CALCULO LINEA 10

CALCULO DE CAPACIDAD DE BOMBA


CAUDAL GPM 2000 4.46 PIES3/SEG 126.2 LT/S
DENSIDAD DEL SOLIDO Ps 4.6
% SOLIDOS Cw 40
DENSIDAD DEL AGUA MAR PL 1.03
LONGITUD MANGUERA PIES 85.14 25.95 M
DIAMETRO TUBERIA PULG 8 0.667 PIES 203.2 MM
ALTURA CICLONES PIES 38.22
ALTURA TUBO SUCCION PIES 0
NIVEL SUMIDERO PIES 4
GRAVEDAD 32.2 PIES/ SEG
AREA PIES 2 0.349
PRESION PSI 12 LB/PULG2 1728 LBS / PIE2
DENSIDAD DE LA PULPA
PM = 1.494
CONCENTRACION VOLUMETRICA
CV= 0.130
CV= 13.0
DIAMETRO PARTICULA
D50 84.1 MICRONES
D50 0.0841 MM
VELOCIDAD CRITICA
DEL GRAFICO 3 TENEMOS
CV = 13,5% Y D50 = 0.1111 FL = 0.847
VD= 10.33 PIES/SEG
VD= 3.15 M/SEG
VELOCIDAD DEL FLUJO
VF = Q/A
VF = 12.77 PIES/SEG VF > VD OK
VF = 3.89 M/SEG 3.89 > 3.15
ALTURA DINAMICA TOTAL
PERDIDAS DE FRICCION
DE TABLAS FACTOR FRICCION F = 0.014
HF = 4.5 PIES
ALTURA GEODESICA Zd - Za = 38.22 PIES
ALTURA DE PRESION CICLONES 18.54 PIES
PERDIDA ADMISION 1.27 PIES
TDH m 62.5 PIES 19.1 M
CONVERSION TDHm en TDHa
TDH a = TDH m / HR
DEL GRAFICO TENEMOS
CW = 40 %
PS= 4,6 HR = 0.858
D50= 0,084 MM
ALTURA DINAMICA TOTAL TDH a = 72.90 PIES 22.2 M
POTENCIA REQUERIDA BOMBA 76.38 HP 56.96 KW
EFICIENCIA BOMBA CURVAS 72 %
NPSH DISPONIBLE
Ha = 10.3 M 33.79 PIES
Hv = 0.4 M 1.31 PIES
Hf = 1.27 PIES
Za= 4.00 PIES POSITIVO
DESCARGA SUMIDERO Hf 1.27 PIES
NPSHD = 24.48 PIES
DE TABLAS TENEMOS
EFICIENCIA BOMBA 72 %
RPM 500
NPSH R 3.28 PIES
OK
24.48 > 3.28 OK
NPSHD > NPS R
CALCULO LINEA 4
CALCULO DE CAPACIDAD DE BOMBA
CAUDAL GPM 1551 3.46 PIES3/SEG 97.9 LT/S
DENSIDAD DEL SOLIDO Ps 4.6
% SOLIDOS Cw 41
DENSIDAD DEL AGUA MAR PL 1.03
LONGITUD MANGUERA PIES 50.72 15.46 M
DIAMETRO TUBERIA PULG 8 0.667 PIES 203.2 MM
ALTURA CICLONES PIES 49.212
ALTURA TUBO SUCCION PIES 0
NIVEL SUMIDERO PIES 4
GRAVEDAD 32.2 PIES/ SEG
AREA PIES 2 0.349
PRESION PSI 0 LB/PULG2 0 LBS / PIE2
DENSIDAD DE LA PULPA
PM = 1.511
CONCENTRACION VOLUMETRICA
CV= 0.135
CV= 13.5
DIAMETRO PARTICULA
D50 111.1 MICRONES
D50 0.1111 MM
VELOCIDAD CRITICA
DEL GRAFICO 3 TENEMOS
CV = 13,5% Y D50 = 0.1111 FL = 0.888
VD= 10.83 PIES/SEG
VD= 3.30 M/SEG
VELOCIDAD DEL FLUJO
VF = Q/A
VF = 9.90 PIES/SEG VF > VD OK
VF = 3.02 M/SEG 3.02 < 3.30
ALTURA DINAMICA TOTAL
PERDIDAS DE FRICCION
DE TABLAS FACTOR FRICCION F = 0.014
HF = 1.6 PIES
ALTURA GEODESICA Zd - Za = 49.21 PIES
ALTURA DE PRESION CICLONES 0 PIES
PERDIDA SALIDA TUBERIA 1.52 PIES
PERDIDA ADMISION 0.76 PIES
TDH m 53.1 PIES 16.2 M
CONVERSION TDHm en TDHa
TDH a = TDH m / HR
DEL GRAFICO TENEMOS
CW = 41 %
PS= 4,6 HR = 0.829
D50= 0,111 MM
ALTURA DINAMICA TOTAL TDH a = 64.07 PIES 19.5 M
POTENCIA REQUERIDA BOMBA 55.75 HP 41.57 KW
EFICIENCIA BOMBA CURVAS 68 %
NPSH DISPONIBLE
Ha = 10.3 M 33.79 PIES
Hv = 0.4 M 1.31 PIES
Hf = 0.76 PIES
Za= 4.00 PIES POSITIVO
DESCARGA SUMIDERO Hf 0.76 PIES
NPSHD = 24.74 PIES
DE TABLAS TENEMOS
EFICIENCIA BOMBA 68 %
RPM 470
NPSH R 3.28 PIES
OK
24.74 > 3.28 OK
NPSHD > NPS R
COMPARACION DE CALCULOS BOMBAS CHINAS LINEA 4 - LINEA 10
CALCULO DE BOMBA LINEA 4
DATOS INGENIERIA SHP CHINA
DIAMETRO IMPULSION 203 203 203
mm
DENSIDAD DE PULPA 1511 1511 1470 gr/L
SOLIDOS 41 41 41 %
ALTURA ESTATICA 15.0 15.0 15.0 m
CAUDAL Q 352 352 352 m3/h
VELOCIDAD FLUIDO 3.02 3.02 4.07 m/s
VELOCIDAD CRITICA 3.30 3.11 m/s
D50 0.111 0.111 0.100 mm
EFICIENCIA BOMBA 66.0 68.0 66.7 %
POTENCIA MOTOR 57.19 41.57 53.84 KW
NPSH a 7.54 5.90 m
NPSH r 1.00 1.00 m
CABEZA DINAMICA TDH m 16.20 m
CABEZA DINAMICA TDH a 19.50 19.50 24.52 m
VELOCIDAD CRITICA > VELOCIDAD FLUIDO
CALCULO DE LA BOMBA LINEA 10
DATOS INGENIERIA SHP CHINA
DIAMETRO IMPULSION 203 203 203
mm
DENSIDAD DE PULPA 1494 1494 1460 gr/L
SOLIDOS 40 40 40 %
ALTURA ESTATICA 11.7 11.7 11.7 m
CAUDAL Q 454 454 454 m3/h
VELOCIDAD FLUIDO 3.89 3.89 4.01 m/s
VELOCIDAD CRITICA 3.15 3.32 m/s
D50 0.084 0.084 0.100 mm
EFICIENCIA BOMBA 72.0 72.0 72.6 %
POTENCIA MOTOR 80.68 56.96 55.23 KW
NPSH a 7.46 6.00 m
NPSH r 1.00 1.00 m
CABEZA DINAMICA TDH m 19.10 m
CABEZA DINAMICA TDH a 23.57 22.20 21.51 m
NPSH a > NPSH requerida No se encuentra cavitacin