.94
3.00
12,170.82
PZA
2,943.11
5.00
14,715.54
PZA
3525.27
1.00
3,525.27
PZA
Costo Modulo 300,187.83Costo Modulo 335,189.76
PRECIO
PRECIO
CANTIDAD
PRECIO
UNIDCANTIDAD UNITARIO TOTAL
C.M.
TOTAL Bs.
Bs
Bs
ML
01AB002
02AC001
03BA010
03CA003
40DA003
40DA004
40DA035
40DA036
40DA037
ML
M3
M3
M3
ML
ML
ML
ML
ML
12862.00
6413.30
2309.30
4104.00
3122.00
926.00
2200.00
270.00
3764.00
1.02
40.73
35.67
25.21
12.99
19.15
18.94
26.66
35.15
13,119.24
261,213.71
82,372.73
103,461.84
40,554.78
17,732.90
41,668.00
7,198.20
132,304.60
14,662.79
6,838.66
1,848.80
4,926.38
4,689.79
953.00
2,261.00
266.00
3,769.00
14,956.05
278,538.51
65,946.82
124,194.00
60,920.37
18,249.95
42,823.34
7,091.56
132,480.35
40DA038
40IA001
40JA001
41BC025
42BC008
93BC1007
93BC15000
93CB616
93FB395
93GB309
ML
ML
ML
PZA
CAMARA DE LLAVES
PZA
GLB
PASO DE QUEBRADA DE 50 M
PASO DE QUEBRADA TIPO I
CONEX. DOM. C/MEDIDOR (INCL. EXC. Y RELL)
POZO DE INFILTRACION 1 M3 (SEG. DISE?O)
GLB
GLB
PZA
PZA
2580.00
12862.00
12862.00
34.00
8.00
1.00
1.00
1.00
34.00
34.00
53.91
0.20
0.29
709.55
787.24
5,325.87
29,227.57
38571.72
1185.07
328.76
139,087.80
2,572.40
3,729.98
24,124.70
6,297.92
5,325.87
29,227.57
38,571.72
40,292.38
11,177.84
2,656.00
14,687.79
14,687.79
34.00
8.00
1.14
0.00
0.00
34.00
34.00
143,184.96
2,937.56
4,259.46
24,124.70
6,297.92
6,071.49
0.00
0.00
40,292.38
11,177.84
M3
0.45
916.29
PRECIO
UNIDCANTIDAD UNITARIO
Bs
23,659.53
31,811.46
212.86
Costo Modulo
412.33
PRECIO
TOTAL
Bs
0.45
CANTIDAD
C.M.
1.00
1.00
23.00
###Costo Modulo
412.33
PRECIO
TOTAL Bs.
23,659.53
31,811.46
4,895.78
###
DESCRIPCION
MSCZ0024 ADUCCION
01AB002 REPLANTEO Y CONTROL DE TUBERIAS
02AC001
03BA010
03CA003
40DA038
40IA001
40JA001
42BC008
93GB263
93GD034
PRECIO
UNIDCANTIDAD UNITARIO
Bs
ML
M3
M3
M3
ML
ML
ML
CAMARA DE LLAVES
PZA
ACCESORIOS DE ADUCCION
GLB
M3
DESCRIPCION
280.00
168.00
58.80
109.20
280.00
280.00
280.00
2.00
1.00
0.80
1.02
40.73
35.67
25.21
53.91
0.2
0.29
787.24
5913.49
916.29
PRECIO
TOTAL
Bs
285.60
6,842.64
2,097.40
2,752.93
15,094.80
56.00
81.20
1,574.48
5,913.49
733.03
CANTIDAD
C.M.
0.00
0.00
0.00
0.00
197.00
220.00
220.00
2.00
1.00
0.78
PRECIO
TOTAL Bs.
0.00
0.00
0.00
0.00
10,620.27
44.00
63.80
1,574.48
5,913.49
718.37
Costo Modulo
35,431.57Costo Modulo
18,934.41
PRECIO
PRECIO
CANTIDAD
PRECIO
UNIDCANTIDAD UNITARIO TOTAL
C.M.
TOTAL Bs.
Bs
Bs
01AD001
02AC001
03CB002
93AB422
93BC10003
93CA049
93FB163
DESCRIPCION
100.00
4.73
473.00
60.00
283.80
15.70
40.73
639.46
16.44
669.40
1.20
42.87
51.44
4.62
198.23
M3
14.00
916.29
12,828.06
6.68
6,116.24
M3
0.60
3283.24
1,969.94
0.33
1,067.05
M3
95.00
350.49
33,296.55
56.00
19,627.44
ML
11.20
408.98
4,580.58
8.00
3,271.84
M2
Costo Modulo
53,839.03Costo Modulo
31,234.00
PRECIO
PRECIO
CANTIDAD
PRECIO
UNIDCANTIDAD UNITARIO TOTAL
C.M.
TOTAL Bs.
Bs
Bs
ML
M3
93BC816
93GB055
93GB056
93GB186
GLB
HR
HR
GLB
1.00
15.00
15.00
1.00
7503.94
341.91
414.55
270.08
7,503.94
5,128.65
6,218.25
270.08
1.00
15.00
15.00
1.00
7,503.94
5,128.65
6,218.25
270.08
DESCRIPCION
1.00
1507.83
1,507.83
1.00
1,507.83
1.00
87043.54
87,043.54
1.00
87,043.54
Costo Modulo 107,672.29Costo Modulo 107,672.29
PRECIO
PRECIO
CANTIDAD
PRECIO
UNIDCANTIDAD UNITARIO TOTAL
C.M.
TOTAL Bs.
Bs
Bs
GLB
GLB
01AC001
02AC001
06BA011
06BA014
31BD003
93AB407
93AD562
93BC677
93DB104
93DB105
93DB134
93GB012
93GB013
93GB025
93GB20001
96EC258
96FC015
M2
M3
M3
M3
ESCALERA METALICA
ML
PZA
M3
ACCESORIOS DE TANQUE
GLB
HIPOCLORADOR
PZA
M3
ZAMPEADO DE PIEDRA
M2
GLB
M3
PINTURA LATEX
M2
M2
M2
REVOQUE EXTERIOR
M2
DESCRIPCION
81.00
67.00
13.45
16.12
5.50
2.00
7.00
1.00
1.00
10.78
70.56
1.00
100.00
65.60
152.88
152.88
65.60
23.51
40.73
4451.53
4733.48
288.72
342.53
42.87
6339.97
3525.27
4265.61
80.62
1606.61
13.98
30.93
93.41
69.91
58.16
PRECIO
UNIDCANTIDAD UNITARIO
Bs
1,904.31
2,728.91
59,873.08
76,303.70
1,587.96
685.06
300.09
6,339.97
3,525.27
45,983.28
5,688.55
1,606.61
1,398.00
2,029.01
14,280.52
10,687.84
3,815.30
PRECIO
TOTAL
Bs
71.52
34.86
13.45
15.92
6.62
2.00
4.86
1.00
1.00
10.07
71.59
1.00
100.78
132.78
146.04
152.08
65.60
CANTIDAD
C.M.
1,681.44
1,419.85
59,873.08
75,357.00
1,911.33
685.06
208.35
6,339.97
3,525.27
42,954.69
5,771.59
1,606.61
1,408.85
4,106.89
13,641.60
10,631.91
3,815.30
PRECIO
TOTAL Bs.
11,954.64
1.00
11,954.64
Costo Modulo 238,737.46Costo Modulo 246,893.43
PRECIO
PRECIO
CANTIDAD
PRECIO
UNIDCANTIDAD UNITARIO TOTAL
C.M.
TOTAL Bs.
Bs
Bs
GLB
DESCRIPCION
MSCZ181
01AB001
ML
840.00
1.02
856.80
845.00
861.90
02AC001
03BA010
03CA003
40DA038
40FA008
40IA001
40JA001
42BC008
93BC961
93GD034
M3
M3
M3
ML
ML
ML
ML
CAMARA DE LLAVES
PZA
ACCESORIOS IMPULSION
GLB
M3
504.00
176.40
327.60
720.00
120.00
411.00
411.00
2.00
1.00
0.60
40.73
35.67
25.21
53.91
212.86
0.2
0.29
787.24
4967.23
916.29
20,527.92
6,292.19
8,258.80
38,815.20
25,543.20
82.20
119.19
1,574.48
4,967.23
549.77
147.96
43.16
104.81
822.00
23.00
845.00
845.00
2.00
1.00
0.80
6,026.41
1,539.34
2,642.13
44,314.02
4,895.78
169.00
245.05
1,574.48
4,967.23
733.03
DESCRIPCION
PRECIO
UNIDCANTIDAD UNITARIO
Bs
MSCZ645
40FA008
DESCRIPCION
PRECIO
TOTAL
Bs
CANTIDAD
C.M.
PRECIO
TOTAL Bs.
212.86
0.00
23.00
4,895.78
Costo Modulo 107,586.98Costo Modulo
72,864.15
PRECIO
PRECIO
CANTIDAD
PRECIO
UNIDCANTIDAD UNITARIO TOTAL
C.M.
TOTAL Bs.
Bs
Bs
ML
MSCZ645
ACTIVIDADES PRELIMINARES
01FA003
93GB187
93GC013
93GD047
INSTALACION DE FAENAS
GLB
PZA
MOVILIZACION Y DESMOVILIZACION
GLB
LETRERO DE OBRAS
PZA
1.00
4604.26
1.00
631.05
1.00
3735.54
2.00
1088.79
Costo Modulo
Costo Total
4,604.26
1.00
631.05
1.00
3,735.54
1.00
2,177.58
2.00
11,148.43Costo Modulo
### Costo Total
4,604.26
631.05
3,735.54
2,177.58
11,148.43
###
###
Periodo
Dias Ejec.
PLANILLA N 1
CANTIDAD
300.00
1.00
2.00
5.00
5.00
0.00
3.00
80.00
12,862.00
5,692.41
1,867.76
2,028.69
4,689.79
953.00
2,261.00
266.00
3,689.00
71.52
34.86
13.45
67.24
17869.04
0.8
0
0.5
2
Planilla N1
CONTRATO MODIFICATORIO N1
Proyecto: AMPL. Y RENOV. SIST. AGUA POTABLE CHARAGUA (CHARAGUA)
Supervisor : EDGAR MORAN FLORES
Empresa: EVISUR S.R.L.
Proyecto: FPS-08-00003382 AMPL. Y RENOV. SIST. AGUA POTABLE CHARAGUA (CHARAGUA)
DESCRIPCION
PRECIO
UNIDCANTIDAD UNITARIO
Bs
CONTRAT
PRECIO
TOTAL
Bs
ML
PZA
PZA
PZA
PZA
GLB
PZA
800.00
1.07
1.00
1,479.86
4.00
117.67
10.00
352.57
15.00
229.88
1.00
2,194.61
3.00
245.39
Costo Modulo
856.00
1,479.86
470.68
3,525.70
3,448.20
2,194.61
736.17
12,711.22
M2
ESCALERA METALICA
ML
GLB
GLB
PINTURA LATEX
M2
M2
GLB
2.10
134.03
3.00
288.72
1.00
6,339.97
1.00
1,602.86
360.00
30.78
356.50
93.14
1.00
276.18
Costo Modulo
281.46
866.16
6,339.97
1,602.86
11,080.80
33,204.41
276.18
53,651.84
ML
M3
M3
INCREMENTOS
CANT.
P. PARCIAL
Bs.
17CB001
31BD003
93DB083
93GB012
93GB025
93GB20001
96FC151
03CA003
40DA035
M3
ML
2411.00
1446.60
940.29
506.31
1314.00
1.02
40.73
35.67
25.21
18.53
2,459.22
58,920.02
33,540.14
12,764.08
24,348.42
1,760.53
32,622.62
40DB024
40IA001
40JA001
93FB395
93GB201
96CC185
ML
ML
ML
PZA
GLB
PZA
1097.00
2411.00
2411.00
54.00
1.00
112.00
14.57
0.20
0.29
1,199.30
5,325.87
722.35
15,983.29
482.20
699.19
64,762.20
5,325.87
80,903.20
644.38
644.38
26.00
128.88
186.87
31,181.80
15.00
10,835.25
300.00
1.00
3.00
5.00
3,897.00
6,148.77
12,170.82
14,715.54
1,800.79
425.36
1,836.81
17,324.80
822.38
1,567.79
27.00
61.00
20,732.16
20,365.59
517.05
1,155.34
40.00
76.00
1,825.79
1,825.79
4,097.16
365.16
529.48
0.14
745.62
40DA003
ML
PZA
PZA
PZA
93DB104 HIPOCLORADOR
PZA
12.99
6,148.77
4,056.94
2,943.11
1.00
3525.27
Costo Modulo
3,525.27
300,187.83
01AB002
02AC001
03BA010
03CA003
40DA003
40DA004
40DA035
40DA036
40DA037
40DA038
40IA001
40JA001
41BC025
42BC008
93BC1007
93BC15000
93CB616
93FB395
93GB309
93GD034
ML
M3
M3
M3
ML
ML
ML
ML
ML
ML
ML
ML
PZA
CAMARA DE LLAVES
PZA
GLB
PASO DE QUEBRADA DE 50 M
PASO DE QUEBRADA TIPO I
CONEX. DOM. C/MEDIDOR (INCL. EXC. Y RELL)
POZO DE INFILTRACION 1 M3 (SEG. DISE?O)
HORMIGON CICLOPEO PARA ANCLAJES
GLB
GLB
PZA
PZA
M3
12862.00
6413.30
2309.30
4104.00
3122.00
926.00
2200.00
270.00
3764.00
2580.00
12862.00
12862.00
34.00
8.00
1.00
1.00
1.00
34.00
34.00
0.45
1.02
40.73
35.67
25.21
12.99
19.15
18.94
26.66
35.15
53.91
0.20
0.29
709.55
787.24
5,325.87
29,227.57
38571.72
1185.07
328.76
916.29
13,119.24
261,213.71
82,372.73
103,461.84
40,554.78
17,732.90
41,668.00
7,198.20
132,304.60
139,087.80
2,572.40
3,729.98
24,124.70
6,297.92
5,325.87
29,227.57
38,571.72
40,292.38
11,177.84
412.33
GLB
GLB
ML
23,659.53
31,811.46
212.86
Costo Modulo
1.00
1.00
23.00
###
23,659.53
31,811.46
4,895.78
MSCZ0024 ADUCCION
01AB002 REPLANTEO Y CONTROL DE TUBERIAS
02AC001
03BA010
03CA003
40DA038
40IA001
40JA001
42BC008
93GB263
93GD034
ML
M3
M3
M3
ML
ML
ML
CAMARA DE LLAVES
PZA
ACCESORIOS DE ADUCCION
GLB
M3
280.00
1.02
168.00
40.73
58.80
35.67
109.20
25.21
280.00
53.91
280.00
0.2
0.29
280.00
787.24
2.00
5913.49
1.00
0.80
916.29
Costo Modulo
285.60
6,842.64
2,097.40
2,752.93
15,094.80
56.00
81.20
1,574.48
5,913.49
733.03
35,431.57
100.00
15.70
1.20
14.00
0.60
95.00
11.20
Costo
4.73
40.73
42.87
916.29
3283.24
350.49
408.98
Modulo
473.00
639.46
51.44
12,828.06
1,969.94
33,296.55
4,580.58
53,839.03
1.00
7503.94
15.00
341.91
15.00
414.55
1.00
270.08
1.00
1507.83
1.00
87043.54
Costo Modulo
7,503.94
5,128.65
6,218.25
270.08
1,507.83
87,043.54
107,672.29
01AD001
02AC001
03CB002
93AB422
93BC10003
93CA049
93FB163
ML
M3
M3
M3
COLUMNAS DE HO AO (S/D)
M3
ML
M2
0.74
3.42
29.94
146.79
1.12
323.37
93BC816
93GB055
93GB056
93GB186
96BB0119
96GF70064
GLB
HR
HR
GLB
GLB
GLB
01AC001
02AC001
06BA011
06BA014
31BD003
M2
M3
M3
M3
ESCALERA METALICA
ML
81.00
67.00
13.45
16.12
5.50
23.51
40.73
4451.53
4733.48
288.72
1,904.31
2,728.91
59,873.08
76,303.70
1,587.96
93AB407
93AD562
93BC677
93DB104
93DB105
93DB134
93GB012
93GB013
93GB025
93GB20001
96EC258
96FC015
PZA
M3
ACCESORIOS DE TANQUE
GLB
HIPOCLORADOR
PZA
M3
ZAMPEADO DE PIEDRA
M2
GLB
M3
PINTURA LATEX
M2
M2
M2
REVOQUE EXTERIOR
M2
2.00
7.00
1.00
1.00
10.78
70.56
1.00
100.00
65.60
152.88
152.88
65.60
342.53
42.87
6339.97
3525.27
4265.61
80.62
1606.61
13.98
30.93
93.41
69.91
58.16
685.06
300.09
6,339.97
3,525.27
45,983.28
5,688.55
1,606.61
1,398.00
2,029.01
14,280.52
10,687.84
3,815.30
1.03
83.04
0.78
67.18
10.85
2077.88
11954.64
5.00
5.10
102.00
5498.82
434.00
434.00
86.8
125.86
0.20
183.258
GLB
MSCZ181
01AB001
02AC001
03BA010
03CA003
40DA038
40FA008
40IA001
40JA001
42BC008
93BC961
93GD034
ML
M3
M3
M3
ML
ML
ML
MSCZ645
ACTIVIDADES PRELIMINARES
01FA003
93GB187
93GC013
93GD047
INSTALACION DE FAENAS
ML
CAMARA DE LLAVES
PZA
ACCESORIOS IMPULSION
GLB
M3
GLB
PZA
MOVILIZACION Y DESMOVILIZACION
GLB
LETRERO DE OBRAS
PZA
11,954.64
Costo Modulo
238,737.46
840.00
504.00
176.40
327.60
720.00
120.00
411.00
411.00
2.00
1.00
0.60
Costo
1.02
40.73
35.67
25.21
53.91
212.86
0.2
0.29
787.24
4967.23
916.29
Modulo
856.80
20,527.92
6,292.19
8,258.80
38,815.20
25,543.20
82.20
119.19
1,574.48
4,967.23
549.77
107,586.98
1.00
1.00
1.00
2.00
Costo
4604.26
631.05
3735.54
1088.79
Modulo
4,604.26
631.05
3,735.54
2,177.58
11,148.43
MSCZ645
40FA008
ML
Costo Total
###
212.86
0.00
23.00
Plazo
Fecha inicio
Conclusion
180
11/18/2015
5/16/2016
CONTRATO MODIFICATORIO
DECREMENTOS
CANT.
-155.75
-90.39
-55.62
-945.50
-760.14
-149.94
CANTIDAD
P. PARCIAL
Bs.
PRECIO
TOTAL Bs.
800.00
1.00
4.00
10.00
15.00
1.00
3.00
Costo Modulo
856.00
1,479.86
470.68
3,525.70
3,448.20
2,194.61
736.17
12,711.22
2.10
3.00
1.00
1.00
-4,793.99
204.25
-8,418.92
266.11
1.00
Costo Modulo
281.46
866.16
6,339.97
1,602.86
6,286.82
24,785.49
276.18
40,438.94
-56.73
-38,510.22
-27,114.31
-3,779.99
2,355.38
501.10
180.15
356.37
3,074.53
2,402.49
20,409.80
6,425.84
8,984.09
56,971.04
-751.52
-10,949.65
345.48
3,055.38
3,055.38
80.00
1.00
127.00
5,033.64
611.08
886.06
95,944.00
5,325.87
91,738.45
300.00
3,897.00
1.00
6,148.77
3.00
12,170.82
5.00
14,715.54
1.00
3,525.27
Costo Modulo 335,189.76
-460.50
-16,425.91
-4.00
-35.00
-106.64
-1,230.25
-1.00
-1.00
14,662.79
6,838.66
1,848.80
4,926.38
4,689.79
953.00
2,261.00
266.00
3,769.00
2,656.00
14,687.79
14,687.79
34.00
8.00
1.14
0.00
0.00
34.00
34.00
0.45
14,956.05
278,538.51
65,946.82
124,194.00
60,920.37
18,249.95
42,823.34
7,091.56
132,480.35
143,184.96
2,937.56
4,259.46
24,124.70
6,297.92
6,071.49
0.00
0.00
40,292.38
11,177.84
412.33
1.00
1.00
23.00
Costo Modulo
23,659.53
31,811.46
4,895.78
###
-280.00
-168.00
-58.80
-109.20
-83.00
-60.00
-60.00
-0.02
-40.00
-7.33
-0.28
-39.00
-3.20
-285.60
-6842.64
-2097.396
-2752.932
0.00
0.00
0.00
0.00
197.00
220.00
220.00
2.00
1.00
-14.66064
0.78
Costo Modulo
0.00
0.00
0.00
0.00
10,620.27
44.00
63.80
1,574.48
5,913.49
718.37
18,934.41
-189.20
283.80
669.40
198.23
6,116.24
1,067.05
19,627.44
3,271.84
31,234.00
60.00
16.44
4.62
-6711.82
6.68
-902.89
0.33
-13669.11
56.00
-1308.74
8.00
Costo Modulo
1.00
7,503.94
15.00
5,128.65
15.00
6,218.25
1.00
270.08
1.00
1,507.83
1.00
87,043.54
Costo Modulo 107,672.29
-9.48
-32.14
-222.87
-1309.06
-0.20
-946.70
71.52
34.86
13.45
15.92
6.62
1,681.44
1,419.85
59,873.08
75,357.00
1,911.33
-2.14
-91.74
-0.71
-3028.58
-6.84
-0.80
-638.92
-55.93
2.00
4.86
1.00
1.00
10.07
71.59
1.00
100.78
132.78
146.04
152.08
65.60
685.06
208.35
6,339.97
3,525.27
42,954.69
5,771.59
1,606.61
1,408.85
4,106.89
13,641.60
10,631.91
3,815.30
1.00
11,954.64
Costo Modulo 246,893.43
-356.04
-133.25
-222.80
-97.00
845.00
-14501.51
147.96
-4752.85
43.16
-5616.66
104.81
822.00
-20647.42
23.00
845.00
845.00
2.00
1.00
0.80
Costo Modulo
861.90
6,026.41
1,539.34
2,642.13
44,314.02
4,895.78
169.00
245.05
1,574.48
4,967.23
733.03
67,968.37
1.00
1.00
1.00
2.00
Costo Modulo
4,604.26
631.05
3,735.54
2,177.58
11,148.43
Costo Total
###
23.00
Costo C.M. Total
4,895.78
###
G.A.M.CHARAGUA
ITEM
I
PROVINCIA:
DEPARTAMENTO:
DESCRIPCION
II
ML
PZA
PZA
PZA
PZA
GLB
Limpieza General
CONTENEDORES DE BASURA
PZA
Contenedores de Basura
M2
ESCALERA METALICA
ML
1.05
1.00
3.00
GLB
GLB
10
11
PINTURA LATEX
12
GRAFICO
alto
LIMPIEZA GENERAL
largo
Dimensiones
ancho
Pasos peatonales
SUPERVISOR:
Letrina
PASOS PEATONALES
SANTA CRUZ
Cinta de seguridad
LETRINA
2
CONTRATISTA:
Unid.
CORDILLERA
M2
12
MUROS
9.50
TECHOS
9.50
3.00
9.50
TOTAL
M2
13
MUROS
8.90
3.50
MUROS
4.45
3.50
8.90
PISO
8.90
TOTAL
LIMPIEZA DE TANQUE
14
III
GLB
INTERIOR DE TANQUE
ML
121.61
DE 20 A 23
199.96
DE 21 A 22
199.96
DE 22 A 23
117.90
147.09
DE 28 A 20
159.47
DE 28 A 21
116.17
DE 26 A 27
108.37
15
89.14
DE 31 A 32
113.54
DE 32 A 33
70.38
DE 33 A 34
82.31
DE 33 A 35
132.94
DE 35 A 36
161.46
58.31
DE 38 A 39
81.15
DE 38 A 42
146.67
293.81
51.67
180.00
271.00
528.00
TUBERIA DE
1"
TUBERIA DE 11/2" FG
80.00
15.00
M3
0.45
121.61
1.00
DE 20 A 23
0.45
199.96
1.00
DE 21 A 22
0.45
199.96
1.00
DE 22 A 23
0.45
117.90
1.00
DE 29 A 28
0.45
147.09
1.00
DE 28 A 20
0.45
159.47
1.00
DE 28 A 21
0.45
116.17
1.00
DE 26 A 27
0.45
108.37
1.00
0.45
89.14
1.00
DE 31 A 32
0.45
113.54
1.00
DE 32 A 33
0.45
70.38
1.00
DE 33 A 34
0.45
82.31
1.00
DE 33 A 35
0.45
132.94
1.00
DE 35 A 36
0.45
161.46
1.00
DE 37 A 38
0.45
58.31
1.00
DE 38 A 39
0.45
81.15
1.00
DE 38 A 42
0.45
146.67
1.00
DE 39 A 40
0.45
293.81
1.00
DE 39 A 41
0.45
51.67
1.00
Calles Nuevas
0.45
180.00
0.70
0.45
271.00
0.70
0.45
528.00
0.70
TUBERIA DE
1"
TUBERIA DE 11/2" FG
0.45
80.00
0.70
0.45
15.00
0.70
DE 20 A 21
0.45
121.61
0.35
DE 20 A 23
0.45
199.96
0.35
DE 21 A 22
0.45
199.96
0.35
DE 22 A 23
0.45
117.90
0.35
DE 29 A 28
0.45
147.09
0.35
DE 28 A 20
0.45
159.47
0.35
DE 28 A 21
0.45
116.17
0.35
DE 26 A 27
0.45
108.37
0.35
0.45
89.14
0.35
DE 31 A 32
0.45
113.54
0.35
DE 32 A 33
0.45
70.38
0.35
DE 33 A 34
0.45
82.31
0.35
16
Total
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATE M3
PARA CAMBIO DE TUBERIA 2" C-9 BARRIO EL CARMEN
17
17
DE 33 A 35
0.45
132.94
0.35
DE 35 A 36
0.45
161.46
0.35
649.77
0.00
0.45
58.31
0.35
DE 38 A 39
0.45
81.15
0.35
DE 38 A 42
0.45
146.67
0.35
286.13
0.00
0.45
293.81
0.35
DE 39 A 41
0.45
51.67
0.35
345.48
0.00
300.00
0.20
300.00
0.00
271.00
0.20
271.00
0.00
528.00
0.20
528.00
0.00
80.00
0.20
80.00
0.00
0.45
0.45
0.45
0.45
Total
RELLENO Y COMPACTADO (TIERRA COMUN)
M3
0.45
121.61
0.65
DE 20 A 23
0.45
199.96
0.65
DE 21 A 22
0.45
199.96
0.65
DE 22 A 23
0.45
117.90
0.65
DE 29 A 28
0.45
147.09
0.65
DE 28 A 20
0.45
159.47
0.65
DE 28 A 21
0.45
116.17
0.65
DE 26 A 27
0.45
108.37
0.65
0.45
89.14
0.65
DE 31 A 32
0.45
113.54
0.65
DE 32 A 33
0.45
70.38
0.65
DE 33 A 34
0.45
82.31
0.65
DE 33 A 35
0.45
132.94
0.65
DE 35 A 36
0.45
161.46
0.65
DE 37 A 38
0.45
58.31
0.65
DE 38 A 39
0.45
81.15
0.65
DE 38 A 42
0.45
146.67
0.65
DE 39 A 40
0.45
293.81
0.65
DE 39 A 41
0.45
51.67
0.65
0.45
300.00
0.50
18
Calles nuevas
0.45
271.00
0.50
0.45
528.00
0.50
TUBERIA DE
1"
TUBERIA DE 11/2" FG
0.45
80.00
0.50
0.45
15.00
0.70
15.00
0.00
Total
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
PARA CAMBIO DE TUBERIA 2" C-9 BARRIO EXT. BARRIO
COTOCA
DE 30 A 31
19
ML
89.14
DE 31 A 32
113.54
DE 32 A 33
70.38
DE 33 A 34
82.31
DE 33 A 35
132.94
DE 35 A 36
161.46
58.31
DE 38 A 39
81.15
DE 38 A 42
146.67
2,138.63
Total
20
DE 39 A 40
293.81
DE 39 A 41
51.67
608.00
TUBERIA DE 11/2"
700.00
Total
ITEMS NUEVOS EN EL MODULO
PROV. Y TENDIDO TUBERIA PVC 1 PULG - ESQ.40 ( ML
180.00
120.00
ML
121.61
DE 20 A 23
199.96
DE 21 A 22
199.96
DE 22 A 23
117.90
147.09
DE 28 A 20
159.47
DE 28 A 21
116.17
DE 26 A 27
108.37
21
DE 30 A 31
89.14
DE 31 A 32
113.54
DE 32 A 33
70.38
DE 33 A 34
82.31
DE 33 A 35
132.94
DE 35 A 36
161.46
58.31
DE 38 A 39
81.15
DE 38 A 42
146.67
293.81
DE 39 A 41
51.67
180.00
271.00
528.00
TUBERIA DE
1"
TUBERIA DE 11/2" FG
80.00
15.00
TUBERIA DE 11/2"
700.00
Total
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG ) ML
PARA CAMBIO DE TUBERIA 2" C-9 BARRIO EL CARMEN
DE 20 A 21
121.61
DE 20 A 23
199.96
DE 21 A 22
199.96
DE 22 A 23
117.90
147.09
DE 28 A 20
159.47
DE 28 A 21
116.17
DE 26 A 27
108.37
22
89.14
DE 31 A 32
113.54
DE 32 A 33
70.38
DE 33 A 34
82.31
DE 33 A 35
132.94
DE 35 A 36
161.46
58.31
DE 38 A 39
81.15
DE 38 A 42
146.67
293.81
DE 39 A 41
51.67
180.00
271.00
528.00
TUBERIA DE
1"
TUBERIA DE 11/2" FG
80.00
15.00
700.00
Total
PZA
23
14.00
27.00
BARRIO CUPESI
14.00
BARRIO 1 DE MAYO
39.00
Total
ACCESORIOS DE RED SEGUN DISE?O
GLB
PZA
24
25
CENTRO URBANO
MEDIDORES 1 DE MAYO LAD0 2
IV
MODULO:RED DE DISTRIBUCION
ML
23.00
2,579.00
688.00
1,053.00
953.00
26
77.00
1,470.50
35.00
1,348.50
50.00
222.00
266.00
1,208.00
550.00
2,500.00
251.92
463.33
924.54
Total
M3
27
0.45
77.00
1.20
0.45
23.00
1.20
0.45
2,579.00
1.20
0.45
688.00
1.20
0.45
1,053.00
1.20
0.45
953.00
1.20
0.45
1,470.50
1.20
0.45
75.00
0.00
0.45
1,348.50
1.20
0.45
75.00
1.20
0.45
222.00
1.20
0.45
266.00
1.20
0.45
1,208.00
0.80
0.45
550.00
0.80
0.45
200.00
1.00
0.45
2,300.00
0.80
0.45
251.92
1.00
0.45
463.33
0.80
0.45
924.54
0.80
0.45
77.00
0.35
0.45
23.00
0.35
0.45
2,579.00
0.35
0.45
688.00
0.35
0.45
1,053.00
0.35
0.45
953.00
0.35
0.45
1,470.50
0.35
0.45
75.00
0.35
0.45
1,348.50
0.35
0.45
75.00
0.35
0.45
222.00
0.35
0.45
266.00
0.35
0.45
1,208.00
0.20
0.45
550.00
0.20
0.45
2,500.00
0.20
0.45
251.92
0.20
0.45
463.33
0.20
0.45
Total
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATE M3
28
924.54
0.20
2,579.00
0.01
3,729.00
0.00
266.00
0.00
2,261.00
0.00
953.00
0.00
4,689.79
0.00
Total
RELLENO Y COMPACTADO (TIERRA COMUN)
M3
0.45
77.00
0.85
0.45
23.00
0.85
0.45
2,579.00
0.85
29
0.45
688.00
0.85
0.45
1,053.00
0.85
0.45
953.00
0.85
0.45
1,470.50
0.85
0.45
75.00
0.85
0.45
1,348.50
0.85
0.45
75.00
0.85
0.45
222.00
0.85
0.45
266.00
0.85
0.45
1,208.00
0.60
0.45
550.00
0.60
0.45
2,500.00
0.60
0.45
251.92
0.80
0.45
463.33
0.60
0.45
924.54
0.60
Total
PROV. Y TENDIDO TUBERIA PVC 1 PULG - ESQ.40 ( ML
PROG. 4+600 A 5+150 (PVC 1" ESQ. 40 RED GUISUIGUA)
550.00
30
2,500.00
251.92
463.33
924.54
Total
PROV. Y TENDIDO TUBERIA PVC 1 1/2 PULG -ESQ.4 ML
31
953.00
Total
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9
32
ML
1,053.00
1,208.00
Total
PROV. Y TENDIDO TUBERIA PVC 2 1/2 PULG - CLASEML
33
266.00
ML
688.00
1,470.50
1,348.50
222.00
Total
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9
35
ML
77.00
2,579.00
Total
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
ML
77.00
23.00
2,579.00
688.00
1,053.00
953.00
1,430.50
36
75.00
1,348.50
75.00
222.00
266.00
1,208.00
550.00
2,500.00
251.92
463.33
924.54
Total
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG ) ML
PROG. 0+000 A 0+077 (INICIO T. ALM. 100 M3 PVC 4"C-9 )
77.00
23.00
2,579.00
688.00
1,053.00
953.00
1,430.50
37
75.00
1,348.50
75.00
222.00
266.00
1,208.00
550.00
2,500.00
251.92
463.33
924.54
Total
PEDESTAL Y BASE PARA PILETA H?A?
38
PZA
38
Red Nueva
CAMARA DE LLAVES
PZA
GLB
PASO DE QUEBRADA DE 50 M
GLB
39
40
41
GLB
Red Nueva
PZA
PZA
Red Nueva
M3
MODULO: ADUCCION
REPLANTEO Y CONTROL DE TUBERIAS
46
ML
220.00
M3
0.45
220.00
1.00
0.25
0.45
220.00
0.75
ML
220.00
-23.00
TUBERIA DE A.G. 4
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
51
220.00
M3
0.45
ML
220.00
220.00
PZA
CAMARA DE LLAVES
53
ACCESORIOS DE ADUCCION
GLB
M3
54
0.40
55
VI
0.70
56
M3
0.40
0.50
0.50
0.60
2.50
0.25
0.15
6.80
6.80
0.25
6.80
6.80
0.10
0.50
0.50
0.60
2.50
0.25
0.15
15.00
0.15
0.20
0.25
0.25
2.60
Total
RELLENO COMPACTADO MANUAL-NO INCLUYE MATEM3
58
CIMIENTO DE H.C. 1:3:4 60% PIEDRA (CERCO P.)
M3
59
Total
COLUMNAS DE HO AO (S/D)
60
M3
61
PERIMETRO ENMALLADO
15.00
DESCUENTO DE PORTON
4.00
Total
PUERTA DE MALLA OLIMPICA PARA CERCO PERIME M2
4.00
62
MOVILIZACION DE EQUIPO
LIMPIEZA DE POZO
15.00
HR
Pozo
HR
GLB
Pozo
Pozo
Pozo
2.00
M2
8.20
8.20
CAMARAS
0.80
3.10
CASETA DE HIPOCLORADOR
1.20
1.50
EXCAVACION DE TANQUE
8.20
8.20
0.50
EXCAVACION DE CAMARAS
3.10
0.80
0.50
8.20
8.20
0.20
MURO
0.20
8.20
2.00
MURO
0.20
7.80
2.00
Total
M3
Total
HORMIGON ARMADO LOSA DE FONDO 1:2:3 (H2O) M3
71
LOSA DE TANQUE
Total
ML
ESCALERA METALICA
73
ESCALERA EXTERIOR
4.22
ESCALERA INTERIOR
2.40
PZA
0.70
0.70
0.30
32.40
0.50
8.20
8.20
0.15
TAPA METALICA
0.70
0.70
0.15
3.10
0.80
0.05
TANQUE
8.20
8.20
CAMARAS
3.10
0.90
1.30
1.20
74
M3
ACCESORIOS DE TANQUE
GLB
HIPOCLORADOR
PZA
76
77
Total
M2
ZAMPEADO DE PIEDRA
79
CASETA DE HIPOCLORADOR
Total
MEDIDOR DE NIVELES TANQUES DE H20
80
MEDIDOR DE NIVELES
GLB
80
3.80
LOSA TAPA
8.40
8.40
PAREDES EXTERIORES
8.20
TAPAS METALICAS
0.70
81
M2
PINTURA LATEX
82
1.70
CASETA HIPOCLORADOR
2.00
0.70
2.00
1.20
Total
IMPERMEABILIZACION DE TANQUE C/SIKA TOP
83
M2
PISO DE TANQUE
8.20
MUROS DE TANQUE
3.80
2.00
MUROS DE TANQUE
8.20
2.00
7.80
2.00
8.20
Total
REVOQUE CON SIKA IMPERMEABILIZANTE (TANQU M2
84
PISO DE TANQUE
7.80
MUROS DE TANQUE
3.80
3.80
2.00
MUROS DE TANQUE
7.80
2.00
Total
M2
REVOQUE EXTERIOR
85
IX
8.20
86
2.00
ML
120.00
625.00
23.00
77.00
Total
M3
87
0.15
120.00
1.20
0.15
625.00
1.20
0.15
23.00
0.00
0.15
77.00
1.20
Total
88
0.15
120.00
0.35
0.15
625.00
0.35
0.15
23.00
0.00
0.15
77.00
0.35
0.15
120.00
0.85
0.15
625.00
0.85
0.15
23.00
0.00
0.15
77.00
0.85
Total
M3
89
Total
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9
90
ML
625.00
77.00
120.00
Total
PROV. Y TENDIDO DE TUBERIA F.G. D=4 PULG
91
ML
120.00
23.00
Total
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
92
ML
120.00
625.00
23.00
77.00
Total
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG ) ML
93
120.00
625.00
23.00
77.00
Total
PZA
CAMARA DE LLAVES
94
SALIDA POZO
LLEGADA POZO
Total
GLB
ACCESORIOS IMPULSION
95
IMPULSION
M3
0.40
0.40
0.50
EN ACSESORIOS
0.40
0.40
0.50
Total
X
97
GLB
97
PZA
MOVILIZACION Y DESMOVILIZACION
GLB
LETRERO DE OBRAS
PZA
98
99
100
PROV.
Y TENDIDO
DE DISTRIBUCION
TUBERIA F.G. D=4 PULG_x000D_
MLPZ5002
RED DE
_x000D_
_x000D_
PROG. 0+077 A 0+100 (TUB. FG 23 M)
23.00
NCE ECONOMICO
TABLE CHARAGUA(CHARAGUA)
CONTRATISTA:
EVISUR S.R.L.
SUPERVISOR:
Volumenes
GRAFICO
N Veces Parcial
800.00
Total
800.00
800.00
1.00
1.00
1.00
4.00
4.00
4.00
10.00
1.00
10.00
15.00
1.00
15.00
1.00
1.00
1.00
3.00
1.00
3.00
2.00
1.00
1.05
2.10
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
28.50
114.00
1.00
90.25
90.25
204.25
4.00
31.15
124.60
4.00
15.58
62.30
1.00
79.21
79.21
266.11
1.00
1.00
1.00
1.00
121.61
0.00
1.00
199.96
0.00
1.00
199.96
0.00
1.00
117.90
0.00
1.00
147.09
0.00
1.00
159.47
0.00
1.00
116.17
0.00
1.00
108.37
0.00
1.00
89.14
89.14
1.00
113.54
113.54
1.00
70.38
70.38
1.00
82.31
82.31
1.00
132.94
132.94
1.00
161.46
161.46
1.00
58.31
58.31
1.00
81.15
81.15
1.00
146.67
146.67
1.00
293.81
293.81
1.00
51.67
51.67
1.00
180.00
180.00
1.00
271.00
271.00
1.00
528.00
528.00
1.00
80.00
80.00
1.00
15.00
15.00
2,355.38
0.00
54.72
0.00
0.00
89.98
0.00
0.00
89.98
0.00
0.00
53.06
0.00
0.00
66.19
0.00
0.00
71.76
0.00
0.00
52.28
0.00
0.00
48.77
0.00
1.00
40.11
40.11
1.00
51.09
51.09
1.00
31.67
31.67
1.00
37.04
37.04
1.00
59.82
59.82
1.00
72.66
72.66
1.00
26.24
26.24
1.00
36.52
36.52
1.00
66.00
66.00
0.00
132.21
0.00
1.00
23.25
23.25
1.00
56.70
56.70
0.00
85.37
0.00
0.00
166.32
0.00
0.00
25.20
0.00
0.00
4.73
0.00
501.10
0.00
19.15
0.00
0.00
31.49
0.00
0.00
31.49
0.00
0.00
18.57
0.00
0.00
23.17
0.00
0.00
25.12
0.00
0.00
18.30
0.00
0.00
17.07
0.00
1.00
14.04
14.04
1.00
17.88
17.88
1.00
11.08
11.08
1.00
12.96
12.96
1.00
20.94
20.94
1.00
25.43
25.43
1.00
1.28
-1.28
1.00
9.18
9.18
1.00
12.78
12.78
1.00
23.10
23.10
1.00
0.56
-0.56
0.00
46.28
0.00
1.00
8.14
8.14
1.00
0.39
-0.39
1.00
27.00
27.00
1.00
0.15
-0.15
0.00
24.39
0.00
0.00
0.53
0.00
0.00
47.52
0.00
0.00
0.60
0.00
0.00
7.20
0.00
0.00
0.04
0.00
180.15
0.00
35.57
0.00
0.00
58.49
0.00
0.00
58.49
0.00
0.00
34.49
0.00
0.00
43.02
0.00
0.00
46.64
0.00
0.00
33.98
0.00
0.00
31.70
0.00
1.00
26.07
26.07
1.00
33.21
33.21
1.00
20.59
20.59
1.00
24.08
24.08
1.00
38.88
38.88
1.00
47.23
47.23
1.00
17.06
17.06
1.00
23.74
23.74
1.00
42.90
42.90
0.00
85.94
0.00
1.00
15.11
15.11
1.00
67.50
67.50
0.00
60.98
0.00
0.00
118.80
0.00
0.00
18.00
0.00
0.00
4.73
0.00
0.00
0.02
0.00
356.37
1.00
89.14
89.14
1.00
113.54
113.54
1.00
70.38
70.38
1.00
82.31
82.31
1.00
132.94
132.94
1.00
161.46
161.46
1.00
58.31
58.31
1.00
81.15
81.15
1.00
146.67
146.67
1.00
2,138.63
2,138.63
3,074.53
1.00
293.81
293.81
1.00
51.67
51.67
0.00
608.00
0.00
0.00
700.00
0.00
345.48
1.00
180.00
180.00
1.00
120.00
120.00
300.00
0.00
121.61
0.00
0.00
199.96
0.00
0.00
199.96
0.00
0.00
117.90
0.00
0.00
147.09
0.00
0.00
159.47
0.00
0.00
116.17
0.00
0.00
108.37
0.00
1.00
89.14
89.14
1.00
113.54
113.54
1.00
70.38
70.38
1.00
82.31
82.31
1.00
132.94
132.94
1.00
161.46
161.46
1.00
58.31
58.31
1.00
81.15
81.15
1.00
146.67
146.67
1.00
293.81
293.81
1.00
51.67
51.67
1.00
180.00
180.00
1.00
271.00
271.00
1.00
528.00
528.00
1.00
80.00
80.00
1.00
15.00
15.00
1.00
700.00
700.00
3,055.38
4,225.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
89.14
89.14
1.00
113.54
113.54
1.00
70.38
70.38
1.00
82.31
82.31
1.00
132.94
132.94
1.00
161.46
161.46
1.00
58.31
58.31
1.00
81.15
81.15
1.00
146.67
146.67
1.00
293.81
293.81
1.00
51.67
51.67
1.00
180.00
180.00
1.00
271.00
271.00
1.00
528.00
528.00
1.00
80.00
80.00
1.00
15.00
15.00
1.00
700.00
700.00
3,055.38
0.00
14.00
0.00
1.00
27.00
27.00
1.00
14.00
14.00
1.00
39.00
39.00
80.00
1.00
1.00
1.00
1.00
112.00
112.00
1.00
15.00
15.00
127.00
1.00
77.00
1.00
23.00
23.00
1.00
2,579.00
2,579.00
77.00
1.00
688.00
688.00
1.00
1,053.00
1,053.00
1.00
953.00
953.00
1.00
1,470.50
1,470.50
1.00
35.00
35.00
1.00
1,348.50
1,348.50
1.00
50.00
50.00
1.00
222.00
222.00
1.00
266.00
266.00
1.00
1,208.00
1,208.00
1.00
550.00
550.00
1.00
2,500.00
2,500.00
1.00
251.92
251.92
1.00
463.33
463.33
1.00
924.54
924.54
14,662.79
1.00
41.58
41.58
0.00
0.00
1.00
1,392.66
1,392.66
1.00
371.52
371.52
1.00
568.62
568.62
1.00
514.62
514.62
1.00
794.07
794.07
0.00
0.00
0.00
1.00
728.19
728.19
0.00
0.00
0.00
1.00
119.88
119.88
1.00
143.64
143.64
1.00
434.88
434.88
1.00
198.00
198.00
1.00
90.00
90.00
1.00
828.00
828.00
1.00
113.36
113.36
1.00
166.80
166.80
1.00
332.83
332.83
6,838.66
1.00
12.13
12.13
0.00
0.00
0.00
1.00
406.19
406.19
1.00
108.36
108.36
1.00
165.85
165.85
1.00
150.10
150.10
1.00
231.60
231.60
0.00
0.00
0.00
1.00
212.39
212.39
0.00
0.00
0.00
1.00
34.97
34.97
1.00
41.90
41.90
1.00
108.72
108.72
1.00
49.50
49.50
1.00
225.00
225.00
1.00
22.67
22.67
1.00
41.70
41.70
1.00
83.21
83.21
1.00
20.26
-20.26
1.00
16.47
-16.47
1.00
0.84
-0.84
1.00
4.44
-4.44
1.00
1.09
-1.09
1.00
2.38
-2.38
1,848.80
1.00
29.45
29.45
0.00
0.00
0.00
1.00
986.47
986.47
1.00
263.16
263.16
1.00
402.77
402.77
1.00
364.52
364.52
1.00
562.47
562.47
0.00
0.00
0.00
1.00
515.80
515.80
0.00
0.00
0.00
1.00
84.92
84.92
1.00
101.75
101.75
1.00
326.16
326.16
1.00
148.50
148.50
1.00
675.00
675.00
1.00
90.69
90.69
1.00
125.10
125.10
1.00
249.63
249.63
4,926.38
1.00
550.00
550.00
1.00
2,500.00
2,500.00
1.00
251.92
251.92
1.00
463.33
463.33
1.00
924.54
924.54
4,689.79
1.00
953.00
953.00
953.00
1.00
1,053.00
1,053.00
1.00
1,208.00
1,208.00
2,261.00
1.00
266.00
266.00
1.00
688.00
688.00
1.00
1,470.50
1,470.50
1.00
1,348.50
1,348.50
1.00
222.00
222.00
3,729.00
1.00
77.00
77.00
1.00
2,579.00
2,579.00
2,656.00
1.00
77.00
77.00
1.00
23.00
23.00
1.00
2,579.00
2,579.00
1.00
688.00
688.00
1.00
1,053.00
1,053.00
1.00
953.00
953.00
1.00
1,430.50
1,430.50
1.00
75.00
75.00
1.00
1,348.50
1,348.50
1.00
75.00
75.00
1.00
222.00
222.00
1.00
266.00
266.00
1.00
1,208.00
1,208.00
1.00
550.00
550.00
1.00
2,500.00
2,500.00
1.00
251.92
251.92
1.00
463.33
463.33
1.00
924.54
924.54
14,687.79
1.00
77.00
77.00
1.00
23.00
23.00
1.00
2,579.00
2,579.00
1.00
688.00
688.00
1.00
1,053.00
1,053.00
1.00
953.00
953.00
1.00
1,430.50
1,430.50
1.00
75.00
75.00
1.00
1,348.50
1,348.50
1.00
75.00
75.00
1.00
222.00
222.00
1.00
266.00
266.00
1.00
1,208.00
1,208.00
1.00
550.00
550.00
1.00
2,500.00
2,500.00
1.00
251.92
251.92
1.00
463.33
463.33
1.00
924.54
924.54
14,687.79
34.00
1.00
34.00
2.00
1.00
2.00
1.00
1.14
1.14
1.00
1.00
1.00
1.00
1.00
1.00
34.00
1.00
34.00
34.00
1.00
34.00
1.00
0.45
0.45
0.00
220.00
0.00
0.00
99.00
0.00
0.00
24.75
0.00
0.00
74.25
0.00
1.00
220.00
220.00
1.00
-23.00
-23.00
197.00
1.00
220.00
220.00
1.00
220.00
220.00
2.00
1.00
2.00
1.00
1.00
1.00
7.00
0.11
0.78
4.00
60.00
60.00
20.00
0.15
3.00
20.00
0.09
1.88
1.00
11.56
11.56
16.44
1.00
4.62
4.62
20.00
0.15
3.00
20.00
0.09
1.88
4.00
0.45
1.80
6.68
2.00
0.16
0.33
4.00
60.00
60.00
-1.00
-4.00
-4.00
56.00
1.00
8.00
8.00
1.00
1.00
1.00
1.00
1.00
15.00
15.00
1.00
15.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
67.24
67.24
1.00
2.48
2.48
1.00
1.80
1.80
71.52
1.00
33.62
1.00
1.24
33.62
1.24
34.86
1.00
13.45
13.45
2.00
3.28
6.56
3.00
3.12
9.36
15.92
1.00
4.22
4.22
1.00
2.40
2.40
6.62
2.00
1.00
2.00
1.00
4.86
4.86
1.00
1.00
1.00
1.00
1.00
1.00
1.00
10.09
10.09
2.00
-0.07
-0.14
1.00
0.12
0.12
10.07
1.00
67.24
67.24
1.00
2.79
2.79
1.00
1.56
1.56
71.59
1.00
1.00
1.00
2.00
100.78
100.78
1.00
70.56
70.56
4.00
16.40
65.60
-2.00
0.49
-0.98
-1.00
2.40
-2.40
132.78
1.00
67.24
67.24
4.00
7.60
30.40
2.00
16.40
32.80
1.00
15.60
15.60
146.04
2.00
29.64
59.28
4.00
7.60
30.40
4.00
15.60
62.40
152.08
4.00
16.40
65.60
1.00
120.00
120.00
1.00
625.00
625.00
1.00
23.00
23.00
1.00
77.00
77.00
845.00
1.00
21.60
21.60
1.00
112.50
112.50
1.00
0.00
0.00
1.00
13.86
13.86
147.96
1.00
6.30
6.30
1.00
32.81
32.81
1.00
0.00
0.00
1.00
4.04
4.04
43.16
1.00
15.30
15.30
1.00
79.69
79.69
1.00
0.00
0.00
1.00
9.82
9.82
104.81
1.00
625.00
625.00
1.00
77.00
77.00
1.00
120.00
120.00
822.00
0.00
120.00
1.00
23.00
0.00
23.00
23.00
1.00
120.00
120.00
1.00
625.00
625.00
1.00
23.00
23.00
1.00
77.00
77.00
845.00
1.00
120.00
120.00
1.00
625.00
625.00
1.00
23.00
23.00
1.00
77.00
77.00
845.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
4.00
0.32
0.32
6.00
0.48
0.48
0.80
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
2.00
1.00
23.00
23.00
MEJORAMIENTO DE TANQUE
DESCRIPCION
PINTURA LATEX
UNIDCANTIDAD
DESCRIPCION
REPLANTEO Y CONTROL DE TUBERIAS
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
DESCRIPCION
RELLENO Y COMPACTADO (TIERRA COMUN)
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
DESCRIPCION
PROV.Y TENDIDO TUBERIA PVC 1 1/2PULG-CLASE 9(JU
DESCRIPCION
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESCRIPCION
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
DESCRIPCION
CONEX. DOM. C/MEDIDOR (INCL. EXC. Y RELL)
DECREMEN.
CANT.
CANT.
360.00
CANTIDAD
C.M.
-155.75
DECREMEN.
CANT.
-90.39
204.25
CANTIDAD
C.M.
DECREMEN.
CANT.
-55.62
DECREMEN.
CANT.
-945.50
DECREMEN.
CANT.
-760.14
DECREMEN.
CANT.
-149.94
DECREMEN.
CANT.
CANTIDAD
C.M.
2,355.38
CANTIDAD
C.M.
501.10
CANTIDAD
C.M.
180.15
CANTIDAD
C.M.
356.37
1,760.53
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
ML
1097.00
-751.52
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
ML
2411.00
644.38
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
ML
2411.00
644.38
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
PZA
54.00
26.00
3,074.53
CANTIDAD
C.M.
M2
DESCRIPCION
INCREMEN.
INCREMEN.
UNIDCANTIDAD
CANT.
356.50
M2
UNIDCANTIDAD
ML
2411.00
UNIDCANTIDAD
M3
INCREMEN.
CANT.
506.31
UNIDCANTIDAD
ML
INCREMEN.
CANT.
940.29
UNIDCANTIDAD
M3
INCREMEN.
CANT.
1446.60
UNIDCANTIDAD
M3
INCREMEN.
CANT.
1314.00
INCREMEN.
CANT.
266.11
CANTIDAD
C.M.
345.48
CANTIDAD
C.M.
3,055.38
CANTIDAD
C.M.
3,055.38
CANTIDAD
C.M.
80.00
DESCRIPCION
PROV Y COLOC MEDIDOR DE AGUA
INCREMEN. DECREMEN.
CANT.
CANT.
112.00
15.00
UNIDCANTIDAD
PZA
CANTIDAD
C.M.
127.00
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 1 PULG - ESQ.40 (ESPIG
DESCRIPCION
CAMARA DE CORTE 4"
UNIDCANTIDAD
ML
UNIDCANTIDAD
PZA
DESCRIPCION
CAMARA DE CORTE 3"
UNIDCANTIDAD
PZA
DESCRIPCION
CAMARA DE CORTE 2"
UNIDCANTIDAD
PZA
DESCRIPCION
HIPOCLORADOR
UNIDCANTIDAD
PZA
INCREMEN.
CANT.
300.00
INCREMEN.
CANT.
1.00
INCREMEN.
CANT.
3.00
INCREMEN.
CANT.
5.00
INCREMEN.
CANT.
1.00
DECREMEN.
CANT.
CANTIDAD
C.M.
300.00
DECREMEN.
CANT.
CANTIDAD
C.M.
1.00
DECREMEN.
CANT.
CANTIDAD
C.M.
3.00
DECREMEN.
CANT.
CANTIDAD
C.M.
5.00
DECREMEN.
CANT.
CANTIDAD
C.M.
1.00
RED DE DISTRIBUCION
DESCRIPCION
REPLANTEO Y CONTROL DE TUBERIAS
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
DESCRIPCION
RELLENO Y COMPACTADO (TIERRA COMUN)
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 1 PULG - ESQ.40 (ESPIG
UNIDCANTIDAD
ML
12862.00
UNIDCANTIDAD
M3
6413.30
UNIDCANTIDAD
M3
2309.30
UNIDCANTIDAD
M3
4104.00
UNIDCANTIDAD
ML
3122.00
INCREMEN. DECREMEN.
CANT.
CANT.
1,800.79
INCREMEN. DECREMEN.
CANT.
CANT.
425.36
INCREMEN. DECREMEN.
CANT.
CANT.
-460.50
INCREMEN. DECREMEN.
CANT.
CANT.
822.38
INCREMEN. DECREMEN.
CANT.
CANT.
1,567.79
CANTIDAD
C.M.
14,662.79
CANTIDAD
C.M.
6,838.66
CANTIDAD
C.M.
1,848.80
CANTIDAD
C.M.
4,926.38
CANTIDAD
C.M.
4,689.79
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 1 1/2 PULG -ESQ.40 (ES
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 2 1/2 PULG - CLASE 9 (
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 3 PULG - CLASE 9 (ESPI
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
DESCRIPCION
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESCRIPCION
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
DESCRIPCION
ACCESORIO RED DE DISTRIBUCION
DESCRIPCION
PASO DE QUEBRADA DE 50 M
DESCRIPCION
PASO DE QUEBRADA TIPO I
ITEMS DE NUEVA CREACION
DESCRIPCION
PASO DE QUEBRADA 35 MTS
DESCRIPCION
UNIDCANTIDAD
ML
926.00
UNIDCANTIDAD
ML
2200.00
UNIDCANTIDAD
ML
270.00
UNIDCANTIDAD
ML
3764.00
UNIDCANTIDAD
ML
2580.00
UNIDCANTIDAD
ML
12862.00
UNIDCANTIDAD
ML
12862.00
UNIDCANTIDAD
GLB
1.00
UNIDCANTIDAD
GLB
1.00
UNIDCANTIDAD
GLB
1.00
INCREMEN. DECREMEN.
CANT.
CANT.
27.00
INCREMEN. DECREMEN.
CANT.
CANT.
61.00
INCREMEN. DECREMEN.
CANT.
CANT.
-4.00
INCREMEN. DECREMEN.
CANT.
CANT.
5.00
INCREMEN. DECREMEN.
CANT.
CANT.
76.00
INCREMEN. DECREMEN.
CANT.
CANT.
1,825.79
INCREMEN. DECREMEN.
CANT.
CANT.
1,825.79
INCREMEN. DECREMEN.
CANT.
CANT.
0.14
INCREMEN. DECREMEN.
CANT.
CANT.
-1.00
INCREMEN. DECREMEN.
CANT.
CANT.
-1.00
INCREMEN. DECREMEN.
CANT.
CANT.
GLB
1.00
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
UNIDCANTIDAD
CANTIDAD
C.M.
953.00
CANTIDAD
C.M.
2,261.00
CANTIDAD
C.M.
266.00
CANTIDAD
C.M.
3,769.00
CANTIDAD
C.M.
2,656.00
CANTIDAD
C.M.
14,687.79
CANTIDAD
C.M.
14,687.79
CANTIDAD
C.M.
1.14
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
1.00
CANTIDAD
C.M.
DESCRIPCION
PROV. Y TENDIDO TUBERIA FG D=4
ADUCCION
DESCRIPCION
REPLANTEO Y CONTROL DE TUBERIAS
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
DESCRIPCION
RELLENO Y COMPACTADO (TIERRA COMUN)
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
DESCRIPCION
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESCRIPCION
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
DESCRIPCION
HORMIGON CICLOPEO PARA ANCLAJES
1.00
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
ML
23.00
GLB
UNIDCANTIDAD
ML
280.00
UNIDCANTIDAD
M3
INCREMEN.
CANT.
58.80
UNIDCANTIDAD
M3
INCREMEN.
CANT.
168.00
UNIDCANTIDAD
M3
INCREMEN.
CANT.
INCREMEN.
CANT.
109.20
INCREMEN.
UNIDCANTIDAD
CANT.
ML
280.00
INCREMEN.
UNIDCANTIDAD
CANT.
ML
280.00
INCREMEN.
UNIDCANTIDAD
CANT.
ML
280.00
INCREMEN.
UNIDCANTIDAD
CANT.
0.80
M3
DECREMEN.
CANT.
-280.00
DECREMEN.
CANT.
-168.00
DECREMEN.
CANT.
-58.80
DECREMEN.
CANT.
-109.20
DECREMEN.
CANT.
-83.00
DECREMEN.
CANT.
-60.00
DECREMEN.
CANT.
-60.00
DECREMEN.
CANT.
-0.02
1.00
CANTIDAD
C.M.
23.00
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
197.00
CANTIDAD
C.M.
220.00
CANTIDAD
C.M.
220.00
CANTIDAD
C.M.
0.78
DESCRIPCION
REPLANTEO (MURO DE CERCO)
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
RELLENO COMPACTADO MANUAL-NO INCLUYE MATERIAL DE R
DESCRIPCION
CIMIENTO DE H.C. 1:3:4 60% PIEDRA (CERCO P.)
DESCRIPCION
COLUMNAS DE HO AO (S/D)
DESCRIPCION
CERCO PERIMETRAL C/MALLA OLIMPICA SEG/DIS?O.
DESCRIPCION
PUERTA DE MALLA OLIMPICA PARA CERCO PERIMETRAL
UNIDCANTIDAD
ML
100.00
UNIDCANTIDAD
M3
15.70
UNIDCANTIDAD
M3
1.20
UNIDCANTIDAD
M3
14.00
UNIDCANTIDAD
M3
0.60
UNIDCANTIDAD
ML
95.00
UNIDCANTIDAD
M2
INCREMEN.
CANT.
11.20
DECREMEN.
CANT.
-40.00
DECREMEN.
CANT.
CANTIDAD
C.M.
60.00
INCREMEN.
CANT.
0.74
INCREMEN. DECREMEN.
CANT.
CANT.
3.42
INCREMEN. DECREMEN.
CANT.
CANT.
-7.33
INCREMEN. DECREMEN.
CANT.
CANT.
-0.28
INCREMEN. DECREMEN.
CANT.
CANT.
-39.00
INCREMEN. DECREMEN.
CANT.
CANT.
-3.20
CANTIDAD
C.M.
INCREMEN.
CANT.
CANTIDAD
C.M.
16.44
CANTIDAD
C.M.
4.62
CANTIDAD
C.M.
6.68
CANTIDAD
C.M.
0.33
CANTIDAD
C.M.
56.00
CANTIDAD
C.M.
8.00
DESCRIPCION
REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
HORMIGON ARMADO PARA MUROS ESTRUCTURAS DE H2O
DESCRIPCION
ESCALERA METALICA
UNIDCANTIDAD
M2
81.00
UNIDCANTIDAD
M3
67.00
UNIDCANTIDAD
M3
INCREMEN.
CANT.
INCREMEN.
CANT.
16.12
INCREMEN.
UNIDCANTIDAD
CANT.
ML
5.50
1.12
DECREMEN.
CANT.
-9.48
DECREMEN.
CANT.
-32.14
DECREMEN.
CANT.
-0.20
DECREMEN.
CANT.
71.52
CANTIDAD
C.M.
34.86
CANTIDAD
C.M.
15.92
CANTIDAD
C.M.
6.62
DESCRIPCION
RELLENO COMUN COMPACTADO
DESCRIPCION
HORMIGON ARMADO LOSA TAPA TANQUE DE AGUA.
DESCRIPCION
ZAMPEADO DE PIEDRA
UNIDCANTIDAD
M3
UNIDCANTIDAD
M3
DESCRIPCION
PINTURA LATEX
DESCRIPCION
REVOQUE CON SIKA IMPERMEABILIZANTE (TANQUE)
70.56
UNIDCANTIDAD
M3
100.00
UNIDCANTIDAD
M2
DESCRIPCION
10.78
UNIDCANTIDAD
M2
DESCRIPCION
7.00
65.60
UNIDCANTIDAD
M2
DECREMEN. CANTIDAD
C.M.
CANT.
-2.14
4.86
INCREMEN. DECREMEN. CANTIDAD
C.M.
CANT.
CANT.
-0.71
10.07
INCREMEN. DECREMEN. CANTIDAD
C.M.
CANT.
CANT.
1.03
71.59
INCREMEN. DECREMEN. CANTIDAD
C.M.
CANT.
CANT.
0.78
100.78
INCREMEN. DECREMEN. CANTIDAD
C.M.
CANT.
CANT.
67.18
132.78
INCREMEN. DECREMEN. CANTIDAD
C.M.
CANT.
CANT.
152.88
UNIDCANTIDAD
M2
INCREMEN.
CANT.
INCREMEN.
CANT.
152.88
-6.84
146.04
DECREMEN. CANTIDAD
C.M.
CANT.
-0.80
152.08
DESCRIPCION
ACCESO A TANQUE
UNIDCANTIDAD
GLB
INCREMEN. DECREMEN.
CANT.
CANT.
1
CANTIDAD
C.M.
1.00
DESCRIPCION
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
INCREMEN. DECREMEN.
CANT.
CANT.
ML
840.00
5.00
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
M3
504.00
-356.04
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
M3
176.40
-133.25
UNIDCANTIDAD
CANTIDAD
C.M.
845.00
CANTIDAD
C.M.
147.96
CANTIDAD
C.M.
43.16
DESCRIPCION
RELLENO Y COMPACTADO (TIERRA COMUN)
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
DESCRIPCION
PROV. Y TENDIDO DE TUBERIA F.G. D=4 PULG
DESCRIPCION
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESCRIPCION
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
DESCRIPCION
HORMIGON CICLOPEO PARA ANCLAJES
UNIDCANTIDAD
M3
327.60
INCREMEN.
CANT.
DECREMEN.
CANT.
-222.80
DECREMEN.
CANT.
INCREMEN.
UNIDCANTIDAD
CANT.
ML
720.00
102.00
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
ML
120.00
-97.00
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
ML
411.00
434.00
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
ML
411.00
434.00
INCREMEN. DECREMEN.
UNIDCANTIDAD
CANT.
CANT.
M3
0.60
0.20
CANTIDAD
C.M.
104.81
CANTIDAD
C.M.
822.00
CANTIDAD
C.M.
23.00
CANTIDAD
C.M.
845.00
CANTIDAD
C.M.
845.00
CANTIDAD
C.M.
0.80
DESCRIPCION
PROV. Y TENDIDO DE TUBERIA F.G. D=4 PULG_x000D_
UNIDCANTIDAD
ML
INCREMEN. DECREMEN.
CANT.
CANT.
23.00
CANTIDAD
C.M.
23.00
DESCRIPCION
ANCLAJES HS
UNID
ML
UNID
ML
UNID
M3
UNID
GLB
UNID
M3
DESCRIPCION
UNID
ML
DESCRIPCION
UNID
PZA
DESCRIPCION
UNID
GLB
UNID
M3
UNID
CANTIDAD
ORIGINAL
8923.12
CANTIDAD
ORIGINAL
8923.12
CANTIDAD
ORIGINAL
4461.56
CANTIDAD
ORIGINAL
124.00
CANTIDAD
ORIGINAL
0.15
CANTIDAD
ORIGINAL
8923.12
CANTIDAD
ORIGINAL
5.00
CANTIDAD
ORIGINAL
1.00
CANTIDAD
ORIGINAL
4389.22
CANTIDAD
ORIGINAL
ML
UNID
PRECIO
UNITARIO Bs
INCREMENTOS
CANT.
P. PARCIAL
29.54 Err:509
PRECIO
UNITARIO Bs
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
CANT.
Err:509
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
CANT.
1,726.63
PRECIO
UNITARIO Bs
-124.00
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
CANT.
1,514.50
PRECIO
UNITARIO Bs
INCREMENTOS
CANT.
1.06 Err:509
PRECIO
UNITARIO Bs
CANT.
Err:509
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
9,917.14 Err:509
PRECIO
UNITARIO Bs
DECREMENT
P. PARCIAL
CANT.
Err:509
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
CANT.
56,454.21 Err:509
PRECIO
UNITARIO Bs
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
58.94
PRECIO
UNITARIO Bs
PRECIO
UNITARIO Bs
CANT.
Err:509
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
13.66 Err:509
CANTIDAD
ORIGINAL
DECREMENT
CANT.
Err:509
69.46
PRECIO
UNITARIO Bs
CANT.
Err:509
INCREMENTOS
CANT.
P. PARCIAL
2.06 Err:509
PRECIO
UNITARIO Bs
DECREMENT
CANT.
Err:509
INCREMENTOS
DECREMENT
DESCRIPCION
UNID
GLB
UNID
M2
UNID
M3
UNID
M3
UNID
UNID
UNID
UNID
UNID
CANTIDAD
ORIGINAL
104.40
CANTIDAD
ORIGINAL
114.05
CANTIDAD
ORIGINAL
7.13
CANTIDAD
ORIGINAL
71.88
CANTIDAD
ORIGINAL
32.21
CANTIDAD
ORIGINAL
31.65
CANTIDAD
ORIGINAL
22.16
30.81
CANTIDAD
ORIGINAL
29.44
CANTIDAD
UNID
ORIGINAL
M2
UNID
M2
PRECIO
UNITARIO Bs
CANT.
P. PARCIAL
468.17 Err:509
CANTIDAD
UNID
ORIGINAL
CANTIDAD
ORIGINAL
226.80
CANTIDAD
ORIGINAL
226.80
PRECIO
UNITARIO Bs
Err:509
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
7.06
PRECIO
UNITARIO Bs
INCREMENTOS
CANT.
CANT.
Err:509
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
CANT.
Err:509
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
121.49 Err:509
PRECIO
UNITARIO Bs
DECREMENT
P. PARCIAL
1,214.68 Err:509
PRECIO
UNITARIO Bs
CANT.
Err:509
69.46 Err:509
PRECIO
UNITARIO Bs
CANT.
CANT.
Err:509
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
CANT.
3,866.51
PRECIO UNITARIO
Bs
-32.21
INCREMENTOS
CANT.
3,903.57 Err:509
PRECIO
UNITARIO Bs
Err:509
CANT.
DECREMENT
P. PARCIAL
Err:509
CANT.
DECREMENT
P. PARCIAL
CANT.
40.64
DECREMENT
P. PARCIAL
CANT.
Err:509
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
145.54 Err:509
PRECIO
UNITARIO Bs
CANT.
Err:509
INCREMENTOS
4,518.45 Err:509
PRECIO
UNITARIO Bs
CANT.
INCREMENTOS
4,055.12
PRECIO
UNITARIO Bs
CANT.
INCREMENTOS
4,124.62 Err:509
PRECIO
UNITARIO Bs
DECREMENTO
P. PARCIAL
CANT.
Err:509
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
9.20
373.89
CANT.
LOSA RADIER
UNID
CANTIDAD
ORIGINAL
M3
PRECIO
UNITARIO Bs
INCREMENTOS
CANT.
DECREMENT
P. PARCIAL
4,626.41 Err:509
CANT.
Err:509
INSTALACION DE FAENAS
UNID
GLB
CANTIDAD
ORIGINAL
PRECIO
UNITARIO Bs
13,978.82
INCREMENTOS
CANT.
P. PARCIAL
1.00
13,978.82
DECREMENT
CANT.
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
Err:509
DECREMENTOS
P. PARCIAL
-214,102.12
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
CANTIDAD C.M.
0.00
CANTIDAD C.M.
0.15
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
Err:509
DECREMENTOS
CANTIDAD C.M.
Err:509
CANTIDAD C.M.
P. PARCIAL
DECREMENTOS
Err:509
CANTIDAD C.M.
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
-124,540.29
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
0.00
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
236.00
DECREMENTOS
CANTIDAD C.M.
P. PARCIAL
Err:509
DECREMENTOS
P. PARCIAL
CANTIDAD C.M.
1.00
Costo
Total
1,223.00
1,334.00
460.00
300.00
110.00
250.42
226.80
127.55
33.41
194.93
2.40
3.61
4,266.12
112.54
49.98
239.84
179.95
582.31
0.00
582.31
0.00
29.12
29.12
317.07
87.00
404.06
341.43
0.00
341.43
341.43
341.43
184.30
184.30
6,148.77
Costo
Total
689.00
576.00
125.40
200.00
94.00
250.42
226.80
127.55
33.41
194.93
2.40
3.61
2,523.52
90.03
49.98
239.84
179.95
559.80
0.00
559.80
0.00
27.99
27.99
304.81
83.63
388.45
217.79
0.00
217.79
217.79
217.79
121.60
121.60
4,056.94
MANO DE OBRA
AYUDANTE PLOMERO
PLOMERO
ALBAIL
AYUDANTE DE ALBAIL
HR.
HR.
HR.
HR.
7.00000
5.00000
16.00000
16.00000
4.-
5.-
6.-
7.-
337.50
179.40
62.00
160.00
16.40
250.42
226.80
127.55
33.41
194.93
2.40
3.61
1,594.42
11.25
10.00
14.99
11.25
SUBTOTAL MANO DE OBRA
0.00%
TOTAL MANO DE OBRA
78.78
49.98
239.84
179.95
548.55
0.00
548.55
0.00000
0.00%
0.00
0.00
HERRAMIENTAS - % DEL TOTAL DE MANO DE OBRA
5.00%
TOTAL EQUIPO, MAQUINARIA Y HERRAMIENTAS
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
54.45%
IMPUESTO AL VALOR AGREGADO - % DE LA MANO DE OBRA DIRECTA
14.94%
TOTAL RECARGOS
GASTOS GENERALES Y ADMINISTRATIVOS
GASTOS GENERALES - % De 1+2+3
7.00%
GASTOS FINANCIEROS - % DE 1+2+3
0.00%
TOTAL GASTOS GENERALES Y ADMINISTRATIVOS
UTILIDAD
UTILIDAD - % DE 1+2+3
7.00%
TOTAL UTILIDAD
IMPUESTOS A LAS TRANSACCIONES
IMPUESTO A LAS TRANSACCIONES - % DE 1+2+3+4+5+6
3.04%
TOTAL IMPUESTOS A LAS TRANSACCIONES
TOTAL PRECIO UNITARIO
0.00
27.43
27.43
Costo
Total
298.69
81.95
380.64
151.93
0.00
151.93
151.93
151.93
88.22
88.22
2,943.11
Unitario:
PZA
Cantidad:
Moneda: BOLIVIANOS
%
Descripcin
1.-
M3
40.00000
1,000.00
TOTAL MATERIALES
1,000.00
HR.
40.00000
11.25
449.88
449.88
HR.
22.00000
0.00%
6.-
0.00
449.88
0.00
383.00
8,426.00
5.00%
22.49
8,448.49
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
54.45%
14.94%
67.21
TOTAL RECARGOS
312.17
244.96
7.00%
692.89
0.00%
0.00
692.89
UTILIDAD
UTILIDAD - % DE 1+2+3
7.-
0.00%
TOTAL MANO DE OBRA
5.-
Total
25.00
4.-
Costo
MANO DE OBRA
AYUDANTE (LIMPIEZA Y DESBROCE)
3.-
Precio
MATERIALES
RIPIO
2.-
Precio
7.00%
692.89
TOTAL UTILIDAD
692.89
3.04%
358.33
358.33
11,954.64
Costo
Total
1,749.60
216.48
777.30
362.00
174.00
191.48
4,498.79
4,872.00
869.30
696.00
1,364.86
97.44
151.74
16,020.99
899.94
168.71
659.82
749.95
2,478.42
0.00
2,478.42
0.00
123.92
123.92
1,349.50
370.28
1,719.77
1,303.63
0.00
1,303.63
1,303.63
1,303.63
709.17
709.17
23,659.53
Costo
Total
2,997.00
370.83
1,332.52
620.10
261.00
160.48
6,664.88
6,699.00
869.30
696.00
2,188.92
97.44
22,957.47
899.94
168.71
659.82
749.95
2,478.42
0.00
2,478.42
0.00
123.92
123.92
1,349.50
370.28
1,719.77
1,789.19
0.00
1,789.19
1,789.19
1,789.19
953.51
953.51
31,811.46
FG
30.0
3.0
3.0
0.5
2.5
2.0
3.5
m
m
m
m
m
pulg
m
2.0
1.5
177.5 Kg
355.0
Kg =
0.355
Tn
Dimetro
Peso
TR efectiva
Numero de Pndolas (Np)
1/ 4
0.15
2.47
pulg
Kg/m
Tn
ok
11
DERECHA
Pnd
ola (i)
Centro
1
2
3
4
5
IZQUIERDA
Centro
1
2
3
4
5
0.0
2.5
5.0
7.5
10.0
12.5
0.0
-2.5
-5.0
-7.5
-10.0
-12.5
0.50
0.58
0.83
1.25
1.83
2.58
0.58
0.83
1.25
1.83
2.58
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
Longitud
Total (m)
1.00
1.08
1.33
1.75
2.33
3.08
1.08
1.33
1.75
2.33
3.08
20.17
11
3
0.0983
ESPECIFICACIONES DE PENDOLA
CABLE
ALMA DE FIBRA
Dimetro
1/ 4
Peso
0.15
TR efectiva
2.47
pulg
Kg/m
Tn
20.17
3.5
9.
6
9.00
Longitud diagonal (Lf)
n=
Longitud del Cable Principal (Lc)
xi
f
3.0
L
H
0.5
T
15
L1
Longitud del Cable
0.1
30.7808 m
15 m centro del puente
3.0 m
30.0 m
21.80
3.5 m
9.00
m (longitud horizontal)
9.66
m (diagonal)
50.09
m
2662.5
39.9375
22.5
Especificaciones del
Cable Principal
Dimetro
Peso (Wc)
Traccin Mxima por Peso de las Pndolas (Hp)
Dimetro
Especificacionesde
las Pndolas
Kg
Kg
Kg
1/2 pulg
0.6 Kg/m
3.69 Kg
1/ 4 pulg
Especificacionesde
las Pndolas
Peso (Wp)
HMx
cos
0.098 Kg/m
2728.62
Kg
21.801409486
0.9284766909
2938.82
Kg
4408
Kg =
Dimetro
Peso
TR efectiva
4.41
Tn
1/ 2 pulg
0.6
Kg/m
8.74 Tn
ok
Largo (l)
Ancho (a)
Alto (h)
1.4 m
1 m
1.4 m
1.40 m
l
1.40 m
Cargas que actan en la Cmara de anclaje
Tmx
Vmx
Hmx
Tmx
Hmx
Vmx
Q
21.8
2938.817 Kg
2728.623 Kg
1091.449 Kg
4508 Kg
Q
l/2
Estabilidad al
Deslizamiento
Cf =
Fv =
Hmx
FSD
1.0
3416.6 Kg
2728.6 Kg
1.2521 OK
Datos de Diseo
Tmx Rot.
4408
Kg
Estabilidad al Volteo
l/2
Mr =
3155.6 Kg-m
Mv = 3820.072 Kg-m
FSV = 0.83 Aumentar l y disminuir a y h
e = 0.89448619 m
t =
1.5
Kg/cm2 cap. Port.del terreno
1 = 11795.671761 Kg/m2
1 = 1.1795671761 Kg/cm2 ok
2 = -6914.8848085 Kg/m2
2 = -0.6914884809 Kg/cm2 ok
A=
D=
4.408225 cm2
2.369119 cm
F.S
fs
2
2000
D=
0.9
usar Macizo de Anclaje
D=
1.00 pulg
Kg/cm
Tmx
F.S
fs
pulg
Macizo de
anclaje
a 1.00 m
l
1.40 m
N
ACT
D ES C R I PC I O N
UNID
ANCHO
(m)
LARGO
(m)
M3
1.4
M3
0.8
HC para anclaje
M3
1.4
HC para torre
M3
0.8
ALTO
(m)
1.4
1.96
3.92
0.8
0.64
2.56
1.4
1.96
3.92
0.8
0.64
2.56
BERIA
AL
ENDOLA
d horizontal)
m
kg
kg/m
57
bre el Terreno
Port.del terreno
TOTAL
3.92
2.56
3.92
2.56
FG
50.0
5.0
5.0
0.6
2.5
2.0
5.6
m
m
m
m
m
pulg
m
2.0
1.5
177.5 Kg
355.0
Kg =
0.355
Tn
Dimetro
Peso
TR efectiva
Numero de Pndolas (Np)
1/ 4
0.15
2.47
pulg
Kg/m
Tn
ok
19
DERECHA
Pnd
ola (i)
Centro
1
2
3
4
5
IZQUIERDA
Centro
1
2
3
4
5
0.0
2.5
5.0
7.5
10.0
12.5
0.0
-2.5
-5.0
-7.5
-10.0
-12.5
0.60
0.65
0.80
1.05
1.40
1.85
0.65
0.80
1.05
1.40
1.85
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
Longitud
Total (m)
1.10
1.15
1.30
1.55
1.90
2.35
1.15
1.30
1.55
1.90
2.35
17.60
19
3
0.0515
ESPECIFICACIONES DE PENDOLA
CABLE
SERIE 6 X 19 TIPO COBRA
ALMA DE FIBRA
Dimetro
1/ 4 pulg
Peso
0.15 Kg/m
TR efectiva
2.47 Tn
17.60
5.6
15
.
08
14.00
Longitud diagonal (Lf)
n=
0.1
Longitud del Cable Principal (Lc) 51.301333333 m
xi
25 m centro del puente
f
5.0 m
5.0
L
50.0 m
21.80
H
0.6
5.6 m
T
25
L1
14.00
m (longitud horizontal)
15.08
m (diagonal)
Longitud del Cable
81.46
m
4437.5
66.5625
37.5
Especificaciones del
Cable Principal
Dimetro
Peso (Wc)
Traccin Mxima por Peso de las Pndolas (Hp)
Dimetro
Especificacionesde
las Pndolas
Kg
Kg
Kg
1/2 pulg
0.6 Kg/m
3.22 Kg
1/ 4 pulg
Especificacionesde
las Pndolas
Peso (Wp)
HMx
cos
0.051 Kg/m
4544.78
Kg
21.801409486
0.9284766909
4894.88
Kg
7342
Kg =
Dimetro
Peso
TR efectiva
7.34
Tn
1/ 2 pulg
0.6
Kg/m
8.74 Tn
ok
Largo (l)
Ancho (a)
Alto (h)
1.5 m
1.4 m
1.5 m
l
1.50
1.50 m
21.8
4894.877 Kg
4544.779 Kg
1817.912 Kg
7245 Kg
Q
l/2
Estabilidad al
Deslizamiento
Cf =
Fv =
Hmx
FSD
1.0
5427.1 Kg
4544.8 Kg
1.1941 OK
Datos de Diseo
Tmx Rot.
7342
Kg
Estabilidad al Volteo
l/2
Mr = 5433.75 Kg-m
Mv = 6817.168 Kg-m
FSV = 0.80 Aumentar l y disminuir a y h
e = 1.00490983 m
t =
1.5
Kg/cm2 cap. Port.del terreno
1 = 12972.393657 Kg/m2
1 = 1.2972393657 Kg/cm2 ok
2 = -7803.7379579 Kg/m2
2 = -0.7803737958 Kg/cm2 ok
A=
D=
7.342315 cm2
3.057536 cm
F.S
fs
2
2000
D=
1.2
usar Macizo de Anclaje
D=
1.00 pulg
Kg/cm
Tmx
F.S
fs
pulg
Macizo de
anclaje
a 1.40 m
l
1.50 m
N
ACT
D ES C R I PC I O N
UNID
ANCHO
(m)
M3
1.4
M3
3 HC para anclaje
M3
4 HC para torre
M3
LARGO ALTO
(m)
(m)
N VECESSUBTOTALTOTAL
1.5
1.5
3.15
6.3
1.2
1.4
1.5
1.5
1.2
4.8
3.15
6.3
1.2
1.2
4.8
A TUBERIA
NCIPAL
ENDOLA
d horizontal)
m
kg
kg/m
re el Terreno
Port.del terreno