Valorizacin N 03
VALORIZACN DE OBRA N 02
(Al 14 de diciembre del 2010)
Obra "CONSTRUCCION Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y
ALCANTARILLADO CENTRO POBLADO CEPEDA PROVINCIA DE ASCOPE
LA LIBERTAD
Ubicacin :
Propietario :
Contratista :
F & K S.A.C.
Supervisor:
Residente:
Modalidad :
Valor Refefencial
A SUMA ALZADA
:
199,134.51
Presupuesto Contratado :
199,134.51
(INCLUIDO I.G.V.)
Presupuesto contratado :
167,339.92
(SIN I.G.V.)
1.00000
0.00
60 Dias calendarios
26-Nov-10
27-Nov-10
25-Jan-11
14-Dec-10
100.00%
PRESUPUESTO
Obra
Fecha :
DESCRIPCIN
01
OBRAS PROVISIONALES
01.01
01.02
01.03
02
02.01
UND
CANT
PRECIO
PARCIAL
und
glb
glb
1.00
1.00
1.00
771.25
800.00
1,500.00
771.25
800.00
1,500.00
02.13
m3
CONCRETO LOSA ALIGERADA F'c= 175 Kg/cm2
m3
ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA
m2
ACERO LOSA ALIGERADA
kg
LADRILLO HUECO DE ARCILLA 15X25X30 CM PARA TECHO ALIGERA und
MURO DE LADRILLO KK DE ARCILLA DE SOGA
m2
TARRAJEO DE MUROS
m2
CIELORASOS
m2
FALSO PISO DE 4" DE CONCRETO 1:10
m2
PISO DE 2" CONCRETO F'C 140 KG/CM2 X 4 CM.+ PULIDO 1:2 X 1CM m2
PUERTA DE FIERRO + CERRAJERIA+ANTICORROSIVO
und
VENTANA DE FIERRO 2.1 X 0.6 CM + ANTICORROSIVO
und
PINTURA LATEX
m2
2.08
0.57
6.76
22.95
56.31
31.35
79.11
6.76
6.76
6.76
1.00
1.00
79.10
248.95
254.97
51.85
4.80
2.28
38.79
15.93
41.30
15.75
26.65
600.00
234.00
7.30
517.82
145.33
350.51
110.16
128.39
1,216.07
1,260.22
279.19
106.47
180.15
600.00
234.00
577.43
03
LINEA DE IMPLULSION
03.01
03.02
03.03
03.04
03.05
50.00
50.00
50.00
50.00
50.00
0.94
9.69
6.70
3.10
2.09
47.00
484.50
335.00
155.00
104.50
04
TANQUE ELEVADO V= 18 M3
04.01
TRAZO Y REPLANTEO
04.02
04.03
04.04
04.05
04.06
04.07
04.08
04.09
21.16
25.98
10.24
7.26
364.97
18.94
8.64
86.40
1,158.51
2.64
34.56
19.68
248.95
5.02
10.87
392.66
41.36
4.80
55.86
897.87
201.52
1,807.38
1,832.15
205.88
3,392.58
3,573.50
5,560.85
02.02
02.03
02.04
02.05
02.06
02.07
02.08
02.09
02.10
02.11
02.12
m
m
m
m
m
m2
m2
m3
kg
m3
m3
m2
kg
04.28
m3
m2
ACERO VIGAS Fy=4200 Kg/cm2
kg
CONCRETO TANQUE ELEVADO, F'c= 210 Kg/cm2
m3
ENCOFRADO Y DESENCOFRADO TANQUE ELEVADO
m2
ACERO TANQUE ELEVADO Fy= 4200 Kg/cm2
kg
TARRAJEO EXT. LOSA DE FONDO TANQUE ELEV.
m2
IMPERMEABILIZACION TANQUE ELEV. MORTERO 1:5+SIKA, E=2.5 C m2
TARRAJEO MUROS EXT. TANQUE ELEV. MORTERO 1:5, E= 2cm
m2
TAPA SANITARIA METALICA
und
PINTURA TANQUE ELEVADO COLUMNAS Y VIGAS
m2
ESCALERA FG
m
SUMINISTRO Y COLOCACION DE HIPOCLORADOR
und
TUBERIA DE VENTILACION FG 2''
und
VALV. ACCESORIOS ENTRADA Y SALIDA 2''
und
TARRAJEO COLUMNAS
m2
TARRAJEO VIGAS
m2
TUBERIA PARA LIMPIEZA Y REBOSE
m
ACCESORIOS
glb
4.99
34.32
646.58
9.81
51.62
810.27
9.00
29.40
30.19
1.00
172.75
21.35
1.00
2.00
1.00
92.16
42.84
16.00
1.00
301.96
69.44
4.80
305.96
48.07
4.80
15.81
22.78
20.78
80.00
7.30
41.11
153.59
83.97
343.58
24.77
22.21
6.28
550.00
1,506.78
2,383.18
3,103.58
3,001.47
2,481.37
3,889.30
142.29
669.73
627.35
80.00
1,261.08
877.70
153.59
167.94
343.58
2,282.80
951.48
100.48
550.00
05
05.01
05.02
790.00
790.00
790.00
948.00
948.00
948.00
99.54
790.00
790.00
5.00
2.00
2.00
7.00
4.00
7.00
0.94
10.79
2.35
6.70
0.24
5.48
12.83
2.67
2.09
451.38
4.51
21.88
35.00
21.00
31.11
742.60
8,524.10
1,856.50
6,351.60
227.52
5,195.04
1,277.10
2,109.30
1,651.10
2,256.90
9.02
43.76
245.00
84.00
217.77
glb
1.00
1.00
14,300.00
460.00
14,300.00
460.00
m3
REFINE Y NIVELACION DE ZANJAS
m
RELLENO Y COMP.MAT.PROPIO
m
ELIMINACION DE MATERIAL EXCEDENTE
m3
SUMINISTRO E INSTALACION DE ACCESORIOS
und
PRUEBA HIDRAULICA DE AGUA
m
SUMINISTRO E INSTALACION PARA CAJA DE REGISTRO DE AGUA und
66.10
136.00
136.00
1.00
68.00
136.00
68.00
28.79
0.54
10.77
10.79
259.05
0.64
45.62
1,903.02
73.44
1,464.72
10.79
17,615.40
87.04
3,102.16
04.10
04.11
04.12
04.13
04.14
04.15
04.16
04.17
04.18
04.19
04.20
04.21
04.22
04.23
04.24
04.25
04.26
04.27
05.15
m
m
CAMA DE APOYO Y REFINE INC CAMA ARENA 10 CM
m
SUMINISTRO TUB. PVC UF. ISO 4422 63 mm x 6m
m
REFINE Y NIVELACION DE ZANJA TN P/TUBO DN 110 MM
m
RELLENO COMPACTADO DE ZANJAS
m
ELIM. MAT. EXCEDENTE HASTA 5 KM PROM.
m3
PRUEBA HIDRAULICA Y DESIFECCION DE REDES DE AGUA
m
INSTALACION TUB. PVC UF DN (63-90) MM
m
VALVULA COMPUERTA FFD-PVC CC ISO 7259 DN 90 MM
und
INSTALACION ACCESORIOS PVC DE 50-110 mm
und
INSTALACION VALVULA COMP. FFD DN (63-110) mm INC REGISTRO und
TEE PVC UF 63MM X 63MM C/ANILLO
und
TAPON PVC UF 63MM X 63MM C/ANILLO
und
DADOS DE CONCRETO F'c= 140 Kg/cm2 DN (50-90)MM
und
06
EQUIPOS DE BOMBEO
06.01
06.02
07
CONEXIONES DOMICILIARIAS
07.01
05.03
05.04
05.05
05.06
05.07
05.08
05.09
05.10
05.11
05.12
05.13
05.14
07.02
07.03
07.04
07.05
07.06
07.07
COSTO DIRECTO
121812.16
Obra
Fecha :
DESCRICION
UND
OBRAS PROVISIONALES
Trazo, nivelacin y replanteo
M
MOVIMIENTO DE TIERRAS
Excavacin manual para buzones
M3
Excavacin Manual para zanjas
M3
Refine y Nivelacin de zanjas
M
Cama de apoyo E = 0.10 m
M
Relleno y compactacin de zanja con material p M3
Eliminacin manual de material excedente
M3
CONSTRUCCIONES DE BUZONES
PARED CIRCULAR PARA BUZONES
Concreto f'c = 175 Kg/cm2
M3
Tarrajeo con Impermeabilizante SIKA Acabado InM2
Encofrado y Desencofrado Metalico
M2
FONDO CIRCULAR PARA BUZONES
Concreto f'c = 175 Kg/cm2
M3
LOSA DE CONCRETO
Concreto f'c = 210 Kg/cm2
M3
Encofrado y Desencofrado
M2
Acero de Refuerzo f'y = 4200 Kg/cm2
KG
TAPA DE CONCRETO
Concreto f'c = 300 Kg/cm2
M3
Acero de Refuerzo f'y = 4200 Kg/cm2
KG
Perfil Angular 2' x 2' x 3/16'
UND
OBRAS DE CONCRETO SIMPLE
DADOS DE EMPALME TUBERIA - BUZON
Concreto f'c = 140 Kg/cm2
M3
Encofrado y Desencofrado de dados
M2
CANT
PRECIO
PARCIAL
165.25
1.11
183.43
9.51
198.30
165.25
165.25
166.46
31.34
24.21
9.91
2.35
4.77
10.75
9.50
230.24
1,965.15
388.34
788.24
1,789.45
297.73
4.16
17.84
17.84
332.56
14.68
14.50
1,383.45
261.89
258.68
1.20
332.56
399.07
1.01
6.64
72.23
265.60
21.34
4.48
268.26
141.70
323.59
0.06
21.08
3.00
137.36
4.48
20.00
8.24
94.44
60.00
0.17
2.58
214.07
21.15
36.39
54.57
05.02.00
05.02.01
05.02.02
06.00.00
06.00.01
06.00.02
07.00.00
07.00.01
07.00.02
07.00.03
07.00.04
07.00.05
07.00.06
07.00.07
07.00.08
07.00.09
07.00.10
0.57
5.22
332.56
14.68
189.56
76.63
165.25
165.25
34.99
1.87
5,782.10
309.02
120.00
57.60
120.00
120.00
24.00
24.00
24.00
120.00
120.00
1.83
1.11
25.98
2.35
20.01
46.58
73.11
9.06
1.87
6.21
20.87
133.20
1,496.45
282.02
2,401.20
1,117.92
1,754.64
217.44
224.40
745.20
38.19
23,700.81
SUBTOTAL
IMPUESTO (I.G.V.) 19 %
============
TOTAL PRESUPUESTO
SON :
11/30/2010
TOTAL
3,071.25
5,705.74
1,126.00
42,101.29
ITEM
DESCRIPCION
01
OBRAS PROVISIONALES
01.01
01.02
01.03
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
TARRAJEO DE MUROS
02.08
CIELORASOS
02.09
02.10
PISO DE 2" CONCRETO F'C 140 KG/CM2 X 4 CM.+ PULIDO 1:2 X 1CM
02.11
02.12
02.13
PINTURA LATEX
03
LINEA DE IMPLULSION
03.01
03.02
03.03
03.04
03.05
04
TANQUE ELEVADO V= 18 M3
04.01
TRAZO Y REPLANTEO
04.02
04.03
04.04
04.05
04.06
04.07
04.08
04.09
UND
und
glb
glb
m3
m3
m2
kg
und
m2
m2
m2
m2
m2
und
und
m2
m
m
m
m
m
m2
m3
m2
m3
kg
m3
m3
m2
kg
30,791.31
14,760.00
24,256.57
m3
m2
kg
m3
m2
kg
m2
m2
m2
und
m2
m
und
und
und
m2
m2
m
glb
04.10
04.11
04.12
04.13
04.14
04.15
04.16
04.17
04.18
04.19
04.20
04.21
ESCALERA FG
04.22
04.23
04.24
04.25
TARRAJEO COLUMNAS
04.26
TARRAJEO VIGAS
04.27
04.28
ACCESORIOS
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
05.08
05.09
05.10
05.11
05.12
05.13
05.14
05.15
06
EQUIPOS DE BOMBEO
06.01
06.02
07
CONEXIONES DOMICILIARIAS
07.01
07.02
07.03
RELLENO Y COMP.MAT.PROPIO
07.04
07.05
07.06
07.07
m
m
m
m
m
m
m3
m
m
und
und
und
und
und
und
glb
m3
m
m
m3
und
m
und
121,812.16
12,181.22
6,090.61
-------------------140,083.99
26,615.96
-------------------166,699.95
NUEVOS SOLES
Obra
11/30/2010
TOTAL
183.43
5,459.15
1,904.02
399.07
733.55
3,199.32
90.96
ITEM
02.00.00
02.00.01
03.00.00
03.00.01
03.00.02
03.00.03
03.00.04
03.00.05
03.00.06
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.02.00
04.02.01
04.03.00
04.03.01
04.03.02
04.03.03
04.04.00
04.04.01
04.04.02
04.04.03
05.00.00
05.01.00
05.01.01
05.01.02
DESCRIPCION
OBRAS PROVISIONALES
Trazo, nivelacin y replanteo
MOVIMIENTO DE TIERRAS
Excavacin manual para buzones
Excavacin Manual para zanjas
Refine y Nivelacin de zanjas
Cama de apoyo E = 0.10 m
Relleno y compactacin de zanja con material propio
Eliminacin manual de material excedente
CONSTRUCCIONES DE BUZONES
PARED CIRCULAR PARA BUZONES
Concreto f'c = 175 Kg/cm2
Tarrajeo con Impermeabilizante SIKA Acabado Interior
Encofrado y Desencofrado Metalico
FONDO CIRCULAR PARA BUZONES
Concreto f'c = 175 Kg/cm2
LOSA DE CONCRETO
Concreto f'c = 210 Kg/cm2
Encofrado y Desencofrado
Acero de Refuerzo f'y = 4200 Kg/cm2
TAPA DE CONCRETO
Concreto f'c = 300 Kg/cm2
Acero de Refuerzo f'y = 4200 Kg/cm2
Perfil Angular 2' x 2' x 3/16'
OBRAS DE CONCRETO SIMPLE
DADOS DE EMPALME TUBERIA - BUZON
Concreto f'c = 140 Kg/cm2
Encofrado y Desencofrado de dados
UND
M
M3
M3
M
M
M3
M3
M3
M2
M2
M3
M3
M2
KG
M3
KG
UND
M3
M2
357.15
6,091.12
8,410.64
23,700.81
2,370.08
1,185.04
----------------27,255.93
5,178.63
============
32,434.56
05.02.00
05.02.01
05.02.02
06.00.00
06.00.01
06.00.02
07.00.00
07.00.01
07.00.02
07.00.03
07.00.04
07.00.05
07.00.06
07.00.07
07.00.08
07.00.09
07.00.10
M3
M2
M
M
M
M3
M
M
UND
UND
UND
M
M
M3
DE AGUA POTABLE Y
A PROVINCIA DE ASCOPE
Fecha : 12/14/2010
ACTUAL
METRADOS
ACUM
% AVANCE
1.00
1.00
1.00
1.00
1.00
1.00
100.00
100.00
100.00
2.08
0.57
6.76
22.95
56.31
31.35
79.11
6.76
6.76
6.76
1.00
1.00
79.10
2.08
0.57
6.76
22.95
56.31
31.35
79.11
6.76
6.76
6.76
1.00
1.00
79.10
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
100.00
100.00
100.00
100.00
100.00
21.16
25.98
10.24
7.26
364.97
18.94
8.64
86.40
1158.51
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
21.16
25.98
10.24
7.26
364.97
18.94
8.64
86.40
1,158.51
4.99
34.32
646.58
9.81
51.62
810.27
9.00
29.40
30.19
1.00
172.75
21.35
1.00
2.00
1.00
92.16
42.84
16.00
1.00
4.99
34.32
646.58
9.81
51.62
810.27
9.00
29.40
30.19
1.00
172.75
21.35
1.00
2.00
1.00
92.16
42.84
16.00
1.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
790.00
790.00
790.00
948.00
948.00
948.00
99.54
790.00
790.00
5.00
2.00
2.00
7.00
4.00
7.00
790.00
790.00
790.00
948.00
948.00
948.00
99.54
790.00
790.00
5.00
2.00
2.00
7.00
4.00
7.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
1.00
1.00
100.00
100.00
66.10
136.00
136.00
1.00
68.00
136.00
68.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
1.00
1.00
66.10
136.00
136.00
1.00
68.00
136.00
68.00
DE AGUA POTABLE Y
A PROVINCIA DE ASCOPE
Fecha : 11/30/2010
ACTUAL
ACUM
% AVANCE
165.25
165.25
100.00
9.51
198.30
165.25
165.25
166.46
31.34
9.51
198.30
165.25
165.25
166.46
31.34
100.00
100.00
100.00
100.00
100.00
100.00
4.16
17.84
17.84
4.16
17.84
17.84
100.00
100.00
100.00
1.20
1.20
100.00
1.01
6.64
72.23
1.01
6.64
72.23
100.00
100.00
100.00
0.06
21.08
3.00
0.06
21.08
3.00
100.00
100.00
100.00
0.17
2.58
0.17
2.58
100.00
100.00
0.57
5.22
0.57
5.22
100.00
100.00
165.25
165.25
165.25
165.25
100.00
100.00
120.00
57.60
120.00
120.00
24.00
24.00
24.00
120.00
120.00
1.83
120.00
57.60
120.00
120.00
24.00
24.00
24.00
120.00
120.00
1.83
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PART
DESCRIPCION
Fecha :
Monto contratado:
Plazo ejecucin:
VALORIZ
N 01
VALORIZ
N 02
VALORIZ
N 03
del 27 al 30 nov.
del 01 al 31 dic
del 01 al 25 ene
AGUA POTABLE
01
OBRAS PROVISIONALES
01.01
01.02
01.03
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
TARRAJEO DE MUROS
02.08
CIELORASOS
02.09
02.10
PISO DE 2" CONCRETO F'C 140 KG/CM2 X 4 CM.+ PULIDO 1:2 X 1CM
02.11
02.12
02.13
PINTURA LATEX
03
LINEA DE IMPLULSION
03.01
03.02
03.03
03.04
03.05
04
TANQUE ELEVADO V= 18 M3
04.01
TRAZO Y REPLANTEO
04.02
04.03
04.04
04.05
04.06
04.07
04.08
04.09
771.25
800.00
1,500.00
517.82
145.33
350.51
110.16
128.39
1,216.07
1,260.22
279.19
106.47
180.15
600.00
234.00
577.43
47.00
484.50
335.00
155.00
104.50
55.86
897.87
201.52
1,807.38
1,832.15
205.88
3,392.58
3,573.50
5,560.85
PART
DESCRIPCION
VALORIZ
N 01
VALORIZ
N 02
VALORIZ
N 03
del 27 al 30 nov.
del 01 al 31 dic
del 01 al 25 ene
04.10
04.11
04.12
04.13
04.14
04.15
04.16
04.17
04.18
04.19
04.20
04.21
ESCALERA FG
04.22
04.23
04.24
04.25
TARRAJEO COLUMNAS
04.26
TARRAJEO VIGAS
04.27
04.28
ACCESORIOS
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
05.08
05.09
05.10
05.11
05.12
05.13
05.14
05.15
06
EQUIPOS DE BOMBEO
06.01
06.02
07
CONEXIONES DOMICILIARIAS
07.01
07.02
07.03
RELLENO Y COMP.MAT.PROPIO
07.04
07.05
07.06
07.07
1,506.78
2,383.18
3,103.58
3,001.47
2,481.37
3,889.30
142.29
669.73
627.35
80.00
1,261.08
877.70
153.59
167.94
343.58
2,282.80
951.48
100.48
550.00
742.60
8,524.10
1,856.50
6,351.60
227.52
5,195.04
1,277.10
2,109.30
1,651.10
2,256.90
9.02
43.76
245.00
84.00
217.77
14,300.00
460.00
1,903.02
73.44
1,464.72
10.79
17,615.40
87.04
3,102.16
PART
II
DESCRIPCION
VALORIZ
N 01
VALORIZ
N 02
VALORIZ
N 03
del 27 al 30 nov.
del 01 al 31 dic
del 01 al 25 ene
ALCANTARILLADO
MOVIMIENTO DE TIERRAS
Excavacin manual para buzones
Excavacin Manual para zanjas
Refine y Nivelacin de zanjas
Cama de apoyo E = 0.10 m
Relleno y compactacin de zanja con material propio
Eliminacin manual de material excedente
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
CONSTRUCCIONES DE BUZONES
PARED CIRCULAR PARA BUZONES
Concreto f'c = 175 Kg/cm2
Tarrajeo con Impermeabilizante SIKA Acabado Interior
Encofrado y Desencofrado Metalico
183.43
230.24
1,965.15
388.34
788.24
1,789.45
297.73
1,383.45
261.89
258.68
399.07
04.03.00
04.03.01
04.03.02
04.03.03
LOSA DE CONCRETO
Concreto f'c = 210 Kg/cm2
Encofrado y Desencofrado
Acero de Refuerzo f'y = 4200 Kg/cm2
268.26
141.70
323.59
04.04.00
04.04.01
04.04.02
04.04.03
TAPA DE CONCRETO
Concreto f'c = 300 Kg/cm2
Acero de Refuerzo f'y = 4200 Kg/cm2
Perfil Angular 2' x 2' x 3/16'
8.24
94.44
60.00
05.00.00
05.01.00
05.01.01
05.01.02
36.39
54.57
189.56
76.63
CONEXIONES DOMICILIARIAS
Trazo, nivelacin y replanteo
Excavacinde zanjas
Refine y Nivelacin de zanjas
Suministro e Instalacin de Tuberia de PVC D=6'-U.F-serie 20
Suministro e Instalacin de Cachimba
5,782.10
309.02
133.20
1,496.45
282.02
2,401.20
1,117.92
PART
07.00.06
07.00.07
07.00.08
07.00.09
07.00.10
DESCRIPCION
VALORIZ
N 01
VALORIZ
N 02
VALORIZ
N 03
del 27 al 30 nov.
del 01 al 31 dic
del 01 al 25 ene
1,754.64
217.44
224.40
745.20
38.19
COSTO DIRECTO
GASTOS GENERALES 10.00 %
UTILIDAD 5.00%
39,005.62
3,900.56
1,950.28
106,507.36
10,650.74
5,325.37
SUBTOTAL
IMPUESTO (I.G.V.) 19 %
44,856.46
8,522.73
122,483.46
23,271.86
TOTAL GENERAL
53,379.19
145,755.32
26.81%
73.19%
26.81%
100.00%
12/14/2010
199,134.51
60 dias calend
T O TAL
771.25
800.00
1,500.00
517.82
145.33
350.51
110.16
128.39
1,216.07
1,260.22
279.19
106.47
180.15
600.00
234.00
577.43
47.00
484.50
335.00
155.00
104.50
55.86
897.87
201.52
1,807.38
1,832.15
205.88
3,392.58
3,573.50
5,560.85
T O TAL
1,506.78
2,383.18
3,103.58
3,001.47
2,481.37
3,889.30
142.29
669.73
627.35
80.00
1,261.08
877.70
153.59
167.94
343.58
2,282.80
951.48
100.48
550.00
742.60
8,524.10
1,856.50
6,351.60
227.52
5,195.04
1,277.10
2,109.30
1,651.10
2,256.90
9.02
43.76
245.00
84.00
217.77
14,300.00
460.00
1,903.02
73.44
1,464.72
10.79
17,615.40
87.04
3,102.16
T O TAL
183.43
230.24
1,965.15
388.34
788.24
1,789.45
297.73
1,383.45
261.89
258.68
399.07
268.26
141.70
323.59
8.24
94.44
60.00
36.39
54.57
189.56
76.63
5,782.10
309.02
133.20
1,496.45
282.02
2,401.20
1,117.92
T O TAL
1,754.64
217.44
224.40
745.20
38.19
145,512.97
14,551.30
7,275.65
167,339.92
31,794.59
199,134.51
Monto contratado:
Plazo ejecucin:
PAR
DESCRIPCION
TI
UNID
DA
01
OBRAS PROVISIONALES
01.01
01.02
01.03
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
TARRAJEO DE MUROS
02.08
CIELORASOS
02.09
02.10
PISO DE 2" CONCRETO F'C 140 KG/CM2 X 4 CM.+ PULIDO 1:2 X 1CM
02.11
02.12
02.13
PINTURA LATEX
ME
PRECIO
TO
TRADO
UNITARIO
TAL
AVANCES
ACTUAL
AMTERIOR
METRADO
MONTO
METRADO
MONTO
und
glb
glb
1.00
1.00
1.00
771.25
800.00
1,500.00
771.25
800.00
1,500.00
1.00
1.00
1.00
771.25
800.00
1500.00
0.00
0.00
0.00
0.00
0.00
0.00
m3
m3
m2
kg
und
m2
m2
m2
m2
m2
und
und
m2
2.08
0.57
6.76
22.95
56.31
31.35
79.11
6.76
6.76
6.76
1.00
1.00
79.10
248.95
254.97
51.85
4.80
2.28
38.79
15.93
41.30
15.75
26.65
600.00
234.00
7.30
517.82
145.33
350.51
110.16
128.39
1,216.07
1,260.22
279.19
106.47
180.15
600.00
234.00
577.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.08
0.57
6.76
22.95
56.31
31.35
79.11
6.76
6.76
6.76
1.00
1.00
79.10
517.82
145.33
350.51
110.16
128.39
1,216.07
1,260.22
279.19
106.47
180.15
600.00
234.00
577.43
03
LINEA DE IMPLULSION
03.01
03.02
03.03
03.04
03.05
04
TANQUE ELEVADO V= 18 M3
04.01
TRAZO Y REPLANTEO
04.02
04.03
04.04
04.05
04.06
04.07
04.08
04.09
04.10
04.11
04.12
04.13
04.14
04.15
04.16
04.17
04.18
04.19
04.20
04.21
ESCALERA FG
04.22
04.23
04.24
m
m
m
m
m
m2
m3
m2
m3
kg
m3
m3
m2
kg
m3
m2
kg
m3
m2
kg
m2
m2
m2
und
m2
m
und
und
und
50.00
50.00
50.00
50.00
50.00
0.94
9.69
6.70
3.10
2.09
47.00
484.50
335.00
155.00
104.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00
50.00
50.00
50.00
50.00
47.00
484.50
335.00
155.00
104.50
21.16
25.98
10.24
7.26
364.97
18.94
8.64
86.40
1,158.51
4.99
34.32
646.58
9.81
51.62
810.27
9.00
29.40
30.19
1.00
172.75
21.35
1.00
2.00
1.00
2.64
34.56
19.68
248.95
5.02
10.87
392.66
41.36
4.80
301.96
69.44
4.80
305.96
48.07
4.80
15.81
22.78
20.78
80.00
7.30
41.11
153.59
83.97
343.58
55.86
897.87
201.52
1,807.38
1,832.15
205.88
3,392.58
3,573.50
5,560.85
1,506.78
2,383.18
3,103.58
3,001.47
2,481.37
3,889.30
142.29
669.73
627.35
80.00
1,261.08
877.70
153.59
167.94
343.58
21.16
25.98
10.24
7.26
364.97
18.94
3.26
32.67
1,158.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
55.86
897.87
201.52
1807.38
1832.15
205.88
1280.07
1351.23
5560.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.38
53.73
0.00
4.99
34.32
646.58
9.81
51.62
810.27
9.00
29.40
30.19
1.00
172.75
21.35
1.00
2.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
2,112.51
2,222.27
0.00
1,506.78
2,383.18
3,103.58
3,001.47
2,481.37
3,889.30
142.29
669.73
627.35
80.00
1,261.08
877.70
153.59
167.94
343.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
92.16
42.84
16.00
1.00
2,282.80
951.48
100.48
550.00
742.60
8,524.10
1,856.50
6,351.60
227.52
5,195.04
1,277.10
2,109.30
1,651.10
2,256.90
9.02
43.76
245.00
84.00
217.77
790.00
790.00
790.00
948.00
948.00
790.00
5.00
2.00
2.00
7.00
4.00
7.00
742.60
8524.10
1856.50
6351.60
227.52
0.00
0.00
0.00
1651.10
2256.90
9.02
43.76
245.00
84.00
217.77
0.00
0.00
0.00
0.00
0.00
948.00
99.54
790.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,195.04
1,277.10
2,109.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14,300.00
460.00
14,300.00
460.00
0.00
0.00
0.00
0.00
1.00
1.00
14,300.00
460.00
28.79
0.54
10.77
10.79
259.05
0.64
1,903.02
73.44
1,464.72
10.79
17,615.40
87.04
13.00
27.00
0.00
0.00
14.00
0.00
374.27
14.58
0.00
0.00
3626.70
0.00
53.10
109.00
136.00
1.00
54.00
136.00
1,528.75
58.86
1,464.72
10.79
13,988.70
87.04
04.25
TARRAJEO COLUMNAS
m2
92.16
24.77
2,282.80
04.26
TARRAJEO VIGAS
04.27
04.28
ACCESORIOS
m2
m
glb
42.84
16.00
1.00
22.21
6.28
550.00
951.48
100.48
550.00
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
05.08
05.09
05.10
05.11
05.12
05.13
05.14
05.15
m
m
m
m
m
m
m3
m
m
und
und
und
und
und
und
790.00
790.00
790.00
948.00
948.00
948.00
99.54
790.00
790.00
5.00
2.00
2.00
7.00
4.00
7.00
0.94
10.79
2.35
6.70
0.24
5.48
12.83
2.67
2.09
451.38
4.51
21.88
35.00
21.00
31.11
06
EQUIPOS DE BOMBEO
06.01
06.02
glb
glb
1.00
1.00
07
CONEXIONES DOMICILIARIAS
07.01
07.02
07.03
RELLENO Y COMP.MAT.PROPIO
07.04
07.05
07.06
m3
m
m
m3
und
m
66.10
136.00
136.00
1.00
68.00
136.00
07.07
und
68.00
45.62
3,102.16
121,812.16
12,181.22
6,090.61
14.00
638.68
43,128.16
4,312.82
2,156.41
54.00
2,463.48
78,683.99
7,868.40
3,934.20
-------------
-------------
-------------
SUB TOTAL
140,083.99
140,083.99
49,597.38
49,597.38
90,486.59
90,486.59
CONSTRUCCION Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DEL CENTRO POBLADO CEPEDA PROVINCIA DE ASCOPE - LA LIBERTA
Monto contratado:
Plazo ejecucin:
PAR
TI
DESCRIPCION
UNID
DA
ME
PRECIO
TO
TRADO
UNITARIO
TAL
AVANCES
ACTUAL
AMTERIOR
METRADO
MONTO
METRADO
MONTO
165.25
1.11
183.43
165.25
183.43
0.00
0.00
03.00.00
03.00.01
03.00.02
03.00.03
03.00.04
03.00.05
03.00.06
MOVIMIENTO DE TIERRAS
Excavacin manual para buzones
Excavacin Manual para zanjas
Refine y Nivelacin de zanjas
Cama de apoyo E = 0.10 m
Relleno y compactacin de zanja con material propio
Eliminacin manual de material excedente
M3
M3
M
M
M3
M3
9.51
198.30
165.25
165.25
166.46
31.34
24.21
9.91
2.35
4.77
10.75
9.50
230.24
1,965.15
388.34
788.24
1,789.45
297.73
9.51
198.3
165.25
165.25
0.00
0.00
230.24
1965.15
388.34
788.24
0.00
0.00
0.00
0.00
0.00
0.00
166.46
31.34
0.00
0.00
0.00
0.00
1,789.45
297.73
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
CONSTRUCCIONES DE BUZONES
PARED CIRCULAR PARA BUZONES
Concreto f'c = 175 Kg/cm2
Tarrajeo con Impermeabilizante SIKA Acabado Interior
Encofrado y Desencofrado Metalico
M3
M2
M2
4.16
17.84
17.84
332.56
14.68
14.50
1,383.45
261.89
258.68
4.16
17.84
17.84
1383.45
261.89
258.68
0.00
0.00
0.00
0.00
0.00
0.00
M3
1.20
332.56
399.07
1.20
399.07
0.00
0.00
M3
M2
KG
1.01
6.64
72.23
265.60
21.34
4.48
268.26
141.70
323.59
1.01
6.64
72.23
268.26
141.70
323.59
0.00
0.00
0.00
0.00
0.00
0.00
0.06
21.08
3.00
137.36
4.48
20.00
8.24
94.44
60.00
0.06
21.08
3.00
8.24
94.44
60.00
0.00
0.00
0.00
0.00
0.00
0.00
04.04.00
04.04.01
04.04.02
04.04.03
TAPA DE CONCRETO
Concreto f'c = 300 Kg/cm2
Acero de Refuerzo f'y = 4200 Kg/cm2
Perfil Angular 2' x 2' x 3/16'
M3
KG
UND
05.00.00
05.01.00
05.01.01
05.01.02
M3
M2
0.17
2.58
214.07
21.15
36.39
54.57
0.17
2.58
36.39
54.57
0.00
0.00
0.00
0.00
M3
M2
0.57
5.22
332.56
14.68
189.56
76.63
0.57
5.22
189.56
76.63
0.00
0.00
0.00
0.00
M
M
165.25
165.25
34.99
1.87
5,782.10
309.02
165.25
165.25
5782.10
309.02
0.00
0.00
0.00
0.00
120.00
57.60
120.00
120.00
24.00
24.00
24.00
120.00
120.00
1.83
1.11
25.98
2.35
20.01
46.58
73.11
9.06
1.87
6.21
20.87
133.20
1,496.45
282.02
2,401.20
1,117.92
1,754.64
217.44
224.40
745.20
38.19
120.00
7.00
15.00
15.00
3.00
3.00
0.00
0.00
0.00
0.00
133.20
181.86
35.26
300.15
139.74
219.33
0.00
0.00
0.00
0.00
0.00
50.60
105.00
105.00
21.00
21.00
24.00
120.00
120.00
1.83
0.00
1,314.59
246.76
2,101.05
978.18
1,535.31
217.44
224.40
745.20
38.19
07.00.00
07.00.01
07.00.02
07.00.03
07.00.04
07.00.05
07.00.06
07.00.07
07.00.08
07.00.09
07.00.10
CONEXIONES DOMICILIARIAS
Trazo, nivelacin y replanteo
M
Excavacinde zanjas
M3
Refine y Nivelacin de zanjas
M
Suministro e Instalacin de Tuberia de PVC D=6'-U.F-serM
Suministro e Instalacin de Cachimba
UND
Suministro e Instalacin de caja de registro
UND
Dados de anclaje
UND
Prueba Hidraulica
M
Relleno y compactacin con material propio
M
Eliminacin de material excedente
M3
COSTO DIRECTO
23,700.81
14,212.52
9,488.30
2,370.08
1,185.04
----------------27,255.93
27,255.93
1,421.25
710.63
----------------16,344.39
16,344.39
948.83
474.41
----------------10,911.54
10,911.54
DE ASCOPE - LA LIBERTAD
Fecha :
12/14/2010
onto contratado:
199,134.51
Plazo ejecucin: 60 dias calend
CES
SALDO
ACUMULADO
METRADO
1.00
1.00
1.00
2.08
0.57
6.76
22.95
56.31
31.35
79.11
6.76
6.76
6.76
1.00
1.00
79.10
MONTO
MET.
MONT.
771.25 100.00%
800.00 100.00%
1,500.00 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
517.82
145.33
350.51
110.16
128.39
1,216.07
1,260.22
279.19
106.47
180.15
600.00
234.00
577.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
50.00
50.00
50.00
50.00
50.00
47.00
484.50
335.00
155.00
104.50
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
21.16
25.98
10.24
7.26
364.97
18.94
8.64
86.40
1,158.51
4.99
34.32
646.58
9.81
51.62
810.27
9.00
29.40
30.19
1.00
172.75
21.35
1.00
2.00
1.00
55.86
897.87
201.52
1,807.38
1,832.15
205.88
3,392.58
3,573.50
5,560.85
1,506.78
2,383.18
3,103.58
3,001.47
2,481.37
3,889.30
142.29
669.73
627.35
80.00
1,261.08
877.70
153.59
167.94
343.58
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
92.16
42.84
16.00
1.00
2,282.80
951.48
100.48
550.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
790.00
790.00
790.00
948.00
948.00
948.00
99.54
790.00
790.00
5.00
2.00
2.00
7.00
4.00
7.00
742.60
8,524.10
1,856.50
6,351.60
227.52
5,195.04
1,277.10
2,109.30
1,651.10
2,256.90
9.02
43.76
245.00
84.00
217.77
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
14,300.00 100.00%
460.00 100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1,903.02
73.44
1,464.72
10.79
17,615.40
87.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
1.00
66.10
136.00
136.00
1.00
68.00
136.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
68.00
3,102.16 100.00%
0.00
0.00
0.00%
121,812.16
12,181.22
6,090.61
0.00
0.00
0.00
-------------
-------------
140,083.99
140,083.99
0.00
0.00
DE ASCOPE - LA LIBERTAD
Fecha :
12/14/2010
onto contratado:
199,134.51
Plazo ejecucin: 60 dias calend
CES
SALDO
ACUMULADO
METRADO
MET.
MONT.
0.00
0.00
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.16
17.84
17.84
1,383.45 100.00%
261.89 100.00%
258.68 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.20
399.07 100.00%
0.00
0.00
0.00%
165.25
9.51
198.30
165.25
165.25
166.46
31.34
MONTO
183.43 100.00%
230.24
1,965.15
388.34
788.24
1,789.45
297.73
1.01
6.64
72.23
268.26 100.00%
141.70 100.00%
323.59 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.06
21.08
3.00
8.24 100.00%
94.44 100.00%
60.00 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.17
2.58
36.39 100.00%
54.57 100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.57
5.22
189.56 100.00%
76.63 100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
165.25
165.25
5,782.10 100.00%
309.02 100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
120.00
57.60
120.00
120.00
24.00
24.00
24.00
120.00
120.00
1.83
133.20
1,496.45
282.02
2,401.20
1,117.92
1,754.64
217.44
224.40
745.20
38.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
23,700.81
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
2,370.08
1,185.04
----------------27,255.93
27,255.93
0.00
0.00
----------------0.00
0.00
RESUMEN DE VALORIZACINES
Obra: CONSTRUCCION Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DEL CENTRO POBLADO CEPEDA PROVINCIA DE ASCOPE LA LIBERTAD
DESCRIPCION
SUP
PRESUP
1
AGUA POTABLE
ALCANTARILLADO
Fecha :
12/14/2010
Monto contratado:
199,134.51
Plazo ejecucin: 60 dias calendrios
MONTO CONTRATADO
S/.
%
VALORIZACIN N 02
S/.
%
140,083.99
83.71%
90,486.59
89.24%
27,255.93
16.29%
10,911.54
10.76%
SUB TOTAL
167,339.92
100.00%
101,398.13
100.00%
I.G.V. (19%)
31,794.59
19,265.64
199,134.51
120,663.77
TOTAL
ANEXO 01
VALORIZACN DE OBRA N 02
(AL 30 NOV 2010)
Obra
Fecha :
199,134.51
167,339.92
CONCEPTOS
VALORIZACION (V) afectada con fr =
1.0000
S/. 19,913.45
OVINCIA DE ASCOPE
12/14/2010
TOTAL(S/.)
65,586.20
0.00
65,586.20
0.00
0.00
16,733.99
48,852.21
9,281.92
S/. 58,134.13
ANEXO N 02
ACUMULADO DE VALORIZACIONES
Obra: CONSTRUCCION Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y
ALCANTARILLADO CENTRO POBLADO CEPEDA PROVINCIA DE ASCOPE - LA LIBERTAD
Ubicacin :
Propietario :
Contratista :
F & K S.A.C.
Supervisor:
Residente:
MONTO VALORIZADO
MONTO
CONTRATADO
S/. 199,134.51
ANTERIOR
ACTUAL
ACUMULADO
S/. 0.00
S/. 78,047.57
S/. 78,047.57
65,586.20 x1.19 = S/ ,
AVANCE
SALDO
39.19%
S/. 121,086.94
78,047.57