Está en la página 1de 6

OPERARIO

CARGA

CARGA

ENFRASCA

TIEMPO
--- 0.00 ----- 0.10 -----

0.20

---

---------------------------------------------

0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40

---------------------------------------------

---

2.50

---

---

2.60

---

---

2.70

---

---

2.80

---

---

2.90

---

---

3.00

---

MAQUINA 1

TRITURA

AGITA

PASTEURIZA

MAQUINA 2

Manzanas

EQUIPO

600 K

Acido Tartrico

400 K

Carga

0.30

Operario

Tritura

0.60

Mquina

Carga

0.40

Operario

Agita

1.00

Pasteuriza

0.20

Mquina

Enfrasca

0.50

TANQUE DE PECTINA
TIEMPO DE EQUIPO
NUMERO DE EQUIPOS
CAPACIDAD
CAPACIDAD
DEMANDA (PRODUCCION)
TASA DE USO
HORA HOMBRE
HORA MAQUINA

1 LOTE

1000 K
HM

2.40
1
8 Lotes
8,000 Kilos
12,000 Kilos
150.0% NO CUBRE LA DEMANDA
50.0%
75.0%

Mquina
Operario

CUBRE LA DEMANDA

OPERARIO

CARGA M1

CARGA M2

CARGA M1

CARGA M2

ENFRASCA M1

ENFRASCA M2

TIEMPO
--- 0.00 ----- 0.10 -----

0.20

---

-------------------------------------------------------

0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.50
2.60
2.70
2.80
2.90

-------------------------------------------------------

---

3.00

---

MAQUINA 1

MAQUINA 2

TRITURA

TRITURA

AGITA

AGITA
PASTEURIZA

PASTEURIZA

Manzanas

EQUIPO

600 K

Acido Tartrico

400 K

Carga

0.30

Operario

Tritura

0.60

Mquina

Carga

0.40

Operario

Agita

1.00

Pasteuriza

0.20

Mquina

Enfrasca

0.50

TANQUE DE PECTINA
NUMERO DE EQUIPOS
TIEMPO DE EQUIPO
CAPACIDAD
CAPACIDAD
DEMANDA (PRODUCCION)
TASA DE USO
HORA HOMBRE
HORA MAQUINA

1 LOTE

1000 K
2
2.90 HM
12 Lotes
12,000 Kilos
12,000 Kilos
100.0% CUBRE LA DEMANDA
82.8%
75.9%

Mquina
Operario

BRE LA DEMANDA