METRADO DE PARTIDAS EJECUTADAS AL MES DE MAYO - 2015

OBRA:

CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA - DISTRITO DE QUIRUVILCA SANTIAGO DE CHUCO - LA LIBERTAD
CONTRATO:
N 766-2015-ACFSACH
PROPIETARIO: ASOCIACION CIVIL FONDO SOCIAL ALTO CHICAMA
CONTRATISTA: CONSORCIO PAPELILLO
SUPERVISOR: CONSORCIO CANIBAMBA
RESIDENTE:
ING. SANTOS ALEJANDRO HERMENEGILDO MANTILLA
Item
Part.
01
01.04
01.05
03
03.01
03.01.02
03.01.03
03.01.05
03.01.06
03.01.07
03.02
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.02.04
03.02.02.05

Descripcin
OBRAS PROVISIONALES
GUARDIANIA DE MAQUINARIA Y MATERIALES
ACCESOS A CANTERAS, FUENTES DE AGUA Y BOTADEROS
MOVIMIENTO DE TIERRAS
EXPLANACIONES
CONFORMACION DE TERREPLENES - MATERIAL PROPIO
PERFILADO Y COMPACTADO EN ZONA DE CORTE
EXCAVACION PARA MEJORAMIENTO DE SUBRASANTE
CONFORMACION DE MEJORAMIENTO
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
PAVIMENTOS
SUB BASE : MATERIAL GRANULAR , e = 0.20 m
EXTRACCION Y APILAMIENTO DE MATERIAL DE SUB BASE
CARGUIO DE MATERIAL SUB BASE
ZARANDEO DE MATERIAL PARA SUB BASE
TRANSPORTE DE MATERIAL DE CANTERA A OBRA SUB BASE
EXTENDIDO, NIVELADO Y COMPACTADO PARA SUB BASE

Und.

Metrado

AVANCE ACTUAL
Valorizado

mes
km

1.00
1.59

1,732.32
2,072.77

10.00%
48.18%

m3
m2
m3
m3
m3

3,066.20
7,188.30
448.50
448.50
3,181.25

14,165.84
9,201.02
1,776.06
2,300.81
5,439.94

8.56%
11.66%
27.98%
27.98%
6.78%

m3
m3
m3
m3
m2

1,360.80
1,360.80
1,360.80
22,218.24
94,290.57

7,552.44
7,116.98
6,763.18
881.28
3,740.00

6.12%
6.12%
6.12%
3.97%
3.97%

Item
Part.
04
04.03
04.03.01
04.03.01.08
07
07.02

Descripcin
OBRAS DE ARTE
ALCANTARILLAS
ALCANTARILLA TIPO MARCO DE CONCRETO
ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60
FLETE
FLETE TERRESTRE Y RURAL

Und.

AVANCE ACTUAL
Metrado

Valorizado

kg

4,081.77

43,484.40

100.00%

glb

0.08

9,632.58

5.00%

VALORIZACION DE PAGO AL CONTRATISTA

OBRA: CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAM
DISTRITO DE QUIRUVILCA - SANTIAGO DE CHUCO - LA LIBERTAD
Lugar: Distr.: Quiruvilca

Prov.: Santiago de Chuco

Fecha de Presentacin:
RUBROS

Departamento: La Libertad

6/8/2015
SIMB.

MONTO

Valorizacin del mes costo directo

VC

432,445.58

Gastos Generales (10%)

GG

43,244.56

Utilidad (5%)

UT

21,622.28

Valorizacin bruta
Valorizacin Neta
Impuesto 18 %
Monto Total
Amortizacin por Adelanto
TOTAL A CANCELAR

VB=VC - GG - UT
VN=VB
IGV=18% VN
MT=VN + IGV
Ret.=20% Del Mont. Total
T=Efect.-Ret.

497,312.42
497,312.42
89,516.24
586,828.66
0.00
586,828.66

CION DE PAGO AL CONTRATISTA

ELILLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA HUCO - LA LIBERTAD

OBSERVACION

Adelanto 20 %
Monto a Facturar

RESUMEN DE VALOR

ASOCIACIN CIVIL F
Contratista
Supervisor

CONSORCIO PAPELILLO
CONSORCIO CANIBAMBA

OBRA

CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA - DISTRITO
QUIRUVILCA - SANTIAGO DE CHUCO - LA LIBERTAD

MONTOS
Contractual
Adicional N 1
TOTAL

N de Valorizac.
1
2
3
4
5
6
7
8
9
10
11
Parcial

NETO
4,819,445.63
0.00
4,819,445.63

Valorizac. Bruta

IGV
867,500.21
0.00
867,500.21

BRUTO
5,686,945.84
0.00
5,686,945.84

Adelanto Para Materiales


Adelanto
Amortizac.

Adelanto en Efectivo
Adelanto

620,540.22
0.00
497,312.42

497,312.42

0.00

0.00

0.00

Adicional N 01
1
Parcial

0.00

0.00

0.00

0.00

Deductivo N 01
1
Parcial

0.00

0.00

0.00

0.00

497,312.42

0.00

0.00

0.00

Total General

SUPERVISOR DE OBRA

MEN DE VALORIZACION DE OBRAS - CONTRATISTA


(En Nuevos Soles)

OCIACIN CIVIL FONDO SOCIAL FONDO ALTO CHICAMA


N de Contrato
Fecha de Inicio

ANIBAMBA - DISTRITO DE

Fecha de Trmino Reprogramada

Adelanto en Efectivo

Adelanto en Efectivo
Amortizac.

Sub- Total

0.00

IGV

MONTO A FACTURAR

620,540.22
0.00
497,312.42

111,697.24
0.00
89,516.24

732,237.46
0.00
586,828.66

497,312.42

89,516.24

586,828.66

Avance Fisico
Actual
3.18%
0.00%
12.18%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

497,312.42

89,516.24

586,828.66

0.00

N 766-2015-ACFSACH
5-Mar-15
2-Mar-16

S/. 0.00

Avance Fisico
Acumulado
3.18%
3.18%
15.36%
15.36%
15.36%
15.36%
15.36%
15.36%
15.36%
15.36%
15.36%
15.36%
15.36%

Programado
Acumulado
3.18%
3.18%
6.43%
21.60%
39.17%
55.47%
72.92%
87.55%
92.99%
95.05%
96.44%
99.24
100

0.00

0.00

VALORIZACION D
OBRA:
CONTRATO:
PROP.:
CONTRATISTA:
SUPERVISOR:
RESIDENTE:
Item
Part.
01
01.01
01.02
01.03
01.04
01.05
02
02.01
02.02
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07

CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA - DISTRITO DE QUIRUV
N 766-2015-ACFSACH
ASOCIACION CIVIL FONDO SOCIAL ALTO CHICAMA
CONSORCIO PAPELILLO
CONSORCIO CANIBAMBA
ING. SANTOS ALEJANDRO HERMENEGILDO MANTILLA
PRESUPUESTO CONTRACTUAL
Descripcin
Und.
Metrado
PU
P. Parcial
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE OBRA 3.60 x 2.40 m
und
2.00
822.99
1,645.98
CAMPAMENTO PROVISIONAL DE LA OBRA
m2
300.00
32.46
9,738.00
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS LIVIANOS
est
1.00
50,716.00
50,716.00
GUARDIANIA DE MAQUINARIA Y MATERIALES
mes
10.00
1,732.32
17,323.20
ACCESOS A CANTERAS, FUENTES DE AGUA Y BOTADEROS
km
3.30
1,303.63
4,301.98
OBRAS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
km
17.24
719.77
12,408.83
REMOCION DE CAPA VEGETAL
m3
4,955.28
4.07
20,167.99
MOVIMIENTO DE TIERRAS
EXPLANACIONES
CORTE DE MATERIAL CONGLOMERADO
m3
66,213.37
3.96
262,204.95
CONFORMACION DE TERREPLENES - MATERIAL PROPIO
m3
35,809.86
4.62
165,441.55
PERFILADO Y COMPACTADO EN ZONA DE CORTE
m2
61,669.65
1.28
78,937.15
CORTE EN ROCA FIJA
m3
7,337.50
26.65
195,544.38
EXCAVACION PARA MEJORAMIENTO DE SUBRASANTE
m3
1,602.94
3.96
6,347.64
CONFORMACION DE MEJORAMIENTO
m3
1,602.94
5.13
8,223.08
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
m3
46,889.95
1.71
80,181.81

03.02

PAVIMENTOS

03.02.01
03.02.01.01
03.02.01.02
03.02.01.03
03.02.01.04

PAVIMENTOS: AFIRMADO e=0.15 m


EXTRACCION Y APILAMIENTO DE MATERIAL DE CANTERA
CARGUIO DE MATERIAL
ZARANDEO DE MATERIAL PARA AFIRMADO
TRANSPORTE DE MATERIAL DE CANTERA A OBRA

m3
m3
m3
m3

16,259.45
16,259.45
16,259.45
16,259.45

5.55
10.90
4.97
18.13

90,239.95
177,228.01
80,809.47
294,783.83

Item
Part.
03.02.01.05
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.02.04
03.02.02.05
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02

Descripcin
EXTENDIDO, NIVELADO Y COMPACTADO
SUB BASE : MATERIAL GRANULAR , e = 0.20 m
EXTRACCION Y APILAMIENTO DE MATERIAL DE SUB BASE
CARGUIO DE MATERIAL SUB BASE
ZARANDEO DE MATERIAL PARA SUB BASE
TRANSPORTE DE MATERIAL DE CANTERA A OBRA SUB BASE
EXTENDIDO, NIVELADO Y COMPACTADO PARA SUB BASE
OBRAS DE ARTE
CUNETAS
TRAZO Y REPLANTEO DE CUNETAS
CONFORMACION MANUAL DE CUNETAS
SUB DRENES
SUMINISTRO Y COLOCACION DE SUB DREN TUBERIA PVC 6" (PERFORADA)
SUMINISTRO Y COLOCACION DE TUBERIA PVC 6" DE DESCARGA TRASVERSA

Und.
m2

PRESUPUESTO CONTRACTUAL
Metrado
PU
P. Parcial
89,820.26
1.51
135,628.59

m3
m3
m3
m3
m2

22,218.24
22,218.24
22,218.24
22,218.24
94,290.57

5.55
5.23
4.97
18.13
1.51

123,311.23
116,201.40
110,424.65
402,816.69
142,378.76

m
m

22,849.07
22,849.07

0.69
2.11

15,765.86
48,211.54

m
m

400.00
33.68

51.44
62.33

20,576.00
2,099.27

Item
Part.
04.02.03
04.02.04
04.02.05
04.03
04.03.01
04.03.01.01
04.03.01.02
04.03.01.03
04.03.01.04
04.03.01.05
04.03.01.06
04.03.01.07
04.03.01.08
04.03.01.09
04.04
04.04.01
04.04.01.01
04.04.01.02
04.04.01.03
04.04.01.04
04.04.01.05
04.04.01.06
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.04.02.04
04.04.02.05
04.04.02.06
04.04.03
04.04.03.01

Descripcin
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
CAMA DE APOYO
GEOTEXTIL
ALCANTARILLAS
ALCANTARILLA TIPO MARCO DE CONCRETO
TRAZO Y REPLANTEO DE ALCANTARILLAS
EXCAVACION NO CLASIFICADA PARA ESTRUCTURA
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO
SOLADO 1:8 C:H e=2"
CONCRETO f'c=210 Kg/cm2
ENCOFRADO Y DESENCOFRADO NORMAL EN ALCANTARILLA
ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60
SUMINISTRO E INSTALACION DE CINTA WATER STOP
BADENES
BADENES (2, L=4.00 m)
TRAZO Y REPLANTEO DE BADENES
EXCAVACION NO CLASIFICADA PARA ESTRUCTURA
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
MEJORAMIENTO DE TERRENO DE FUNDACION
CONCRETO f'c=210 Kg/cm2 EN BADENES
ENCOFRADO Y DESENCOFRADO NORMAL EN BADENES
BADENES (4, L=6.00 m)
TRAZO Y REPLANTEO DE BADENES
EXCAVACION NO CLASIFICADA PARA ESTRUCTURA
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
MEJORAMIENTO DE TERRENO DE FUNDACION
CONCRETO f'c=210 Kg/cm2 EN BADENES
ENCOFRADO Y DESENCOFRADO NORMAL EN BADENES
BADENES (2, L=8.00 m)
TRAZO Y REPLANTEO DE BADENES

Und.
m3
m3
m2

PRESUPUESTO CONTRACTUAL
Metrado
PU
P. Parcial
465.00
1.71
795.15
30.00
126.80
3,804.00
1,680.00
3.83
6,434.40

m2
m3
m3
m3
m2
m3
m2
kg
m

424.32
599.16
489.06
207.91
130.90
143.06
788.29
11,565.00
122.40

2.87
14.31
1.71
16.65
28.82
421.96
38.18
3.76
21.88

1,217.80
8,573.98
836.29
3,461.70
3,772.54
60,365.60
30,096.91
43,484.40
2,678.11

m2
m3
m3
m3
m3
m2

56.00
12.88
16.10
7.20
12.88
19.20

2.87
14.31
1.71
97.68
421.96
38.18

160.72
184.31
27.53
703.30
5,434.84
733.06

m2
m3
m3
m3
m3
m2

168.00
38.64
48.30
21.60
38.64
53.60

2.87
14.31
1.71
97.68
421.96
38.18

482.16
552.94
82.59
2,109.89
16,304.53
2,046.45

m2

112.00

2.87

321.44

Item
Part.
04.04.03.02
04.04.03.03
04.04.03.04
04.04.03.05
04.04.03.06
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
04.04.04.04
04.04.04.05
04.04.04.06
04.05
04.05.01
04.05.01.01
04.05.01.01.01
04.05.01.02
04.05.01.02.01
04.05.01.02.02
04.05.01.02.03
04.05.01.03
04.05.01.03.01
04.05.01.03.01.01
04.05.01.03.02
04.05.01.03.02.01
04.05.01.03.02.02
04.05.01.03.03
04.05.01.03.03.01
04.05.01.03.03.02
04.05.01.04
04.05.01.04.01

Descripcin
EXCAVACION NO CLASIFICADA PARA ESTRUCTURA
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
MEJORAMIENTO DE TERRENO DE FUNDACION
CONCRETO f'c=210 Kg/cm2 EN BADENES
ENCOFRADO Y DESENCOFRADO NORMAL EN BADENES
BADENES (1, L=10.00 m)
TRAZO Y REPLANTEO DE BADENES
EXCAVACION NO CLASIFICADA PARA ESTRUCTURA
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
MEJORAMIENTO DE TERRENO DE FUNDACION
CONCRETO f'c=210 Kg/cm2 EN BADENES
ENCOFRADO Y DESENCOFRADO NORMAL EN BADENES
PUENTES
PUENTE : KM 3 + 001.015 , L = 12 m
OBRAS PRELIMINARES
TRAZO Y REPLANTEO DE PUENTES
MOVIMIENTO DE TIERRAS
EXCAVACION NO CLASIFICADA PARA ESTRUCTURA
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
RELLENO MANUAL CON MATERIAL SELECCIONADO
CONCRETO SIMPLE
SOLADOS
SOLADO 1:8 C:H e=3"
LOSAS DE APROXIMACION
CONCRETO f'c=210 Kg/cm2 EN LOSAS DE APROXIMACION
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS DE APROXIMACION
ESTRIBOS
CONCRETO f'c=140 Kg/cm2 + 30% P.G. EN ESTRIBOS
ENCOFRADO Y DESENCOFRADO NORMAL EN ESTRIBOS
CONCRETO ARMADO
LOSA

Und.
m3
m3
m3
m3
m2

PRESUPUESTO CONTRACTUAL
Metrado
PU
P. Parcial
25.76
14.31
368.63
32.20
1.71
55.06
14.40
97.68
1,406.59
25.76
421.96
10,869.69
34.40
38.18
1,313.39

m2
m3
m3
m3
m3
m2

70.00
16.10
20.13
9.00
16.10
21.00

2.87
14.31
1.71
97.68
421.96
38.18

200.90
230.39
34.42
879.12
6,793.56
801.78

m2

339.29

2.87

973.76

m3
m3
m3

502.03
602.44
110.80

14.31
1.71
41.63

7,184.05
1,030.17
4,612.60

m2

94.24

28.82

2,716.00

m3
m2

9.38
5.52

421.96
38.18

3,957.98
210.75

m3
m2

168.39
150.78

322.23
38.18

54,260.31
5,756.78

Item
Part.
04.05.01.04.01.01
04.05.01.04.01.02
04.05.01.04.01.03
04.05.01.04.02
04.05.01.04.02.01
04.05.01.04.02.02
04.05.01.04.02.03
04.05.01.05
04.05.01.05.01
04.05.01.05.02
04.05.01.06
04.05.01.06.01
04.05.01.06.02
04.05.01.06.03
04.05.02
04.05.02.01
04.05.02.01.01
04.05.02.02
04.05.02.02.01
04.05.02.02.02
04.05.02.02.03
04.05.02.03
04.05.02.03.01
04.05.02.03.01.01
04.05.02.03.02
04.05.02.03.02.01
04.05.02.03.02.02
04.05.02.03.03
04.05.02.03.03.01
04.05.02.03.03.02
04.05.02.04

Descripcin
CONCRETO f'c=280 Kg/cm2 EN LOSA
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA
ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60
SARDINELES
CONCRETO f'c=210 Kg/cm2 EN SARDINELES
ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES
ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60
DRENAJE
SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 2" EN LOSA
SUMINISTRO Y COLOCACION DE LLORADORES DE TUBERIA PVC SAL 2"
VARIOS
APOYOS DE NEOPRENO
JUNTA DE DILATACION e=1" EN PUENTES
JUNTA DE DILATACION e=1" EN LOSAS DE APROXIMACION
PUENTE : KM 4 + 095.490 , L = 10 m
OBRAS PRELIMINARES
TRAZO Y REPLANTEO DE PUENTES
MOVIMIENTO DE TIERRAS
EXCAVACION NO CLASIFICADA PARA ESTRUCTURA
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
RELLENO MANUAL CON MATERIAL SELECCIONADO
CONCRETO SIMPLE
SOLADOS
SOLADO 1:8 C:H e=3"
LOSAS DE APROXIMACION
CONCRETO f'c=210 Kg/cm2 EN LOSAS DE APROXIMACION
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS DE APROXIMACION
ESTRIBOS
CONCRETO f'c=140 Kg/cm2 + 30% P.G. EN ESTRIBOS
ENCOFRADO Y DESENCOFRADO NORMAL EN ESTRIBOS
CONCRETO ARMADO

Und.
m3
m2
kg

PRESUPUESTO CONTRACTUAL
Metrado
PU
P. Parcial
42.00
458.94
19,275.48
83.80
38.18
3,199.48
5,070.84
3.76
19,066.36

m3
m2
kg

3.00
24.50
739.49

421.96
38.18
3.76

1,265.88
935.41
2,780.48

und
und

6.00
40.00

7.11
10.16

42.66
406.40

und
m
m

16.00
12.00
18.00

397.90
9.25
9.25

6,366.40
111.00
166.50

m2

336.04

2.87

964.43

m3
m3
m3

289.05
346.86
95.80

14.31
1.71
41.63

4,136.31
593.13
3,988.15

m2

61.34

28.82

1,767.82

m3
m2

13.16
7.20

421.96
38.18

5,552.99
274.90

m3
m2

116.77
113.59

322.23
38.18

37,626.80
4,336.87

Item
Part.
04.05.02.04.01
04.05.02.04.01.01
04.05.02.04.01.02
04.05.02.04.01.03
04.05.02.04.02
04.05.02.04.02.01
04.05.02.04.02.02
04.05.02.04.02.03
04.05.02.05
04.05.02.05.01
04.05.02.05.02
04.05.02.06
04.05.02.06.01
04.05.02.06.02
04.05.02.06.03
04.05.03
04.05.03.01
04.05.03.01.01
04.05.03.02
04.05.03.02.01
04.05.03.02.02
04.05.03.02.03
04.05.03.03
04.05.03.03.01
04.05.03.03.01.01
04.05.03.03.02
04.05.03.03.02.01
04.05.03.03.02.02
04.05.03.03.03
04.05.03.03.03.01
04.05.03.03.03.02

Descripcin
LOSA
CONCRETO f'c=280 Kg/cm2 EN LOSA
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA
ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60
SARDINELES
CONCRETO f'c=210 Kg/cm2 EN SARDINELES
ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES
ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60
DRENAJE
SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 2" EN LOSA
SUMINISTRO Y COLOCACION DE LLORADORES DE TUBERIA PVC SAL 2"
VARIOS
APOYOS DE NEOPRENO
JUNTA DE DILATACION e=1" EN PUENTES
JUNTA DE DILATACION e=1" EN LOSAS DE APROXIMACION
PUENTE : KM 14 + 705.49 , L = 12 m
OBRAS PRELIMINARES
TRAZO Y REPLANTEO DE PUENTES
MOVIMIENTO DE TIERRAS
EXCAVACION NO CLASIFICADA PARA ESTRUCTURA
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
RELLENO MANUAL CON MATERIAL SELECCIONADO
CONCRETO SIMPLE
SOLADOS
SOLADO 1:8 C:H e=3"
LOSAS DE APROXIMACION
CONCRETO f'c=210 Kg/cm2 EN LOSAS DE APROXIMACION
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS DE APROXIMACION
ESTRIBOS
CONCRETO f'c=140 Kg/cm2 + 30% P.G. EN ESTRIBOS
ENCOFRADO Y DESENCOFRADO NORMAL EN ESTRIBOS

Und.

PRESUPUESTO CONTRACTUAL
Metrado
PU
P. Parcial

m3
m2
kg

27.50
66.50
2,741.10

458.94
38.18
3.76

12,620.85
2,538.97
10,306.54

m3
m2
kg

2.50
20.54
486.00

421.96
38.18
3.76

1,054.90
784.22
1,827.36

und
und

10.00
14.00

7.11
10.16

71.10
142.24

und
m
m

16.00
12.00
18.00

397.90
9.25
9.25

6,366.40
111.00
166.50

m2

339.29

2.87

973.76

m3
m3
m3

901.50
1,081.80
344.25

14.31
1.71
41.63

12,900.47
1,849.88
14,331.13

m2

94.24

28.82

2,716.00

m3
m2

9.38
5.52

421.96
38.18

3,957.98
210.75

m3
m2

255.48
199.50

322.23
38.18

82,323.32
7,616.91

Item
Part.
04.05.03.04
04.05.03.04.01
04.05.03.04.01.01
04.05.03.04.01.02
04.05.03.04.01.03
04.05.03.04.02
04.05.03.04.02.01
04.05.03.04.02.02
04.05.03.04.02.03
04.05.03.05
04.05.03.05.01
04.05.03.05.02
04.05.03.06
04.05.03.06.01
04.05.03.06.02
04.05.03.06.03
05
05.01
05.02
06
06.01
06.02
06.03
07
07.01
07.02

Descripcin
CONCRETO ARMADO
LOSA
CONCRETO f'c=280 Kg/cm2 EN LOSA
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA
ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60
SARDINELES
CONCRETO f'c=210 Kg/cm2 EN SARDINELES
ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES
ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60
DRENAJE
SUMINISTRO Y COLOCACION DE TUBERIA PVC SAL 2" EN LOSA
SUMINISTRO Y COLOCACION DE LLORADORES DE TUBERIA PVC SAL 2"
VARIOS
APOYOS DE NEOPRENO
JUNTA DE DILATACION e=1" EN PUENTES
JUNTA DE DILATACION e=1" EN LOSAS DE APROXIMACION
SEGURIDAD VIAL
SUMINISTRO Y COLOCACION DE SEALES IMFORMATIVAS 2.10 x 1.20 m
SUMINISTRO Y COLOCACION DE SEALES REGLAMENTARIAS 0.60 x 0.90 m
MEDIO AMBIENTE
RESTAURACION AMBIENTAL DE LAS AREAS EN CANTERAS Y OTROS
PROGRAMA DE EDUCACION AMBIENTAL Y PROMOCION AL TURISMO
PROGRAMA DE MONITOREO ARQUEOLGICO
FLETE
FLETE DE EXPLOSIVOS
FLETE TERRESTRE Y RURAL
COSTO DIRECTO
GASTOS GENERALES
10.00 %
UTILIDAD
5.00 %
SUB TOTAL
IMPUESTO IGV 18%

Und.

PRESUPUESTO CONTRACTUAL
Metrado
PU
P. Parcial

m3
m2
kg

42.00
83.80
5,070.84

458.94
38.18
3.76

19,275.48
3,199.48
19,066.36

m3
m2
kg

3.00
24.50
739.49

421.96
38.18
3.76

1,265.88
935.41
2,780.48

und
und

6.00
40.00

7.11
10.16

42.66
406.40

und
m
m

16.00
12.00
18.00

397.90
9.25
9.25

6,366.40
111.00
166.50

und
und

14.00
4.00

1,068.64
748.14

14,960.96
2,992.56

ha
mes
mes

0.50
9.00
3.00

7,234.03
2,500.00
2,500.00

3,617.02
22,500.00
7,500.00

glb
glb

1.00
1.00

6,000.00
192,651.63

6,000.00
192,651.63
3,551,544.31
355,154.43
177,577.22
4,084,275.96
735,169.67

Item
Part.

Descripcin
MONTO VALORIZADO
AVANCE FISICO EJECUTADO
AVANCE FISICO PROGRAMADO

Und.

PRESUPUESTO CONTRACTUAL
Metrado
PU
P. Parcial
4,819,445.63

IZACION DE AVANCE FISICO DE OBRA

TO DE QUIRUVILCA - SANTIAGO DE CHUCO - LA LIBERTAD

AVANCE ANTERIOR
Metrado
Valorizado

AVANCE ACTUAL
Metrado
Valorizado

Valorizacin N:
Fecha:
Valor Referencial:
Monto Contratado:
Factor de Relacin:
AVANCE ACUMULADO
SALDO PO
Metrado
Valorizado
%
Metrado

1.00
240.00
0.50
3.00
1.59

822.99
7,790.40
25,358.00
5,196.96
2,072.77

50.00%
80.00%
50.00%
30.00%
48.18%

0.00
0.00
0.00
1.00
0.00

0.00
0.00
0.00
1,732.32
0.00

0.00%
0.00%
0.00%
10.00%
0.00%

1.00
240.00
0.50
4.00
1.59

822.99
7,790.40
25,358.00
6,929.28
2,072.77

50.00%
80.00%
50.00%
40.00%
48.18%

1.00
60.00
0.50
6.00
1.71

12.00
1,092.50

8,637.24
4,446.48

69.61%
22.05%

0.00
632.50

0.00
2,574.28

0.00%
12.76%

12.00
1,725.00

8,637.24
7,020.75

69.61%
34.81%

5.24
3,230.28

12,104.50
5,528.10
10,337.40
241.40
448.50
448.50
3,181.25

47,933.82
25,539.82
13,231.87
6,433.31
1,776.06
2,300.81
5,439.94

18.28%
15.44%
16.76%
3.29%
27.98%
27.98%
6.78%

13,252.80
4,978.30
11,352.48
487.50
0.00
0.00
9,878.13

52,481.09
22,999.75
14,531.17
12,991.88
0.00
0.00
16,891.60

20.02%
13.90%
18.41%
6.64%
0.00%
0.00%
21.07%

25,357.30
10,506.40
21,689.88
728.90
448.50
448.50
13,059.38

100,414.91
48,539.57
27,763.05
19,425.19
1,776.06
2,300.81
22,331.54

38.30%
29.34%
35.17%
9.93%
27.98%
27.98%
27.85%

40,856.07
25,303.46
39,979.77
6,608.60
1,154.44
1,154.44
33,830.57

5,223.55
10,258.86
4,677.66
17,063.59

5.79%
5.79%
5.79%
5.79%

3,756.11
3,756.11
3,756.11
3,756.11

20,846.41
40,941.60
18,667.87
68,098.27

23.10%
23.10%
23.10%
23.10%

12,503.34
12,503.34
12,503.34
12,503.34

5,625.71
2,814.93
2,814.93
2,814.93
2,814.93

15,622.86
30,682.74
13,990.20
51,034.68

17.31%
17.31%
17.31%
17.31%

941.18
941.18
941.18
941.18

AVANCE ANTERIOR
Metrado
Valorizado
15,578.50
23,523.54

%
17.34%

AVANCE ACTUAL
Metrado
Valorizado
5,198.80
7,850.19

%
5.79%

AVANCE ACUMULADO
Metrado
Valorizado
20,777.30
31,373.72

%
23.13%

SALDO PO
Metrado
69,042.96

4,536.00
4,536.00
4,536.00
3,888.00
16,500.00

25,174.80
23,723.28
22,543.92
70,489.44
24,915.00

20.42%
20.42%
20.42%
17.50%
17.50%

3,856.90
3,856.90
3,856.90
3,856.90
16,368.00

21,405.80
20,171.59
19,168.79
69,925.60
24,715.68

17.36%
17.36%
17.36%
17.36%
17.36%

8,392.90
8,392.90
8,392.90
7,744.90
32,868.00

46,580.60
43,894.87
41,712.71
140,415.04
49,630.68

37.77%
37.77%
37.77%
34.86%
34.86%

13,825.34
13,825.34
13,825.34
14,473.34
61,422.57

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

22,849.07
22,849.07

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

400.00
33.68

AVANCE ANTERIOR
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00

%
0.00%
0.00%
0.00%

AVANCE ACTUAL
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00

%
0.00%
0.00%
0.00%

AVANCE ACUMULADO
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00

%
0.00%
0.00%
0.00%

SALDO PO
Metrado
465.00
30.00
1,680.00

49.92
59.09
0.00
0.00
15.40
16.83
92.74
11,565.00
14.40

143.27
845.58
0.00
0.00
443.83
7,101.59
3,540.81
43,484.40
315.07

11.76%
9.86%
0.00%
0.00%
11.76%
11.76%
11.76%
100.00%
11.76%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

49.92
59.09
0.00
0.00
15.40
16.83
92.74
11,565.00
14.40

143.27
845.58
0.00
0.00
443.83
7,101.59
3,540.81
43,484.40
315.07

11.76%
9.86%
0.00%
0.00%
11.76%
11.76%
11.76%
100.00%
11.76%

374.40
540.07
489.06
207.91
115.50
126.23
695.55
0.00
108.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

56.00
12.88
16.10
7.20
12.88
19.20

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

168.00
38.64
48.30
21.60
38.64
53.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

112.00

AVANCE ANTERIOR
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

%
0.00%
0.00%
0.00%
0.00%
0.00%

AVANCE ACTUAL
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

%
0.00%
0.00%
0.00%
0.00%
0.00%

AVANCE ACUMULADO
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

%
0.00%
0.00%
0.00%
0.00%
0.00%

SALDO PO
Metrado
25.76
32.20
14.40
25.76
34.40

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

70.00
16.10
20.13
9.00
16.10
21.00

0.00

0.00

0.00%

339.29

973.76

100.00%

339.29

973.76

100.00%

0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

502.03
602.44
0.00

7,184.05
1,030.17
0.00

100.00%
100.00%
0.00%

502.03
602.44
0.00

7,184.05
1,030.17
0.00

100.00%
100.00%
0.00%

0.00
0.00
110.80

0.00

0.00

0.00%

47.12

1,358.00

50.00%

47.12

1,358.00

50.00%

47.12

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

9.38
5.52

0.00
0.00

0.00
0.00

0.00%
0.00%

84.19
75.39

27,128.54
2,878.39

50.00%
50.00%

84.19
75.39

27,128.54
2,878.39

50.00%
50.00%

84.20
75.39

AVANCE ANTERIOR
Metrado
Valorizado
0.00
0.00
0.00
0.00
0.00
0.00

%
0.00%
0.00%
0.00%

AVANCE ACTUAL
Metrado
Valorizado
0.00
0.00
0.00
0.00
5,070.84
19,066.36

%
0.00%
0.00%
100.00%

AVANCE ACUMULADO
Metrado
Valorizado
0.00
0.00
0.00
0.00
5,070.84
19,066.36

%
0.00%
0.00%
100.00%

SALDO PO
Metrado
42.00
83.80
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

3.00
24.50
739.49

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

6.00
40.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

16.00
12.00
18.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

336.04

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

289.05
346.86
95.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

61.34

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

13.16
7.20

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

116.77
113.59

AVANCE ANTERIOR
Metrado
Valorizado

AVANCE ACTUAL
Metrado
Valorizado

AVANCE ACUMULADO
Metrado
Valorizado

SALDO PO
Metrado

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

27.50
66.50
2,741.10

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

2.50
20.54
486.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

10.00
14.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

16.00
12.00
18.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

339.29

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

901.50
1,081.80
344.25

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

94.24

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

9.38
5.52

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

255.48
199.50

AVANCE ANTERIOR
Metrado
Valorizado

AVANCE ACTUAL
Metrado
Valorizado

AVANCE ACUMULADO
Metrado
Valorizado

SALDO PO
Metrado

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

42.00
83.80
5,070.84

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

3.00
24.50
739.49

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

6.00
40.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

16.00
12.00
18.00

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

14.00
4.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.50
9.00
3.00

0.00
0.13

0.00
25,044.71
539,600.19
53,960.02
26,980.01
620,540.22
111,697.24

0.00%
13.00%

0.00
0.25

0.00
48,162.91
432,445.58
43,244.56
21,622.28
497,312.42
89,516.24

0.00%
25.00%

0.00
0.38

0.00
73,207.62
972,045.77
97,204.58
48,602.29
1,117,852.64
201,213.48

0.00%
38.00%

1.00
0.62

AVANCE ANTERIOR
Metrado
Valorizado
732,237.47
15.19%
3.18%

%
15.19%

AVANCE ACTUAL
Metrado
Valorizado
586,828.66
12.18%
3.25%

%
12.18%

AVANCE ACUMULADO
Metrado
Valorizado
1,319,066.13
27.37%
6.43%

%
27.37%

SALDO PO
Metrado

72.

04
01/07/2015
S/. 4,819,445.63
S/. 4,819,445.63
1.00
SALDO POR EJECUTAR
Valorizado

822.99
1,947.60
25,358.00
10,393.92
2,229.21

50.00%
20.00%
50.00%
60.00%
51.82%

3,771.59
13,147.24

30.39%
65.19%

161,790.04
116,901.99
51,174.11
176,119.19
4,571.58
5,922.28
57,850.26

61.70%
70.66%
64.83%
90.07%
72.02%
72.02%
72.15%

69,393.54
136,286.41
62,141.60
226,685.55

76.90%
76.90%
76.90%
76.90%

SALDO POR EJECUTAR


Valorizado
104,254.86

%
76.87%

76,730.64
72,306.53
68,711.94
262,401.65
92,748.08

62.23%
62.23%
62.23%
65.14%
65.14%

15,765.86
48,211.54

100.00%
100.00%

20,576.00
2,099.27

100.00%
100.00%

SALDO POR EJECUTAR


Valorizado
%
795.15
100.00%
3,804.00
100.00%
6,434.40
100.00%

1,074.53
7,728.40
836.29
3,461.70
3,328.71
53,264.01
26,556.10
0.00
2,363.04

88.24%
90.14%
100.00%
100.00%
88.24%
88.24%
88.24%
0.00%
88.24%

160.72
184.31
27.53
703.30
5,434.84
733.06

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

482.16
552.94
82.59
2,109.89
16,304.53
2,046.45

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

321.44

100.00%

SALDO POR EJECUTAR


Valorizado
368.63
55.06
1,406.59
10,869.69
1,313.39

%
100.00%
100.00%
100.00%
100.00%
100.00%

200.90
230.39
34.42
879.12
6,793.56
801.78

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00

0.00%

0.00
0.00
4,612.60

0.00%
0.00%
100.00%

1,358.00

50.00%

3,957.98
210.75

100.00%
100.00%

27,131.77
2,878.39

50.00%
50.00%

SALDO POR EJECUTAR


Valorizado
%
19,275.48
100.00%
3,199.48
100.00%
0.00
0.00%
1,265.88
935.41
2,780.48

100.00%
100.00%
100.00%

42.66
406.40

100.00%
100.00%

6,366.40
111.00
166.50

100.00%
100.00%
100.00%

964.43

100.00%

4,136.31
593.13
3,988.15

100.00%
100.00%
100.00%

1,767.82

100.00%

5,552.99
274.90

100.00%
100.00%

37,626.80
4,336.87

100.00%
100.00%

SALDO POR EJECUTAR


Valorizado

12,620.85
2,538.97
10,306.54

100.00%
100.00%
100.00%

1,054.90
784.22
1,827.36

100.00%
100.00%
100.00%

71.10
142.24

100.00%
100.00%

6,366.40
111.00
166.50

100.00%
100.00%
100.00%

973.76

100.00%

12,900.47
1,849.88
14,331.13

100.00%
100.00%
100.00%

2,716.00

100.00%

3,957.98
210.75

100.00%
100.00%

82,323.32
7,616.91

100.00%
100.00%

SALDO POR EJECUTAR


Valorizado

19,275.48
3,199.48
19,066.36

100.00%
100.00%
100.00%

1,265.88
935.41
2,780.48

100.00%
100.00%
100.00%

42.66
406.40

100.00%
100.00%

6,366.40
111.00
166.50

100.00%
100.00%
100.00%

14,960.96
2,992.56

100.00%
100.00%

3,617.02
22,500.00
7,500.00

100.00%
100.00%
100.00%

6,000.00
119,444.01
2,579,498.54
257,949.85
128,974.93
2,966,423.32
533,956.19

100.00%
62.00%

SALDO POR EJECUTAR


Valorizado
3,500,379.50
72.63%

%
72.63%

VALORIZACIN DE PAGO DEL SUPERVISOR N 03


OBRA: CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LORENZO - EL TAMBO CANIBAMBA - DISTRITO DE QUIRUVILCA - SANTIAGO DE CHUCO - LA LIBERTAD
Lugar: Distr.: Quiruvilca
RUBROS
Valorizacin bruta

Prov.: Santiago de Chuco


SIMB.

Departamento: La Libertad
MONTO

OBSERVACION

VB

5,173.81

Ret.=20% x VB

1,034.76

Sub Total

ST=VB - Ret

4,139.04

Impuesto 18 %

IGV=18% ST

745.03

Retencion 20%

Monto Total
TOTAL A FACTURAR

MT=ST + IGV

4,884.07
4,884.07

Monto a Facturar

RESUMEN DE PAGO POR SUPERVISIN DE OBRA


Nombre del Proyecto
Entidad Contratante
Supervisor
Contrato
Monto contratado Inc. IGV
Monto contratado Sin IGV
Ret. por Liq. 20% Sin IGV
Periodo

CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA - DISTR
ASOCIACION CIVIL FONDO SOCIAL ALTO CHICAMA
CONSORCIO CANIBAMBA
N 766-2015-ACFSACH
S/. 191,984.00
S/. 162,698.31
S/. 32,539.66
MAYO - 2015

ITEM

CONCEPTO

MONTO CONTRATADO
SIN IGV

VALORIZACION
BRUTA

RETENCION POR
LIQUIDACION DE
OBRA ( 20% )

SUB TOTAL

IGV

1
2
3

VALORIZACION N 01
VALORIZACION N 02
VALORIZACION N 03

S/. 162,698.31
S/. 162,698.31
S/. 162,698.31

S/. 5,173.81
S/. 0.00
S/. 19,810.58

S/. 1,034.76
S/. 0.00
S/. 3,962.12

S/. 4,139.04
S/. 0.00
S/. 15,848.47

S/. 745.03
S/. 0.00
S/. 2,852.72

TOTAL

S/. 19,810.58

S/. 3,962.12

S/. 15,848.47

S/. 2,852.72

O POR SUPERVISIN DE OBRA

RENZO - EL TAMBO - CANIBAMBA - DISTRITO DE QUIRUVILCA - SANTIAGO DE CHUCO - LA LIBERTAD

AVANCE FISICO EJECUTADO (%)

MONTO A
FACTURAR

ANTERIOR

ACTUAL

ACUMULADO

S/. 4,884.07
S/. 0.00
S/. 18,701.19

0.00%
3.18%
0.00%

3.18%
0.00%
12.18%

3.18%
3.18%
15.36%

S/. 18,701.19

SUPERVISOR DE OBRA

OBRA:

CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LOR

PERODO

05/03/2015 - 31/03/2015

SUPERVISOR

CONSORCIO CANIBAMBA

RESIDENTE

ING. SANTOS HERMENEGILDO MANTILLA

CONTRATISTA

CONSORCIO PAPELILLO

MESES

5-mar-2015

31-mar-2015

% AVANCE PROGRAMADO

0.00

3.18

% AVANCE REAL

0.00

3.18

SITUACIN
20.00

15.00

CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LOR

OBRA:
20.00

PERODO

05/03/2015 - 31/03/2015

SUPERVISOR

CONSORCIO CANIBAMBA

RESIDENTE

ING. SANTOS HERMENEGILDO MANTILLA

CONTRATISTA

CONSORCIO PAPELILLO

15.00

10.00

5.00

4.52
3.18
3.18

3.25

15.00

CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LOR

OBRA:
10.00

PERODO

05/03/2015 - 31/03/2015

SUPERVISOR

CONSORCIO CANIBAMBA

RESIDENTE

ING. SANTOS HERMENEGILDO MANTILLA

CONTRATISTA

CONSORCIO PAPELILLO

5.00

4.52
3.18
3.25

3.18

0.00 0
0.00
5-mar-2015

31-mar-2015

0
0.00
30-abr-2015

31-may-2015

30-ju

OBRA:

CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LOR

PERODO

05/03/2015 - 31/03/2015

SUPERVISOR

CONSORCIO CANIBAMBA

RESIDENTE

ING. SANTOS HERMENEGILDO MANTILLA

CONTRATISTA

CONSORCIO PAPELILLO

MESES

5-mar-2015

31-mar-2015

% AVANCE PROGRAMADO

0.00

153,052.15

% AVANCE REAL

0.00

153,052.15

SITUACIN
900,000.00

800,000.00

700,000.00

600,000.00

CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LOR

OBRA:

900,000.00

PERODO

05/03/2015 - 31/03/2015

SUPERVISOR

CONSORCIO CANIBAMBA

800,000.00
RESIDENTE

ING. SANTOS HERMENEGILDO MANTILLA

CONTRATISTA

CONSORCIO PAPELILLO

700,000.00

600,000.00

500,000.00

400,000.00

300,000.00

217,819.32

200,000.00
153,052.15
153,052.15
100,000.00

156,723.21

700,000.00

600,000.00

OBRA:

500,000.00

400,000.00

CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LOR

PERODO

05/03/2015 - 31/03/2015

SUPERVISOR

CONSORCIO CANIBAMBA

300,000.00
RESIDENTE

ING. SANTOS HERMENEGILDO MANTILLA

CONTRATISTA

CONSORCIO PAPELILLO
217,819.32

200,000.00
153,052.15
153,052.15

156,723.21

100,000.00

0.00 0.00
5-mar-2015

31-mar-2015

0.00
30-abr-2015

31-may-2015

INFORME DE SUPERVISION N 03

LLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA - DISTRITO DE QUIRUVILCA - SANTIAGO DE CH

FECHA DE INICIO

3/5/2015

PLAZO EJECUCIN

306 das calendarios

FECHA DE TRMINO

2/4/2016

FECHA PRESENTACIN

4/16/2015

AVANCE FISICO PROGRAMADO VS AVANCE FISICO EJ


30-abr-2015

31-may-2015

30-jun-2015

31-jul-2015

0.00

3.25

15.17

17.57

0.00

4.52
ADELANTADA

17.57

17.45
16.30

15.17

INFORME DE SUPERVISION N 03

LLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA - DISTRITO DE QUIRUVILCA - SANTIAGO DE CH

FECHA DE INICIO

3/5/2015

PLAZO EJECUCIN

306 das calendarios

FECHA DE TRMINO

2/4/2016

FECHA PRESENTACIN

4/16/2015

15.17

4.52

3.25

17.57

17.45
16.30

15.17

INFORME DE SUPERVISION N 03

LLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA - DISTRITO DE QUIRUVILCA - SANTIAGO DE CH

FECHA DE INICIO

3/5/2015

PLAZO EJECUCIN

306 das calendarios

FECHA DE TRMINO

2/4/2016

FECHA PRESENTACIN

4/16/2015

4.52

3.25

31-may-2015

30-jun-2015

31-jul-2015

31-ago-2015

30-sep-2015

INFORME DE SUPERVISION N 03

LLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA - DISTRITO DE QUIRUVILCA - SANTIAGO DE CH

FECHA DE INICIO

3/5/2015

PLAZO EJECUCIN

306 das calendarios

FECHA DE TRMINO

2/4/2016

FECHA PRESENTACIN

4/16/2015

AVANCE FINANCIERO PROGRAMADO VS AVANCE FINANCIERO EJECUTADO


30-abr-2015

31-may-2015

30-jun-2015

31-jul-2015

0.00

156,723.21

731,112.48

846,935.91

0.00

217,819.32
ADELANTADA

846,935.91
841,090.68
785,572.07
731,112.48

INFORME DE SUPERVISION N 03

LLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA - DISTRITO DE QUIRUVILCA - SANTIAGO DE CH

FECHA DE INICIO

3/5/2015

PLAZO EJECUCIN

846,935.91
306 das calendarios

FECHA DE TRMINO

2/4/2016

FECHA PRESENTACIN
731,112.48

4/16/2015

217,819.32
156,723.21

841,090.68
785,572.07

INFORME DE SUPERVISION N 03

LLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA - DISTRITO DE QUIRUVILCA - SANTIAGO DE CH

FECHA DE INICIO

3/5/2015

PLAZO EJECUCIN

306 das calendarios

FECHA DE TRMINO

2/4/2016

FECHA PRESENTACIN

4/16/2015

217,819.32
156,723.21

31-may-2015

30-jun-2015

31-jul-2015

31-ago-2015

30-sep-2015

N 03

LCA - SANTIAGO DE CHUCO - LA LIBERTAD

O VS AVANCE FISICO EJECUTADO


31-ago-2015

30-sep-2015

31-oct-2015

30-nov-2015

31-dic-2015

16.30

17.45

14.62

5.44

2.06

17.45

14.62

N 03

LCA - SANTIAGO DE CHUCO - LA LIBERTAD

17.45

14.62

5.44

2.06

14.62

N 03

LCA - SANTIAGO DE CHUCO - LA LIBERTAD

5.44

2.06
1.39

30-sep-2015

31-oct-2015

30-nov-2015

31-dic-2015

31-ene-2016

N 03

LCA - SANTIAGO DE CHUCO - LA LIBERTAD

NANCIERO EJECUTADO
31-ago-2015

30-sep-2015

31-oct-2015

30-nov-2015

31-dic-2015

785,572.07

841,090.68

704,814.16

262,135.81

99,487.17

841,090.68

704,814.16

N 03

LCA - SANTIAGO DE CHUCO - LA LIBERTAD

841,090.68

704,814.16

262,135.81

99,487.17
67,001.88

704,814.16

N 03

LCA - SANTIAGO DE CHUCO - LA LIBERTAD

262,135.81

99,487.17
67,001.88

30-sep-2015

31-oct-2015

30-nov-2015

31-dic-2015

31-ene-2016

31-ene-2016

29-feb-2016

2-mar-2016

1.39

2.80

0.76

06

PROGRAMADO
EJECUTADO

2.80

PROGRAMADO
EJECUTADO

2.80

06

15

1.39
0.76
31-ene-2016

29-feb-2016

2-mar-2016

31-ene-2016

29-feb-2016

2-mar-2016

67001.88

134771.73

36,728.41

PROGRAMADO
Ejecutado

134,771.73

9,487.17
67,001.88

PROGRAMADO
Ejecutado

134,771.73

9,487.17

015

67,001.88
36,728.41
31-ene-2016

29-feb-2016

2-mar-2016

PROGRAMADO
EJECUTADO

2.80

PROGRAMADO
EJECUTADO

2.80

0.76
29-feb-2016

2-mar-2016

CUADRO COMPARATIVO DE METRADOS


OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:

CREACION DEL CAMINO VECINAL PAPELILLO - HUAYGORRAL - SAN LORENZO - EL TAMBO - CANIBAMBA - DISTR
DE QUIRUVILCA - SANTIAGO DE CHUCO - LA LIBERTAD
ASOCIACION CIVIL FONDO SOCIAL ALTO CHICAMA
CONSORCIO PAPELILLO
CONSORCIO CANIBAMBA

Item
Part.
01
01.04
01.05
03
03.01
03.01.02
03.01.03
03.01.05
03.01.06
03.01.07
03.02
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.02.04
03.02.02.05
04
04.03
04.03.01
04.03.01.08
07

Descripcin
OBRAS PROVISIONALES
GUARDIANIA DE MAQUINARIA Y MATERIALES
ACCESOS A CANTERAS, FUENTES DE AGUA Y BOTADEROS
MOVIMIENTO DE TIERRAS
EXPLANACIONES
CONFORMACION DE TERREPLENES - MATERIAL PROPIO
PERFILADO Y COMPACTADO EN ZONA DE CORTE
EXCAVACION PARA MEJORAMIENTO DE SUBRASANTE
CONFORMACION DE MEJORAMIENTO
ELIMINACION DE MATERIAL EXCEDENTE DM > 1KM
PAVIMENTOS
SUB BASE : MATERIAL GRANULAR , e = 0.20 m
EXTRACCION Y APILAMIENTO DE MATERIAL DE SUB BASE
CARGUIO DE MATERIAL SUB BASE
ZARANDEO DE MATERIAL PARA SUB BASE
TRANSPORTE DE MATERIAL DE CANTERA A OBRA SUB BASE
EXTENDIDO, NIVELADO Y COMPACTADO PARA SUB BASE
OBRAS DE ARTE
ALCANTARILLAS
ALCANTARILLA TIPO MARCO DE CONCRETO
ACERO CORRUGADO fy= 4200 kg/cm2 GRADO 60
FLETE

Und.

mes
km

m3
m2
m3
m3
m3

m3
m3
m3
m3
m2

kg

07.02

FLETE TERRESTRE Y RURAL

glb

RADOS

RENZO - EL TAMBO - CANIBAMBA - DISTRITO

METRADO
Expediente
Tcnico

Ejecutado mes
de Mayo

10.00
3.30

1.00
1.59

35,809.86
61,669.65
1,602.94
1,602.94
46,889.95

3,066.20
7,188.30
448.50
448.50
3,181.25

22,218.24
22,218.24
22,218.24
22,218.24
94,290.57

1,360.80
1,360.80
1,360.80
881.28
3,740.00

11,565.00

4,081.77

1.00

0.08

También podría gustarte