Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Camino de Herradura
Trocha Lastrada/Sin Afirmado
Afirmado
Afirmado Estabilizado
20,000
40,000
60,000
x
Sierra
360,000
510,000
570,000
600,000
Costa
240,000
340,000
380,000
400,000
Region
Monocapa
Bicapa (TSB)
CAC 2"
Asfaltado CAC 3"
Sistema de Verificacion
50,000
100,000
x
Sierra
360,000
510,000
570,000
600,000
Costa
240,000
340,000
380,000
400,000
Region
Sistema de Verificacion
Costa
240,000
340,000
380,000
400,000
Region
Costa
120,000
170,000
190,000
200,000
80,000
120,000
x
Sierra
360,000
510,000
570,000
600,000
Selva
480,000
680,000
760,000
800,000
Costa
120,000
170,000
190,000
200,000
2
1
PONTON
Minimo
(metros)
Selva
480,000
680,000
760,000
800,000
Costa
120,000
170,000
190,000
200,000
6.00
3.50
Sierra
20,700
11,500
2,875.00
Selva
180,000
255,000
285,000
300,000
25,000
50,000
x
Sierra
150,000
212,500
237,500
250,000
Selva
180,000
255,000
285,000
300,000
Sistema Nacional
Rehabilitacion ($)
Numero de Carriles
10,000
20,000
25,000
x
Sierra
150,000
212,500
237,500
250,000
Sistema Departamental
Rehabilitacion ($)
Costruccion ($)
Selva
480,000
680,000
760,000
800,000
Costruccion ($)
Sistema Vecinal
Rehabilitacion ($)
Costruccion ($)
Selva
23,400
13,000
3,250.00
30,000
60,000
x
Sierra
150,000
212,500
237,500
250,000
Selva
180,000
255,000
285,000
300,000
Mejoramiento ($)
Costa
210,000
297,500
332,500
350,000
15,000
30,000
30,000
34,500
Sierra
360,000
510,000
570,000
600,000
Selva
480,000
680,000
760,000
800,000
Mejoramiento ($)
Costa
210,000
297,500
332,500
350,000
30,000
80,000
92,000
Sierra
360,000
510,000
570,000
600,000
Selva
480,000
680,000
760,000
800,000
Mejoramiento ($)
Costa
210,000
297,500
332,500
350,000
50,000
90,000
103,500
Sierra
360,000
510,000
570,000
600,000
Selva
480,000
680,000
760,000
800,000
3920073
7.7
509100.3896
175,551.86
5762162
9
640240.2222
220772.4904
8544765.67
25.15
339,752.11
117,155.90