PROGRAMA ANUAL 2014 - UNIDAD MORRITOS

1. PROGRAMA DE PRODUCCION
ENERO FEBRERO MARZO ABRIL MAYO
5,000.00 5,000.00 5,000.00 - -
12,648.00 14,760.00 14,910.00 24,000.00 24,000.00
2,352.00 6,240.00 5,880.00 6,000.00 6,000.00
10,000.00 4,000.00 4,210.00 - -
30,000.00 30,000.00 30,000.00 30,000.00 30,000.00
2. PROGRAMA DE AVANCES
FASE CLASE LABOR ENERO FEBRERO MARZO ABRIL MAYO
EXPLORACION GALERIA 60.00 60.00 60.00 60.00
CAMARA ALIMAK 40.00
CAMARA CARGUIO 45.00 45.00
CHIMENEA 50.00 70.00 20.00
CRUCERO 65.00 80.00 40.00 80.00 80.00
GALERIA 48.00 70.00 70.00 120.00 120.00
RAMPA 60.00 60.00 60.00 30.00 30.00
REFUGIO 4.00 4.00 6.00 8.00 6.00
CHIMENEA 60.00 50.00
CRUCERO 30.00 30.00 15.00
GALERIA 20.00 40.00 40.00 40.00 70.00
SUBNIVEL 30.00 90.00 75.00 90.00 90.00
392.00 474.00 476.00 508.00 471.00
DESMONTE ml 294.00 214.00 231.00 198.00 131.00
MINERAL ml 98.00 260.00 245.00 310.00 340.00
MINA SUBTERRANEA - AVANCES
SELECTOR MAGNETICO
TOTAL GENERAL
PRODUCCION ESTIMADA 2014 UNIDAD MINERA MORRITOS
Total general
DESARROLLO
PREPARACION
ITEM
TAJO ABIERTO
MINA SUBTERRANEA - TAJOS
JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE TOTAL GENERAL
- - - - - - - 15,000.00
24,720.00 29,844.80 29,960.00 29,852.00 29,588.00 29,960.00 29,780.00 294,022.80
5,280.00 5,155.20 5,040.00 5,148.00 5,412.00 5,040.00 5,220.00 62,767.20
- - - - - - - 18,210.00
30,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 390,000.00
JUNIO JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE TOTAL GENERAL
40.00 40.00 40.00 20.00 380.00
45.00 85.00
140.00 45.00 45.00 45.00 365.00
30.00 40.00 210.00
30.00 375.00
150.00 218.00 180.00 200.00 200.00 180.00 120.00 1,676.00
30.00 30.00 30.00 30.00 30.00 30.00 30.00 450.00
2.00 4.00 10.00 12.00 14.00 12.00 8.00 90.00
60.00 60.00 60.00 290.00
75.00
70.00 70.00 70.00 70.00 40.00 50.00 80.00 660.00
60.00 60.00 60.00 100.00 150.00 150.00 120.00 1,075.00
542.00 527.00 540.00 482.00 494.00 422.00 403.00 5,731.00
262.00 139.00 190.00 72.00 84.00 42.00 38.00 1,895.00
280.00 388.00 350.00 410.00 410.00 380.00 365.00 3,836.00
PRODUCCION ESTIMADA 2014 UNIDAD MINERA MORRITOS
MINADO SUPERFICIAL
VETA TAJOS MATERIAL FASES CORTES TIPO
G G2 MINERAL 1 1 ZANJEO
B B2N MINERAL 1 1 ZANJEO
M M MINERAL 2 1 ZANJEO
M M DESMONTE 1 1 PREPARACIN
N N1N DESMONTE 1 2 PREPARACIN
STRIPING RATIO 2.22
LONGITUD (m) POTENCIA(m)
ANCHO
CORTE (m)
ALTURA(m)
P.E
(tn/m3)
MINERAL(tn) DESMONTE (tn)
40.00 1.20 - 3.00 4.50 648.00 -
40.00 7.00 - 3.00 4.50 3,780.00 -
28.25 1.50 - 3.00 4.50 572.00 -
25.00 - 10.00 3.00 2.70 - 2,025.00
80.00 - 7.00 6.00 2.70 - 9,072.00
TOTAL 5,000.00 11,097.00
OBSERVACIONES
zanjeo de mineral ultima etapa
zanjeo de mineral ltima etapa
zanjeo de mineral ltima etapa
Limpieza para preparacin y acceso - TRACTOR
Acceso y corte en dos barras de desmonte para posterior corte en mineral - TRACTOR
PU US$/TM
COSTO TOTAL
US$
4.23 2,741.04
4.23 15,989.40
4.23 2,419.56
3.74 7,573.50
3.74 33,929.28
TOTAL 62,652.78
MINADO SUBTERRANEO
ZONA EJECUTOR NIVEL ETAPA VETA TIPO DE LABOR LABOR a-veta
C.I.A. 735 DESARROLLO B GL 645 NW 3.50
C.I.A. 735 DESARROLLO B GL 645 SE 2.50
C.I.A. 735 DESARROLLO BP 847
C.I.A. 735 DESARROLLO XC 190
C.I.A. 754 PREPARACION SN 885 NW 2.00
C.I.A. 735 DESARROLLO R
C.I.A. 780 DESARROLLO N GL 420 SE 2.00
C.I.A. 792 PREPARACION N SN 425 SE 1.20
C.I.A. 780 DESARROLLO CA 640
C.I.A. 780 DESARROLLO CH 640
C.I.A. 780 DESARROLLO EST 640
C.I.A. 786 PREPARACION E SN 858 NW 1.70
C.I.A. 786 PREPARACION TENSIONAL SN 867 SE 1.20
C.I.A. 764 DESARROLLO RP 903
C.I.A. 764 PREPARACION VE 902
C.I.A. 764 PREPARACION B GL 870 NW 3.20
ZONA EJECUTOR NIVEL ETAPA VETA TIPO DE LABOR LABOR a-veta
BC-2 C.I.A. 735 EXPLOTACION F TJ 915 SE-1 NORTE 2.40
C.I.A. 736 EXPLOTACION F TJ 915 SE-1 SUR 1.20
BC-2 C.I.A. 735 EXPLOTACION E TJ 885 SE-1 2.90
MINERAL ( TM )
5,880.00
14,910.00
PROGRAMA DE AVANCES Y PRODUCCION - MARZO 2014
BC-4
BC-5
BC-2
BC-3
PRODUCCION
PRODUCCION TOTAL MINA SUBTERRANEA DICIEMBRE
MINERAL DE AVANCES LINEALES
MINERAL DE TAJOS
AVANCES LINEALES
20,790.00 TOTAL PRODUCCION
PE. DESMONTE
%LEY a (m) h (m)
TIPO DE
MATERIAL
LONGITUD
PROGRAM. (m)
LONGIT
EJECUT (m)
% CUMPLIM P.E. VOL. ROTO (m3)
55.00 4.50 4.50 MINERAL 50.00 4.50 911.25
52.00 4.50 4.50 MINERAL 50.00 4.50 911.25
4.50 4.50 DESMONTE 50.00 2.70 911.25
3.50 3.50 DESMONTE 30.00 2.70 330.75
55.00 3.50 3.50 MINERAL 30.00 4.50 330.75
2.00 2.00 DESMONTE 10.00 2.70 36.00
55.00 3.50 3.50 MINERAL 50.00 4.50 551.25
55.00 3.50 3.50 MINERAL 50.00 4.50 551.25
3.50 3.50 DESMONTE 10.00 2.70 110.25
2.00 2.00 DESMONTE 24.00 2.70 86.40
3.50 3.00 DESMONTE 6.00 2.70 56.70
60.00 3.50 3.50 MINERAL 43.00 4.50 474.08
61.80 3.50 3.50 MINERAL 23.00 4.50 253.58
4.50 4.50 DESMONTE 25.00 2.70 455.63
3.50 3.50 DESMONTE 10.00 2.70 110.25
55.00 4.50 4.50 MINERAL 15.00 4.50 273.38
476.00 6,354.00
476.00 0.54
DENSIDAD DESMONTE
%LEY a (m) h (m)
TIPO DE
MATERIAL
LONGITUD
PROGRAM. (m)
LONGIT
EJECUT (m)
% CUMPLIM P.E. VOL-ROTO
2.40 15.00 MINERAL 9.59 4.50 345.24
1.20 15.00 MINERAL 21.33 4.50 383.94
2.90 15.00 MINERAL 59.41 4.50 2,584.15
90.33 0.00 0.00 3,313.33
PROGRAMA DE AVANCES Y PRODUCCION - MARZO 2014
TOTAL TM CORREGIDO 52 %
TOTAL
TOTAL TM
2.7
MINERAL (m3) DESMONTE (m3) MIN. BRUTO (TM) DESMONTE (TM) PU US$/TM COSTO TOTAL US$
708.75 202.50 3,189.38 546.75 886.50 44,325.00
506.25 405.00 2,278.13 1,093.50 886.50 44,325.00
- 911.25 - 2,460.38 771.58 38,579.00
- 330.75 - 893.03 612.22 18,366.60
189.00 141.75 850.50 382.73 728.91 21,867.30
- 36.00 - 97.20 250.00 2,500.00
315.00 236.25 1,417.50 637.88 728.91 36,445.50
189.00 362.25 850.50 978.08 728.91 36,445.50
- 110.25 - 297.68 612.22 6,122.20
- 86.40 - 233.28 202.00 4,848.00
- 56.70 - 153.09 612.22 3,673.32
230.27 243.81 1,036.19 658.29 728.91 31,343.13
86.94 166.64 391.23 449.91 728.91 16,764.93
- 455.63 - 1,230.19 771.58 19,289.50
- 110.25 - 297.68 612.22 6,122.20
194.40 78.98 874.80 213.23 886.50 13,297.50
2,419.61 3,934.40 10,888.22 10,622.87 344,314.68
5,880.00
2.7
MINERAL (m3) DESMONTE (m3) MIN. BRUTO DESMONTE PU US$/TM COSTO TOTAL US$
345.24 0.00 1,553.58 0.00 9.54 14,821.15
383.94 0.00 1,727.73 0.00 9.54 16,482.54
2,584.15 0.00 11,628.69 0.00 9.54 110,937.70
3,313.33 0.00 14,910.00 0.00 9.54 142,241.39
PROGRAMA DE AVANCES Y PRODUCCION - MARZO 2014
PROGRAMA DE PRODUCCION MENSUAL - MARZO 2014
PROGRAMADO (TM)
SUPERFICIE 5,000.00
SUBTERRANEO TAJOS 14,910.00
AVANCES 5,880.00
SEPARADOR MAGNETICO 4,210.00
TOTAL 30,000.00