Está en la página 1de 5

Clculo de Zapata

DATOS:
P6 =

1 x 0,50

T=

1,3kg/ cm

Fck=
Fyk=
(ADN)

240 k/cm2
4200 k/cm2

h=
mamp=

2.4 tn/m3
1.6 tn/m3

es. Mamp.= 15cm.


h. mamp= 2,7cm.

Clculo de la Zapata 11
PASO 1

CA V6V7

PT
T

Ab =

Ab =

30+( 4,11.2)
1,3.10

Ab =

2,95 m2

Pp=

h. h . b

Pp= 2,4. 0,6. 0,5= 0,72 tn/m2

PASO 2
tn/m2

Pmamp= 1,6. 2,7. 0.15= 0,72

Ppz = 2,4 . 2,95 . 0,40


Ppz = 2,84 tn.

PASO 3
a=

PT .100
T .1000

a=

30. 4,11. 2,84. 100


1300

PASO 4
e=

3,150,50
2

= 1,325m.

a= 3,15m.

PASO 5
CA Va y Vb
Pp = 2,4. 0,6. 0,20= 0,29tn.
Pmamp = 0,65 tn/m
q= 0,95tn/m. Rv-a/b = 2,85tn.
q1= Pp= 0,72 + Pmamp= 0,64
q1= 1,36tn/m.
q2= Pp= 0,75
q2= 0,75tn/m.
Rq1= 2,48tn. Rq2= 0,79tn.

Mz20 = 0
[30+(4,11.2).5,75]+(2,48.3,925)+(0,79.1,05)+(2,85.2,17)- [Rz11.(5,751,325)]
[(30+8,22).5,75]+9,73+0,83+6,18= [Rz11.(5,75-1,325)]
236,50= Rz11.4,425
Rz11= 53,45tn.

PASO 6
b=

PT
a . T .10

1,50m.

PASO 7

y=0

b=

53,45+2,84
3,15.13

b= 1,37m.

Z11= 3,20 x

Z11-P6-Rq1-Rq2-Rva/b+Z12=0
2,85

Z12+53,45= 38,22 - 2,48 - 0,79 -

Z12= 21,35tn.

PASO 8
DEQ

PASO 9
DMF

3,65
1,36 .

Mmx=( 38,22 .3,65 ) + ( 2,325. 53,45 )( 2,85.0,075 )


Mmx=124,27139,50,219,05
Mmx=24,50 tn /m

2,1
0,75 .

+ Mmx=(21,35 . 2,1 ) +

+ 44,8

+ Mmx=1,6544,8+ 44,8
+ Mmx=1,65 tn/m
PASO 10
d=

1,77

Md
b . fcd

d=

1,77

1,6. 24,50. 103


30 . 160

d= 50,60cm. 55

h=

55+5 h=60
PASO 11

40,02.1,6 . 1 03
32
30.60

Qm x
b . h 32

h=

Qm x . d
b.0,20 . fcd

h=

3532 NO VERIFICA

40,02.103 . 1,6
0,20 . 30.160

h=

h= 70 d= 65
PAS0 12
- =

+ =

Md
b .d 2. fcd
Md
b .d 2. fcd

- =

1,6. 105 .24,50


30. 652 .160

+ =

1,6. 105 .1,65


30. 652 .160

- = 0,19

+ = 0,013

66,7 70

PASO 13

+ S = .

b .d . fcd
fyd

+ S = 0,0310 .

30 . 65 .160
3852

= 5,02 = 710

S = .

b .d . fcd
fyd

S = 0,2190 .

30. 65 . 160
3852

= 16,65 = 916

PASO 14

También podría gustarte