Valorización #09
Valorización #09
OBRA
UBICACIN
ENTIDAD
CONTRATISTA
SUPERVISOR DE OBRA
RESIDENTE DE OBRA
ITEM
: "MEJORAMIENTO DE CALLES Y PUENTES EN LA LOCALIDAD DE CARMEN ROSA DEL C.P. LA MERCED GAUCHO, DISTRITO DE SAN MARCOS - HUARI - ANCASH"
DESCRIPCIN DE PARTIDAS
EJECUTADAS EN EL PERIODO
PRECIO
UNIT S/.
12/1/2013
AREA GEOGRFICA
2- (ANCASH)
106,076.14
AVANCES
PRESUPUESTO
UND METRADO
89,895.04
ANTERIOR
Presup.
METRADO
S/.
22,406.29
SALDO
ACTUAL
Valoriz.
%
S/.
22,406.29 100.00%
METRADO
ACUMULADO
Valoriz.
S/.
%
-
METRADO
Valoriz.
S/.
22,406.29
% METRADO
Valoriz.
S/.
-
OBRAS PROVISIONALES
1.01
UND
1.00
658.58
658.58
1.00
658.58
100.00%
0.00
0.00
0.00%
1.00
658.58
100.00%
0.00
0.00
0.00%
1.02
M2
80.00
39.13
3,130.40
80.00
3,130.40
100.00%
0.00
0.00
0.00%
80.00
3130.40
100.00%
0.00
0.00
0.00%
1.03
M2
25.00
50.19
1,254.75
25.00
1,254.75
100.00%
0.00
0.00
0.00%
25.00
1254.75
100.00%
0.00
0.00
0.00%
1.04
UND
2.00
906.19
1,812.38
2.00
1,812.38
100.00%
0.00
0.00
0.00%
2.00
1812.38
100.00%
0.00
0.00
0.00%
1.05
1.06
KM
M
10.00
16.00
600.89
596.33
6,008.90
9,541.28
10.00
16.00
6,008.90
9541.28
90.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
10.00
16.00
6008.90
9541.28
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2.01
OBRAS PRELIMINARES
02.01.01
M2
213.60
1.10
234.96
213.60
234.96
100.00%
0.00
0.00
0.00%
213.60
234.96
100.00%
0.00
0.00
0.00%
02.01.02
M2
213.60
2.74
585.26
213.60
585.26
100.00%
0.00
0.00
0.00%
213.60
585.26
100.00%
0.00
0.00
0.00%
02.01.03
M2
213.60
4.32
922.75
213.60
922.75
100.00%
0.00
0.00
0.00%
213.60
922.75
100.00%
0.00
0.00
0.00%
02.01.04
M3
210.00
25.06
5,262.60
210.00
5262.60
100.00%
0.00
0.00
0.00%
210.00
5262.60
100.00%
0.00
0.00
0.00%
02.01.05
M3
361.02
44.43
16,040.12
361.02
16040.12
100.00%
0.00
0.00
0.00%
361.02
16040.12
100.00%
0.00
0.00
0.00%
2.02
MOVIMIENTO DE TIERRAS
02.02.01
M3
842.40
34.01
28,650.02
842.40
28650.02
100.00%
0.00
0.00
0.00%
842.40
28650.02
100.00%
0.00
0.00
0.00%
02.02.02
M3
76.80
36.81
2,827.01
76.80
2827.01
100.00%
0.00
0.00
0.00%
76.80
2827.01
100.00%
0.00
0.00
0.00%
02.02.03
M2
153.60
3.75
576.00
153.60
576.00
100.00%
0.00
0.00
0.00%
153.60
576.00
100.00%
0.00
0.00
0.00%
02.02.04
M3
892.16
73.85
65,886.02
892.16
65886.02
100.00%
0.00
0.00
0.00%
892.16
65886.02
100.00%
0.00
0.00
0.00%
02.02.05
M3
580.09
46.11
26,747.95
580.09
26747.95
100.00%
0.00
0.00
0.00%
580.09
26747.95
100.00%
0.00
0.00
0.00%
RESIDENTE DE OBRA
572,079.13
572,079.13 100.00%
0.00%
1.00
572,079.13 100.00%
0.00%
SUPERVISOR
0.00%
0.00%
: "MEJORAMIENTO DE CALLES Y PUENTES EN LA LOCALIDAD DE CARMEN ROSA DEL C.P. LA MERCED GAUCHO, DISTRITO DE SAN MARCOS - HUARI - ANCASH"
METRADO
2- (ANCASH)
106,076.14
AVANCES
PRESUPUESTO
UND
12/1/2013
AREA GEOGRFICA
SALDO
ANTERIOR
89,895.04
Presup.
S/.
METRADO
Valoriz.
S/.
METRADO
ACTUAL
Valoriz.
S/.
METRADO
ACUMULADO
Valoriz.
S/.
METRADO
Valoriz.
S/.
2.03
SUB - ESTRUCTURA
02.03.01
CONCRETO SIMPLE
02.03.01.01
M2
136.80
20.06
2,744.21
136.80
2744.21
100.00%
0.00
0.00
0.00%
136.80
2744.21
100.00%
0.00
0.00
0.00%
02.03.01.02
M2
98.56
63.49
6,257.57
98.56
6257.57
100.00%
0.00
0.00
0.00%
98.56
6257.57
100.00%
0.00
0.00
0.00%
02.03.01.03
M2
623.20
86.67
54,012.74
623.20
54012.74
100.00%
0.00
0.00
0.00%
623.20
54012.74
100.00%
0.00
0.00
0.00%
02.03.01.04
M2
23.04
50.28
1,158.45
23.04
1158.45
100.00%
0.00
0.00
0.00%
23.04
1158.45
100.00%
0.00
0.00
0.00%
02.03.01.05
M3
107.52
381.11
40,976.95
107.52
40976.95
100.00%
0.00
0.00
0.00%
107.52
40976.95
100.00%
0.00
0.00
0.00%
02.03.01.06
M3
356.40
381.11
135,827.60
356.40
135827.60
100.00%
0.00
0.00
0.00%
356.40
135827.60
100.00%
0.00
0.00
0.00%
02.03.01.07
M3
17.28
463.53
8,009.80
17.28
8009.80
100.00%
0.00
0.00
0.00%
17.28
8009.80
100.00%
0.00
0.00
0.00%
02.03.01.08
CURADO DE CONCRETO
M2
744.80
0.51
379.85
744.80
379.85
0.00%
0.00
0.00
0.00%
744.80
379.85
100.00%
0.00
0.00
0.00%
2.04
SUPER ESTRUCTURA
02.04.01
VIGAS
02.04.01.01
M3
10.80
539.78
5,829.62
10.80
5829.62
100.00%
0.00
0.00
0.00%
10.80
5829.62
100.00%
0.00
0.00
0.00%
02.04.01.02
M2
66.00
89.90
5,933.40
66.00
5933.40
100.00%
0.00
0.00
0.00%
66.00
5933.40
100.00%
0.00
0.00
0.00%
02.04.01.03
KG
3,504.87
7.14
25,024.77
3504.87
25024.77
100.00%
0.00
0.00
0.00%
3504.87
25024.77
100.00%
0.00
0.00
0.00%
02.04.01.04
CURADO DE CONCRETO
M2
66.00
0.51
33.66
66.00
33.66
100.00%
0.00
0.00
0.00%
66.00
33.66
100.00%
0.00
0.00
0.00%
02.04.02
DIAFRAGMAS
02.04.02.01
M3
1.50
463.53
695.30
1.50
695.30
100.00%
0.00
0.00
0.00%
1.50
695.30
100.00%
0.00
0.00
0.00%
02.04.02.02
M2
6.00
89.90
539.40
6.00
539.40
100.00%
0.00
0.00
0.00%
6.00
539.40
100.00%
0.00
0.00
0.00%
02.04.02.03
KG
540.80
7.14
3,861.31
540.80
3861.31
100.00%
0.00
0.00
0.00%
540.80
3861.31
100.00%
0.00
0.00
0.00%
02.04.02.04
CURADO DE CONCRETO
M2
6.00
0.51
3.06
6.00
3.06
100.00%
0.00
0.00
0.00%
6.00
3.06
100.00%
0.00
0.00
0.00%
02.04.03
LOSA
02.04.03.01
M3
13.50
539.78
7,287.03
13.50
7287.03
100.00%
0.00
0.00
0.00%
13.50
7287.03
100.00%
0.00
0.00
0.00%
02.04.03.02
M2
73.50
94.74
6,963.39
73.50
6963.39
100.00%
0.00
0.00
0.00%
73.50
6963.39
100.00%
0.00
0.00
0.00%
02.04.03.03
KG
M2
2,062.61
73.50
7.14
0.51
14,727.04
37.49
2062.61
73.50
14727.04
37.49
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2062.61
73.50
14727.04
37.49
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
02.04.03.04
RESIDENTE DE OBRA
SUPERVISOR
: "MEJORAMIENTO DE CALLES Y PUENTES EN LA LOCALIDAD DE CARMEN ROSA DEL C.P. LA MERCED GAUCHO, DISTRITO DE SAN MARCOS - HUARI - ANCASH"
METRADO
2- (ANCASH)
106,076.14
AVANCES
PRESUPUESTO
UND
12/1/2013
AREA GEOGRFICA
SALDO
ANTERIOR
89,895.04
Presup.
S/.
METRADO
Valoriz.
S/.
METRADO
ACTUAL
Valoriz.
S/.
METRADO
ACUMULADO
Valoriz.
S/.
METRADO
Valoriz.
S/.
02.04.04
VEREDAS
02.04.04.01
M3
3.90
463.53
1,807.77
3.90
1807.77
100.00%
0.00
0.00
0.00%
3.90
1807.77
0.00%
0.00
0.00
0.00%
02.04.04.02
M2
24.00
30.29
726.96
24.00
726.96
100.00%
0.00
0.00
0.00%
24.00
726.96
0.00%
0.00
0.00
0.00%
02.04.04.03
KG
406.95
7.14
2,905.62
406.95
2905.62
100.00%
0.00
0.00
0.00%
406.95
2905.62
0.00%
0.00
0.00
0.00%
02.04.04.04
CURADO DE CONCRETO
M2
24.00
0.51
12.24
24.00
12.24
100.00%
0.00
0.00
0.00%
24.00
12.24
0.00%
0.00
0.00
0.00%
2.05
REVESTIMIENTOS
02.05.01
M2
491.40
36.84
18,103.18
491.40
18103.18
100.00%
0.00
0.00
0.00%
491.40
18103.18
0.00%
0.00
0.00
0.00%
02.05.02
M2
72.00
40.92
2,946.24
72.00
2946.24
100.00%
0.00
0.00
0.00%
72.00
2946.24
0.00%
0.00
0.00
0.00%
02.05.03
M2
73.50
55.98
4,114.53
73.50
4114.53
100.00%
0.00
0.00
0.00%
73.50
4114.53
0.00%
0.00
0.00
0.00%
2.06
FALSO PUENTE
02.06.01
M3
6.56
335.84
2,203.11
6.56
2203.11
100.00%
0.00
0.00
0.00%
6.56
2203.11
0.00%
0.00
0.00
0.00%
02.06.02
M2
13.12
51.17
671.35
13.12
671.35
100.00%
0.00
0.00
0.00%
13.12
671.35
0.00%
0.00
0.00
0.00%
02.06.03
15.00
2,148.27
32,224.05
15.00
32224.05
100.00%
0.00
0.00
0.00%
15.00
32224.05
0.00%
0.00
0.00
0.00%
2.07
APOYOS
02.07.01
UND
4.00
2,209.16
8,836.64
4.00
8836.64
100.00%
0.00
0.00
0.00%
4.00
8836.64
0.00%
0.00
0.00
0.00%
02.07.02
UND
4.00
683.74
2,734.96
4.00
2734.96
100.00%
0.00
0.00
0.00%
4.00
2734.96
0.00%
0.00
0.00
0.00%
2.08
02.08.01
5.60
12.87
72.07
5.60
72.07
100.00%
0.00
0.00
0.00%
5.60
72.07
0.00%
0.00
0.00
0.00%
02.08.02
61.60
12.70
782.32
61.60
782.32
100.00%
0.00
0.00
0.00%
61.60
782.32
0.00%
0.00
0.00
0.00%
2.09
JUNTAS DE CONSTRUCCION
02.09.01
JUNTAS DE DILATACION
16.00
461.71
7,387.36
16.00
7387.36
100.00%
0.00
0.00
0.00%
16.00
7387.36
0.00%
0.00
0.00
0.00%
02.10
BARANDA METALICA
02.10.01
30.00
564.20
16,926.00
30.00
16926.00
100.00%
0.00
0.00
0.00%
30.00
16926.00
0.00%
0.00
0.00
0.00%
2.11
PINTURA
MARCAS EN LA CALZADA
60.00
26.49
1,589.40
60.00
1589.40
100.00%
0.00
0.00
0.00%
60.00
1589.40
0.00%
0.00
0.00
0.00%
02.11.01
RESIDENTE DE OBRA
SUPERVISOR
: "MEJORAMIENTO DE CALLES Y PUENTES EN LA LOCALIDAD DE CARMEN ROSA DEL C.P. LA MERCED GAUCHO, DISTRITO DE SAN MARCOS - HUARI - ANCASH"
METRADO
2- (ANCASH)
106,076.14
AVANCES
PRESUPUESTO
UND
12/1/2013
AREA GEOGRFICA
SALDO
ANTERIOR
89,895.04
Presup.
S/.
METRADO
331,481.90
Valoriz.
S/.
METRADO
331,481.90 100.00%
ACTUAL
Valoriz.
S/.
METRADO
ACUMULADO
Valoriz.
S/.
METRADO
331,481.90 100.00%
Valoriz.
S/.
3.01
OBRAS PRELIMINARES
03.01.01
M2
182.39
1.10
200.63
182.39
200.63
100.00%
0.00
0.00
0.00%
182.39
200.63
100.00%
0.00
0.00
0.00%
03.01.02
M2
182.39
2.74
499.75
182.39
499.75
100.00%
0.00
0.00
0.00%
182.39
499.75
100.00%
0.00
0.00
0.00%
03.01.03
M2
182.39
4.32
787.92
182.39
787.92
100.00%
0.00
0.00
0.00%
182.39
787.92
100.00%
0.00
0.00
0.00%
3.02
MOVIMIENTO DE TIERRAS
03.02.01
M3
404.76
79.32
32,105.56
404.76
32105.56
100.00%
0.00
0.00
0.00%
404.76
32105.56
100.00%
0.00
0.00
0.00%
03.02.02
M3
136.97
50.69
6,943.01
136.97
6943.01
100.00%
0.00
0.00
0.00%
136.97
6943.01
100.00%
0.00
0.00
0.00%
03.02.03
M2
157.19
3.75
589.46
157.19
589.46
100.00%
0.00
0.00
0.00%
157.19
589.46
100.00%
0.00
0.00
0.00%
03.02.04
M3
66.87
57.66
3,855.72
66.87
3855.72
100.00%
0.00
0.00
0.00%
66.87
3855.72
100.00%
0.00
0.00
0.00%
3.03
CONCRETO SIMPLE
03.03.01
M2
91.31
20.06
1,831.68
91.31
1831.68
100.00%
0.00
0.00
0.00%
91.31
1831.68
100.00%
0.00
0.00
0.00%
3.04
CONCRETO ARMADO
03.04.01
KG
11,823.68
7.14
84,421.08
11823.68
84421.08
100.00%
0.00
0.00
0.00%
11823.68
84421.08
100.00%
0.00
0.00
0.00%
03.04.02
M2
883.90
65.48
57,877.77
883.90
57877.77
100.00%
0.00
0.00
0.00%
883.90
57877.77
100.00%
0.00
0.00
0.00%
03.04.03
M3
228.40
381.11
87,045.52
228.40
87045.52
100.00%
0.00
0.00
0.00%
228.40
87045.52
100.00%
0.00
0.00
0.00%
03.04.04.04
CURADO DE CONCRETO
M2
883.90
0.51
450.79
883.90
450.79
100.00%
0.00
0.00
0.00%
883.90
450.79
100.00%
0.00
0.00
0.00%
3.05
REVESTIMIENTOS
03.04.01
M2
883.90
36.84
32,562.88
883.90
32562.88
100.00%
0.00
0.00
0.00%
883.90
32562.88
100.00%
0.00
0.00
0.00%
3.06
BARANDA METALICA
03.05.01
271.05
76.03
20,607.93
271.05
20607.93
100.00%
0.00
0.00
0.00%
271.05
20607.93
100.00%
0.00
0.00
0.00%
3.07
PINTURA
03.07.01
271.05
6.28
1,702.19
271.05
1702.19
628.00%
0.00
0.00
0.00%
271.05
1702.19
100.00%
0.00
0.00
0.00%
RESIDENTE DE OBRA
0.00%
0.00%
0.00
SUPERVISOR
: "MEJORAMIENTO DE CALLES Y PUENTES EN LA LOCALIDAD DE CARMEN ROSA DEL C.P. LA MERCED GAUCHO, DISTRITO DE SAN MARCOS - HUARI - ANCASH"
METRADO
2- (ANCASH)
106,076.14
AVANCES
PRESUPUESTO
UND
12/1/2013
AREA GEOGRFICA
SALDO
ANTERIOR
89,895.04
Presup.
S/.
METRADO
97,780.49
Valoriz.
S/.
METRADO
97,780.49 100.00%
ACTUAL
Valoriz.
S/.
METRADO
ACUMULADO
Valoriz.
S/.
METRADO
97,780.49 100.00%
Valoriz.
S/.
MUROS DE SOSTENIMIENTO
4.01
OBRAS PRELIMINARES
04.01.01
M2
84.65
1.10
93.12
84.65
93.12
100.00%
0.00
0.00
0.00%
84.65
93.12
100.00%
0.00
0.00
0.00%
04.01.02
M2
84.65
2.74
231.94
84.65
231.94
100.00%
0.00
0.00
0.00%
84.65
231.94
100.00%
0.00
0.00
0.00%
04.01.03
M2
84.65
4.32
365.69
84.65
365.69
100.00%
0.00
0.00
0.00%
84.65
365.69
100.00%
0.00
0.00
0.00%
4.02
MOVIMIENTO DE TIERRAS
04.02.01
1M3
101.57
34.01
3,454.40
101.57
3454.40
100.00%
0.00
0.00
0.00%
101.57
3454.40
100.00%
0.00
0.00
0.00%
04.02.02
M3
39.90
36.81
1,468.72
39.90
1468.72
100.00%
0.00
0.00
0.00%
39.90
1468.72
100.00%
0.00
0.00
0.00%
04.02.03
M2
84.65
3.75
317.44
84.65
317.44
100.00%
0.00
0.00
0.00%
84.65
317.44
100.00%
0.00
0.00
0.00%
04.02.04
M3
33.86
73.85
2,500.56
33.86
2500.56
100.00%
0.00
0.00
0.00%
33.86
2500.56
100.00%
0.00
0.00
0.00%
04.02.05
M3
77.87
46.11
3,590.59
77.87
3590.59
100.00%
0.00
0.00
0.00%
77.87
3590.59
100.00%
0.00
0.00
0.00%
4.03
CONCRETO SIMPLE
04.03.01
M2
84.65
20.06
1,698.08
84.65
1698.08
100.00%
0.00
0.00
0.00%
84.65
1698.08
100.00%
0.00
0.00
0.00%
04.03.02
M2
42.32
35.03
1,482.47
42.32
1482.47
100.00%
0.00
0.00
0.00%
42.32
1482.47
100.00%
0.00
0.00
0.00%
04.03.03
M2
342.08
65.48
22,399.40
342.08
22399.40
100.00%
0.00
0.00
0.00%
342.08
22399.40
100.00%
0.00
0.00
0.00%
04.03.04
M3
141.08
381.11
53,767.00
141.08
53767.00
100.00%
0.00
0.00
0.00%
141.08
53767.00
100.00%
0.00
0.00
0.00%
04.03.05
CURADO DE CONCRETO
M2
342.08
0.51
174.46
342.08
174.46
100.00%
0.00
0.00
0.00%
342.08
174.46
100.00%
0.00
0.00
0.00%
4.04
REVESTIMIENTOS
04.04.01
M2
169.29
36.84
6,236.64
169.29
6236.64
100.00%
0.00
0.00
0.00%
169.29
6236.64
100.00%
0.00
0.00
0.00%
RESIDENTE DE OBRA
0.00%
SUPERVISOR
0.00%
: "MEJORAMIENTO DE CALLES Y PUENTES EN LA LOCALIDAD DE CARMEN ROSA DEL C.P. LA MERCED GAUCHO, DISTRITO DE SAN MARCOS - HUARI - ANCASH"
METRADO
2- (ANCASH)
106,076.14
AVANCES
PRESUPUESTO
UND
12/1/2013
AREA GEOGRFICA
SALDO
ANTERIOR
89,895.04
Presup.
S/.
METRADO
487,990.60
Valoriz.
S/.
449,202.14
METRADO
ACTUAL
Valoriz.
S/.
38,788.46
METRADO
ACUMULADO
Valoriz.
S/.
METRADO
487,990.60 100.00%
Valoriz.
S/.
5.01
OBRAS PRELIMINARES
05.01.01
M2
2929.71
2.74
8,027.41
2929.71
8027.41
100.00%
0.00
0.00
0.00%
2929.71
8027.41
100.00%
0.00
0.00
0.00%
05.01.02
M2
2929.71
3.97
11,630.95
2929.71
11630.95
100.00%
0.00
0.00
0.00%
2929.71
11630.95
100.00%
0.00
0.00
0.00%
5.02
MOVIMIENTO DE TIERRAS
05.02.01
M3
585.94
5.64
3,304.70
585.94
3304.70
100.00%
0.00
0.00
0.00%
585.94
3304.70
100.00%
0.00
0.00
0.00%
05.02.02
M3
127.11
36.81
4,678.92
127.11
4678.92
100.00%
0.00
0.00
0.00%
127.11
4678.92
100.00%
0.00
0.00
0.00%
05.02.03
M2
2929.71
2.55
7,470.76
2929.71
7470.76
100.00%
0.00
0.00
0.00%
2929.71
7470.76
100.00%
0.00
0.00
0.00%
05.02.04
M2
2929.71
15.50
45,410.51
2929.71
45410.51
100.00%
0.00
0.00
0.00%
2929.71
45410.51
100.00%
0.00
0.00
0.00%
05.02.05
M3
820.01
46.11
37,810.66
820.01
37810.66
100.00%
0.00
0.00
0.00%
820.01
37810.66
100.00%
0.00
0.00
0.00%
5.03
CONCRETO SIMPLE
05.03.01
M2
455.61
61.37
27,960.79
455.61
27960.79
100.00%
0.00
0.00
0.00%
455.61
27960.79
100.00%
0.00
0.00
0.00%
05.03.02
M3
585.94
463.53
271,600.77
585.94
271600.77
100.00%
0.00
0.00
0.00%
585.94
271600.77
100.00%
0.00
0.00
0.00%
05.03.03
KG
1048.38
7.14
7,485.43
1048.38
7485.43
100.00%
0.00
0.00
0.00%
1048.38
7485.43
100.00%
0.00
0.00
0.00%
05.03.04
CURADO DE CONCRETO
M2
2929.71
7.35
21,533.37
2929.71
21533.37
100.00%
0.00
0.00
0.00%
2929.71
21533.37
100.00%
0.00
0.00
0.00%
5.04
JUNTAS DE CONSTRUCCION
05.04.01
1651.32
9.01
14,878.39
165.13
1487.84
10.00%
1486.19
13390.55
90.00%
1651.32
14878.39
100.00%
0.00
0.00
0.00%
05.04.02
708.00
11.30
8,000.40
70.80
800.04
10.00%
637.20
7200.36
90.00%
708.00
8000.40
100.00%
0.00
0.00
0.00%
5.05
PINTURA
05.05.01
MARCAS EN EL PAVIMENTO
1651.32
11.02
18,197.55
0.00
0.00
0.00%
1651.32
18197.55
100.00%
1651.32
18197.55
100.00%
0.00
0.00
0.00%
130,114.14
0.00%
6.01
OBRAS PRELIMINARES
06.01.01
M2
1100.88
2.74
3,016.41
1100.88
3016.41
100.00%
0.00
0.00
0.00%
1100.88
3016.41
100.00%
0.00
0.00
0.00%
06.01.02
M2
1100.88
3.97
4,370.49
1100.88
4370.49
100.00%
0.00
0.00
0.00%
1100.88
4370.49
100.00%
0.00
0.00
0.00%
6.02
MOVIMIENTO DE TIERRAS
06.02.01
M3
57.80
5.64
325.99
57.80
325.99
100.00%
0.00
0.00
0.00%
57.80
325.99
100.00%
0.00
0.00
0.00%
06.02.02
M2
1100.88
5.35
5,889.71
1100.88
5889.71
100.00%
0.00
0.00
0.00%
1100.88
5889.71
100.00%
0.00
0.00
0.00%
06.02.03
46.11
3,064.93
66.47
3064.93
100.00%
0.00
0.00
0.00%
66.47
3064.93
100.00%
0.00
0.00
0.00%
RESIDENTE DE OBRA
130,114.14
M3
66.47
130,114.14
92.05%
0.00%
7.95%
0.00%
SUPERVISOR
0.00%
0.00%
: "MEJORAMIENTO DE CALLES Y PUENTES EN LA LOCALIDAD DE CARMEN ROSA DEL C.P. LA MERCED GAUCHO, DISTRITO DE SAN MARCOS - HUARI - ANCASH"
METRADO
2- (ANCASH)
106,076.14
AVANCES
PRESUPUESTO
UND
12/1/2013
AREA GEOGRFICA
SALDO
ANTERIOR
89,895.04
Presup.
S/.
METRADO
Valoriz.
S/.
METRADO
ACTUAL
Valoriz.
S/.
METRADO
ACUMULADO
Valoriz.
S/.
METRADO
Valoriz.
S/.
6.03
CONCRETO SIMPLE
06.03.01
M2
523.15
30.29
15,846.21
523.15
15846.21
100.00%
0.00
0.00
0.00%
523.15
15846.21
100.00%
0.00
0.00
0.00%
06.03.02
M3
198.16
365.38
72,403.70
198.16
72403.70
100.00%
0.00
0.00
0.00%
198.16
72403.70
100.00%
0.00
0.00
0.00%
06.03.03
CURADO DE CONCRETO
M2
1100.88
7.35
8,091.47
1100.88
8091.47
100.00%
0.00
0.00
0.00%
1100.88
8091.47
100.00%
0.00
0.00
0.00%
6.04
JUNTAS DE CONSTRUCCION
06.04.01
JUNTAS ASFALTICAS
552.00
9.01
4,973.52
552.00
4973.52
100.00%
0.00
0.00
0.00%
552.00
4973.52
100.00%
0.00
0.00
0.00%
6.05
PINTURA
06.05.01
MARCAS EN EL PAVIMENTO
1100.88
11.02
12,131.70
1100.88
12131.70
100.00%
0.00
0.00
0.00%
1100.88
12131.70
100.00%
0.00
5,416.26
0.00%
7.01
OBRAS PRELIMINARES
07.01.01
M2
24.00
2.74
65.76
24.00
65.76
100.00%
0.00
0.00
0.00%
24.00
65.76
100.00%
0.00
0.00
0.00%
07.01.02
M2
24.00
3.97
95.28
24.00
95.28
100.00%
0.00
0.00
0.00%
24.00
95.28
100.00%
0.00
0.00
0.00%
7.02
OBRAS DE CONCRETO
07.02.01
M2
2.95
61.37
181.04
2.95
181.04
100.00%
0.00
0.00
0.00%
2.95
181.04
100.00%
0.00
0.00
0.00%
07.02.02
M3
3.84
463.53
1,779.96
3.84
1779.96
100.00%
0.00
0.00
0.00%
3.84
1779.96
100.00%
0.00
0.00
0.00%
07.02.03
KG
400.40
7.14
2,858.86
400.40
2858.86
100.00%
0.00
0.00
0.00%
400.40
2858.86
100.00%
0.00
0.00
0.00%
07.02.04
CURADO DE CONCRETO
M2
24.00
7.35
176.40
24.00
176.40
100.00%
0.00
0.00
0.00%
24.00
176.40
100.00%
0.00
0.00
0.00%
7.03
PINTURA
07.03.01
MARCAS EN EL PAVIMENTO
23.50
11.02
258.97
23.50
258.97
100.00%
0.00
0.00
0.00%
23.50
258.97
100.00%
0.00
0.00
0.00%
63,070.87
0.00%
8.01
OBRAS PRELIMINARES
8.01.01
M2
68.49
2.74
187.66
68.49
187.66
100.00%
0.00
0.00
0.00%
68.49
187.66
100.00%
0.00
0.00
0.00%
8.01.02
M2
68.49
3.97
271.91
68.49
271.91
100.00%
0.00
0.00
0.00%
68.49
271.91
100.00%
0.00
0.00
0.00%
8.02
MOVIMIENTO DE TIERRAS
8.02.01
M3
51.37
24.49
1,258.05
51.37
1258.05
100.00%
0.00
0.00
0.00%
51.37
1258.05
100.00%
0.00
0.00
0.00%
8.02.02
M2
68.49
7.40
506.83
68.49
506.83
100.00%
0.00
0.00
0.00%
68.49
506.83
100.00%
0.00
0.00
0.00%
8.02.03
M3
59.08
46.11
2,724.18
59.08
2724.18
100.00%
0.00
0.00
0.00%
59.08
2724.18
100.00%
0.00
0.00
0.00%
RESIDENTE DE OBRA
5,416.26
5,416.26
63,070.87
63,070.87
0.00%
0.00%
0.00%
0.00%
SUPERVISOR
0.00
-
0.00%
0.00%
0.00%
: "MEJORAMIENTO DE CALLES Y PUENTES EN LA LOCALIDAD DE CARMEN ROSA DEL C.P. LA MERCED GAUCHO, DISTRITO DE SAN MARCOS - HUARI - ANCASH"
8.03
CONCRETO SIMPLE
8.03.01
8.04
CONCRETO ARMADO
8.04.01
8.04.02
8.04.03
M3
8.04.04
8.04.05
CURADO DE CONCRETO
8.05
REJILLAS
8.05.01
9.01
OBRAS PRELIMINARES
9.01.01
9.01.02
M2
9.01.03
M3
9.02
MOVIMIENTO DE TIERRAS
9.02.01
9.02.02
9.02.03
9.03
CONCRETO CICLOPEO
9.03.01
10
SEALIZACION
10.01
RESIDENTE DE OBRA
METRADO
106,076.14
AVANCES
SALDO
ANTERIOR
Presup.
S/.
68.49
18.03
1,234.87
M2
283.66
50.72
KG
1765.19
7.14
25.62
M3
M2
M
22.20
659.75
M2
2- (ANCASH)
PRESUPUESTO
UND
12/1/2013
AREA GEOGRFICA
89,895.04
METRADO
Valoriz.
S/.
METRADO
ACTUAL
Valoriz.
S/.
68.49
1234.87
100.00%
0.00
0.00
0.00%
14,387.24
283.66
14387.24
100.00%
0.00
0.00
12,603.46
1765.19
12603.46
100.00%
0.00
0.00
413.86
10,603.09
25.62
10603.09
100.00%
0.00
9.70
463.53
4,496.24
9.70
4496.24
100.00%
295.88
0.51
150.90
295.88
150.90
100.00%
14,646.45
22.20
100.00%
0.00
119,733.50
14646.45
100,575.55
METRADO
ACUMULADO
Valoriz.
S/.
METRADO
Valoriz.
S/.
68.49
1234.87
100.00%
0.00
0.00
0.00%
0.00%
283.66
14387.24
100.00%
0.00
0.00
0.00%
0.00%
1765.19
12603.46
100.00%
0.00
0.00
0.00%
0.00
0.00%
25.62
10603.09
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
9.70
4496.24
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
295.88
150.90
100.00%
0.00
0.00
0.00%
0.00%
22.20
14646.45
100.00%
0.00
0.00
19,157.95
84.00%
119,733.50 100.00%
16.00%
0.00
-
0.00%
0.00%
2.74
981.33
358.15
981.33
100.00%
0.00
0.00
0.00%
358.15
981.33
100.00%
0.00
0.00
0.00%
358.15
4.32
1,547.21
358.15
1547.21
100.00%
0.00
0.00
0.00%
358.15
1547.21
100.00%
0.00
0.00
0.00%
178.05
25.06
4,461.93
178.05
4461.93
100.00%
0.00
0.00
0.00%
178.05
4461.93
100.00%
0.00
0.00
0.00%
M3
358.15
24.49
8,771.09
358.15
8771.09
100.00%
0.00
0.00
0.00%
358.15
8771.09
100.00%
0.00
0.00
0.00%
M3
89.54
36.81
3,295.97
89.54
3295.97
100.00%
0.00
0.00
0.00%
89.54
3295.97
100.00%
0.00
0.00
0.00%
358.15
1343.06
100.00%
0.00
0.00
0.00%
358.15
1343.06
100.00%
0.00
0.00
0.00%
289.08
80174.95
80.71%
69.08
19157.95
19.29%
358.15
99332.90
100.00%
0.00
0.00
0.00
0.00%
0.00%
M2
358.15
M2
358.15
3.75
1,343.06
M2
358.15
277.35
99,332.90
2191.02
6,573.06
6,573.06
UND
3.00
3.00
6,573.06 100.00%
6573.06
100.00%
3.00
100.00%
6573.06
100.00%
SUPERVISOR
0.00
0.00%
0.00
0.00%
0.00%
0.00
: "MEJORAMIENTO DE CALLES Y PUENTES EN LA LOCALIDAD DE CARMEN ROSA DEL C.P. LA MERCED GAUCHO, DISTRITO DE SAN MARCOS - HUARI - ANCASH"
METRADO
ENSAYOS DE LABORATORIO
11.01
11.02
UND
11.03
UND
12
12.01
13
CAPACITACION
13.01
CAPACITACION
UND
Presup.
S/.
METRADO
GLB
Valoriz.
S/.
SALDO
%
METRADO
4,745.39 100.00%
ACTUAL
Valoriz.
S/.
METRADO
ACUMULADO
Valoriz.
S/.
METRADO
4,745.39 100.00%
0.00%
Valoriz.
S/.
0.00%
42.37
2,711.68
64.00
2711.68
100.00%
0.00
0.00
0.00%
64.00
2711.68
100.00%
0.00
0.00
0.00%
3.00
254.17
762.51
3.00
762.51
100.00%
0.00
0.00
0.00%
3.00
762.51
100.00%
0.00
0.00
0.00%
5.00
254.24
1,271.20
5.00
1271.20
100.00%
0.00
0.00
0.00%
5.00
1271.20
100.00%
0.00
77,768.14
4,093.06
64.00
81,861.19
TON
106,076.14
AVANCES
ANTERIOR
4,745.39
11
2- (ANCASH)
PRESUPUESTO
UND
12/1/2013
AREA GEOGRFICA
89,895.04
798.49
1.00
102.52
81,861.19
7000.00
7,000.00
7,000.00
758.57
77768.14
95.00%
95.00%
0.10
700.00
700.00
10.00%
10.00%
39.92
4093.06
5.00%
5.00%
0.90
6,300.00
6300.00
90.00%
90.00%
798.49
81,861.19 100.00%
81861.19
100.00%
1.00
7,000.00 100.00%
7000.00
100.00%
0.00
0.00%
0.00
0.00%
0.00%
0.00
0.00%
0.00%
0.00
0.00
COSTO DIRECTO
1,930,252.83
1,855,340.30
74,912.53
1,930,252.83
193,025.28
185,534.03
7,491.25
193,025.28
UTILlDAD(10% C.D)
193,025.28
185,534.03
7,491.25
193,025.28
SUBTOTAL
2,316,303.39
2,226,408.35
89,895.04
2,316,303.39
IMPUESTO(IGV) 18%
416,934.61
400,753.50
2,733,238.00
2,627,161.86
106,076.14
2,733,238.00
1.00
1.00
1.00
1.00
1.00
2,733,238.00
2,627,161.86
106,076.14
2,733,238.00
S/.
FACTOR DE RELACIN
PORCENTAJES
PORCENTAJE DE AVANCE ACTUAL
96.12%
16,181.11
3.88%
416,934.61
100.00%
100.00%
0.00%
PORCENTAJE DE SALDO
RESUMEN:
REAJUSTE POR FRMULA POLINOMICA
RESIDENTE DE OBRA
0.00%
3.88%
VALORIZACIN
106,076.14
4,030.89
110,107.04
SUPERVISOR