Documentos de Académico
Documentos de Profesional
Documentos de Cultura
7.10
1.95
.15
.90
3.95
.90
BAO
3.65
4.07
.20
.40
.75
HALL
.15
1.25
3.80
3.35
2.75
SALA
Datos
Casa Habitacin
Contrapaso
fc
fy
Pterminado
S/C
0.175 m
210 kg/cm2
4200 kg/cm2
100 kg/m2
200 kg/m2
8.42
.15 .50
1.20
8.42
.40
.30
.90
3.80
.95
.25
.20
2.75
A. Predimensionamiento
t=
Ln
30
Ln
25
Ln (
3.5
t=
2.75
30
2.75
25
2.75
(3.5
9.82666667
10 cm
Peralte de la Losa
0.09166667
0.11
9.63 9.83
.25
arctg
35
1
cos
x=
x=
17.5 )
25
1
cos 35
x=
1.22 m
.175
B.Metrado de Cargas
B1. Carga Muerta
Peso de la losa
2400 Kg/m3
Peso De Peldaos
2400 Kg/m3
Piso Terminado
100 Kg/m2
1.22 m
(
x
0.25
1 ml
0.1 m
x
2
0.175
=
) m2
602.8 Kg/m
C.L.
=
=
1.4
1.4
200 Kg/m2
C.D.
602.8
843.92
+
+
1.7
1.7
1 ml
C.L.
200
=
=
340
1183.92
Kg/m
100 Kg/m
SC
292.8 Kg/m
200 Kg/m
C.D.
210 Kg/m
0.04375
0.021875
0.0875
Peso de la losa
2400 Kg/m3
0.1 m
Piso Terminado
120 Kg/m2
1.25 m
Seccion del Descanzo
1.25 m
300 kg/m
150 kg/m
450 kg/m
=
Cu
C.L.
=
=
1.4
1.4
200 Kg/m2
C.D.
450
+
+
1.7
1.7
630
1.2 m
C.L.
240
=
=
1038
240 Kg/m
Kg/m
408
Lxq
FR
q
=
=
=
3.5 m x
3633 Kg
1038 Kg/m
1038 Kg/m
3.5
0.25
2.75
0.50
M(+)
q x L2
16
3633 x
3.5 )2
16
44504.25
16
2781.51563
M(+)
q x L2
10
3633 x
(
10
3.5 )2
44504.25
10
4450.425
12.25