Documentos de Académico
Documentos de Profesional
Documentos de Cultura
MODALIDADES DE INTERVENCION
CONCURSO REGULAR
DESCRIPCION
% MAXIMO
MONC
COSTO DE
PARTICIPANTE
CUANDRO DE
INSUMOS
65.00%
APORTE MAXIMO
SOLICITADO
RUBRO OTROS
S/. 150,000.00
DESCRIPCION
SI
NO
A. COSTOS DIRECTOS
SI
-
S/.
36,350.00
S/.
26,250.00
S/.
5,000.00
COSTO
S/.
X
X
EQUIPOS
S/.
2,600.00
KIT HERRAMIENTAS
S/.
2,500.00
S/.
4,025.00
S/.
1,650.00
S/.
1,875.00
B. COSTOS INDIRECTOS
SEGUIMIENTO Y CONTROL DEL PROYECTO
(CTE)
MAESTRO DE OBRA
S/.
S/.
500.00
DIFERENCIA
ASISTENTE DE OBRA
COMISIONES BANCARIAS 1% CD
GUARDIAN
OTROS GASTOS POR FORMULACION DE
PROYECTO
Sub-TOTAL
X
A+B
X
S/.
40,375.00
VO
MODALIDADES DE INTERVENCION
ACCION DE CONTINGENCIA
%MONC
APORTE MAXIMO
SOLICITADO
APORTE
SOLICITADO AL
PROGRAMA
RUBRO OTROS
%MONC
26250
COSTO
S/.
5,050.00
S/.
5,000.00
S/.
41,350.00
S/.
4,075.00
S/.
45,425.00
0
0.00
5,000.00
S/.
50.00
50.00
S/.
5,050.00
APORTE MAXIMO
SOLICITADO
RUBRO OTROS
14,135.00
5000
4025
9025
S/. 5,110.00
DESCRIPCION
NO
SUB TOTAL
TOTAL DE COFINANCIAMIENTO
SI
A. COSTOS DIRECTOS
X
X
X
X
X
X
X
X
X
X
X
B. COSTOS INDIRECTOS
SEGUIMIENTO Y CONTROL DEL PROYECTO (CTE)
X
X
DIFERENCIA
X
X
X
X
X
X
X
X
X
X
X
A+B
X
S/.
TOTAL DE COFINANCIAMIENTO
NO
COSTO TOTAL
DEL
PROYECTO
SUB TOTAL
S/.
S/.
S/.
S/.
EJEMPLO APLICATIVO
ACTIVIDAD
Plazo de ejecucion
S/.
241,869.47
111,417.00
63 dias/habiles
CRITERIOS BASICOS A TENER ENCUENTA DURANTE LA FORMULACION DEL PROYECTO REFERENTE AL APORTE DEL
APORTE DEL PROGRAMA
MODALIDADES DE INTERVENCION
CONCURSO REGULAR
DESCRIPCION
% MAXIMO
MONC
65.00%
74.56%
DESCRIPCION
COSTO DE
PARTICIPANTE
CUANDRO DE
INSUMOS
S/.
111,417.00 S/.
NO
A. COSTOS DIRECTOS
X
COSTO
KIT HERRAMIENTAS
149,429.91
S/.
137,682.41
S/.
111,417.00
0
S/.
21,319.91
0
S/.
X
4,945.50
B. COSTOS INDIRECTOS
SI
S/.
11,747.50
S/.
7,647.50
S/.
3,600.00
S/.
500.00
X
X
S/.
MAESTRO DE OBRA
ASISTENTE DE OBRA
38,012.91
EQUIPOS
149,429.91 S/.
MATERIALES
RUBRO OTROS
S/. 150,000.00
APORTE MAXIMO
SOLICITADO
X
DIFERENCIA
X
COMISIONES BANCARIAS 1% CD
GUARDIAN
OTROS GASTOS POR FORMULACION DE
PROYECTO
Sub-TOTAL
X
A+B
S/.
149,429.91
0.00
ODALIDADES DE INTERVENCION
ACCION DE CONTINGENCIA
%MONC
APORTE MAXIMO
SOLICITADO
APORTE
SOLICITADO AL
PROGRAMA
COSTO
S/.
92,439.56
S/.
74,427.45
S/. 212,109.86
X
12,752.04
47,923.41
11,460.61
0
2,291.39
S/.
18,012.11
0
7,000.00
0.00
550.00
3,000.00
S/.
29,759.61
RUBRO OTROS
212.11
2,250.00
5,000.00
S/.
92,439.56
S/. 241,869.47
FORMATO N 02
FICHA GENERAL DEL PROYECTO REGULAR DEFINITIVO
CDIGO SNIP:
I.
FECHA DE VIABILIDAD:
MUNICIPALIDAD DISTRITAL DE ATE
1.1
Municipalidad Distrital
1.2
Clasificacin de OP
Gobierno Local
1.3
Tipo de Institucin
Institucin Pblica
Centro Poblado
Distrito
Provincia
Departamento
: Ate
: Ate
: Lima
: Lima
Direccin
RUC
20131378620
Telfono: celular/fijo
204-4700
6.1
6.2
Direccin
6.3
Telfono: celular/fijo
6.4
II.
Resolucin de Alcalda
Ubicacin
: Ate
Distrito
: Ate
Provincia
: Lima
Departamento
: Lima
Muro de Contencin
Infraestructura Urbana
11
12
13
14
S/.
241,869.47
S/.
212,109.86
S/.
29,759.61
S/.
149,429.91
S/.
111,417.00
74.56%
S/.
38,012.91
25.44%
52.53%
63 das hbiles
70
participantes
15 Cofinanciamiento
15.1 Organismo Proponente
Documento que presenta como sustento del aporte del Organismo Proponente:
Acta de Acuerdo de Concejo Municipal N .
S/.
92,439.56
S/.
92,439.56
FORMATO N 02
FICHA GENERAL DEL PROYECTO REGULAR DEFINITIVO
S/.
15.2 Cofinanciante 1
Nombre o razn social:
0.00
FORMATO N 02
FICHA GENERAL DEL PROYECTO REGULAR DEFINITIVO
Al no tener el terreno en condiciones estables, no se pueden construir las veredas de ese lado de la calle, as
como tampoco se pueden solicitar a SEDAPAL la construccin de los servicios de agua potable y alcantarillado
por encontrarse el pasaje en un terreno inestable y en pendiente.
17.2 Descripcin de la situacin deseada
El anhelo de la poblacin es contar con la construccin de un muro de contencin en el Pasaje Nuevo Milenio
en la Manzana J-1 del Asentamiento Humano Inmaculada Concepcin, que permitir tener una va de acceso
a las viviendas, amplia, nivelada y sobre todo eliminar el peligro de los inminentes derrumbes y deslizamientos
del terreno, as como permitir ejecutar las obras de agua potable y desague.
17.3 Contribucin del proyecto al desarrollo de la localidad o zona de intervencin
El proyecto permitir el desarrollo local del Asentamiento Humano Inmaculada Concepcin, mejorando la
calidad de vida de los pobladores que hacen uso diario de esta va para llegar a sus viviendas, generando un
adecuado trnsito peatonal de la zona. Seria muy importante que se tome en cuenta la ejecucin del presente
proyecto y que el Programa TRABAJ PERU, pueda contribuir con esta zona del Valle Amauta, ya que
contando con al construccin del muro de contencin se podr realizar los proyectos de Agua Potabley
Alcantarillado.
17.4 Otra informacin
Las vas de acceso se encuentran en condicin inestable, ya que no cuentan con proteccin contra posibles
deslizamiento y ninguna implementacin de seguridad a excepcin de los pircados con piedras (muro seco), lo
que la convierte en una zona peligrosa para los pobladores del lugar que tienen que trasladarse a su centro
de labores y estudios. La inestabilidad del terreno es un factor para la carencia de las instalaciones de agua
potable y alcantarillado, ocasionando con ello psimas condiciones de salubridad lo que conlleva al aumento
de enfermedades gastrointestinales y parasitosis en los pobladores. Para la construccin de los servicios
bsicos de agua potable y alcantarillado, SEDAPAL solicita como requisito que las vas sean estables.
18
Relevancia econmica
18.1
Qu tipo de actividades economicas se podra implementar una vez finalizada la ejecucin del proyecto?
Una vez finalizada la obra se garantiza el desarrollo de algunas otras actividades econmicas, como por
ejemplo la apertura de pequeas bodegas a las cuales puedan ingresar pequeos vehculos que abasteceran
con artculos que se expenderan en el lugar.
18.2 El proyecto tendr impacto en la actividad econmica de la zona? Explique.
El proyecto tendr un impacto significativo en todas las actividades economicas que existen en la zona y en
aquellas que se inicien, ya que dinamizar estas y otorgar las condiciones minimas para que estas se
desarrollen.
19
FORMATO N 02
FICHA GENERAL DEL PROYECTO REGULAR DEFINITIVO
Vista N 01: Inicio del Pasaje Nuevo Milenio donde se proyecta la construccin del muro de contencin
Vista N 02: Pasaje Nuevo Milenio donde se aprecia el pircado de piedras (muro seco)
FORMATO N 02
FICHA GENERAL DEL PROYECTO REGULAR DEFINITIVO
Vista N 03: Pasaje Nuevo Milenio donde se aprecia su ancho mnimo de 1.00 a 1.50 m, que con la construccin del
muro se ampliar hasta 5.00 m aproximadamente.
149,429.91
FORMATO N 04
PRESUPUESTO DEL PROYECTO DEFINITIVO
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA CONCEPCION,
DISTRITO DE ATE - LIMA - LIMA
MUNICIPALIDAD DISTRITAL DE ATE
ITEM
PARTIDAS
UNIDAD METRADO
PU
SUB-TOTAL
1,012.28
un
1.00
412.28
412.28
un
3.00
200.00
m2
618.00
0.56
600.00
1,706.13
346.08
mes
515.00
0.71
365.65
un
35.00
7.91
276.85
214.00
0.47
100.58
m2
103.00
5.99
616.97
m3
503.73
14.99
7,550.91
m3
215.89
37.07
8,003.04
m3
524.28
20.14
10,559.00
m3
473.80
9.77
4,629.03
m3
629.14
5.00
3,145.70
m3
297.20
6.42
1,908.02
m3
297.20
15.68
4,660.10
m3
896.63
29.97
26,872.00
m3
245.81
32.98
8,106.81
m3
896.63
14.99
13,440.48
m3
334.00
22.48
7,508.32
m3
1,249.00
0.56
699.44
un
98.00
6.42
02.05.00
40,455.80
03.03.00
57,256.21
629.16
88,662.50
m3
148.57
164.64
24,460.56
m3
506.56
114.12
57,808.63
m2
479.36
9.53
4,568.30
m2
128.84
8.20
1,056.49
58.80
13.07
768.52
7,970.59
06.00.00 VARIOS
06.01.00 ENSAYO PROCTOR (COMPACTACION DEL SUELO)
06.02.00 ENSAYO DE DENSIDAD DE CAMPO
un
un
1.00
8.00
350.00
33.80
un
1.00
4,945.50
4,945.50
un
1.00
2,291.39
2,291.39
m2
515.00
0.22
Subproyecto
350.00
270.40
113.30
Subtotales
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA CONCEPCION,
DISTRITO DE ATE - LIMA - LIMA
MUNICIPALIDAD DISTRITAL DE ATE
ITEM
1
PARTIDAS
UNIDAD METRADO
PU
SUB-TOTAL
S/.
212,109.86
Total
S/.
212,109.86
S/.
212,109.86
S/.
29,759.61
S/.
241,869.47
FORMATO N 11
DESAGREGADO DE COSTOS INDIRECTOS SEGN FUENTES
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA CONCEPCION, DISTRITO DE ATE - LIMA - LIMA
Desagregado segn Fuentes
Concepto
N de
meses
(Nm)
Factor de
distancia
(K)
Frmula de clculo de
costo
Aporte del
Organismo Ejecutor
Total
11,247.50
10,000.00
21,247.50
1,900.00
3.0
0.15
CS = H[1+K][Nm+0.50]
7647.50
7,647.50
0.00
7,647.50
2,000.00
3.0
0.15
CRT = [H x (Nm+0.5)]
7,000.00
0.00
7,000.00
7,000.00
Asistente Tcnico
1,000.00
3.0
CAT = (H x Nm)
3,000.00
0.00
3,000.00
3,000.00
Maestro de Obra
1,200.00
3.0
CAT = (H x Nm)
3,600.00
3,600.00
0.00
3,600.00
500.00
8,012.11
8,512.11
212.11
0.00
212.11
212.11
1,050.00
500.00
550.00
1,050.00
2,250.00
0.00
2,250.00
2,250.00
0.00
5,000.00
5,000.00
11,747.50
18,012.11
29,759.61
Otros
Comisiones Bancarias 0.1% CD
212,109.86
0.10%
15.00
70.0
Guardiana
750.00
3.0
212,109.86
CG = (H x Nm)
FORMATO N 05
USOS Y FUENTES DEL PROYECTO DEFINITIVO
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA CONCEPCION, DISTRITO DE ATE - LIMA - LIMA
USOS
TRANSFERENCIA AL
ORGANISMO PROPONENTE
(a)
S/.
%
1. COSTOS DIRECTOS
TOTAL APORTE
DEL PROGRAMA
( b ) = (a + b)
S/.
%
Organismo
Proponente
(c)
S/.
%
COFINANCIAMIENTO
Otros
Cofinanciantes
(d)
S/.
%
Total
Cofinanciante
( e ) =(c+d)
S/.
%
137,682.41
56.92%
0.00
0.00%
137,682.41
56.92%
74,427.45
30.77%
0.00
0.00%
74,427.45
30.77%
212,109.86
0.000
0.00%
0.00
0.00%
0.00
0.00%
12,634.100
5.22%
0.00
0.00%
12,634.10
5.22%
12,634.10
5.22%
111,417.000
46.06%
0.00
0.00%
111,417.00
46.06%
0.00
0.00%
0.00
0.00%
0.00
0.00%
111,417.00
46.06%
- Topgrafo
0.000
0.00%
0.00
0.00%
0.00
0.00%
117.940
0.05%
0.00
0.00%
117.94
0.05%
117.94
0.05%
- Materiales
21,319.910
8.81%
0.00
0.00%
21,319.91
8.81%
47,923.41
19.81%
0.00
0.00%
47,923.41
19.81%
69,243.32
28.63%
- kit Herramientas
- kit implementos de seguridad
- Equipos y Maquinarias
2. COSTOS INDIRECTOS
- Direccion Tcnica , Administrativa y Otros
3. TOTAL S/.
87.70%
0.000
0.00%
0.00
0.00%
0.00
0.00%
2,291.39
0.95%
0.00
0.00%
2,291.39
0.95%
2,291.39
0.95%
4,945.500
2.04%
0.00
0.00%
4,945.50
2.04%
0.00
0.00%
0.00
0.00%
0.00
0.00%
4,945.50
2.04%
0.00%
0.00
0.00%
0.00
0.00%
11,460.61
4.74%
0.00
0.00%
11,460.61
4.74%
11,460.61
4.74%
11,747.50
4.86%
0.00
0.00%
11,747.50
4.86%
18,012.11
7.45%
0.00
0.00%
18,012.11
7.45%
29,759.61
12.30%
11,747.50
4.86%
0.00
0.00%
11,747.50
4.86%
18,012.11
7.45%
0.00
0.00%
18,012.11
7.45%
29,759.61
12.30%
149,429.91
61.78%
0.00
0.00%
149,429.91
61.78%
92,439.56
38.22%
0.00
0.00%
92,439.56
38.22%
241,869.47
100.00%
RESUMEN DE METRADOS
OBRA
UBICACIN
FECHA
: DISTRITO : ATE
: Enero del 2013
TEM
DESCRIPCIN
1.00
OBRAS PROVISIONALES
CARTEL DE OBRA IMPRESION BANNER DE 3.60x2.40m. (SOPORTE DE
MADERA)
ALQUILER DE LOCAL PARA LA OBRA
TRABAJOS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO EN ROCA SUELTA
TRAZO Y REPLANTEO EN TERRENO ACCIDENTADO CON PENDIENTE
PRONUNCIADA CON EQUIPO
POSTE P/SEALIZACION EN OBRAS VIALES 3",H=1.00m. PINTADOS
ROJO Y BLANCO ALTERNADOS
SEALIZACIN EN OBRA DURANTE LA EJECUCIN
DEMOLICION Y/O DESMONTAJE DE MURO EMPIRCADO DE PIEDRA
h.prom.=1.00m.
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO SEMIROCOSO MANUAL
CORTE EN TERRENO ROCOSO (Manual, inc. insumos para rotura de
roca por calentamiento)
RELLENO CON MATERIAL PROPIO COMPACTACIN CON EQUIPO
LIVIANO
RELLENO CON AFIRMADO Y/O MATERIAL GRANULAR E=4" INC.
COMPACTACION EQUIPO LIVIANO
ACARREO DE MATERIAL EXCEDENTE PARA SER UTILIZADO EN
RELLENOS D<50m.
ACARREO Y ACOPIO MANUAL DE MATERIAL EXCEDENTE A ELIMINAR
D > 100m.
ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE DE 6.0 M3
CARGUIO MNUAL D<=5KM
EXTRACCIN DE MATERIAL Y ACARREO
EXTRACCIN DE PIEDRA EN CANTERA
CORTE PERFILADO Y HABILITACION DE PIEDRA SEGUN DISEO
ACARREO MANUAL DE P.G. (Prom. 8") D>100m. TERRENO
C/PENDIENTE PRONUNCIADA
1.01
1.02
2.00
2.01
2.02
2.03
2.04
2.05
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
4.00
4.01
4.02
4.03
4.04
4.05
4.06
05.00
05.01
05.02
05.03
Und
TOTAL
Gbl
1.00
mes
3.00
m2
618.00
m2
515.00
un
35
214.00
m2
103.00
m3
503.73
m3
215.89
m3
524.28
m2
473.80
m3
629.14
m3
297.20
m3
297.20
m3
m3
896.63
245.81
m3
896.63
m3
bls
m3
334.00
1,249.00
98.00
m3
148.57
m3
506.56
m2
479.36
05.04
m2
128.84
05.05
06.00
58.80
RESUMEN DE METRADOS
OBRA
UBICACIN
FECHA
TEM
06.01
06.02
06.03
06.04
06.05
: DISTRITO : ATE
: Enero del 2013
DESCRIPCIN
ENSAYO PROCTOR (COMPACTACION DE SUELO)
ENSAYO DE DENSIDAD DE CAMPO
KIT DE IMPLEMENTOS DE SEGURIDAD
KIT DE HERRAMIENTAS
LIMPIEZA GENERAL DE OBRA
Und
m
m
Un
Un
m2
TOTAL
1.00
8.00
1.00
1.00
515.00
RESUMEN DE METRADOS
OBRA
UBICACIN
FECHA
TEM
: DISTRITO : ATE
: Enero del 2013
DESCRIPCIN
Und
TOTAL
RESUMEN DE METRADOS
OBRA
UBICACIN
FECHA
TEM
: DISTRITO : ATE
: Enero del 2013
DESCRIPCIN
Und
TOTAL
RESUMEN DE METRADOS
OBRA
UBICACIN
FECHA
TEM
: DISTRITO : ATE
: Enero del 2013
DESCRIPCIN
Und
TOTAL
RESUMEN DE METRADOS
OBRA
UBICACIN
FECHA
TEM
: DISTRITO : ATE
: Enero del 2013
DESCRIPCIN
Und
TOTAL
RESUMEN DE METRADOS
OBRA
UBICACIN
FECHA
TEM
: DISTRITO : ATE
: Enero del 2013
DESCRIPCIN
Und
TOTAL
RESUMEN DE METRADOS
OBRA
UBICACIN
FECHA
TEM
: DISTRITO : ATE
: Enero del 2013
DESCRIPCIN
Und
TOTAL
RESUMEN DE METRADOS
OBRA
UBICACIN
FECHA
TEM
: DISTRITO : ATE
: Enero del 2013
DESCRIPCIN
Und
TOTAL
RESUMEN DE METRADOS
OBRA
UBICACIN
FECHA
TEM
: DISTRITO : ATE
: Enero del 2013
DESCRIPCIN
Und
TOTAL
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
: DISTRITO : ATE
: Enero del 2013
TEM
DESCRIPCIN
Un
CANTIDAD
DIMENSIONES
LARGO
1.00
OBRAS PROVISIONALES
1.01
1.02
Gbl
TRABAJOS PRELIMINARES
2.01
ALTO
1.00
SUB
TOTAL
TOTAL
1.00
1.00
3.00
2.00
ANCHO
Meses =
3.00
3.00
m2
618.00
2.02
m2
m2
103.00
6.00
618.00
515.00
2.03
m2
un
103.00
5.00
515.00
35
2.04
un
103.00
3.00
35.33
214.00
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
: DISTRITO : ATE
: Enero del 2013
2.05
m2
103.00
2m@c/lado
8.00
214.00
103.00
Largo
Ancho
Alto
m2
3.00
MOVIMIENTO DE TIERRAS
3.01
103.00
1.00
m3
503.73
1
-1
V.muro=
A.muro=
760.82
103.00
0.40
3.02
760.82
-41.20
719.62
m3
m3
70%
503.73
215.89
1
-1
V.muro=
A.muro=
760.82
103.00
0.40
103.00
760.82
-41.20
719.62
m3
30%
215.89
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
3.03
: DISTRITO : ATE
: Enero del 2013
3.04
m3
m3
m3
524.28
1
-1
A.relleno=
476.90
473.80
0.10
476.90
47.38
m2
473.80
3.05
3.06
3.07
m2
103.00
4.60
473.80
629.14
m3
m3
1.00
V.acarr.=
V. Esponj.
524.28
20.00%
524.28
104.86
m3
297.20
m3
m3
1.00
V.corte=
Esponj.
503.73
20%
503.73
100.75
m3
m3
1.00
V.corte=
Esponj.
215.89
30%
215.89
64.77
Volumen desmontado
m3
1.00
V.desm.=
103.00
m3
-1.00
V.acarr.=
629.14
0.40
41.20
-629.14
m3
297.20
m3
m3
1.00
V.corte=
Esponj.
503.73
20%
503.73
100.75
m3
m3
1.00
V.corte=
Esponj.
215.89
30%
215.89
64.77
Volumen desmontado
m3
1.00
V.desm.=
103.00
m3
-1.00
V.acarr.=
629.14
0.40
41.20
-629.14
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
4.00
: DISTRITO : ATE
: Enero del 2013
ACARREO DE MATERIAL
VOLUMEN DE PIEDRA A UTILIZAR:
m3
CIMIENTO
MURO
4.01
m3
1.00
1.00
77.26
V.muro=
Cantidad C.U.
655.13
1.251
819.37
896.63
m3
1.00
V.extrac.=
m3
V.extrac.=
30.00%
Afirmado
Arena Fina
Arena Gruesa
Gravilla
Hormigon
m3
819.37
245.81
896.63
1.00
V.extrac.=
896.63
896.63
m3
334.00
Cantidad
m3
m3
m3
m3
m3
1.00
1.00
1.00
1.00
1.00
62.00
2.00
146.00
8.00
116.00
62.00
2.00
146.00
8.00
116.00
bls
4.06
896.63
m3
De Relacin de Insumos
4.05
896.63
245.81
4.04
148.57
0.520
m3
MURO
4.03
V.muro=
Cantidad C.U.
m3
MURO
4.02
m3
896.63
1,249.00
1.00
m3
Insumos=
1,249.00
1,249.00
98.00
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
: DISTRITO : ATE
: Enero del 2013
1.00
5.00
MURO DE MAMPOSTERA
5.01
98.00
148.57
1.00
V.muro=
148.57
148.57
m3
5.03
98.00
m3
5.02
Relacin de insumos=
506.56
1.00
V.muro=
506.56
506.56
m2
479.36
Hp.muro=
L.Corona
menos
H.base
L. muro
Lm
Emboquil.
LxH
(1.2-0.5m.)
5.06
0+000
0+005
0+010
0+015
0+020
0+025
0+030
0+035
0+040
0+045
0+050
0+055
0+060
0+065
0+070
0+075
0+080
0+085
0+090
0+095
0+100
0+005
0+010
0+015
0+020
0+025
0+030
0+035
0+040
0+045
0+050
0+055
0+060
0+065
0+070
0+075
0+080
0+085
0+090
0+095
0+100
0+103
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.50
3.80
3.80
3.80
3.80
4.00
3.80
3.50
3.50
3.80
4.00
4.50
4.50
4.50
4.50
4.80
4.80
5.00
5.00
5.00
5.00
(b)
H=a+b
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
3.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
3.60
5.00
5.00
5.00
5.00
5.00
5.00
5.00
3.60
5.00
3.60
3.60
12.60
22.50
22.50
22.50
22.50
23.50
22.50
21.00
21.00
16.20
23.50
26.00
26.00
26.00
26.00
27.50
27.50
20.52
28.50
20.52
20.52
128.84
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
: DISTRITO : ATE
: Enero del 2013
Cada 5.00m.
Prog. 0+005
Prog. 0+010
Prog. 0+015
Prog. 0+020
Prog. 0+025
Prog. 0+030
Prog. 0+035
Prog. 0+040
Prog. 0+045
Prog. 0+050
Prog. 0+055
Prog. 0+060
Prog. 0+065
Prog. 0+070
Prog. 0+075
Prog. 0+080
Prog. 0+085
Prog. 0+090
Prog. 0+095
Prog. 0+100
5.07
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
A.muro =
58.80
Nmero
tubos
0+000
0+005
0+010
0+015
0+020
0+025
0+030
0+035
0+040
0+045
0+050
0+055
0+060
0+065
0+070
0+075
0+080
0+085
0+090
0+095
0+100
0+005
0+010
0+015
0+020
0+025
0+030
0+035
0+040
0+045
0+050
0+055
0+060
0+065
0+070
0+075
0+080
0+085
0+090
0+095
0+100
0+103
4.56
5.34
5.34
5.34
5.34
5.81
5.34
4.56
4.56
5.34
5.81
7.21
7.21
7.21
7.21
8.04
8.04
8.86
8.86
8.86
4.56
5.34
5.34
5.34
5.34
5.81
5.34
4.56
4.56
5.34
5.81
7.21
7.21
7.21
7.21
8.04
8.04
8.86
8.86
8.86
Longitud
tubo
Tubos
drenaje
Cada 5.00m.
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
2.80
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
: DISTRITO : ATE
: Enero del 2013
6.00
VARIOS
6.01
un
un
un
1.00
8.00
8.00
6.03
un
1.00
1.00
1.00
1.00
6.04
KIT DE HERRAMIENTAS
un
1.00
1.00
1.00
1.00
6.05
m2
6.02
1.00
1.00
1.00
1.00
8.00
515.00
m2
103.00
5.00
515.00
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
DEPARTAMENTO : LIMA
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
DEPARTAMENTO : LIMA
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
DEPARTAMENTO : LIMA
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
DEPARTAMENTO : LIMA
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
DEPARTAMENTO : LIMA
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
DEPARTAMENTO : LIMA
FORMATO N 13
PLANILLA DE SUSTENTACIN DE METRADOS
OBRA
UBICACIN
FECHA
DEPARTAMENTO : LIMA
719.62
754.66
885.13
-629.14
885.13
-629.14
479.36
#REF!
CUADRO DE VOLUMENES
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA
CONCEPCION, DISTRITO DE ATE - LIMA - LIMA
3.01.00
3.02.00
CORTE EN TERRENO ROCOSO (Manual, inc. insumos para rotura de roca por calentamiento)
3.03.00
ESTACION
AREA
VOLUMENES
Metros Cuadrados
Metros Cbicos
CORTE
RELLENO
MURO
0+000
2.65
1.39
2.59
0+005
5.88
3.12
0+010
5.43
0+015
ACUMULADOS
Metros Cbicos
CORTE
RELLENO
MURO
CORTE
RELLENO
MURO
4.56
21.33
11.28
17.88
21.33
11.28
17.88
4.17
5.34
28.28
18.23
24.75
49.61
29.51
42.63
4.73
3.54
5.34
25.40
19.28
26.70
75.01
48.79
69.33
0+020
4.94
3.45
5.34
24.18
17.48
26.70
99.19
66.27
96.03
0+025
6.05
4.68
5.34
27.48
20.33
26.70
126.67
86.60
122.73
0+030
5.62
4.62
5.81
29.18
23.25
27.88
155.85
109.85
150.61
0+035
6.61
4.14
5.34
30.58
21.90
27.88
186.43
131.75
178.49
0+040
5.72
3.13
4.56
30.83
18.18
24.75
217.26
149.93
203.24
0+045
6.36
3.47
4.56
30.20
16.50
22.80
247.46
166.43
226.04
0+050
6.32
3.98
5.34
31.70
18.63
24.75
279.16
185.06
250.79
0+055
7.30
4.65
5.81
34.05
21.58
27.88
313.21
206.64
278.67
0+060
8.36
5.65
7.21
39.15
25.75
32.55
352.36
232.39
311.22
0+065
8.64
5.76
7.21
42.50
28.53
36.05
394.86
260.92
347.27
0+070
8.08
5.53
7.21
41.80
28.23
36.05
436.66
289.15
383.32
0+075
7.09
5.93
7.21
37.93
28.65
36.05
474.59
317.80
419.37
0+080
6.95
6.23
8.04
35.10
30.40
38.13
509.69
348.20
457.50
0+085
7.76
6.04
8.04
36.78
30.68
40.20
546.47
378.88
497.70
0+090
12.16
3.25
8.86
49.80
23.23
42.25
596.27
402.11
539.95
0+095
12.84
6.20
8.86
62.50
23.63
44.30
658.77
425.74
584.25
0+100
12.60
6.37
8.86
63.60
31.43
44.30
722.37
457.17
628.55
0+103
13.03
6.78
8.86
38.45
19.73
26.58
760.82
476.90
655.13
05.01.00
CIMIENTO CORRIDO MEZCLA C:H 1:10 + 30% P.G INC. PREPARACION MANUAL
ESTACION
0+000
AREA
VOLUMENES
Metros Cuadrados
Metros Cbicos
ANCHO
ALTURA
REA BASE
1.35
0.50
0.68
ACUMULADOS
Metros Cbicos
BASE
BASE
CUADRO DE VOLUMENES
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA
CONCEPCION, DISTRITO DE ATE - LIMA - LIMA
3.01.00
3.02.00
CORTE EN TERRENO ROCOSO (Manual, inc. insumos para rotura de roca por calentamiento)
3.03.00
0+005
4.06
0+010
2.10
0.50
1.05
5.00
9.06
0+015
2.10
0.50
1.05
5.25
14.31
0+020
2.10
0.50
1.05
5.25
19.56
0+025
2.10
0.50
1.05
5.25
24.81
0+030
2.20
0.50
1.10
5.38
30.19
0+035
2.10
0.50
1.05
5.38
35.57
0+040
1.90
0.50
0.95
5.00
40.57
0+045
1.90
0.50
0.95
4.75
45.32
0+050
2.10
0.50
1.05
5.00
50.32
0+055
2.20
0.50
1.10
5.38
55.70
0+060
2.50
0.50
1.25
5.88
61.58
0+065
2.50
0.50
1.25
6.25
67.83
0+070
2.50
0.50
1.25
6.25
74.08
0+075
2.50
0.50
1.25
6.25
80.33
0+080
2.65
0.50
1.33
6.44
86.77
0+085
2.65
0.50
1.33
6.63
93.40
0+090
2.75
0.70
1.93
8.13
101.53
0+095
2.75
0.70
1.93
9.63
111.16
0+100
2.75
0.70
1.93
9.63
120.79
0+103
2.75
0.70
1.93
5.78
126.57
2.75
1.00
2.75
0+100
2.75
1.00
2.75
13.75
13.75
0+103
2.75
1.00
2.75
8.25
22.00
148.57
RESUMEN
VOLMEN DE CORTE DE TERRENO TOTAL
(1)
760.82
VOLMEN DE RELLENO
(2)
476.90
(3)
655.13
CUADRO DE VOLUMENES
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA
CONCEPCION, DISTRITO DE ATE - LIMA - LIMA
3.01.00
3.02.00
CORTE EN TERRENO ROCOSO (Manual, inc. insumos para rotura de roca por calentamiento)
3.03.00
rea
(1)
(5)
(6)
(7)
(8)
103.00
Largo
((3) -(4) )
506.56
Ancho
Alto
0.40
760.82
41.20
===========
(1) - (5)
719.62
30%
215.89
70%
503.73
FORMATO N 15
RELACIN DE INSUMOS DEL COSTO DIRECTO
PROYECTO
O.P.
UBICACIN
Cdigo
COSTO AL:
Recurso
Unidad
Cantidad
Precio S/.
30/08/2011
Total
124,169.04
MANO DE OBRA
0147010105
JEFE DE CUADRILLA
hh
1,403.7884
9.0000
0147000032
TOPOGRAFO
hh
11.7935
10.0000
117.94
0147010102
PARTICIPANTE
hh
35,653.4400
3.1250
111,417.00
0205010000
AFIRMADO
m3
61.5940
53.3300
3,284.81
0239010100
AGUA
m3
97.7248
6.3300
618.60
0239010101
ALQUILER DE LOCAL
mes
3.0000
200.0000
600.00
0204000000
ARENA FINA
m3
2.0133
30.6900
61.79
0205010004
ARENA GRUESA
m3
145.6867
35.0000
5,099.03
0221000093
BOL
1,248.9695
17.0700
21,319.91
0221000000
235.4000
0.3000
70.62
0229040091
kg
1.7500
4.6000
8.05
0202010061
ESTACA DE MADERA
p2
5.9100
1.0000
5.91
0243510061
GRAVILLA
m3
8.0850
55.0000
444.68
0205000001
m3
116.4486
48.7500
5,676.87
0238000004
IMPRESION BANNER
m2
8.6500
15.3900
133.12
0229130051
pqt
1,295.3400
1.0000
1,295.34
0243010101
KEROSENE
gln
21.5890
11.0000
237.48
0234020001
und
2.0000
1.5500
3.10
0239020075
pza
14.0000
7.0000
98.00
0244010039
MADERA TORNILLO
p2
47.2500
4.0000
189.00
0243010003
p2
8.7500
3.6400
31.85
0243570052
und
6.0000
3.2000
19.20
0202080013
m3
710.8110
40.0000
28,432.44
0205000009
PINTURA ESMALTE
gln
0.1820
25.3800
4.62
0254110090
gln
0.4235
25.3800
10.75
0254110011
und
8.0000
25.0000
200.00
0239150007
und
1.0000
350.0000
350.00
0239150008
TECNOPORT DE 2"X4X8
m2
135.2820
6.3800
863.10
0229120065
THINER CORRIENTE
gln
0.1400
12.6000
1.76
0253030034
60.5640
2.9200
176.85
0273010039
YESO
kg
12.8750
0.5000
6.44
0349030001
hm
337.6470
22.9000
7,732.12
0337010105
HERRAMIENTAS MANUALES
est
1.0000
2291.3900
2,291.39
0337010106
IMPLEMENTOS DE SEGURIDAD
est
1.0000
4945.5000
4,945.50
0349880002
NIVEL TOPOGRAFICO
hm
11.7935
7.0000
82.55
0337540011
TEODOLITO
HE
11.7935
8.5000
100.24
0349170001
VOLQUETE 6 M3
hm
39.6168
89.5000
3,545.70
69,243.32
MATERIALES
18,697.50
EQUIPOS
COSTO DIRECTO
12,634.10
S/.
212,109.86
137,682.41
11,747.50
149,429.910000
70.74095238
70.74095238
################
11,460.61
Programa
OE
TOTAL
212,109.86
0.000000
0
137,682.41
74,427.45
212,109.86
PROYECTO
Presupuesto:
Lugar :
Cdigo
COSTO AL:
Recurso
Unidad
Cantidad
Precio S/.
MANO DE OBRA
0147010105
JEFE DE CUADRILLA
hh
1,403.7884
9.0000
0147000032
TOPOGRAFO
hh
11.7935
10.0000
0205010000
AFIRMADO
m3
61.5940
53.3300
0205010004
ARENA GRUESA
m3
145.6867
35.0000
0239010100
AGUA
m3
97.7248
6.3300
0239010101
ALQUILER DE LOCAL
mes
3.0000
200.0000
0204000000
ARENA FINA
m3
2.0133
30.6900
0221000000
235.4000
0.3000
0229040091
kg
1.7500
4.6000
0202010061
ESTACA DE MADERA
p2
5.9100
1.0000
0243510061
GRAVILLA
m3
8.0850
55.0000
0337010105
HERRAMIENTAS MANUALES
est
1.0000
2291.3900
0205000001
m3
116.4486
48.7500
0238000004
IMPRESION BANNER
m2
8.6500
15.3900
0229130051
pqt
1,295.3400
1.0000
0243010101
KEROSENE
gln
21.5890
11.0000
0234020001
und
2.0000
1.5500
0239020075
pza
14.0000
7.0000
0244010039
MADERA TORNILLO
p2
47.2500
4.0000
0243010003
p2
8.7500
3.6400
0243570052
und
6.0000
3.2000
0202080013
m3
710.8110
40.0000
0205000009
PINTURA ESMALTE
gln
0.1820
25.3800
0254110090
gln
0.4235
25.3800
0254110011
und
8.0000
25.0000
0239150007
und
1.0000
350.0000
0239150008
TECNOPORT DE 2"X4X8
m2
135.2820
6.3800
0229120065
THINER CORRIENTE
gln
0.1400
12.6000
0253030034
60.5640
2.9200
0273010039
YESO
kg
12.8750
0.5000
0337010106
IMPLEMENTOS DE SEGURIDAD
est
0.0000
0.0000
0349030001
hm
337.6470
22.9000
0349880002
NIVEL TOPOGRAFICO
hm
11.7935
7.0000
0337540011
TEODOLITO
HE
11.7935
8.5000
0349170001
VOLQUETE 6 M3
hm
39.6168
89.5000
MATERIALES
EQUIPOS
S/.
25/01/2013
Total
12,752.0400
12,634.1000
117.9400
50,214.80
3,284.8100
5,099.0300
618.60
600.00
61.79
70.62
8.05
5.91
444.68
2,291.39
5,676.8700
133.1200
1,295.34
237.48
3.10
98.00
189.00
31.85
19.20
28,432.44
4.6200
10.7500
200.0000
350.0000
863.1000
1.7600
176.8500
6.4400
11,460.61
0.00
7,732.13
82.55
100.24
3,545.69
74,427.450
RELACIN DE INSUMOS
PROYECTO
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA CONCEPCION, DISTRITO DE ATE - LIMA - LIMA
Lugar :
Cdigo
COSTO AL:
Recurso
Unidad
Cantidad
Precio S/.
25/01/2013
Total
APORTE DE ORGANISMO
PROPONENTE
APORTE DE PROGRAMA
Cantidad
Precio S/.
124,169.0400
Total
Cantidad
Precio S/.
Total
Cantidad
Precio S/.
Total
0.00
124,169.04
JEFE DE CUADRILLA
hh
1,403.7884
9.0000
12,634.1000
0.0000
9.0000
0.00
1,403.7884
9.0000
12,634.10
0.0000
6.2500
0.00
12,634.10
0147000032
TOPOGRAFO
hh
11.7935
10.0000
117.9400
0.0000
10.0000
0.00
11.7935
10.0000
117.94
0.0000
6.2500
0.00
117.94
0147010102
PARTICIPANTE
hh
35,653.4400
3.1250
111,417.0000
35,653.4400
3.1250
111,417.000
0.0000
2.8125
0.000
0.0000
2.8125
0.000
111,417.00
0.00
69,243.32
0205010000
AFIRMADO
m3
61.5940
53.3300
3,284.8100
0.0000
53.3300
0.00
61.5940
53.3300
3,284.81
0.0000
53.3300
0.00
3,284.81
0239010100
AGUA
m3
97.7248
6.3300
618.6000
0.0000
6.3300
0.00
97.7248
6.3300
618.60
0.0000
6.3300
0.00
618.60
0239010101
ALQUILER DE LOCAL
mes
3.0000
200.0000
600.0000
0.0000
200.0000
0.00
3.0000
200.0000
600.00
0.0000
200.0000
0.00
600.00
0204000000
ARENA FINA
m3
2.0133
30.6900
61.7900
0.0000
30.6900
0.00
2.0133
30.6900
61.79
0.0000
30.6900
0.00
61.79
0205010004
ARENA GRUESA
m3
145.6867
35.0000
5,099.0300
0.0000
35.0000
0.00
145.6867
35.0000
5,099.03
0.0000
35.0000
0.00
5,099.03
0221000093
BOL
1,248.9695
17.0700
21,319.9100
1,248.9695
17.0700
21,319.91
0.0000
17.0700
0.00
0.0000
17.0700
0.00
21,319.91
0221000000
235.4000
0.3000
70.6200
0.0000
0.3000
0.00
235.4000
0.3000
70.62
0.0000
0.3000
0.00
70.62
0229040091
kg
1.7500
4.6000
8.0500
0.0000
4.6000
0.00
1.7500
4.6000
8.05
0.0000
4.6000
0.00
8.05
0202010061
ESTACA DE MADERA
p2
5.9100
1.0000
5.9100
0.0000
1.0000
0.00
5.9100
1.0000
5.91
0.0000
1.0000
0.00
5.91
0243510061
GRAVILLA
m3
8.0850
55.0000
444.6800
0.0000
55.0000
0.00
8.0850
55.0000
444.68
0.0000
55.0000
0.00
444.68
0205000001
m3
116.4486
48.7500
5,676.8700
0.0000
48.7500
0.00
116.4486
48.7500
5,676.87
0.0000
48.7500
0.00
5,676.87
0238000004
IMPRESION BANNER
m2
8.6500
15.3900
133.1200
0.0000
15.3900
0.00
8.6500
15.3900
133.12
0.0000
15.3900
0.00
133.12
0229130051
1,295.3400
1.0000
1,295.3400
0.0000
1.0000
0.00
1,295.3400
1.0000
1,295.34
0.0000
1.0000
0.00
1,295.34
0243010101
KEROSENE
gln
21.5890
11.0000
237.4800
0.0000
11.0000
0.00
21.5890
11.0000
237.48
0.0000
11.0000
0.00
237.48
0234020001
und
2.0000
1.5500
3.1000
0.0000
1.5500
0.00
2.0000
1.5500
3.10
0.0000
1.5500
0.00
3.10
0239020075
pza
14.0000
7.0000
98.0000
0.0000
7.0000
0.00
14.0000
7.0000
98.00
0.0000
7.0000
0.00
98.00
0244010039
MADERA TORNILLO
p2
47.2500
4.0000
189.0000
0.0000
4.0000
0.00
47.2500
4.0000
189.00
0.0000
4.0000
0.00
189.00
0243010003
p2
8.7500
3.6400
31.8500
0.0000
3.6400
0.00
8.7500
3.6400
31.85
0.0000
3.6400
0.00
31.85
0243570052
und
6.0000
3.2000
19.2000
0.0000
3.2000
0.00
6.0000
3.2000
19.20
0.0000
3.2000
0.00
19.20
0202080013
m3
710.8110
40.0000
28,432.4400
0.0000
40.0000
0.00
710.8110
40.0000
28,432.44
0.0000
40.0000
0.00
28,432.44
0205000009
PINTURA ESMALTE
gln
0.1820
25.3800
4.6200
0.0000
25.3800
0.00
0.1820
25.3800
4.62
0.0000
25.3800
0.00
4.62
0254110090
gln
0.4235
25.3800
10.7500
0.0000
25.3800
0.00
0.4235
25.3800
10.75
0.0000
25.3800
0.00
10.75
0254110011
und
8.0000
25.0000
200.0000
0.0000
25.0000
0.00
8.0000
25.0000
200.00
0.0000
25.0000
0.00
200.00
0239150007
und
1.0000
350.0000
350.0000
0.0000
350.0000
0.00
1.0000
350.0000
350.00
0.0000
350.0000
0.00
350.00
0239150008
TECNOPORT DE 2"X4X8
m2
135.2820
6.3800
863.1000
0.0000
6.3800
0.00
135.2820
6.3800
863.10
0.0000
6.3800
0.00
863.10
0229120065
THINER CORRIENTE
gln
0.1400
12.6000
1.7600
0.0000
12.6000
0.00
0.1400
12.6000
1.76
0.0000
12.6000
0.00
1.76
0253030034
60.5640
2.9200
176.8500
0.0000
2.9200
0.00
60.5640
2.9200
176.85
0.0000
2.9200
0.00
176.85
0273010039
YESO
kg
12.8750
0.5000
6.4400
0.0000
0.5000
0.00
12.8750
0.5000
6.44
0.0000
0.5000
0.00
6.44
0.00
18,697.50
0349030001
hm
337.6470
22.9000
7,732.1200
0.0000
22.9000
0.00
337.6470
22.9000
7,732.12
0.0000
22.9000
0.00
7,732.12
0337010105
HERRAMIENTAS MANUALES
est
1.0000
2291.3900
2,291.3900
0.0000
2291.3900
0.00
1.0000
2291.3900
2,291.39
0.0000
2291.3900
0.00
2,291.39
0337010106
IMPLEMENTOS DE SEGURIDAD
est
1.0000
4945.5000
4,945.5000
1.0000
4945.5000
4,945.50
0.0000
0.0000
0.00
0.0000
4945.5000
0.00
4,945.50
0349880002
NIVEL TOPOGRAFICO
hm
11.7935
7.0000
82.5500
0.0000
7.0000
0.00
11.7935
7.0000
82.55
0.0000
7.0000
0.00
82.55
0337540011
TEODOLITO
HE
11.7935
8.5000
100.2400
0.0000
8.5000
0.00
11.7935
8.5000
100.24
0.0000
8.5000
0.00
100.24
0349170001
VOLQUETE 6 M3
hm
39.6168
89.5000
3,545.7000
0.0000
89.5000
0.00
39.6168
89.5000
3,545.70
0.0000
89.5000
0.00
3,545.70
69,243.3200
MATERIALES
21,319.91
18,697.5000
EQUIPOS
12,752.04
TOTAL
Total
0147010105
MANO DE OBRA
111,417.00
APORTE DE ORGANISMO
COFINANCIANTE
47,923.41
4,945.50
13,752.00
COSTO DIRECTO
S/.
212,109.860000
212,109.86000
0.00000
137,682.410000
74,427.450000
Aport. Prog.
Direc. Tc.
149,429.91000
Costo Directo
137,682.41
137,682.4100
0.00000
0.0000
137,682.4100
56.7430
11,747.50
11,747.5000
34.69700
23.84375
149,429.9100
0.00000
31.7753
76,227.45
0.000000
212,109.86
0.0
0.0000
0.0000
0.0000
0.0
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
FORMATO N 16
DESAGREGADO DE HERRAMIENTAS
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA
CONCEPCION, DISTRITO DE ATE - LIMA - LIMA
Organismo Proponente :
Insumo
Herramientas Aporte del Programa
Unidad
Cantidad
Precio S/.
ML
UND
UND
UND
UND
UND
ML
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
100.00
1.00
15.00
15.00
1.00
2.00
10.00
2.00
2.00
20.00
5.00
12.00
3.00
5.00
5.00
4.00
1.00
2.00
3.00
Sub Total (2) S/.
Total (1)+(2) S/.
Parcial S/.
0.00
0.00
0.40
9.00
21.00
25.67
21.00
12.25
0.70
8.50
4.25
4.00
38.50
4.00
115.00
76.50
50.00
25.00
20.29
9.15
9.25
40.00
9.00
315.00
385.05
21.00
24.50
7.00
17.00
8.50
80.00
192.50
48.00
345.00
382.50
250.00
100.00
20.29
18.30
27.75
2,291.39
2,291.39
FORMATO N 12
DESAGREGADO DE KIT DE IMPLEMENTOS DE SEGURIDAD
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA CONCEPCION,
DISTRITO DE ATE - LIMA - LIMA
N participantes
promedio
Precio Unitario
(S/.) (*)
Parcial (S/.)
CASCOS
1.00
63
5.00
315.00
2.00
63
5.50
693.00
LENTES DE SEGURIDAD
1.00
63
4.00
252.00
MASCARILLAS
2.50
63
2.00
315.00
POLOS
2.00
63
5.00
630.00
PONCHO O CHALECO
1.00
63
16.00
1,008.00
BOTAS
1.50
63
17.00
1,606.50
FLETE
1.00
63
2.00
Implementos
TOTAL
126.00
4,945.50
CON COFINANCIAMIENTO
Cantidad (Und)
N participantes
promedio
Precio Unitario
(S/.)
Parcial (S/.)
CASCOS
0.00
63
5.00
0.00
0.00
63
5.50
0.00
0.00
63
4.00
0.00
MASCARILLAS
0.00
63
2.00
0.00
POLOS
0.00
5.00
0.00
0.00
16.00
0.00
BOTAS (**)(***)
0.00
17.00
0.00
FLETE
0.00
2.00
Implementos
TOTAL
0.00
0.00
FORMATO N 12
DESAGREGADO DE KIT DE IMPLEMENTOS DE SEGURIDAD
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA CONCEPCION,
DISTRITO DE ATE - LIMA - LIMA
TOTAL
4,945.50
FORMATO N 18
CRONOGRAMA DE VALORIZACIN MENSUAL
OBRA :
ITEM
01.00.00
01.01.00
01.02.00
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
03.06.00
03.07.00
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA CONCEPCION, DISTRITO DE ATE LIMA - LIMA
DESCRIPCION
OBRAS PROVISIONALES
CARTEL DE OBRA IMPRESION BANNER DE 3.60x2.40m. (SOPORTE DE
MADERA)
ALQUILER DE LOCAL PARA LA OBRA
TRABAJOS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO EN ROCA SUELTA
TRAZO Y REPLANTEO EN TERRENO ACCIDENTADO CON PENDIENTE
PRONUNCIADA CON EQUIPO
POSTE P/SEALIZACION EN OBRAS VIALES 3",H=1.00m. PINTADOS
ROJO Y BLANCO ALTERNADOS
SEALIZACIN EN OBRA DURANTE LA EJECUCIN
DEMOLICION Y/O DESMONTAJE DE MURO EMPIRCADO DE PIEDRA
h.prom.=1.00m.
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO SEMIROCOSO MANUAL
CORTE EN TERRENO ROCOSO (Manual, inc. insumos para rotura de roca
por calentamiento)
RELLENO CON MATERIAL PROPIO COMPACTACIN CON EQUIPO
LIVIANO
RELLENO CON AFIRMADO Y/O MATERIAL GRANULAR E=4" INC.
COMPACTACION EQUIPO LIVIANO
ACARREO DE MATERIAL EXCEDENTE PARA SER UTILIZADO EN
RELLENOS D<50m.
ACARREO Y ACOPIO MANUAL DE MATERIAL EXCEDENTE A ELIMINAR D
> 100m.
ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE DE 6.0 M3
CARGUIO MNUAL D<=5KM
EXTRACCIN DE MATERIAL Y ACARREO
EXTRACCIN DE PIEDRA EN CANTERA
CORTE PERFILADO Y HABILITACION DE PIEDRA SEGUN DISEO
ACARREO MANUAL DE P.G. (Prom. 8") D>100m. TERRENO C/PENDIENTE
PRONUNCIADA
ACARREO DE AGREGADOS EN PENDIENTE PRONUNCIADA D>100m.
PRESUPUESTO
PRECIO
UNITARIO
Un
METRADO
un
1.00
412.28
un
3.00
200.00
m2
618.00
0.56
mes
515.00
0.71
un
35.00
7.91
214.00
0.47
m2
103.00
5.99
m3
503.73
14.99
m3
215.89
37.07
m3
524.28
20.14
m3
473.80
9.77
m3
629.14
5.00
m3
297.20
6.42
m3
297.20
15.68
m3
m3
896.63
245.81
29.97
32.98
m3
896.63
14.99
m3
334.00
22.48
IMPORTE
PARCIAL
412.28 100%
600.00
35%
412.28
210.00
346.08 100%
365.65 100%
MESES
MES 2
2 3
MES 3
3
0%
35%
0.00
210.00
0%
30%
0.00
180.00
346.08
0%
0.00
0%
0.00
365.65
0%
0.00
0%
0.00
35%
35%
96.90
35.20
35%
35%
96.90
35.20
30%
30%
83.06
30.17
616.97 100%
616.97
0%
0.00
0%
0.00
276.85
100.58
MES 3
2 3
7,550.91
35%
2,642.82
40%
3,020.36
25%
1,887.73
8,003.04
25%
2,000.76
35%
2,801.06
40%
3,201.22
10,559.00
0%
0.00
40%
4,223.60
60%
6,335.40
4,629.03
0%
0.00
0%
0.00 100%
4,629.03
3,145.70
35%
1,101.00
35%
1,101.00
30%
943.71
1,908.02
35%
667.81
35%
667.81
30%
572.41
4,660.10
35%
1,631.04
35%
1,631.04
30%
1,398.03
26,872.00
8,106.81
40%
40%
10,748.80
3,242.72
30%
30%
8,061.60
2,432.04
30%
30%
8,061.60
2,432.04
13,440.48
7,508.32
40%
40%
5,376.19
3,003.33
30%
30%
4,032.14
2,252.50
30%
30%
4,032.14
2,252.50
FORMATO N 18
CRONOGRAMA DE VALORIZACIN MENSUAL
OBRA :
CREACION DE MURO DE CONTENCION EN EL PASAJE NUEVO MILENIO, MZ J-1 AA.HH. INMACULADA CONCEPCION, DISTRITO DE ATE LIMA - LIMA
ITEM
04.05.00
04.06.00
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
DESCRIPCION
ACARREO DE CEMENTO Dmx=100m.
ACARREO DE AGUA PARA LA OBRA Dmx<=50m.
MURO DE MAMPOSTERIA DE PIEDRA
CIMIENTO CORRIDO MEZCLA C:H 1:10 + 30% P.G INC. PREPARACION
MANUAL
ASENTADO DE MUROS DE PIEDRA HABILITADA MEZCLA C:A 1:6 + 75%
P.G.
EMBOQUILLADO DECORATIVO EN MURO DE PIEDRA MEZCLA C:A 1:4
JUNTA DE CONSTRUCCIN DE TECNOPORT E=2", PARA MUROS
DRENAJE EN MUROS TUBERA PVC 2"
VARIOS
ENSAYO PROCTOR (COMPACTACION DEL SUELO)
ENSAYO DE DENSIDAD DE CAMPO
KIT DE IMPLEMENTOS DE SEGURIDAD
KIT DE HERRAMIENTAS
LIMPIEZA GENERAL DE OBRA
Un
m3
un
PRESUPUESTO
PRECIO
UNITARIO
1,249.00
0.56
98.00
6.42
METRADO
m3
148.57
164.64
m3
506.56
114.12
m2
m2
m
479.36
128.84
58.80
9.53
8.20
13.07
un
un
un
un
m2
1.00
8.00
1.00
1.00
515.00
350.00
33.80
4,945.50
2,291.39
0.22
IMPORTE
PARCIAL
699.44
629.16
1
30%
30%
24,460.56
57,808.63
4,568.30
1,056.49
768.52
MESES
MES 2
2 3
1
40%
40%
35%
8,561.20
35%
8,561.20
30%
7,338.17
25%
20%
25%
25%
14,452.16
913.66
264.12
192.13
40%
40%
40%
40%
23,123.45
1,827.32
422.60
307.41
35%
40%
35%
35%
20,233.02
1,827.32
369.77
268.98
350.00
0%
135.20
50%
0.00
0%
0.00
0%
0.00 100%
0.00
135.20
0.00
0.00
113.30
0.00 100%
0.00
50%
4,945.50
0%
2,291.39
0%
0.00
0%
4
279.78
251.66
1
2
30%
30%
MES 3
3
4
209.83
188.75
350.00
0%
270.40
0%
4,945.50 100%
2,291.39 100%
113.30
0%
212,109.86
MES 3
2 3
4
209.83
188.75
69,442.28
70,849.69
71,817.89
32.74%
32.74%
33.40%
66.14%
33.86%
100.00%
1.00
1.00
412.28
600.00
0.00
0.00
1.00
346.08
0.00
1.00
365.65
0.00
1.00
1.00
276.85
100.58
0.00
0.00
1.00
616.97
0.00
1.00
7,550.91
0.00
1.00
8,003.04
0.00
1.00
10,559.00
0.00
1.00
4,629.03
0.00
1.00
3,145.70
0.00
1.00
1,908.02
0.00
1.00
4,660.10
0.00
1.00
1.00
26,872.00
8,106.81
0.00
0.00
1.00
1.00
13,440.48
7,508.32
0.00
0.00
1.00
1.00
699.44
629.16
0.00
0.00
1.00
24,460.56
0.00
1.00
1.00
1.00
1.00
57,808.63
4,568.30
1,056.49
768.52
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00
350.00
270.40
4,945.50
2,291.39
113.30
0.00
0.00
0.00
0.00
0.00
212,109.86
212,109.86
0.00