A. DISEO DE MUROS.
y= 1,900.00 kgf/m
Df= 1.20 m
SUELO DE RELLENO
= 34.00
= 27.00
c= 0.44 kgf/cm
SUELO DE
FUNDACION
c= 0.00 kgf/cm
MATERIALES DEL
MURO
CONDICIONES DEL
SITIO
Sobrecarga Vehicular
PREDIMENSIONAMIENTO
=
H= 4.00 m
B= 2.40 m
e= 0.40 m
P= 0.60 m
F= 0.60 m
T= 1.20 m
c= 0.30 m
A= 0.40 m
L1= 3.60 m
Hdet. 0.20 m
A2
A1
FAA/10
A3
BRAZO Y
PESO
PESO*BRAZO X
kgf/m
kgf-m/m
kgf-m/m
1.00
0.75
1.60
1,296.00
972.00
2,073.60
2.00
1.10
2.00
2,592.00
2,851.20
5,184.00
3.00
1.20
0.20
2,304.00
2,764.80
460.80
6,192.00
6,588.00
7,718.40
REA
Sumatoria=
Xcg=
6,588.00
6,192.00
= 1.06 m
Ycg=
7,718.40
6,192.00
= 1.25 m
PESO*BRAZO X
PROYECTO:
CALCULADO:
PROPIETARIO
JIBELLCA
CIUDAD:
MARACAIBO
a.- Sobrecarga q=
La altura de relleno equivalente a sobrecarga vehicular se tomo siguiendo la recomendaciones de la Norma AASHTO 2002
Hs= 0.60 m
q= Y
q=
2 pies
Hz
1,900.00 kgf/m
x 0.60 m
= 1,140.00 kgf/m
x 1.50 m
= 1,710.00 kgf/m
Xs=1.70 m
Aplicado a:
Xr=1.80 m
= 8,208.00 kgf/m
1-sen
= 0.283
1+sen
e.- Empuje de tierra Ea:
Ea= (1/2*Y*H)*Ka
Aplicado a:
= 4,301.60 kgf/m
1.33 m
= 1,290.48 kgf/m
Aplicado a:
2.00 m
= 5,592.08 kgf/m
PROYECTO:
CALCULADO:
Rv
PROPIETARIO
JIBELLCA
CIUDAD:
MARACAIBO
= 16,110.00 kgf/m
= 0.32
c`= 0.50*c
= 2,200.00 kgf/m
Fr= (Rv+Eav)+c`*B+Ep
= 10,435.20 kgf/m
10,435.20 kgf/m
= 1.87
5,592.08 kgf/m
CONDICIN
1.87
ok
1.5
Mv=
= 8,302.09 kgf-m/m
= 24,244.92 kgf-m/m
Mc
Mv
8,302.09 kgf-m/m
CONDICIN
2.92
1.50
ok
3.12 kgf/cm
3.00
Punto de aplicacin de la fuerza resultante Xr=
Xr=
Mc-Mv
Xr=0.99 m
Rv
Excentricidad de la fuerza resultante
ex= (B/2)-Xr
=0.21 m
B/6=
B/6 ex B/3
0.21
0.40
ok
max.
1.02
CONDICIN
min.= Rv/B*(1-(6*ex)/B)
= 10,236.56 kgf/m
= 1.02 kgf/cm
adm.
1.04
ok
= 3,188.44 kgf/m
= 0.32 kgf/cm
=0.40 m
PROYECTO:
CALCULADO:
PROPIETARIO
JIBELLCA
CIUDAD:
MARACAIBO
Ao =0.30 g
Csh= 0.15
Csv=0.11 g
= arct(Csh/(1-Csv)
=9.51
= 928.80 kgf/m
<-0<[34-9.57]
34.00 -9.51
=24.49
Sen
2
Kas
= 2/3*
Sen * Sen
Sen * Sen
=22.67
= 90.00
= 0.00
= 1.571
= 0.000
= 0.396
= 0.166
= 0.593
Kas=
0.828332797
0.715689422
=0.34
x[
1.00 +
0.35
0.85
PROYECTO:
CALCULADO:
PROPIETARIO
JIBELLCA
CIUDAD:
MARACAIBO
2.67 m
= 5,072.70 kgf/m
Rv
= 771.10 kgf/m
= 14,400.00 kgf/m
= 0.39
c`= 0.50*c
= 220.00 kgf/m
Fr= (Rv+Eav)+c`*B
= 6,144.00 kgf/m
6,144.00 kgf/m
= 1.21
5,072.70 kgf/m
CONDICIN
1.21
1.5
no cumple
= 4,793.40 kgf/m
= 5,592.30 kgf/m
(ps+pi)/2
= 5,192.85 kgf/m
= 0.39
c`= 0.50*c
= 220.00 kgf/m
Fr= (Rv+Eav)+c`*B+Ep
= 11,336.85 kgf/m
PROYECTO:
CALCULADO:
PROPIETARIO
JIBELLCA
CIUDAD:
MARACAIBO
11,336.85 kgf/m
= 2.23
5,072.70 kgf/m
CONDICIN
2.23
ok
1.4
Mv=
8,940.97 kgf-m/m
= 8,940.97 kgf-m/m
= 21,337.92 kgf-m/m
Mc
Mv
8,940.97 kgf-m/m
CONDICIN
2.39
1.40
ok
3.12 kgf/cm
2.00
Punto de aplicacin de la fuerza resultante Xr=
Xr=
Mc-Mv
Xr=0.86 m
Rv
Excentricidad de la fuerza resultante
ex= (B/2)-Xr
=0.34 m
B/6 ex B/3
0.34
B/6=
B`= 3(B/2-ex)
=2.06 m
0.40
ok
=0.40 m
max.
1.12
CONDICIN
min.= Rv/B*(1-(6*ex)/B)
= 11,162.79 kgf/m
= 1.12 kgf/cm
adm.
1.56
ok
= 900.00 kgf/m
= 0.09 kgf/cm
= 0.09 kgf/cm
PROYECTO:
PROPIETARIO
JIBELLCA
CIUDAD:
CASO 1 RESUMEN
Wr
Ws
8,208.00 kgf/m
1,140.00 kgf/m
MARACAIBO
max
min
1.02 kgf/m
0.85 kgf/m
0.79 kgf/m
0.32 kgf/m
LA PUNTERA
PESO PROPIO.
Wpp= M3 base X por m X peso especifico del concreto
Wpp=
0.40 m x
0.60 m x
1.00 m x
2,400.00 kgf/m
= 576.00 kgf
1.00 x
1.00 m
= 0.50 m
2
wr=8208 kgf
max +
1
ws=1.140 kgf
2
Rs1=
1.02 kgf/cm+
0.85 kgf/cm
= 0.94 kgf/cm
Rs1=
0.94 kgf/cm x
100.00 m x
100.00 m
= 9,400.00 kgf
wpp=1.152 kgf
wpp=576 kgf
0.60
wpp=1.152 kgf
9,400.00 kgf +
576.00 kgf
0.60
Reacciones
1.02 kgf/cm -
0.85 kgf/cm
0.40
= 9,976.00 kgf
1.20
= 0.17 kgf/cm
2=0.79 kgf/cm
1=0.85 kgf/cm
min=0.32 kgf/cm
max=1.02 kgf/cm
Rtriangulo=
x 0.17 kgf/cm
x 100.00 cm
x 100.00 cm
x 100.00 cm
x 100.00 cm
= 850.00 kgf
b= 2/3*b
= 0.40 m
= 8,500.00 kgf
b= 1/2*b
= 0.60 m
Rrectangulo=
0.85 kgf/cm
CASO 1.
A.
Talon
PESO PROPIO.
Wpp= M3 base X por m X peso especifico del concreto
Wpp=
0.40 m x
1.20 m x
1.00 m x
2,400.00 kgf/m
= 1,152.00 kgf
1.00 x
1.20 m
= 0.60 m
2 +
min
2
Rs1=
0.79 kgf/cm+
0.32 kgf/cm
= 0.56 kgf/cm
PROYECTO:
PROPIETARIO
JIBELLCA
CIUDAD:
MARACAIBO
Rs1=
0.56 kgf/cm x
100.00 m x
100.00 m
= 5,600.00 kgf
8,208.00 kgf
1.80 m
1,140.00 kgf
1.70 m
Reacciones
Rtriangulo=
5,600.00 kgf -
1,152.00 kgf -
8,208.00 kgf -
0.79 kgf/cm -
0.32 kgf/cm
x 0.47 kgf/cm
x 100.00 cm
x 100.00 cm
x 100.00 cm
1,140.00 kgf
-= 4,900.00 kgf
= 0.47 kgf/cm
x 100.00 cm
= 2,350.00 kgf
b= 2/3*b
= 0.80 m
= 3,200.00 kgf
b= 1/2*b
= 0.60 m
Rrectangulo=
0.32 kgf/cm
PROYECTO:
PROPIETARIO
JIBELLCA
CIUDAD:
CASO 2 RESUMEN
Wr
Ws
8,208.00 kgf/m
MARACAIBO
max
min
1.12 kgf/m
0.84 kgf/m
0.56 kgf/m
0.09 kgf/m
LA PUNTERA
PESO PROPIO.
Wpp= M3 base X por m X peso especifico del concreto
Wpp=
0.40 m x
0.60 m x
1.00 m x
2,400.00 kgf/m
= 576.00 kgf
1.00 x
0.60 m
= 0.30 m
2
wr=8208 kgf
max +
1
ws=0
2
Rs1=
1.12 kgf/cm+
0.84 kgf/cm
= 0.98 kgf/cm
Rs1=
0.98 kgf/cm x
100.00 m x
100.00 m
= 9,800.00 kgf
wpp=1.152 kgf
wpp=576 kgf
0.60
wpp=1.152 kgf
9,800.00 kgf +
576.00 kgf
0.60
Reacciones
1.12 kgf/cm -
0.84 kgf/cm
0.40
= 10,376.00 kgf
1.20
min=0. kgf/cm
= 0.28 kgf/cm
2=0.56 kgf/cm
max=1.12 kgf/cm
1=0.84 kgf/cm
Rtriangulo=
x 0.28 kgf/cm
x 100.00 cm
x 100.00 cm
x 100.00 cm
x 100.00 cm
= 1,400.00 kgf
b= 2/3*b
= 0.40 m
= 8,400.00 kgf
b= 1/2*b
= 0.60 m
Rrectangulo=
0.84 kgf/cm
CASO 1.
A.
Talon
PESO PROPIO.
Wpp= M3 base X por m X peso especifico del concreto
Wpp=
0.40 m x
1.20 m x
1.00 m x
2,400.00 kgf/m
= 1,152.00 kgf
1.00 x
1.20 m
= 0.60 m
PROYECTO:
PROPIETARIO
JIBELLCA
CIUDAD:
Rs1=
2 +
MARACAIBO
min
2
Rs1=
0.56 kgf/cm+
0.00 kgf/cm
= 0.28 kgf/cm
Rs1=
0.28 kgf/cm x
100.00 m x
100.00 m
= 2,800.00 kgf
8,208.00 kgf
1.80 m
0.00 kgf
0.00 m
Reacciones
Rtriangulo=
2,800.00 kgf -
1,152.00 kgf -
0.56 kgf/cm -
0.00 kgf/cm
x 0.56 kgf/cm
8,208.00 kgf -
0.00 kgf
-= 6,560.00 kgf
= 0.56 kgf/cm
x 100.00 cm
x 100.00 cm
= 2,800.00 kgf
b= 2/3*b
= 0.80 m
PROYECTO:
PROPIETARIO
JIBELLCA
CIUDAD:
MARACAIBO
F.C.= 1.60*Ea +
1.0*DEa+
1.0*Fspp
F.C.=
6,882.56 kgf/m +
771.10 kgf/m +
928.80 kgf/m
= 1.69
5,072.70 kgf/m
Vmax
= 6,560.00 kgf
di= e - ri
di=
40.00 cm
ds= e - rs
ds=
40.00 cm
= 11,086.40 kgf
7.50 cm
= 32.50 cm
5.00 cm
= 35.00 cm
24,959.03 kgf
CONDICIN
>
>
24,959.03 kgf
>
Vc
14.49 x
100.00 cm
32.50 cm
= 24,959.03 kgf
Vu/
11,086.40 kgf
14,781.87 kgf
0.75
= 14,781.87 kgf
ok
210.00 kgf/cm
100.00 cm
7.50 cm
32.50 cm
Max=
Mu puntera=
5,427.20 kgf-m
f`y=
4,200.00 kgf/cm
e=
40.00 cm
Rec. Superior=5.00 cm
ds=
35.00 cm
5,427.20 kgf-m
x
1.69
= 9,171.97 kgf-m
(mu/0.189**f`c*b)
d=
e=
d+recubrimiento
40.00 cm
As min=
= 16.02 cm
>
= 21.02 cm
ok
21.02 cm
0.0018 * b *t
= 16.02 cm
+ 5.00 cm
= 0.0018 x
100.00 cm x
40.00 cm
= 7.20 cm
Por Equilibrio
As*f=0.85*f`c*b*a
a=
Mu =
As=
=
(As*f`y)/(0.85*f`c*b)
As*f`y*(d-(a/2))
(*d)-[(-d) - ((2*Mu*)/(*f`y))]
(0.85*f`c*b)/f
= 4.25 cm
As=
As min
7.20 cm
= 17.36 cm
comparar
<
As
17.36 cm
se coloca As
PROYECTO:
PROPIETARIO
JIBELLCA
CIUDAD:
MARACAIBO
# Barras=
Max=
Mu Talon=
d
As
Area
17.36 cm
1.98 cm 5/8
= 8.8
13,225.60 kgf-m
13,225.60 kgf-m
1.69
= 22,351.26 kgf-m
(mu/0.189**f`c*b)
d=
e=
d+recubrimiento
40.00 cm
>
= 25.01 cm
= 25.01 cm
+ 5.00 cm
= 30.01 cm
ok
30.01 cm
As min=
0.0018 * b *t
As=
(*d)-[(-d) - ((2*Mu*)/(*f`y))]
(0.85*f`c*b)/f
= 0.0018 x
100.00 cm x
40.00 cm
# Barras=
= 7.20 cm
= 4.25 cm
As=
As min
7.20 cm
9 5/8"@ 0.11xm/m
= 27.10 cm
comparar
<
As
Area
As
27.10 cm
se coloca As
27.10 cm
1.98 cm 5/8
= 13.7
13 5/8"@ 0.08xm/m
PROYECTO:
PROPIETARIO
JIBELLCA
CIUDAD:
MARACAIBO
As min=
0.0018 * b *t
= 0.0018 x
As=
(*d)-[(-d) - ((2*Mu*)/(*f`y))]
(0.85*f`c*b)/f`y
100.00 cm x
40.00 cm
= 7.20 cm
= 4.25 cm
CASO 1
CASO 2
SOLICITACIONES MAXIMAS
y (m)
Vu (kgf)
Mu (kgf-m)
Vu (kgf)
Mu (kgf-m)
Vu (kgf)
Mu (kgf-m)
1.00
2.00
3.00
3.60
962.35
2,785.02
5,468.01
7,490.76
401.26
2,177.68
6,188.22
10,024.25
704.07
2,470.66
5,299.77
7,507.24
289.18
1,967.84
6,252.66
10,580.65
962.35
2,785.02
6,188.22
10,024.25
401.26
2,177.68
6,252.66
10,580.65
0.08 * y
+ 30.00 cm
CASO 1
Vu= 430.16*y + 532.19*y
Mu= 143*y + 258.10*y
CASO 2
Vu= 531.26*y + 172.80*y
Mu= 202.78*y + 86.40*y
El espesor de la pantalla vara desde 30cm hasta 60cm.
F(y)=
30.00 cm
+ 30.00 cm =
360.00 cm
0.75 *
576.03 * d(y)
0.53 *
210.00 kgf/cm*
100.00 *
0.0018 *
100.00 *
F(y)
= 0.18 * F(y)
d (y)
PROYECTO:
PROPIETARIO
JIBELLCA
CIUDAD:
MARACAIBO
y (m)
Vu (kgf)
Mu (kgf-m)
F(y) (cm)
d (y) (cm)
*Vu (kgf)
Asmin. (cm/m)
As req.
(cm/m)
1.00
2.00
3.00
3.60
962.35
2,785.02
6,188.22
10,024.25
401.26
2,177.68
6,252.66
10,580.65
38.00
46.00
54.00
58.80
33.00
41.00
49.00
53.80
19,008.99
23,617.23
28,225.47
30,990.41
6.84
8.28
9.72
10.58
0.32
1.41
3.40
5.26
(mu/0.189**f`c*b)
d=
e=
= 17.21 cm
40.00 cm
>
22.21 cm
+ 5.00 cm
= 17.21 cm
= 22.21 cm
ok
# Barras=
As
Area
10.58 cm
1.98 cm 5/8
= 5.3
6 5/8"@ 0.17xm/m
# Barras=
As
Area
10.58 cm
1.27 cm 5/8
= 8.3
8 5/8"@ 0.13xm/m