SALDO VALORIZADO DE ALMACEN

OBRA :

CONSTRUCCION DEL PUENTE AZUCENA URAN PUNYAN MATARA

EJECUTA

MUNICIPALIDAD DISTRITAL DE AMASHCA

PERIODO
Residente:

19/03/2007 AL 19/05/2007

Supervisor :

JEFE DE OBRAS MDA ING. ANIBAL BAZAN ALVARADO

ING. FIDEL H. RODRIGUEZ MENDEZ

DESCRIPCION

UND

INGRESO

EGRESO

SALDO

CANTIDAD

P.U

PARCIAL (S/.)

CANTIDAD

PARCIAL (S/.)

(%)

CANTIDAD

PARCIAL (S/.)

(%)

01

ACERO DE REFUERZO F'Y=4200 KG/CM2 DE =1"

VAR

24.00

96.70

2,320.80

24.00

2,320.80

1.00

0.00

0.00

0.00

02

ACERO DE REFUERZO F'Y=4200 KG/CM2 DE =1/2"

VAR

341.00

24.90

8,490.90

66.00

1,643.40

0.19

275.00

6,847.50

0.81

03

ACERO DE REFUERZO F'Y=4200 KG/CM2 DE =3/4"

VAR

15.00

55.00

825.00

14.00

770.00

0.93

1.00

55.00

0.07

04

ACERO DE REFUERZO F'Y=4200 KG/CM2 DE =3/8"

VAR

82.00

13.80

1,131.60

74.00

1,021.20

0.90

8.00

110.40

0.10

05

ACERO DE REFUERZO F'Y=4200 KG/CM2 DE =5/8"

VAR

55.00

37.00

2,035.00

36.00

1,332.00

0.65

19.00

703.00

0.35

06

ALAMBRE N 8

KG

290.00

3.45

1,000.50

136.00

469.20

0.47

154.00

531.30

0.53

07

ALAMBRE N 16

KG

263.00

3.45

907.35

66.00

227.70

0.25

197.00

679.65

0.75

08

ANGULO DE FIERRO DE 3"x3"x1/4", L=6M.

UND

4.00

165.00

660.00

2.00

330.00

0.50

2.00

330.00

0.50

09

CEMENTO PORTLAND TIPO I

BLS

840.00

19.60

16,464.00

716.00

14,033.60

0.85

124.00

2,430.40

0.15

10

CLAVOS C/C DE 4"

KG

17.00

3.50

59.50

10.00

35.00

0.59

7.00

24.50

0.41

11

CLAVOS C/C DE 3"

KG

26.00

3.50

91.00

24.00

84.00

0.92

2.00

7.00

0.08

12

CLAVOS C/C DE 21/2"

KG

6.00

3.50

21.00

5.00

17.50

0.83

1.00

3.50

0.17

13

CLAVOS C/C DE 2"

KG

18.00

3.50

63.00

8.00

28.00

0.44

10.00

35.00

0.56

14

HORMIGON

M3

139.00

73.00

10,147.00

114.25

8,340.25

0.82

24.75

1,806.75

0.18

15

MADERA EUCALIPTO PARA PIE DERECHO

UND

140.00

6.00

840.00

140.00

840.00

1.00

0.00

0.00

0.00

16

MAD. EUCALIPTO PARA FALSO PUENTE =12" L=4.5 M.

UND

16.00

30.00

480.00

16.00

480.00

1.00

0.00

0.00

0.00

17

LISTONES DE MADERA TORNILLO 3"x5"x10' (30 UND)

P2

375.00

3.80

1,425.00

350.00

1,330.00

0.93

25.00

95.00

0.07

18

LISTONES DE MADERA TORNILLO 2"x2"x10' (51 UND)

P2

170.00

3.80

646.00

170.00

646.00

1.00

0.00

0.00

0.00

22

TABLAS DE MADERA TORNILLO 1"x8"x10'

P2

266.67

3.80

1,013.33

266.67

1,013.33

1.00

0.00

0.00

0.00

25

TRIPLAY e=10 MM (1.20x2.40 M.)

PL

8.00

75.00

600.00

8.00

600.00

1.00

0.00

0.00

0.00

26

MAPRESA e=18MM (1.20x2.40M.)

PL

10.00

100.00

1,000.00

10.00

1,000.00

1.00

0.00

0.00

0.00

27

PLANCHA DE ACERO e=1/4"

PL

0.50

265.00

132.50

0.36

95.40

0.72

0.14

37.10

0.28

18

YESO EN BOLSAS DE 25 KG.

BOL

5.00

0.00

1.00

0.00

0.20

4.00

0.00

0.80

22

LISTONES DE MADERA TORNILLO 2"x3"x10' (120 UND)

P2

600.00

3.80

2,280.00

360.00

1,368.00

0.60

240.00

912.00

0.40

25

TABLAS DE MADERA TORNILLO 1"x6"x10'

(15 UND)

P2

75.00

3.80

285.00

30.00

114.00

0.40

45.00

171.00

0.60

26

TABLAS DE MADERA TORNILLO 1"x8"x10'

(50 UND)

P2

333.33

3.80

1,266.67

206.67

785.33

0.62

126.67

481.33

0.38

27

TABLAS DE MADERA TORNILLO 1"x10"x10'

(54 UND)

P2

450.00

3.80

1,710.00

91.67

348.33

0.20

358.33

1,361.67

0.80

28

TABLAS DE MADERA TORNILLO 1"x12"x10'

(3 UND)

P2

30.00

3.80

114.00

30.00

114.00

1.00

0.00

0.00

0.00

39,387.05

70.32%

16,622.10

29.68%

TOTAL

(40 UND)

56,009.15

CUADRO RESUMEN DE MOVIMIENTO DE ALMACEN


EJECUTA :

GOBIERNO DISTRITAL DE AMASHCA

PROYECTO :

CONSTRUCCIN DEL PUENTE AZUCENA URAN PUNYAN - MATARA

PERIODO DE CONTROL :

DEL ../../ 2007

MATERIAL

UND.

SALDO
ANTERIOR

AL

../../ 2007
INGRESOS

FECHA

PROVEEDOR

CANTIDAD

INGRESO
ACUM.

EGRESOS
SALDO
FECHA

PARTIDAS

ALMACENERO

CANTIDAD

También podría gustarte