Documentos de Académico
Documentos de Profesional
Documentos de Cultura
PLANTILLA
PLANTILLA
Item
ABREVIATURA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
ADI.ARQ.CER.PER.
ADI.EST.CER. PER.
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
Descripcion
OBRAS EXTERIORES -ARQUITECTURA (CAMBIO DE LADRILLOS POR BLOQUETAS)
OBRAS EXTERIORES - ESTRUCTURAS (CAMBIO DE LADRILLO POR BLOQUETA)
VOL 1 - OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES - ARQUITECTURA
VOL 1 - OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES - ESTRUCTURAS
VOL 1 - OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES - INST SANITARIAS
(IV) VOL 1 - OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES - INST ELECTRICAS
OBRAS EXTERIORES -ARQUITECTURA
OBRAS EXTERIORES - ESTRUCTURAS
(LI) VOL 13 - OBRAS EXTERIORES - INST. SANITARIAS
(LI) VOL 13 - OBRAS EXTERIORES - INST. ELECTRICAS
(VI) VOL 2 - PABELLON ADMINISTRATIVO (B1) - ARQUITECTURA
006 (V) VOL 2 - PABELLON ADMINISTRATIVO (B1) - ESTRUCTURA
(VII) VOL 2 - PABELLON ADMINISTRATIVO (B1) - INST SANITARIAS
009 (VIII) VOL 2 - PABELLON ADMINISTRATIVO (B1) - INST ELECTRICAS
(XIV) VOL 3a - PABELLON DE 11 AULAS + SSHH (B2a) - ARQUITECTURA
(IX) VOL 3a - PABELLON DE 11 AULAS + SSHH (B2a) - ESTRUCTURAS
(XI) VOL 3a - PABELLON DE 11 AULAS + SSHH (B2a) - INST SANITARIAS
(XII) VOL 3a - PABELLON DE 11 AULAS + SSHH (B2a) - INST. ELECTRICAS
(XIV) VOL 3b - PABELLON DE 11 AULAS + SSHH (B2b) - ARQUITECTURA
(XIII) VOL 3b - PABELLON DE 11 AULAS + SSHH (B2b) - ESTRUCTURAS (CORREGIDA)
(XV) VOL 3b - PABELLON DE 11 AULAS + SSHH (B2b) - INST. SANITARIAS
(XVI) VOL 3b - PABELLON DE 11 AULAS + SSHH (B2b) - INST ELECTRICAS
(XVIII) VOL 4 - PAB. DE LABORATORIOS - AULAS (B3) - ARQUITECTURA
(XIV) VOL 3 - PABELLON (B3) - ESTRUCTURAS
(XIX) VOL 4 - PAB. DE LABORATORIOS - AULAS (B3) - INST. SANITARIAS
(XVI) VOL 3b - PABELLON DE 11 AULAS + SSHH (B3) - INST ELECTRICAS
(XXII) VOL 5 - TALLER 1: ELECTRICIDAD Y ELECTRONICA (B4) - ARQUITECTURA
(XXI) VOL 5 - TALLER 1: ELECTRICIDAD Y ELECTRONICA (B4) - ESTRUCTURAS
XXIII) VOL 5 - TALLER 1: ELECTRICIDAD Y ELECTRONICA (B4) - INST. SANITARIAS
(XXIV) VOL 5 - TALLER 1: ELECTRICIDAD Y ELECTRONICA (B4) - INST. ELECTRICAS
027 (XXVI) V OL 6 - TALLER 2: MECNICA DE PRODUCCIN ( B5) - ARQUITECTURA
(XXV) VOL 6 - TALLER 2: MECNICA DE PRODUCCIN (B5) - ESTRUCTURAS
(XXVII) VOL 6 - TALLER 2: MECNICA DE PRODUCCIN (B5) - INST. SANITARIAS
029 (XXVIII) VOL 6 - TALLER 2: MECNICA DE PRODUCCIN (B5) - INST. ELECTRICAS
VOL 7 - TALLER 3: CARPINTERIA Y EBANISTERIA (B6) - ARQUITECTURA
(XXIX) VOL 7 - TALLER 3: CARPINTERIA Y EBANISTERIA (B6) - ESTRUCTURAS
(XXVII) VOL 7 - TALLER 3: CARPINTERIA Y EBANISTERIA (B6) - INST. SANITARIAS
(XXVIII) VOL 7 - TALLER 3: CARPINTERIA Y EBENISTERIA (B6) - INST. ELECTRICAS
(XXX) VOL 8 - TALLER 4: MECNICA Y MOTORES (B7) - ARQUITECTURA
034 (XXIX) VOL 8 - TALLER 4: MECNICA Y MOTORES (B7) - ESTRUCTURAS
(XXXI) VOL 8 - TALLER 4: MECNICA Y MOTORES (B7) - INST. SANITARIAS
(XXXII) VOL 8 - TALLER 4: MECNICA Y MOTORES (B7) - INST. ELECTRICAS
(XXXIV) VOL 9 - TALLER 5-6: HOSTELERA - CONFECCIONES (B8) - ARQUITECTURA
(XXXIII) VOL 9 - TALLER 5-6: HOSTELERA - CONFECCIONES (B8) - ESTRUCTURAS
(XXXV) VOL 9 - TALLER 5-6: HOSTELERA - CONFECCIONES (B8) - INST. SANITARIAS
(XXXVI) VOL 9 - TALLER 5-6: HOSTELERA - CONFECCIONES (B8) - INST. ELECTRICAS
XXXVIII) VOL 10 - PABELLON SUM (B9) -ARQUITECTURA
(XXXVII) VOL 10 - PABELLON SUM (B9) - ESTRUCTURAS
(XXXIX) VOL 10 - PABELLON SUM (B9) - INST. SANITARIAS
(XL) VOL 10 - PABELLON SUM (B9) - INST. ELECTRICAS
(XL) VOL 11 - POLIDEPORTIVO (B10) - ARQUITECTURA
POLIDEPORTIVO (B10) - ESTRUCTURAS
(XL) VOL 11 - POLIDEPORTIVO (B10) - INST. SANITARIAS
(XL) VOL 11 - POLIDEPORTIVO (B10) - INST. ELECTRICAS
TOTAL COSTO DIRECTO
PRESUPUESTO
193,298.04
488,765.21
420,597.20
1,317,820.98
111,721.92
80,397.02
75,956.78
860,516.56
1,254,106.92
232,971.30
208,744.53
643,367.51
18,214.88
36,466.62
351,167.60
952,366.11
33,019.68
53,719.56
351,167.60
952,366.11
33,019.68
50,442.73
335,768.24
956,744.44
42,444.92
56,536.58
99,411.32
371,446.17
9,010.92
28,915.39
101,262.60
393,608.91
16,302.27
57,842.85
100,994.89
390,209.13
11,754.12
34,788.57
110,630.51
407,443.32
17,150.53
24,366.22
106,006.20
417,998.30
22,587.16
32,445.83
207,364.10
793,778.75
59,618.05
45,645.69
133,401.64
1,318,518.24
53,924.09
72,822.76
15,550,957.25
ACUMULADO
ANTERIOR
56,817.73
238,890.05
250,247.15
799,973.84
23,656.09
45,995.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
594,726.98
0.00
0.00
208,935.13
952,366.09
23,583.96
22,695.23
33,771.48
865,541.65
0.00
0.00
38,527.81
371,446.16
8,042.72
11,315.53
26,011.69
393,608.92
15,751.48
10,153.99
19,215.21
318,697.23
9,865.66
12,230.12
27,694.72
340,684.97
0.00
3,917.36
36,236.71
408,724.77
16,012.59
9,767.51
42,940.25
638,346.10
38,240.46
8,397.73
13,799.47
608,722.37
26,782.40
653.42
7,572,987.76
ACUMULADO
ACTUAL
ACTUAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56,817.73
238,890.05
250,247.15
799,973.84
23,656.09
45,995.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
594,726.98
0.00
0.00
208,935.13
952,366.09
23,583.96
22,695.23
33,771.48
865,541.65
0.00
0.00
38,527.81
371,446.16
8,042.72
11,315.53
26,011.69
393,608.92
15,751.48
10,153.99
19,215.21
318,697.23
9,865.66
12,230.12
27,694.72
340,684.97
0.00
3,917.36
36,236.71
408,724.77
16,012.59
9,767.51
42,940.25
638,346.10
38,240.46
8,397.73
13,799.47
608,722.37
26,782.40
653.42
7,572,987.76
SALDO POR
VALORIZAR
136,480.30
249,875.16
170,350.05
517,847.14
88,065.83
34,402.02
75,956.78
860,516.56
1,254,106.92
232,971.30
208,744.53
643,367.51
18,214.88
36,466.62
351,167.60
357,639.13
33,019.68
53,719.56
142,232.47
0.02
9,435.72
27,747.50
301,996.76
91,202.79
42,444.92
56,536.58
60,883.51
0.01
968.20
17,599.86
75,250.91
-0.01
550.79
47,688.86
81,779.68
71,511.90
1,888.46
22,558.45
82,935.79
66,758.35
17,150.53
20,448.86
69,769.49
9,273.53
6,574.57
22,678.32
164,423.85
155,432.65
21,377.59
37,247.96
119,602.17
709,795.87
27,141.69
72,169.34
7,977,969.49
15,550,957.25
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
OBSERVACIONES
(INC. IGV.)
BASE DE DATOS D
COR
Obra
Form.
Cliente
Ubicac.
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
ARQ
EST
SAN
ELE
21 (und)
CEMENTO
318.56
1,838.85
618.32
843.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,358.50
0.00
1,064.23
6,281.08
0.00
167.15
6,444.43
0.00
271.89
2,054.71
0.00
131.17
2,210.00
5.60
103.00
1,934.47
0.00
133.77
1,888.09
0.00
172.51
2,202.63
0.00
237.06
4,162.47
0.00
77.01
3,521.95
0.42
41,041.82
PRECIO UNITARIO
SUB TOTAL
26.00
1,067,087.33
TOTAL
3,511,262.10
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
21
03
05
43
17
03 (KG)
A. CORRUGADO ALAMBRE DE C. CLAVO DE C. PIEDRA S. 1/2"
0.00
0.00
79.96
0.00
5,820.99
1,306.64
224.97
54.16
0.00
0.00
3,391.04
18.09
323.19
104.65
89.21
3.41
0.00
0.00
0.00
0.00
05 (M3)
HORMIGON
A. GRUESA
0.00
0.00
189.95
80.53
0.00
14.07
134.04
2.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
42,970.64
0.00
0.00
2,529.98
0.00
0.00
598.92
0.00
0.00
311.95
0.00
0.00
55.48
0.00
0.00
248.79
0.00
0.00
54,596.84
0.00
0.00
4,991.83
0.00
173.28
1,042.92
0.00
24.01
967.68
0.00
5.74
106.82
0.00
24.28
350.52
0.00
0.00
52,418.04
0.00
0.00
22,890.71
0.00
43.70
831.07
0.00
0.00
410.16
0.00
0.00
257.00
0.00
0.00
322.83
0.00
0.00
13,718.29
0.00
0.00
1,197.41
0.00
40.64
297.01
0.00
7.32
106.90
0.00
0.00
128.10
0.00
5.70
110.81
0.00
0.00
14,421.32
47.00
0.00
1,298.40
0.00
121.18
200.76
0.00
0.00
111.31
0.00
0.00
144.35
0.80
0.00
138.22
0.00
0.00
14,273.41
0.00
0.00
1,271.40
0.00
24.38
304.94
0.00
0.00
110.23
0.00
0.00
93.53
0.00
0.00
137.87
0.00
0.00
14,172.42
0.00
0.00
1,294.38
0.00
36.07
304.66
0.00
0.00
105.24
0.00
0.00
90.24
0.00
0.00
137.51
0.00
0.00
15,191.72
0.00
0.00
1,684.83
0.00
43.57
332.02
0.00
0.00
115.16
0.00
0.00
129.07
0.00
0.00
144.96
0.00
0.00
37,928.65
0.00
0.00
3,234.14
0.00
61.91
692.18
0.00
0.00
282.63
0.00
0.00
80.32
0.00
0.00
230.59
0.00
0.00
37,264.21
3.53
0.00
2,980.61
0.00
18.75
686.45
0.00
0.00
260.28
0.00
0.00
67.78
0.06
0.00
186.78
0.00
303,150.25
3.40
1,030,710.86
44,784.99
5.00
223,924.97
9,639.59
5.50
53,017.76
2,888.53
47.00
135,761.03
1,483.28
31.00
45,981.66
2,136.45
45.00
96,140.14
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
OS UNITARIOS
TERIA
M3)
A. FINA
92.15
0.00
75.90
0.00
0.00
43 (P2)
17 (und)
M.NACIONAL E.
LADRILLO A.
1,307.08
0.00
6,138.08
51,090.00
5,159.27
0.00
4,473.85
655.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13,966.42
0.00
0.00
3,376.44
0.00
208.97
0.00
0.00
4,441.22
24,398.97
0.00
0.00
35,394.86
0.00
26.77
0.00
0.00
695.35
82,331.71
0.00
0.00
23,137.08
0.00
26.22
0.00
0.00
607.91
6,853.08
0.00
0.00
0.00
0.00
21.19
0.00
0.44
563.72
6,497.39
64.00
0.00
0.00
0.00
16.68
0.00
0.00
427.48
6,375.68
0.00
0.00
0.00
0.00
21.70
0.00
0.00
546.22
6,007.84
0.00
0.00
12,873.63
0.00
36.20
0.00
0.00
689.58
6,925.08
0.00
0.00
10,949.40
0.00
78.36
0.00
0.00
972.89
14,099.76
0.00
0.00
20,925.18
0.00
12.01
0.00
0.03
330.68
15,721.00
4.80
0.00
6,739.65
0.00
616.61
39.00
24,047.67
209,599.05
2.80
586,877.35
165,142.23
1.50
247,713.34
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
01.02
01.02.01
01.03
01.03.01
01.04
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.04.06
Metrado
P.unit
Parcial
METRADO
21.18
18.14
26.37
32.75
48.33
11.63
3.15
12.75
335.62
8.65
7.96
9.25
9.24
6.32
14.89
193,298.04
113,286.38
36,485.09
31,248.33
16,245.24
12,411.60
1,761.15
325.64
14,809.35
21,178.01
21,178.01
9,397.36
9,397.36
49,436.29
14,900.66
13,712.06
5,698.46
3,501.78
10,497.65
1,125.68
193,298.04
ACUM ANT
S/.
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
METRADO
MES ACTUAL
S/.
2,046.18
17,738.25
15,192.25
6,536.07
6,034.19
600.26
0.00
6,445.47
48.62%
48.62%
40.23%
48.62%
34.08%
0.00%
43.52%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
335.00
4,271.25
20.17%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
56,817.73
29.39%
0.00
0.00%
837.50
837.50
247.86
184.25
12.42
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ONTO DE CONTRATO
AZO EJECUCION
ACUMULADO ACTUAL
METRADO
S/.
21
03
05
43
17
(INC. IGV.)
INDIC
CEMENTO PORTLAN TIPO I
ACERO CORRUGADO
AGREGADOS
MADERA NACIONAL PARA E
BLOQUE Y LADRILLO
21 (und)
CEMENTO SUB TOTAL
837.50
837.50
247.86
184.25
12.42
0.00
2,046.18
17,738.25
15,192.25
6,536.07
6,034.19
600.26
0.00
6,445.47
48.62%
48.62%
40.23%
48.62%
34.08%
0.00%
43.52%
885.12
885.12
368.19
194.73
24.02
28.00
2,655.20
18,746.84
16,056.08
9,709.17
6,377.41
1,160.89
325.64
8,363.88
51.38%
51.38%
59.77%
51.38%
65.92%
100.00%
56.48%
0.1500
0.1500
0.1170
0.1170
335.00
4,271.25
20.17%
1,326.02
16,906.76
79.83%
0.0500
0.00
0.00
0.00%
28.00
9,397.36
100.00%
0.1000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1,722.62
1,722.62
616.05
378.98
1,661.02
75.60
14,900.66
13,712.06
5,698.46
3,501.78
10,497.65
1,125.68
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
125.63
125.63
29.00
21.56
0.00
0.00
0.00
0.00
16.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56,817.73
29.39%
136,480.30
70.61%
318.56
N 02
O 2013
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0400
0.0400
0.0300
0.0300
33.50
33.50
7.44
5.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
79.96
05 (M3)
SUB TOTAL AFIRMADO SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0250
0.1800
0.0180
0.0070
20.94
20.94
44.61
3.32
0.00
0.00
0.00
0.00
2.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
92.15
0.00
43 (P2)
17 (und)
M.NACIONAL E. SUB TOTAL LADRILLO A. SUB TOTAL
0.6500
0.5800
0.5200
0.5200
0.1560
544.38
485.75
128.89
95.81
0.00
0.00
0.00
0.00
52.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,307.08
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.01.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.03
01.03.01
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.01.03
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.03
01.04.03.01
01.04.03.02
01.04.03.03
01.04.04
01.04.04.01
Metrado
P.unit
1.12
4.18
2.49
33.34
23.67
17.00
7.91
303.68
404.09
31.61
5.24
381.44
46.14
4.77
329.85
53.91
4.90
57.70
Parcial
488,765.21
4,388.82
927.45
3,461.37
47,537.85
2,061.92
23,241.65
6,493.15
10,742.64
4,998.49
105,853.74
105,853.74
330,984.80
100,610.48
38,930.03
40,608.42
21,072.03
96,645.35
23,256.40
39,582.58
33,806.37
34,333.79
6,785.01
14,785.36
12,763.42
99,395.17
99,395.17
488,765.21
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
MES ACTUAL
S/.
335.00
335.00
375.20
1,400.30
40.46%
40.46%
0.00
0.00
335.00
281.40
112.56
253.26
253.26
834.15
9,381.88
2,664.30
4,305.42
2,003.29
40.46%
40.37%
41.03%
40.08%
40.08%
0.00
0.00
0.00
0.00
0.00
140.70
42,727.78
40.36%
0.00
45.23
603.00
1,774.35
18,276.99
19,060.83
9,297.59
46.95%
46.94%
44.12%
0.00
0.00
0.00
24.56
329.76
2,849.13
9,368.17
15,215.13
13,590.35
40.28%
38.44%
40.20%
0.00
0.00
0.00
10.05
134.00
869.95
3,314.99
7,223.94
4,262.76
48.86%
48.86%
33.40%
0.00
0.00
0.00
1,310.00
75,587.00
76.05%
0.00
238,890.05
48.88%
0.00
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
S ACTUAL
%
METRADO
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
S/.
(INC. IGV.)
0.00%
0.00%
335.00
335.00
375.20
1,400.30
40.46%
40.46%
493.08
493.08
552.25
2,061.07
59.54%
59.54%
0.00%
0.00%
0.00%
0.00%
0.00%
335.00
281.40
112.56
253.26
253.26
834.15
9,381.88
2,664.30
4,305.42
2,003.29
40.46%
40.37%
41.03%
40.08%
40.08%
493.08
415.71
161.76
378.66
378.66
1,227.77
13,859.77
3,828.86
6,437.22
2,995.20
59.54%
59.63%
58.97%
59.92%
59.92%
0.00%
140.70
42,727.78
40.36%
207.87
63,125.96
59.64%
0.00%
0.00%
0.00%
45.23
603.00
1,774.35
18,276.99
19,060.83
9,297.59
46.95%
46.94%
44.12%
51.11
681.67
2,247.03
20,653.04
21,547.59
11,774.44
53.05%
53.06%
55.88%
0.00%
0.00%
0.00%
24.56
329.76
2,849.13
9,368.17
15,215.13
13,590.35
40.28%
38.44%
40.20%
36.41
528.12
4,238.16
13,888.23
24,367.46
20,216.02
59.72%
61.56%
59.80%
0.00%
0.00%
0.00%
10.05
134.00
869.95
3,314.99
7,223.94
4,262.76
48.86%
48.86%
33.40%
10.52
140.26
1,734.83
3,470.02
7,561.42
8,500.67
51.14%
51.14%
66.60%
0.00%
1,310.00
75,587.00
76.05%
412.62
23,808.17
23.95%
238,890.05
48.88%
0.00
249,875.16
51.12%
0.00%
N ADICIONAL DE OBRA N 04
IENTE AL MES DE JULIO 2013
21
03
05
43
17
21 (und)
CEMENTO SUB TOTAL
A. CORRUGADO
03 (KG)
SUB TOTAL ALAMBRE DE C. SUB TOTAL CLAVO DE C.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.5000
914.55
0.00
0.00
8.0000
361.84
0.00
0.00
0.2700
0.0600
0.00
162.81
106.46
0.1500
1.0700
0.00
0.00
1,898.55
0.3000
0.0600
0.00
98.93
170.95
0.1700
1.0500
0.00
0.00
2,991.59
0.4500
0.0600
0.00
60.30
52.20
0.3000
1.0700
0.00
0.00
930.85
285.58
0.00
0.5000
655.00
0.0200
1,838.85
5,820.99
8.0000
8.0000
0.2180
196.48
0.00
0.00
80.40
0.00
0.00
1,306.64
0.0360
SUB TOTAL
PIEDRA S. 1/2"
05 (M3)
SUB TOTAL HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA
0.00
12.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
189.95
0.00
1.3500
0.00
90.45
0.00
0.7000
31.66
0.00
0.00
0.00
0.00
0.00
0.5000
22.62
0.00
0.00
0.00
56.06
0.00
0.6500
15.96
0.00
0.00
0.00
0.00
0.00
0.5000
12.28
0.00
0.00
0.00
40.20
0.00
0.6500
6.53
0.00
0.00
0.00
0.00
0.00
0.5000
5.03
0.00
0.00
26.20
0.00
0.00
0.0310
40.61
224.97
54.16
189.95
80.53
43 (P2)
SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17 (und)
LADRILLO A. SUB TOTAL
0.00
167.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
0.00
2,912.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
1,632.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
665.98
0.00
0.00
0.00
0.00
0.00
0.00
0.5800
759.80
0.00
0.00
0.5000
6,138.08
39.0000
51,090.00
51,090.00
Obra
Form.
Cliente
Ubicac.
ITEM
01
01.01
01.01.01
01.01.02
01.01.03
01.02
01.02.01
01.02.02
01.03
01.03.01
01.03.02
01.04
01.04.01
01.04.02
01.04.03
01.05
01.05.01
01.06
01.06.01
01.07
01.07.01
01.07.02
01.07.03
01.07.04
01.08
01.08.01
01.08.02
01.08.03
01.08.04
01.08.05
01.08.06
01.08.07
DESCRIPCION
und
METRADO
P.unit
BAS
ERMIN FITZCARRALD
CONSORCIO CARLOS F. FITZCARRALD
ING. JOSE JAVIER ANTONIO ESTREMADOYRO ALGUIAR
1.0000000000
P Parcial
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
S/.
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
15,524.94
1,506.26
8,436.60
725.17
82.52
0.00
13,154.58
1,013.35
0.00
84.73%
67.28%
0.00%
0.000
0.000
0.000
0.00%
0.00%
0.00%
725.17
82.52
0.00
13,154.58
1,013.35
0.00
84.73%
67.28%
0.00%
130.67
40.14
1,308.00
94,750.44
12,801.30
1,450.40
404.23
87,705.69
11,480.13
92.56%
89.68%
0.000
0.000
0.00%
0.00%
1,450.40
404.23
87,705.69
11,480.13
92.56%
89.68%
116.50
46.52
39,042.72
6,168.42
669.99
49.85
18,330.93
2,725.30
46.95%
44.18%
0.000
0.000
0.00%
0.00%
669.99
49.85
18,330.93
2,725.30
46.95%
44.18%
757.01
62.98
4,739.18
28,077.85
1,710.60
258.45
333.59
2,594.84
19,088.02
0.00
54.75%
67.98%
0.00%
0.000
0.000
0.000
0.00%
0.00%
0.00%
258.45
333.59
0.00
2,594.84
19,088.02
0.00
54.75%
67.98%
0.00%
213.58
157.11
21.83
26,537.50
30.24
7,560.00
28.49%
0.000
0.00%
30.24
7,560.00
28.49%
75.91
83,408.40
203.05
36,549.00
43.82%
0.000
0.00%
203.05
36,549.00
43.82%
260.33
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
204.00
46.00
64.00
26.00
14,678.91
8,798.43
14,353.23
3,792.50
4,111.80
4,310.44
0.00
53.71%
63.21%
63.54%
69.24%
39.98%
64.38%
0.00%
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2,410.33
1,017.16
1,803.17
410.00
445.00
611.41
0.00
14,678.91
8,798.43
14,353.23
3,792.50
4,111.80
4,310.44
0.00
53.71%
63.21%
63.54%
69.24%
39.98%
64.38%
0.00%
2,077.02
591.89
1,034.74
182.15
667.93
338.25
455.12
250,247.15
59.50%
0.00
0.00%
250,247.15
59.50%
2,323.56
4,184.62
1,938.56
296.14
27,327.96
13,918.28
22,589.76
5,477.39
10,283.47
6,695.10
2,858.15
420,597.20
2,410.33
1,017.16
1,803.17
410.00
445.00
611.41
21 (und)
CEMENTO SUB TOTAL
0.1500
0.0400
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
108.78
3.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0400
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
2.0000
1.0000
304.85
8.57
0.00
0.00
0.00
0.00
A. CORRUGADO
2,370.36
492.91
8,436.60
15.27%
32.72%
100.00%
7,044.75
1,321.17
7.44%
10.32%
20,711.79
3,443.12
53.05%
55.82%
2,144.34
8,989.83
1,710.60
45.25%
32.02%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18,977.50
71.51%
0.00
0.00
0.00
46,859.40
56.18%
0.00
0.00
0.00
2,323.56
4,184.62
1,938.56
296.14
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12,649.05
5,119.85
8,236.53
1,684.89
6,171.67
2,384.66
2,858.15
46.29%
36.79%
36.46%
30.76%
60.02%
35.62%
100.00%
192.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
170,350.05
40.50%
618.32
0.00
0.00
0.4550
0.1720
0.0800
CLAVO DE C.
0.0090
0.0220
SUB TOTAL
PIEDRA S. 1/2"
05 (M3)
A. GRUESA SUB TOTAL
29.01
1.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,900.80
404.23
0.00
0.00
0.00
0.00
0.00
0.00
18.09
0.00
0.00
0.00
2.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0270
0.0210
A. FINA
0.0250
0.0065
0.0020
SUB TOTAL
18.13
0.54
0.00
0.00
0.00
14.07
0.00
0.0080
0.0260
5.36
1.30
0.00
0.00
0.00
0.00
0.00
0.00
0.0020
0.0200
0.0200
0.52
6.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,391.04
18.09
0.00
14.07
0.0180
43.39
0.00
0.00
0.00
0.00
0.00
0.00
75.90
(M3)
43 (P2)
TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.5800
0.1270
420.60
10.48
0.00
0.00
0.00
0.00
0.00
0.00
2.1000
1.2000
3,045.84
485.08
0.00
0.00
0.00
0.00
0.00
0.00
40.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,156.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,159.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1560
0.4800
Obra
Form.
Cliente
Ubicac.
: 01 PRESUPUESTO GENERAL
: GOBIERNO REGIONAL DE MADRE DE DIOS
: TAMBOPATA - TAMBOPATA - MADRE DE DIOS.
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
02.01.06
02.01.07
02.01.08
02.01.09
02.01.09.01
02.01.09.02
02.01.09.03
02.01.09.04
02.01.09.05
02.01.10
02.01.11
02.01.12
02.01.13
02.01.14
02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.01.03
02.02.01.04
02.02.01.05
02.02.01.06
02.02.01.07
02.02.01.08
P.unit
Parcial
ACUMULADO ANTER
METRADO
OBRAS PROVISIONALES
533,094.97
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
und
2.00
1,434.55
2,869.10
2.00
CAMPAMENTO PROVISIONAL DE LA OBRA (OFICINAS, ALMACEN, SSHH,
CASETA
glb
1.00DE GUARDIANIA)
41,863.02
41,863.02
1.00
AGUA PARA LA CONSTRUCCION
glb
1.00
4,550.00
4,550.00
0.60
ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION
glb
1.00
1,400.00
1,400.00
1.00
LIMPIEZA GENERAL AL FINALIZAR OBRA
glb
1.00
3,399.20
3,399.20
0.00
SUMINISTRO E INSTALACION DE MODULO DE 02 AULAS PREFABRICADAS
Y EJECUCION
DE LOSAS DE
CONCRETO SEGUN4.81
DISEO
glb
5.00
86,504.89
432,524.45
IMPLEMENTACION Y ADMINISTRACION DE SEGURIDAD Y SALUD glb
1.00
46,489.20
46,489.20
0.80
DEMOLICIONES DE PABELLONES EXISTENTES
272,194.20
DESMONTAJES
39,024.74
DESMONTAJE DE APARATOS ELECTRICOS
und
307.00
5.21
1,599.47
307.00
DESMONTAJE DE PUERTA METALICA
m2
36.03
14.92
537.57
36.03
DESMONTAJE DE VENTANA METALICA
m2
345.50
7.45
2,573.98
345.50
DESMONTAJE DE PUERTA DE MADERA
m2
169.63
11.61
1,969.40
141.45
DESMONTAJE DE VENTANA DE MADERA
m2
495.25
7.25
3,590.56
391.54
DESMONTAJE DE TABIQUE DE MADERA - ENTABLADO 1 CARA
m2
344.89
9.39
3,238.52
344.89
DESMONTAJE DE CIELO RASO DE ENTABLADO DE MADERA - INC SOPORTE
m2
2,007.52
2.31
4,637.37
2,007.52
DESMONTAJE DE COBERTURA DE CALAMINAS INCLUYE CORREAS
DE MADERA
m2
3,349.58
3.20
10,718.66
2,039.08
DESMONTAJE DE TIJERAL DE MADERA
7,683.77
DESMONTAJE DE TIJERALES DE MADERA (L=3-5M)
und
24.00
51.13
1,227.12
15.00
DESMONTAJE DE TIJERALES DE MADERA (L=5-7M)
und
19.00
55.76
1,059.44
19.00
DESMONTAJE DE TIJERALES DE MADERA (L=7-9M)
und
5.00
61.32
306.60
5.00
DESMONTAJE DE TIJERALES DE MADERA (L=9-12M)
und
53.00
68.13
3,610.89
53.00
DESMONTAJE DE TIJERALES DE MADERA (L=12-18M)
und
19.00
77.88
1,479.72
19.00
DESMONTAJE DE COLUMNAS DE MADERA (6"x6")
und
47.00
6.79
319.13
47.00
DESMONTAJE DE COLUMNETAS DE MADERA (2"x3")
und
52.00
2.92
151.84
52.00
DESMONTAJE DE CORREAS DE MADERA (2"x2")
und
69.00
1.91
131.79
69.00
DESMONTAJE DE VIGAS DE MADERA DE MADERA (4"x4")
und
63.00
6.37
401.31
63.00
TRASLADO Y ENTREGA DE MATERIAL DESMONTADO
glb
1.00
1,471.37
1,471.37
0.80
DEMOLICIONES
233,169.46
DEMOLICIONES DE EDIFICACIONES
124,045.48
DEMOLICION DE MURO DE BLOQUETA DE CONCRETO, e=15cm
m2
3,708.92
7.74
28,707.04
2,083.35
DEMOLICION DE PISO DE CONCRETO DE 0.10 M.
m2
2,447.23
6.66
16,298.55
2,105.15
DEMOLICION DE VEREDA DE 0.15 M.
m2
1,058.80
8.00
8,470.40
754.98
DEMOLICION MASIVA DE CIMIENTO CORRIDO A MAQUINA
m3
767.88
23.31
17,899.28
474.00
DEMOLICION MANUAL DE SOBRECIMIENTO
m3
62.84
67.99
4,272.49
53.72
DEMOLICION MANUAL DE COLUMNA DE CONCRETO
m3
139.64
178.63
24,943.89
94.68
DEMOLICION DE VIGAS DE CONCRETO
m3
104.28
110.66
11,539.62
78.77
DEMOLICION MANUAL DE PLATAFORMA DE CONCRETO, e=0.40m m3
358.97
33.19
11,914.21
105.76
Obra
Form.
Cliente
Ubicac.
: 01 PRESUPUESTO GENERAL
: GOBIERNO REGIONAL DE MADRE DE DIOS
: TAMBOPATA - TAMBOPATA - MADRE DE DIOS.
Item
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.02.04
02.02.02.05
02.02.02.06
02.02.03
02.02.03.01
02.02.03.02
02.02.03.03
02.02.03.04
03
03.01
03.01.01
03.01.01.01
03.01.01.02
03.01.01.03
03.01.01.04
03.01.01.05
03.01.01.06
03.01.01.07
03.01.01.08
03.01.01.09
03.01.01.10
03.01.01.11
03.01.01.11.01
03.01.01.11.02
03.01.01.11.03
03.01.02
03.01.02.01
03.01.02.02
03.01.02.03
03.01.02.04
03.01.02.05
03.01.03
03.01.03.01
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
Parcial
6,515.91
4,340.31
381.27
310.95
439.94
569.12
474.32
102,608.07
2,042.72
142.78
2,933.96
97,488.61
182,442.44
33,200.76
15,903.11
797.13
1,309.96
3,415.62
53.26
58.56
285.36
1,892.54
959.64
919.41
5,835.65
375.98
55.76
183.96
136.26
17,203.73
1,585.00
10,391.13
2,003.84
3,108.79
114.97
93.92
93.92
12,834.94
802.49
209.48
144.44
2,520.71
9,157.82
ACUMULADO ANTER
46.66
4.86
2.81
6.68
6.16
6.16
21.96
1.82
28.77
9,501.98
153.00
112.83
471.12
0.00
0.00
0.00
819.28
233.49
223.70
1,686.30
0.00
0.00
0.00
0.00
972.14
178.08
224.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
: 01 PRESUPUESTO GENERAL
: GOBIERNO REGIONAL DE MADRE DE DIOS
: TAMBOPATA - TAMBOPATA - MADRE DE DIOS.
Item
03.03
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
03.03.06
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.02.02
03.04.02.03
03.04.03
03.04.03.01
03.04.03.02
03.04.03.03
03.04.04
03.04.04.01
03.04.04.02
03.04.04.03
03.04.05
03.04.05.01
03.04.05.02
03.04.05.03
03.05
03.05.01
03.05.02
03.05.03
03.05.04
03.05.05
03.06
03.06.01
04
04.01
04.01.01
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.03
04.03.01
04.03.02
1,317,820.98
ACUMULADO ANTER
3.58
0.37
4.69
731.17
570.65
570.65
0.00
0.00
2.58
31.75
112.41
1.05
12.79
94.80
0.46
4.72
45.70
0.47
8.57
66.80
0.00
2.00
307.44
178.16
18.23
16.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ACUMULADO ANTERIOR
S/.
%
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
MES ACTUAL
METRADO
S/.
ACUMULADO ACTUAL
METRADO
S/.
%
2,869.10
41,863.02
2,730.00
1,400.00
0.00
416,088.52
37,191.36
100.00%
100.00%
60.00%
100.00%
0.00%
96.20%
80.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.00
1.00
0.60
1.00
0.00
4.81
0.80
2,869.10
41,863.02
2,730.00
1,400.00
0.00
416,088.52
37,191.36
100.00%
100.00%
60.00%
100.00%
0.00%
96.20%
80.00%
0.00
0.00
0.40
0.00
1.00
0.19
0.20
0.00
0.00
1,820.00
0.00
3,399.20
16,435.93
9,297.84
0.00%
0.00%
40.00%
0.00%
100.00%
3.80%
20.00%
1,599.47
537.57
2,573.98
1,642.23
2,838.67
3,238.52
4,637.37
6,525.06
100.00%
100.00%
100.00%
83.39%
79.06%
100.00%
100.00%
60.88%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
307.00
36.03
345.50
141.45
391.54
344.89
2,007.52
2,039.08
1,599.47
537.57
2,573.98
1,642.23
2,838.67
3,238.52
4,637.37
6,525.06
100.00%
100.00%
100.00%
83.39%
79.06%
100.00%
100.00%
60.88%
0.00
0.00
0.00
28.18
103.71
0.00
0.00
1,310.50
0.00
0.00
0.01
327.17
751.90
0.00
0.00
4,193.60
0.00%
0.00%
0.00%
16.61%
20.94%
0.00%
0.00%
39.12%
766.95
1,059.44
306.60
3,610.89
1,479.72
319.13
151.84
131.79
401.31
1,177.10
62.50%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
80.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
15.00
19.00
5.00
53.00
19.00
47.00
52.00
69.00
63.00
0.80
766.95
1,059.44
306.60
3,610.89
1,479.72
319.13
151.84
131.79
401.31
1,177.10
62.50%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
80.00%
9.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.20
460.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
294.27
37.50%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
20.00%
16,125.13
14,020.30
6,039.84
11,048.94
3,652.42
16,912.69
8,716.69
3,510.17
56.17%
86.02%
71.31%
61.73%
85.49%
67.80%
75.54%
29.46%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2,083.35
2,105.15
754.98
474.00
53.72
94.68
78.77
105.76
16,125.13
14,020.30
6,039.84
11,048.94
3,652.42
16,912.69
8,716.69
3,510.17
56.17%
86.02%
71.31%
61.73%
85.49%
67.80%
75.54%
29.46%
1,625.57
342.08
303.82
293.88
9.12
44.96
25.51
253.21
12,581.91
2,278.25
2,430.56
6,850.34
620.07
8,031.20
2,822.93
8,404.04
43.83%
13.98%
28.69%
38.27%
14.51%
32.20%
24.46%
70.54%
ACUMULADO ANTERIOR
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
MES ACTUAL
ACUMULADO ACTUAL
4,340.31
381.27
310.95
439.94
569.12
474.32
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
46.66
4.86
2.81
6.68
6.16
6.16
4,340.31
381.27
310.95
439.94
569.12
474.32
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2,042.72
142.78
2,933.96
75,160.66
100.00%
100.00%
100.00%
77.10%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
21.96
1.82
28.77
9,501.98
2,042.72
142.78
2,933.96
75,160.66
100.00%
100.00%
100.00%
77.10%
0.00
0.00
0.00
2,822.75
0.00
0.00
0.00
22,327.95
0.00%
0.00%
0.00%
22.90%
797.13
1,309.96
3,415.62
0.00
0.00
0.00
1,892.54
959.64
919.41
5,396.16
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
92.47%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
153.00
112.83
471.12
0.00
0.00
0.00
819.28
233.49
223.70
1,686.30
797.13
1,309.96
3,415.62
0.00
0.00
0.00
1,892.54
959.64
919.41
5,396.16
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
92.47%
0.00
0.00
0.00
3.57
7.86
30.39
0.00
0.00
0.00
137.34
0.00
0.00
0.00
53.26
58.56
285.36
0.00
0.00
0.00
439.49
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
7.53%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
3.00
2.00
55.76
183.96
136.26
100.00%
100.00%
100.00%
0.00
6,474.45
1,424.64
1,774.13
0.00
0.00%
62.31%
71.10%
57.07%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
972.14
178.08
224.29
0.00
0.00
6,474.45
1,424.64
1,774.13
0.00
0.00%
62.31%
71.10%
57.07%
0.00%
204.78
588.09
72.40
168.73
102.65
1,585.00
3,916.68
579.20
1,334.66
114.97
100.00%
37.69%
28.90%
42.93%
100.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
22.47
93.92
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
24.07
8.85
18.26
1,156.29
1,156.29
802.49
209.48
144.44
2,520.71
9,157.82
100.00%
100.00%
100.00%
100.00%
100.00%
ACUMULADO ANTERIOR
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
MES ACTUAL
ACUMULADO ACTUAL
1,087.17
148.64
148.25
29,853.67
667.66
14,146.41
31.18%
28.24%
25.84%
63.23%
64.30%
64.30%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.58
0.37
4.69
731.17
570.65
570.65
1,087.17
148.64
148.25
29,853.67
667.66
14,146.41
31.18%
28.24%
25.84%
63.23%
64.30%
64.30%
7.90
0.94
13.46
425.12
316.81
316.81
2,399.08
377.64
425.47
17,357.65
370.67
7,853.72
68.82%
71.76%
74.16%
36.77%
35.70%
35.70%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.55
20.95
192.21
101.19
100.00%
100.00%
1,036.49
1,036.32
589.03
60.71%
58.28%
58.42%
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.58
31.75
112.41
1,036.49
1,036.32
589.03
60.71%
58.28%
58.42%
1.67
22.73
80.01
670.91
741.91
419.25
39.29%
41.72%
41.58%
542.29
720.97
478.74
61.40%
59.46%
53.40%
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.05
12.79
94.80
542.29
720.97
478.74
61.40%
59.46%
53.40%
0.66
8.72
82.74
340.87
491.55
417.84
38.60%
40.54%
46.60%
175.46
217.78
217.99
19.25%
10.99%
13.05%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.46
4.72
45.70
175.46
217.78
217.99
19.25%
10.99%
13.05%
1.93
38.21
304.36
736.18
1,763.01
1,451.80
80.75%
89.01%
86.95%
155.03
462.01
327.32
24.74%
35.47%
28.85%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.47
8.57
66.80
155.03
462.01
327.32
24.74%
35.47%
28.85%
1.43
15.59
164.76
471.69
840.46
807.32
75.26%
64.53%
71.15%
0.00
4,452.54
3,059.03
11,970.57
621.28
0.00%
100.00%
54.60%
56.68%
61.07%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
2.00
307.44
178.16
18.23
0.00
4,452.54
3,059.03
11,970.57
621.28
0.00%
100.00%
54.60%
56.68%
61.07%
4.00
0.00
255.64
136.19
11.62
9,272.92
0.00
2,543.62
9,150.61
396.01
100.00%
0.00%
45.40%
43.32%
38.93%
1,533.65
32.64%
0.00
0.00%
16.82
1,533.65
32.64%
34.71
3,164.86
67.36%
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
3.69
5,729.39
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
4,476.77
5,343.61
12,275.48
3,927.48
8,348.00
13,788.45
16,511.75
21,850.35
10,054.35
66,032.68
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
3,141.98
5,234.00
8,797.54
187,324.86
100.00%
100.00%
517,847.14
39.30%
799,973.84
60.70%
0.00
0.00%
799,973.84
60.70%
21 (und)
CEMENTO
SUB TOTAL
45.0000
0.00
45.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
A. CORRUGADO
15.0000
SUB TOTAL
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03 (KG)
ALAMBRE DE C. SUB TOTAL
10.0000
0.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CLAVO DE C.
1.0000
50.0000
SUB TOTAL
2.00
50.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PIEDRA S. 1/2"
03 (KG)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0036
0.0100
0.00
0.00
0.00
0.00
0.00
0.00
6.5000
8.0000
0.6500
0.4500
8.5000
8.0000
8.5000
8.0000
8.0000
03 (KG)
23.27
2.96
0.00
475.26
0.00
256.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2700
0.00
0.00
1.27
0.00
0.00
0.00
1.0500
0.00
0.00
0.0600
0.00
0.00
1.0700
0.00
0.00
120.28
0.3000
0.0600
0.00
9.53
6.74
1.0700
0.00
0.00
101.44
0.4500
0.0600
0.00
5.76
5.69
3.68
0.00
0.00
0.00
0.00
0.00
0.3000
1.0500
0.00
1.42
47.99
3.76
0.00
0.00
0.00
0.00
71.48
0.4500
0.0600
0.00
3.86
4.01
20.64
0.00
0.00
8.93
0.00
0.00
1.0700
0.1500
0.00
0.00
0.70
0.00
0.00
0.00
0.00
0.00
0.6500
0.00
9.84
0.00
0.6500
0.3100
0.00
3.84
0.00
0.8500
0.3000
0.00
0.80
2.74
0.6500
0.00
2.57
0.00
0.6500
0.1700
0.0600
0.3000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2180
3.67
0.00
0.2000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
843.95
323.19
104.65
89.21
0.5000
0.6500
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
0.0500
0.00
1.00
15.37
0.00
0.00
8.41
0.0200
0.34
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HORMIGON
0.3600
SUB TOTAL
05 (M3)
A. GRUESA
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
SUB TOTAL
0.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
M.NACIONAL E.
70.0000
1,500.0000
0.0500
0.0500
0.0500
0.0500
0.0500
0.0500
0.0500
0.3400
05 (M3)
43 (P2)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0500
0.0500
0.0500
0.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0500
0.0500
0.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.3400
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05 (M3)
0.00
0.24
0.00
0.00
0.00
0.00
1.3500
0.1250
0.0650
4.83
0.00
0.00
91.40
0.00
37.09
0.5000
43 (P2)
0.00
0.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
1.68
0.00
0.00
0.00
0.00
0.00
0.5000
1.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
0.89
0.00
0.00
0.00
0.00
0.00
0.5000
0.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.30
0.00
0.00
0.00
0.00
0.00
0.5000
0.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.31
0.00
0.00
0.00
0.00
0.00
0.5000
0.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
114.5700
101.9000
1.7500
4.0000
0.00
0.00
0.52
0.00
0.00
0.5800
0.00
0.00
0.00
0.00
50.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.41
134.04
2.99
0.00
0.00
0.00
0.2700
0.0310
43 (P2)
SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
140.00
1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.38
101.95
0.00
0.75
0.95
0.25
2.65
0.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
708.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
17 (und)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.96
11.67
11.19
84.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
17 (und)
0.00
0.00
22.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
153.35
0.00
0.00
0.00
0.00
0.00
63.31
0.00
0.00
0.00
0.00
0.00
23.36
0.00
0.00
0.00
0.00
0.00
42.59
0.00
0.00
0.00
0.00
0.00
203.80
538.02
712.64
0.00
0.00
0.00
0.00
0.00
0.00
9.76
39.0000
655.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,473.85
655.98
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.01.01
01.01.02
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
01.01.02.04
01.01.02.05
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.04
01.01.04.01
01.01.04.02
01.01.05
01.01.05.01
01.01.05.02
01.01.05.03
01.01.05.04
01.01.05.05
01.01.05.06
01.01.05.07
01.01.06
01.01.06.01
01.01.06.02
01.01.06.03
01.01.06.04
01.01.06.05
01.01.07
01.01.07.01
01.01.07.02
01.01.07.03
01.01.07.04
01.01.07.05
01.01.07.06
01.01.07.07
01.02
01.02.01
01.02.01.01
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.03
01.02.03.01
01.02.03.02
01.02.03.03
01.02.04
01.02.04.01
01.02.04.02
01.02.04.03
und
Metrado
P.unit
und
m
51.00
163.30
18.60
2.83
m
m
m
m
m3
163.30
163.30
163.30
163.30
9.55
28.58
1.61
1.98
29.51
28.58
m
m
m
17.60
145.70
163.30
5.15
4.10
1.34
und
und
7.00
21.00
91.92
83.62
pto
pto
pto
pto
pto
pto
pto
16.00
9.00
8.00
3.00
1.00
1.00
5.00
69.27
69.27
70.08
68.28
68.28
107.78
69.27
und
und
und
und
und
7.00
44.00
8.00
44.00
1.00
21.77
14.65
15.65
33.81
33.31
pza
pza
und
pza
und
pza
pza
16.00
13.00
4.00
1.00
8.00
5.00
45.00
215.05
287.00
55.00
185.00
175.12
435.00
70.08
166.65
2.83
m
m
m
m
m3
166.65
166.65
166.65
166.65
9.75
50.02
1.61
1.98
29.51
28.58
m
m
m
92.90
73.75
166.65
10.69
9.79
1.55
pto
pto
pto
16.00
13.00
4.00
92.73
58.85
58.85
Parcial
111,721.92
34,831.44
1,410.74
948.60
462.14
10,345.27
4,667.11
262.91
323.33
4,818.98
272.94
906.83
90.64
597.37
218.82
2,399.46
643.44
1,756.02
3,019.64
1,108.32
623.43
560.64
204.84
68.28
107.78
346.35
2,443.14
152.39
644.60
125.20
1,487.64
33.31
14,306.36
3,440.80
3,731.00
220.00
185.00
1,400.96
2,175.00
3,153.60
29,893.07
471.62
471.62
14,130.61
8,335.83
268.31
329.97
4,917.84
278.66
1,973.42
993.10
722.01
258.31
10,682.70
1,483.68
765.05
235.40
01.02.04.04
01.02.04.05
01.02.04.06
01.02.04.07
01.02.04.08
01.02.04.09
01.02.04.10
01.02.04.11
01.02.05
01.02.05.01
01.02.05.02
01.02.05.03
01.02.05.04
01.02.05.05
01.02.05.06
01.02.05.07
01.02.05.08
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
pto
pto
pto
pto
pto
pto
pto
pto
2.00
1.00
8.00
5.00
44.38
5.00
8.00
17.00
66.85
58.85
81.85
83.85
115.63
53.43
65.93
59.16
pza
pza
pza
und
und
und
pza
pza
15.00
22.00
36.00
12.00
9.00
3.00
9.00
8.00
26.55
28.05
14.22
38.72
35.72
24.45
12.94
16.44
m
und
und
pza
m
pza
230.78
62.00
31.00
93.00
301.72
31.00
61.80
24.22
48.22
37.39
62.17
242.05
133.70
58.85
654.80
419.25
5,131.66
267.15
527.44
1,005.72
2,634.72
398.25
617.10
511.92
464.64
321.48
73.35
116.46
131.52
46,997.41
14,262.20
1,501.64
1,494.82
3,477.27
18,757.93
7,503.55
111,721.92
BASE DE DAT
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
S/.
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
(INC. IGV.)
32.00
56.40
595.20
159.61
62.75%
34.54%
0.000
0.000
0.00%
0.00%
32.00
56.40
595.20
159.61
62.75%
34.54%
19.00
106.90
353.40
302.53
56.40
56.40
56.40
56.40
3.30
1,611.91
90.80
111.67
1,664.36
94.31
34.54%
34.54%
34.54%
34.54%
34.55%
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
56.40
56.40
56.40
56.40
3.30
1,611.91
90.80
111.67
1,664.36
94.31
34.54%
34.54%
34.54%
34.54%
34.55%
106.90
106.90
106.90
106.90
6.25
3,055.20
172.11
211.66
3,154.62
178.63
5.70
50.70
56.40
29.36
207.87
75.58
32.39%
34.80%
34.54%
0.000
0.000
0.000
0.00%
0.00%
0.00%
5.70
50.70
56.40
29.36
207.87
75.58
32.39%
34.80%
34.54%
11.90
95.00
106.90
61.29
389.50
143.24
2.00
4.00
183.84
334.48
28.57%
19.05%
0.000
0.000
0.00%
0.00%
2.00
4.00
183.84
334.48
28.57%
19.05%
5.00
17.00
459.60
1,421.54
8.00
6.00
554.16
415.62
0.00
136.56
0.00
107.78
138.54
50.00%
66.67%
0.00%
66.67%
0.00%
100.00%
40.00%
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.00
6.00
0.00
2.00
0.00
1.00
2.00
554.16
415.62
0.00
136.56
0.00
107.78
138.54
50.00%
66.67%
0.00%
66.67%
0.00%
100.00%
40.00%
8.00
3.00
8.00
1.00
1.00
0.00
3.00
554.16
207.81
560.64
68.28
68.28
0.00
207.81
3.00
13.00
5.00
17.00
65.31
190.45
78.25
574.77
0.00
42.86%
29.55%
62.50%
38.64%
0.00%
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
3.00
13.00
5.00
17.00
0.00
65.31
190.45
78.25
574.77
0.00
42.86%
29.55%
62.50%
38.64%
0.00%
4.00
31.00
3.00
27.00
1.00
87.08
454.15
46.95
912.87
33.31
8.00
6.00
2.00
1.00
14.00
1,720.40
1,722.00
110.00
185.00
0.00
0.00
981.12
50.00%
46.15%
50.00%
100.00%
0.00%
0.00%
31.11%
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.00
6.00
2.00
1.00
0.00
0.00
14.00
1,720.40
1,722.00
110.00
185.00
0.00
0.00
981.12
50.00%
46.15%
50.00%
100.00%
0.00%
0.00%
31.11%
8.00
7.00
2.00
0.00
8.00
5.00
31.00
1,720.40
2,009.00
110.00
0.00
1,400.96
2,175.00
2,172.48
67.05
0.00
189.75
0.00%
40.23%
0.000
0.00%
67.05
189.75
40.23%
99.60
281.87
40.23%
40.23%
40.23%
40.23%
40.20%
0.00%
41.77%
38.31%
40.23%
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
67.05
67.05
67.05
67.05
3.92
3,353.84
107.95
132.76
1,978.65
112.03
40.23%
40.23%
40.23%
40.23%
40.20%
99.60
99.60
99.60
99.60
5.83
4,981.99
160.36
197.21
2,939.19
166.63
38.80
28.25
67.05
3,353.84
107.95
132.76
1,978.65
112.03
0.00
414.77
276.57
103.93
0.000
0.000
0.000
0.00%
0.00%
0.00%
38.80
28.25
67.05
414.77
276.57
103.93
41.77%
38.31%
40.23%
54.10
45.50
99.60
578.33
445.44
154.38
8.00
6.00
2.00
741.84
353.10
117.70
50.00%
46.15%
50.00%
0.000
0.000
0.000
0.00%
0.00%
0.00%
8.00
6.00
2.00
741.84
353.10
117.70
50.00%
46.15%
50.00%
8.00
7.00
2.00
741.84
411.95
117.70
2.00
0.00
1.00
2.00
67.05
67.05
67.05
67.05
3.92
1.00
17.24
2.00
1.00
4.00
8.00
6.00
16.00
12.00
2.00
4.00
66.85
0.00
0.00
0.00
1,993.46
106.86
65.93
236.64
50.00%
0.00%
0.00%
0.00%
38.85%
40.00%
12.50%
23.53%
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
0.00
0.00
0.00
17.24
2.00
1.00
4.00
66.85
0.00
0.00
0.00
1,993.46
106.86
65.93
236.64
50.00%
0.00%
0.00%
0.00%
38.85%
40.00%
12.50%
23.53%
1.00
1.00
8.00
5.00
27.14
3.00
7.00
13.00
66.85
58.85
654.80
419.25
3,138.20
160.29
461.51
769.08
212.40
168.30
227.52
464.64
0.00
0.00
25.88
65.76
53.33%
27.27%
44.44%
100.00%
0.00%
0.00%
22.22%
50.00%
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.00
6.00
16.00
12.00
0.00
0.00
2.00
4.00
212.40
168.30
227.52
464.64
0.00
0.00
25.88
65.76
53.33%
27.27%
44.44%
100.00%
0.00%
0.00%
22.22%
50.00%
7.00
16.00
20.00
0.00
9.00
3.00
7.00
4.00
185.85
448.80
284.40
0.00
321.48
73.35
90.58
65.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.000
0.000
0.000
0.000
0.000
0.000
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
230.78
62.00
31.00
93.00
301.72
31.00
14,262.20
1,501.64
1,494.82
3,477.27
18,757.93
7,503.55
23,656.09
21.17%
0.00
0.00%
23,656.09
21.17%
88,065.83
OR VALORIZAR
%
21 (und)
CEMENTO
SUB TOTAL
A. CORRUGADO
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
SUB TOTAL
37.25%
65.46%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65.46%
65.46%
65.46%
65.46%
65.45%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
67.61%
65.20%
65.46%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
71.43%
80.95%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00%
33.33%
100.00%
33.33%
100.00%
0.00%
60.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
57.14%
70.45%
37.50%
61.36%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00%
53.85%
50.00%
0.00%
100.00%
100.00%
68.89%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59.77%
0.00
0.00
0.00
0.00
59.77%
59.77%
59.77%
59.77%
59.80%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
58.23%
61.69%
59.77%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00%
53.85%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00%
100.00%
100.00%
100.00%
61.15%
60.00%
87.50%
76.47%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.67%
72.73%
55.56%
0.00%
100.00%
100.00%
77.78%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.4000
0.00
11.7500
PIEDRA S. 1/2"
SUB TOTAL
HORMIGON
SUB TOTAL
05 (M3)
A. GRUESA
SUB TOTAL
A. FINA
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TIERRA ORG.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2000
0.1100
0.00
SUB TOTAL
43 (P2)
M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.0000
Obra
Form.
Cliente
Ubicac.
: 01 PRESUPUESTO GENERAL
: GOBIERNO REGIONAL DE MADRE DE DIOS
: TAMBOPATA - TAMBOPATA - MADRE DE DIOS.
Item
01
01.01
01.01.01
01.01.01
01.01.02
01.01.03
01.01.02
01.01.02.01
01.01.03
01.01.03.01
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.04.04
01.01.04.05
01.01.05
01.01.05.01
01.01.05.02
01.01.06
01.01.06.01
01.01.06.02
01.01.06.03
01.01.06.04
01.01.06.05
01.01.06.06
01.01.07
01.01.07.01
01.01.08
01.01.08.01
01.01.08.02
01.01.08.03
01.01.09
01.01.09.01
P.unit
Parcial
Obra
Form.
Cliente
Ubicac.
: 01 PRESUPUESTO GENERAL
: GOBIERNO REGIONAL DE MADRE DE DIOS
: TAMBOPATA - TAMBOPATA - MADRE DE DIOS.
Item
01.01.10
01.01.10.01
01.01.10.02
01.01.10.03
01.01.10.04
01.01.10.05
01.01.10.06
01.01.10.07
01.01.10.08
01.01.10.09
01.01.11
01.01.11.01
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.02
01.02.02.01
01.02.03
01.02.03.01
01.02.04
01.02.04.01
01.02.05
01.02.05.01
01.02.05.02
01.02.05.03
01.02.06
01.02.06.01
01.02.07
01.02.07.01
01.02.07.02
80,397.02
ACUMULADO ANTERIOR
METRADO
S/.
%
100.00
0.60
0.60
15.00
130.00
100.00
2.00
20.00
10.00
10.00
90.00
5.00
30.00
30.00
1,200.00
1,500.00
1,300.00
40.00
51.00
692.00
14.64
9.57
0.00
131.10
0.00
629.20
0.00
862.00
81.54
768.80
349.60
424.90
0.00
3,195.00
283.40
0.00
5,652.30
4,467.60
0.00
0.00
0.00
0.00
0.00
9,360.00
0.00
6,780.00
6,656.00
214.80
0.00
800.70
63.57%
75.93%
75.95%
0.00%
82.92%
0.00%
82.64%
0.00%
53.48%
100.00%
71.43%
83.33%
71.43%
0.00%
92.78%
100.00%
0.00%
53.57%
55.56%
0.00%
0.00%
0.00%
0.00%
0.00%
77.07%
0.00%
71.37%
77.50%
73.26%
0.00%
100.00%
METRADO
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
MES ACTUAL
S/.
%
METRADO
ACUMULADO ACTUAL
S/.
%
0.00
0.00
0.00
0.00%
0.00%
0.00%
100.00
0.60
0.60
692.00
14.64
9.57
63.57%
75.93%
75.95%
0.00
0.00%
15.00
131.10
82.92%
0.00
0.00%
130.00
629.20
82.64%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
100.00
2.00
20.00
10.00
10.00
862.00
81.54
768.80
349.60
424.90
53.48%
100.00%
71.43%
83.33%
71.43%
0.00
0.00
0.00%
0.00%
90.00
5.00
3,195.00
283.40
92.78%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
30.00
30.00
0.00
0.00
0.00
0.00
5,652.30
4,467.60
0.00
0.00
0.00
0.00
53.57%
55.56%
0.00%
0.00%
0.00%
0.00%
0.00
0.00%
1,200.00
9,360.00
77.07%
0.00
0.00
0.00
0.00%
0.00%
0.00%
1,500.00
1,300.00
40.00
6,780.00
6,656.00
214.80
71.37%
77.50%
73.26%
0.00
0.00%
51.00
800.70
100.00%
ACUMULADO ANTERIOR
0.00
0.00%
1.00
976.37 100.00%
1.00
886.37 100.00%
1.00
811.37 100.00%
1.00
726.37 100.00%
1.00
1,221.37 100.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
45,995.00
57.21%
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
MES ACTUAL
0.00
ACUMULADO ACTUAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
976.37
886.37
811.37
726.37
1,221.37
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
45,995.00
57.21%
21
03
05
43
17
(INC. IGV.)
21 (und)
CEMENTO
SUB TOTAL
A. CORRUGADO
SUB TOTAL
57.30
0.19
0.19
396.52
4.64
3.03
36.43%
24.07%
24.05%
0.00
0.00
0.00
0.00
0.00
0.00
3.09
27.01
17.08%
0.00
0.00
27.30
132.13
17.36%
0.00
0.00
87.00
0.00
8.00
2.00
4.00
749.94
0.00
307.52
69.92
169.96
46.52%
0.00%
28.57%
16.67%
28.57%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
0.00
248.50
0.00
7.22%
0.00%
0.00
0.00
0.00
0.00
26.00
24.00
17.00
59.00
1.00
2.00
4,898.66
3,574.08
1,083.58
4,223.81
60.44
181.18
46.43%
44.44%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
357.01
2,784.68
22.93%
0.00
0.00
601.77
377.48
14.60
2,720.00
1,932.70
78.40
28.63%
22.50%
26.74%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00
03 (KG)
ALAMBRE DE C.
21
03
05
43
17
(INC. IGV.)
03 (KG)
0.00
0.00
0.00
0.00
0.00
1.00
1.00
2.00
2.00
0.00
0.00
0.00
0.00
0.00
1,131.37
706.37
750.46
552.74
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1,662.00
100.00%
0.00
0.00
1.00
1.00
8.62
29.07
100.00%
100.00%
0.00
0.00
0.00
0.00
1.00
32.01
100.00%
0.00
0.00
1.00
19.90
100.00%
0.00
0.00
42.53
331.73
100.00%
0.00
0.00
90.83
32.55
6.00
376.04
153.64
69.06
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
375.23
100.00%
0.00
0.00
1.00
1.00
1,097.00
3,460.08
100.00%
100.00%
0.00
0.00
0.00
0.00
42.79%
0.00
0.00
0.00
34,402.02
O DIRECTO
OFRADO Y CARPINTERIA
03 (KG)
SUB TOTAL
CLAVO DE C.
SUB TOTAL
PIEDRA S. 1/2"
SUB TOTAL
AFIRMADO
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05 (M3)
A. GRUESA
O DIRECTO
OFRADO Y CARPINTERIA
05 (M3)
03 (KG)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05 (M3)
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
SUB TOTAL
43 (P2)
M.NACIONAL E. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17 (und)
LADRILLO A.
05 (M3)
43 (P2)
17 (und)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17 (und)
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17 (und)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
02.02
02.02.01
02.02.02
02.03
02.03.01
02.04
02.04.01
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.06
02.06.01
02.06.02
02.06.03
02.06.04
02.06.05
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.02
3.02.01
3.02.02
03.03
03.03.01
03.04
03.04.01
03.05
03.05.01
03.05.02
03.05.03
03.05.04
03.05.05
03.05
03.05.01
03.05.02
und
Metrado
P.unit
03.05.03
03.05.04
03.05.05
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.03
04.03.01
04.04
04.01.01
04.01.02
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.03
05.03.01
05.04
05.04.01
05.04.02
Parcial
158,648.65
25,920.68
6,771.28
4,467.07
1,073.00
125.11
711.42
394.68
155.20
100.49
54.71
677.41
677.41
616.00
616.00
15,537.00
2,208.00
11,136.00
108.00
1,085.00
1,000.00
2,163.79
1,824.37
75.94
35.30
195.00
33.18
25,920.68
6,771.28
4,467.07
1,073.00
125.11
711.42
394.68
155.20
100.49
54.71
677.41
677.41
616.00
616.00
15,537.00
2,208.00
11,136.00
108.00
1,085.00
1,000.00
2,163.79
1,824.37
75.94
ACUMULADO ANTERIOR
METRADO
S/.
%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
METRADO
MES ACTUAL
S/.
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
35.30
195.00
33.18
12,057.71
788.44
474.66
313.78
344.76
257.04
87.72
10,672.00
10,672.00
252.51
166.50
86.01
12,057.71
788.44
474.66
313.78
344.76
257.04
87.72
10,672.00
10,672.00
252.51
166.50
86.01
234,605.43
75,956.78
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00%
INDICE D
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
MONTO DE CONTRATO
PLAZO EJECUCION
ACUMULADO ACTUAL
METRADO
S/.
21
03
05
43
17
(INC. IGV.)
21 (und)
CEMENTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
210.91
40.69
3.82
27.66
58.82
4,467.07
1,073.00
125.11
711.42
394.68
100.00%
100.00%
100.00%
100.00%
100.00%
0.1500
0.1170
0.1170
0.1500
0.00
0.00
0.00
0.00
0.00%
0.00%
3.62
4.02
100.49
54.71
100.00%
100.00%
0.4550
0.00
0.00
0.00%
53.13
677.41
100.00%
0.0500
0.00
0.00
0.00%
1.76
616.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
2.76
13.92
0.60
31.00
1.00
2,208.00
11,136.00
108.00
1,085.00
1,000.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
210.91
8.21
3.82
27.66
8.40
1,824.37
75.94
35.30
195.00
33.18
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
210.91
40.69
3.82
27.66
58.82
4,467.07
1,073.00
125.11
711.42
394.68
100.00%
100.00%
100.00%
100.00%
100.00%
0.1500
0.1170
0.1170
0.1500
0.00
0.00
0.00
0.00
0.00%
0.00%
3.62
4.02
100.49
54.71
100.00%
100.00%
0.4550
0.00
0.00
0.00%
53.13
677.41
100.00%
0.0500
0.00
0.00
0.00%
1.76
616.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
2.76
13.92
0.60
31.00
1.00
2,208.00
11,136.00
108.00
1,085.00
1,000.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
210.91
8.21
1,824.37
75.94
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
3.82
27.66
8.40
35.30
195.00
33.18
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
18.00
12.20
474.66
313.78
100.00%
100.00%
0.1170
0.1500
0.00
0.00
0.00
0.00
0.00%
0.00%
20.16
6.88
257.04
87.72
100.00%
100.00%
0.0500
0.0500
0.00
0.00
0.00%
13.34
10,672.00
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
18.00
12.20
166.50
86.01
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
18.00
12.20
474.66
313.78
100.00%
100.00%
0.1170
0.1500
0.00
0.00
0.00
0.00
0.00%
0.00%
20.16
6.88
257.04
87.72
100.00%
100.00%
0.0500
0.0500
0.00
0.00
0.00%
13.34
10,672.00
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
18.00
12.20
166.50
86.01
100.00%
100.00%
0.00
0.00%
75,956.78
32.38%
A. CORRUGADO
03 (KG)
SUB TOTAL ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0400
0.0300
0.0300
0.0400
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0400
0.0300
0.3000
0.0400
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0300
0.0400
0.0300
0.0400
0.00
0.00
0.00
0.00
PIEDRA S. 1/2"
0.0270
0.0270
05 (M3)
SUB TOTAL HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0180
0.0180
0.0180
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0080
0.0120
0.00
0.00
0.00
0.00
0.00
0.0070
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0180
0.0180
0.0250
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0080
0.0120
0.00
0.00
0.00
0.00
0.00
0.0070
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0300
0.0300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0180
0.0250
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0070
0.0070
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0180
0.0250
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0070
0.0070
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.6500
0.5200
0.5200
0.5800
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1560
0.6500
0.5200
0.5200
0.5800
0.00
0.00
0.00
0.1560
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5200
0.5800
0.00
0.00
0.00
0.00
0.00
0.00
0.1560
0.1560
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5200
0.5800
0.00
0.00
0.00
0.00
0.00
0.00
0.1560
0.1560
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
und
Metrado
P.unit
1.12
4.18
33.34
2.50
23.67
17.00
15.95
290.68
28.91
349.47
4.83
401.74
31.61
5.24
Parcial
545,787.72
60,387.01
113.32
23.95
89.37
2,939.40
1,503.97
53.45
599.09
403.92
378.97
4,463.33
4,397.99
65.34
52,870.96
510.68
394.90
115.78
4,820.31
1,827.92
1,916.83
1,075.56
ACUMULADO ANTERIOR
METRADO
S/.
%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
METRADO S/.
%
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
METRADO
ACUMULADO ACTUAL
S/.
21
03
05
43
17
(INC. IGV.)
INDICE DE ANALISIS DE
CEMENTO PORTLAN TIPO I
ACERO CORRUGADO
AGREGADOS
MADERA NACIONAL PARA ENCOFRADO Y CAR
BLOQUE Y LADRILLO
21 (und)
CEMENTO SUB TOTAL
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
21.38
21.38
23.95
89.37
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
45.11
21.38
25.31
23.76
23.76
1,503.97
53.45
599.09
403.92
378.97
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
15.13
2.26
4,397.99
65.34
100.00%
100.00%
6.0000
0.6500
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.13
23.97
394.90
115.78
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.55
60.64
205.26
1,827.92
1,916.83
1,075.56
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
02.04.03
02.04.03.01
02.04.03.02
02.04.03.03
02.04.04
02.04.04.01
02.04.04.02
02.04.04.03
02.04.05
02.04.05.01
02.04.05.02
02.04.05.03
02.04.06
02.04.06.01
02.04.06.02
02.04.06.03
02.04.07
02.04.07.01
03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.02.02
03.04.02.03
03.04.03
03.04.03.01
03.04.03.02
03.04.03.03
03.04.04
03.04.04.01
03.04.04.02
03.04.04.03
P.unit
507.07
56.37
5.05
381.44
46.14
4.77
329.85
53.91
4.90
390.64
44.49
4.72
91.18
1.12
4.18
33.34
2.50
23.67
17.00
15.95
290.68
28.91
349.47
4.83
401.74
31.61
5.24
507.07
56.37
5.05
381.44
46.14
4.77
Parcial
9,073.61
7,758.17
826.95
488.49
26,664.39
21,105.08
2,397.90
3,161.41
1,648.05
277.07
603.79
767.19
3,060.12
1,464.90
671.80
923.42
7,093.80
7,093.80
60,387.01
113.32
23.95
89.37
2,939.40
1,503.97
53.45
599.09
403.92
378.97
4,463.33
4,397.99
65.34
52,870.96
510.68
394.90
115.78
4,820.31
1,827.92
1,916.83
1,075.56
9,073.61
7,758.17
826.95
488.49
26,664.39
21,105.08
2,397.90
3,161.41
ACUMULADO ANTERIOR
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
INDICE DE ANALISIS DE
CEMENTO PORTLAN TIPO I
ACERO CORRUGADO
AGREGADOS
MADERA NACIONAL PARA ENCOFRADO Y CAR
BLOQUE Y LADRILLO
21
03
05
43
17
(INC. IGV.)
21 (und)
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
15.30
14.67
96.73
7,758.17
826.95
488.49
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
55.33
51.97
662.77
21,105.08
2,397.90
3,161.41
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.84
11.20
156.57
277.07
603.79
767.19
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
3.75
15.10
195.64
1,464.90
671.80
923.42
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00%
77.80
7,093.80
100.00%
0.2180
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
21.38
21.38
23.95
89.37
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
45.11
21.38
25.31
23.76
23.76
1,503.97
53.45
599.09
403.92
378.97
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
15.13
2.26
4,397.99
65.34
100.00%
100.00%
6.0000
0.6500
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.13
23.97
394.90
115.78
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.55
60.64
205.26
1,827.92
1,916.83
1,075.56
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
15.30
14.67
96.73
7,758.17
826.95
488.49
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
55.33
51.97
662.77
21,105.08
2,397.90
3,161.41
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
03.04.05
03.04.05.01
03.04.05.02
03.04.05.03
03.04.06
03.04.06.01
03.04.06.02
03.04.06.03
03.04.07
03.04.07.01
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.03
04.03.01
04.04
04.04.01
04.04.01.01
04.04.01.02
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.04.03
04.04.03.01
04.04.03.02
04.04.03.03
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.03
05.03.01
05.04
05.04.01
05.04.01.01
05.04.01.02
P.unit
329.85
53.91
4.90
390.64
44.49
4.72
91.18
1.12
4.18
33.34
2.50
23.67
17.00
15.95
28.91
349.47
4.83
507.07
56.37
5.05
390.64
44.49
4.72
1.12
4.18
33.34
2.50
23.67
17.00
15.95
28.91
349.47
4.83
Parcial
1,648.05
277.07
603.79
767.19
3,060.12
1,464.90
671.80
923.42
7,093.80
7,093.80
6,558.89
85.60
18.09
67.51
459.49
221.38
40.38
96.57
52.19
48.97
115.64
115.64
5,898.16
947.25
698.94
248.31
4,041.58
1,156.12
1,499.44
1,386.02
909.33
371.11
249.59
288.63
6,558.89
85.60
18.09
67.51
459.49
221.38
40.38
96.57
52.19
48.97
115.64
115.64
5,898.16
947.25
698.94
248.31
ACUMULADO ANTERIOR
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
INDICE DE ANALISIS DE
CEMENTO PORTLAN TIPO I
ACERO CORRUGADO
AGREGADOS
MADERA NACIONAL PARA ENCOFRADO Y CAR
BLOQUE Y LADRILLO
21
03
05
43
17
(INC. IGV.)
21 (und)
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.84
11.20
156.57
277.07
603.79
767.19
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
3.75
15.10
195.64
1,464.90
671.80
923.42
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00%
77.80
7,093.80
100.00%
0.2180
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
16.15
16.15
18.09
67.51
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
6.64
16.15
4.08
3.07
3.07
221.38
40.38
96.57
52.19
48.97
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00%
4.00
115.64
100.00%
0.6500
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
51.41
698.94
248.31
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.28
26.60
274.46
1,156.12
1,499.44
1,386.02
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.95
5.61
61.15
371.11
249.59
288.63
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
16.15
16.15
18.09
67.51
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
6.64
16.15
4.08
3.07
3.07
221.38
40.38
96.57
52.19
48.97
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00%
4.00
115.64
100.00%
0.6500
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
51.41
698.94
248.31
100.00%
100.00%
8.5000
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
05.04.02
05.04.02.01
05.04.02.02
05.04.02.03
05.04.03
05.04.03.01
05.04.03.02
05.04.03.03
06
06.01
06.01.01
06.01.02
06.01.03
06.02
06.02.01
06.02.02
06.02.03
06.02.04
06.03
06.03.01
06.03.02
06.03.03
07
07.01
07.01.01
07.01.02
07.02
07.02.01
07.02.02
07.02.03
07.02.04
07.03
07.03.01
07.03.02
07.03.03
08
08.01
08.01.01
08.01.02
08.02
08.02.01
08.02.02
08.02.03
08.02.04
08.03
08.03.01
08.03.02
08.03.03
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
INDICE DE ANALISIS DE
CEMENTO PORTLAN TIPO I
ACERO CORRUGADO
AGREGADOS
MADERA NACIONAL PARA ENCOFRADO Y CAR
BLOQUE Y LADRILLO
21
03
05
43
17
(INC. IGV.)
21 (und)
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.28
26.60
274.46
1,156.12
1,499.44
1,386.02
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.95
5.61
61.15
371.11
249.59
288.63
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1,457.57
1,457.57
585.89
1,632.48
6,092.64
4,687.12
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1,460.59
146.06
479.40
479.40
5,842.36
11,157.52
8,149.80
3,792.05
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1,460.59
227.78
639.17
84,159.20
10,020.04
2,384.10
100.00%
100.00%
100.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1,835.52
1,835.52
2,055.78
7,672.47
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1,835.52
183.55
458.88
458.88
7,342.08
14,021.38
7,800.96
3,629.74
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1,835.52
187.84
709.10
105,762.66
8,263.08
2,644.94
100.00%
100.00%
100.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1,310.20
1,310.20
1,467.42
5,476.64
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
96.42
34.44
75.76
75.76
1,608.29
1,442.00
1,287.92
599.26
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
41.39
627.15
1,689.77
7,706.40
43,511.67
8,077.10
100.00%
100.00%
100.00%
0.00
0.00
0.00
1.0200
1.0200
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
09
09.01
09.01.01
09.01.02
09.02
09.02.01
09.02.02
09.02.03
09.02.04
09.03
09.03.01
09.03.01.01
09.03.01.02
09.03.01.03
09.03.01.04
09.03.01.05
09.03.01.06
09.04
09.04.01
10
10.01
10.02
10.03
11
11.01
11.01.01
11.02
11.02.01
11.02.02
11.02.03
11.02.04
11.03
11.03.01
11.03.02
11.03.03
11.03.04
12
12.01
12.02
12.03
12.04
13
13.01
13.02
13.03
ACUMULADO ANTERIOR
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
0.00
INDICE DE ANALISIS DE
CEMENTO PORTLAN TIPO I
ACERO CORRUGADO
AGREGADOS
MADERA NACIONAL PARA ENCOFRADO Y CAR
BLOQUE Y LADRILLO
21
03
05
43
17
(INC. IGV.)
21 (und)
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1,178.75
1,178.75
1,320.20
4,927.18
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
235.75
1,178.75
1,178.75
306.48
1,676.18
1,779.91
12,966.25
1,783.71
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
106.47
68.33
649.40
167.05
56.60
348.57
50,564.73
2,092.95
3,156.08
910.42
1,378.21
1,899.71
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00%
60.56
380.32
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
6,400.00
2.00
629.80
102,400.00
2,648.08
1,675.27
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00%
3,320.36
13,879.10
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
50.64
8.44
3,320.36
52.33
844.68
118.16
36,523.96
304.56
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
38.87
759.61
3,328.15
150.00
13,164.88
22,583.21
15,908.56
792.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1,939.60
3.00
1,080.00
910.24
12,510.42
2,328.54
15,433.20
5,716.31
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1,500.00
1,132.99
20.00
3,075.00
13,595.88
10,000.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00 0.00%
0.00
0.00%
0.00
0.00%
860,516.56
100.00%
0.00
8.0000
8.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
A. CORRUGADO
03 (KG)
SUB TOTAL ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL
PIEDRA S. 1/2"
05 (M3)
SUB TOTAL HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG.
43 (P2)
SUB TOTAL M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0500
0.00
0.00
0.0600
0.00
0.00
1.0700
0.00
0.00
0.00
0.2700
0.0600
0.00
0.00
0.00
0.0036
0.1500
1.3500
0.1250
0.5000
4.8300
03 (KG)
1.0700
0.00
0.00
0.00
0.4500
0.0600
0.00
0.00
0.00
0.6500
0.3000
0.00
0.00
0.00
1.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.3000
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.1700
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.3000
0.00
0.00
0.00
0.6500
0.4500
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.3000
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.5800
0.00
0.0200
0.00
0.00
0.00
0.0310
0.00
0.00
0.00
0.00
0.0036
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0500
0.00
0.00
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.2700
0.0600
0.1500
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.3000
0.0600
0.1700
1.0500
43 (P2)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17 (und)
4.9500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5800
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
0.00
0.00
0.00
0.00
0.00
1.3500
0.1250
0.00
0.00
0.00
39.0000
0.00
03 (KG)
1.0700
0.00
0.00
0.00
0.4500
0.0060
0.00
0.00
0.00
0.6500
0.3000
0.00
0.00
0.00
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.3000
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.5000
0.00
0.0200
0.00
0.00
0.00
0.0310
0.00
0.00
0.00
0.00
0.0036
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
0.00
0.00
0.00
0.00
0.00
6.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5800
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.0600
0.00
0.00
0.00
0.3000
1.0700
1.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0600
0.6500
0.00
0.00
0.1250
0.1250
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17 (und)
0.00
0.00
0.00
1.0500
0.0036
43 (P2)
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
39.0000
0.00
03 (KG)
1.0700
0.00
0.00
0.00
1.0700
0.00
0.00
0.00
0.6500
0.3000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.3000
0.00
0.00
0.00
0.00
0.00
0.00
0.0036
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0600
0.1000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0500
0.4500
0.0600
0.00
0.00
0.00
0.1000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1000
0.0500
0.00
0.00
0.00
0.5000
0.2000
0.0036
0.0500
0.3000
0.0036
0.3500
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.1200
0.1200
43 (P2)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0020
0.0020
0.5500
17 (und)
4.9500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0100
0.0100
0.9860
5.0000
0.5000
0.9860
5.0000
0.5000
2.9300
03 (KG)
1.0700
0.7000
1.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2200
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.0036
0.1000
43 (P2)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.7600
0.5100
0.0020
0.0020
0.0020
0.5000
3.5000
17 (und)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2000
0.0500
0.00
0.00
0.00
0.00
0.0036
0.0800
0.00
0.00
0.00
0.00
0.8500
0.4900
0.0020
0.5000
3.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.03
01.03.01
01.03.02
01.03.03
01.04
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05
01.05.06
01.05.07
01.05.08
01.06
01.06.01
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.04
02.04.01
02.04.02
und
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.06
02.06.01
02.06.02
03
03.01
03.01.01
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.03
03.03.01
03.03.02
03.03.03
03.04
03.04.01
03.04.02
03.04.03
04
04.01
04.01.01
04.01.02
04.01.03
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.03
04.03.01
04.04
04.04.01
04.04.01.01
04.04.01.02
04.04.01.03
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.04.03
04.04.03.01
04.04.03.02
04.04.03.03
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
04.04.05
04.04.05.01
04.04.05.02
ACCESORIOS VARIOS
TEE FG 2 1/2" U.R
und
CODO FG 2 1/2" * 90
und
TEE FG 1 1/2" U.R
und
CODO FG 1 1/2" * 90
und
REDUCCION FG 2 1/2" - 2"
und
REDUCCION FG 2" - 1 1/2"
und
OTROS
SUMINISTRO, TRAMITES E INSTALACION DE CONEXIN DOMICILIARIA DE AGUA POTABLE
glb
SUMINISTRO E INSTALACION DE GABINETE DE MANGUERA CONTRA DE INCENDIO
und
RED DE DESAGUES
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DE DESAGUE
m
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANAJAS MANUAL 4"-6", HASTA 1.0 M
m
REFINE Y NIVELACION ZANJA TERR. NORMAL "C" PARA TUB 4"-6"
m
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO. E=10CM m
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m
TUBERIAS
SUMINISTRO E INST. PVC DESAGUE ISO 4435 UF, DN 150mm (6")
m
SUMINISTRO E INST. TUB. PVC DESAGUE ISO 4435 UF, DN 100mm (4")
m
PRUEBA HIDRAULICA + ESCORENTIA P/DESAGUE
m
CAJA DE REGISTRO CR
CAJA DE REGISTRO DE DESAGUE 12"x24" C/TAPA DE CONCRETO
pza
CAJA DE REGISTRO DE DESAGUE 12"x24" C/TAPA METALICA (ACOMETIDA)
pza
CAJA DE REGISTRO DE DESAGUE 24"x24" C/TAPA DE CONCRETO
pza
TANQUE ELEVADO Y TANQUE CISTERNA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
COLOCACION DE NIVELES DURANTE LA OBRA
m2
TRAZO, NIVELES Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS (>2.00m)
m3
ACARREO INTERNO MAT. PRECED. DE EXCAVACIONES
m3
ELIMINACION MATERIAL CARGUIO MANUAL VOLQUETE 6M3 V=30KM/h D=5KM
m3
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m3
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
OBRAS DE CONCRETO SIMPLE
SOLADO f'c=100KG/CM2 e=10CM
m2
OBRAS DE CONCRETO ARMADO
PLATEA DE CIMENTACION
PLATEA DE CIMENTACION, CONCRETO F'C=210KG/CM2
m3
PLATEA DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
PLATEA DE CIMENTACION, ACERO Fy=4200KG/CM2
kg
MURO DE CONCRETO
MURO DE CONCRETO, CONCRETO F'C=210KG/CM2
m3
MURO DE CONCRETO, ENCOFRADO Y DESENCOFRADO
m2
MURO DE CONCRETO, ACERO DE REFUERZO FY=4200KG/CM2
kg
LOSA MACIZA
LOSA MACIZA, CONCRETO F'C=210KG/CM2 CARAVISTA CON ADITIVO PLASTIF.
m3
LOSA MACIZA, ENCONFRADO Y DESENCOFRADO
m2
LOSA MACIZA, ACERO FY=4200KG/CM2
kg
COLUMNAS
COLUMNAS, CONCRETO F'C=210KG/CM2
m3
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
COLUMNAS, ACERO FY=4200KG/CM2
kg
COLUMNETAS
COLUMNETAS, CONCRETO F'C=175KG/CM2
m3
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
04.04.05.03
04.04.06
04.04.06.01
04.04.06.02
04.04.06.03
04.04.07
04.04.07.01
04.04.07.02
04.04.07.03
04.04.08
04.04.08.01
04.04.09
04.04.09.01
04.04.09.02
04.04.09.03
04.04.10
04.04.10.01
04.04.10.02
04.04.10.03
04.04.10.04
04.04.11
04.04.11.01
04.04.12
04.04.12.01
04.04.12.02
04.04.12.03
04.04.12.04
04.04.12.05
04.04.12.06
04.04.12.07
04.04.12.08
04.04.12.09
04.04.12.10
04.04.12.11
04.04.12.12
04.04.12.13
04.04.12.14
04.04.12.15
05
05.01
05.01.01
05.01.02
05.01.03
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.06
05.06.01
05.06.02
05.06.03
05.06.04
05.06.05
05.06.06
05.06.07
05.06.08
05.06.09
05.06.10
05.06.11
05.06.12
05.06.13
05.06.14
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.02.03
06.03
06.03.01
06.03.02
06.03.03
06.03.04
06.04
06.04.01
07
07.01
07.01.01
07.01.02
07.02
07.02.01
07.03
07.03.01
07.03.02
07.03.03
07.04
07.04.01
07.04.02
07.04.03
07.04.04
07.05
07.05.01
08
08.01
08.01.01
08.02
08.02.01
08.02.02
08.02.03
08.02.04
08.02.05
08.02.06
08.03
08.03.01
08.03.02
08.03.03
08.03.04
08.03.05
08.04
08.04.01
08.04.02
08.04.03
08.04.04
08.04.05
08.04.06
08.05
08.05.01
08.05.02
08.05.03
08.05.04
08.05.05
08.05.06
08.05.07
Metrado
P.unit
1,054.76
2.83
1,054.76
1,054.76
1,054.76
1,054.76
61.70
23.81
1.61
1.98
16.82
15.95
57.27
997.49
1,054.76
12.89
11.21
1.34
8.00
4.00
188.65
75.01
5.00
8.00
3.00
101.43
226.89
280.73
7.00
6.00
23.00
16.00
3.00
24.00
2.00
2.00
23.80
21.14
21.14
21.14
26.58
24.58
24.27
35.00
1.00
800.00
625.73
2.83
625.73
625.73
625.73
625.73
36.61
23.81
1.61
1.98
16.82
15.95
7.00
663.73
52.61
37.35
58.00
1.00
1,018.88
226.89
Parcial
71,623.82
2,984.97
2,984.97
47,625.60
25,113.84
1,698.16
2,088.42
17,741.06
984.12
13,333.45
738.21
11,181.86
1,413.38
4,973.70
1,509.20
300.04
507.15
1,815.12
842.19
1,906.10
166.60
126.84
486.22
338.24
79.74
589.92
48.54
70.00
800.00
800.00
139,530.65
1,770.82
1,770.82
28,253.72
14,898.63
1,007.43
1,238.95
10,524.78
583.93
25,158.59
368.27
24,790.32
59,321.93
59,095.04
226.89
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
ACUMULADO ANTERIOR
MES ACTUAL
METRADO S/.
%
METRADO
S/.
ACUMULADO ACTU
METRADO
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
1.00
2.00
11.00
27.00
1.00
1.00
25.45
45.03
24.45
40.03
44.58
39.58
1.00
13.00
800.00
1,744.32
619.95
2.83
619.95
619.95
619.95
619.95
23.81
1.61
1.98
29.51
454.60
165.35
619.95
23.42
19.70
1.55
30.00
6.00
24.00
242.05
253.92
319.68
81.03
65.04
65.04
1.12
7.31
4.74
230.72
299.94
299.94
78.21
126.64
40.02
20.00
15.95
2.71
79.39
4.66
4.35
27.97
16.56
1,066.72
384.10
43.94
4.83
9.77
53.49
689.56
380.25
35.01
5.47
7.85
62.12
314.22
396.44
57.50
4.72
7.55
75.52
732.47
516.47
46.64
5.05
0.52
7.04
381.44
46.14
1,549.43
25.45
90.06
268.95
1,080.81
44.58
39.58
23,476.16
800.00
22,676.16
68,358.20
1,754.46
1,754.46
35,281.35
14,761.01
998.12
1,227.50
18,294.72
14,865.05
10,646.73
3,257.40
960.92
16,457.34
7,261.50
1,523.52
7,672.32
131,899.92
874.48
90.75
475.44
308.29
30,282.15
9,233.41
5,998.80
4,784.04
211.95
10,053.95
20.27
20.27
100,723.02
16,623.19
10,743.28
727.65
5,152.26
9,359.61
3,715.04
1,872.68
3,771.89
8,167.07
3,112.05
3,571.90
1,483.12
11,120.57
3,899.35
3,522.25
3,698.97
811.53
198.35
324.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
60.45
4.77
6.73
62.96
1,283.42
400.42
53.91
4.90
12.96
116.75
720.34
422.07
72.87
4.90
24.34
82.96
36.94
91.80
147.12
25.56
32.39
17.26
15.21
23.15
28.90
14.45
24.79
53.37
9.36
29.73
32.00
8.82
14.00
203.82
11.34
2.00
1.00
2.50
14.81
15.00
8.00
29.45
17.70
1.00
1.00
1.00
2.00
187.26
8.65
13.72
250.00
600.00
200.00
80.71
37.39
38.66
33.85
39.06
1,714.06
1,324.94
300.00
226.01
0.65
87.43
1.00
203.95
12.50
677.49
1.52
1.52
3.13
2.50
40.02
15.95
2.71
79.39
10.76
50.38
1.50
4.74
69.16
396.44
57.50
4.72
23.49
44.56
32.39
17.26
16.90
185.95
288.35
12,377.76
2,694.83
3,394.17
6,288.76
17,507.27
5,470.03
8,507.57
3,529.67
2,019.25
2,019.25
6,456.88
944.19
2,973.40
2,539.29
2,312.68
377.06
1,235.52
270.50
429.60
282.24
282.24
13,684.97
2,621.64
1,763.04
155.58
500.00
600.00
500.00
1,195.32
560.85
309.28
996.88
691.36
1,714.06
1,324.94
300.00
452.02
17,462.02
1,902.94
132.57
1,092.88
677.49
292.03
60.83
24.24
8.48
198.48
542.09
542.09
1,193.65
594.66
272.55
326.44
1,529.95
760.84
769.11
12,001.36
3,142.56
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
160.04
4.50
2.00
1.00
2.00
12.00
27.00
14.00
2.00
1.00
1.00
1.00
2.00
8.65
13.72
210.00
600.00
350.00
37.39
33.37
33.85
39.06
1,714.06
1,324.94
300.00
226.01
1,261.50
1,291.62
1.12
3.84
739.91
961.88
961.88
16.68
20.00
7.91
1,283.73
463.85
3,034.14
24,018.80
28.91
364.94
43.03
4.78
2,002.90
9.27
45.51
45.51
1.12
3.84
2.85
8.00
52.90
68.77
68.77
16.68
20.00
7.91
45.51
23.15
124.00
832.49
28.91
501.10
62.18
4.78
25.96
5.45
1,832.90
2.83
1,803.90
1,803.90
1,803.90
606.32
17.95
649.40
23.81
1.61
1.98
76.86
77.01
20.00
268.60
1,504.70
30.60
29.56
33.30
26.34
1,384.35
61.74
420.00
600.00
700.00
448.68
900.99
473.90
78.12
1,714.06
1,324.94
300.00
452.02
515,886.30
6,372.70
1,412.88
4,959.82
39,187.77
12,341.70
19,237.60
7,608.47
451,758.95
37,112.63
169,277.42
130,559.04
114,809.86
18,566.88
18,566.88
27,797.53
225.73
50.97
174.76
22.80
22.80
2,801.74
882.37
1,375.40
543.97
24,605.78
1,315.69
11,600.47
7,710.32
3,979.30
141.48
141.48
281,548.48
5,187.11
5,187.11
110,398.95
42,950.86
2,904.28
3,571.72
46,601.76
1,382.33
12,988.00
160,200.99
7,939.82
50,106.51
806.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
1,803.90
2,241.87
1.55
43.96
2.56
2.56
3.33
7.92
456.96
0.32
40.02
20.00
7.91
38.41
7.44
458.49
2.44
1.00
3.18
6.33
108.78
0.97
1.00
40.02
20.00
7.91
38.41
7.44
458.49
90.73
2,796.05
98,552.61
4,030.70
102.45
51.20
26.34
304.21
3,399.78
146.72
1,730.73
97.65
20.00
25.15
243.14
809.32
444.74
90.73
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,254,106.92
0.00
0.00%
0.00
0.00%
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
MONTO DE CONTRATO
PLAZO EJECUCION
ACUMULADO ACTUAL
S/.
%
21
03
05
43
17
21 (und)
CEMENTO SUB TOTAL
0.00
0.00%
1,054.76
2,984.97
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
1,054.76
1,054.76
1,054.76
1,054.76
61.70
25,113.84
1,698.16
2,088.42
17,741.06
984.12
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
57.27
997.49
1,054.76
738.21
11,181.86
1,413.38
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
8.00
4.00
1,509.20
300.04
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
5.00
8.00
3.00
507.15
1,815.12
842.19
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.00
6.00
23.00
16.00
3.00
24.00
2.00
2.00
166.60
126.84
486.22
338.24
79.74
589.92
48.54
70.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
800.00
100.00%
0.00
0.00
0.00%
625.73
1,770.82
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
625.73
625.73
625.73
625.73
36.61
14,898.63
1,007.43
1,238.95
10,524.78
583.93
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
7.00
663.73
368.27
24,790.32
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
58.00
1.00
59,095.04
226.89
100.00%
100.00%
1.0000
1.0000
1.0000
0.00
0.00
0.00
0.00
0.00
A. CORRUGADO
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
2.00
11.00
27.00
1.00
1.00
25.45
90.06
268.95
1,080.81
44.58
39.58
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
13.00
800.00
22,676.16
100.00%
100.00%
0.00
0.00
0.00
0.00%
619.95
1,754.46
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
619.95
619.95
619.95
619.95
14,761.01
998.12
1,227.50
18,294.72
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
454.60
165.35
619.95
10,646.73
3,257.40
960.92
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
30.00
6.00
24.00
7,261.50
1,523.52
7,672.32
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
81.03
65.04
65.04
90.75
475.44
308.29
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
230.72
299.94
299.94
78.21
126.64
0.00
0.00%
0.00
0.00
0.00
1.4000
1.2200
3.2000
0.00
0.00
0.00
11.7500
11.7500
21.3700
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.0800
9,233.41
5,998.80
4,784.04
211.95
10,053.95
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
4.66
20.27
100.00%
0.00
0.00%
0.00%
0.00%
27.97
16.56
1,066.72
10,743.28
727.65
5,152.26
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00%
0.00%
0.00%
9.77
53.49
689.56
3,715.04
1,872.68
3,771.89
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00%
0.00%
0.00%
7.85
62.12
314.22
3,112.05
3,571.90
1,483.12
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00%
0.00%
0.00%
7.55
75.52
732.47
3,899.35
3,522.25
3,698.97
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00%
0.00%
0.52
7.04
198.35
324.83
100.00%
100.00%
8.0000
0.00
0.00
0.00
1.0500
0.00
0.00
0.00
1.0700
0.00
0.00
0.00
1.0700
0.00
0.00
0.00
1.0700
0.00
0.00
0.00
0.00%
60.45
288.35
100.00%
0.00
0.7000
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.73
62.96
1,283.42
2,694.83
3,394.17
6,288.76
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
1.0700
0.00
0.00
0.00
0.00%
0.00%
0.00%
12.96
116.75
720.34
5,470.03
8,507.57
3,529.67
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
1.0700
0.00
0.00%
24.34
2,019.25
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
36.94
91.80
147.12
944.19
2,973.40
2,539.29
100.00%
100.00%
100.00%
0.4800
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
15.21
23.15
28.90
14.45
377.06
1,235.52
270.50
429.60
100.00%
100.00%
100.00%
100.00%
0.4500
1.0200
0.00
0.00
0.00
0.00
0.00
0.00%
32.00
282.24
100.00%
0.0240
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
14.00
203.82
11.34
2.00
1.00
2.50
14.81
15.00
8.00
29.45
17.70
1.00
1.00
1.00
2.00
2,621.64
1,763.04
155.58
500.00
600.00
500.00
1,195.32
560.85
309.28
996.88
691.36
1,714.06
1,324.94
300.00
452.02
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.65
87.43
1.00
132.57
1,092.88
677.49
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.52
1.52
3.13
2.50
60.83
24.24
8.48
198.48
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
10.76
542.09
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.50
4.74
69.16
594.66
272.55
326.44
100.00%
100.00%
100.00%
0.00
0.00
0.00%
0.00%
23.49
44.56
760.84
769.11
100.00%
100.00%
0.00
0.00
0.00
0.00%
16.90
3,142.56
100.00%
0.00
0.00
0.2000
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
160.04
4.50
2.00
1.00
2.00
12.00
27.00
14.00
2.00
1.00
1.00
1.00
2.00
1,384.35
61.74
420.00
600.00
700.00
448.68
900.99
473.90
78.12
1,714.06
1,324.94
300.00
452.02
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1,261.50
1,291.62
1,412.88
4,959.82
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
739.91
961.88
961.88
12,341.70
19,237.60
7,608.47
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1,283.73
463.85
3,034.14
24,018.80
37,112.63
169,277.42
130,559.04
114,809.86
100.00%
100.00%
100.00%
100.00%
0.00
0.00%
2,002.90
18,566.88
100.00%
0.00
0.00
0.00
0.00%
0.00%
45.51
45.51
50.97
174.76
100.00%
100.00%
0.00
0.00
0.00
0.00%
2.85
22.80
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
52.90
68.77
68.77
882.37
1,375.40
543.97
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
45.51
23.15
124.00
832.49
1,315.69
11,600.47
7,710.32
3,979.30
100.00%
100.00%
100.00%
100.00%
0.00
0.00%
25.96
141.48
100.00%
0.00
0.00
0.00%
1,832.90
5,187.11
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1,803.90
1,803.90
1,803.90
606.32
17.95
649.40
42,950.86
2,904.28
3,571.72
46,601.76
1,382.33
12,988.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
268.60
1,504.70
30.60
7,939.82
50,106.51
806.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.6500
8.0000
0.6500
9.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0500
1.0500
0.00
0.00
0.00%
0.00%
1,803.90
2,241.87
2,796.05
98,552.61
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.56
2.56
3.33
7.92
456.96
0.32
102.45
51.20
26.34
304.21
3,399.78
146.72
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.44
1.00
3.18
6.33
108.78
0.97
1.00
97.65
20.00
25.15
243.14
809.32
444.74
90.73
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00%
1,254,106.92
100.00%
8.2000
8.2000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0700
1.0700
ADELANTO DIRECTO
O 2013
PIEDRA S. 1/2"
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0000
1.0000
1.0000
0.00
0.00
0.00
0.00
0.00
0.1200
0.1200
0.1200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1500
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0800
0.0600
0.00
0.00
0.00
0.2200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.8500
0.3000
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.3000
0.00
0.00
0.00
0.8500
0.4500
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.3000
0.00
0.00
0.0100
0.0036
0.0100
0.1700
0.8500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.3000
0.00
0.00
0.00
0.8500
0.4500
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2500
0.00
0.00
0.00
0.8500
0.2100
0.0600
0.00
0.00
0.00
0.00
0.00
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0400
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0500
0.0800
0.0800
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.3000
0.0600
0.0100
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0400
0.8500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.4000
0.0500
0.3000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2000
0.0500
0.3000
0.8500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.2000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2000
0.4500
0.2000
0.4500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0700
0.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.7000
0.7000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05 (M3)
HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0600
0.0600
0.00
0.00
0.00
0.0300
0.0300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0600
0.00
0.00
0.0300
0.2000
0.1700
0.4600
0.0615
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.3800
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.4200
0.4200
0.00
0.00
0.00
0.00
0.00
0.5000
0.1100
0.0900
0.2000
0.00
0.0650
1.1650
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.4200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0300
0.00
0.00
0.00
0.00
0.00
0.00
0.0210
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0080
0.0300
0.0250
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0040
0.0310
0.00
0.0300
0.00
0.00
0.00
0.00
0.00
0.00
0.4200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0300
0.0250
0.1250
1.3800
0.1250
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.4200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.2500
0.0020
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.6500
43 (P2)
M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31.0000
29.0000
31.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.0000
2.8800
3.2400
0.00
0.00
0.00
0.00
0.00
0.00
0.7000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.0300
0.00
0.00
0.00
0.00
0.00
0.00
4.1800
0.00
0.00
0.00
0.00
0.00
0.00
6.0000
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.1300
4.9700
0.00
0.00
0.00
0.00
0.00
0.00
0.5800
0.00
0.6500
0.00
0.00
0.00
0.00
0.00
0.00
0.8300
1.1200
3.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.0070
39.0000
17.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5800
0.00
6.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
13.0000
0.00
6.0000
4.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.7500
3.7500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.01.01
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
01.01.02.04
01.01.02.05
01.01.02.06
01.01.02.07
01.01.02.08
01.01.02.09
01.01.02.10
01.01.02.11
01.01.02.12
01.01.02.13
01.01.02.14
01.01.02.15
01.01.02.16
01.01.02.17
01.01.02.18
01.01.02.19
01.01.02.20
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.03.04
01.01.03.05
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.04.04
01.01.05
01.01.05.01
01.01.06
01.01.06.01
01.01.06.02
01.02
01.02.01
01.02.01.01
01.02.02
01.02.02.01
und
Metrado
01.02.03
01.02.03.01
01.02.03.02
01.02.03.03
01.02.03.04
01.02.03.05
01.02.03.06
01.02.03.07
01.02.04
01.02.04.01
01.02.04.02
01.02.05
01.02.05.01
01.02.05.02
01.02.05.03
01.02.05.04
01.02.06
01.02.06.01
01.02.06.02
01.01.07
01.01.07.01
01.03
01.03.01
01.03.01
01.03.02
01.03.03
01.03.02
01.03.02.01
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.04
01.03.04.01
01.03.05
01.03.05.01
01.03.05.02
01.03.06
01.03.06.01
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.01.03
01.04.02
01.04.02.01
01.04.03
01.04.03.01
01.04.03.02
01.04.03.03
01.04.04
01.04.04.01
01.04.05
01.04.05.01
01.04.05.02
01.04.06
01.04.06.01
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.02
01.05.02.01
01.05.03
01.05.03.01
01.05.04
01.05.04.01
01.05.05
01.05.05.01
01.05.06
01.05.06.01
01.06
01.06.01
01.06.01.01
01.06.01.02
01.06.01.03
01.06.02
01.06.02.01
01.06.03
01.06.03.01
01.06.03.02
01.06.04
01.06.04.01
01.06.05
01.06.05.01
01.06.05.02
01.06.05.03
01.06.06
01.06.06.01
01.06.07
01.06.07.01
01.06.07.02
OS FERMIN FITZCARRALD
N DE CONTRATO
CONTRATISTA: CONSORCIO CARLOS F. FITZCARRALD
FECHA
INSPECTOR: ING. JOSE JAVIER ANTONIO ESTREMADOYRO ALGUIAR
MONTO DE CONTRATO
FACTOR DE RELACION: 1.0000000000
PLAZO EJECUCION
P.unit
2.74
18.82
19.60
41.77
64.69
91.05
104.00
371.50
287.50
581.50
59.50
40.10
33.00
11.51
15.87
25.30
16.28
33.77
67.10
33.27
155.16
30.34
31.64
33.74
41.44
57.27
8.53
14.89
12.69
15.11
254.33
6,971.28
831.00
2.74
8.53
Parcial
232,971.30
130,492.17
2,270.09
2,270.09
106,499.51
4,537.50
2,285.36
2,610.63
18,443.12
8,986.64
7,207.20
2,229.00
14,662.50
14,537.50
10,412.50
2,245.60
1,386.00
265.88
299.94
637.56
102.56
1,614.21
422.73
8,958.28
4,654.80
5,413.54
1,941.76
2,278.08
269.92
580.16
343.62
7,421.42
1,168.61
2,985.45
333.75
2,933.61
254.33
254.33
8,633.28
6,971.28
1,662.00
90,125.42
2,476.96
2,476.96
731.02
731.02
ACUMULADO ANTERIOR
MES ACTUAL
METRADO S/.
%
METRADO
S/.
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
18.82
19.60
57.96
34.68
33.27
155.16
138.16
33.91
30.34
323.08
695.03
55.19
41.39
218.53
349.10
831.00
8.62
38.44
34.96
149.91
54.38
100.44
60.44
7.80
4.14
4.72
375.23
8.62
38.44
34.96
149.91
54.38
100.44
60.44
7.80
4.14
4.72
375.23
39,144.98
12,470.13
7,152.04
1,043.28
1,248.48
9,774.73
2,482.56
4,973.76
1,179.70
542.56
637.14
26,624.88
11,630.88
12,510.54
993.42
1,490.04
14,150.88
7,867.08
6,283.80
5,817.00
5,817.00
1,714.32
116.50
43.10
38.44
34.96
149.91
149.91
478.84
217.52
200.88
60.44
274.40
274.40
319.44
284.75
34.69
375.23
375.23
1,714.32
116.50
43.10
38.44
34.96
149.91
149.91
478.84
217.52
200.88
60.44
274.40
274.40
319.44
284.75
34.69
375.23
375.23
802.16
52.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
8.62
34.96
149.91
54.38
7.80
4.14
276.37
8.62
21.73
38.44
35.50
19.90
100.44
7.80
4.14
4.72
11.51
375.23
1,097.00
5,460.08
17.24
34.96
149.91
149.91
108.76
108.76
140.40
140.40
74.52
74.52
276.37
276.37
8,122.91
68.79
8.62
21.73
38.44
71.00
71.00
120.34
19.90
100.44
331.73
331.73
598.74
376.04
153.64
69.06
375.23
375.23
6,557.08
1,097.00
5,460.08
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
232,971.30
0.00
0.00%
0.00 0.00%
0.00
21
03
05
43
17
036-2012/GOREMAD/GGR.
S/. 23,508,980.65
(INC. IGV.)
548 DIAS CALENDARIOS
ULADO ACTUAL
%
0.00%
828.50
2,270.09
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
241.10
116.60
62.50
285.10
98.70
69.30
6.00
51.00
25.00
175.00
56.00
42.00
23.10
18.90
25.20
6.30
47.80
6.30
269.26
30.00
4,537.50
2,285.36
2,610.63
18,443.12
8,986.64
7,207.20
2,229.00
14,662.50
14,537.50
10,412.50
2,245.60
1,386.00
265.88
299.94
637.56
102.56
1,614.21
422.73
8,958.28
4,654.80
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
64.00
72.00
8.00
14.00
6.00
1,941.76
2,278.08
269.92
580.16
343.62
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
137.00
200.50
26.30
194.15
1,168.61
2,985.45
333.75
2,933.61
100.00%
100.00%
100.00%
100.00%
0.00%
1.00
254.33
100.00%
0.00%
0.00%
1.00
2.00
6,971.28
1,662.00
100.00%
100.00%
0.00%
904.00
2,476.96
100.00%
0.00%
85.70
731.02
100.00%
21 (und)
CEMENTO
SUB TOTAL A. CORRUGADO SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03 (KG)
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
662.60
364.90
18.00
36.00
293.80
16.00
36.00
12,470.13
7,152.04
1,043.28
1,248.48
9,774.73
2,482.56
4,973.76
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
16.00
21.00
542.56
637.14
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
36.00
18.00
18.00
36.00
11,630.88
12,510.54
993.42
1,490.04
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
36.00
18.00
7,867.08
6,283.80
100.00%
100.00%
0.00%
7.00
5,817.00
100.00%
0.00%
0.00%
0.00%
5.00
1.00
1.00
43.10
38.44
34.96
100.00%
100.00%
100.00%
0.00%
1.00
149.91
100.00%
0.00%
0.00%
0.00%
4.00
2.00
1.00
217.52
200.88
60.44
100.00%
100.00%
100.00%
0.00%
35.18
274.40
100.00%
0.00%
0.00%
68.78
7.35
284.75
34.69
100.00%
100.00%
0.00%
1.00
375.23
100.00%
0.00%
0.00%
0.00%
5.00
1.00
1.00
43.10
38.44
34.96
100.00%
100.00%
100.00%
0.00%
1.00
149.91
100.00%
0.00%
0.00%
0.00%
4.00
2.00
1.00
217.52
200.88
60.44
100.00%
100.00%
100.00%
0.00%
35.18
274.40
100.00%
0.00%
0.00%
68.78
7.35
284.75
34.69
100.00%
100.00%
0.00%
1.00
375.23
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
1.00
17.24
34.96
100.00%
100.00%
0.00%
1.00
149.91
100.00%
0.00%
2.00
108.76
100.00%
0.00%
18.00
140.40
100.00%
0.00%
18.00
74.52
100.00%
0.00%
1.00
276.37
100.00%
0.00%
0.00%
0.00%
1.00
1.00
1.00
8.62
21.73
38.44
100.00%
100.00%
100.00%
0.00%
2.00
71.00
100.00%
0.00%
0.00%
1.00
1.00
19.90
100.44
100.00%
100.00%
0.00%
42.53
331.73
100.00%
0.00%
0.00%
0.00%
90.83
32.55
6.00
376.04
153.64
69.06
100.00%
100.00%
100.00%
0.00%
1.00
375.23
100.00%
0.00%
0.00%
1.00
1.00
1,097.00
5,460.08
232,971.30
0.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00
0.00
ELANTO DIRECTO
013
OFRADO Y CARPINTERIA
03 (KG)
ALAMBRE DE C. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CLAVO DE C.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AFIRMADO
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05 (M3)
A. GRUESA
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
A. FINA
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TIERRA ORG.
43 (P2)
SUB TOTAL M.NACIONAL E. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
01.11
01.12
01.13
02
02.01
02.02
02.03
02.04
02.05
03
03.01
03.02
03.03
03.04
04
04.01
04.02
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
06
06.01
06.02
06.03
06.04
06.05
06.06
06.07
07
07.01
07.02
07.03
07.04
07.05
CONTRATISTA:
FACTOR DE RELACION:
und
Metrado
P.unit
REVOQUES Y ENLUCIDOS
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
184.56
21.18
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
598.75
18.14
TARRAJEO EN ESCALERA C:A 1:5 e=1.50 cm.
m2
63.27
26.50
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
736.35
26.37
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
383.23
32.75
TARRAJEO EN TAPASOL Y CANALETA C:A 1:5 e=1.50 cm.
m2
242.97
29.52
VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm.
m
339.54
12.28
TARRAJEO EN CIELORASOS C:A 1:5 e=1.50 cm
m2
610.92
25.72
BRUAS VERTICALES DE 1"
m
528.97
6.71
JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1"
m
58.12
7.34
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA ZOCALOS m2
29.16
17.52
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA MESA DE CONCRETO
m2
0.75
17.30
REVESTIMIENTO DE MUEBLE DE CONCRETO CON CERMICO DE 20X30CM
m2
COLOR CLARO
0.75
82.98
PISOS Y PAVIMENTOS
PISOS EXTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO
m2 Y BRUADO
189.65
30.42
PISOS INTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO
m2 Y BRUADO
432.11
27.76
VEREDA DE CONCRETO F'C=175 KG/CM2 h=0.10m, ACABADO SEMIPULIDOm2
Y BRUADO
58.91(INC. 57.83
UA LATERAL DE PROTECCIO
JUNTAS DE DILATACIN HORIZONTAL + SELLO ASFALTICO e=1" c/4m
m
32.98
13.61
PISO DE CERAMICO DE 30X30CM COLOR CLARO
m2
26.59
68.57
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIOR m m
157.03
13.95
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR
m
42.02
7.71
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR
m
244.81
7.71
ZOCALO DE CERMICO DE 20X30 COLOR CLARO
m2
29.16
62.11
CARPINTERIA DE MADERA
PUERTA DE MADERA QUINILLA MACHIHEMBRADA CON CRISTAL REFLECTIVO
m2 6mm,23.33
ACERO250.00
LISO DE 1/2" +MARCO (INC. SEL
PUERTA DE MADERA QUINILLA MACHIHEMBRADA + MARCO (INC. SELLADO
m2Y BARNIZADO
2.00
350.00
CARPINTERIA METALICA Y ALUMINIO
VENTANA DE ALUMINIO, CON VIDRIOS PAVONADO E INCOLORO DE 6 mm Y
m2BARRAS
132.47
DE SEGURIDAD
180.00
DE ACERO LISO 1/2"
PUERTA DE ALUMINIO, CON POLICARBONATO ALVEOLAR TRASLUCIDO DE
m2
8 MM SOBRE
3.15 ELEVADA
300.00 DE 0.30 M
BARANDA DE ESCALERA DE TUBO F G. DE 2"x2mm SEGUN DISEO (INC.
m 2 MANOS
18.70
DE PINTURA
190.00 ESMALTE Y ANTICORRO
BARANDA METALICA H=0.60m, TUBO DE FIERRO 2"X2"X3mm, 2"x1"x3mm Y BARRAS
m
DE
28.81
SEGURIDAD
150.00 DE ACERO LISO 1/2" (IN
CELOSIA METLICA H=65 m, CON TUBOS DE FIERRO DE 2"X2"X3mm, 2"x1"x3mm
m
(INC.2.00
2 MANOS
100.00
DE PINTURA ESMALTE Y ANT
SUMINISTRO Y COLOCACION DE CANTONERA DE ALUMINIO DE 2" X 1.20 Mm(SEGN48.00
DETALLES)
38.32
PROTECCION Y SUJECION PARA EXTREMO DE CUBIERTA CON CUMBRERA
mTERMOACUSTICA
29.50
62.06
Y ANGULO DE 2"x2"x2mm (INC
CERRAJERIA
BISAGRA DE BRONCE ALUMINIZADAS DE 4"
und
94.00
13.52
BISAGRA DE BRONCE ALUMINIZADAS DE 2"
und
6.00
12.52
CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA
und
5.00
90.97
CERRADURA NACIONAL DE 1 GOLPES PARA PUERTA
und
4.00
75.97
MANIJA DE BRONCE PARA PUERTAS
und
9.00
30.29
CERRADURA DE PERILLA CON SEGURIDAD PARA BAO Y OFICINAS
pza
9.00
66.93
PICAPORTE 3" PARA PUERTAS
und
12.00
11.39
PINTURA
PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS
m2
161.15
8.65
PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS
m2
598.75
7.96
PINTURA EN ESCALERA AL LATEX SATINADO 2 MANOS
m2
24.72
9.04
PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS
m2
736.35
9.25
PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS
m2
383.23
9.24
07.06
07.07
07.08
08
08.01
Parcial
80,032.27
3,908.98
10,861.33
1,676.66
19,417.55
12,550.78
7,172.47
4,169.55
15,712.86
3,549.39
426.60
510.88
12.98
62.24
23,443.43
5,769.15
11,995.37
3,406.77
448.86
1,823.28
6,213.16
2,190.57
323.97
1,887.49
1,811.13
6,532.50
5,832.50
700.00
36,534.23
23,844.60
945.00
3,553.00
4,321.50
200.00
1,839.36
1,830.77
3,116.39
1,270.88
75.12
454.85
303.88
272.61
602.37
136.68
23,972.52
1,393.95
4,766.05
223.47
6,811.24
3,541.05
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
MES ACTUAL
S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
1,461.41
1,285.09
4,490.26
28,900.03
28,900.03
208,744.53
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00%
0.00
0.00%
0.00%
0.00
0.00%
IN
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
(INC. IGV.)
21
03
05
43
17
21 (und)
CEMENTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
184.56
598.75
63.27
736.35
383.23
242.97
339.54
610.92
528.97
58.12
29.16
0.75
0.75
3,908.98
10,861.33
1,676.66
19,417.55
12,550.78
7,172.47
4,169.55
15,712.86
3,549.39
426.60
510.88
12.98
62.24
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.1500
0.1500
0.1800
0.1170
0.1170
0.1500
0.0400
0.1500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
189.65
432.11
58.91
32.98
26.59
5,769.15
11,995.37
3,406.77
448.86
1,823.28
100.00%
100.00%
100.00%
100.00%
100.00%
0.4850
0.4550
1.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
157.03
42.02
244.81
29.16
2,190.57
323.97
1,887.49
1,811.13
100.00%
100.00%
100.00%
100.00%
0.0640
0.0180
0.0180
0.1870
0.00
0.00
0.00
0.00
0.00%
0.00%
23.33
2.00
5,832.50
700.00
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
132.47
3.15
18.70
28.81
2.00
48.00
29.50
23,844.60
945.00
3,553.00
4,321.50
200.00
1,839.36
1,830.77
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
94.00
6.00
5.00
4.00
9.00
9.00
12.00
1,270.88
75.12
454.85
303.88
272.61
602.37
136.68
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
161.15
598.75
24.72
736.35
383.23
1,393.95
4,766.05
223.47
6,811.24
3,541.05
100.00%
100.00%
100.00%
100.00%
100.00%
0.1170
0.1170
0.1200
0.1870
0.0200
0.0300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
171.93
325.34
610.92
1,461.41
1,285.09
4,490.26
100.00%
100.00%
100.00%
0.00
0.00
0.00%
407.10
28,900.03
100.00%
0.00
0.00%
208,744.53
100.00%
A. CORRUGADO
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.6000
0.0400
0.0400
0.0400
0.0300
0.0300
0.0400
0.0200
0.0400
SUB TOTAL
0.0100
0.0100
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PIEDRA S. 1/2"
0.0270
0.0270
SUB TOTAL
HORMIGON
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1200
05 (M3)
A. GRUESA
SUB TOTAL
0.0210
0.0300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0250
0.0250
0.0180
0.0180
0.0250
0.0065
0.0250
0.00
0.00
0.00
0.00
0.00
0.0090
0.0080
0.0140
0.0120
0.0260
0.0090
0.0200
0.0200
0.2000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0100
0.0100
A. FINA
0.0160
0.0160
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
TIERRA ORG.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
M.NACIONAL E. SUB TOTAL
0.6500
0.5800
0.5800
0.5200
0.5200
0.5800
0.1270
0.5800
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5800
0.5000
0.9860
0.0560
0.0560
0.0560
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
01.03
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.03.02
04.03.03
04.04
04.04.01
04.04.02
04.04.03
04.05
04.05.01
04.05.02
04.05.03
04.06
04.06.01
04.06.02
04.06.03 .
04.07
04.07.01
04.07.02
04.07.03
04.07.04
CONTRATISTA:
INSPECTOR:
FACTOR DE RELACION:
P.unit
Parcial
TRABAJOS PRELIMINARES
3,725.09
LIMPIEZA DE TERRENO MANUAL
m2
505.44
1.12
566.09
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
505.44
4.18
2,112.74
COLOCACION DE NIVELES DURANTE LA OBRA
m2
505.44
2.07
1,046.26
MOVIMIENTO DE TIERRAS
40,146.83
NIVELACION DE TERRENO
m2
505.44
2.49
1,258.55
EXCAVACION DE ZANJAS
m3
539.41
33.34
17,983.93
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
395.79
23.67
9,368.35
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES
m3
Dprom=30M
305.44
17.00
5,192.48
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA
m3VOLQUETE
305.44
15M3 V=30KM/h
7.91 D=3KM
2,416.03
NIVELACION Y APISONADO PARA FALSO PISO O PISO m2
399.95
2.18
871.89
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
40.00
76.39
3,055.60
OBRAS DE CONCRETO SIMPLE
49,495.86
FALSA ZAPATA, CONCRETO F'C= 100 KG/CM2
m3
117.26
264.22
30,982.44
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
7.19
303.68
2,183.46
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
399.95
40.83
16,329.96
OBRAS DE CONCRETO ARMADO
501,272.25
ZAPATAS
77,538.99
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
144.25
349.47
50,411.05
ZAPATAS, ACERO FY=4200KG/CM2
kg
5,616.55
4.83
27,127.94
VIGAS DE CIMENTACION
18,146.70
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2m3
13.24
371.88
4,923.69
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
88.75
54.27
4,816.46
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
1,649.45
4.96
8,181.27
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO
m2
(TECNOPORT)
13.37
16.85
225.28
SOBRECIMIENTOS REFORZADOS
20,398.42
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175m3
KG/CM2 21.54
401.74
8,653.48
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 2 m2
178.77
31.61
5,650.92
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
1,162.98
5.24
6,094.02
COLUMNAS
94,096.89
COLUMNAS, CONCRETO F'C=210 KG/CM2
m3
48.28
507.07
24,481.34
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
543.79
56.37
30,653.44
COLUMNAS, ACERO FY=4200 KG/CM2
kg
7,715.27
5.05
38,962.11
PLACA
72,277.57
PLACAS, CONCRETO F'C= 210 KG/CM2
m3
43.18
563.42
24,328.48
PLACA, ENCOFRADO Y DESENCOFRADO
m2
419.51
66.25
27,792.54
PLACA, ACERO FY=4200 KG/CM2.
kg
4,088.55
4.93
20,156.55
VIGAS
91,737.53
VIGAS, CONCRETO F'C=210 KG/CM2
m3
56.77
391.02
22,198.21
VIGAS, ENCOFRADO Y DESENCOFRADO
m2
622.82
59.62
37,132.53
VIGAS, ACERO FY=4200 KG/CM2
kg
6,613.63
4.90
32,406.79
LOSA ALIGERADA
75,196.10
LOSA ALIGERADA, CONCRETO F'C=210 KG/CM2
m3
62.63
395.53
24,772.04
LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO m2
314.89
45.20
14,233.03
LOSA ALIGERADA, ACERO FY=4200 KG/CM2.
kg
3,503.92
4.72
16,538.50
LOSA ALIGERADA, LADRILLO DE CONCRETO PARA TECHO
und DE 20X30X15
3,482.00
2.69
9,366.58
04.07.05
04.08
04.08.01
04.08.02
04.08.03
04.09
04.09.01
04.09.02
04.09.03
04.1
04.10.01
04.10.02
04.10.03
04.10.04
04.11
04.11.01
04.11.02
04.11.03
04.12
04.12.01
04.12.02
04.12.03
05
05.01
05.02
S FERMIN FITZCARRALD
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
ACUMULADO ANTERIOR
METRADO
S/.
METRADO
MES ACTUAL
S/.
ACUMULADO ACTUAL
METRADO
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00%
INDICE DE ANA
DE CONTRATO
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ONTO DE CONTRATO
AZO EJECUCION
ACUMULADO ACTUAL
S/.
(INC. IGV.)
21
03
05
43
17
21 (und)
CEMENTO
SUB TOTAL
0.00
0.00
0.00
0.00%
0.00%
0.00%
505.44
505.44
505.44
566.09
2,112.74
1,046.26
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
505.44
539.41
395.79
305.44
305.44
399.95
40.00
1,258.55
17,983.93
9,368.35
5,192.48
2,416.03
871.89
3,055.60
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
117.26
7.19
399.95
30,982.44
2,183.46
16,329.96
100.00%
100.00%
100.00%
5.5000
6.5000
0.6500
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
144.25
5,616.55
50,411.05
27,127.94
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
13.24
88.75
1,649.45
13.37
4,923.69
4,816.46
8,181.27
225.28
100.00%
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
21.54
178.77
1,162.98
8,653.48
5,650.92
6,094.02
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
48.28
543.79
7,715.27
24,481.34
30,653.44
38,962.11
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
43.18
419.51
4,088.55
24,328.48
27,792.54
20,156.55
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
56.77
622.82
6,613.63
22,198.21
37,132.53
32,406.79
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
62.63
314.89
3,503.92
3,482.00
24,772.04
14,233.03
16,538.50
9,366.58
100.00%
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4,377.00
10,285.95
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.74
4.93
35.01
289.07
219.34
165.25
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.16
45.39
595.64
2,897.79
3,636.65
2,894.81
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
15.63
252.76
2,446.44
38.00
5,961.91
11,662.35
11,669.52
785.08
100.00%
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
5.51
67.35
620.69
1,817.47
3,630.84
3,041.38
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.06
22.99
95.32
767.80
1,731.61
709.18
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
57.98
293.44
5,286.62
43,440.86
100.00%
100.00%
0.2180
0.4100
0.00
0.00
0.00%
643,367.51
100.00%
0.00
0.00
A. CORRUGADO
1.0500
1.0500
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
SUB TOTAL
PIEDRA S. 1/2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.00
0.00
0.00
0.00
0.6500
0.00
0.00
0.00
0.00
0.00
0.00
0.0600
0.3000
0.0500
0.00
0.00
0.00
0.00
0.0036
0.0100
0.0100
0.1500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.2700
0.0600
0.1500
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
1.0700
0.00
0.00
0.00
0.00
0.1100
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.0600
0.00
0.00
0.00
0.3000
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.0800
0.0600
0.1000
1.0700
0.00
0.00
0.00
0.3000
0.0600
0.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
1.0500
2.1300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6000
0.4500
0.4500
0.2000
1.0700
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
0.00
0.00
0.0200
0.0220
0.00
0.00
0.00
0.00
0.00
0.1700
0.00
SUB TOTAL
HORMIGON
SUB TOTAL
05 (M3)
A. GRUESA
SUB TOTAL
A. FINA
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.3500
1.3500
0.1250
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5400
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.3100
0.0580
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TIERRA ORG.
SUB TOTAL
0.00
0.00
0.00
43 (P2)
M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.1000
5.4700
0.00
0.00
0.00
4.8300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.4700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.1500
1.0500
0.00
0.00
1.0500
0.00
0.00
0.00
0.00
6.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.7400
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
0.00
0.00
4.9700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.2400
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5800
0.5800
0.00
0.00
0.00
0.00
39.0000
66.0000
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.03
01.03.01
01.03.02
01.03.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.06
01.06.01
01.06.02
01.06.03
01.06.04
01.07
01.07.01
01.07.02
01.07.03
01.07.04
01.07.05
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.04.02
02.04.03
02.04.04
und
m
m
m
m
m
m3
m
m
m
und
und
pto
pto
pto
pto
und
und
und
und
pza
pza
pza
pza
pza
m
m
m
m
m
m3
m
m
m
pto
pto
pto
pto
02.04.05
02.04.06
02.04.07
02.04.08
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
02.05.08
03
03.01
03.02
03.03
pto
pza
pza
und
pza
pza
pza
und
und
und
pza
pza
m
pza
pza
N DE CONTRATO
CONTRATISTA: CONSORCIO CARLOS F. FITZCARRALD
FECHA
INSPECTOR: ING. JOSE JAVIER ANTONIO ESTREMADOYRO ALGUIAR
MONTO DE CONTRATO
FACTOR DE RELACION: 1.0000000000
PLAZO EJECUCION
Metrado
P.unit
21.85
2.83
21.85
21.85
21.85
21.85
1.28
50.02
1.61
1.98
29.51
18.19
3.00
18.85
21.85
6.47
5.42
1.34
2.00
3.00
91.92
83.62
3.00
2.00
1.00
1.00
69.27
69.27
83.85
68.28
2.00
10.00
1.00
4.00
21.77
14.65
33.31
32.31
3.00
2.00
1.00
1.00
7.00
215.05
287.00
185.00
435.00
70.08
18.80
2.83
18.80
18.80
18.80
18.80
1.10
50.02
1.61
1.98
29.51
18.19
13.30
5.50
18.80
10.69
9.79
1.55
3.00
2.00
1.00
1.00
92.73
84.60
83.85
58.85
Parcial
5,667.63
61.84
61.84
1,839.45
1,092.94
35.18
43.26
644.79
23.28
150.86
19.41
102.17
29.28
434.70
183.84
250.86
498.48
207.81
138.54
83.85
68.28
352.59
43.54
146.50
33.31
129.24
2,329.71
645.15
574.00
185.00
435.00
490.56
5,345.54
53.20
53.20
1,582.67
940.38
30.27
37.22
554.79
20.01
225.17
142.18
53.85
29.14
3,040.90
278.19
169.20
83.85
58.85
ACUMULADO ANTERIOR
MES ACTUAL
METRADO S/.
%
METRADO
S/.
ACUMULADO ACTUAL
METRADO
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
18.00
1.00
2.00
3.00
115.88
53.43
66.43
59.56
3.00
2.00
4.00
1.00
4.00
1.00
2.00
1.00
26.84
28.39
14.47
38.01
35.72
24.45
13.16
16.76
85.04
16.00
2.00
72.70
33.45
242.05
2,085.84
53.43
132.86
178.68
443.60
80.52
56.78
57.88
38.01
142.88
24.45
26.32
16.76
7,201.71
6,182.41
535.20
484.10
18,214.88
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00 0.00%
0.000 0.00%
INDICE DE ANALIS
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
MONTO DE CONTRATO
PLAZO EJECUCION
ACUMULADO ACTUAL
S/.
(INC. IGV.)
21
03
05
43
17
21 (und)
CEMENTO
SUB TOTAL
0.00
0.00%
21.85
61.84
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
21.85
21.85
21.85
21.85
1.28
1,092.94
35.18
43.26
644.79
23.28
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
3.00
18.85
21.85
19.41
102.17
29.28
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
3.00
183.84
250.86
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
3.00
2.00
1.00
1.00
207.81
138.54
83.85
68.28
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
2.00
10.00
1.00
4.00
43.54
146.50
33.31
129.24
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
3.00
2.00
1.00
1.00
7.00
645.15
574.00
185.00
435.00
490.56
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.80
53.20
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
18.80
18.80
18.80
18.80
1.10
940.38
30.27
37.22
554.79
20.01
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
13.30
5.50
18.80
142.18
53.85
29.14
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
3.00
2.00
1.00
1.00
278.19
169.20
83.85
58.85
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
18.00
1.00
2.00
3.00
2,085.84
53.43
132.86
178.68
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.00
2.00
4.00
1.00
4.00
1.00
2.00
1.00
80.52
56.78
57.88
38.01
142.88
24.45
26.32
16.76
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
85.04
16.00
2.00
6,182.41
535.20
484.10
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00
18,214.88
100.00%
1.4000
0.00
A. CORRUGADO
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PIEDRA S. 1/2"
11.7500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
HORMIGON
SUB TOTAL
05 (M3)
A. GRUESA
SUB TOTAL
A. FINA
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2000
0.1100
0.00
TIERRA ORG.
SUB TOTAL
43 (P2)
M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.0000
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.02
01.02.01
01.03
01.03.01
01.04
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.05
01.05.01
01.05.02
01.06
01.06.01
01.06.02
01.07
01.07.01
01.08
01.01.10.07
01.01.10.09
01.09
01.01.11.01
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
02.01.06
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.03
02.03.01
02.03.02
P.unit
02.04
02.04.01
02.04.02
02.04.03
PTO
PTO
Glb
6.00
1.00
2.00
27.74
26.42
901.43
OS FERMIN FITZCARRALD
N DE CONTRATO
CONTRATISTA: CONSORCIO CARLOS F. FITZCARRALD
FECHA
INSPECTOR: ING. JOSE JAVIER ANTONIO ESTREMADOYRO ALGUIAR
MONTO DE CONTRATO
FACTOR DE RELACION: 1.0000000000
PLAZO EJECUCION
Parcial
31,090.39
1,656.50
543.06
211.98
576.60
69.92
254.94
2,094.50
2,094.50
149.91
149.91
8,503.43
6,258.42
166.50
1,281.96
697.98
98.57
4,905.75
54.93
4,850.82
7,009.65
3,632.02
3,377.63
3,517.39
3,517.39
2,422.26
1,230.89
1,191.37
831.00
831.00
5,376.23
2,205.59
282.05
624.75
939.51
187.98
92.25
79.05
843.61
163.80
38.64
421.26
219.91
331.31
95.90
235.41
ACUMULADO ANTERIOR
MES ACTUAL
METRADO S/.
%
METRADO S/.
%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
ACUMULADO ACTUAL
METRADO
S/.
1,995.72
166.44
26.42
1,802.86
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
36,466.62
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00%
(INC. IGV.)
21
03
05
43
17
21 (und)
CEMENTO
SUB TOTAL A. CORRUGADO SUB TOTAL
63.00
6.00
15.00
2.00
6.00
543.06
211.98
576.60
69.92
254.94
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59.00
2,094.50
100.00%
0.00
0.00
1.00
149.91
100.00%
0.00
0.00
42.00
2.00
18.00
6.00
1.00
6,258.42
166.50
1,281.96
697.98
98.57
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
621.90
54.93
4,850.82
100.00%
100.00%
0.00
0.00
0.00
0.00
877.30
715.60
3,632.02
3,377.63
100.00%
100.00%
0.00
0.00
0.00
0.00
23.00
3,517.39
100.00%
0.00
0.00
1.00
1.00
1,230.89
1,191.37
100.00%
100.00%
0.00
0.00
0.00
0.00
1.00
831.00
100.00%
0.00
0.00
79.90
15.00
80.30
24.10
15.00
24.10
282.05
624.75
939.51
187.98
92.25
79.05
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
12.00
71.40
71.40
163.80
38.64
421.26
219.91
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
39.90
95.90
235.41
100.00%
100.00%
0.00
0.00
0.00
0.00
03 (KG)
6.00
1.00
2.00
166.44
26.42
1,802.86
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
36,466.62
100.00%
0.00
0.00
DELANTO DIRECTO
2013
OFRADO Y CARPINTERIA
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AFIRMADO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
05 (M3)
A. GRUESA
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
01.11
01.12
01.13
02
02.01
02.02
02.03
02.04
02.05
03
03.01
03.02
03.03
03.04
04
04.01
04.02
04.03
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
05.08
06
06.01
06.02
06.03
06.04
06.05
06.06
07
07.01
07.02
07.03
07.04
07.05
und
REVOQUES Y ENLUCIDOS
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
TARRAJEO EN ESCALERA C:A 1:5 e=1.50 cm.
m2
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
TARRAJEO EN TAPASOL Y CANALETA C:A 1:5 e=1.50 cm.
m2
VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm.
m
TARRAJEO EN CIELORASOS C:A 1:5 e=1.50 cm
m2
BRUAS VERTICALES DE 1"
m
JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1"
m
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA ZOCALOS
m2
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA MESA DE CONCRETO
m2
REVESTIMIENTO DE MUEBLE DE CONCRETO CON CERMICO DE 20X30CM COLOR CLARO
m2
PISOS Y PAVIMENTOS
PISOS EXTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO Y BRUADO
m2
PISOS INTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO Y BRUADO
m2
VEREDA DE CONCRETO F'C=175 KG/CM2 h=0.10m, ACABADO SEMIPULIDO Y BRUADO (INC. UA
m2LATERAL DE PROTECCIO
JUNTAS DE DILATACIN HORIZONTAL + SELLO ASFALTICO e=1" c/4m
m
PISO DE CERAMICO DE 30X30CM COLOR CLARO
m2
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIOR m
m
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR
m
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR
m
ZOCALO DE CERMICO DE 20X30 COLOR CLARO
m2
CARPINTERIA DE MADERA
PUERTA DE MADERA QUINILLA MACHIHEMBRADA CON CRISTAL REFLECTIVO 6mm, ACERO LISO
m2DE 1/2" +MARCO (INC. SEL
PUERTA DE MADERA QUINILLA MACHIHEMBRADA + MARCO (INC. SELLADO Y BARNIZADO
m2
BORDE DE MADERA QUINILLA DE 8"x1" EN PISO A DESNIVEL (INC. ACABADO BARNIZ DD)
m
CARPINTERIA METALICA Y ALUMINIO
VENTANA DE ALUMINIO, CON VIDRIOS PAVONADO E INCOLORO DE 6 mm Y BARRAS DE SEGURIDAD
m2
DE ACERO LISO 1/2"
PUERTA DE ALUMINIO, CON POLICARBONATO ALVEOLAR TRASLUCIDO DE 8 MM SOBRE ELEVADA
m2 DE 0.30 M
BARANDA DE ESCALERA DE TUBO F G. DE 2"x2mm SEGUN DISEO (INC. 2 MANOS DE PINTURA
m ESMALTE Y ANTICORRO
BARANDA METALICA H=0.60m, TUBO DE FIERRO 2"X2"X3mm, 2"x1"x3mm Y BARRAS DE SEGURIDAD
m DE ACERO LISO 1/2" (IN
CELOSIA METLICA H=65 m, CON TUBOS DE FIERRO DE 2"X2"X3mm, 2"x1"x3mm (INC. 2 MANOS DE
m PINTURA ESMALTE Y ANT
SUMINISTRO Y COLOCACION DE CANTONERA DE ALUMINIO DE 2" X 1.20 M (SEGN DETALLES) m
PROTECCION Y SUJECION PARA EXTREMO DE CUBIERTA CON CUMBRERA TERMOACUSTICA YmANGULO DE 2"x2"x2mm (INC
SUMINISTRO Y COLOCACION DE TAPAJUNTA DE ALUMINIO PESADO DE 88.9 MM X 6.40 MM
m
CERRAJERIA
BISAGRA DE BRONCE ALUMINIZADAS DE 4"
und
BISAGRA DE BRONCE ALUMINIZADAS DE 2"
und
CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA
und
CERRADURA NACIONAL DE 1 GOLPES PARA PUERTA
und
MANIJA DE BRONCE PARA PUERTAS
und
PICAPORTE 3" PARA PUERTAS
und
PINTURA
PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS
m2
PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS
m2
PINTURA EN ESCALERA AL LATEX SATINADO 2 MANOS
m2
PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS
m2
PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS
m2
07.06
07.07
07.08
08
08.01
Metrado
P.unit
319.16
782.85
52.61
1,170.28
631.27
463.03
495.08
1,013.77
882.79
107.72
114.24
6.26
6.26
21.18
18.14
26.50
26.37
32.75
29.52
12.28
25.72
6.71
7.34
17.52
17.30
82.98
332.90
692.15
95.65
48.98
51.43
30.42
27.76
57.83
13.61
68.57
223.88
60.25
380.43
114.24
13.95
7.71
7.71
62.11
42.77
10.01
79.64
250.00
350.00
15.00
243.10
10.50
18.70
49.86
2.00
48.00
54.75
39.12
180.00
300.00
190.00
150.00
100.00
38.32
62.06
20.00
108.00
10.00
11.00
5.00
16.00
22.00
13.52
12.52
90.97
75.97
30.29
11.39
277.01
778.97
19.39
1,170.25
631.27
8.65
7.96
9.04
9.25
9.24
Parcial
129,055.05
6,759.81
14,200.90
1,394.17
30,860.28
20,674.09
13,668.65
6,079.58
26,074.16
5,923.52
790.66
2,001.48
108.30
519.45
39,065.52
10,126.82
19,214.08
5,531.44
666.62
3,526.56
13,616.23
3,123.13
464.53
2,933.12
7,095.45
15,390.60
10,692.50
3,503.50
1,194.60
64,159.55
43,758.00
3,150.00
3,553.00
7,479.00
200.00
1,839.36
3,397.79
782.40
3,701.10
1,460.16
125.20
1,000.67
379.85
484.64
250.58
37,595.41
2,396.14
6,200.60
175.29
10,824.81
5,832.93
ACUMULADO ANTERIOR
METRADO
S/.
%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
METRADO
S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
331.17
480.88
1,013.77
8.50
3.95
7.35
684.38
70.99
2,814.95
1,899.48
7,451.21
48,584.14
48,584.14
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
351,167.60
0.00 0.00%
0.00 0.00%
INDICE DE ANALISIS DE PR
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65 (INC. IGV.)
: 548 DIAS CALENDARIOS
ONTO DE CONTRATO
ACUMULADO ACTUAL
METRADO
S/.
%
21
03
05
43
17
21 (und)
CEMENTO
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
319.16
782.85
52.61
1,170.28
631.27
463.03
495.08
1,013.77
882.79
107.72
114.24
6.26
6.26
6,759.81
14,200.90
1,394.17
30,860.28
20,674.09
13,668.65
6,079.58
26,074.16
5,923.52
790.66
2,001.48
108.30
519.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.1500
0.1500
0.1800
0.1170
0.1170
0.1500
0.0400
0.1500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
332.90
692.15
95.65
48.98
51.43
10,126.82
19,214.08
5,531.44
666.62
3,526.56
100.00%
100.00%
100.00%
100.00%
100.00%
0.0485
0.4550
1.0200
0.1870
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
223.88
60.25
380.43
114.24
3,123.13
464.53
2,933.12
7,095.45
100.00%
100.00%
100.00%
100.00%
0.0640
0.0180
0.0180
0.1870
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
42.77
10.01
79.64
10,692.50
3,503.50
1,194.60
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
243.10
10.50
18.70
49.86
2.00
48.00
54.75
39.12
43,758.00
3,150.00
3,553.00
7,479.00
200.00
1,839.36
3,397.79
782.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
108.00
10.00
11.00
5.00
16.00
22.00
1,460.16
125.20
1,000.67
379.85
484.64
250.58
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
277.01
778.97
19.39
1,170.25
631.27
2,396.14
6,200.60
175.29
10,824.81
5,832.93
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.1170
0.1170
0.1200
0.0200
0.0300
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
331.17
480.88
1,013.77
2,814.95
1,899.48
7,451.21
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00 0.00%
684.38
48,584.14
100.00%
0.00
351,167.60
100.00%
0.00
0.00 0.00%
A. CORRUGADO
0.5000
0.6000
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
0.0400
0.0400
0.0400
0.0300
0.0300
0.0400
0.2000
0.0400
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0100
0.0100
0.0600
PIEDRA S. 1/2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0270
0.0270
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
HORMIGON
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1200
05 (M3)
A. GRUESA
SUB TOTAL
0.0210
0.0300
A. FINA
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0250
0.0250
0.0180
0.0180
0.0250
0.0650
0.0250
0.0160
0.0160
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0900
0.0080
0.0140
0.0120
0.0250
0.00
0.00
0.00
0.00
0.00
0.0090
0.0200
0.0200
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0100
0.0100
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TIERRA ORG.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
M.NACIONAL E. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.7500
0.5800
0.5800
0.5200
0.5200
0.5800
0.1270
0.5800
17 (und)
LADRILLO A. SUB TOTAL
0.5800
0.5000
0.9860
0.1560
0.1560
0.1560
0.00
0.00
0.00
0.00
0.00
2.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
01.03
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.03.02
04.03.03
04.04
04.04.01
04.04.02
04.04.03
04.05
04.05.01
04.05.02
04.05.03
04.06
04.06.01
04.06.02
04.06.03
04.06.04
und
Metrado
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
870.00
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
870.00
COLOCACION DE NIVELES DURANTE LA OBRA
m2
870.00
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
m3
652.57
CORTE O RELLENO DE TERRENO HASTA 0.20 M DE PROFUNDIDAD SIN APISONADO
m2
792.30
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
358.18
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M
m3
350.08
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h
m3 D=3KM350.08
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m2
772.98
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
77.30
OBRAS DE CONCRETO SIMPLE
SOLADO fc=100 KG/CM2 e=10CM
m2
368.81
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
6.95
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
410.70
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
221.28
ZAPATAS, ACERO FY=4200KG/CM2
kg
8,559.61
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2
m3
58.86
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
456.04
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
2,592.95
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT)m2
19.10
SOBRECIMIENTOS REFORZADOS
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2
m3
7.29
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 2
m2
97.22
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
1,367.92
COLUMNAS
COLUMNAS, CONCRETO F'C=210 KG/CM2
m3
93.01
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
1,029.08
COLUMNAS, ACERO FY=4200 KG/CM2
kg
12,816.11
PLACA
PLACAS, CONCRETO F'C= 210 KG/CM2
m3
69.28
PLACA, ENCOFRADO Y DESENCOFRADO
m2
841.82
PLACA, ACERO FY=4200 KG/CM2.
kg
5,265.33
COLUMNETAS
COLUMNETAS, CONCRETO F'C= 175 KG/CM2
m3
18.66
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
191.42
COLUMNETAS, ACERO FY=4200 KG/CM2
kg
2,438.24
COLUMNETAS - PIN DE ARRIOSTRE VERTICAL
und
33.00
P.unit
1.12
4.18
2.07
33.34
2.50
23.67
17.00
7.91
2.18
76.39
28.91
303.68
40.83
349.47
4.83
371.88
54.27
4.96
16.85
404.49
31.61
5.24
507.07
56.37
5.05
563.42
66.25
4.93
381.44
46.14
4.77
20.66
Parcial
6,411.90
974.40
3,636.60
1,800.90
48,526.09
21,756.68
1,980.75
8,478.12
5,951.36
2,769.13
1,685.10
5,904.95
29,541.76
10,662.30
2,110.58
16,768.88
820,054.53
118,673.64
77,330.72
41,342.92
59,821.02
21,888.86
24,749.29
12,861.03
321.84
13,189.75
2,948.73
3,073.12
7,167.90
169,893.18
47,162.58
58,009.24
64,721.36
120,762.40
39,033.74
55,770.58
25,958.08
28,261.97
7,117.67
8,832.12
11,630.40
681.78
Obra
Form.
Cliente
Ubicac.
Item
04.07
04.07.01
04.07.02
04.07.03
04.08
04.08.01
04.08.02
04.08.03
04.09
04.09.01
04.09.02
04.09.03
04.09.04
04.09.05
04.10
04.10.01
04.10.02
04.10.03
04.11
04.11.01
04.11.02
04.11.03
04.12
04.12.01
04.12.02
04.12.03
04.13
04.13.01
04.13.02
04.13.03
05
05.01
05.02
Parcial
103,265.42
28,219.91
33,171.97
41,873.54
11,912.14
2,741.05
4,512.81
4,658.28
149,910.33
36,214.73
49,551.86
29,608.47
17,300.25
17,235.02
854.51
324.23
246.47
283.81
8,964.00
2,963.65
3,672.70
2,327.65
16,308.05
2,795.40
7,434.84
6,077.81
18,238.12
4,778.72
8,435.43
5,023.97
47,831.83
17,593.18
30,238.65
952,366.11
BASE DE
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
MES ACTUAL
S/.
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
870.00
870.00
870.00
974.40
3,636.60
1,800.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
870.00
870.00
870.00
974.40
3,636.60
1,800.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
652.57
792.30
100.00
350.08
0.00
0.00
0.00
21,756.68
1,980.75
2,367.00
5,951.36
0.00
0.00
0.00
100.00%
100.00%
27.92%
100.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
652.57
792.30
100.00
350.08
0.00
0.00
0.00
21,756.68
1,980.75
2,367.00
5,951.36
0.00
0.00
0.00
100.00%
100.00%
27.92%
100.00%
0.00%
0.00%
0.00%
0.00
0.00
258.18
0.00
350.08
772.98
77.30
368.81
6.95
0.00
10,662.30
2,110.58
0.00
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
368.81
6.95
0.00
10,662.30
2,110.58
0.00
100.00%
100.00%
0.00%
0.00
0.00
410.70
221.28
8,559.61
77,330.72
41,342.92
100.00%
100.00%
0.00
0.00
0.00%
0.00%
221.28
8,559.61
77,330.72
41,342.92
100.00%
100.00%
0.00
0.00
58.86
456.04
2,592.95
19.10
21,888.86
24,749.29
12,861.03
321.84
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
58.86
456.04
2,592.95
19.10
21,888.86
24,749.29
12,861.03
321.84
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
7.29
97.22
1,367.92
2,948.73
3,073.12
7,167.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
7.29
97.22
1,367.92
2,948.73
3,073.12
7,167.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
65.11
720.35
12,816.11
33,015.33
40,606.13
64,721.36
70.00%
70.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
65.11
720.35
12,816.11
33,015.33
40,606.13
64,721.36
70.00%
70.00%
100.00%
27.90
308.73
0.00
34.64
420.91
4,212.19
19,516.87
27,885.29
20,766.10
50.00%
50.00%
80.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
34.64
420.91
4,212.19
19,516.87
27,885.29
20,766.10
50.00%
50.00%
80.00%
34.64
420.91
1,053.14
0.00
0.00
2,438.24
16.50
0.00
0.00
11,630.40
340.89
0.00%
0.00%
100.00%
50.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
2,438.24
16.50
0.00
0.00
11,630.40
340.89
0.00%
0.00%
100.00%
50.00%
18.66
191.42
0.00
16.50
BASE DE
ACUMULADO ANTERIOR
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
36.09
278.20
4,272.81
14,109.96
16,585.99
20,936.77
50.00%
50.00%
50.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
36.09
278.20
4,272.81
14,109.96
16,585.99
20,936.77
50.00%
50.00%
50.00%
36.09
278.20
4,272.81
4.16
41.86
475.34
1,370.53
2,256.40
2,329.14
50.00%
50.00%
50.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.16
41.86
475.34
1,370.53
2,256.40
2,329.14
50.00%
50.00%
50.00%
4.16
41.86
475.34
45.78
548.14
3,136.49
3,215.66
0.00
18,107.36
24,775.93
14,804.23
8,650.13
0.00
50.00%
50.00%
50.00%
50.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
45.78
548.14
3,136.49
3,215.66
0.00
18,107.36
24,775.93
14,804.23
8,650.13
0.00
50.00%
50.00%
50.00%
50.00%
0.00%
45.78
548.14
3,136.49
3,215.66
7,272.16
0.42
2.77
30.07
164.07
123.24
141.91
50.60%
50.00%
50.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.42
2.77
30.07
164.07
123.24
141.91
50.60%
50.00%
50.00%
0.41
2.77
30.07
6.30
45.84
478.94
2,963.65
3,672.70
2,327.65
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.30
45.84
478.94
2,963.65
3,672.70
2,327.65
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
7.50
98.71
816.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
11.58
115.76
1,025.30
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
192.95
204.26
594,726.98
62.45%
0.00
0.00%
594,726.98
62.45%
21 (und)
CEMENTO
SUB TOTAL
A. CORRUGADO
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
SUB TOTAL
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,111.12
0.00
2,769.13
1,685.10
5,904.95
0.00%
0.00%
72.08%
0.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16,768.88
0.00%
0.00%
100.00%
0.6500
6.5000
0.6500
239.73
45.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
8.5000
1,880.88
0.00
0.00
513.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.5000
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
14,147.25
17,403.11
0.00
30.00%
30.00%
0.00%
8.5000
19,516.87
27,885.29
5,191.98
50.00%
50.00%
20.00%
8.5000
7,117.67
8,832.12
0.00
340.89
100.00%
100.00%
0.00%
50.00%
8.0000
500.31
0.00
0.00
0.00
58.32
0.00
0.00
553.44
0.00
0.00
294.44
0.00
0.00
0.00
0.00
0.00
0.00
1.0500
1.0500
0.00
8,987.59
0.00
0.00
2,722.60
0.00
0.0600
0.3000
0.0500
0.00
136.81
129.65
0.00
0.0036
0.0100
0.0100
0.1500
0.00
3.13
8.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
68.41
0.00
0.00
0.2700
0.0600
0.00
26.25
82.08
0.1500
1.0700
0.00
0.00
1,463.67
0.00
14.58
0.00
0.4500
0.0060
0.00
324.16
76.90
0.3000
1.0700
0.00
0.00
13,713.24
0.00
216.11
0.00
0.4500
0.0600
0.00
189.41
252.73
0.3000
1.0700
0.00
0.00
4,507.04
0.00
126.27
0.00
1.0500
2.1300
0.00
0.00
2,560.15
35.15
0.3000
0.0600
0.0500
0.00
0.00
146.29
0.83
0.1700
0.00
0.00
0.00
0.00
14,109.95
16,585.98
20,936.77
50.00%
50.00%
50.00%
8.5000
1,370.52
2,256.41
2,329.14
50.00%
50.00%
50.00%
8.0000
18,107.37
24,775.93
14,804.24
8,650.12
17,235.02
50.00%
50.00%
50.00%
50.00%
100.00%
8.5000
160.16
123.23
141.90
49.40%
50.00%
50.00%
8.5000
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
2,795.40
7,434.84
6,077.81
100.00%
100.00%
100.00%
8.0000
4,778.72
8,435.43
5,023.97
100.00%
100.00%
100.00%
8.5000
17,593.18
30,238.65
100.00%
100.00%
0.2180
0.4100
357,639.13
37.55%
03 (KG)
306.72
0.00
0.00
33.24
0.00
0.00
389.13
0.00
0.00
0.00
0.00
3.57
0.00
0.00
0.4500
0.0600
0.00
125.19
256.37
0.3000
1.0700
0.00
0.00
4,571.91
0.00
83.46
0.00
0.4500
0.0600
0.00
18.83
28.52
0.3000
1.0700
0.00
0.00
508.61
0.00
12.56
0.00
1.0700
0.00
0.00
3,356.04
0.00
0.00
0.1100
0.00
60.30
0.00
0.00
0.00
0.3000
0.0600
0.00
0.00
1.80
0.00
0.83
0.00
0.0800
0.0600
0.00
3.67
28.74
0.1000
1.0700
0.00
0.00
512.47
0.00
4.58
0.00
0.4500
0.4500
0.00
0.00
0.00
0.2000
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.2100
0.0600
0.00
0.00
0.00
0.2500
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
0.00
0.00
0.0200
0.0220
0.00
0.00
4,358.50
42,970.64
53.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0700
0.00
0.00
32.17
0.0600
0.00
0.00
188.19
0.00
0.00
2,529.98
598.92
PIEDRA S. 1/2"
SUB TOTAL
HORMIGON
SUB TOTAL
05 (M3)
A. GRUESA
SUB TOTAL
A. FINA
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.10
9.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1250
1.3500
0.1250
0.6500
143.83
0.00
0.00
0.00
0.5000
110.64
0.00
0.00
0.00
0.00
0.00
0.6500
38.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
38.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
4.74
0.00
0.00
0.00
0.00
0.00
0.5000
3.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
42.32
0.00
0.00
0.00
0.00
0.00
0.5000
32.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
22.52
0.00
0.00
0.00
0.00
0.00
0.5000
17.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05 (M3)
0.6500
23.46
0.00
0.00
0.00
0.00
0.00
0.5000
18.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
2.70
0.00
0.00
0.00
0.00
0.00
0.5000
2.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
29.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
22.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.27
0.00
0.00
0.00
0.00
0.00
0.5000
0.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
4.10
0.00
0.00
0.00
0.00
0.00
0.5000
3.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6000
0.00
0.00
0.00
0.00
0.00
0.00
0.5400
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.00
0.00
0.00
0.00
0.00
0.00
0.4200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0300
0.0580
0.00
0.00
0.00
0.00
0.00
0.00
311.95
55.48
248.79
0.00
0.00
43 (P2)
M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
435.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.89
2,494.54
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
0.00
469.57
0.00
0.00
0.00
0.00
4.9500
0.00
3,565.73
0.00
0.00
0.00
0.00
5.4700
0.00
2,302.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.1000
5.4700
4.9500
43 (P2)
17 (und)
4.9700
0.00
1,382.63
0.00
0.00
0.00
0.00
4.9700
0.00
208.02
0.00
0.00
0.00
0.00
0.00
2,822.92
0.00
0.00
0.00
0.00
0.00
0.00
3,376.44
0.00
5.1500
1.0500
1.0500
6.0000
0.00
16.62
0.00
0.00
0.00
0.00
5.7400
0.00
263.12
0.00
0.00
0.00
0.00
4.2400
0.00
0.00
0.00
0.00
0.00
0.00
1.1300
4.9700
0.00
0.00
0.00
0.00
0.00
0.00
0.5800
0.5800
0.00
0.00
13,966.42
39.0000
66.0000
0.00
0.00
3,376.44
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.03
01.03.01
01.03.02
01.03.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05
01.06
01.06.01
01.06.02
01.06.03
01.07
01.07.01
01.07.02
01.07.03
01.07.04
01.01.07.07
.02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.04
und
m
m
m
m
m
m3
m
m
m
und
und
pto
pto
pto
pto
pto
und
und
und
pza
pza
und
und
pza
m
m
m
m
m
m3
m
m
m
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.04.06
02.04.07
02.04.08
02.04.09
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
03
03.01
03.02
03.03
pto
pto
pto
pto
pto
pto
pto
pto
pto
pza
pza
pza
und
und
pza
pza
m
und
pza
ERMIN FITZCARRALD
CONTRATISTA: CONSORCIO CARLOS F. FITZCARRALD
INSPECTOR: ING. JOSE JAVIER ANTONIO ESTREMADOYRO ALGUIAR
FACTOR DE RELACION: 1.0000000000
Metrado
P.unit
51.00
2.83
51.00
51.00
51.00
51.00
2.99
28.58
1.61
1.98
29.51
28.58
1.00
50.00
51.00
5.15
4.10
1.34
2.00
7.00
91.92
83.62
6.00
2.00
1.00
7.00
4.00
69.27
69.27
68.28
107.78
70.08
2.00
19.00
19.00
21.77
14.65
33.81
7.00
6.00
4.00
2.00
19.00
215.05
287.00
175.12
55.00
70.08
65.00
2.83
65.00
65.00
65.00
65.00
3.81
50.02
1.61
1.98
29.51
28.58
42.50
22.50
130.00
10.69
9.79
1.55
Parcial
12,413.98
144.33
144.33
3,231.13
1,457.58
82.11
100.98
1,505.01
85.45
278.49
5.15
205.00
68.34
769.18
183.84
585.34
1,657.22
415.62
138.54
68.28
754.46
280.32
964.28
43.54
278.35
642.39
5,369.35
1,505.35
1,722.00
700.48
110.00
1,331.52
12,938.85
183.95
183.95
5,511.69
3,251.30
104.65
128.70
1,918.15
108.89
876.11
454.33
220.28
201.50
5,302.76
ACUMULADO ANTERIOR
METRADO
S/.
%
MES ACTUAL
METRADO
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
7.00
6.00
2.00
1.00
4.00
25.92
2.00
5.00
6.00
92.73
58.85
58.85
66.85
81.85
115.63
53.43
65.93
59.16
7.00
5.00
17.00
2.00
9.00
5.00
2.00
26.55
28.05
14.22
38.72
35.72
12.94
16.44
90.14
16.00
3.00
72.70
24.22
242.05
649.11
353.10
117.70
66.85
327.40
2,997.13
106.86
329.65
354.96
1,064.34
185.85
140.25
241.74
77.44
321.48
64.70
32.88
7,666.85
6,553.18
387.52
726.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
33,019.68
0.00
0.00%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
S/.
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
(INC. IGV.)
0.00
0.00%
0.00
0.00
0.00%
51.00
144.33
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
51.00
51.00
51.00
51.00
2.99
1,457.58
82.11
100.98
1,505.01
85.45
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
50.00
51.00
5.15
205.00
68.34
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
7.00
183.84
585.34
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
6.00
2.00
1.00
7.00
4.00
415.62
138.54
68.28
754.46
280.32
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.00
19.00
19.00
43.54
278.35
642.39
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
7.00
6.00
4.00
2.00
19.00
1,505.35
1,722.00
700.48
110.00
1,331.52
0.00
0.00%
0.00
0.00
0.00%
65.00
183.95
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
65.00
65.00
65.00
65.00
3.81
3,251.30
104.65
128.70
1,918.15
108.89
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
42.50
22.50
130.00
454.33
220.28
201.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.00
6.00
2.00
1.00
4.00
25.92
2.00
5.00
6.00
649.11
353.10
117.70
66.85
327.40
2,997.13
106.86
329.65
354.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.00
5.00
17.00
2.00
9.00
5.00
2.00
185.85
140.25
241.74
77.44
321.48
64.70
32.88
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
90.14
16.00
3.00
6,553.18
387.52
726.15
0.00
0.00%
0.00
0.00
0.00%
33,019.68
POR VALORIZAR
%
21 (und)
CEMENTO
SUB TOTAL
A. CORRUGADO
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
100.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
1.4000
0.00
11.7500
CLAVO DE C.
SUB TOTAL
PIEDRA S. 1/2"
SUB TOTAL
HORMIGON
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05 (M3)
A. GRUESA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2000
0.00
05 (M3)
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
SUB TOTAL
43 (P2)
M.NACIONAL E. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1200
16.0000
0.00
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.02
01.02.01
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.04
01.04.01
01.04.02
01.04.03
01.05
01.05.01
01.05.02
01.06
01.06.01
01.07
01.07.01
01.07.02
01.07.03
01.08
01.08.01
02
02.01
02.01.04
02.01.06
02.03
02.03.01
02.03.02
02.04
02.04.01
Metrado
P.unit
S FERMIN FITZCARRALD
CONSORCIO CARLOS F. FITZCARRALD
ING. JOSE JAVIER ANTONIO ESTREMADOYRO ALGUIAR
1.0000000000
Parcial
50,794.78
2,253.90
836.14
353.30
499.72
139.84
424.90
1,952.50
1,952.50
13,154.30
9,834.66
254.96
1,780.50
120.88
1,163.30
8,118.79
18.31
89.88
8,010.60
11,810.80
6,425.28
5,385.52
6,728.92
6,728.92
5,944.57
3,276.83
1,476.37
1,191.37
831.00
831.00
2,924.78
963.90
619.50
344.40
1,905.40
465.80
1,439.60
55.48
55.48
53,719.56
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
S/.
ACUMULADO ACTUAL
METRADO
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00%
INDICE DE ANALIS
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
S/.
21
03
05
43
17
(INC. IGV.)
21 (und)
CEMENTO
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
97.00
10.00
13.00
4.00
10.00
836.14
353.30
499.72
139.84
424.90
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
55.00
1,952.50
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
66.00
4.00
25.00
2.00
10.00
9,834.66
254.96
1,780.50
120.88
1,163.30
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
4.00
1,027.00
18.31
89.88
8,010.60
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1,552.00
1,141.00
6,425.28
5,385.52
100.00%
100.00%
0.00
0.00
0.00
0.00%
44.00
6,728.92
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
1.00
1.00
3,276.83
1,476.37
1,191.37
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
1.00
831.00
100.00%
0.00
0.00
0.00
0.00%
0.00%
105.00
105.00
619.50
344.40
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
34.00
244.00
465.80
1,439.60
100.00%
100.00%
0.00
0.00
0.00
0.00%
2.00
55.48
100.00%
0.00
0.00
0.00%
0.00
53,719.56
100.00%
0.00
CLAVO DE C.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AFIRMADO
SUB TOTAL
05 (M3)
A. GRUESA
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
01.11
01.12
01.13
02
02.01
02.02
02.03
02.04
02.05
03
03.01
03.02
03.03
03.04
04
04.01
04.02
04.03
und
Metrado
P.unit
Parcial
REVOQUES Y ENLUCIDOS
129,055.05
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
319.16
21.18
6,759.81
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
782.85
18.14
14,200.90
TARRAJEO EN ESCALERA C:A 1:5 e=1.50 cm.
m2
52.61
26.50
1,394.17
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
1,170.28
26.37
30,860.28
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
631.27
32.75
20,674.09
TARRAJEO EN TAPASOL Y CANALETA C:A 1:5 e=1.50 cm.
m2
463.03
29.52
13,668.65
VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm.
m
495.08
12.28
6,079.58
TARRAJEO EN CIELORASOS C:A 1:5 e=1.50 cm
m2
1,013.77
25.72
26,074.16
BRUAS VERTICALES DE 1"
m
882.79
6.71
5,923.52
JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1"
m
107.72
7.34
790.66
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA ZOCALOS
m2
114.24
17.52
2,001.48
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA MESA DE CONCRETO
m2
6.26
17.30
108.30
REVESTIMIENTO DE MUEBLE DE CONCRETO CON CERMICO DE 20X30CM COLOR
m2 CLARO 6.26
82.98
519.45
PISOS Y PAVIMENTOS
39,065.52
PISOS EXTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO m2
Y BRUADO332.90
30.42
10,126.82
PISOS INTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO Y
m2
BRUADO692.15
27.76
19,214.08
VEREDA DE CONCRETO F'C=175 KG/CM2 h=0.10m, ACABADO SEMIPULIDO Y BRUADO
m2
(INC.95.65
UA LATERAL
DE PROTECCION
DE H=0.2)
57.83
5,531.44
JUNTAS DE DILATACIN HORIZONTAL + SELLO ASFALTICO e=1" c/4m
m
48.98
13.61
666.62
PISO DE CERAMICO DE 30X30CM COLOR CLARO
m2
51.43
68.57
3,526.56
ZOCALOS Y CONTRAZOCALOS
13,616.23
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIOR m
m
223.88
13.95
3,123.13
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR
m
60.25
7.71
464.53
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR
m
380.43
7.71
2,933.12
ZOCALO DE CERMICO DE 20X30 COLOR CLARO
m2
114.24
62.11
7,095.45
CARPINTERIA DE MADERA
15,390.60
PUERTA DE MADERA QUINILLA MACHIHEMBRADA CON CRISTAL REFLECTIVO 6mm,
m2 ACERO 42.77
LISO DE 1/2"250.00
+MARCO (INC.10,692.50
SELLADO Y BARNIZAD
PUERTA DE MADERA QUINILLA MACHIHEMBRADA + MARCO (INC. SELLADO Y BARNIZADO
m2
10.01
350.00
3,503.50
BORDE DE MADERA QUINILLA DE 8"x1" EN PISO A DESNIVEL (INC. ACABADO BARNIZ
m
DD)
79.64
15.00
1,194.60
Obra
Form.
Cliente
Ubicac.
Item
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
05.08
06
06.01
06.02
06.03
06.04
06.05
06.06
07
07.01
07.02
07.03
07.04
07.05
07.06
07.07
08
08.01
351,167.60
BASE DE DATO
C
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
S/.
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
319.16
782.85
52.61
1,170.28
631.27
463.03
495.08
1,013.77
882.79
107.72
114.24
6.26
0.00
6,759.81
14,200.90
1,394.17
30,860.28
20,674.09
13,668.65
6,079.58
26,074.16
5,923.52
790.66
2,001.48
108.30
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
319.16
782.85
52.61
1,170.28
631.27
463.03
495.08
1,013.77
882.79
107.72
114.24
6.26
0.00
6,759.81
14,200.90
1,394.17
30,860.28
20,674.09
13,668.65
6,079.58
26,074.16
5,923.52
790.66
2,001.48
108.30
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.26
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
519.45
266.34
622.94
47.83
0.00
0.00
8,101.94
17,292.68
2,765.72
0.00
0.00
80.00%
90.00%
50.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
266.34
622.94
47.83
0.00
0.00
8,101.94
17,292.68
2,765.72
0.00
0.00
80.00%
90.00%
50.00%
0.00%
0.00%
66.56
69.22
47.83
48.98
51.43
2,024.88
1,921.40
2,765.72
666.62
3,526.56
67.16
48.20
304.34
0.00
936.94
371.62
2,346.49
0.00
30.00%
80.00%
80.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
67.16
48.20
304.34
0.00
936.94
371.62
2,346.49
0.00
30.00%
80.00%
80.00%
0.00%
156.72
12.05
76.09
114.24
2,186.19
92.91
586.63
7,095.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
42.77
10.01
79.64
10,692.50
3,503.50
1,194.60
BASE DE DATO
C
ACUMULADO ANTERIOR
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
243.10
10.50
18.70
49.86
2.00
48.00
54.75
39.12
43,758.00
3,150.00
3,553.00
7,479.00
200.00
1,839.36
3,397.79
782.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
108.00
10.00
11.00
5.00
16.00
22.00
1,460.16
125.20
1,000.67
379.85
484.64
250.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
277.01
778.97
19.39
1,170.25
631.27
331.17
480.88
1,013.77
2,396.14
6,200.60
175.29
10,824.81
5,832.93
2,814.95
1,899.48
7,451.21
684.38
48,584.14
100.00%
0.00
0.00%
684.38
48,584.14
100.00%
0.00
0.00
59.50%
0.00
0.00%
208,935.13
59.50%
208,935.13
142,232.47
21 (und)
CEMENTO
SUB TOTAL
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.1500
0.1500
0.1800
0.1170
0.1170
0.1500
0.0400
0.1500
20.00%
10.00%
50.00%
100.00%
100.00%
0.4850
0.4550
70.00%
20.00%
20.00%
100.00%
100.00%
100.00%
100.00%
A. CORRUGADO
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
47.87
117.43
9.47
136.92
73.86
69.45
19.80
152.07
0.00
0.00
13.37
0.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1870
129.17
283.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0640
0.0180
0.0180
0.1870
4.30
0.87
5.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1170
0.1170
0.1200
0.0400
0.0400
0.0400
0.0300
0.0300
0.0400
0.0200
0.0400
SUB TOTAL
0.0100
0.0100
0.0200
0.0600
12.77
31.31
2.10
35.11
18.94
18.52
9.90
40.55
0.00
0.00
1.14
0.06
0.00
0.00
0.00
2.87
0.00
0.00
0.0200
0.0300
03 (KG)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.6000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
40.50%
1,064.23
0.00
0.00
173.28
PIEDRA S. 1/2"
0.0270
0.0270
SUB TOTAL
HORMIGON
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.19
16.82
0.00
0.00
0.00
0.00
0.00
5.74
0.00
0.00
0.1200
05 (M3)
A. GRUESA
SUB TOTAL
0.0210
0.0300
A. FINA
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0250
0.0250
0.0180
0.0180
0.0250
0.0650
0.0250
5.59
18.69
0.00
0.00
0.00
0.0900
0.0800
0.0140
0.0120
0.0260
23.97
49.83
0.67
0.00
0.00
0.0090
0.0200
0.0020
0.0200
0.60
0.96
0.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0160
0.0160
7.98
19.57
1.32
21.07
11.36
11.58
32.18
25.34
0.00
0.00
1.83
0.10
0.00
0.00
0.00
0.00
TIERRA ORG.
05 (M3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.01
5.74
24.28
208.97
0.0100
0.0100
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
M.NACIONAL E. SUB TOTAL
0.6500
0.5800
0.5800
0.5200
0.5200
0.5800
0.1270
0.5800
0.5800
0.5000
0.9860
0.1560
0.1560
0.1560
17 (und)
LADRILLO A. SUB TOTAL
207.45
454.05
30.51
608.55
328.26
268.56
62.88
587.99
0.00
0.00
66.26
3.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
47.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.48
7.52
47.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
17 (und)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,710.95
0.00
4,441.22
0.00
0.00
0.00
2.5000
INDICE DE ANAL
Obra
Form.
Cliente
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
Ubicac.
Item
01
01.01
01.02
01.03
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.03.02
04.03.03
04.04
04.04.01
04.04.02
04.04.03
04.05
04.05.01
04.05.02
04.05.03
04.06
04.06.01
04.06.02
04.06.03
04.06.04
04.07
04.07.01
04.07.02
04.07.03
04.08
04.08.01
04.08.02
04.08.03
04.09
04.09.01
04.09.02
04.09.03
04.09.04
04.09.05
04.10
04.10.01
04.10.02
04.10.03
04.11
04.11.01
04.11.02
04.11.03
04.12
04.12.01
04.12.02
04.12.03
04.13
04.13.01
04.13.02
04.13.03
05
05.01
05.02
P.unit
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
870.00
1.12
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
870.00
4.18
COLOCACION DE NIVELES DURANTE LA OBRA
m2
870.00
2.07
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
m3
652.57
33.34
CORTE O RELLENO DE TERRENO HASTA 0.20 M DE PROFUNDIDAD SIN APISONADO
m2
792.30
2.50
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
358.18
23.67
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M
m3
350.08
17.00
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h
m3
D=3KM
350.08
7.91
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m2
772.98
2.18
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
77.30
76.39
OBRAS DE CONCRETO SIMPLE
SOLADO fc=100 KG/CM2 e=10CM
m2
368.81
28.91
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
6.95
303.68
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
410.70
40.83
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
221.28
349.47
ZAPATAS, ACERO FY=4200KG/CM2
kg
8,559.61
4.83
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2
m3
58.86
371.88
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
456.04
54.27
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
2,592.95
4.96
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT)
m2
19.10
16.85
SOBRECIMIENTOS REFORZADOS
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2
m3
7.29
404.49
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO 2
m2
97.22
31.61
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
1,367.92
5.24
COLUMNAS
COLUMNAS, CONCRETO F'C=210 KG/CM2
m3
93.01
507.07
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
1,029.08
56.37
COLUMNAS, ACERO FY=4200 KG/CM2
kg
12,816.11
5.05
PLACA
PLACAS, CONCRETO F'C= 210 KG/CM2
m3
69.28
563.42
PLACA, ENCOFRADO Y DESENCOFRADO
m2
841.82
66.25
PLACA, ACERO FY=4200 KG/CM2.
kg
5,265.33
4.93
COLUMNETAS
COLUMNETAS, CONCRETO F'C= 175 KG/CM2
m3
18.66
381.44
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
191.42
46.14
COLUMNETAS, ACERO FY=4200 KG/CM2
kg
2,438.24
4.77
COLUMNETAS - PIN DE ARRIOSTRE VERTICAL
und
33.00
20.66
VIGAS
VIGAS, CONCRETO F'C=210 KG/CM2
m3
72.17
391.02
VIGAS, ENCOFRADO Y DESENCOFRADO
m2
556.39
59.62
VIGAS, ACERO FY=4200 KG/CM2
kg
8,545.62
4.90
VIGUETAS DE ARRIOSTRE
VIGUETAS DE ARRIOSTRE, CONCRETO F'c= 175KG/CM2
m3
8.31
329.85
VIGUETAS DE ARRIOSTRE, ENCOFRADO Y DESENCOFRADO
m2
83.71
53.91
VIGA DE ARRIOSTRE, ACERO FY=4200 KG/CM2.
kg
950.67
4.90
LOSA ALIGERADA
LOSA ALIGERADA, CONCRETO F'C=210 KG/CM2
m3
91.56
395.53
LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO
m2
1,096.28
45.20
LOSA ALIGERADA, ACERO FY=4200 KG/CM2.
kg
6,272.98
4.72
LOSA ALIGERADA, LADRILLO DE CONCRETO PARA TECHO DE 20X30X15
und
6,431.32
2.69
LOSA ALIGERADA, LADRILLO DE CONCRETO PARA TECHO DE 20X30X12
und
7,272.16
2.37
LOSA MACIZA
LOSA MACIZAS, CONCRETO F'C=210 KG/CM2
m3
0.83
390.64
LOSA MACIZA, ENCOFRADO Y DESENCOFRADO
m2
5.54
44.49
LOSA MACIZA, ACERO FY=4200 KG/CM2.
kg
60.13
4.72
ESCALERAS
ESCALERAS, CONCRETO F'C=210 KG/CM2
m3
6.30
470.42
ESCALERAS, ENCOFRADO Y DESENCOFRADO
m2
45.84
80.12
ESCALERAS, ACERO FY=4200 KG/CM2.
kg
478.94
4.86
MUEBLE DE CONCRETO
MUEBLE DE CONCRETO, CONCRETO F'c= 175KG/CM2
m3
7.50
372.72
MUEBLE DE CONCRETO, ENCOFRADO Y DESENCOFRADO
m2
98.71
75.32
MUEBLE DE CONCRETO, ACERO FY=4200 KG/CM2.
kg
816.91
7.44
CANALETA DE CONCRETO EN TECHO
CANALETA DE CONCRETO EN TECHO, CONCRETO F'C=210 KG/CM2 CON ADITIVO
m3 IMPERMEABILIZANTE
11.58
412.67
CANALETA DE CONCRETO EN TECHO, ENCOFRADO Y DESENCOFRADO
m2
115.76
72.87
CANALETA DE CONCRETO EN TECHO, ACERO FY=4200 KG/CM2.
kg
1,025.30
4.90
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N8m2
C/3 HILADAS)
192.95
91.18
MURO DE CABEZA CON LADRILLO DE ARCILLA 9X13X24 (CON ALAMBRE N8 m2
C/3 HILADAS)
204.26
148.04
Parcial
6,411.90
974.40
3,636.60
1,800.90
48,526.09
21,756.68
1,980.75
8,478.12
5,951.36
2,769.13
1,685.10
5,904.95
29,541.76
10,662.30
2,110.58
16,768.88
820,054.53
118,673.64
77,330.72
41,342.92
59,821.02
21,888.86
24,749.29
12,861.03
321.84
13,189.75
2,948.73
3,073.12
7,167.90
169,893.18
47,162.58
58,009.24
64,721.36
120,762.40
39,033.74
55,770.58
25,958.08
28,261.97
7,117.67
8,832.12
11,630.40
681.78
103,265.42
28,219.91
33,171.97
41,873.54
11,912.14
2,741.05
4,512.81
4,658.28
149,910.33
36,214.73
49,551.86
29,608.47
17,300.25
17,235.02
854.51
324.23
246.47
283.81
8,964.00
2,963.65
3,672.70
2,327.65
16,308.05
2,795.40
7,434.84
6,077.81
18,238.12
4,778.72
8,435.43
5,023.97
47,831.83
17,593.18
30,238.65
PLAZO EJECUCION
ACUMULADO ANTERIOR
METRADO
S/.
%
MES ACTUAL
METRADO
S/.
(INC. IGV.)
ACUMULADO ACTUAL
METRADO
S/.
21
03
05
43
17
21 (und)
CEMENTO
SUB TOTAL
870.00
870.00
870.00
974.40
3,636.60
1,800.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
870.00
870.00
870.00
974.40
3,636.60
1,800.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
652.57
792.30
358.18
350.08
350.08
772.98
77.30
21,756.68
1,980.75
8,478.12
5,951.36
2,769.13
1,685.10
5,904.95
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
652.57
792.30
358.18
350.08
350.08
772.98
77.30
21,756.68
1,980.75
8,478.12
5,951.36
2,769.13
1,685.10
5,904.95
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
368.81
6.95
410.70
10,662.30
2,110.58
16,768.88
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
368.81
6.95
410.70
10,662.30
2,110.58
16,768.88
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.6500
6.5000
0.6500
239.73
45.18
266.96
221.28
8,559.61
77,330.72
41,342.92
100.00%
100.00%
0.00
0.00
0.00%
0.00%
221.28
8,559.61
77,330.72
41,342.92
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
8.5000
1,880.88
0.00
58.86
456.04
2,592.95
19.10
21,888.86
24,749.29
12,861.03
321.84
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
58.86
456.04
2,592.95
19.10
21,888.86
24,749.29
12,861.03
321.84
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.5000
500.31
0.00
0.00
0.00
7.29
97.22
1,367.92
2,948.73
3,073.12
7,167.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
7.29
97.22
1,367.92
2,948.73
3,073.12
7,167.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
58.32
0.00
0.00
93.01
1,029.08
12,816.11
47,162.58
58,009.24
64,721.36
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
93.01
1,029.08
12,816.11
47,162.58
58,009.24
64,721.36
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
790.59
0.00
0.00
69.28
841.82
5,265.33
39,033.74
55,770.58
25,958.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
69.28
841.82
5,265.33
39,033.74
55,770.58
25,958.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
588.88
0.00
0.00
18.66
191.42
2,438.24
33.00
7,117.67
8,832.12
11,630.40
681.78
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
18.66
191.42
2,438.24
33.00
7,117.67
8,832.12
11,630.40
681.78
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.0000
149.28
0.00
0.00
0.00
72.17
556.39
8,545.62
28,219.91
33,171.97
41,873.54
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
72.17
556.39
8,545.62
28,219.91
33,171.97
41,873.54
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
613.45
0.00
0.00
8.31
83.71
950.67
2,741.05
4,512.81
4,658.28
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.31
83.71
950.67
2,741.05
4,512.81
4,658.28
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
66.48
0.00
0.00
91.56
1,096.28
6,272.98
6,431.32
7,272.16
36,214.73
49,551.86
29,608.47
17,300.25
17,235.02
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
91.56
1,096.28
6,272.98
6,431.32
7,272.16
36,214.73
49,551.86
29,608.47
17,300.25
17,235.02
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
8.5000
778.26
0.00
0.00
0.00
0.00
0.83
5.54
60.13
324.23
246.47
283.81
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.83
5.54
60.13
324.23
246.47
283.81
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
7.06
0.00
0.00
6.30
45.84
478.94
2,963.65
3,672.70
2,327.65
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.30
45.84
478.94
2,963.65
3,672.70
2,327.65
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
53.55
0.00
0.00
7.50
98.71
816.91
2,795.40
7,434.84
6,077.81
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
7.50
98.71
816.91
2,795.40
7,434.84
6,077.81
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
60.00
0.00
0.00
11.58
115.76
1,025.30
4,778.72
8,435.43
5,023.97
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
11.58
115.76
1,025.30
4,778.72
8,435.43
5,023.97
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
98.43
0.00
0.00
192.95
204.26
17,593.18
30,238.65
100.00%
100.00%
0.00
0.00
0.00%
0.00%
192.95
204.26
17,593.18
30,238.65
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.4100
0.00
83.75
INDICE DE ANAL
Obra
Form.
Cliente
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
Ubicac.
Item
P.unit
Parcial
952,366.11
PLAZO EJECUCION
ACUMULADO ANTERIOR
952,366.09
100.00%
MES ACTUAL
0.00
(INC. IGV.)
ACUMULADO ACTUAL
0.00%
952,366.09
0.02
0.00%
21
03
05
43
17
A. CORRUGADO
1.0500
1.0500
43 (P2)
M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
435.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
110.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
29.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.89
2,494.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
3.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
0.00
469.57
0.00
0.00
0.00
0.00
60.46
0.00
0.00
0.00
0.00
0.00
0.5000
46.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
5,093.95
0.00
0.00
0.00
0.00
45.03
0.00
0.00
0.00
0.00
0.00
0.5000
34.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.4700
0.00
4,604.76
0.00
0.00
0.00
0.00
12.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
9.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
947.53
0.00
0.00
0.00
0.00
0.00
0.00
46.91
0.00
0.00
0.00
0.00
0.00
0.5000
36.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
2,765.26
0.00
0.00
0.00
0.00
540.15
0.00
0.00
0.00
0.00
0.00
0.5000
4.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
416.04
0.00
0.00
0.00
0.00
59.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
45.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,645.84
0.00
0.00
0.00
0.00
0.00
0.00
6,752.89
7,635.77
0.54
0.00
0.00
0.00
0.00
0.00
0.5000
0.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.0000
0.00
33.24
0.00
0.00
0.00
0.00
4.10
0.00
0.00
0.00
0.00
0.00
0.5000
3.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.7400
0.00
263.12
0.00
0.00
0.00
0.00
4.50
0.00
0.00
0.00
0.00
0.00
0.5400
4.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.2400
0.00
418.53
0.00
0.00
0.00
0.00
7.53
0.00
0.00
0.00
0.00
0.00
0.4200
4.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
575.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0310
0.0580
5.98
11.85
0.00
0.00
0.00
0.00
0.5800
0.5800
111.91
118.47
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.0036
0.0100
0.00
3.13
8.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46.10
9.38
51.34
0.00
0.00
0.00
0.00
513.58
0.00
0.00
0.6500
143.83
0.00
0.00
0.00
0.5000
0.00
68.41
0.00
0.00
0.6500
38.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.74
0.00
0.00
0.00
8,987.59
0.00
0.00
2,722.60
0.00
0.0600
0.3000
0.0500
0.00
136.81
129.65
0.00
0.0100
0.1500
PIEDRA S. 1/2"
0.00
0.00
1,463.67
0.00
26.25
82.08
0.00
14.58
0.00
0.6500
0.2700
0.0600
0.1500
1.0700
0.00
0.00
13,713.24
0.00
463.09
768.97
0.00
308.72
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
5,633.90
0.00
378.82
315.92
0.00
252.55
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
2,560.15
70.29
0.3000
0.0600
0.0500
0.00
57.43
146.29
1.65
0.00
32.54
0.00
0.00
0.6500
1.0500
2.1300
0.00
0.00
9,143.81
0.00
250.38
512.74
0.00
166.92
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
1,017.22
0.00
37.67
57.04
0.00
25.11
0.00
65.0000
0.4500
0.0600
0.3000
1.0700
0.00
120.59
0.00
0.00
0.00
0.6500
1.0700
05 (M3)
A. GRUESA SUB TOTAL A. FINA SUB TOTAL
SUB TOTAL
0.00
0.00
6,712.09
0.00
0.00
0.0600
0.00
0.00
376.38
0.00
0.00
0.1700
0.1100
0.00
0.00
64.34
0.00
1.66
0.00
0.6500
0.0600
0.00
0.00
3.61
0.3000
1.0700
0.00
0.00
512.47
0.00
3.67
28.74
0.00
4.58
0.00
0.6500
0.0800
0.0600
0.1000
1.0700
0.00
0.00
874.09
0.00
44.42
367.61
0.00
19.74
0.00
0.6000
0.4500
0.4500
0.2000
1.0700
0.00
24.31
1,097.07
0.2500
0.0600
0.00
28.94
61.52
0.00
0.00
0.00
0.6500
0.2100
1.0700
0.00
0.00
0.5000
0.5000
96.48
102.13
0.0200
0.0200
3.86
4.09
SUB TOTAL
HORMIGON
0.1250
1.3500
0.1250
SUB TOTAL
TIERRA ORG.
SUB TOTAL
0.5000
0.1000
5.4700
4.9500
5.1500
1.0500
1.0500
39.0000
66.0000
7,525.05
13,481.16
03 (KG)
54,596.84
4,991.83
1,042.92
967.68
106.82
43 (P2)
350.52
0.00
0.00
17 (und)
24,398.97
35,394.86
INDICE DE ANALISIS
Obra
Form.
Cliente
N DE CONTRATO
FECHA
MONTO DE CONTRATO
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
21
03
05
Ubicac.
PLAZO EJECUCION
43
17
Item
01
01.01
01.01.01
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.03
01.03.01
01.03.02
01.03.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05
01.06
01.06.01
01.06.02
01.06.03
01.07
01.07.01
01.07.02
01.07.03
01.07.04
01.01.07.07
.02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.04.06
02.04.07
02.04.08
02.04.09
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
03
03.01
03.02
03.03
und
Metrado
P.unit
51.00
2.83
m
m
m
m
m3
51.00
51.00
51.00
51.00
2.99
28.58
1.61
1.98
29.51
28.58
m
m
m
1.00
50.00
51.00
5.15
4.10
1.34
und
und
2.00
7.00
91.92
83.62
pto
pto
pto
pto
pto
6.00
2.00
1.00
7.00
4.00
69.27
69.27
68.28
107.78
70.08
und
und
und
2.00
19.00
19.00
21.77
14.65
33.81
pza
pza
und
und
pza
7.00
6.00
4.00
2.00
19.00
215.05
287.00
175.12
55.00
70.08
65.00
2.83
m
m
m
m
m3
65.00
65.00
65.00
65.00
3.81
50.02
1.61
1.98
29.51
28.58
m
m
m
42.50
22.50
130.00
10.69
9.79
1.55
pto
pto
pto
pto
pto
pto
pto
pto
pto
7.00
6.00
2.00
1.00
4.00
25.92
2.00
5.00
6.00
92.73
58.85
58.85
66.85
81.85
115.63
53.43
65.93
59.16
pza
pza
pza
und
und
pza
pza
7.00
5.00
17.00
2.00
9.00
5.00
2.00
26.55
28.05
14.22
38.72
35.72
12.94
16.44
m
und
pza
90.14
16.00
3.00
72.70
24.22
242.05
Parcial
12,413.98
144.33
144.33
3,231.13
1,457.58
82.11
100.98
1,505.01
85.45
278.49
5.15
205.00
68.34
769.18
183.84
585.34
1,657.22
415.62
138.54
68.28
754.46
280.32
964.28
43.54
278.35
642.39
5,369.35
1,505.35
1,722.00
700.48
110.00
1,331.52
12,938.85
183.95
183.95
5,511.69
3,251.30
104.65
128.70
1,918.15
108.89
876.11
454.33
220.28
201.50
5,302.76
649.11
353.10
117.70
66.85
327.40
2,997.13
106.86
329.65
354.96
1,064.34
185.85
140.25
241.74
77.44
321.48
64.70
32.88
7,666.85
6,553.18
387.52
726.15
33,019.68
ACUMULADO ANTERIOR
METRADO
S/.
%
MES ACTUAL
METRADO
S/.
ACUMULADO ACTUAL
METRADO
S/.
21 (und)
CEMENTO
SUB TOTAL
51.00
144.33
100.00%
0.00
0.00%
51.00
144.33
100.00%
0.00
0.00
0.00%
0.00
51.00
51.00
51.00
51.00
2.99
1,457.58
82.11
100.98
1,505.01
85.45
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
51.00
51.00
51.00
51.00
2.99
1,457.58
82.11
100.98
1,505.01
85.45
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
1.00
50.00
51.00
5.15
205.00
68.34
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
50.00
51.00
5.15
205.00
68.34
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
2.00
6.30
183.84
526.81
100.00%
90.00%
0.00
0.00
0.00%
0.00%
2.00
6.30
183.84
526.81
100.00%
90.00%
0.00
0.70
0.00
58.53
0.00%
10.00%
0.00
0.00
6.00
2.00
1.00
7.00
4.00
415.62
138.54
68.28
754.46
280.32
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
6.00
2.00
1.00
7.00
4.00
415.62
138.54
68.28
754.46
280.32
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
2.00
19.00
19.00
43.54
278.35
642.39
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.00
19.00
19.00
43.54
278.35
642.39
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
7.00
6.00
4.00
2.00
19.00
1,505.35
1,722.00
700.48
110.00
1,331.52
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
65.00
183.95
100.00%
0.00
0.00%
65.00
183.95
100.00%
0.00
0.00
0.00%
0.00
65.00
65.00
65.00
65.00
3.81
3,251.30
104.65
128.70
1,918.15
108.89
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
65.00
65.00
65.00
65.00
3.81
3,251.30
104.65
128.70
1,918.15
108.89
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
42.50
22.50
130.00
454.33
220.28
201.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
42.50
22.50
130.00
454.33
220.28
201.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.01
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
7.00
6.00
2.00
1.00
4.00
25.92
2.00
5.00
6.00
649.11
353.10
117.70
66.85
327.40
2,997.13
106.86
329.65
354.96
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.00
6.00
2.00
1.00
4.00
25.92
2.00
5.00
6.00
649.11
353.10
117.70
66.85
327.40
2,997.13
106.86
329.65
354.96
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
5.00
17.00
2.00
9.00
5.00
2.00
185.85
140.25
241.74
77.44
321.48
64.70
32.88
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.00
5.00
17.00
2.00
9.00
5.00
2.00
185.85
140.25
241.74
77.44
321.48
64.70
32.88
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
45.00
16.00
0.00
3,271.50
387.52
0.00
49.92%
100.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
45.00
16.00
0.00
3,271.50
387.52
0.00
49.92%
100.00%
0.00%
45.14
0.00
3.00
3,281.68
0.00
726.15
50.08%
0.00%
100.00%
23,583.96
71.42%
0.00
0.00%
23,583.96
71.42%
9,435.72
28.58%
1.4000
0.00
0.00
0.00
0.00
A. CORRUGADO
11.7500
SUB TOTAL
03 (KG)
ALAMBRE DE C.
SUB TOTAL
CLAVO DE C.
SUB TOTAL
PIEDRA S. 1/2"
SUB TOTAL
HORMIGON
SUB TOTAL
05 (M3)
A. GRUESA
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
SUB TOTAL
43 (P2)
M.NACIONAL E.
SUB TOTAL
17 (und)
LADRILLO A.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2000
0.1100
16.0000
N DE CONTRATO
FECHA
MONTO DE CONTRATO
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
Ubicac.
PLAZO EJECUCION
Item
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.02
01.02.01
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.04
01.04.01
01.04.02
01.04.03
01.05
01.05.01
01.05.02
01.06
01.06.01
01.07
01.07.01
01.07.02
01.08
01.08.01
02
02.01
02.01.04
02.01.06
02.03
02.03.01
02.03.02
02.04
02.04.01
und
Metrado
P.unit
Parcial
50,442.73
ACUMULADO ANTERIOR
METRADO
S/.
%
MES ACTUAL
METRADO
S/.
ACUMULADO ACTUAL
METRADO
S/.
%
92.15
5.00
6.50
2.00
5.00
794.33
176.65
249.86
69.92
212.45
95.00%
50.00%
50.00%
50.00%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
92.15
5.00
6.50
2.00
5.00
794.33
176.65
249.86
69.92
212.45
95.00%
50.00%
50.00%
50.00%
50.00%
55.00
1,952.50
100.00%
0.00
0.00%
55.00
1,952.50
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
66.00
4.00
25.00
2.00
10.00
1.00
4.00
924.30
18.31
89.88
7,209.54
100.00%
100.00%
90.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
4.00
924.30
18.31
89.88
7,209.54
100.00%
100.00%
90.00%
0.00
0.00
102.70
620.80
456.40
2,570.11
2,154.21
40.00%
40.00%
0.00
0.00
0.00%
0.00%
620.80
456.40
2,570.11
2,154.21
40.00%
40.00%
931.20
684.60
30.80
4,710.24
70.00%
0.00
0.00%
30.80
4,710.24
70.00%
13.20
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
105.00
0.00
619.50
0.00
100.00%
0.00%
0.00
0.00
0.00%
0.00%
105.00
0.00
619.50
0.00
27.20
244.00
372.64
1,439.60
80.00%
100.00%
0.00
0.00
0.00%
0.00%
27.20
244.00
2.00
55.48
100.00%
0.00
0.00%
2.00
22,695.23
44.99%
0.00
0.00%
43
17
21 (und)
03 (KG)
CEMENTO
SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL CLAVO DE C.
05 (M3)
SUB TOTAL PIEDRA S. 1/2" SUB TOTAL
AFIRMADO
SUB TOTAL
A. GRUESA
43 (P2)
SUB TOTAL
A. FINA
17 (und)
LADRILLO A.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,834.66
254.96
1,780.50
120.88
1,163.30
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
801.06
0.00%
0.00%
10.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,855.17
3,231.31
60.00%
60.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,018.68
30.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,476.37
1,191.37
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
831.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00%
0.00
105.00
0.00
344.40
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
372.64
1,439.60
80.00%
100.00%
6.80
0.00
93.16
0.00
20.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
55.48
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.99%
41.81
176.65
249.86
69.92
212.45
5.00%
50.00%
50.00%
50.00%
50.00%
22,695.23
4.85
5.00
6.50
2.00
5.00
21
03
05
27,747.50
55.01%
Obra
Form.
Cliente
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
01.11
01.12
02
02.01
02.02
02.03
02.04
03
03.01
03.02
03.03
04
04.01
04.02
04.03
05
05.01
05.02
05.03
05.04
05.05
05.06
05.07
06
06.01
06.02
06.03
06.04
06.05
07
07.01
07.02
07.03
07.04
07.05
07.06
07.07
07.08
08
FACTOR DE RELACION:
Metrado
P.unit
REVOQUES Y ENLUCIDOS
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
302.72
21.18
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
713.64
18.14
TARRAJEO EN ESCALERA C:A 1:5 e=1.50 cm.
m2
52.61
26.50
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
1,181.32
26.37
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
632.99
32.75
TARRAJEO EN TAPASOL Y CANALETA C:A 1:5 e=1.50 cm.
m2
463.03
29.52
VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm.
m
488.96
12.28
TARRAJEO EN CIELORASOS C:A 1:5 e=1.50 cm
m2
1,013.77
25.72
BRUAS VERTICALES DE 1"
m
935.29
6.71
JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1"
m
123.16
7.34
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA MESA m2
DE CONCRETO
39.28
17.30
REVESTIMIENTO DE MUEBLE DE CONCRETO CON CERMICO DE 20X30CM
m2
COLOR
39.28 CLARO
82.98
PISOS Y PAVIMENTOS
PISOS EXTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO
m2
334.23
Y BRUADO
30.42
PISOS INTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO
m2
754.68
Y BRUADO
27.76
VEREDA DE CONCRETO F'C=175 KG/CM2 h=0.10m, ACABADO SEMIPULIDO
m2
Y BRUADO
95.65
57.83
(INC. UA LATERAL DE PROTECCIO
JUNTAS DE DILATACIN HORIZONTAL + SELLO ASFALTICO e=1" c/4mm
48.98
13.61
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIOR
mm
225.23
13.95
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm EXTERIOR
m
60.25
7.71
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR
m
398.73
7.71
CARPINTERIA DE MADERA
PUERTA DE MADERA QUINILLA MACHIHEMBRADA CON CRISTAL REFLECTIVO
m2
34.99
6mm, ACERO
250.00LISO DE 1/2" +MARCO (INC. SEL
PUERTA DE MADERA QUINILLA MACHIHEMBRADA + MARCO (INC. SELLADO
m2
Y BARNIZADO
8.01
350.00
BORDE DE MADERA QUINILLA DE 8"x1" EN PISO A DESNIVEL (INC. ACABADO
m
BARNIZ
65.16 DD)
15.00
CARPINTERIA METALICA Y ALUMINIO
VENTANA DE ALUMINIO, CON VIDRIOS PAVONADO E INCOLORO DEm2
6 mm Y BARRAS
244.87 DE
180.00
SEGURIDAD DE ACERO LISO 1/2"
BARANDA DE ESCALERA DE TUBO F G. DE 2"x2mm SEGUN DISEO
m (INC. 218.70
MANOS 190.00
DE PINTURA ESMALTE Y ANTICORRO
BARANDA METALICA H=0.60m, TUBO DE FIERRO 2"X2"X3mm, 2"x1"x3mm
m Y BARRAS
49.86 DE 150.00
SEGURIDAD DE ACERO LISO 1/2" (IN
CELOSIA METLICA H=65 m, CON TUBOS DE FIERRO DE 2"X2"X3mm,m
2"x1"x3mm2.00
(INC. 2100.00
MANOS DE PINTURA ESMALTE Y ANT
SUMINISTRO Y COLOCACION DE CANTONERA DE ALUMINIO DE 2" X m
1.20 M (SEGN
48.00 DETALLES)
38.32
PROTECCION Y SUJECION PARA EXTREMO DE CUBIERTA CON CUMBRERA
m
TERMOACUSTICA
54.75
62.06 Y ANGULO DE 2"x2"x2mm (INC
SUMINISTRO Y COLOCACION DE TAPAJUNTA DE ALUMINIO PESADOmDE 88.9 MM
39.12
X6.40 MM
20.00
CERRAJERIA
BISAGRA DE BRONCE ALUMINIZADAS DE 4"
und
88.00
13.52
ERRADURA NACIONAL DE 3 GOLPES PARA PUERTA
und
9.00
90.97
CERRADURA NACIONAL DE 1 GOLPES PARA PUERTA
und
4.00
75.97
MANIJA DE BRONCE PARA PUERTAS
und
13.00
30.29
PICAPORTE 3" PARA PUERTAS
und
18.00
11.39
PINTURA
PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS m2
241.84
8.65
PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS m2
713.64
7.96
PINTURA EN ESCALERA AL LATEX SATINADO 2 MANOS
m2
19.39
9.04
PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS m2
1,181.32
9.25
PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS
m2
632.99
9.24
PINTURA EN TAPASOL Y CANALETA AL LATEX SATINADO 2 MANOS m2
331.17
8.50
PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS
m
488.96
3.95
PINTURA EN CIELORASOS AL LATEX
m2
1,013.77
7.35
CUBIERTAS
08.01
N DE CONTRATO
FECHA
MONTO DE CONTRATO
1.0000000000
Parcial
129,499.06
6,411.61
12,945.43
1,394.17
31,151.41
20,730.42
13,668.65
6,004.43
26,074.16
6,275.80
903.99
679.54
3,259.45
37,315.26
10,167.28
20,949.92
5,531.44
666.62
6,680.70
3,141.96
464.53
3,074.21
12,528.40
8,747.50
2,803.50
977.40
61,328.15
44,076.60
3,553.00
7,479.00
200.00
1,839.36
3,397.79
782.40
2,911.16
1,189.76
818.73
303.88
393.77
205.02
36,921.37
2,091.92
5,680.57
175.29
10,927.21
5,848.83
2,814.95
1,931.39
7,451.21
48,584.14
PLAZO EJECUCION
ACUMULADO ANTERIOR
METRADO
S/.
%
MES ACTUAL
METRADO
S/.
ACUMULADO ACTUAL
METRADO
S/.
0.00
142.73
0.00
2,589.09
0.00%
20.00%
0.00
0.00
0.00%
0.00%
0.00
142.73
0.00
2,589.09
472.53
253.20
0.00
0.00
405.51
0.00
0.00
0.00
0.00
12,460.56
8,292.17
0.00
0.00
10,429.67
0.00
0.00
0.00
0.00
40.00%
40.00%
0.00%
0.00%
40.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
472.53
253.20
0.00
0.00
405.51
0.00
0.00
0.00
0.00
12,460.56
8,292.17
0.00
0.00
10,429.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,584.14
335,768.24
0.00
0.00
0.00%
0.00
0.00%
33,771.48
10.06%
0.00
0.00%
0.00
0.00
33,771.48
21
03
05
43
17
ACUMULADO ACTUAL
%
0.00%
20.00%
302.72
570.91
6,411.61
10,356.34
100.00%
80.00%
40.00%
40.00%
0.00%
0.00%
40.00%
0.00%
0.00%
0.00%
0.00%
708.79
379.79
463.03
488.96
608.26
935.29
123.16
39.28
39.28
18,690.85
12,438.25
13,668.65
6,004.43
15,644.49
6,275.80
903.99
679.54
3,259.45
60.00%
60.00%
100.00%
100.00%
60.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
334.23
754.68
95.65
48.98
10,167.28
20,949.92
5,531.44
666.62
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
225.23
60.25
398.73
3,141.96
464.53
3,074.21
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
34.99
8.01
65.16
8,747.50
2,803.50
977.40
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
244.87
18.70
49.86
2.00
48.00
54.75
39.12
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
21 (und)
CEMENTO SUB TOTAL
0.1500
0.1500
0.1800
0.1170
0.1170
0.1500
0.0400
0.1500
03 (KG)
A. CORRUGADO
SUB TOTAL
0.00
21.41
0.00
55.29
29.62
0.00
0.00
60.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.4850
0.4550
1.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0640
0.0180
0.0180
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
44,076.60
3,553.00
7,479.00
200.00
1,839.36
3,397.79
782.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
88.00
9.00
4.00
13.00
18.00
1,189.76
818.73
303.88
393.77
205.02
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
241.84
713.64
19.39
1,181.32
632.99
331.17
488.96
1,013.77
2,091.92
5,680.57
175.29
10,927.21
5,848.83
2,814.95
1,931.39
7,451.21
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1170
0.1200
0.0300
0.00%
10.06%
684.38
48,584.14
100.00%
0.00
0.00
300,602.59
89.53%
167.15
0.00
ES Y ADELANTO DIRECTO
JULIO 2013
OI
167.15
A ENCOFRADO Y CARPINTERIA
03 (KG)
ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0400
0.0400
0.0400
0.0300
0.0300
0.0400
0.0200
0.0400
0.0100
05 (M3)
PIEDRA S. 1/2"
0.00
5.71
0.00
14.18
7.60
0.00
0.00
16.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0270
0.0270
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1200
0.00
0.00
0.00
0.00
43.70
0.00
05 (M3)
43 (P2)
SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0250
0.0250
0.0180
0.0180
0.0250
0.0065
0.0250
0.00
3.57
0.00
8.51
4.56
0.00
0.00
10.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0090
0.0080
0.0140
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0090
0.0020
0.0020
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0210
0.0300
0.0100
0.0160
0.0200
0.6500
0.5800
0.5800
0.5200
0.5200
0.5800
0.1270
0.5800
0.5000
0.9860
0.1560
0.1560
0.1560
0.00
0.00
0.00
0.00
0.00
0.00
26.77
0.00
2.5000
43 (P2)
SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
82.78
0.00
245.71
131.66
0.00
0.00
235.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
695.35
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
01.03
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.03.02
04.03.03
04.04
04.04.01
04.04.02
04.04.03
04.05
04.05.01
04.05.02
04.05.03
04.06
04.06.01
04.06.02
04.06.03
04.06.04
und
Metrado
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
870.00
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
870.00
COLOCACION DE NIVELES DURANTE LA OBRA
m2
870.00
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
m3
812.68
CORTE O RELLENO DE TERRENO HASTA 0.20 M DE PROFUNDIDAD SIN APISONADO
m2
792.30
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
341.26
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES
m3
572.21
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h
m3
D=3KM
572.21
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m2
772.98
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
77.30
OBRAS DE CONCRETO SIMPLE
FALSA ZAPATA, CONCRETO F'C= 100 KG/CM2
m3
183.42
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
6.95
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
410.70
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
221.28
ZAPATAS, ACERO FY=4200KG/CM2
kg
8,559.61
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2
m3
23.30
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
148.72
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
2,592.95
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT)
m2
34.81
SOBRECIMIENTOS REFORZADOS
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2
m3
36.46
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
301.02
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
1,367.92
COLUMNAS
COLUMNAS, CONCRETO F'C=210 KG/CM2
m3
92.75
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
653.57
COLUMNAS, ACERO FY=4200 KG/CM2.
kg
12,816.11
PLACA
PLACAS, CONCRETO F'C= 210 KG/CM2
m3
69.68
PLACA, ENCOFRADO Y DESENCOFRADO
m2
825.93
PLACA, ACERO FY=4200 KG/CM2.
kg
5,265.33
COLUMNETAS
COLUMNETAS, CONCRETO F'C= 175 KG/CM2
m3
12.86
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
69.25
COLUMNETAS, ACERO FY=4200 KG/CM2
kg
2,438.24
COLUMNETAS - PIN DE ARRIOSTRE VERTICAL
und
30.00
P.unit
1.12
4.18
2.07
33.34
2.50
23.67
17.00
7.91
2.18
76.39
264.22
303.68
40.83
349.47
4.83
371.88
54.27
4.96
16.85
404.49
31.61
5.24
507.07
56.37
5.05
563.42
66.25
4.93
381.44
46.14
4.77
20.66
Parcial
6,411.90
974.40
3,636.60
1,800.90
58,996.92
27,094.75
1,980.75
8,077.62
9,727.57
4,526.18
1,685.10
5,904.95
67,342.69
48,463.23
2,110.58
16,768.88
784,767.64
118,673.64
77,330.72
41,342.92
30,183.41
8,664.80
8,071.03
12,861.03
586.55
31,430.85
14,747.71
9,515.24
7,167.90
148,593.84
47,030.74
36,841.74
64,721.36
119,935.05
39,259.11
54,717.86
25,958.08
20,350.72
4,905.32
3,195.20
11,630.40
619.80
ACUMULADO ANTERIOR
METRADO
S/.
870.00
870.00
870.00
974.40
3,636.60
1,800.90
812.68
792.30
341.26
572.21
572.21
772.98
0.00
27,094.75
1,980.75
8,077.62
9,727.57
4,526.18
1,685.10
0.00
183.42
6.95
0.00
48,463.23
2,110.58
0.00
221.28
8,559.61
77,330.72
41,342.92
23.30
148.72
2,592.95
34.81
8,664.80
8,071.03
12,861.03
586.55
36.46
301.02
1,367.92
14,747.71
9,515.24
7,167.90
92.75
653.57
12,816.11
47,030.74
36,841.74
64,721.36
69.68
825.93
5,265.33
39,259.11
54,717.86
25,958.08
6.42
34.74
2,438.24
0.00
2,448.84
1,602.90
11,630.40
0.00
Obra
Form.
Cliente
Ubicac.
Item
04.07
04.07.01
04.07.02
04.07.03
04.08
04.08.01
04.08.02
04.08.03
04.09
04.09.01
04.09.02
04.09.03
04.09.04
04.09.05
4.1
04.10.01
04.10.02
04.10.03
4.11
04.11.01
04.11.02
04.11.03
4.12
04.12.01
04.12.02
04.12.03
04.13
04.13.01
04.13.02
04.13.03
05
05.01
05.02
Parcial
100,476.68
29,252.21
29,350.93
41,873.54
10,656.55
2,246.28
4,266.98
4,143.29
151,111.73
36,649.81
49,997.08
29,608.47
17,547.22
17,309.15
847.49
320.32
243.36
283.81
8,259.20
2,831.93
3,102.25
2,325.02
25,163.56
5,531.16
13,554.59
6,077.81
19,084.92
5,084.09
8,976.86
5,023.97
39,225.29
13,808.30
25,416.99
956,744.44
ACUMULADO ANTERIOR
74.81
492.30
8,545.62
29,252.21
29,350.93
41,873.54
6.81
79.15
845.57
2,246.28
4,266.98
4,143.29
92.66
1,106.13
6,272.98
6,523.13
7,303.44
36,649.81
49,997.08
29,608.47
17,547.22
17,309.15
0.82
5.47
60.13
320.32
243.36
283.81
6.02
38.72
478.40
2,831.93
3,102.25
2,325.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.72
85.85
6,904.15
12,709.23
865,541.65
INDICE D
ACUMULADO ANTERIOR
%
MES ACTUAL
METRADO
S/.
N DE CONTRATO
FECHA
MONTO DE CONTRATO
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
21
03
05
PLAZO EJECUCION
43
17
ACUMULADO ACTUAL
METRADO
S/.
%
21 (und)
CEMENTO SUB TOTAL
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
870.00
870.00
870.00
974.40
3,636.60
1,800.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
812.68
792.30
341.26
572.21
572.21
772.98
0.00
27,094.75
1,980.75
8,077.62
9,727.57
4,526.18
1,685.10
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
77.30
-0.00
0.00
-0.00
0.00
-0.00
0.00
5,904.95
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
183.42
6.95
0.00
48,463.23
2,110.58
0.00
100.00%
100.00%
0.00%
0.00
0.00
410.70
-0.00
0.00
16,768.88
0.00%
0.00%
100.00%
5.5000
6.5000
0.6500
1,008.81
45.18
0.00
100.00%
100.00%
0.00
0.00
0.00%
0.00%
221.28
8,559.61
77,330.72
41,342.92
100.00%
100.00%
0.00
0.00
-0.00
0.00
0.00%
0.00%
8.5000
1,880.88
0.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
23.30
148.72
2,592.95
34.81
8,664.80
8,071.03
12,861.03
586.55
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
-0.00
-0.00
-0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.5000
198.05
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
36.46
301.02
1,367.92
14,747.71
9,515.24
7,167.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
-0.00
-0.00
0.00%
0.00%
0.00%
8.0000
291.68
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
92.75
653.57
12,816.11
47,030.74
36,841.74
64,721.36
100.00%
100.00%
100.00%
0.00
0.00
0.00
-0.00
-0.00
0.00
0.00%
0.00%
0.00%
8.5000
788.38
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
69.68
825.93
5,265.33
39,259.11
54,717.86
25,958.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
-0.00
0.00
0.00%
0.00%
0.00%
8.5000
592.28
0.00
0.00
49.92%
50.17%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
6.42
34.74
2,438.24
0.00
2,448.84
1,602.90
11,630.40
0.00
49.92%
50.17%
100.00%
0.00%
6.44
34.51
0.00
30.00
2,456.48
1,592.30
-0.00
619.80
50.08%
49.83%
0.00%
100.00%
8.0000
51.36
0.00
0.00
0.00
INDICE D
ACUMULADO ANTERIOR
N DE CONTRATO
FECHA
MONTO DE CONTRATO
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
21
03
05
PLAZO EJECUCION
43
17
MES ACTUAL
ACUMULADO ACTUAL
21 (und)
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
74.81
492.30
8,545.62
29,252.21
29,350.93
41,873.54
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
635.89
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.81
79.15
845.57
2,246.28
4,266.98
4,143.29
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
-0.00
0.00%
0.00%
0.00%
8.0000
54.48
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
92.66
1,106.13
6,272.98
6,523.13
7,303.44
36,649.81
49,997.08
29,608.47
17,547.22
17,309.15
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.00
0.00%
0.00%
0.00%
0.00%
0.00%
8.5000
787.61
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.82
5.47
60.13
320.32
243.36
283.81
100.00%
100.00%
100.00%
0.00
0.00
0.00
-0.00
-0.00
-0.00
0.00%
0.00%
0.00%
8.5000
6.97
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.02
38.72
478.40
2,831.93
3,102.25
2,325.02
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
-0.00
0.00%
0.00%
0.00%
8.5000
51.17
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
14.84
179.96
816.91
5,531.16
13,554.59
6,077.81
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
12.32
123.19
1,025.30
5,084.09
8,976.86
5,023.97
100.00%
100.00%
100.00%
8.5000
0.00
0.00
0.00
50.00%
50.00%
0.00
0.00
0.00%
0.00%
75.72
85.85
6,904.15
12,709.23
50.00%
50.00%
75.72
85.84
6,904.15
12,707.76
50.00%
50.00%
0.2180
0.4100
16.51
35.20
90.47%
0.00
0.00%
865,541.65
90.47%
91,202.79
9.53%
6,444.43
1.0500
1.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,987.59
0.00
0.00
2,722.60
0.00
0.0600
0.3000
0.0500
0.00
3.13
8.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
513.58
0.00
0.00
0.6500
143.83
0.00
0.00
0.00
0.00
22.31
0.00
0.00
0.6500
15.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.62
129.65
0.00
0.0036
0.0100
0.1500
1.3500
1.3500
0.1250
247.62
9.38
0.00
0.00
81.28
82.08
0.00
45.15
0.00
0.6500
0.2700
0.0600
0.1500
1.0700
0.00
0.00
1,463.67
23.70
0.00
0.00
0.00
0.00
0.00
0.00
294.11
768.97
0.00
196.07
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
13,713.24
60.29
0.00
0.00
0.00
0.00
0.00
0.00
371.67
315.92
0.00
247.78
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
5,633.90
45.29
0.00
0.00
0.00
0.00
0.00
0.3000
0.0600
0.0500
0.00
10.42
146.29
0.00
0.00
5.91
0.00
0.00
0.6500
1.0500
2.3000
0.00
0.00
2,560.15
0.00
4.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1700
05 (M3)
03 (KG)
0.00
221.54
512.74
0.00
147.69
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
9,143.81
48.63
0.00
0.00
0.00
0.00
0.00
0.00
35.62
50.73
0.00
23.75
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
904.76
4.43
0.00
0.00
0.00
0.00
0.00
0.00
121.67
0.00
0.00
0.00
0.6500
60.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0700
0.00
0.00
6,712.09
0.00
0.00
1.0700
0.00
0.00
64.34
3.0600
0.00
0.00
19,195.32
0.00
0.00
0.1100
0.00
1.64
0.00
0.6500
0.3000
0.0600
0.00
0.00
3.61
0.53
0.00
0.00
0.00
0.00
0.00
0.00
3.10
28.70
0.00
3.87
0.00
0.6500
0.0800
0.0600
0.1000
1.0700
0.00
0.00
511.89
3.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6000
0.4500
0.4500
0.2000
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.7500
0.2100
0.0600
0.2500
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
37.86
42.93
0.0200
0.0220
1.51
1.89
0.00
0.00
0.00
0.00
831.07
410.16
257.00
52,418.04
22,890.71
05 (M3)
43 (P2)
17 (und)
A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
0.00
435.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
110.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
813.50
0.00
0.00
0.00
0.00
0.00
0.00
18.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,453.93
0.00
0.00
0.00
0.00
46.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,614.28
63,439.74
0.00
0.00
0.00
34.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,517.84
0.00
0.00
0.00
0.00
3.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
171.96
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
5.4700
4.8300
4.0000
4.9500
5.4700
4.9500
05 (M3)
0.5000
43 (P2)
17 (und)
37.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
2,446.73
0.00
0.00
0.00
0.00
3.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
393.38
0.00
0.00
0.00
0.00
46.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,696.57
0.00
0.00
0.00
0.00
0.00
0.00
6,849.29
7,668.61
0.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.0000
0.00
32.82
0.00
0.00
0.00
0.00
3.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.7400
0.00
222.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.2400
0.00
0.00
0.00
0.00
0.00
0.00
0.4200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.1300
4.9700
0.00
0.00
0.00
0.00
0.00
0.00
0.0310
0.0580
2.35
4.98
0.00
0.00
0.00
0.00
0.5800
0.5800
43.92
49.79
322.83
0.00
0.00
0.5000
0.5000
0.5000
0.5000
0.5400
5.1500
82,331.71
1.0500
1.0500
39.0000
66.0000
2,953.08
5,666.10
23,137.08
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.03
01.03.01
01.03.02
01.03.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.06
01.06.01
01.06.02
01.06.03
01.06.04
01.07
01.07.01
01.07.02
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.05
02.05.01
02.05.02
02.05.03
02.05.04
03
FACTOR DE RELACION:
Metrado
P.unit
2.83
28.58
1.61
1.98
29.51
28.58
5.15
4.10
1.34
91.92
83.62
69.27
21.77
14.65
15.65
33.81
435.00
70.08
2.83
50.02
1.61
1.98
29.51
28.58
10.69
9.79
1.55
83.85
115.63
65.93
59.16
28.05
14.22
24.45
12.94
03.01
03.02
03.03
m
und
pza
164.42
38.00
5.00
72.70
24.22
242.05
N DE CONTRATO
FECHA
MONTO DE CONTRATO
1.0000000000
Parcial
17,154.22
217.91
217.91
4,857.96
2,200.66
123.97
152.46
2,272.27
108.60
424.13
25.75
295.20
103.18
518.32
183.84
334.48
1,246.86
1,246.86
797.60
43.54
87.90
125.20
540.96
9,091.44
7,830.00
1,261.44
11,206.76
228.38
228.38
3,488.79
2,018.31
64.96
79.89
1,190.73
134.90
954.83
471.43
358.31
125.09
5,689.38
1,509.30
3,561.40
263.72
354.96
845.38
561.00
28.44
48.90
207.04
14,083.94
PLAZO EJECUCION
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
MES ACTUAL
S/.
ACUMULADO ACTUAL
METRADO S/.
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11,953.33
920.36
1,210.25
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
42,444.92
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21
03
05
43
17
ACUMULADO ACTUAL
%
21 (und)
CEMENTO SUB TOTAL A. CORRUGADO SUB TOTAL
0.00%
77.00
217.91
100.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
77.00
77.00
77.00
77.00
3.80
2,200.66
123.97
152.46
2,272.27
108.60
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
5.00
72.00
77.00
25.75
295.20
103.18
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
4.00
183.84
334.48
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
18.00
1,246.86
100.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00%
2.00
6.00
8.00
16.00
43.54
87.90
125.20
540.96
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
18.00
18.00
7,830.00
1,261.44
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
80.70
228.38
100.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
40.35
40.35
40.35
40.35
4.72
2,018.31
64.96
79.89
1,190.73
134.90
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
44.10
36.60
80.70
471.43
358.31
125.09
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
18.00
30.80
4.00
6.00
1,509.30
3,561.40
263.72
354.96
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
20.00
2.00
2.00
16.00
561.00
28.44
48.90
207.04
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03 (KG)
0.00%
0.00%
0.00%
0.00%
164.42
38.00
5.00
11,953.33
920.36
1,210.25
100.00%
100.00%
100.00%
42,444.92
100.00%
1.4000
0.00
0.00
0.00
0.00
11.5500
0.00
0.00
0.00
0.00
ES Y ADELANTO DIRECTO
JULIO 2013
OI
A ENCOFRADO Y CARPINTERIA
03 (KG)
ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL PIEDRA S. 1/2" SUB TOTAL HORMIGON
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05 (M3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2000
05 (M3)
43 (P2)
SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1100
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.0000
43 (P2)
17 (und)
SUB TOTAL LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.02
01.02.01
01.02.02
01.02.03
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.04
01.04.01
01.04.02
01.05
01.05.01
01.05.02
01.05.03
01.06
01.06.01
01.07
01.07.01
01.07.02
01.07.03
01.07.04
01.08
01.08.01
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
02.01.06
02.02
02.02.01
02.02.02
02.03
02.03.01
02.03.02
FACTOR DE RELACION:
und
Metrado
COSTO DIRECTRO
RMIN FITZCARRALD
N DE CONTRATO
CONTRATISTA: CONSORCIO CARLOS F. FITZCARRALD
FECHA
INSPECTOR: ING. JOSE JAVIER ANTONIO ESTREMADOYRO ALGUIARMONTO DE CONTRATO
P.unit
8.62
35.33
38.44
29.07
42.49
35.50
35.01
56.68
149.01
63.74
71.22
116.33
22.47
7.80
3.71
4.31
5.37
152.93
2,223.50
1,948.50
618.50
1,236.37
743.00
3.53
15.73
7.80
8.53
6.15
3.28
13.70
7.80
27.74
60.58
Parcial
51,846.56
2,143.34
844.76
353.30
345.96
174.42
424.90
3,780.42
2,130.00
630.18
1,020.24
12,762.65
9,387.63
573.66
1,638.06
1,163.30
8,022.48
89.88
7,932.60
10,284.16
5,468.54
4,568.60
247.02
7,340.64
7,340.64
6,026.87
2,223.50
1,948.50
618.50
1,236.37
1,486.00
1,486.00
4,690.02
2,249.86
180.03
283.14
873.60
435.03
110.70
367.36
2,324.10
452.10
1,872.00
116.06
55.48
60.58
PLAZO EJECUCION
ACUMULADO ANTERIOR
MES ACTUAL
METRADO S/.
%
METRADO S/.
%
0.00
0.00
0.00
0.00
0.00
ACUMULADO ACTUAL
METRADO
S/.
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
56,536.58
0.00 0.00%
0.00
0.00%
0.00
(INC. IGV.)
ULADO ACTUAL
21
03
05
43
17
21 (und)
CEMENTO
SUB TOTAL A. CORRUGADO
0.00%
0.00%
0.00%
0.00%
0.00%
98.00
10.00
9.00
6.00
10.00
844.76
353.30
345.96
174.42
424.90
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
60.00
18.00
18.00
2,130.00
630.18
1,020.24
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
63.00
9.00
23.00
10.00
9,387.63
573.66
1,638.06
1,163.30
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
4.00
1,017.00
89.88
7,932.60
100.00%
100.00%
0.00
0.00
0.00%
0.00%
0.00%
1,474.00
1,060.00
46.00
5,468.54
4,568.60
247.02
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
48.00
7,340.64
100.00%
0.00
0.00%
0.00%
0.00%
0.00%
1.00
1.00
1.00
1.00
2,223.50
1,948.50
618.50
1,236.37
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
2.00
1,486.00
100.00%
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
51.00
18.00
112.00
51.00
18.00
112.00
180.03
283.14
873.60
435.03
110.70
367.36
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
33.00
240.00
452.10
1,872.00
100.00%
100.00%
0.00
0.00
0.00%
0.00%
2.00
1.00
55.48
60.58
100.00%
100.00%
0.00
0.00
0.00%
56,536.58
100.00%
0.00
S Y ADELANTO DIRECTO
ULIO 2013
INDICE DE ANALISIS DE PRECIOS UNITARIOS
LAN TIPO I
ADO
CLAVO DE C.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AFIRMADO
SUB TOTAL
05 (M3)
A. GRUESA
SUB TOTAL
A. FINA
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TIERRA ORG.
0.00
0.00
0.00
43 (P2)
SUB TOTAL M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.08
01.09
02
02.01
02.02
02.03
02.04
03
03.01
03.02
04
04.01
05
05.01
05.02
05.03
06
06.01
06.02
06.03
07
07.01
07.02
07.03
07.04
07.05
07.06
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
P.unit
Parcial
ACUMULADO ANTERIOR
MES ACTUAL
METRADO
S/.
%
METRADO
S/.
REVOQUES Y ENLUCIDOS
31,105.58
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
120.17
21.18
2,545.20
120.17
2,545.20 100.00%
0.00
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
202.01
18.14
3,664.46
202.01
3,664.46 100.00%
0.00
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
299.17
26.37
7,889.11
299.17
7,889.11 100.00%
0.00
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
147.04
32.75
4,815.56
147.04
4,815.56 100.00%
0.00
TARRAJEO EN TAPASOL Y CANALETA C:A 1:5 e=1.50 cm.
m2
274.20
29.52
8,094.38
274.20
8,094.38 100.00%
0.00
VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm.
m
169.80
12.28
2,085.14
169.80
2,085.14 100.00%
0.00
BRUAS VERTICALES DE 1"
m
247.96
6.71
1,663.81
247.96
1,663.81 100.00%
0.00
JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1"
m
47.40
7.34
347.92
47.40
347.92 100.00%
0.00
PISOS Y PAVIMENTOS
16,952.75
PISOS INTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO
m2
271.28
Y BRUADO27.36
7,422.22
271.28
7,422.22 100.00%
0.00
PISOS INTERIORES DE CONCRETO F'C=210 KG/CM2 REFORZADO CON
m2 FIBRAS 55.25
DE ACERO 38.06
E=4" (Incluye2,102.82
acabado)
0.00
0.00
0.00%
0.00
VEREDA DE CONCRETO F'C=175 KG/CM2 h=0.10m, ACABADO SEMIPULIDO
m2
Y BRUADO
75.00
(INC.
57.62
UA LATERAL
4,321.50
DE PROTECCION
0.00
DE H=0.2)
0.00
0.00%
0.00
JUNTAS DE DILATACIN HORIZONTAL + SELLO ASFALTICO e=1" c/4m
m
228.23
13.61
3,106.21
0.00
0.00
0.00%
0.00
ZOCALOS Y CONTRAZOCALOS
1,732.06
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIOR
m m
78.32
13.95
1,092.56
0.00
0.00
0.00%
0.00
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR
m
82.41
7.76
639.50
0.00
0.00
0.00%
0.00
CARPINTERIA DE MADERA
1,634.50
PUERTA DE MADERA QUINILLA MACHIHEMBRADA + MARCO (INC. SELLADO
m2
Y BARNIZADO
4.67
350.00
1,634.50
0.00
0.00
0.00%
0.00
CARPINTERIA METALICA Y ALUMINIO
37,860.90
VENTANA METALICA CON MALLA OLIMPICA 2" + MARCO DE ANG 2"X2"X1/8"
m2
( INC.
104.30
2 MANOS220.00
DE PINTURA
22,946.00
ESMALTE Y ANTICORROSIVO)
0.00
0.00
0.00%
0.00
PUERTA METALICA ENROLLABLE CON PLANCHA GALVANIZADA (INCm2
CERRADURA,
10.36
DOS MANOS
260.00 DE PINTURA
2,693.60ESMALTE
0.00
Y ANTICORROSIVO)
0.00
0.00%
0.00
PARASOL DE POLICARBONATO CON MARCO DE ALUMINIO SUJETADOS
m2 A COLUMNAS
94.01 (SEGN
130.00DISEO)
12,221.30
0.00
0.00
0.00%
0.00
CERRAJERIA
350.68
BISAGRA DE BRONCE ALUMINIZADAS DE 4"
und
8.00
13.52
108.16
0.00
0.00
0.00%
0.00
CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA
und
2.00
90.97
181.94
0.00
0.00
0.00%
0.00
MANIJA DE BRONCE PARA PUERTAS
und
2.00
30.29
60.58
0.00
0.00
0.00%
0.00
PINTURA
9,774.85
PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS m2
120.17
8.65
1,039.47
0.00
0.00
0.00%
0.00
PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS m2
202.01
7.96
1,608.00
0.00
0.00
0.00%
0.00
PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS m2
299.17
9.25
2,767.32
0.00
0.00
0.00%
0.00
PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS
m2
147.04
9.24
1,358.65
0.00
0.00
0.00%
0.00
PINTURA EN TAPASOL Y CANALETA AL LATEX SATINADO 2 MANOS m2
274.20
8.50
2,330.70
0.00
0.00
0.00%
0.00
PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS
m
169.80
3.95
670.71
0.00
0.00
0.00%
0.00
COSTO DIRECTO
99,411.32
38,527.81
38.76%
0.00
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
21
03
05
43
17
21 (und)
03 (KG)
CEMENTO SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
120.17
202.01
299.17
147.04
274.20
169.80
247.96
47.40
2,545.20
3,664.46
7,889.11
4,815.56
8,094.38
2,085.14
1,663.81
347.92
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.1500
0.1500
0.1170
0.1170
0.1500
0.0400
18.03
30.30
35.00
17.20
41.13
6.79
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
271.28
0.00
0.00
0.00
7,422.22
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00
55.25
75.00
228.23
0.00
2,102.82
4,321.50
3,106.21
0.00%
100.00%
100.00%
100.00%
0.4550
123.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
78.32
82.41
1,092.56
639.50
100.00%
100.00%
0.0064
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00
0.00%
4.67
1,634.50
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
104.30
10.36
94.01
22,946.00
2,693.60
12,221.30
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.00
2.00
2.00
108.16
181.94
60.58
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
120.17
202.01
299.17
147.04
274.20
169.80
1,039.47
1,608.00
2,767.32
1,358.65
2,330.70
670.71
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38,527.81
38.76%
60,883.51
61.24%
271.89
0.00
0.00
0.00%
1.0200
05 (M3)
CLAVO DE C. SUB TOTAL PIEDRA S. 1/2" SUB TOTAL HORMIGON SUB TOTAL A. GRUESA SUB TOTAL
0.0400
0.0400
0.0300
0.0300
0.0400
0.0200
0.0500
4.81
8.08
8.98
4.41
10.97
3.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0270
0.0850
7.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.1200
0.00
0.00
0.00
0.00
0.0210
0.0320
A. FINA
43 (P2)
17 (und)
SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0250
0.0180
0.0180
0.0250
0.0065
3.00
5.05
5.39
2.65
6.86
1.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.70
0.00
0.00
0.00
0.0080
0.0100
0.0120
2.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0090
0.0020
0.00
0.00
0.00
0.00
0.6500
0.5800
0.5200
0.5200
0.5800
0.1270
0.9860
0.1560
0.1560
78.11
117.17
155.57
76.46
159.04
21.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.64
7.32
0.00
5.70
26.22
0.00
607.91
0.00
: MEJORAMIENTO
Obra DE LA INFRAESTRUCTURA EN LA INSTITUCIN EDUCATIVA CARLOS FERMIN FITZCARRALD
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
03.04
03.05
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.03.02
04.03.03
04.04
04.04.01
04.04.02
04.04.03
04.05
04.05.01
04.05.02
04.05.03
04.06
04.06.01
04.06.02
04.06.03
04.07
04.07.01
04.07.02
04.07.03
04.08
04.08.01
04.08.02
04.08.03
05
05.01
05.02
05.03
05.04
05.05
05.06
06
06.01
06.02
: 01 PRESUPUESTO GENERAL
: GOBIERNO REGIONAL DE MADRE DE DIOS
: TAMBOPATA - TAMBOPATA - MADRE DE DIOS.
P.unit
Parcial
TRABAJOS PRELIMINARES
2,486.76
LIMPIEZA DE TERRENO MANUAL
m2
469.20
1.12
525.50
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
469.20
4.18
1,961.26
MOVIMIENTO DE TIERRAS
23,133.44
NIVELACION DE TERRENO
M2
469.20
2.49
1,168.31
EXCAVACION DE ZANJAS
m3
277.39
33.34
9,248.18
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
190.67
23.67
4,513.16
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M
m3
169.94
17.00
2,888.98
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETEm3
15M3 V=30KM/h
169.94 D=3KM7.91
1,344.23
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m2
399.39
2.18
870.67
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
40.58
76.39
3,099.91
OBRAS DE CONCRETO SIMPLE
36,975.49
CONCRETO EN FALSA ZAPATAS F'C= 100 KG/CM2
m3
56.97
257.89
14,691.99
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
9.38
303.68
2,848.52
CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2
m3
3.75
411.54
1,543.28
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
50.13
31.61
1,584.61
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
399.39
40.83
16,307.09
OBRAS DE CONCRETO ARMADO
192,998.43
ZAPATAS
31,979.03
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
65.80
349.47
22,995.13
ZAPATAS, ACERO FY=4200KG/CM2
kg
1,860.02
4.83
8,983.90
VIGAS DE CIMENTACION
9,867.55
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2
m3
6.27
371.88
2,331.69
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
60.25
54.27
3,269.77
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
828.88
4.96
4,111.24
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT)
m2
9.19
16.85
154.85
SOBRECIMIENTOS REFORZADOS
13,392.28
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2
m3
12.14
401.74
4,877.12
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
140.24
31.61
4,432.99
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
779.04
5.24
4,082.17
COLUMNETAS
8,449.56
COLUMNETAS, CONCRETO F'C= 175 KG/CM2
m3
4.33
381.44
1,651.64
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
42.41
46.14
1,956.80
COLUMNETAS, ACERO FY=4200 KG/CM2
kg
1,014.91
4.77
4,841.12
COLUMNAS
73,972.99
COLUMNAS, CONCRETO F'C= 210 KG/CM2
m3
41.00
507.07
20,789.87
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
416.20
56.37
23,461.19
COLUMNAS, ACERO FY=4200 KG/CM2
kg
5,885.53
5.05
29,721.93
VIGUETAS DE ARRIOSTRE
2,797.25
VIGUETAS DE ARRIOSTRE, CONCRETO F'c= 175KG/CM2
m3
1.80
329.85
593.73
VIGUETAS DE ARRIOSTRE, ENCOFRADO Y DESENCOFRADO
m2
23.47
53.91
1,265.27
VIGA DE ARRIOSTRE, ACERO FY=4200 KG/CM2.
kg
191.48
4.90
938.25
VIGAS
23,310.95
VIGAS, CONCRETO F'C=210 KG/CM2
m3
15.91
391.02
6,221.13
VIGAS, ENCOFRADO Y DESENCOFRADO
m2
155.95
59.62
9,297.74
VIGAS, ACERO FY=4200 KG/CM2.
kg
1,590.22
4.90
7,792.08
CANALETA DE CONCRETO EN TECHO
29,228.82
CANALETA DE CONCRETO EN TECHO, CONCRETO F'C=210 KG/CM2m3
CON ADITIVO
12.60IMPERMEABILIZANTE
412.67
5,199.64
CANALETA DE CONCRETO EN TECHO, ENCOFRADO Y DESENCOFRADO
m2
267.12
72.87
19,465.03
CANALETA DE CONCRETO EN TECHO, ACERO FY=4200 KG/CM2. kg
931.46
4.90
4,564.15
ESTRUCTURA METALICA Y COBERTURA
110,699.04
TIJERAL METLICO DE SECCIN RECTANGULAR T-1
und
5.00
6,670.74
33,353.70
SOPORTES METALICOS PARA CERCHAS
und
10.00
580.16
5,801.60
VIGUETA TIPO "Z" DE 100mm x 51mm x 4.5mmm x 6.00m
m
453.60
80.82
36,659.95
TENSORES METALICOS DE ACERO LISO DE 3/8"
m
100.80
28.32
2,854.66
TEMPLADORES METALICOS DE ACERO LISO DE 1/2" (ENTRE TIJERALES)
m
170.56
23.45
3,999.63
COBERTURA CON PLANCHA METALICA TIPO TECNOTECHO MOD. TR4
m2 950x45x80mm
359.86 ALUZINC.
77.89
28,029.50
MUROS Y TABIQUES DE ALBAILERIA
5,153.01
MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE
m2
N8 C/3
44.63
HILADAS)
91.18
4,069.36
MURO DE CABEZA CON LADRILLO DE ARCILLA 9X13X24 (CON ALAMBRE
m2 N8 C/37.32
HILADAS)
148.04
1,083.65
COSTO DIRECTO
371,446.17
ACUMULADO ANTERIOR
METRADO
469.20
469.20
469.20
277.39
190.67
169.94
169.94
399.39
40.58
56.97
9.38
3.75
50.13
399.39
65.80
1,860.02
6.27
60.25
828.88
9.19
12.14
140.24
779.04
4.33
42.41
1,014.91
41.00
416.20
5,885.53
1.80
23.47
191.48
15.91
155.95
1,590.22
12.60
267.12
931.46
5.00
10.00
453.60
100.80
170.56
359.86
44.63
7.32
ACUMULADO ANTERIOR
S/.
%
MES ACTUAL
METRADO
S/.
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
525.50
1,961.26
0.00
1,168.31
9,248.18
4,513.16
2,888.98
1,344.23
870.67
3,099.91
0.00
14,691.99
2,848.52
1,543.28
1,584.61
16,307.09
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00%
0.00%
469.20
469.20
525.50
1,961.26
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
469.20
277.39
190.67
169.94
169.94
399.39
40.58
1,168.31
9,248.18
4,513.16
2,888.98
1,344.23
870.67
3,099.91
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
56.97
9.38
3.75
50.13
399.39
14,691.99
2,848.52
1,543.28
1,584.61
16,307.09
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
22,995.13
8,983.90
100.00%
100.00%
0.00
0.00
0.00%
0.00%
65.80
1,860.02
22,995.13
8,983.90
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2,331.69
3,269.77
4,111.24
154.85
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
6.27
60.25
828.88
9.19
2,331.69
3,269.77
4,111.24
154.85
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
4,877.12
4,432.99
4,082.17
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
12.14
140.24
779.04
4,877.12
4,432.99
4,082.17
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1,651.64
1,956.80
4,841.12
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.33
42.41
1,014.91
1,651.64
1,956.80
4,841.12
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
20,789.87
23,461.19
29,721.93
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
41.00
416.20
5,885.53
20,789.87
23,461.19
29,721.93
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
593.73
1,265.27
938.25
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.80
23.47
191.48
593.73
1,265.27
938.25
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
6,221.13
9,297.74
7,792.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
15.91
155.95
1,590.22
6,221.13
9,297.74
7,792.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
5,199.64
19,465.03
4,564.15
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
12.60
267.12
931.46
5,199.64
19,465.03
4,564.15
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
33,353.70
5,801.60
36,659.95
2,854.66
3,999.63
28,029.50
0.00
4,069.36
1,083.65
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.00
10.00
453.60
100.80
170.56
359.86
33,353.70
5,801.60
36,659.95
2,854.66
3,999.63
28,029.50
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00%
44.63
7.32
4,069.36
1,083.65
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
371,446.16
100.00%
0.00
0.00%
371,446.16
100.00%
0.01
0.00%
21 (und)
CEMENTO SUB TOTAL
6.0000
6.5000
8.0000
0.6500
8.5000
8.5000
8.0000
8.0000
8.5000
8.0000
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.0036
0.00
1.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
341.82
60.97
30.00
0.00
259.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.54
0.00
559.30
0.00
53.30
0.00
0.00
0.00
97.12
0.00
0.00
34.64
0.00
0.00
348.50
0.00
0.00
A. CORRUGADO
1.0500
1.0500
0.00
1,953.02
0.00
0.00
870.32
0.00
8.5000
0.2180
0.4100
107.10
0.00
0.00
0.3000
0.0500
0.00
111.60
0.00
18.08
41.44
0.00
0.1500
0.00
0.00
0.00
7.52
0.00
0.8000
0.00
0.00
0.6500
0.00
9.04
0.00
0.00
0.6500
0.1500
1.0700
0.00
37.86
46.74
0.00
21.04
0.00
0.6500
0.2700
0.0600
0.00
12.72
60.89
0.00
7.21
0.00
0.6500
0.3000
0.0600
0.1700
1.0500
0.00
0.00
1,065.66
0.00
187.29
353.13
0.00
124.86
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
6,297.52
0.00
10.56
0.00
0.00
7.04
0.00
0.6500
0.3000
14.40
0.00
0.00
135.24
0.00
0.00
0.0600
0.1500
0.00
0.00
0.00
0.00
0.00
3.99
0.00
0.00
0.00
833.57
0.00
0.00
0.00
1.0700
8.5000
0.2700
0.0100
PIEDRA S. 1/2"
0.4500
0.0600
0.00
70.18
95.41
0.00
46.79
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
1,701.54
0.00
56.10
55.89
0.00
66.78
0.00
0.6500
0.2100
0.0600
0.2500
1.0700
0.00
0.00
996.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.73
3.00
0.00
0.00
2,054.71
13,718.29
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
22.32
3.66
1,197.41
0.00
0.00
0.00
0.00
0.00
0.00
0.0200
0.0220
0.89
0.16
297.01
SUB TOTAL
HORMIGON
SUB TOTAL
05 (M3)
A. GRUESA SUB TOTAL A. FINA SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65.52
12.66
0.00
0.00
49.92
0.00
0.00
1.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
1.1500
1.3500
0.1250
0.5000
43 (P2)
M.NACIONAL E.
0.5000
4.8300
42.77
0.00
0.00
0.00
4.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
3.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.89
0.00
0.00
0.00
0.00
0.00
0.5000
6.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
2.81
0.00
0.00
0.00
0.00
0.00
0.5000
2.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
26.65
0.00
0.00
0.00
0.00
0.00
0.5000
20.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
1.17
0.00
0.00
0.00
0.00
0.00
0.5000
0.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.34
0.00
0.00
0.00
0.00
0.00
0.5000
7.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.19
0.00
0.00
0.00
0.00
0.00
0.4200
5.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.0800
0.1000
2.50
0.80
45.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.3100
0.0580
13.84
0.42
0.00
0.00
0.00
0.00
106.90
128.10
110.81
0.00
0.00
0.1000
5.4700
4.9700
4.9700
1.1300
4.9700
0.5800
0.5800
43 (P2)
SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
234.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
242.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.63
329.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
677.36
0.00
0.00
0.00
0.00
0.00
209.93
0.00
0.00
0.00
0.00
0.00
2,060.19
0.00
0.00
0.00
0.00
0.00
0.00
951.66
0.00
0.00
0.00
0.00
775.07
0.00
0.00
0.00
0.00
14.24
1,327.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.89
4.25
0.00
0.00
6,853.08
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
01.03
FACTOR DE RELACION:
117.60
32.00
4.00
P.unit
61.80
24.22
242.05
N DE CONTRATO
FECHA
MONTO DE CONTRATO
1.0000000000
Parcial
9,010.92
7,267.68
775.04
968.20
9,010.92
PLAZO EJECUCION
ACUMULADO ANTERIOR
METRADO
S/.
%
117.60
32.00
METRADO
MES ACTUAL
S/.
7,267.68
775.04
0.00
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
8,042.72
80.65%
0.00
0.00%
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
MONTO DE CONTRATO
: 03/07/2012
: S/. 23,508,980.65
PLAZO EJECUCION
ACUMULADO ACTUAL
METRADO
S/.
117.60
32.00
0.00
7,267.68
775.04
0.00
100.00%
100.00%
0.00%
8,042.72
89.26%
21
03
05
(INC. IGV.)
43
17
0.00
0.00
968.20
0.00%
0.00%
100.00%
968.20
10.74%
21 (und)
CEMENTO
1.4000
A. CORRUGADO
11.7500
SUB TOTAL
03 (KG)
ALAMBRE DE C.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CLAVO DE C.
SUB TOTAL
PIEDRA S. 1/2"
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HORMIGON
0.2000
SUB TOTAL
0.00
0.00
0.00
0.00
05 (M3)
A. GRUESA
05 (M3)
SUB TOTAL
0.00
0.00
0.00
0.00
A. FINA
0.1100
SUB TOTAL
TIERRA ORG.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
M.NACIONAL E.
SUB TOTAL
16.0000
0.00
0.00
0.00
0.00
17 (und)
LADRILLO A.
SUB TOTAL
0.00
0.00
0.00
0.00
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
Form.
Cliente
: 01 PRESUPUESTO GENERAL
: GOBIERNO REGIONAL DE MADRE DE DIOS
FECHA
MONTO DE CONTRATO
: 03/07/2012
: S/. 23,508,980.65
Ubicac.
PLAZO EJECUCION
Item
01
01.01
01.02
01.03
01.04
02
02.01
02.02
02.03
03
03.01
04
04.01
04.02
05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
06.04
06.05
06.06
06.07
07
07.01
07.02
07.03
07.04
08
08.01
08.02
08.03
08.04
08.05
09
09.01
09.02
09.03
09.04
09.05
09.06
glb
Exp
m2
glb
P.unit
1.00
1.00
1.00
1.00
511.57
475.04
247.06
527.73
M2
JGO
JGO
1.00
1.00
1.00
275.21
3,227.19
1,384.11
ml
20.00
23.14
JGO
ml
1.00
35.00
971.13
15.75
m
m
m
und
184.80
141.23
99.53
14.00
4.38
6.87
4.91
13.65
m
m
m
m
m
m
m
26.37
34.77
16.20
104.67
21.00
90.96
222.30
23.14
19.36
9.40
7.69
167.55
5.22
3.76
und
und
und
und
20.00
8.00
4.00
8.00
63.04
29.59
30.05
22.48
und
und
und
und
und
20.00
8.00
4.00
7.00
1.00
219.18
53.03
179.92
28.14
33.42
und
und
und
und
und
und
2.00
19.00
14.00
6.00
4.00
5.00
74.31
49.12
44.97
78.25
99.07
124.07
Parcial
1,761.40
511.57
475.04
247.06
527.73
4,886.51
275.21
3,227.19
1,384.11
462.80
462.80
1,522.38
971.13
551.25
2,459.46
809.42
970.25
488.69
191.10
7,069.75
610.20
673.15
152.28
804.91
3,518.55
474.81
835.85
1,797.56
1,260.80
236.72
120.20
179.84
5,757.92
4,383.60
424.24
719.68
196.98
33.42
3,197.61
148.62
933.28
629.58
469.50
396.28
620.35
28,915.39
ACUMULADO ANTERIOR
METRADO
S/.
%
MES ACTUAL
METRADO
S/.
ACUMULADO ACTUAL
METRADO
S/.
%
1.00
1.00
1.00
1.00
511.57 100.00%
475.04 100.00%
247.06 100.00%
527.73 100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
1.00
1.00
1.00
511.57
475.04
247.06
527.73
100.00%
100.00%
100.00%
100.00%
1.00
0.00
0.00
275.21 100.00%
0.00
0.00%
0.00
0.00%
(INC. IGV.)
21
03
05
43
17
21 (und)
03 (KG)
CEMENTO
SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL
05 (M3)
CLAVO DE C.
AFIRMADO
SUB TOTAL
A. GRUESA
43 (P2)
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
17 (und)
LADRILLO A.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
0.00
0.00
275.21
0.00
0.00
100.00%
0.00%
0.00%
0.00
1.00
1.00
0.00
3,227.19
1,384.11
0.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
20.00
462.80
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
35.00
971.13
551.25
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
184.80
141.23
99.53
14.00
809.42
970.25
488.69
191.10
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
184.80
141.23
99.53
14.00
809.42
970.25
488.69
191.10
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
-0.00
-0.00
-0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
26.37
34.77
16.20
104.67
21.00
90.96
222.30
610.20
673.15
152.28
804.91
3,518.55
474.81
835.85
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
8.00
4.00
8.00
1,260.80 100.00%
236.72 100.00%
120.20 100.00%
179.84 100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
20.00
8.00
4.00
8.00
1,260.80
236.72
120.20
179.84
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
4.00
2.00
3.50
0.50
2,191.80
212.12
359.84
98.49
16.71
50.00%
50.00%
50.00%
50.00%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
10.00
4.00
2.00
3.50
0.50
2,191.80
212.12
359.84
98.49
16.71
50.00%
50.00%
50.00%
50.00%
50.00%
10.00
4.00
2.00
3.50
0.50
2,191.80
212.12
359.84
98.49
16.71
50.00%
50.00%
50.00%
50.00%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
16.00
12.00
3.00
2.00
2.50
74.31
785.92
539.64
234.75
198.14
310.18
50.00%
84.21%
85.71%
50.00%
50.00%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
16.00
12.00
3.00
2.00
2.50
74.31
785.92
539.64
234.75
198.14
310.18
50.00%
84.21%
85.71%
50.00%
50.00%
50.00%
1.00
3.00
2.00
3.00
2.00
2.50
74.31
147.36
89.94
234.75
198.14
310.18
50.00%
15.79%
14.29%
50.00%
50.00%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11,315.53
39.13%
0.00
0.00%
11,315.53
39.13%
17,599.86
60.87%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
01.11
02
02.01
02.02
02.03
03
03.01
03.02
03.03
04
04.01
05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
07
07.01
07.02
07.03
07.04
07.05
07.06
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
P.Parcial
ACUMULADO ANTERIOR
METRADO
S/.
%
REVOQUES Y ENLUCIDOS
26,011.68
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
108.44
21.18
2,296.76
108.44
2,296.76
100.00%
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
261.78
18.14
4,748.69
261.78
4,748.69
100.00%
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
321.03
26.37
8,465.56
321.03
8,465.56
100.00%
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
116.31
32.75
3,809.15
116.31
3,809.15
100.00%
TARRAJEO EN TAPASOL Y CANALETA C:A 1:5 e=1.50 cm. m2
148.68
29.52
4,389.03
148.68
4,389.03
100.00%
VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm.
m
29.20
12.28
358.58
29.20
358.58
100.00%
BRUAS VERTICALES DE 1"
m
153.60
6.71
1,030.66
153.60
1,030.66
100.00%
JUNTAS DE DILATACIN VERTICAL DE 25 CM CON TEKNOPORT,
m
e= 1" 35.20
9.47
333.34
35.20
333.34
100.00%
JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT
m
e=1" 19.80
7.34
145.33
19.80
145.33
100.00%
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARAm2
ZOCALOS
4.06
17.52
71.13
4.06
71.13
100.00%
REVESTIMIENTO DE MUEBLE DE CONCRETO CON CERMICO
m2 DE 20X30CM
4.38
COLOR CLARO
82.98
363.45
4.38
363.45
100.00%
PISOS Y PAVIMENTOS
15,478.97
PISOS INTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE m2
E=2" SEMI-PULIDO
322.94 Y BRUADO
27.36
8,835.64
0.00
0.00
0.00%
VEREDA DE CONCRETO F'C=175 KG/CM2 h=0.10m, ACABADO
m2SEMIPULIDO
91.25
Y BRUADO57.62
(INC. UA LATERAL
5,257.83
DE PROTECCION
0.00 DE H=0.2) 0.00
0.00%
JUNTAS DE DILATACIN HORIZONTAL + SELLO ASFALTICO m
e=1" c/4m 101.80
13.61
1,385.50
0.00
0.00
0.00%
ZOCALOS Y CONTRAZOCALOS
2,589.38
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIOR
m
m 90.60
13.95
1,263.87
0.00
0.00
0.00%
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cmm
INTERIOR 122.55
7.76
950.99
0.00
0.00
0.00%
ZOCALO DE CERMICO DE 20X30 COLOR CLARO
m2
6.03
62.11
374.52
0.00
0.00
0.00%
CARPINTERIA DE MADERA
1,403.50
PUERTA DE MADERA QUINILLA MACHIHEMBRADA + MARCO m2
(INC. SELLADO4.01
Y BARNIZADO
350.00
1,403.50
0.00
0.00
0.00%
CARPINTERIA METALICA Y ALUMINIO
47,081.30
VENTANA METALICA CON MALLA OLIMPICA 2" + MARCO DE ANG
m2 2"X2"X1/8"
109.76
( INC. 2 MANOS
220.00DE PINTURA
24,147.20
ESMALTE Y ANTICORROSIVO)
0.00
0.00
0.00%
PUERTA METALICA ENROLLABLE CON PLANCHA GALVANIZADA
m2 (INC CERRADURA,
18.28
DOS
260.00
MANOS DE PINTURA
4,752.80ESMALTE Y 0.00
ANTICORROSIVO)
0.00
0.00%
PUERTA METALICA CORREDIZA DE TUBO CUADRADO CON m2
MALLA OLIMPICA
14.90
2" INCLUYE
400.00
DOS MANOS5,960.00
DE PINTURA ESMALTE
0.00 Y ANTICORROSIVO)
0.00
0.00%
PARASOL DE POLICARBONATO CON MARCO DE ALUMINIO SUJETADOS
m2
A94.01
COLUMNAS130.00
(SEGN DISEO)
12,221.30
0.00
0.00
0.00%
CERRAJERIA
350.68
BISAGRA DE BRONCE ALUMINIZADAS DE 4"
und
8.00
13.52
108.16
0.00
0.00
0.00%
CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA
und
2.00
90.97
181.94
0.00
0.00
0.00%
MANIJA DE BRONCE PARA PUERTAS
und
2.00
30.29
60.58
0.00
0.00
0.00%
PINTURA
8,347.09
PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS
m2
108.44
8.65
938.01
0.00
0.00
0.00%
PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS
m2
261.78
7.96
2,083.77
0.00
0.00
0.00%
PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS
m2
321.03
9.25
2,969.53
0.00
0.00
0.00%
PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS
m2
116.31
9.24
1,074.70
0.00
0.00
0.00%
PINTURA EN TAPASOL Y CANALETA AL LATEX SATINADO 2 MANOS
m2
148.68
8.50
1,263.78
0.00
0.00
0.00%
PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS
m
4.38
3.95
17.30
0.00
0.00
0.00%
COSTO DIRECTO
101,262.60
26,011.69
25.69%
METRADO
MES ACTUAL
S/.
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
METRADO
ACUMULADO ACTUAL
S/.
21
03
05
43
17
(INC. IGV.)
METRADO
21 (und)
CEMENTO
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
108.44
261.78
321.03
116.31
148.68
29.20
153.60
35.20
19.80
4.06
4.38
2,296.76
4,748.69
8,465.56
3,809.15
4,389.03
358.58
1,030.66
333.34
145.33
71.13
363.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.00
-0.00
-0.00
0.00
0.00
-0.00
-0.00
-0.00
-0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.1500
0.1500
0.1170
0.1170
0.1500
0.0400
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
322.94
91.25
101.80
8,835.64
5,257.83
1,385.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
90.60
122.55
6.03
1,263.87
950.99
374.52
100.00%
100.00%
100.00%
0.00
0.00%
0.00
0.00
0.00%
4.01
1,403.50
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
109.76
18.28
14.90
94.01
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00%
26,011.69
25.69%
A. CORRUGADO
SUB TOTAL
03 (KG)
ALAMBRE DE C.
SUB TOTAL
05 (M3)
CLAVO DE C.
PIEDRA S. 1/2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.4550
1.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0064
0.0200
0.1870
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00
0.00
0.00
0.00
24,147.20
4,752.80
5,960.00
12,221.30
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
2.00
2.00
108.16
181.94
60.58
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
108.44
261.78
321.03
116.31
148.68
4.38
938.01
2,083.77
2,969.53
1,074.70
1,263.78
17.30
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
131.17
0.00
75,250.91
74.31%
HORMIGON
A. GRUESA
43 (P2)
A. FINA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
121.18
0.00
0.00
0.00
0.0270
SUB TOTAL
TIERRA ORG.
SUB TOTAL
0.0160
0.0200
2.71
6.54
5.78
2.09
3.72
0.19
0.00
0.00
0.00
0.06
0.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0080
0.0100
0.0120
0.00
0.00
0.00
0.00
0.00
0.00
0.0090
0.0020
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
0.0250
0.0250
0.0180
0.0180
0.0250
0.0065
0.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0100
4.34
10.47
96.31
3.49
5.95
0.58
0.00
0.00
0.00
0.04
0.00
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1170
0.1200
0.0400
0.0400
0.3000
0.0300
0.0400
0.0200
SUB TOTAL
16.27
39.27
37.56
13.61
22.30
1.17
0.00
0.00
0.00
0.48
0.53
0.1200
0.00
0.00
0.00
0.0210
M.NACIONAL E.
0.8500
0.5800
0.5200
0.5200
0.5800
0.1270
17 (und)
SUB TOTAL
LADRILLO A.
SUB TOTAL
92.17
151.83
166.94
60.48
86.23
3.71
0.00
0.00
0.00
2.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.19
0.00
563.72
0.00
0.5800
0.9860
0.1560
0.1560
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
03.04
03.05
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.03.02
04.03.03
04.04
04.04.01
04.04.02
04.04.03
04.05
04.05.01
04.05.02
04.05.03
04.06
04.06.01
04.06.02
04.06.03
04.07
04.07.01
04.07.02
04.07.03
und
Metrado
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
469.20
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
469.20
MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO
M2
469.20
EXCAVACION DE ZANJAS
m3
298.78
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
200.94
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M
m3
187.47
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h
m3
D=3KM
187.47
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m2
375.29
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
38.13
OBRAS DE CONCRETO SIMPLE
CONCRETO EN FALSA ZAPATAS F'C= 100 KG/CM2
m3
56.97
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
23.65
CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2
m3
5.00
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
71.09
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
375.29
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
65.80
ZAPATAS, ACERO FY=4200KG/CM2
kg
1,857.82
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2
m3
6.27
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
60.25
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
828.88
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT)
m2
9.19
SOBRECIMIENTOS REFORZADOS
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2
m3
15.83
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
194.73
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
945.46
COLUMNETAS
COLUMNETAS, CONCRETO F'C= 175 KG/CM2
m3
4.96
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
49.71
COLUMNETAS, ACERO FY=4200 KG/CM2
kg
1,271.61
COLUMNAS
COLUMNAS, CONCRETO F'C= 210 KG/CM2
m3
41.00
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
416.20
COLUMNAS, ACERO FY=4200 KG/CM2
kg
5,885.53
VIGUETAS DE ARRIOSTRE
VIGUETAS DE ARRIOSTRE, CONCRETO F'c= 175KG/CM2
m3
2.72
VIGUETAS DE ARRIOSTRE, ENCOFRADO Y DESENCOFRADO
m2
31.08
VIGA DE ARRIOSTRE, ACERO FY=4200 KG/CM2.
kg
240.88
VIGAS
VIGAS, CONCRETO F'C=210 KG/CM2
m3
15.91
VIGAS, ENCOFRADO Y DESENCOFRADO
m2
155.95
VIGAS, ACERO FY=4200 KG/CM2.
kg
1,590.22
P.unit
1.12
4.18
2.49
33.34
23.67
17.00
7.91
2.18
76.39
257.89
303.68
411.54
31.61
40.83
349.47
4.83
371.88
54.27
4.96
16.85
401.74
31.61
5.24
381.44
46.14
4.77
507.07
56.37
5.05
329.85
53.91
4.90
391.02
59.62
4.90
Parcial
2,486.76
525.50
1,961.26
24,286.65
1,168.31
9,961.33
4,756.25
3,186.99
1,482.89
818.13
2,912.75
41,501.96
14,691.99
7,182.03
2,057.70
2,247.15
15,323.09
199,822.04
31,968.40
22,995.13
8,973.27
9,867.55
2,331.69
3,269.77
4,111.24
154.85
17,469.17
6,359.54
6,155.42
4,954.21
10,251.14
1,891.94
2,293.62
6,065.58
73,972.99
20,789.87
23,461.19
29,721.93
3,753.02
897.19
1,675.52
1,180.31
23,310.95
6,221.13
9,297.74
7,792.08
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
S/.
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
INDICE DE
CEMENTO PORTLAN TIPO I
ACERO CORRUGADO
AGREGADOS
MADERA NACIONAL PARA ENCOF
BLOQUE Y LADRILLO
21 (und)
CEMENTO SUB TOTAL
469.20
469.20
525.50
1,961.26
100.00%
100.00%
0.00
0.00
0.00%
0.00%
469.20
469.20
525.50
1,961.26
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
469.20
298.78
200.94
187.47
187.47
375.29
38.13
1,168.31
9,961.33
4,756.25
3,186.99
1,482.89
818.13
2,912.75
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
469.20
298.78
200.94
187.47
187.47
375.29
38.13
1,168.31
9,961.33
4,756.25
3,186.99
1,482.89
818.13
2,912.75
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56.97
23.65
5.00
71.09
375.29
14,691.99
7,182.03
2,057.70
2,247.15
15,323.09
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
56.97
23.65
5.00
71.09
375.29
14,691.99
7,182.03
2,057.70
2,247.15
15,323.09
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
6.0000
6.5000
8.0000
65.80
1,857.82
22,995.13
8,973.27
100.00%
100.00%
0.00
0.00
0.00%
0.00%
65.80
1,857.82
22,995.13
8,973.27
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
8.5000
559.30
0.00
6.27
60.25
828.88
9.19
2,331.69
3,269.77
4,111.24
154.85
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
6.27
60.25
828.88
9.19
2,331.69
3,269.77
4,111.24
154.85
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.5000
53.30
0.00
0.00
0.00
15.83
194.73
945.46
6,359.54
6,155.42
4,954.21
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
15.83
194.73
945.46
6,359.54
6,155.42
4,954.21
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
126.64
0.00
0.00
4.96
49.71
1,271.61
1,891.94
2,293.62
6,065.58
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.96
49.71
1,271.61
1,891.94
2,293.62
6,065.58
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
39.68
0.00
0.00
41.00
416.20
5,885.53
20,789.87
23,461.19
29,721.93
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
41.00
416.20
5,885.53
20,789.87
23,461.19
29,721.93
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
348.50
0.00
0.00
2.72
31.08
240.88
897.19
1,675.52
1,180.31
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.72
31.08
240.88
897.19
1,675.52
1,180.31
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
21.76
0.00
0.00
15.91
155.95
1,590.22
6,221.13
9,297.74
7,792.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
15.91
155.95
1,590.22
6,221.13
9,297.74
7,792.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
135.24
0.00
0.00
0.6500
341.82
153.73
40.00
0.00
243.94
Obra
Form.
Cliente
Ubicac.
Item
04.08
04.08.01
04.08.02
04.08.03
05
05.01
05.02
05.03
05.04
05.05
05.06
06
06.01
06.02
Parcial
29,228.82
5,199.64
19,465.03
4,564.15
110,699.04
33,353.70
5,801.60
36,659.95
2,854.66
3,999.63
28,029.50
14,812.46
5,334.94
9,477.52
393,608.91
ACUMULADO ANTERIOR
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
ACUMULADO ACTUAL
INDICE DE
CEMENTO PORTLAN TIPO I
ACERO CORRUGADO
AGREGADOS
MADERA NACIONAL PARA ENCOF
BLOQUE Y LADRILLO
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
12.60
267.12
931.46
5,199.64
19,465.03
4,564.15
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
12.60
267.12
931.46
5,199.64
19,465.03
4,564.15
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
5.00
10.00
453.60
100.80
170.56
359.86
33,353.70
5,801.60
36,659.95
2,854.66
3,999.63
28,029.50
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.00
10.00
453.60
100.80
170.56
359.86
33,353.70
5,801.60
36,659.95
2,854.66
3,999.63
28,029.50
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
58.51
64.02
5,334.94
9,477.52
100.00%
100.00%
0.00
0.00
0.00%
0.00%
58.51
64.02
5,334.94
9,477.52
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
393,608.92
88.37%
0.00
0.00%
393,608.92
100.00%
-0.01
0.00%
21 (und)
8.5000
107.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2180
0.4100
12.76
26.25
2,210.00
1.0500
1.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.19
0.00
0.00
1,950.71
0.00
0.00
870.32
0.00
0.2700
0.0600
0.3000
0.0500
0.0036
0.0100
0.1500
0.00
111.47
0.00
18.08
41.44
0.00
0.1500
05 (M3)
43 (P2)
SUB TOTAL HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL
0.00
1.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.50
0.00
0.00
0.00
0.00
0.00
10.66
0.00
0.8000
0.00
0.00
4.00
0.00
0.00
1.1500
1.3500
0.1250
65.52
31.93
0.00
0.00
46.91
0.5000
17 (und)
LADRILLO A. SUB TOTAL
0.00
234.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
343.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.63
329.57
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
4.8300
0.00
0.00
0.6500
42.77
0.00
0.00
0.00
0.5000
32.90
0.00
0.00
0.00
0.00
0.00
0.00
9.04
0.00
0.00
0.6500
4.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
3.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.29
0.00
0.00
0.00
0.00
0.00
0.5000
7.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
0.00
940.55
0.00
0.00
0.00
0.00
3.22
0.00
0.00
0.00
0.00
0.00
0.5000
2.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
246.06
0.00
0.00
0.00
0.00
26.65
0.00
0.00
0.00
0.00
0.00
0.5000
20.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
2,060.19
0.00
0.00
0.00
0.00
1.77
0.00
0.00
0.00
0.00
0.00
0.5000
1.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
154.47
0.00
0.00
0.00
0.00
10.34
0.00
0.00
0.00
0.00
0.00
0.5000
7.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
775.07
0.00
0.00
0.00
0.00
0.00
0.00
1,011.64
0.00
52.58
56.73
0.00
29.21
0.00
0.6500
0.2700
0.0600
0.1500
1.0700
0.00
0.00
1,335.19
0.00
14.91
76.30
0.00
8.45
0.00
0.6500
0.3000
0.0600
0.1700
1.0500
0.00
0.00
6,297.52
0.00
187.29
353.13
0.00
12.49
0.00
0.6500
0.4500
0.0600
0.0300
1.0700
0.00
0.00
257.74
0.00
13.99
14.45
0.00
9.32
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
1,701.54
0.00
70.18
95.41
0.00
46.79
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.1000
5.4700
03 (KG)
1.0700
0.00
0.00
996.66
0.2100
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14,421.32
0.00
56.10
55.89
0.2500
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
29.26
32.01
1,298.40
0.0200
0.0220
0.00
66.78
0.00
0.6500
43 (P2)
8.19
0.00
0.00
0.00
0.00
0.00
0.4200
5.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.0800
0.1000
2.50
0.80
45.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.17
1.41
0.00
0.00
0.00
0.00
0.0310
0.0580
1.81
3.71
0.00
0.00
0.00
0.00
200.76
111.31
144.35
138.22
0.00
0.00
1.1300
4.9700
0.5800
0.5800
17 (und)
14.24
1,327.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.94
37.13
0.00
0.00
6,497.39
0.00
N DE CONTRATO
FECHA
MONTO DE CONTRATO
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
21
03
05
Ubicac.
PLAZO EJECUCION
43
17
Item
01
01.01
01.01.01
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.03
01.03.01
01.03.02
01.03.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.06
01.06.01
01.06.02
01.06.03
01.06.04
01.07
01.07.01
01.07.02
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.05
02.05.01
02.05.02
02.06
02.06.01
02.06.02
03
03.01
03.02
03.03
P.unit
2.83
50.02
1.61
1.98
29.51
20.00
5.15
4.10
1.34
91.92
83.62
68.28
21.77
14.65
15.65
33.81
55.00
70.08
2.83
50.02
1.61
1.98
29.51
20.00
10.69
11.74
9.79
1.55
83.85
66.43
59.16
77.61
28.05
14.22
176.03
1,798.38
61.80
24.22
242.05
Parcial
1,829.54
27.73
27.73
825.98
490.20
15.78
19.40
289.20
11.40
56.57
15.97
27.47
13.13
175.54
91.92
83.62
204.84
204.84
163.64
21.77
58.60
15.65
67.62
375.24
165.00
210.24
5,461.81
39.34
39.34
1,170.37
695.28
22.38
27.52
410.19
15.00
170.47
45.97
54.00
48.95
21.55
287.05
83.85
66.43
59.16
77.61
42.27
28.05
14.22
3,752.31
1,953.93
1,798.38
9,010.92
7,267.68
775.04
968.20
16,302.27
ACUMULADO ANTERIOR
METRADO
S/.
%
MES ACTUAL
METRADO
S/.
ACUMULADO ACTUAL
METRADO
S/.
%
05 (M3)
43 (P2)
17 (und)
21 (und)
03 (KG)
CEMENTO SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL PIEDRA S. 1/2" SUB TOTAL HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL LADRILLO A. SUB TOTAL
9.80
27.73
100.01%
0.00 0.00%
9.80
27.73
100.01%
0.00
0.00
-0.01%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.80
9.80
9.80
9.80
0.57
490.20
15.78
19.40
289.20
11.40
100.00%
99.99%
100.02%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
9.80
9.80
9.80
9.80
0.57
490.20
15.78
19.40
289.20
11.40
100.00%
99.99%
100.02%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.01%
-0.02%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.10
6.70
9.80
15.97
27.47
13.13
99.97%
100.00%
100.02%
0.00 0.00%
0.00 0.00%
0.00 0.00%
3.10
6.70
9.80
15.97
27.47
13.13
99.97%
100.00%
100.02%
0.00
0.00
0.00
0.00
0.00
0.00
0.03%
0.00%
-0.02%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
91.92
83.62
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
204.84
100.00%
0.00 0.00%
3.00
204.84
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
4.00
1.00
2.00
21.77
58.60
15.65
67.62
100.00%
100.00%
100.00%
100.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
1.00
4.00
1.00
2.00
21.77
58.60
15.65
67.62
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00 0.00%
0.00 0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
3.00
3.00
165.00
210.24
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.90
39.34
99.99%
0.00 0.00%
13.90
39.34
99.99%
0.00
0.00
0.01%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.90
13.90
13.90
13.90
0.75
695.28
22.38
27.52
410.19
15.00
100.00%
100.00%
100.01%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
13.90
13.90
13.90
13.90
0.75
695.28
22.38
27.52
410.19
15.00
100.00%
100.00%
100.01%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
-0.01%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.30
4.60
5.00
13.90
45.97
54.00
48.95
21.55
99.99%
100.01%
100.00%
99.98%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
4.30
4.60
5.00
13.90
45.97
54.00
48.95
21.55
99.99%
100.01%
100.00%
99.98%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01%
-0.01%
0.00%
0.02%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
83.85
66.43
59.16
77.61
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
83.85
66.43
59.16
77.61
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
1.00
28.05
14.22
100.00%
100.00%
0.00 0.00%
0.00 0.00%
1.00
1.00
28.05
14.22
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.10
1.00
1,953.93
1,798.38
100.00%
100.00%
0.00 0.00%
0.00 0.00%
11.10
1.00
1,953.93
1,798.38
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
117.60
32.00
4.00
7,267.68
775.04
968.20
100.00%
100.00%
100.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
117.60
32.00
4.00
7,267.68
775.04
968.20
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
5.60
0.00
0.00
47.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.80
0.00
0.00
0.00
0.00
0.00
0.44
0.00
0.00
0.00
0.00
0.00
64.00
0.00
0.00
0.00
15 751.48
96.62%
0.00 0.00%
15,751.48
96.62%
550.79
3.38%
47.00
0.00
0.00
0.00
0.80
0.00
0.44
0.00
64.00
0.00
1.4000
5.60
11.7500
0.2000
0.1100
16.0000
Ubicac.
Item
01
01.01
01.02
01.03
01.04
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
02.08
02.09
03
03.01
03.02
03.03
04
04.01
04.02
04.03
04.04
04.05
05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
06.04
06.05
06.06
07
07.01
07.02
07.03
07.04
07.05
07.06
07.07
07.08
08
08.01
08.02
08.03
08.04
09
09.01
09.02
09.03
09.04
09.05
09
09.01
09.02
09.03
09.04
09.05
P.unit
glb
Exp
m2
glb
1.00
1.00
1.00
1.00
511.57
475.04
247.06
527.73
M2
JGO
JGO
JGO
JGO
JGO
JGO
JGO
JGO
8.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
275.21
4,904.16
560.39
3,330.04
2,345.19
773.39
1,680.04
1,490.04
1,181.08
ml
ml
und
59.22
51.00
43.00
13.36
68.11
59.34
ml
ml
ml
ml
ml
15.00
38.30
10.00
31.00
18.00
297.07
21.99
17.26
65.05
46.89
JGO
ml
und
und
1.00
83.70
17.00
43.00
971.13
15.75
65.23
2.90
m
m
m
m
m
und
149.82
131.20
47.68
7.80
2.80
14.00
4.38
6.87
4.91
5.56
6.61
13.65
m
m
m
m
m
m
m
m
5.00
4.00
5.42
44.42
15.50
92.03
79.18
122.45
392.15
31.47
23.14
19.36
9.40
7.69
5.22
3.76
und
und
und
und
20.00
8.00
4.00
8.00
63.04
29.59
30.05
22.48
und
und
und
und
und
20.00
8.00
4.00
7.00
1.00
219.18
53.03
179.92
28.14
33.42
und
und
und
und
und
1.00
23.00
11.00
5.00
16.00
74.31
49.12
78.25
99.07
124.07
Parcial
1,761.40
511.57
475.04
247.06
527.73
18,466.01
2,201.68
4,904.16
560.39
3,330.04
2,345.19
773.39
1,680.04
1,490.04
1,181.08
6,816.41
791.18
3,473.61
2,551.62
8,331.44
4,456.05
842.22
172.60
2,016.55
844.02
3,523.02
971.13
1,318.28
1,108.91
124.70
2,044.64
656.21
901.34
234.11
43.37
18.51
191.10
4,799.16
1,960.75
125.88
125.42
859.97
145.70
707.71
413.32
460.41
1,797.56
1,260.80
236.72
120.20
179.84
5,757.92
4,383.60
424.24
719.68
196.98
33.42
4,545.29
74.31
1,129.76
860.75
495.35
1,985.12
57,842.85
ACUMULADO ANTERIOR
METRADO
S/.
%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
PLAZO EJECUCION
MES ACTUAL
METRADO S/.
%
ACUMULADO ACTUAL
METRADO
S/.
%
21
03
05
43
17
21 (und)
03 (KG)
CEMENTO
SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL
05 (M3)
CLAVO DE C.
AFIRMADO
SUB TOTAL
A. GRUESA
43 (P2)
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
17 (und)
LADRILLO A.
SUB TOTAL
1.00
1.00
1.00
1.00
511.57
475.04
247.06
527.73
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
1.00
1.00
1.00
511.57
475.04
247.06
527.73
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,201.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,201.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
4,904.16
560.39
3,330.04
2,345.19
773.39
1,680.04
1,490.04
1,181.08
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
59.22
51.00
43.00
791.18 100.00%
3,473.61 100.00%
2,551.62 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
15.00
38.30
10.00
31.00
18.00
4,456.05
842.22
172.60
2,016.55
844.02
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
83.70
17.00
43.00
971.13 100.00%
1,318.28 100.00%
1,108.91 100.00%
124.70 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
149.82
131.20
47.68
7.80
2.80
14.00
656.21
901.34
234.11
43.37
18.51
191.10
100.00%
100.00%
100.00%
100.00%
99.99%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
149.82
131.20
47.68
7.80
2.80
14.00
656.21
901.34
234.11
43.37
18.51
191.10
100.00%
100.00%
100.00%
100.00%
99.99%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.00
4.00
5.42
44.42
15.50
92.03
79.18
122.45
1,960.75
125.88
125.42
859.97
145.70
707.71
413.32
460.41
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
8.00
4.00
8.00
1,260.80
236.72
120.20
179.84
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
20.00
8.00
4.00
8.00
1,260.80
236.72
120.20
179.84
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
20.00
8.00
4.00
7.00
1.00
4,383.60
424.24
719.68
196.98
33.42
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
6.00
3.00
8.00
0.00
589.44
469.50
297.21
992.56
0.00%
52.17%
54.55%
60.00%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
12.00
6.00
3.00
8.00
0.00
589.44
469.50
297.21
992.56
0.00%
52.17%
54.55%
60.00%
50.00%
1.00
11.00
5.00
2.00
8.00
74.31 100.00%
540.32
47.83%
391.25
45.45%
198.14
40.00%
992.56
50.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10,153.99
17.55%
0.00
0.00%
10,153.99
17.55%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
47,688.86
82.45%
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
01.11
02
02.01
02.02
02.03
03
03.01
03.02
03.03
04
04.01
05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
07
07.01
07.02
07.03
07.04
07.05
07.06
Metrado
P.unit
Parcial
ACUMULADO AN
METRADO
REVOQUES Y ENLUCIDOS
25,807.18
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
108.44
21.18
2,296.76
108.44
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
253.35
18.14
4,595.77
253.35
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
321.03
26.37
8,465.56
256.82
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
116.31
32.75
3,809.15
58.16
TARRAJEO EN TAPASOL Y CANALETA C:A 1:5 e=1.50 cm.
m2
148.68
29.52
4,389.03
74.34
VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm.
m
25
12.28
307.00
6.25
BRUAS VERTICALES DE 1"
m
153.6
6.71
1,030.66
122.88
JUNTAS DE DILATACIN VERTICAL DE 25 CM CON TEKNOPORT, e= 1" m
35.2
9.47
333.34
35.20
JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1" m
19.8
7.34
145.33
19.80
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA ZOCALOS m2
4.06
17.52
71.13
4.06
REVESTIMIENTO DE MUEBLE DE CONCRETO CON CERMICO DE 20X30CM
m2 COLOR CLARO
4.38
82.98
363.45
PISOS Y PAVIMENTOS
15,481.43
PISOS INTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO Y BRUADO
323.03
27.36
8,838.10
VEREDA DE CONCRETO F'C=175 KG/CM2 h=0.10m, ACABADO SEMIPULIDO
m2Y BRUADO
91.25(INC. 57.62
UA LATERAL
5,257.83
DE PROTECCION DE H=0.2
JUNTAS DE DILATACIN HORIZONTAL + SELLO ASFALTICO e=1" c/4m
m
101.8
13.61
1,385.50
ZOCALOS Y CONTRAZOCALOS
2,589.38
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIOR m
90.6
13.95
1,263.87
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR m
122.55
7.76
950.99
ZOCALO DE CERMICO DE 20X30 COLOR CLARO
m2
6.03
62.11
374.52
CARPINTERIA DE MADERA
1,403.50
PUERTA DE MADERA QUINILLA MACHIHEMBRADA + MARCO (INC. SELLADO
m2 Y BARNIZADO)
4.01
350.00
1,403.50
CARPINTERIA METALICA Y ALUMINIO
47,081.30
VENTANA METALICA CON MALLA OLIMPICA 2" + MARCO DE ANG 2"X2"X1/8"
m2 ( INC. 2109.76
MANOS 220.00
DE PINTURA
24,147.20
ESMALTE Y ANTICORROSIVO
PUERTA METALICA ENROLLABLE CON PLANCHA GALVANIZADA (INC CERRADURA,
m2
18.28
DOS MANOS
260.00
DE PINTURA
4,752.80
ESMALTE Y ANTICORRO
PUERTA METALICA CORREDIZA DE TUBO CUADRADO CON MALLA OLIMPICA
m2 2" (INCLUYE
14.9 DOS
400.00
MANOS 5,960.00
DE PINTURA ESMALTE Y ANTIC
PARASOL DE POLICARBONATO CON MARCO DE ALUMINIO SUJETADOS A
m2COLUMNAS
94.01
(SEGUN
130.00
DISEO)
12,221.30
CERRAJERIA
350.68
BISAGRA DE BRONCE ALUMINIZADAS DE 4"
und
8
13.52
108.16
CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA
und
2
90.97
181.94
MANIJA DE BRONCE PARA PUERTAS
und
2
30.29
60.58
PINTURA
8,281.42
PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS
m2
108.44
8.65
938.01
PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS
m2
253.53
7.96
2,018.10
PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS
m2
321.03
9.25
2,969.53
PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS
m2
116.31
9.24
1,074.70
PINTURA EN TAPASOL Y CANALETA AL LATEX SATINADO 2 MANOS
m2
148.68
8.50
1,263.78
PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS
m
4.38
3.95
17.30
COSTO DIRECTO
100,994.89
RLOS F. FITZCARRALD
ER ANTONIO ESTREMADOYRO ALGUIAR
ACUMULADO ANTERIOR
S/.
%
MES ACTUAL
METRADO
S/.
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
21
03
05
43
17
21 (und)
CEMENTO
2,296.76
4,595.77
6,772.34
1,904.74
2,194.52
76.75
824.52
333.34
145.33
71.13
0.00
100.00%
100.00%
80.00%
50.00%
50.00%
25.00%
80.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
108.44
253.35
256.82
58.16
74.34
6.25
122.88
35.20
19.80
4.06
0.00
2,296.76
4,595.77
6,772.34
1,904.74
2,194.52
76.75
824.52
333.34
145.33
71.13
0.00
100.00%
100.00%
80.00%
50.00%
50.00%
25.00%
80.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00
64.21
58.15
74.34
18.75
30.72
0.00
0.00
0.00
4.38
0.00
0.00
1,693.22
1,904.41
2,194.51
230.25
206.14
0.00
0.00
0.00
363.45
0.00%
0.00%
20.00%
50.00%
50.00%
75.00%
20.00%
0.00%
0.00%
0.00%
100.00%
0.1500
0.1500
0.1170
0.1170
0.1500
0.0400
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
323.03
91.25
101.80
8,838.10
5,257.83
1,385.50
100.00%
100.00%
100.00%
0.4550
1.0200
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
90.60
122.55
6.03
1,263.87
950.99
374.52
100.00%
100.00%
100.00%
0.0640
0.0200
0.1870
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
4.01
1,403.50
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
109.76
18.28
14.90
94.01
24,147.20
4,752.80
5,960.00
12,221.30
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.00
2.00
2.00
108.16
181.94
60.58
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
108.44
253.53
321.03
116.31
148.68
4.38
938.01
2,018.10
2,969.53
1,074.70
1,263.78
17.30
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
19,215.21
19.03%
0.00
0.00%
19,215.21
19.03%
81,779.68
80.97%
0.1170
0.1200
A. CORRUGADO
03 (KG)
SUB TOTAL ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL PIEDRA S. 1/2"
0.0400
0.0400
0.0300
0.0300
0.0040
0.0200
16.27
38.00
30.05
6.80
11.15
0.25
0.00
0.00
0.00
0.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
103.00
0.00
0.00
24.38
0.00
0.0100
0.0500
4.34
10.13
7.70
1.74
0.30
0.13
0.00
0.00
0.00
0.04
0.00
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0270
0.00
0.00
0.00
05 (M3)
43 (P2)
HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.1200
0.0160
0.0200
2.71
6.33
4.62
1.05
1.86
0.04
0.00
0.00
0.00
0.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0008
0.0100
0.0120
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0090
0.0020
0.0020
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.68
0.00
427.48
0.00
0.00
0.00
0.0210
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0250
0.0180
0.0180
0.0250
0.0065
0.6500
0.5800
0.5200
0.5200
0.5800
0.1270
0.5800
0.9860
0.1560
0.1560
70.49
146.94
133.55
30.24
43.12
0.79
0.00
0.00
0.00
2.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
03.04
03.05
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.03.02
04.03.03
04.04
04.04.01
04.04.02
04.04.03
04.05
04.05.01
04.05.02
04.05.03
04.06
04.06.01
04.06.02
04.06.03
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
Metrado
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
469.20
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
469.20
MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO
M2
469.20
EXCAVACION DE ZANJAS
m3
293.32
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
198.24
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M
m3
183.08
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h
m3
183.08
D=3KM
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m2
376.83
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
38.29
OBRAS DE CONCRETO SIMPLE
CONCRETO EN FALSA ZAPATAS F'C= 100 KG/CM2
m3
56.97
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
20.75
CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2
m3
4.64
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
65.30
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
376.83
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
65.80
ZAPATAS, ACERO FY=4200KG/CM2
kg
1,857.82
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2
m3
6.27
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
60.25
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
828.88
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT)
m2
9.19
SOBRECIMIENTOS REFORZADOS
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2
m3
14.89
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
180.68
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
920.71
COLUMNETAS
COLUMNETAS, CONCRETO F'C= 175 KG/CM2
m3
4.91
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
48.97
COLUMNETAS, ACERO FY=4200 KG/CM2
kg
1,169.41
COLUMNAS
COLUMNAS, CONCRETO F'C= 210 KG/CM2
m3
41.00
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
416.20
COLUMNAS, ACERO FY=4200 KG/CM2
kg
5,885.53
VIGUETAS DE ARRIOSTRE
VIGUETAS DE ARRIOSTRE, CONCRETO F'c= 175KG/CM2
m3
2.49
VIGUETAS DE ARRIOSTRE, ENCOFRADO Y DESENCOFRADO
m2
26.66
VIGA DE ARRIOSTRE, ACERO FY=4200 KG/CM2.
kg
227.68
P.unit
1.12
4.18
2.49
33.34
23.67
17.00
7.91
2.18
76.39
257.89
303.68
411.54
31.61
40.83
349.47
4.83
371.88
54.27
4.96
16.85
401.74
31.61
5.24
381.44
46.14
4.77
507.07
56.37
5.05
329.85
53.91
4.90
Parcial
2,486.76
525.50
1,961.26
23,946.92
1,168.31
9,779.29
4,692.34
3,112.36
1,448.16
821.49
2,924.97
40,353.00
14,691.99
6,301.36
1,909.55
2,064.13
15,385.97
197,951.07
31,968.40
22,995.13
8,973.27
9,867.55
2,331.69
3,269.77
4,111.24
154.85
16,517.72
5,981.91
5,711.29
4,824.52
9,710.44
1,872.87
2,259.48
5,578.09
73,972.99
20,789.87
23,461.19
29,721.93
3,374.20
821.33
1,437.24
1,115.63
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
MES ACTUAL
S/.
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
21
03
05
43
17
(INC. IGV.)
IND
CEMENTO PORTLAN TIPO I
ACERO CORRUGADO
AGREGADOS
MADERA NACIONAL PARA EN
BLOQUE Y LADRILLO
21 (und)
CEMENTO SUB TOTAL
469.20
469.20
525.50
1,961.26
100.00%
100.00%
0.00
0.00
0.00%
0.00%
469.20
469.20
525.50
1,961.26
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
469.20
293.32
198.24
183.08
183.08
0.00
0.00
1,168.31
9,779.29
4,692.34
3,112.36
1,448.16
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
469.20
293.32
198.24
183.08
183.08
0.00
0.00
1,168.31
9,779.29
4,692.34
3,112.36
1,448.16
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
376.83
38.29
0.00
0.00
0.00
0.00
0.00
821.49
2,924.97
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56.97
20.75
4.64
65.30
0.00
14,691.99
6,301.36
1,909.55
2,064.13
0.00
100.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
56.97
20.75
4.64
65.30
0.00
14,691.99
6,301.36
1,909.55
2,064.13
0.00
100.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
376.83
0.00
0.00
0.00
0.00
15,385.97
0.00%
0.00%
0.00%
0.00%
100.00%
6.0000
6.5000
8.0000
65.80
1,857.82
22,995.13
8,973.27
100.00%
100.00%
0.00
0.00
0.00%
0.00%
65.80
1,857.82
22,995.13
8,973.27
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
8.5000
559.30
0.00
6.27
60.25
828.88
9.19
2,331.69
3,269.77
4,111.24
154.85
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
6.27
60.25
828.88
9.19
2,331.69
3,269.77
4,111.24
154.85
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.5000
53.30
0.00
0.00
0.00
14.89
180.68
920.71
5,981.91
5,711.29
4,824.52
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
14.89
180.68
920.71
5,981.91
5,711.29
4,824.52
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
119.12
0.00
0.00
4.91
48.97
1,169.41
1,872.87
2,259.48
5,578.09
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.91
48.97
1,169.41
1,872.87
2,259.48
5,578.09
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
39.28
0.00
0.00
41.00
416.20
5,885.53
20,789.87
23,461.19
29,721.93
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
41.00
416.20
5,885.53
20,789.87
23,461.19
29,721.93
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
348.50
0.00
0.00
2.49
26.66
227.68
821.33
1,437.24
1,115.63
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.49
26.66
227.68
821.33
1,437.24
1,115.63
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
19.92
0.00
0.00
0.6500
341.82
134.88
37.12
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
04.07
04.07.01
04.07.02
04.07.03
04.08
04.08.01
04.08.02
04.08.03
05
05.01
05.02
05.03
05.04
05.05
05.06
06
06.01
06.02
Parcial
23,310.95
6,221.13
9,297.74
7,792.08
29,228.82
5,199.64
19,465.03
4,564.15
110,699.04
33,353.70
5,801.60
36,659.95
2,854.66
3,999.63
28,029.50
14,772.34
5,294.82
9,477.52
390,209.13
ACUMULADO ANTERIOR
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
IND
CEMENTO PORTLAN TIPO I
ACERO CORRUGADO
AGREGADOS
MADERA NACIONAL PARA EN
BLOQUE Y LADRILLO
21
03
05
43
17
(INC. IGV.)
21 (und)
15.91
155.95
1,590.22
6,221.13
9,297.74
7,792.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
15.91
155.95
1,590.22
6,221.13
9,297.74
7,792.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
135.24
0.00
0.00
12.60
267.12
931.46
5,199.64
19,465.03
4,564.15
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
12.60
267.12
931.46
5,199.64
19,465.03
4,564.15
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
107.10
0.00
0.00
3.00
5.00
300.00
50.00
100.00
95.00
20,012.22
2,900.80
24,246.00
1,416.00
2,345.00
7,399.55
60.00%
50.00%
66.14%
49.60%
58.63%
26.40%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.00
5.00
300.00
50.00
100.00
95.00
20,012.22
2,900.80
24,246.00
1,416.00
2,345.00
7,399.55
60.00%
50.00%
66.14%
49.60%
58.63%
26.40%
2.00
5.00
153.60
50.80
70.56
264.86
13,341.48
2,900.80
12,413.95
1,438.66
1,654.63
20,629.95
40.00%
50.00%
33.86%
50.40%
41.37%
73.60%
58.07
64.02
5,294.82
9,477.52
100.00%
100.00%
0.00
0.00
0.00%
0.00%
58.07
64.02
5,294.82
9,477.52
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
318,697.23
81.67%
0.00
0.00%
318,697.23
81.67%
71,511.90
18.33%
0.00
0.00
0.00
0.00
0.00
0.00
0.2180
0.4100
12.66
26.25
1,934.47
A. CORRUGADO
1.0500
1.0500
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17.63
0.00
0.00
1,950.71
0.00
0.00
870.32
0.00
0.2700
0.0600
0.3000
0.0500
0.0036
0.0100
0.1500
0.00
111.47
0.00
18.08
41.44
0.00
SUB TOTAL
05 (M3)
A. GRUESA SUB TOTAL
0.00
1.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.80
0.00
0.00
0.00
3.71
0.00
0.00
65.52
28.01
0.00
0.00
0.00
0.00
0.00
2.32
0.00
0.00
0.1500
PIEDRA S. 1/2"
0.8000
1.1500
1.3500
0.1250
0.5000
43 (P2)
M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
234.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
315.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.63
329.57
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
4.8300
0.00
0.00
0.6500
42.77
0.00
0.00
0.00
0.5000
32.90
0.00
0.00
0.00
0.00
0.00
0.00
9.04
0.00
0.00
0.6500
4.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
3.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.68
0.00
0.00
0.00
0.00
0.00
0.5000
7.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
0.00
872.68
0.00
0.00
0.00
0.00
3.19
0.00
0.00
0.00
0.00
0.00
0.5000
2.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
242.40
0.00
0.00
0.00
0.00
26.65
0.00
0.00
0.00
0.00
0.00
0.5000
20.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
2,060.19
0.00
0.00
0.00
0.00
1.62
0.00
0.00
0.00
0.00
0.00
0.5000
1.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
132.50
0.00
0.00
0.00
0.00
0.00
0.00
985.16
0.00
48.78
55.24
0.00
27.10
0.00
0.6500
0.2700
0.0600
0.1500
1.0700
0.00
0.00
1,227.88
0.00
14.69
70.16
0.00
8.32
0.00
0.6500
0.3000
0.0600
0.1700
1.0500
0.00
0.00
6,297.52
0.00
187.29
353.13
0.00
124.86
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
1.20
13.66
0.00
8.00
0.00
0.6500
0.0450
0.0600
0.3000
1.0700
0.00
0.00
243.62
0.1000
5.4700
03 (KG)
1.0700
0.00
0.00
1,701.54
1.0700
0.00
0.00
996.66
0.4500
0.0600
0.00
70.18
95.41
0.2100
0.0600
0.00
56.10
55.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14,273.41
0.6500
0.3000
0.00
46.79
0.00
0.00
66.78
0.00
0.6500
0.2500
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
29.04
32.01
1,271.40
0.0200
0.0220
10.34
0.00
0.00
0.00
0.00
0.00
0.5000
8.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.16
1.41
304.94
43 (P2)
7.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
6.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.0800
0.1000
1.50
0.40
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.3100
0.0580
18.00
3.71
0.00
0.00
0.00
0.00
110.23
93.53
137.87
0.00
0.00
4.9700
1.1300
4.9700
0.5800
0.5800
17 (und)
0.00
775.07
0.00
0.00
0.00
0.00
14.24
1,327.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.68
37.13
0.00
0.00
6,375.68
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.03
01.03.01
01.03.02
01.03.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.06
01.06.01
01.06.02
01.06.03
01.06.04
01.07
01.07.01
01.07.02
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.02
03
03.01
03.02
03.03
P.unit
2.83
50.02
1.61
1.98
29.51
20.00
5.15
4.10
1.34
91.92
83.62
68.28
21.77
14.65
15.65
33.81
55.00
70.08
2.83
50.02
1.61
1.98
29.51
20.00
10.69
9.79
1.55
83.85
59.16
28.05
14.22
61.80
24.22
242.05
VA CARLOS FERMIN
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
Parcial
1,929.99
27.73
27.73
918.81
545.22
17.55
21.58
321.66
12.80
63.19
19.06
29.52
14.61
175.54
91.92
83.62
204.84
204.84
164.64
21.77
43.95
31.30
67.62
375.24
165.00
210.24
1,109.85
26.46
26.46
788.17
467.69
15.05
18.51
275.92
11.00
109.94
46.50
48.95
14.49
143.01
83.85
59.16
42.27
28.05
14.22
8,714.28
6,971.04
775.04
968.20
11,754.12
ACUMULADO ANTERIOR
METRADO
S/.
%
MES ACTUAL
METRADO S/.
%
ACUMULADO ACTUAL
METRADO
S/.
9.80
27.73
100.01%
0.00
0.00%
9.80
27.73
10.90
10.90
10.90
10.90
0.64
545.22
17.55
21.58
321.66
12.80
100.00%
99.99%
100.01%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
10.90
10.90
10.90
10.90
0.64
545.22
17.55
21.58
321.66
12.80
3.70
7.20
10.90
19.06
29.52
14.61
99.97%
100.00%
99.97%
0.00
0.00
0.00
0.00%
0.00%
0.00%
3.70
7.20
10.90
19.06
29.52
14.61
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
9.35
26.46
100.00%
0.00
0.00%
9.35
26.46
9.35
9.35
9.35
9.35
0.55
467.69
15.05
18.51
275.92
11.00
100.00%
100.02%
100.02%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
9.35
9.35
9.35
9.35
0.55
467.69
15.05
18.51
275.92
11.00
4.35
5.00
9.35
46.50
48.95
14.49
100.00%
100.00%
100.02%
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.35
5.00
9.35
46.50
48.95
14.49
1.00
1.00
83.85
59.16
100.00%
100.00%
0.00
0.00
0.00%
0.00%
1.00
1.00
83.85
59.16
1.00
1.00
28.05
14.22
100.00%
100.00%
0.00
0.00
0.00%
0.00%
1.00
1.00
28.05
14.22
112.80
32.00
6,971.04
775.04
0.00
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
112.80
32.00
0.00
6,971.04
775.04
0.00
9,865.66
83.93%
0.00
0.00%
9,865.66
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
%
21 (und)
CEMENTO SUB TOTAL
03 (KG)
A. CORRUGADO
SUB TOTAL
100.01%
0.00
0.00
-0.01%
0.00
0.00
100.00%
99.99%
100.01%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.01%
-0.01%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
99.97%
100.00%
99.97%
0.00
0.00
0.00
0.00
0.00
0.00
0.03%
0.00%
0.03%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
91.92
83.62
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
3.00
204.84
100.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
3.00
2.00
2.00
21.77
43.95
31.30
67.62
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
3.00
3.00
165.00
210.24
100.00%
100.00%
0.00
0.00
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
100.02%
100.02%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
-0.02%
-0.02%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.02%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
-0.02%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
0.00%
0.00
0.00
4.00
0.00
0.00
968.20
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1,888.46
16.07%
83.93%
1.4000
0.00
11.7500
0.00
ES Y ADELANTO DIRECTO
JULIO 2013
A ENCOFRADO Y CARPINTERIA
03 (KG)
ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL
05 (M3)
PIEDRA S. 1/2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2200
05 (M3)
43 (P2)
SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1100
16.0000
43 (P2)
SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
01
01.01
01.02
01.03
01.04
02
02.01
02.02
02.03
02.04
03
03.01
03.02
03.03
04
04.01
04.02
05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
06.04
06.05
07
07.01
07.02
07.03
07.04
07.05
08
08.01
08.02
08.03
08.04
09
09.01
09.02
09.03
09.04
09.05
09
09.01
09.02
09.03
09.04
09.05
P.unit
glb
Exp
m2
glb
1.00
1.00
1.00
1.00
511.57
475.04
247.06
527.73
M2
JGO
JGO
JGO
3.00
1.00
1.00
1.00
275.21
2,522.16
1,150.04
896.45
ml
ml
und
59.22
51.00
43.00
13.36
68.11
59.34
ml
ml
15.00
18.00
39.44
28.32
JGO
ml
und
und
1.00
67.00
27.50
43.00
971.13
15.75
65.23
2.90
m
m
m
m
und
144.00
150.75
36.00
9.60
14.00
4.38
6.87
4.91
5.56
13.65
m
m
m
m
m
2.50
61.00
99.10
70.79
124.47
19.36
9.40
7.69
5.22
3.76
und
und
und
und
20.00
8.00
4.00
8.00
63.04
29.59
30.05
22.48
und
und
und
und
und
20.00
8.00
4.00
7.00
1.00
219.18
53.03
179.92
28.14
33.42
und
und
und
und
und
1.00
27.00
13.00
5.00
8.00
74.31
49.12
78.25
99.07
124.07
Parcial
1,761.40
511.57
475.04
247.06
527.73
5,394.28
825.63
2,522.16
1,150.04
896.45
6,816.41
791.18
3,473.61
2,551.62
1,101.36
591.60
509.76
3,944.91
971.13
1,055.25
1,793.83
124.70
2,087.61
630.72
1,035.65
176.76
53.38
191.10
2,221.41
48.40
573.40
762.08
369.52
468.01
1,797.56
1,260.80
236.72
120.20
179.84
5,757.92
4,383.60
424.24
719.68
196.98
33.42
3,905.71
74.31
1,326.24
1,017.25
495.35
992.56
34,788.57
ACUMULADO ANTERIOR
METRADO
S/.
%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
METRADO
S/.
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
21 (und)
03 (KG)
CEMENTO
SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL
05 (M3)
CLAVO DE C.
AFIRMADO
SUB TOTAL
A. GRUESA
43 (P2)
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
17 (und)
LADRILLO A.
SUB TOTAL
1.00
1.00
1.00
1.00
511.57
475.04
247.06
527.73
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
1.00
1.00
1.00
511.57
475.04
247.06
527.73
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
825.63 100.00%
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
3.00
0.00
0.00
0.00
825.63
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00
1.00
1.00
1.00
0.00
2,522.16
1,150.04
896.45
0.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
59.22
51.00
43.00
791.18
3,473.61
2,551.62
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
15.00
18.00
591.60
509.76
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
67.00
27.50
43.00
971.13
1,055.25
1,793.83
124.70
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
630.72
1,035.65
176.76
53.38
191.10
100.00%
100.00%
100.00%
99.99%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
144.00
150.75
36.00
9.60
14.00
630.72
1,035.65
176.76
53.38
191.10
100.00%
100.00%
100.00%
99.99%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
-0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.01%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
2.50
61.00
99.10
70.79
124.47
48.40
573.40
762.08
369.52
468.01
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
8.00
4.00
8.00
1,260.80 100.00%
236.72 100.00%
120.20 100.00%
179.84 100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
20.00
8.00
4.00
8.00
1,260.80
236.72
120.20
179.84
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
8.00
4.00
7.00
1.00
4,383.60
424.24
719.68
196.98
33.42
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
20.00
8.00
4.00
7.00
1.00
4,383.60
424.24
719.68
196.98
33.42
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
27.00
13.00
5.00
8.00
74.31
1,326.24
1,017.25
495.35
992.56
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12,230.12
35.16%
0.00
0.00%
12,230.12
35.16%
22,558.45
64.84%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
144.00
150.75
36.00
9.60
14.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
02
02.01
02.02
02.03
02.04
03
03.01
03.02
03.03
04
04.01
05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
07
07.01
07.02
07.03
07.04
07.05
07.06
Metrado
P.unit
Parcial
ACUMULADO ANTERI
METRADO
REVOQUES Y ENLUCIDOS
29,996.08
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
84.06
21.18
1,780.39
75.65
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
237.95
18.14
4,316.41
214.16
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
254.17
26.37
6,702.46
241.47
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
147.04
32.75
4,815.56
147.04
TARRAJEO EN TAPASOL Y CANALETA C:A 1:5 e=1.50 cm.
m2
274.20
29.52
8,094.38
274.20
VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm.
m
154.50
12.28
1,897.26
92.70
BRUAS VERTICALES DE 1"
m
243.45
6.71
1,633.55
219.11
JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1"m
43.80
7.34
321.49
43.80
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA ZOCALOS
m2
4.06
17.52
71.13
REVESTIMIENTO DE MUEBLE DE CONCRETO CON CERMICO DE 20X30CM
m2
COLOR
4.38
CLARO
82.98
363.45
PISOS Y PAVIMENTOS
17,319.67
PISOS INTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO
m2
Y
286.58
BRUADO
27.36
7,840.83
PISOS INTERIORES DE CONCRETO F'C=210 KG/CM2 REFORZADO CON
m2FIBRAS DE
47.18
ACERO E=4"38.06
(Incluye acabado)
1,795.67
VEREDA DE CONCRETO F'C=175 KG/CM2 h=0.10m, ACABADO SEMIPULIDO
m2 Y BRUADO
75.00 (INC. UA
57.62
LATERAL DE
4,321.50
PROTECCION DE H=0.2)
JUNTAS DE DILATACIN HORIZONTAL + SELLO ASFALTICO e=1" c/4m m
247.00
13.61
3,361.67
ZOCALOS Y CONTRAZOCALOS
2,617.41
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIORmm
92.12
13.95
1,285.07
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIORm
123.43
7.76
957.82
ZOCALO DE CERMICO DE 20X30 COLOR CLARO
m2
6.03
62.11
374.52
CARPINTERIA DE MADERA
1,403.50
PUERTA DE MADERA QUINILLA MACHIHEMBRADA + MARCO (INC. SELLADO
m2
Y BARNIZADO
4.01
350.00
1,403.50
CARPINTERIA METALICA Y ALUMINIO
49,812.00
VENTANA METALICA CON MALLA OLIMPICA 2" + MARCO DE ANG 2"X2"X1/8"
m2
( INC.
103.60
2 MANOS DE220.00
PINTURA ESMALTE
22,792.00
Y ANTICORROSIVO)
PUERTA METALICA ENROLLABLE CON PLANCHA GALVANIZADA (INC CERRADURA,
m2
36.76
DOS MANOS
260.00
DE PINTURA9,557.60
ESMALTE Y ANTICORROSIVO)
PUERTA METALICA CORREDIZA DE TUBO CUADRADO CON MALLA OLIMPICA
m2
2" (INCLUYE
14.90
DOS400.00
MANOS DE PINTURA
5,960.00 ESMALTE Y ANTICORROSIV
PARASOL DE POLICARBONATO CON MARCO DE ALUMINIO SUJETADOS
m2 A COLUMNAS
88.48 (SEGUN130.00
DISEO)
11,502.40
CERRAJERIA
350.68
BISAGRA DE BRONCE ALUMINIZADAS DE 4"
und
8.00
13.52
108.16
CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA
und
2.00
90.97
181.94
MANIJA DE BRONCE PARA PUERTAS
und
2.00
30.29
60.58
PINTURA
9,131.17
PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS
m2
84.06
8.65
727.12
PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS
m2
220.27
7.96
1,753.35
PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS m2
254.17
9.25
2,351.07
PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS
m2
147.04
9.24
1,358.65
PINTURA EN TAPASOL Y CANALETA AL LATEX SATINADO 2 MANOS m2
274.20
8.50
2,330.70
PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS
m
154.50
3.95
610.28
COSTO DIRECTO
110,630.51
ACUMULADO ANTERIOR
S/.
%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
METRADO S/.
%
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO S/.
%
1,602.35
3,884.86
6,367.48
4,815.56
8,094.38
1,138.36
1,470.23
321.49
0.00
0.00
90.00%
90.00%
95.00%
100.00%
100.00%
60.00%
90.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
75.65
214.16
241.47
147.04
274.20
92.70
219.11
43.80
0.00
0.00
1,602.35
3,884.86
6,367.48
4,815.56
8,094.38
1,138.36
1,470.23
321.49
0.00
0.00
90.00%
90.00%
95.00%
100.00%
100.00%
60.00%
90.00%
100.00%
0.00%
0.00%
8.41
23.79
12.70
0.00
0.00
61.80
24.34
0.00
4.06
4.38
178.04
431.55
334.98
0.00
-0.00
758.90
163.32
-0.00
71.13
363.45
10.00%
10.00%
5.00%
0.00%
0.00%
40.00%
10.00%
0.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
286.58
47.18
75.00
247.00
7,840.83
1,795.67
4,321.50
3,361.67
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
92.12
123.43
6.03
1,285.07
957.82
374.52
100.00%
100.00%
100.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
4.01
1,403.50
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
103.60
36.76
14.90
88.48
22,792.00
9,557.60
5,960.00
11,502.40
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.00
2.00
2.00
108.16
181.94
60.58
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
84.06
220.27
254.17
147.04
274.20
154.50
727.12
1,753.35
2,351.07
1,358.65
2,330.70
610.28
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
27,694.72
25.03%
0.00%
0.00
27,694.72
25.03%
82,935.79
74.97%
21 (und)
03 (KG)
CEMENTO SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL PIEDRA S. 1/2"
0.1500
0.1500
0.1170
0.1170
0.1500
0.0400
0.1170
0.1200
0.4550
1.0200
0.0640
0.0200
0.1870
11.35
32.12
28.25
17.20
41.13
3.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0400
0.0400
0.0300
0.0300
0.0400
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
133.77
0.00
0.00
36.07
0.0100
0.0200
0.0500
3.03
8.57
7.24
4.41
10.97
1.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0270
0.0850
05 (M3)
43 (P2)
SUB TOTAL HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1200
0.0210
0.0420
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0250
0.0180
0.0180
0.0250
0.0065
1.89
5.35
4.35
2.65
6.86
0.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0800
0.0100
0.0120
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0090
0.0020
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.0160
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.70
0.00
0.6500
0.5800
0.5200
0.5200
0.5800
0.1270
0.5800
0.9860
0.1560
0.1560
43 (P2)
17 (und)
SUB TOTAL LADRILLO A. SUB TOTAL
49.18
124.21
125.56
76.46
159.04
11.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
546.22
0.00
Item
01
01.01
01.02
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
03.04
03.05
04
04.01
04.01.01
04.01.02
4.02
04.02.01
04.02.02
04.02.03
04.02.04
4.03
04.03.01
04.03.02
04.03.03
4.04
04.04.01
04.04.02
04.04.03
4.05
04.05.01
04.05.02
04.05.03
4.06
04.06.01
04.06.02
04.06.03
4.07
04.07.01
04.07.02
04.07.03
4.08
04.08.01
04.08.02
04.08.03
4.09
04.09.01
04.09.02
04.09.03
05
05.01
05.02
05.03
05.04
05.05
05.06
06
06.01
06.02
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
Parcial
ACUMULADO ANTERIOR
MES ACTUAL
METRADO
S/.
%
METRADO
S/.
TRABAJOS PRELIMINARES
2,486.76
LIMPIEZA DE TERRENO MANUAL
m2
469.20
1.12
525.50
469.20
525.50 100.00%
0.00
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
469.20
4.18
1,961.26
469.20
1,961.26 100.00%
0.00
MOVIMIENTO DE TIERRAS
24,823.69
NIVELACION DE TERRENO
m2
469.20
2.49
1,168.31
469.20
1,168.31 100.00%
0.00
EXCAVACION DE ZANJAS
m3
303.97
33.34
10,134.36
303.97
10,134.36 100.00%
0.00
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
185.79
23.67
4,397.65
111.47
2,638.49
60.00%
0.00
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M
m3
209.37
17.00
3,559.29
167.50
2,847.50
80.00%
0.00
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE
m3
209.37
15M3 V=30KM/h
7.91 D=3KM
1,656.12
0.00
0.00
0.00%
0.00
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m2
393.09
2.18
856.94
0.00
0.00
0.00%
0.00
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)m3
39.94
76.39
3,051.02
0.00
0.00
0.00%
0.00
OBRAS DE CONCRETO SIMPLE
39,448.08
CONCRETO EN FALSA ZAPATAS F'C= 100 KG/CM2
m3
61.34
257.89
15,818.97
61.34
15,818.97 100.00%
0.00
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
14.59
303.68
4,430.69
14.59
4,430.69 100.00%
0.00
CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2
m3
4.19
411.54
1,724.35
4.19
1,724.35 100.00%
0.00
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
58.14
31.61
1,837.81
58.14
1,837.81 100.00%
0.00
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
382.96
40.83
15,636.26
0.00
0.00
0.00%
0.00
OBRAS DE CONCRETO ARMADO
200,910.69
ZAPATAS
31,968.40
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
65.80
349.47
22,995.13
65.80
22,995.13 100.00%
0.00
ZAPATAS, ACERO FY=4200KG/CM2
kg
1,857.82
4.83
8,973.27
1,857.82
8,973.27 100.00%
0.00
VIGAS DE CIMENTACION
9,867.55
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2 m3
6.27
371.88
2,331.69
6.27
2,331.69 100.00%
0.00
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADOm2
60.25
54.27
3,269.77
60.25
3,269.77 100.00%
0.00
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
828.88
4.96
4,111.24
828.88
4,111.24 100.00%
0.00
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO
m2
(TECNOPORT)
9.19
16.85
154.85
9.19
154.85 100.00%
0.00
SOBRECIMIENTOS REFORZADOS
15,863.67
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2
m3
13.70
401.74
5,503.84
13.70
5,503.84 100.00%
0.00
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
163.30
31.61
5,161.91
163.30
5,161.91 100.00%
0.00
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
991.97
5.24
5,197.92
991.97
5,197.92 100.00%
0.00
COLUMNETAS
9,889.73
COLUMNETAS, CONCRETO F'C= 175 KG/CM2
m3
4.91
381.44
1,872.87
1.47
561.86
30.00%
0.00
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
47.48
46.14
2,190.73
14.24
657.22
30.00%
0.00
COLUMNETAS, ACERO FY=4200 KG/CM2
kg
1,221.41
4.77
5,826.13
1,221.41
5,826.13 100.00%
0.00
COLUMNAS
73,972.99
COLUMNAS, CONCRETO F'C=210 KG/CM2
m3
41.00
507.07
20,789.87
41.00
20,789.87 100.00%
0.00
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
416.20
56.37
23,461.19
416.20
23,461.19 100.00%
0.00
COLUMNAS, ACERO FY=4200 KG/CM2.
kg
5,885.53
5.05
29,721.93
5,885.53
29,721.93 100.00%
0.00
VIGUETAS DE ARRIOSTRE
3,069.60
VIGUETAS DE ARRIOSTRE, CONCRETO F'c= 175KG/CM2 m3
2.37
329.85
781.74
0.00
0.00
0.00%
0.00
VIGUETAS DE ARRIOSTRE, ENCOFRADO Y DESENCOFRADO
m2
24.13
53.91
1,300.85
0.00
0.00
0.00%
0.00
VIGA DE ARRIOSTRE, ACERO FY=4200 KG/CM2.
kg
201.43
4.90
987.01
0.00
0.00
0.00%
0.00
VIGAS
23,310.95
VIGAS, CONCRETO F'C=210 KG/CM2
m3
15.91
391.02
6,221.13
15.91
6,221.13 100.00%
0.00
VIGAS, ENCOFRADO Y DESENCOFRADO
m2
155.95
59.62
9,297.74
155.95
9,297.74 100.00%
0.00
VIGAS, ACERO FY=4200 KG/CM2.
kg
1,590.22
4.90
7,792.08
1,590.22
7,792.08 100.00%
0.00
CANALETA DE CONCRETO EN TECHO
29,228.82
CANALETA DE CONCRETO EN TECHO, CONCRETO F'C=210
m3KG/CM2
12.60
CON ADITIVO
412.67IMPERMEABILIZANTE
5,199.64
12.60
5,199.64 100.00%
0.00
CANALETA DE CONCRETO EN TECHO, ENCOFRADO Y DESENCOFRADO
m2
267.12
72.87
19,465.03
267.12
19,465.03 100.00%
0.00
CANALETA DE CONCRETO EN TECHO, ACERO FY=4200 KG/CM2.
kg
931.46
4.90
4,564.15
931.46
4,564.15 100.00%
0.00
FOSA DE ALINEAMIENTO PARA AUTOS
3,738.98
FOSA DE ALINEAMIENTO, CONCRETO F'C=210 KG/CM2
m3
3.83
257.70
986.99
0.00
0.00
0.00%
0.00
FOSA DE ALINEAMIENTO, ENCOFRADO Y DESENCOFRADO
m2
35.43
38.41
1,360.87
0.00
0.00
0.00%
0.00
ACERO DE REFUERZO FY=4200 KG/CM2
kg
291.03
4.78
1,391.12
0.00
0.00
0.00%
0.00
ESTRUCTURA METALICA Y COBERTURA
110,699.04
TIJERAL METLICO DE SECCIN RECTANGULAR T-1
und
5.00
6,670.74
33,353.70
3.00
20,012.22
60.00%
0.00
SOPORTES METALICOS PARA CERCHAS
und
10.00
580.16
5,801.60
5.00
2,900.80
50.00%
0.00
VIGUETA TIPO "Z" DE 100mm x 51mm x 4.5mmm x 6.00m
m
453.60
80.82
36,659.95
300.00
24,246.00
66.14%
0.00
TENSORES METALICOS DE ACERO LISO DE 3/8"
m
100.80
28.32
2,854.66
40.00
1,132.80
39.68%
0.00
TEMPLADORES METALICOS DE ACERO LISO DE 1/2" (ENTRE
m TIJERALES)
170.56
23.45
3,999.63
100.00
2,345.00
58.63%
0.00
COBERTURA CON PLANCHA METALICA TIPO TECNOTECHO
m2MOD.359.86
TR4 950x45x80mm
77.89 ALUZINC.
28,029.50
341.87
26,628.25
95.00%
0.00
MUROS Y TABIQUES DE ALBAILERIA
29,075.06
MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM. (CON
m2 ALAMBRE
53.79 N8 C/3
91.18
HILADAS)
4,904.57
53.79
4,904.57 100.00%
0.00
MURO DE CABEZA CON LADRILLO DE ARCILLA 9X13X24 (CON
m2 ALAMBRE
163.27 N8 C/3
148.04
HILADAS
24,170.49
163.27
24,170.49 100.00%
0.00
COSTO DIRECTO
407,443.32
340,684.97
83.62%
0.00
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
05 (M3)
43 (P2)
17 (und)
21 (und)
03 (KG)
CEMENTO SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL PIEDRA S. 1/2" SUB TOTAL HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL LADRILLO A. SUB TOTAL
0.00%
0.00%
469.20
469.20
525.50
1,961.26
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
469.20
303.97
111.47
167.50
0.00
0.00
0.00
1,168.31
10,134.36
2,638.49
2,847.50
0.00
0.00
0.00
100.00%
100.00%
60.00%
80.00%
0.00%
0.00%
0.00%
0.00
0.00
74.32
41.87
209.37
393.09
39.94
0.00
0.00
1,759.16
711.79
1,656.12
856.94
3,051.02
0.00%
0.00%
40.00%
20.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
61.34
14.59
4.19
58.14
0.00
15,818.97
4,430.69
1,724.35
1,837.81
0.00
100.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
382.96
0.00
0.00
0.00
0.00
15,636.26
0.00%
0.00%
0.00%
0.00%
100.00%
6.0000
6.5000
8.0000
368.04
94.84
33.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.70
0.00
0.00%
0.00%
65.80
1,857.82
22,995.13
8,973.27
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
8.5000
0.00%
0.00%
0.00%
0.00%
6.27
60.25
828.88
9.19
2,331.69
3,269.77
4,111.24
154.85
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.5000
0.00%
0.00%
0.00%
13.70
163.30
991.97
5,503.84
5,161.91
5,197.92
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
0.00%
0.00%
0.00%
1.47
14.24
1,221.41
561.86
657.22
5,826.13
30.00%
30.00%
100.00%
3.44
33.24
0.00
1,311.01
1,533.51
0.00
70.00%
70.00%
0.00%
0.00%
0.00%
0.00%
41.00
416.20
5,885.53
20,789.87
23,461.19
29,721.93
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
348.50
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.37
24.13
201.43
781.74
1,300.85
987.01
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
0.00%
0.00%
0.00%
15.91
155.95
1,590.22
6,221.13
9,297.74
7,792.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
135.24
0.00
0.00
0.00%
0.00%
0.00%
12.60
267.12
931.46
5,199.64
19,465.03
4,564.15
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
107.10
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
3.83
35.43
291.03
986.99
1,360.87
1,391.12
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.00
5.00
300.00
40.00
100.00
341.87
20,012.22
2,900.80
24,246.00
1,132.80
2,345.00
26,628.25
60.00%
50.00%
66.14%
39.68%
58.63%
95.00%
2.00
5.00
153.60
60.80
70.56
17.99
13,341.48
2,900.80
12,413.95
1,721.86
1,654.63
1,401.25
40.00%
50.00%
33.86%
60.32%
41.37%
5.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
53.79
163.27
4,904.57
24,170.49
100.00%
100.00%
0.00
0.00
340,684.97
83.62%
0.00%
0.00
0.00
0.00%
0.00%
66,758.35
16.38%
0.6500
559.30
0.00
53.30
0.00
0.00
0.00
109.60
0.00
0.00
0.00
0.00
0.00
0.2180
0.4100
1.0500
1.0500
0.00
1,950.71
0.00
0.00
870.32
0.00
0.0600
0.3000
0.0500
0.0100
0.1500
0.00
16.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.72
0.00
0.8000
0.00
0.00
3.35
0.00
0.00
1.1500
1.3500
0.1250
70.54
19.70
0.00
0.00
0.00
0.5000
0.00
111.47
0.00
0.00
0.6500
42.77
0.00
0.00
0.00
0.5000
32.90
0.00
0.00
0.00
0.00
0.00
0.00
18.08
41.44
0.00
0.00
9.04
0.00
0.00
0.6500
4.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
3.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1500
0.5000
4.8300
0.1000
5.4700
0.00
234.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
280.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.63
329.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.09
59.52
8.91
0.00
0.00
0.00
0.00
0.00
0.5000
0.1500
0.00
24.50
0.00
0.6500
0.2700
0.0600
6.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
0.00
788.74
0.00
0.00
0.00
0.00
0.1700
0.00
2.42
0.00
0.96
0.00
0.00
0.00
0.00
0.00
0.5000
0.3000
0.0600
0.00
4.27
73.28
0.6500
0.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
1.0500
11.78
0.00
1,282.48
0.00
70.51
0.00
0.00
0.00
0.00
0.00
0.00
6,297.52
0.00
187.29
353.13
0.00
124.86
0.00
0.6500
26.65
0.00
0.00
0.00
0.00
0.00
0.5000
0.4500
0.0600
0.3000
20.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
1.0700
0.00
2,060.19
0.00
0.00
0.00
0.00
0.3000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.4500
0.0600
0.00
0.00
0.00
0.6500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
1.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,701.54
0.00
70.18
95.41
0.00
46.79
0.00
0.6500
10.34
0.00
0.00
0.00
0.00
0.00
0.5000
0.4500
0.0600
0.3000
7.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
1.0700
0.00
775.07
0.00
0.00
0.00
0.00
0.2500
0.00
66.78
0.00
8.19
0.00
0.00
0.00
0.00
0.00
0.4200
0.2100
0.0600
0.00
56.10
55.89
0.6500
1.0700
0.00
0.00
996.66
5.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.24
1,327.59
0.00
0.00
0.00
0.00
0.0700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.4200
0.2000
0.0500
0.00
0.00
0.00
0.6500
1.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.0800
0.1000
1.50
0.40
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.3100
0.0580
16.67
9.47
0.00
0.00
0.00
0.00
137.51
0.00
0.00
1.0700
8.0000
0.00
0.00
1,061.41
0.2700
0.0360
0.00
0.00
0.00
0.00
0.00
0.00
11.73
66.94
0.00
0.00
1,888.09
14,172.42
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
26.90
81.64
1,294.38
0.00
0.00
0.00
0.00
0.00
0.00
0.0200
0.0220
1.08
3.59
0.00
0.00
0.00
0.00
304.66
105.24
90.24
1.1300
4.9700
3.7500
0.5800
0.5800
31.20
94.70
6,007.84
39.0000
66.0000
2,097.81
10,775.82
12,873.63
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.03
01.03.01
01.03.02
01.03.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.06
01.06.01
01.06.02
01.06.03
01.06.04
01.07
01.07.01
01.07.02
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.05.02
02.05.03
02.06
02.06.01
02.06.02
03
P.unit
2.83
50.02
1.61
1.98
29.51
20.00
5.15
4.10
1.34
91.92
83.62
68.28
21.77
14.65
15.65
33.81
55.00
70.08
2.83
50.02
1.61
1.98
29.51
20.00
10.69
9.79
1.55
83.85
66.43
59.16
28.05
14.22
24.45
176.03
1,798.38
03.01
03.02
03.03
117.60
32.00
4.00
61.80
24.22
242.05
Parcial
1,872.79
28.58
28.58
851.31
505.20
16.26
20.00
298.05
11.80
57.99
14.94
29.52
13.53
175.54
91.92
83.62
204.84
204.84
179.29
21.77
58.60
31.30
67.62
375.24
165.00
210.24
6,266.82
43.16
43.16
1,285.39
762.81
24.55
30.20
450.03
17.80
177.84
58.26
95.94
23.64
275.87
83.85
132.86
59.16
80.94
28.05
28.44
24.45
4,403.62
2,605.24
1,798.38
9,010.92
ACUMULADO ANTERIOR
METRADO
S/.
%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
METRADO
S/.
ACUMULADO ACTUAL
METRADO
S/.
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
7,267.68
775.04
968.20
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
17,150.53
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ONTO DE CONTRATO
ACUMULADO ACTUAL
%
21
03
05
43
17
21 (und)
CEMENTO SUB TOTAL
03 (KG)
A. CORRUGADO
SUB TOTAL
0.00%
10.10
28.58
100.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
10.10
10.10
10.10
10.10
0.59
505.20
16.26
20.00
298.05
11.80
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.90
7.20
10.10
14.94
29.52
13.53
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
91.92
83.62
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
3.00
204.84
100.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
4.00
2.00
2.00
21.77
58.60
31.30
67.62
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
3.00
3.00
165.00
210.24
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
15.25
43.16
100.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
15.25
15.25
15.25
15.25
0.89
762.81
24.55
30.20
450.03
17.80
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
5.45
9.80
15.25
58.26
95.94
23.64
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
2.00
1.00
83.85
132.86
59.16
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
2.00
1.00
28.05
28.44
24.45
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
14.80
1.00
2,605.24
1,798.38
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
117.60
32.00
4.00
7,267.68
775.04
968.20
100.00%
100.00%
100.00%
17,150.53
100.00%
1.4000
0.00
0.00
0.00
0.00
11.7500
0.00
0.00
0.00
0.00
S Y ADELANTO DIRECTO
JULIO 2013
OI
A ENCOFRADO Y CARPINTERIA
03 (KG)
ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL
05 (M3)
PIEDRA S. 1/2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2000
05 (M3)
43 (P2)
SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1100
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.0000
43 (P2)
SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Item
01
01.01
01.02
01.03
01.04
02
02.01
02.02
02.03
03
03.01
04
04.01
04.02
05
05.01
05.02
05.03
05.04
05.05
06
06.01
06.02
06.03
06.04
06.05
07
07.01
07.02
07.03
07.04
08
08.01
08.02
08.03
08.04
08.05
09
09.01
09.02
09.03
09.04
und
Metrado
glb
Exp
m2
glb
1.00
1.00
1.00
1.00
P.unit
511.57
475.04
247.06
527.73
M2
JGO
JGO
1.00
1.00
1.00
275.21
3,446.38
1,910.19
ml
23.00
39.44
JGO
ml
1.00
38.00
971.13
15.75
m
m
m
m
und
132.00
148.00
49.30
23.00
14.00
4.38
6.87
4.91
5.56
13.65
m
m
m
m
m
20.00
29.30
69.30
100.36
230.67
23.14
9.40
7.69
5.22
3.76
und
und
und
und
20.00
8.00
4.00
8.00
63.04
29.59
30.05
22.48
und
und
und
und
und
20.00
8.00
4.00
7.00
1.00
219.18
53.03
179.92
28.14
33.42
und
und
und
und
1.00
22.00
1.00
7.00
74.31
49.12
99.07
124.07
Parcial
1,761.40
511.57
475.04
247.06
527.73
5,631.78
275.21
3,446.38
1,910.19
907.12
907.12
1,569.63
971.13
598.50
2,155.96
578.16
1,016.76
242.06
127.88
191.10
2,662.34
462.80
275.42
532.92
523.88
867.32
1,797.56
1,260.80
236.72
120.20
179.84
5,757.92
4,383.60
424.24
719.68
196.98
33.42
2,122.51
74.31
1,080.64
99.07
868.49
24,366.22
ACUMULADO ANTERIOR
METRADO
S/.
%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
METRADO S/.
%
ACUMULADO ACTUAL
METRADO
S/.
%
511.57 100.00%
475.04 100.00%
247.06 100.00%
527.73 100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
1.00
1.00
1.00
511.57
475.04
247.06
527.73
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
38.00
132.00
578.16 100.00%
148.00 1,016.76 100.00%
49.30
242.06 100.00%
23.00
127.88 100.00%
14.00
191.10 100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
132.00
578.16
148.00 1,016.76
49.30
242.06
23.00
127.88
14.00
191.10
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
20.00
29.30
69.30
100.36
230.67
462.80
275.42
532.92
523.88
867.32
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
3,917.36
16.08%
0.00
0.00%
1.00
1.00
1.00
1.00
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21 (und)
03 (KG)
CEMENTO
SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL
05 (M3)
CLAVO DE C.
AFIRMADO
SUB TOTAL
A. GRUESA
43 (P2)
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
17 (und)
LADRILLO A.
SUB TOTAL
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
275.21 100.00%
3,446.38 100.00%
1,910.19 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23.00
907.12 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
971.13 100.00%
598.50 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.00
8.00
4.00
8.00
1,260.80 100.00%
236.72 100.00%
120.20 100.00%
179.84 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
20.00
8.00
4.00
7.00
1.00
4,383.60
424.24
719.68
196.98
33.42
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
22.00
1.00
7.00
74.31 100.00%
1,080.64 100.00%
99.07 100.00%
868.49 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,917.36
16.08%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20,448.86
83.92%
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
01.11
02
02.01
02.02
02.03
02.04
03
03.01
03.02
03.03
04
04.01
05
05.01
05.02
05.03
06
06.01
06.02
06.03
07
07.01
07.02
07.03
07.04
07.05
07.06
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
P.unit
Parcial
ACUMULADO ANTERIOR
MES ACTUAL
METRADO
S/.
%
METRADO
S/.
REVOQUES Y ENLUCIDOS
36,236.72
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
120.40
21.18
2,550.07
120.40
2,550.07
100.00%
0.00
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
314.76
18.14
5,709.75
314.76
5,709.75
100.00%
0.00
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
227.50
26.37
5,999.18
227.50
5,999.18
100.00%
0.00
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
147.04
32.75
4,815.56
147.04
4,815.56
100.00%
0.00
TARRAJEO EN TAPASOL Y CANALETA C:A 1:5 e=1.50 cm.
m2
274.20
29.52
8,094.38
274.20
8,094.38
100.00%
0.00
VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm.
m
143.90
12.28
1,767.09
143.90
1,767.09
100.00%
0.00
BRUAS VERTICALES DE 1"
m
361.84
6.71
2,427.95
361.84
2,427.95
100.00%
0.00
JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1"m
43.80
7.34
321.49
43.80
321.49
100.00%
0.00
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA ZOCALOS
m2
32.20
17.52
564.14
32.20
564.14
100.00%
0.00
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA MESA DE
m2CONCRETO
76.02
17.30
1,315.15
76.02
1,315.15
100.00%
0.00
REVESTIMIENTO DE MUEBLE DE CONCRETO CON CERMICO DE 20X30CM
m2
COLOR
32.20
82.98
2,671.96
32.20
2,671.96
100.00%
0.00
PISOS Y PAVIMENTOS
21,618.78
PISOS INTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO
m2
162.50
BRUADO 27.36
4,446.00
0.00
0.00
0.00%
0.00
VEREDA DE CONCRETO F'C=175 KG/CM2 h=0.10m, ACABADO SEMIPULIDO
m2 Y BRUADO
75.00 (INC.57.62
UA LATERAL
4,321.50
DE PROTECCION
0.00 DE H=0.2)0.00
0.00%
0.00
JUNTAS DE DILATACIN HORIZONTAL + SELLO ASFALTICO e=1" c/4m m
255.48
13.61
3,477.08
0.00
0.00
0.00%
0.00
PISO DE CERAMICO DE 30X30CM COLOR CLARO
m2
136.71
68.57
9,374.20
0.00
0.00
0.00%
0.00
ZOCALOS Y CONTRAZOCALOS
7,084.27
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIORm
83.72
13.95
1,167.89
0.00
0.00
0.00%
0.00
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIORm
77.61
7.76
602.25
0.00
0.00
0.00%
0.00
ZOCALO DE CERMICO DE 20X30 COLOR CLARO
m2
85.56
62.11
5,314.13
0.00
0.00
0.00%
0.00
CARPINTERIA DE MADERA
2,772.00
PUERTA DE MADERA QUINILLA MACHIHEMBRADA + MARCO (INC. SELLADO
m2
Y BARNIZADO
7.92
350.00
2,772.00
0.00
0.00
0.00%
0.00
CARPINTERIA METALICA Y ALUMINIO
28,161.50
VENTANA METALICA CON MALLA OLIMPICA 2" + MARCO DE ANG 2"X2"X1/8"
m2
( INC.
76.06
2 MANOS220.00
DE PINTURA
16,733.20
ESMALTE Y ANTICORROSIVO)
0.00
0.00
0.00%
0.00
PUERTA METALICA ENROLLABLE CON PLANCHA GALVANIZADA (INC CERRADURA,
m2
8.01
DOS MANOS
260.00DE PINTURA
2,082.60ESMALTE0.00
Y ANTICORROSIVO)
0.00
0.00%
0.00
PARASOL DE POLICARBONATO CON MARCO DE ALUMINIO SUJETADOS
m2A COLUMNAS
71.89 (SEGUN
130.00
DISEO)9,345.70
0.00
0.00
0.00%
0.00
CERRAJERIA
526.02
BISAGRA DE BRONCE ALUMINIZADAS DE 4"
und
12.00
13.52
162.24
0.00
0.00
0.00%
0.00
CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA
und
3.00
90.97
272.91
0.00
0.00
0.00%
0.00
MANIJA DE BRONCE PARA PUERTAS
und
3.00
30.29
90.87
0.00
0.00
0.00%
0.00
PINTURA
9,606.91
PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS
m2
120.40
8.65
1,041.46
0.00
0.00
0.00%
0.00
PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS
m2
314.76
7.96
2,505.49
0.00
0.00
0.00%
0.00
PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS m2
227.50
9.25
2,104.38
0.00
0.00
0.00%
0.00
PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS
m2
147.04
9.24
1,358.65
0.00
0.00
0.00%
0.00
PINTURA EN TAPASOL Y CANALETA AL LATEX SATINADO 2 MANOS m2
274.20
8.50
2,330.70
0.00
0.00
0.00%
0.00
PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS
m
67.40
3.95
266.23
0.00
0.00
0.00%
0.00
COSTO DIRECTO
106,006.20
36,236.71
34.18%
0.00
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
21
03
05
43
17
21 (und)
03 (KG)
CEMENTO SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C.
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
120.40
314.76
227.50
147.04
274.20
143.90
361.84
43.80
32.20
76.02
32.20
2,550.07
5,709.75
5,999.18
4,815.56
8,094.38
1,767.09
2,427.95
321.49
564.14
1,315.15
2,671.96
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.1500
0.1500
0.1170
0.1170
0.1500
0.0400
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
162.50
75.00
255.48
136.71
4,446.00
4,321.50
3,477.08
9,374.20
100.00%
100.00%
100.00%
100.00%
0.4550
1.0200
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
83.72
77.61
85.56
1,167.89
602.25
5,314.13
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00%
7.92
2,772.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
76.06
8.01
71.89
16,733.20
2,082.60
9,345.70
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
12.00
3.00
3.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
120.40
314.76
227.50
147.04
274.20
67.40
36,236.71
34.18%
0.00%
18.06
47.21
26.62
17.20
41.13
5.76
0.00
0.00
3.77
8.89
3.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1870
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6400
0.0200
0.1870
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00
0.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
162.24
272.91
90.87
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1,041.46
2,505.49
2,104.38
1,358.65
2,330.70
266.23
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
69,769.49
65.82%
172.51
0.00
0.1170
0.1170
0.1200
DIRECTO
ADO Y CARPINTERIA
03 (KG)
05 (M3)
43 (P2)
17 (und)
SUB TOTAL CLAVO DE C. SUB TOTAL PIEDRA S. 1/2" SUB TOTAL HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0400
0.0400
0.0300
0.0300
0.0400
0.0200
0.0100
0.0100
0.0500
4.82
12.59
6.83
4.41
10.97
2.88
0.00
0.00
0.32
0.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2700
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1200
0.00
0.00
0.00
0.00
0.2100
0.0100
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0250
0.0180
0.0180
0.0250
0.0650
3.01
7.87
4.10
2.65
6.86
9.35
0.00
0.00
0.52
1.22
0.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0800
0.0120
0.0260
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0090
0.0200
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.0160
0.0160
0.0200
0.6500
0.5800
0.5200
0.5200
0.5800
0.1270
0.5800
0.5000
0.9860
0.1560
0.1560
78.26
182.56
118.30
76.46
159.04
18.28
0.00
0.00
18.68
38.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43.57
0.00
0.00
0.00
36.20
0.00
689.58
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
03.04
03.05
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.03.02
04.03.03
04.04
04.04.01
04.04.02
04.04.03
04.05
04.05.01
04.05.02
04.05.03
04.06
04.06.01
04.06.02
04.06.03
04.07
04.07.01
04.07.02
04.07.03
04.08
04.08.01
04.08.02
04.08.03
05
05.01
05.02
05.03
05.04
05.05
05.06
06
06.01
06.02
Metrado
P.unit
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
469.20
1.12
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
469.20
4.18
MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO
m2
469.20
2.49
EXCAVACION DE ZANJAS
m3
305.65
33.34
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
202.88
23.67
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M
m3
194.47
17.00
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h
m3 D=3KM
194.47
7.91
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m2
454.25
2.18
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
46.15
76.39
OBRAS DE CONCRETO SIMPLE
CONCRETO EN FALSA ZAPATAS F'C= 100 KG/CM2
m3
56.97
257.89
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
26.05
303.68
CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM2
m3
5.70
411.54
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
73.43
31.61
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
454.25
40.83
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
65.80
349.47
ZAPATAS, ACERO FY=4200KG/CM2
kg
1,857.82
4.83
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2
m3
6.27
371.88
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
60.25
54.27
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
828.88
4.96
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT)m2
9.19
16.85
SOBRECIMIENTOS REFORZADOS
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2
m3
17.88
401.74
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
223.64
31.61
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
1,176.86
5.24
COLUMNETAS
COLUMNETAS, CONCRETO F'C= 175 KG/CM2
m3
6.70
381.44
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
67.69
46.14
COLUMNETAS, ACERO FY=4200 KG/CM2
kg
1,487.44
4.77
COLUMNAS
COLUMNAS, CONCRETO F'C=210 KG/CM2
m3
41.00
507.07
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
416.20
56.37
COLUMNAS, ACERO FY=4200 KG/CM2.
kg
5,885.53
5.05
VIGUETAS DE ARRIOSTRE
VIGUETAS DE ARRIOSTRE, CONCRETO F'c= 175KG/CM2
m3
3.99
329.85
VIGUETAS DE ARRIOSTRE, ENCOFRADO Y DESENCOFRADO
m2
60.35
53.91
VIGA DE ARRIOSTRE, ACERO FY=4200 KG/CM2.
kg
517.68
4.90
VIGAS
VIGAS, CONCRETO F'C=210 KG/CM2
m3
15.91
391.02
VIGAS, ENCOFRADO Y DESENCOFRADO
m2
155.95
59.62
VIGAS, ACERO FY=4200 KG/CM2.
kg
1,590.22
4.90
CANALETA DE CONCRETO EN TECHO
CANALETA DE CONCRETO EN TECHO, CONCRETO F'C=210 KG/CM2 CON ADITIVO
m3 IMPERMEABILIZANTE
12.60
412.67
CANALETA DE CONCRETO EN TECHO, ENCOFRADO Y DESENCOFRADO
m2
267.12
72.87
CANALETA DE CONCRETO EN TECHO, ACERO FY=4200 KG/CM2.
kg
931.46
4.90
ESTRUCTURA METALICA Y COBERTURA
TIJERAL METLICO DE SECCIN RECTANGULAR T-1
und
5.00
6,670.74
SOPORTES METALICOS PARA CERCHAS
und
10.00
580.16
VIGUETA TIPO "Z" DE 100mm x 51mm x 4.5mmm x 6.00m
m
453.60
80.82
TENSORES METALICOS DE ACERO LISO DE 3/8"
m
100.80
28.32
TEMPLADORES METALICOS DE ACERO LISO DE 1/2" (ENTRE TIJERALES)
m
170.56
23.45
COBERTURA CON PLANCHA METALICA TIPO TECNOTECHO MOD. TR4 950x45x80mm
m2
ALUZINC.
359.86
77.89
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM. (CON ALAMBRE N8 C/3
m2 HILADAS)72.16
91.18
MURO DE CABEZA CON LADRILLO DE ARCILLA 9X13X24 (CON ALAMBRE N8 C/3
m2HILADAS 123.26
148.04
COSTO DIRECTO
Parcial
2,486.76
525.50
1,961.26
25,520.77
1,168.31
10,190.37
4,802.17
3,305.99
1,538.26
990.27
3,525.40
45,816.78
14,691.99
7,910.86
2,345.78
2,321.12
18,547.03
208,647.99
31,968.40
22,995.13
8,973.27
9,867.55
2,331.69
3,269.77
4,111.24
154.85
20,419.12
7,183.11
7,069.26
6,166.75
12,773.96
2,555.65
3,123.22
7,095.09
73,972.99
20,789.87
23,461.19
29,721.93
7,106.20
1,316.10
3,253.47
2,536.63
23,310.95
6,221.13
9,297.74
7,792.08
29,228.82
5,199.64
19,465.03
4,564.15
110,699.04
33,353.70
5,801.60
36,659.95
2,854.66
3,999.63
28,029.50
24,826.96
6,579.55
18,247.41
417,998.30
ACUMULADO ANTERIO
METRADO
469.20
469.20
469.20
305.65
202.88
194.47
194.47
454.25
46.15
56.97
26.05
5.70
73.43
227.13
65.80
1,857.82
6.27
60.25
828.88
9.19
17.88
223.64
1,176.86
6.70
67.69
1,487.44
41.00
416.20
5,885.53
3.99
60.35
517.68
15.91
155.95
1,590.22
12.60
267.12
931.46
5.00
10.00
453.60
100.80
170.56
359.86
72.16
123.26
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
ACUMULADO ANTERIOR
S/.
%
MES ACTUAL
METRADO
S/.
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
21
03
05
43
17
21 (und)
CEMENTO
525.50
1,961.26
100.00%
100.00%
0.00
0.00
0.00%
0.00%
469.20
469.20
525.50
1,961.26
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1,168.31
10,190.37
4,802.17
3,305.99
1,538.26
990.27
3,525.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
469.20
305.65
202.88
194.47
194.47
454.25
46.15
1,168.31
10,190.37
4,802.17
3,305.99
1,538.26
990.27
3,525.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
14,691.99
7,910.86
2,345.78
2,321.12
9,273.51
100.00%
100.00%
100.00%
100.00%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
56.97
26.05
5.70
73.43
227.13
14,691.99
7,910.86
2,345.78
2,321.12
9,273.51
100.00%
100.00%
100.00%
100.00%
50.00%
0.00
0.00
0.00
0.00
227.13
0.00
0.00
0.00
0.00
9,273.52
0.00%
0.00%
0.00%
0.00%
50.00%
6.0000
6.5000
8.0000
22,995.13
8,973.27
100.00%
100.00%
0.00
0.00
0.00%
0.00%
65.80
1,857.82
22,995.13
8,973.27
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
8.5000
2,331.69
3,269.77
4,111.24
154.85
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
6.27
60.25
828.88
9.19
2,331.69
3,269.77
4,111.24
154.85
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.5000
7,183.11
7,069.26
6,166.75
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
17.88
223.64
1,176.86
7,183.11
7,069.26
6,166.75
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
2,555.65
3,123.22
7,095.09
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.70
67.69
1,487.44
2,555.65
3,123.22
7,095.09
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
20,789.87
23,461.19
29,721.93
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
41.00
416.20
5,885.53
20,789.87
23,461.19
29,721.93
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
1,316.10
3,253.47
2,536.63
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
3.99
60.35
517.68
1,316.10
3,253.47
2,536.63
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
6,221.13
9,297.74
7,792.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
15.91
155.95
1,590.22
6,221.13
9,297.74
7,792.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
5,199.64
19,465.03
4,564.15
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
12.60
267.12
931.46
5,199.64
19,465.03
4,564.15
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
33,353.70
5,801.60
36,659.95
2,854.66
3,999.63
28,029.50
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.00
10.00
453.60
100.80
170.56
359.86
33,353.70
5,801.60
36,659.95
2,854.66
3,999.63
28,029.50
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6,579.55
18,247.41
100.00%
100.00%
0.00
0.00
0.00%
0.00%
72.16
123.26
6,579.55
18,247.41
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
408,724.77
97.78%
0.00
0.00%
408,724.77
97.78%
9,273.53
2.22%
0.6500
0.2180
0.4100
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.0036
0.00
1.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
341.82
169.33
45.60
0.00
147.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.83
0.00
0.00
0.00
0.00
11.01
0.00
0.00
0.00
4.56
0.00
0.00
559.30
0.00
53.30
0.00
0.00
0.00
143.04
0.00
0.00
53.60
0.00
0.00
348.50
0.00
0.00
31.92
0.00
0.00
135.24
0.00
0.00
107.10
0.00
0.00
A. CORRUGADO
1.0500
1.0500
0.00
1,950.71
0.00
0.00
870.32
0.00
0.2700
0.0600
0.3000
0.0500
0.0100
0.1500
0.00
111.47
0.00
18.08
41.44
0.00
0.1500
PIEDRA S. 1/2"
0.8000
SUB TOTAL
0.00
0.00
0.6500
42.77
0.00
0.00
9.04
0.00
0.00
0.6500
4.08
0.00
0.00
0.00
0.00
60.38
70.61
0.00
33.55
0.00
0.6500
0.2700
0.0600
0.1500
1.0700
0.00
0.00
1,259.24
11.62
0.00
0.00
0.00
20.31
89.25
0.00
11.51
0.00
0.6500
0.3000
0.0600
0.1700
1.0500
0.00
0.00
1,561.81
4.36
0.00
0.00
0.00
187.29
353.13
0.00
124.86
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
6,297.52
26.65
0.00
0.00
0.00
27.16
310.61
0.00
18.11
0.00
0.6500
0.4500
0.6000
0.3000
1.0700
0.00
0.00
553.92
2.59
0.00
0.00
0.00
70.18
95.41
0.00
46.79
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
1,701.54
10.34
0.00
0.00
0.00
56.10
55.89
0.00
66.78
0.00
0.6500
0.2100
0.0600
0.2500
1.0700
0.00
0.00
996.66
8.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.73
50.54
0.00
0.00
2,202.63
15,191.72
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
36.08
61.63
1,684.83
0.0200
0.0220
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.44
2.71
0.00
0.00
332.02
115.16
HORMIGON
1.1500
1.3500
0.1250
SUB TOTAL
05 (M3)
A. GRUESA SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
65.52
35.17
0.00
0.00
28.39
0.00
0.00
2.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
354.67
0.00
0.5000
A. FINA
SUB TOTAL
TIERRA ORG.
SUB TOTAL
43 (P2)
M.NACIONAL E. SUB TOTAL
0.5000
4.8300
0.00
234.60
0.00
0.00
0.5000
32.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
3.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
8.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
0.00
1,080.18
0.00
0.00
0.00
0.00
0.5000
3.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
335.07
0.00
0.00
0.00
0.00
0.5000
20.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
2,060.19
0.00
0.00
0.00
0.00
0.5000
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
299.94
0.00
0.00
0.00
0.00
0.5000
7.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
775.07
0.00
0.00
0.00
0.00
0.4200
5.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.0800
0.1000
2.50
0.80
45.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0310
0.0580
2.24
7.15
0.00
0.00
0.00
0.00
144.96
0.00
0.00
129.07
17 (und)
LADRILLO A.
0.00
0.00
0.1000
5.4700
1.1300
4.9700
0.63
329.57
0.00
0.00
14.24
1,327.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5800
0.5800
41.85
71.49
6,925.08
39.0000
66.0000
17 (und)
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,814.24
8,135.16
10,949.40
Item
01
01.01
01.01.01
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.03
01.03.01
01.03.02
01.03.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.05.02
01.06
01.06.01
01.06.02
01.06.03
01.06.04
01.07
01.07.01
01.07.02
01.07.03
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.05
02.05.01
02.05.02
02.05.03
03
03.01
03.02
03.03
Metrado
P.unit
36.30
2.83
36.30
36.30
36.30
36.30
2.12
50.02
1.61
1.98
29.51
20.00
2.10
34.20
36.30
5.15
4.10
1.34
1.00
5.00
91.92
83.62
1.00
10.00
68.28
69.27
1.00
8.00
2.00
2.00
21.77
14.65
15.65
33.31
1.00
5.00
6.00
55.00
870.00
70.08
40.20
2.83
40.20
40.20
40.20
40.20
2.35
50.02
1.61
1.98
29.51
20.00
27.90
12.30
40.20
10.69
9.79
1.55
1.00
5.00
4.00
1.00
5.00
83.85
68.28
53.43
66.43
59.16
4.00
6.00
3.00
28.05
14.22
24.45
95.36
32.00
4.00
61.80
24.22
242.05
Parcial
9,695.43
102.73
102.73
3,059.65
1,815.73
58.44
71.87
1,071.21
42.40
199.68
10.82
140.22
48.64
510.02
91.92
418.10
760.98
68.28
692.70
236.89
21.77
117.20
31.30
66.62
4,825.48
55.00
4,350.00
420.48
5,255.24
113.77
113.77
3,388.42
2,010.80
64.72
79.60
1,186.30
47.00
480.98
298.25
120.42
62.31
1,001.20
83.85
341.40
213.72
66.43
295.80
270.87
112.20
85.32
73.35
7,636.49
5,893.25
775.04
968.20
22,587.16
ACUMULADO ANTERIOR
METRADO
S/.
%
36.30
36.30
36.30
36.30
36.30
2.12
2.10
34.20
36.30
0.00
0.00
1.00
10.00
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
METRADO S/.
%
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
21 (und)
CEMENTO SUB TOTAL
A. CORRUGADO
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
05 (M3)
CLAVO DE C.
SUB TOTAL
PIEDRA S. 1/2"
SUB TOTAL
HORMIGON
SUB TOTAL
A. GRUESA
43 (P2)
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
SUB TOTAL
M.NACIONAL E.
17 (und)
SUB TOTAL
LADRILLO A.
SUB TOTAL
102.73 100.00%
0.00
0.00%
36.30
102.73
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.01%
100.01%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
36.30
36.30
36.30
36.30
2.12
1,815.73
58.44
71.87
1,071.21
42.40
100.00%
100.01%
100.01%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
-0.01%
-0.01%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
99.95%
10.82
140.22 100.00%
48.64 100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.10
34.20
36.30
10.82
140.22
48.64
99.95%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.05%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
5.00
91.92 100.00%
418.10 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
68.28 100.00%
692.70 100.00%
0.00
0.00
0.00%
0.00%
1.00
10.00
68.28
692.70
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
55.00 100.00%
4,350.00 100.00%
420.48 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,815.73
58.44
71.87
1,071.21
42.40
0.00
0.00
1.00
8.00
2.00
2.00
21.77
117.20
31.30
66.62
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
8.00
2.00
2.00
21.77
117.20
31.30
66.62
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
5.00
6.00
113.77 100.00%
0.00
0.00%
40.20
113.77
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
99.99%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
40.20
40.20
40.20
40.20
2.35
2,010.80
64.72
79.60
1,186.30
47.00
100.00%
100.00%
99.99%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.01%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
298.25 100.00%
120.42 100.00%
62.31 100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
27.90
12.30
40.20
298.25
120.42
62.31
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
83.85
341.40
213.72
66.43
295.80
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
5.00
4.00
1.00
5.00
83.85
341.40
213.72
66.43
295.80
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.20
40.20
40.20
40.20
40.20
2.35
27.90
12.30
40.20
1.00
5.00
4.00
1.00
5.00
0.00
0.00
0.00
95.36
32.00
0.00
2,010.80
64.72
79.60
1,186.30
47.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.00
6.00
3.00
112.20 100.00%
85.32 100.00%
73.35 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,893.25 100.00%
775.04 100.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
95.36
32.00
0.00
5,893.25
775.04
0.00
100.00%
100.00%
0.00%
0.00
0.00
4.00
0.00
0.00%
0.00
0.00%
968.20 100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.89%
0.00
0.00%
16,012.59
70.89%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16,012.59
6,574.57
29.11%
1.4000
0.00
11.7500
0.2000
0.1100
16.0000
Item
01
01.01
01.02
01.03
01.04
02
02.01
02.02
02.03
02.04
03
03.01
04
04.01
04.02
05
05.01
05.02
05.03
05.04
06
06.01
06.02
06.03
06.04
06.05
07
07.01
07.02
07.03
07.04
08
08.01
08.02
08.03
08.04
08.05
09
09.01
09.02
09.03
09.04
09.05
09.06
511.57
475.04
247.06
527.73
275.21
3,227.19
1,634.19
1,384.11
21.88
971.13
15.75
4.38
6.87
4.91
13.65
19.36
9.40
7.69
5.22
3.76
63.04
29.59
30.05
22.48
219.18
53.03
179.92
28.14
33.42
74.31
60.24
49.12
79.27
99.07
124.07
Parcial
3,522.80
1,023.14
950.08
494.12
1,055.46
7,071.12
825.63
3,227.19
1,634.19
1,384.11
437.60
437.60
2,651.01
1,942.26
708.75
3,061.59
1,097.41
1,473.96
271.82
218.40
3,333.10
510.52
191.38
1,803.69
308.14
519.37
1,915.85
1,008.64
562.21
120.20
224.80
5,526.09
3,506.88
1,007.57
719.68
225.12
66.84
4,926.67
297.24
903.60
1,228.00
1,902.48
99.07
496.28
32,445.83
ACUMULADO ANTERIOR
METRADO
S/.
%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
METRADO
S/.
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
21 (und)
03 (KG)
CEMENTO
SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL CLAVO DE C.
05 (M3)
SUB TOTAL PIEDRA S. 1/2" SUB TOTAL
AFIRMADO
SUB TOTAL
A. GRUESA
43 (P2)
SUB TOTAL
A. FINA
17 (und)
LADRILLO A.
SUB TOTAL
2.00
2.00
2.00
2.00
1,023.14
950.08
494.12
1,055.46
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
2.00
2.00
2.00
2.00
1,023.14
950.08
494.12
1,055.46
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
825.63
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
3.00
0.00
0.00
0.00
825.63
0.00
0.00
0.00
100.00%
0.00%
0.00%
0.00%
0.00
1.00
1.00
1.00
0.00
3,227.19
1,634.19
1,384.11
0.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
20.00
437.60
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
45.00
1,942.26
708.75
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250.55
214.55
55.36
0.00
1,097.41
1,473.96
271.82
0.00
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
250.55
214.55
55.36
0.00
1,097.41
1,473.96
271.82
0.00
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
16.00
0.00
0.00
0.00
218.40
0.00%
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
26.37
20.36
234.55
59.03
138.13
510.52
191.38
1,803.69
308.14
519.37
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
16.00
19.00
4.00
10.00
1,008.64
562.21
120.20
224.80
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
112.56
0.00
0.00%
0.00%
0.00%
50.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
112.56
0.00
0.00%
0.00%
0.00%
50.00%
0.00%
16.00
19.00
4.00
4.00
2.00
3,506.88
1,007.57
719.68
112.56
66.84
100.00%
100.00%
100.00%
50.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
7.50
12.50
12.00
0.50
2.00
148.62
451.80
614.00
951.24
49.54
248.14
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.00
7.50
12.50
12.00
0.50
2.00
148.62
451.80
614.00
951.24
49.54
248.14
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
2.00
7.50
12.50
12.00
0.50
2.00
148.62
451.80
614.00
951.24
49.54
248.14
50.00%
50.00%
50.00%
50.00%
50.00%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,767.51
30.10%
0.00
0.00%
9,767.51
30.10%
22,678.32
69.90%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
01.03
01.04
01.05
01.06
01.07
01.08
01.09
01.10
01.11
01.12
01.13
02
02.01
02.02
02.03
02.04
02.05
03
03.01
03.02
03.03
04
04.01
04.02
04.03
05
05.01
05.02
05.03
05.04
05.05
05.06
06
06.01
06.02
06.03
06.04
06.05
06.06
07
07.01
07.02
07.03
07.04
07.05
07.06
07.07
08
08.01
und
Metrado
P.unit
Parcial
ACUMULADO ANTERIOR
METRADO
S/.
REVOQUES Y ENLUCIDOS
90,911.63
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
329.94
21.18
6,988.13
214.97
4,553.06
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
570.19
18.14
10,343.25
427.64
7,757.39
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
431.81
26.37
11,386.83
323.86
8,540.19
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
239.81
32.75
7,853.78
179.86
5,890.42
TARRAJEO EN TAPASOL Y CANALETA C:A 1:5 e=1.50 cm.
m2
317.86
29.52
9,383.23
158.93
4,691.61
VESTIDURA DE DERRAMES a=0.15 C:A 1:5 e=1.50cm.
m
266.17
12.28
3,268.57
186.32
2,288.01
TARRAJEO EN CIELORASOS C:A 1:5 e=1.50 cm
m2
308.15
25.72
7,925.62
246.52
6,340.49
BRUAS VERTICALES DE 1"
m
213.08
6.71
1,429.77
80.00
536.80
JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1" m
45.38
7.34
333.09
45.38
333.09
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA MESA DE m2
CONCRETO
58.97
17.30
1,020.18
29.49
510.18
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA ZOCALOSm2
171.11
17.52
2,997.85
85.56
1,499.01
REVESTIMIENTO DE MUEBLE DE CONCRETO CON CERMICO DE 20X30CM
m2 COLOR
58.97
CLARO 82.98
4,893.33
0.00
CIELO RASO DE BALDOSAS ACUSTICAS DE FIBRA MINERAL - INC. SOPORTES
m2
DE
384.80
ALUMINIO (SEGN
60.00 DISEO)
23,088.00
0.00
PISOS Y PAVIMENTOS
37,281.70
PISOS EXTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO
m2
229.15
Y BRUADO 30.42
6,970.74
0.00
PISOS INTERIORES DE CONCRETO - ACABADOS C:A 1:4 DE E=2" SEMI-PULIDO
m2
Y
290.03
BRUADO 27.76
8,051.23
0.00
VEREDA DE CONCRETO F'C=175 KG/CM2 h=0.10m, ACABADO SEMIPULIDO
m2 Y BRUADO
74.79 (INC. UA
57.62LATERAL
4,309.40
DE PROTECCION DE H=0.2)
0.00
JUNTAS DE DILATACIN HORIZONTAL + SELLO ASFALTICO e=1" c/4m m
215.54
13.61
2,933.50
0.00
PISO DE CERAMICO DE 30X30CM COLOR CLARO
m2
219.00
68.57
15,016.83
0.00
ZOCALOS Y CONTRAZOCALOS
14,310.75
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=40cm EXTERIOR mm
168.70
13.95
2,353.37
0.00
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H=10 cm INTERIOR m
172.47
7.71
1,329.74
0.00
ZOCALO DE CERMICO DE 20X30 COLOR CLARO
m2
171.11
62.11
10,627.64
0.00
CARPINTERIA DE MADERA
20,338.05
PUERTA DE MADERA QUINILLA MACHIHEMBRADA CON CRISTAL REFLECTIVO
m2
6mm,
52.49
ACERO 250.00
LISO DE 1/2"
13,122.50
+MARCO (INC. SELLADO Y BARNIZADO)
0.00
PUERTA DE MADERA QUINILLA MACHIHEMBRADA + MARCO (INC. SELLADO
m2 Y BARNIZADO
20.03
350.00
7,010.50
0.00
BORDE DE MADERA QUINILLA DE 8"x1" EN PISO A DESNIVEL (INC. ACABADO
m
BARNIZ
13.67DD)
15.00
205.05
0.00
CARPINTERIA METALICA Y ALUMINIO
16,054.00
PUERTA DE ALUMINIO, CON POLICARBONATO ALVEOLAR TRASLUCIDOm2
DE 8 MM SOBRE
9.45
ELEVADA
300.00 DE 0.30
2,835.00
M
0.00
PUERTA METALICA DOS HOJAS CON TUBOS DE 2"x1"x1/8" @15CM + PL1"X1/8"
m2
(INC
2.64
DOS MANOS
800.00
DE PINTURA
2,112.00
ESMALTE Y ANTICORROSIVO)
0.00
VENTANA DE ALUMINIO, CON VIDRIOS PAVONADO E INCOLORO DE 6 mm
m2Y BARRAS
38.00DE SEGURIDAD
180.00 DE 6,840.00
ACERO LISO 1/2"
0.00
VENTANA DE ALUMINIO, CON VIDRIOS PAVONADO E INCOLORO DE 6 mm
m2Y BARRAS
15.95DE SEGURIDAD
180.00 DE 2,871.00
ACERO LISO 1/2"
0.00
LINEA METALICA EMPOTRADA DE PLATINA DE ACERO DE 4"x1/8"
ML
13.80
20.00
276.00
0.00
LETRAS DE PLANCHAS METLICAS SOLDADAS DE 0.20X0.35 m
GLB
1.00
1,120.00
1,120.00
0.00
CERRAJERIA
4,210.84
BISAGRA DE BRONCE ALUMINIZADAS DE 4"
und
104.00
13.52
1,406.08
0.00
BISAGRA DE BRONCE ALUMINIZADAS DE 2"
und
18.00
12.52
225.36
0.00
CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA
und
8.00
90.97
727.76
0.00
CERRADURA NACIONAL DE 1 GOLPES PARA PUERTA
und
10.00
75.97
759.70
0.00
MANIJA DE BRONCE PARA PUERTAS
und
18.00
30.29
545.22
0.00
PICAPORTE 3" PARA PUERTAS
und
48.00
11.39
546.72
0.00
PINTURA
18,883.19
PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS
m2
259.67
8.65
2,246.15
0.00
PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS
m2
553.88
7.96
4,408.88
0.00
PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS
m2
431.81
9.25
3,994.24
0.00
PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS
m2
239.81
9.24
2,215.84
0.00
PINTURA EN TAPASOL Y CANALETA AL LATEX SATINADO 2 MANOS
m2
317.86
8.50
2,701.81
0.00
PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS
m
266.17
3.95
1,051.37
0.00
PINTURA EN CIELORASOS AL LATEX
m2
308.15
7.35
2,264.90
0.00
CUBIERTAS
5,373.94
COBERTURA LIVIANA CON POLICARBONATO ALVEOLAR DE10MM
m2
55.43
96.95
5,373.94
0.00
COSTO DIRECTO
207,364.10
42,940.25
IND
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
ACUMULADO ANTERIOR
%
METRADO
MES ACTUAL
S/.
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
21
03
05
43
17
21 (und)
CEMENTO
65.15%
75.00%
75.00%
75.00%
50.00%
70.00%
80.00%
37.54%
100.00%
50.01%
50.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
214.97
427.64
323.86
179.86
158.93
186.32
246.52
80.00
45.38
29.49
85.56
0.00
0.00
4,553.06
7,757.39
8,540.19
5,890.42
4,691.61
2,288.01
6,340.49
536.80
333.09
510.18
1,499.01
0.00
0.00
65.15%
75.00%
75.00%
75.00%
50.00%
70.00%
80.00%
37.54%
100.00%
50.01%
50.00%
0.00%
0.00%
114.97
142.55
107.95
59.95
158.93
79.85
61.63
133.08
0.00
29.48
85.55
58.97
384.80
2,435.07
2,585.86
2,846.64
1,963.37
4,691.62
980.56
1,585.13
892.97
0.00
510.00
1,498.84
4,893.33
23,088.00
34.85%
25.00%
25.00%
25.00%
50.00%
30.00%
20.00%
62.46%
0.00%
49.99%
50.00%
100.00%
100.00%
0.1500
0.1500
0.1170
0.1170
0.1500
0.0400
0.1500
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
229.15
290.03
74.79
215.54
219.00
6,970.74
8,051.23
4,309.40
2,933.50
15,016.83
100.00%
100.00%
100.00%
100.00%
100.00%
0.4850
0.4550
1.0200
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
168.70
172.47
171.11
2,353.37
1,329.74
10,627.64
100.00%
100.00%
100.00%
0.0640
0.0180
0.1870
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
52.49
20.03
13.67
13,122.50
7,010.50
205.05
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
9.45
2.64
38.00
15.95
13.80
1.00
2,835.00
2,112.00
6,840.00
2,871.00
276.00
1,120.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
104.00
18.00
8.00
10.00
18.00
48.00
1,406.08
225.36
727.76
759.70
545.22
546.72
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
259.67
553.88
431.81
239.81
317.86
266.17
308.15
2,246.15
4,408.88
3,994.24
2,215.84
2,701.81
1,051.37
2,264.90
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00%
0.00
0.00
0.00%
55.43
5,373.94
100.00%
20.71%
0.00
0.00%
42,940.25
20.71%
164,423.85
79.29%
0.1170
0.1170
0.1200
0.1870
32.25
64.15
37.89
21.04
23.84
7.45
36.98
0.00
0.00
3.45
10.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
237.06
0.00
0.00
61.91
0.00
0.0100
0.0100
0.0500
8.60
17.11
9.72
5.40
6.36
3.73
9.86
0.00
0.00
0.29
0.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0270
0.0270
0.00
0.00
0.00
0.00
0.00
05 (M3)
43 (P2)
HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0250
0.0180
0.1800
0.0250
0.0650
0.0250
5.37
10.69
5.83
32.37
3.97
12.11
6.16
0.00
0.00
0.47
1.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0090
0.0080
0.0100
0.0120
0.0260
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0090
0.0020
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
78.36
0.00
972.89
0.00
0.00
0.00
0.00
0.00
0.0210
0.0300
0.0160
0.0160
0.0200
0.6500
0.5800
0.5200
0.5200
0.5800
0.1270
0.5800
0.5000
0.5800
0.9860
0.1560
0.1560
139.73
248.03
168.41
93.53
92.18
23.66
142.98
0.00
0.00
14.75
49.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Obra
Form.
Cliente
Ubicac.
: 01 PRESUPUESTO GENERAL
: GOBIERNO REGIONAL DE MADRE DE DIOS
: TAMBOPATA - TAMBOPATA - MADRE DE DIOS.
Item
01
01.01
01.02
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
03
03.01
03.02
03.03
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.03.02
04.03.03
04.04
04.04.01
04.04.02
04.04.03
04.05
04.05.01
04.05.02
04.05.03
04.06
04.06.01
04.06.02
04.06.03
04.07
04.07.01
04.07.02
04.07.03
04.08
04.08.01
04.08.02
04.08.03
04.08.04
04.09
04.09.01
04.09.02
04.09.03
05
05.01
05.02
05.03
05.04
05.05
05.06
06
06.01
06.02
und
Metrado
P.unit
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
1,026.00
1.12
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
1,026.00
4.18
MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO
M2
1,026.00
2.49
EXCAVACION DE ZANJAS
m3
593.72
33.34
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
324.39
23.67
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M
m3
323.20
17.00
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h
m3
D=3KM
269.33
7.91
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m2
839.49
2.18
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
83.95
76.39
OBRAS DE CONCRETO SIMPLE
SOLADO fc=100 KG/CM2 e=10CM
m2
290.66
28.91
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
32.58
303.68
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
839.49
40.83
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
174.39
349.47
ZAPATAS, ACERO FY=4200KG/CM2
kg
4,163.58
4.83
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2
m3
26.64
371.88
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
187.98
54.27
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
4,118.88
4.96
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT)
m2
25.23
16.85
SOBRECIMIENTOS REFORZADOS
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2
m3
35.73
401.74
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
450.69
31.61
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
1,533.34
5.24
COLUMNAS
COLUMNAS, CONCRETO F'C=210 KG/CM2
m3
86.31
507.07
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
839.18
56.37
COLUMNAS, ACERO FY=4200 KG/CM2.
kg
13,823.03
5.05
COLUMNETAS
COLUMNETAS, CONCRETO F'C= 175 KG/CM2
m3
22.20
381.44
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
311.40
46.14
COLUMNETAS, ACERO FY=4200 KG/CM2
kg
3,036.07
4.77
VIGAS
VIGAS, CONCRETO F'C=210 KG/CM2
m3
39.14
391.02
VIGAS, ENCOFRADO Y DESENCOFRADO
m2
401.85
59.62
VIGAS, ACERO FY=4200 KG/CM2.
kg
5,001.85
4.90
VIGUETAS DE ARRIOSTRE
VIGUETAS DE ARRIOSTRE, CONCRETO F'c= 175KG/CM2
m3
4.56
329.85
VIGUETAS DE ARRIOSTRE, ENCOFRADO Y DESENCOFRADO
m2
55.25
53.91
VIGA DE ARRIOSTRE, ACERO FY=4200 KG/CM2.
kg
667.81
4.90
LOSA ALIGERADA
LOSA ALIGERADA, CONCRETO F'C=210 KG/CM2
m3
24.65
395.53
LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO
m2
312.47
45.20
LOSA ALIGERADA, ACERO FY=4200 KG/CM2.
kg
1,202.10
4.72
LOSA ALIGERADA, LADRILLO DE CONCRETO PARA TECHO DE 20X30X12
und
3,906.00
2.37
CANALETA DE CONCRETO EN TECHO
CANALETA DE CONCRETO EN TECHO, CONCRETO F'C=210 KG/CM2 CON ADITIVO
m3 IMPERMEABILIZANTE
26.33
412.67
CANALETA DE CONCRETO EN TECHO, ENCOFRADO Y DESENCOFRADO
m2
435.04
72.87
CANALETA DE CONCRETO EN TECHO, ACERO FY=4200 KG/CM2.
kg
2,112.24
4.90
ESTRUCTURA METALICA Y COBERTURA
TIJERAL METLICO DE SECCIN RECTANGULAR T-1
und
6.00
6,670.74
SOPORTES METALICOS PARA CERCHAS
und
12.00
580.16
VIGUETA TIPO "Z" DE 100mm x 51mm x 4.5mmm x 6.00m
m
530.10
80.82
TENSORES METALICOS DE ACERO LISO DE 3/8"
m
117.60
28.32
TEMPLADORES METALICOS DE ACERO LISO DE 1/2" (ENTRE TIJERALES)
m
213.20
23.45
COBERTURA CON PLANCHA METALICA TIPO TECNOTECHO MOD. TR4 950x45x80mm
m2
ALUZINC.
420.55
77.89
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N8m2
C/3 HILADAS)
303.90
91.18
MURO DE CABEZA CON LADRILLO DE ARCILLA 9X13X24 (CON ALAMBRE N8 m2
C/3 HILADAS)
75.33
148.04
COSTO DIRECTO
Parcial
5,437.80
1,149.12
4,288.68
45,895.50
2,554.74
19,794.62
7,678.31
5,494.40
2,130.40
1,830.09
6,412.94
52,573.25
8,402.98
9,893.89
34,276.38
520,095.10
81,054.16
60,944.07
20,110.09
40,963.32
9,906.88
10,201.67
20,429.64
425.13
36,635.18
14,354.17
14,246.31
8,034.70
160,876.09
43,765.21
47,304.58
69,806.30
37,318.02
8,467.97
14,368.00
14,482.05
63,771.89
15,304.52
23,958.30
24,509.07
7,754.92
1,504.12
2,978.53
3,272.27
38,804.58
9,749.81
14,123.64
5,673.91
9,257.22
52,916.94
10,865.60
31,701.36
10,349.98
130,915.65
40,024.44
6,961.92
42,842.68
3,330.43
4,999.54
32,756.64
38,861.45
27,709.60
11,151.85
793,778.75
ACUMULADO ANTERIOR
METRADO
1,026.00
1,026.00
1,026.00
593.72
324.39
323.20
269.33
0.00
0.00
290.66
32.58
0.00
174.39
4,163.58
26.64
187.98
4,118.88
25.23
35.73
450.69
1,533.34
86.31
839.18
13,823.03
22.20
311.40
3,036.07
34.00
401.85
5,001.85
4.56
55.25
667.81
24.65
312.47
1,202.10
3,906.00
26.33
435.04
2,112.24
3.00
0.00
0.00
0.00
0.00
0.00
303.90
75.33
ACUMULADO ANTERIOR
S/.
%
N DE CONTRATO
: 036-2012/GOREMAD/GGR.
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
MES ACTUAL
METRADO
S/.
ACUMULADO ACTUAL
METRADO
S/.
1,149.12
4,288.68
100.00%
100.00%
0.00
0.00
0.00%
0.00%
1,026.00
1,026.00
1,149.12
4,288.68
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2,554.74
19,794.62
7,678.31
5,494.40
2,130.40
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1,026.00
593.72
324.39
323.20
269.33
0.00
0.00
2,554.74
19,794.62
7,678.31
5,494.40
2,130.40
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
839.49
83.95
0.00
0.00
0.00
0.00
0.00
1,830.09
6,412.94
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
8,402.98
9,893.89
0.00
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
290.66
32.58
0.00
8,402.98
9,893.89
0.00
100.00%
100.00%
0.00%
0.00
0.00
839.49
0.00
0.00
34,276.38
0.00%
0.00%
100.00%
60,944.07
20,110.09
100.00%
100.00%
0.00
0.00
0.00%
0.00%
174.39
4,163.58
60,944.07
20,110.09
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
9,906.88
10,201.67
20,429.64
425.13
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
26.64
187.98
4,118.88
25.23
9,906.88
10,201.67
20,429.64
425.13
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
14,354.17
14,246.31
8,034.70
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
35.73
450.69
1,533.34
14,354.17
14,246.31
8,034.70
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
43,765.21
47,304.58
69,806.30
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
86.31
839.18
13,823.03
43,765.21
47,304.58
69,806.30
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8,467.97
14,368.00
14,482.05
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
22.20
311.40
3,036.07
8,467.97
14,368.00
14,482.05
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
13,294.68
23,958.30
24,509.07
86.87%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
34.00
401.85
5,001.85
13,294.68
23,958.30
24,509.07
86.87%
100.00%
100.00%
5.14
0.00
0.00
2,009.84
0.00
0.00
13.13%
0.00%
0.00%
1,504.12
2,978.53
3,272.27
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.56
55.25
667.81
1,504.12
2,978.53
3,272.27
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
9,749.81
14,123.64
5,673.91
9,257.22
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
24.65
312.47
1,202.10
3,906.00
9,749.81
14,123.64
5,673.91
9,257.22
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
10,865.60
31,701.36
10,349.98
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
26.33
435.04
2,112.24
10,865.60
31,701.36
10,349.98
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
20,012.22
0.00
0.00
0.00
0.00
0.00
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.00
0.00
0.00
0.00
0.00
0.00
20,012.22
0.00
0.00
0.00
0.00
0.00
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.00
12.00
530.10
117.60
213.20
420.55
20,012.22
6,961.92
42,842.68
3,330.43
4,999.54
32,756.64
50.00%
100.00%
100.00%
100.00%
100.00%
100.00%
27,709.60
11,151.85
100.00%
100.00%
0.00
0.00
0.00%
0.00%
303.90
75.33
27,709.60
11,151.85
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
638,346.10
80.42%
0.00
0.00%
638,346.10
80.42%
155,432.65
19.58%
21 (und)
CEMENTO SUB TOTAL
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.0036
0.00
3.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
6.5000
0.6500
188.93
211.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.5000
1,482.32
0.00
0.00
249.81
0.00
0.00
0.6500
113.35
0.00
0.00
28.20
0.00
0.00
0.6500
17.32
0.00
0.00
0.00
8.5000
8.0000
8.5000
8.0000
8.5000
8.0000
8.5000
8.5000
0.2180
0.4100
226.44
0.00
0.00
0.00
285.84
0.00
0.00
733.64
0.00
0.00
177.60
0.00
0.00
289.00
0.00
0.00
36.48
0.00
0.00
209.53
0.00
0.00
0.00
223.81
0.00
0.00
A. CORRUGADO
1.0500
1.0500
0.00
4,371.76
0.00
0.00
4,324.82
0.00
0.0600
0.3000
0.0500
0.00
56.39
205.94
0.00
0.0100
0.1500
PIEDRA S. 1/2"
SUB TOTAL
0.00
121.69
92.00
0.00
67.60
0.00
0.6500
0.2700
0.0600
0.1500
1.0700
0.00
0.00
1,640.67
23.22
0.00
0.00
0.00
377.63
829.38
0.00
251.75
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
14,790.64
56.10
0.00
0.00
0.00
93.42
182.16
0.00
52.94
0.00
0.6500
0.3000
0.0600
0.1700
1.0500
0.00
0.00
3,187.87
14.43
0.00
0.00
0.00
180.83
300.11
0.00
120.56
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
5,351.98
22.10
0.00
0.00
0.00
24.86
40.07
0.00
16.58
0.00
0.6500
0.4500
0.0600
0.3000
1.0700
0.00
0.00
714.56
2.96
0.00
0.00
0.00
34.37
0.00
0.00
0.6500
16.02
0.00
0.00
0.00
0.00
108.76
0.00
0.6500
17.11
0.00
0.00
1.0700
1.0700
0.00
0.00
1,286.25
0.00
0.00
0.00
2,260.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66.25
30.89
0.00
0.00
4,162.47
37,928.65
0.0600
0.2100
0.0600
0.00
0.00
72.13
0.00
0.00
91.36
126.73
0.1100
0.2500
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
151.95
37.67
3,234.14
0.0200
0.0220
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.08
1.66
0.00
0.00
692.18
282.63
05 (M3)
A. GRUESA SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.33
43.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1250
1.3500
0.1250
A. FINA
SUB TOTAL
TIERRA ORG.
SUB TOTAL
43 (P2)
M.NACIONAL E. SUB TOTAL
0.5000
0.00
513.00
0.00
0.00
0.5000
87.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
13.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
17.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.8300
0.00
2,176.83
0.00
0.00
0.00
0.00
0.5000
43.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
4,153.94
0.00
0.00
0.00
0.00
0.5000
11.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9500
0.00
1,541.43
0.00
0.00
0.00
0.00
0.5000
17.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
1,997.19
0.00
0.00
0.00
0.00
0.5000
2.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.9700
0.00
274.59
0.00
0.00
0.00
0.00
0.00
0.5000
12.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.4200
11.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.0800
0.0500
1.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0310
0.0580
9.42
4.37
0.00
0.00
0.00
0.00
230.59
0.00
0.00
80.32
0.1000
5.4700
2.66
1,028.25
0.00
0.00
0.00
0.00
0.00
0.00
1.1300
4.9700
29.75
2,162.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5800
0.5800
176.26
43.69
14,099.76
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0500
0.00
0.00
0.00
4,101.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.0000
66.0000
11,852.10
4,971.78
20,925.18
Item
01
01.01
01.01.01
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.03
01.03.01
01.03.02
01.03.03
01.04
01.04.01
01.04.02
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05
01.05.06
01.05.07
01.06
01.06.01
01.06.02
01.06.03
01.06.04
01.07
01.07.01
01.07.02
01.07.03
01.07.04
01.07.05
01.07.06
01.07.07
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.04.06
02.04.07
02.04.08
02.04.09
02.04.10
02.04.11
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
02.05.08
03
03.01
03.02
03.03
und
Metrado
P.unit
2.83
28.58
1.61
1.98
29.51
28.58
5.15
4.10
1.34
91.92
83.62
69.27
69.27
68.28
68.28
70.08
68.28
69.27
21.77
14.65
15.65
33.31
215.05
287.00
55.00
185.00
175.12
870.00
70.08
2.83
50.02
1.61
1.98
29.51
28.58
10.69
9.79
1.55
92.73
58.85
83.85
58.85
81.85
58.85
83.85
115.63
53.43
65.93
59.16
26.55
28.05
14.22
38.72
35.72
24.45
12.94
16.44
61.80
24.22
242.05
Parcial
20,116.13
236.87
236.87
5,302.67
2,392.15
134.76
165.73
2,469.99
140.04
464.78
46.35
306.27
112.16
1,371.12
367.68
1,003.44
1,798.68
554.16
623.43
68.28
136.56
140.16
68.28
207.81
1,376.29
87.08
73.25
516.45
699.51
9,565.72
1,720.40
2,583.00
110.00
370.00
350.24
2,610.00
1,822.08
16,945.04
267.60
267.60
8,017.88
4,729.89
152.24
187.23
2,790.47
158.05
1,123.43
607.19
369.67
146.57
6,159.17
741.84
529.65
83.85
117.70
163.70
58.85
503.10
2,659.49
320.58
329.65
650.76
1,376.96
265.50
308.55
241.74
77.44
142.88
122.25
103.52
115.08
22,556.88
17,520.92
2,131.36
2,904.60
59,618.05
ACUMULADO ANTERIOR
METRADO
S/.
%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
METRADO S/.
%
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
21 (und)
CEMENTO SUB TOTAL
A. CORRUGADO
SUB TOTAL
03 (KG)
ALAMBRE DE C. SUB TOTAL
05 (M3)
CLAVO DE C.
SUB TOTAL
PIEDRA S. 1/2"
SUB TOTAL
HORMIGON
SUB TOTAL
83.70
236.87
100.00%
0.00
0.00%
83.70
236.87
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
83.70
83.70
83.70
83.70
4.90
2,392.15
134.76
165.73
2,469.99
140.04
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
83.70
83.70
83.70
83.70
4.90
2,392.15
134.76
165.73
2,469.99
140.04
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
74.70
83.70
46.35
306.27
112.16
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
9.00
74.70
83.70
46.35
306.27
112.16
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
4.00
12.00
367.68
1,003.44
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
9.00
1.00
2.00
2.00
1.00
3.00
554.16
623.43
68.28
136.56
140.16
68.28
207.81
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.00
9.00
1.00
2.00
2.00
1.00
3.00
554.16
623.43
68.28
136.56
140.16
68.28
207.81
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
5.00
33.00
21.00
87.08
73.25
516.45
699.51
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
4.00
5.00
33.00
21.00
87.08
73.25
516.45
699.51
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.00
9.00
2.00
2.00
2.00
3.00
26.00
1,720.40
2,583.00
110.00
370.00
350.24
2,610.00
1,822.08
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
94.56
267.60
100.00%
0.00
0.00%
94.56
267.60
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
94.56
94.56
94.56
94.56
5.53
4,729.89
152.24
187.23
2,790.47
158.05
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
94.56
94.56
94.56
94.56
5.53
4,729.89
152.24
187.23
2,790.47
158.05
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56.80
37.76
94.56
607.19
369.67
146.57
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
56.80
37.76
94.56
607.19
369.67
146.57
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.00
9.00
1.00
2.00
2.00
1.00
6.00
23.00
6.00
5.00
11.00
741.84
529.65
83.85
117.70
163.70
58.85
503.10
2,659.49
320.58
329.65
650.76
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
10.00
11.00
17.00
2.00
4.00
5.00
8.00
7.00
265.50
308.55
241.74
77.44
142.88
122.25
103.52
115.08
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
283.51
88.00
0.00
17,520.92
2,131.36
0.00
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
283.51
88.00
0.00
17,520.92
2,131.36
0.00
100.00%
100.00%
0.00%
0.00
0.00
12.00
0.00
0.00
2,904.60
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38,240.46
64.14%
0.00
0.00%
38,240.46
64.14%
21,377.59
35.86%
0.00
0.00
0.00
0.00
1.4000
0.00
0.00
0.00
0.00
11.7500
0.2000
0.00
0.00
0.00
0.00
05 (M3)
A. GRUESA SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
SUB TOTAL
43 (P2)
M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1100
16.0000
Item
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
01.02
01.02.01
01.02.02
01.03
01.03.01
01.04
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.04.06
01.04.07
01.04.08
01.04.09
01.04.10
01.04.11
01.04.12
01.04.13
01.04.14
01.05
01.05.01
01.05.02
01.05.03
01.06
01.06.01
01.06.02
01.06.03
01.07
01.07.01
01.08
01.01.10.07
01.01.10.09
01.09
01.01.11.01
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.03
02.03.01
02.03.02
02.04
02.04.01
02.04.02
02.04.03
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
und
Metrado
P.unit
Parcial
ACUMULADO ANTERIOR
MES ACTUAL
METRADO
S/.
%
METRADO S/.
INSTALACIONES ELECTRICAS INTERIORES
43,254.72
SALIDAS PARA ALUMBRADO
2,315.20
0.00%
SALIDAS PARA CENTROS DE LUZ EN TECHOS
PTO
94.00
8.62
810.28
0.00
0.00
0.00
0.00%
SALIDAS PARA CENTROS DE LUZ EN PARED (BRAQUETE)
PTO
12.00
21.73
260.76
0.00
0.00
0.00
0.00%
SALIDA PARA LUCES DE EMERGENCIA (PARED)
PTO
8.00
35.33
282.64
0.00
0.00
0.00
0.00%
SALIDA PARA LUZ DE SEALIZACION EN PARED
PTO
3.00
30.84
92.52
0.00
0.00
0.00
0.00%
SALIDA CON INTERRUPTOR DOBLE DE EMPOTRAR
PTO
10.00
38.44
384.40
0.00
0.00
0.00
0.00%
SALIDA CON INTERRUPTOR SIMPLE PARA EMPOTRAR EN PARED
PTO
9.00
34.96
314.64
0.00
0.00
0.00
0.00%
SALIDA PARA CONMUTADOR SIMPLE
PTO
4.00
42.49
169.96
0.00
0.00
0.00
SALIDAS PARA TOMACORRIENTES
1,309.09
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE
pto
28.00
35.50
994.00
28.00
994.00 100.00%
0.00
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE PARA EMPOTRAR EN PARED A 1.10
pto M., INC. PLACA
9.00 BAKELITA
35.01CON PT,
315.09
15 A. 220V. 9.00
315.09 100.00%
0.00
SALIDAS PARA TOMA DE FUERZA
7,001.68
0.00%
SALIDA DE FUERZA AIRE ACONDICIONADO
pto
4.00
1,750.42
7,001.68
0.00
0.00
0.00
ARTEFACTOS DE ILUMINACION
13,138.88
0.00%
ARTEF. PARA EMPOTRAR A CIELO RASO CON LAMP FLUORESCENTE, SIMIL AL MOD
und RCP 4X18
30.00
W, REJILLA
171.14
PORTALAMPARA
5,134.20
0.00
0.00
0.00
0.00%
ARTEF. PARA EMPOTRAR A TECHO CON LAMP AHORRADORA PL-C, SIMIL AL MOD
und
SDL 2X26 W,
24.00
SPOT LIGHT
120.77
PORTALAMPARA
2,898.48
0.00
0.00
0.00
0.00%
ARTEF. RECTANGULAR TIPO REJILLA PARA ADOSAR CON TRES LAMPARAS 3X36und
W. ALTO FACTOR
1.00 POTENCIA
149.01
149.01
0.00
0.00
0.00
0.00%
ARTEF. RECTANGULAR PARA ADOSAR TIPO ECONOMICO CON DOS LAMPARAS 2X36
und W ALTO FACTOR
6.00
DE 76.81
POTENCIA 460.86
0.00
0.00
0.00
0.00%
ARTEF. RECTANG TIPO LINEAL PARA ADOSAR , CON UNA LAMPARA FLUORESCENTE
und 36 W. ALTO
7.00
F. P.
63.74
446.18
0.00
0.00
0.00
0.00%
ARTEF. PARA ADOSAR EN PARED INT. CON LAMPARA FLUORES COMP. 1X9 W. SIM.
und MOD PAP12.00
1X7-9 PORTALAMPARA
67.93
815.16
0.00
0.00
0.00
0.00%
ARTEF. PARA ADOSAR CON FLUORESCENTE CIRCULAR 32W T'L'E 1X32W ALTO F.P.
und SIM. MOD.1.00
PLC 1X32 60.44
W PORTALAMPARA
60.44
0.00
0.00
0.00
0.00%
ARTEF. PARA ADOSAR CON LAMPARA DICROICA DE 50W, SIM AL MOD SDE 1X50und
FIJO PORTALAMPARA
3.00
92.45
277.35
0.00
0.00
0.00
0.00%
ARTEF. PARA ADOSAR A TECHO LAMP. FLUORESCENTE CIRCULAR 32W SIMIL. AL
und
MOD. PAR 15.00
1X32 W PORTALAMPARA
71.22
1,068.30
0.00
0.00
0.00
0.00%
ARTEF. RECTG. TIPO LINEAL PARA ADOSAR CON DOS LAMPARAS FLUORESCENTES
und 18 W ALTO
5.00
F.P.
90.59
452.95
0.00
0.00
0.00
0.00%
ARTEF. CIRCULAR PARA ADOSAR A TECHO SIMIL AL MODELO ALPHA SPTO DE JOSFEL
und
1.00
54.38
54.38
0.00
0.00
0.00
0.00%
ARTEF. PARA EMPOTRAR A PARED CON LAMP. FLUORESC COMPACTA, SIM. AL MOD
und PLG 1X7-11,
6.00PORTALAMPARA
68.64
411.84
0.00
0.00
0.00
0.00%
ARTEF. LUZ DE EMERGENCIA A BATERIA DOS FAROS, SIMI. AL LED-4H
und
5.00
116.33
581.65
0.00
0.00
0.00
0.00%
ARTEF. DE LUZ DE SEALIZACIN CON FLUORESCENTE 1X8, 3.5 H. AUT. SIM. ALund
DL 16 SPAS 3.00
109.36
328.08
0.00
0.00
0.00
CAJAS Y TUBERIAS
6,193.97
0.00%
CAJA DE PASE DE FIERRO GALVANIZADO DE 4"X2 1/8", EMPOTRADO EN PARED DE
undCONCRETO
5.00
18.31
91.55
0.00
0.00
0.00
0.00%
CAJA DE PASE DE FIERRO GALVANIZADO DE 4"X4 1/8", EMPOTRADO EN PARED DE
undCONCRETO
2.00
22.47
44.94
0.00
0.00
0.00
TUBERIA PVC.P. 20 MM (3/4" X 3M)
und
776.60
7.80
6,057.48
776.60 6,057.48 100.00%
0.00
CONDUCTORES Y CONEXIONES A TABLEROS DE DISTRIBUCION
9,492.40
0.00%
CABLE ELECTRICO TW N 14 AWG - 2.5 MM2
m
1,427.85
4.14
5,911.30
0.00
0.00
0.00
0.00%
CABLE ELECTRICO TW N 12 AWG - 4 MM2
m
461.69
4.72
2,179.18
0.00
0.00
0.00
0.00%
CABLE ELECTRICO THW (1X6+1X6+4) MM2
m
121.80
11.51
1,401.92
0.00
0.00
0.00
SISTEMA DE CLIMATIZACION
611.72
0.00%
SALIDA PARA VENTILADOR EMPOTRADO EN CIELO RASO
PTO
4.00
152.93
611.72
0.00
0.00
0.00
TABLEROS DE DISTRIBUCION
2,360.78
0.00%
TABLERO DE DISTRIBUCION CON INT. AUTO 1-3X60A,4-2X15A, 9-2X25A, TABLEROund
36 POLOS 3 1.00
ID 25A-30mA
1,746.37
1,746.37
0.00
0.00
0.00
0.00%
TABLERO DE DISTRIBUCION CON INT. AUT 1-2X25A,1-6X15A, TABLERO 18 POLOSund
1.00
614.41
614.41
0.00
0.00
0.00
SISTEMA DE PROTECCION
831.00
0.00%
POZO DE CONEXIN A TIERRA
Glb
1.00
831.00
831.00
0.00
0.00
0.00
VOZ Y DATO
2,390.97
REDES DE INFORMACION DE DATOS
411.61
0.00%
CABLE DE RED
m
14.20
3.53
50.13
0.00
0.00
0.00
0.00%
APARATO MODULAR PARA SALIDA DE DATOS
und
2.00
41.65
83.30
0.00
0.00
0.00
TUBERIA PVC.SAP. 20 MM (3/4" X 3M)
m
28.20
7.80
219.96
28.20
219.96 100.00%
0.00
0.00%
CONECTOR RJ 45 MACHO
und
2.00
6.15
12.30
0.00
0.00
0.00
0.00%
CABLEADO PROYECTOR MULTIMEDIA
m
14.00
3.28
45.92
0.00
0.00
0.00
REDES TELEFONICAS
49.51
0.00%
APARATO MODULAR PARA SALIDA DE TELEFONO
und
1.00
13.65
13.65
0.00
0.00
0.00
0.00%
CONECTOR RJ 11 MACHO
und
1.00
3.22
3.22
0.00
0.00
0.00
TUBERIA PVC.SAP. 20 MM (3/4" X 3M)
m
3.00
7.80
23.40
3.00
23.40 100.00%
0.00
0.00%
CABLEADO TELEFONICO
m
3.00
3.08
9.24
0.00
0.00
0.00
SISTEMA DE AUDIO
938.50
0.00%
SALIDA PARA DIFUSOR DE AUDIO EN CIELO RASO
PTO
11.00
13.70
150.70
0.00
0.00
0.00
TUBERIA PVC.SAP. 20 MM (3/4" X 3M)
m
101.00
7.80
787.80
101.00
787.80 100.00%
0.00
GENERALES DE REDES DE COMUNICACIONES
991.35
0.00%
CAJA DE PASO O DERIVACION DATOS
PTO
1.00
27.74
27.74
0.00
0.00
0.00
0.00%
CAJA DE SALIDA PARA SWITC (4 PUNTOS)
PTO
1.00
62.18
62.18
0.00
0.00
0.00
0.00%
POZO DE CONEXIN A TIERRA PARA R Menor 5 Ohm.
Glb
1.00
901.43
901.43
0.00
0.00
0.00
COSTO DIRECTO
45,645.69
8,397.73
18.40%
0.00
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
94.00
12.00
8.00
3.00
10.00
9.00
4.00
0.00%
0.00%
28.00
9.00
994.00
315.09
100.00%
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
30.00
24.00
1.00
6.00
7.00
12.00
1.00
3.00
15.00
5.00
1.00
6.00
5.00
3.00
0.00%
0.00%
0.00%
0.00
0.00
776.60
0.00
0.00
6,057.48
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
28.20
0.00
0.00
0.00%
0.00%
0.00%
0.00%
21 (und)
03 (KG)
CEMENTO
SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL
05 (M3)
CLAVO DE C.
AFIRMADO
SUB TOTAL
A. GRUESA
43 (P2)
SUB TOTAL
A. FINA
SUB TOTAL
TIERRA ORG.
17 (und)
LADRILLO A.
SUB TOTAL
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,001.68
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,134.20
2,898.48
149.01
460.86
446.18
815.16
60.44
277.35
1,068.30
452.95
54.38
411.84
581.65
328.08
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
2.00
0.00
91.55
44.94
0.00
100.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,427.85
461.69
121.80
5,911.30
2,179.18
1,401.92
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
611.72
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1,746.37
614.41
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
831.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
219.96
0.00
0.00
0.00%
0.00%
100.00%
0.00%
0.00%
14.20
2.00
0.00
2.00
14.00
50.13
83.30
0.00
12.30
45.92
100.00%
100.00%
0.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
23.40
0.00
0.00%
0.00%
100.00%
0.00%
1.00
1.00
0.00
3.00
13.65
3.22
0.00
9.24
100.00%
100.00%
0.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
101.00
0.00
787.80
0.00%
100.00%
11.00
0.00
150.70
0.00
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
1.00
1.00
27.74
62.18
901.43
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,397.73
18.40%
37,247.96
81.60%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
810.28
260.76
282.64
92.52
384.40
314.64
169.96
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
01.01.08
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.03
01.03.01
01.03.02
01.04
01.04.01
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.06
01.06.01
01.06.02
07.01
07.01.01
07.01.02
07.01.03
07.01.04
07.01.05
07.01.06
07.01.07
07.01.08
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
02.01.06
02.01.07
02.01.08
und
Metrado
P.unit
POLIDEPORTIVO
REVOQUES Y ENLUCIDOS
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
177.98
21.18
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
44.24
18.14
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
51.32
26.37
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
4.38
32.75
TARRAJEO EN ESCALERAS Y GRADAS C:A 1:5 e=1.50 cm.
m2
2.00
26.50
VESTIDURA DE DERRAMES C:A 1:5 e=1.50cm.
m
23.28
11.63
TARRAJEO EN CIELORASOS C:A 1:5 e=1.50 cm.
m2
12.78
25.72
SOLAQUEO EN CONCRETO CARAVISTA
m2
1,800.81
5.37
PISOS Y PAVIMENTOS
VEREDA DE CONCRETO F'C=175 KG/CM2 h=0.10m, ACABADO SEMIPULIDO
m2 Y BRUADO
184.16 (INC.57.62
UA LATERAL DE PROTE
ATRIO DE CONCRETO F'C= 175 KG/CM2. h=10m, ACABADO SEMIPULIDO m2
Y BRUADO
47.80
(INC. UA
135.87
LATERAL DE PROTECC
LOSA DE CONCRETO, CONCRETO F'C=175 KG/CM2 E=15CM.,ACABADO m2
14.23
63.01
JUNTAS DE DILATACIN HORIZONTAL + SELLO ASFALTICO e=1" c/4m
m
41.08
12.58
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H = 30 CM
m
40.04
11.70
CONTRAZOCALO CEMENTO PULIDO S/COLOREAR H = 15 CM
m
8.21
10.46
CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA TORNILLO DE 0.90 x 2.20 m + MARCO und
(INC. DOS 2.00
MANOS DE
600.00
PINTURA ESMALTE)
CARPINTERIA METALICA Y ALUMINIO
BARANDA METALICA DE FG 1" y 2" CON PARANTES @ 1.38m
m
67.80
135.04
BARANDA METALICA INCLINADA DE FG 1" y 2" CON PARANTES
m
19.88
164.56
CERCO CON MALLA METALICA CON TUBO DE FG DE 3" Y 2" Y MALLA GALVANIZADA
ML
71.33DE 2"X2"
380.46
#8", SEGUN DISEO
VENTANA DE ALUMINIO, CON VIDRIOS PAVONADO E INCOLORO DE 6 mm
m2Y BARRAS
2.91
DE SEGURIDAD
180.00
DE ACERO LISO
CERRAJERIA
BISAGRA CAPUCHINA DE 4" X4"
und
8.00
13.52
CERRADURA NACIONAL DE 3 GOLPES PARA PUERTA
und
2.00
90.97
PINTURA
PINTURA EN MUROS EXTERIORES AL LATEX SATINADO 2 MANOS
m2
177.98
8.65
PINTURA EN MUROS INTERIORES AL LATEX SATINADO 2 MANOS
m2
44.24
7.96
PINTURA EN COLUMNAS Y PLACAS AL LATEX SATINADO 2 MANOS
m2
51.32
9.25
PINTURA EN VIGAS AL LATEX SATINADO 2 MANOS
m2
4.38
9.24
PINTURA EN DERRAMES AL LATEX SATINADO 2 MANOS
m
23.28
3.95
PINTURA EN CIELORASOS AL LATEX
m2
12.78
7.35
DEMARCACION DE LOSA CON PINTURA DE TRAFICO
ML
455.12
6.28
PINTURA ESMALTE EN LOSA DEPORTIVA
m2
720.00
14.29
SERVICIOS HIGIENICOS Y VESTIDORES
REVOQUES Y ENLUCIDOS
TARRAJEO EXTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
57.69
21.18
TARRAJEO INTERIOR EN MUROS C:A 1:5 e=1.50 cm.
m2
95.32
18.14
TARRAJEO EN COLUMNAS - PLACAS C:A 1:5 e=1.50 cm
m2
18.17
26.37
TARRAJEO EN VIGAS C:A 1/5, e=1.50 cm
m2
58.31
32.75
VESTIDURA DE DERRAMES C:A 1:5 e=1.50cm.
m
41.08
12.28
BRUAS VERTICALES DE 1"
m
154.62
6.71
JUNTA DE DILATACION VERTICAL DE 15 C.M. CON TECNORPORT e=1" m
51.46
7.34
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA PARA ZOCALOS m2
114.78
17.52
02.01.09
02.01.10
02.02
02.02.01
02.03
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.04.02
02.05
02.05.01
02.06
02.06.01
02.06.02
02.07
02.07.01
02.07.02
02.07.03
02.07.04
02.07.05
02.08
02.08.01
02.08.02
02.08.03
02.08.04
02.08.05
OS FERMIN FITZCARRALD
CONSORCIO CARLOS F. FITZCARRALD
ING. JOSE JAVIER ANTONIO ESTREMADOYRO ALGUIAR
1.0000000000
Parcial
92,784.32
16,391.69
3,769.62
802.51
1,353.31
143.45
53.00
270.75
328.70
9,670.35
18,519.31
10,611.30
6,494.59
896.63
516.79
554.35
468.47
85.88
1,200.00
1,200.00
40,089.17
9,155.71
3,271.45
27,138.21
523.80
290.10
108.16
181.94
15,739.70
1,539.53
352.15
474.71
40.47
91.96
93.93
2,858.15
10,288.80
40,617.32
11,018.27
1,221.87
1,729.10
479.14
1,909.65
504.46
1,037.50
377.72
2,010.95
ACUMULADO ANTERIOR
METRADO
S/.
%
142.38
35.39
41.06
4.38
20.95
12.78
51.92
85.79
16.35
52.48
36.97
139.16
46.31
103.30
METRADO
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
S/.
ACUMULADO ACTUAL
METRADO
S/.
3,015.61
641.97
1,082.75
143.45
0.00
243.67
328.70
0.00
80.00%
80.00%
80.01%
100.00%
0.00%
90.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
142.38
35.39
41.06
4.38
0.00
20.95
12.78
0.00
3,015.61
641.97
1,082.75
143.45
0.00
243.67
328.70
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,099.67
1,556.23
431.20
1,718.72
453.99
933.76
339.93
1,809.82
90.00%
90.00%
90.00%
90.00%
90.00%
90.00%
90.00%
90.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
51.92
85.79
16.35
52.48
36.97
139.16
46.31
103.30
1,099.67
1,556.23
431.20
1,718.72
453.99
933.76
339.93
1,809.82
301.54
1,446.34
4,313.93
4,313.93
5,439.97
696.48
1,694.78
3,048.71
7,606.75
321.48
7,285.27
2,670.50
2,670.50
6,451.20
2,671.20
3,780.00
989.81
216.32
250.40
363.88
90.87
68.34
2,126.89
499.02
758.75
168.07
538.78
162.27
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
133,401.64
13,799.47
10.34%
0.00
0.00%
13,799.47
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
MULADO ACTUAL
%
21 (und)
CEMENTO SUB TOTAL
03 (KG)
A. CORRUGADO
SUB TOTAL
80.00%
80.00%
80.01%
100.00%
0.00%
90.00%
100.00%
0.00%
35.60
8.85
10.26
0.00
2.00
2.33
0.00
1,800.81
754.01
160.54
270.56
0.00
53.00
27.08
0.00
9,670.35
20.00%
20.00%
19.99%
0.00%
100.00%
10.00%
0.00%
100.00%
0.1500
0.1500
0.1170
0.1170
0.1800
0.0400
0.1500
0.0350
21.36
5.31
4.80
0.51
0.00
0.84
1.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
184.16
47.80
14.23
41.08
10,611.30
6,494.59
896.63
516.79
100.00%
100.00%
100.00%
100.00%
1.0200
3.0000
1.3500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
40.04
8.21
468.47
85.88
100.00%
100.00%
0.0640
0.0160
0.00
0.00
0.00
0.00
0.00%
2.00
1,200.00
100.00%
0.00
0.00
0.00%
0.00%
0.00%
0.00%
67.80
19.88
71.33
2.91
9,155.71
3,271.45
27,138.21
523.80
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
8.00
2.00
108.16
181.94
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
177.98
44.24
51.32
4.38
23.28
12.78
455.12
720.00
1,539.53
352.15
474.71
40.47
91.96
93.93
2,858.15
10,288.80
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
90.00%
90.00%
90.00%
90.00%
90.00%
90.00%
90.00%
90.00%
5.77
9.53
1.82
5.83
4.11
15.46
5.15
11.48
122.20
172.87
47.94
190.93
50.47
103.74
37.79
201.13
10.00%
10.00%
10.00%
10.00%
10.00%
10.00%
10.00%
10.00%
7.79
12.87
1.91
6.14
1.48
0.00
0.00
12.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1500
0.1500
0.1170
0.1170
0.0400
0.1170
0.00%
0.00%
17.43
17.43
301.54
1,446.34
100.00%
100.00%
0.00%
71.34
4,313.93
100.00%
0.00%
0.00%
0.00%
25.18
134.72
49.84
696.48
1,694.78
3,048.71
100.00%
100.00%
100.00%
0.00%
0.00%
32.02
113.46
321.48
7,285.27
100.00%
100.00%
0.00%
7.63
2,670.50
100.00%
0.00%
0.00%
14.84
12.60
2,671.20
3,780.00
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
16.00
20.00
4.00
3.00
6.00
216.32
250.40
363.88
90.87
68.34
0.00%
0.00%
0.00%
0.00%
0.00%
57.69
95.32
18.17
58.31
41.08
10.34%
0.1170
0.1200
0.00
0.00
0.00
0.00
0.00
0.00
0.1870
0.00
0.00
0.00
0.00
0.00
0.00
0.1870
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
499.02
758.75
168.07
538.78
162.27
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
119,602.17
89.66%
77.01
0.00
0.4540
NTO DIRECTO
RADO Y CARPINTERIA
03 (KG)
ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL
05 (
PIEDRA S. 1/2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0400
0.0400
0.0300
0.0300
0.0400
0.0200
0.0400
5.70
1.42
1.23
0.13
0.00
0.42
0.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0500
0.2250
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0090
0.0090
0.1000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.08
3.43
0.49
1.57
0.74
0.00
0.00
1.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0400
0.0400
0.0300
0.0300
0.0200
0.0100
0.1200
0.4000
0.00
0.00
0.0100
0.00
0.00
0.00
0.00
0.00
2.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18.75
0.00
0.00
0.00
0.00
0.00
0.00
0.0090
05 (M3)
43 (P2)
SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0250
0.0250
0.0180
0.0180
0.0250
0.0065
0.0025
0.0500
3.56
0.88
0.74
0.08
0.00
0.14
0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.6500
0.5800
0.5200
0.5200
0.5800
0.1270
0.5800
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0100
0.00
0.00
0.00
0.00
0.9860
3.0000
0.0160
0.0120
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0020
0.0020
0.00
0.00
0.00
0.00
0.1560
0.1560
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.30
2.14
0.29
0.94
0.24
0.00
0.00
1.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0800
0.0250
0.0250
0.0180
0.0180
0.0065
0.0160
0.6500
0.5800
0.5200
0.5200
0.1270
0.5800
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0210
0.0160
0.0200
0.00
0.00
0.00
0.00
0.5000
0.00
0.00
2.1000
0.00
0.00
0.00
0.0080
0.0120
0.0260
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0020
0.0200
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.01
0.00
0.5600
43 (P2)
SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
92.55
20.53
21.35
2.28
0.00
2.66
7.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.75
49.76
8.50
27.29
4.70
0.00
0.00
59.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
330.68
0.00
Obra
Form.
Cliente
Ubicac.
01
Item
01.01
01.01.01
01.01.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.02.04
01.04.03
01.04.03.01
01.04.03.02
01.04.03.03
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.05
01.04.05.01
01.04.05.02
01.04.05.03
01.04.06
01.04.06.01
01.04.06.02
01.04.06.03
01.04.07
01.04.07.01
01.04.07.02
01.04.07.03
01.04.08
01.04.08.01
01.04.08.02
01.04.08.03
01.04.08.04
01.04.09
01.04.09.01
01.04.09.02
01.04.09.03
01.04.10
01.04.10.01
01.04.10.02
01.04.10.03
und
Metrado
P.unit
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
1,685.60
1.12
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
1,685.60
4.18
MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO
M2
1,685.60
2.49
EXCAVACION DE ZANJAS
m3
410.62
33.34
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
218.22
23.67
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M
m3
250.12
17.00
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h
m3
D=3KM
250.12
7.91
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m2
246.35
2.18
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
246.35
76.39
OBRAS DE CONCRETO SIMPLE
SOLADO fc=100 KG/CM2 e=10CM
m2
209.18
11.00
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
7.52
258.82
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
14.45
32.97
GRADAS DE CONCRETO, F'C=175 KG/CM2. - ACABADO CoAo 1:4 FROTACHADO
m3 BRUADO3.52
CADA 0.10
225.32
M
ENCOFRADO Y DESENCOFRADO PARA GRADAS
m2
26.27
14.00
JUNTAS DE DILACIN HORIZONTAL + SELLO ASFALTICO 1"
m
21.36
7.48
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
104.59
349.47
ZAPATAS, ACERO FY=4200KG/CM2
kg
2,718.82
4.83
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2
m3
50.78
371.88
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
338.53
54.27
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
4,378.61
4.96
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT)
m2
84.63
16.85
SOBRECIMIENTOS REFORZADOS
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2
m3
7.40
401.74
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
103.08
32.64
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
365.13
5.24
COLUMNAS CARAVISTA
COLUMNAS, CONCRETO F'C=210 KG/CM2 CARAVISTA CON ADITIVO PLASTIF.
m3
1.08
527.36
COLUMNAS, ENCOFRADO Y DESENCOFRADO CARAVISTA
m2
0.75
77.53
COLUMNAS, ACERO FY=4200 KG/CM2.
kg
186.05
5.53
PLACAS CARAVISTA
PLACAS, CONCRETO F'C=210 KG/CM2 CARAVISTA CON ADITIVO PLASTIF.m3
34.61
533.53
PLACAS, ENCOFRADO Y DESENCOFRADO CARAVISTA
m2
608.90
88.18
PLACAS, ACERO FY=4200 KG/CM2.
kg
7,948.99
5.36
VIGAS CARAVISTA
VIGAS, CONCRETO F'C=210 KG/CM2 CARAVISTA CON ADITIVO PLASTIF. m3
244.21
400.63
VIGAS, ENCOFRADO Y DESENCOFRADO CARAVISTA
m2
997.11
75.75
VIGAS, ACERO FY=4200 KG/CM2.
kg
11,128.08
4.90
LOSAS MACIZAS CARAVISTA
LOSAS MACIZAS CARAVISTA, CONCRETO F'c= 175KG/CM2, CON ADITIVO PLASTIF.
m3
28.40
436.71
LOSAS MACIZAS CARAVISTA, ENCOFRADO Y DESENCOFRADO CARAVISTA
m2
270.86
80.07
LOSAS MACIZAS CARAVISTA, ACERO FY=4200 KG/CM2.
kg
2,214.91
4.90
LOSA ALIGERADA
LOSA ALIGERADA, CONCRETO F'C=210 KG/CM2
m3
1.72
395.53
LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO
m2
21.50
45.20
LOSA ALIGERADA, ACERO FY=4200 KG/CM2.
kg
144.52
4.72
LOSA ALIGERADA, LADRILLO DE CONCRETO PARA TECHO DE 20X30X12 und
269.00
2.37
COLUMNETAS
COLUMNETAS, CONCRETO F'C= 175 KG/CM2
m3
1.40
381.44
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
22.84
46.14
COLUMNETAS, ACERO FY=4200 KG/CM2
kg
201.30
4.77
VIGUETAS DE ARRIOSTRE
VIGUETAS DE ARRIOSTRE, CONCRETO F'c= 175KG/CM2
m3
1.36
329.85
VIGUETAS DE ARRIOSTRE, ENCOFRADO Y DESENCOFRADO
m2
4.72
53.91
VIGA DE ARRIOSTRE, ACERO FY=4200 KG/CM2.
kg
151.49
4.90
Parcial
8,933.68
1,887.87
7,045.81
48,638.69
4,197.14
13,690.07
5,165.27
4,252.04
1,978.45
537.04
18,818.68
6,044.41
2,300.98
1,946.33
476.42
793.13
367.78
159.77
514,560.19
49,682.97
36,551.07
13,131.90
60,400.02
18,884.07
18,372.02
21,717.91
1,426.02
8,250.69
2,972.88
3,364.53
1,913.28
1,656.56
569.55
58.15
1,028.86
114,764.86
18,465.47
53,692.80
42,606.59
227,896.52
97,837.85
75,531.08
54,527.59
44,943.38
12,402.56
21,687.76
10,853.06
2,971.77
680.31
971.80
682.13
637.53
2,548.06
534.02
1,053.84
960.20
1,445.36
448.60
254.46
742.30
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
S/.
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO
S/.
%
21 (und)
CEMENTO SUB TOTAL
1,685.60
1,685.60
1,887.87
7,045.81
100.00%
100.00%
0.00
0.00
0.00%
0.00%
1,685.60
1,685.60
1,887.87
7,045.81
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1,685.60
410.62
218.22
250.12
250.12
0.00
0.00
4,197.14
13,690.07
5,165.27
4,252.04
1,978.45
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1,685.60
410.62
218.22
250.12
250.12
0.00
0.00
4,197.14
13,690.07
5,165.27
4,252.04
1,978.45
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
246.35
246.35
0.00
0.00
0.00
0.00
0.00
537.04
18,818.68
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
209.18
7.52
14.45
0.00
0.00
0.00
2,300.98
1,946.33
476.42
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
209.18
7.52
14.45
0.00
0.00
0.00
2,300.98
1,946.33
476.42
0.00
0.00
0.00
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
3.52
26.27
21.36
0.00
0.00
0.00
793.13
367.78
159.77
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
0.1800
6.0000
0.4400
104.59
2,718.82
36,551.07
13,131.90
100.00%
100.00%
0.00
0.00
0.00%
0.00%
104.59
2,718.82
36,551.07
13,131.90
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
8.5000
50.78
338.53
4,378.61
84.63
18,884.07
18,372.02
21,717.91
1,426.02
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
50.78
338.53
4,378.61
84.63
18,884.07
18,372.02
21,717.91
1,426.02
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.5000
7.40
103.08
365.13
2,972.88
3,364.53
1,913.28
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
7.40
103.08
365.13
2,972.88
3,364.53
1,913.28
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
1.08
0.75
186.05
569.55
58.15
1,028.86
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.08
0.75
186.05
569.55
58.15
1,028.86
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
34.61
608.90
7,948.99
18,465.47
53,692.80
42,606.59
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
34.61
608.90
7,948.99
18,465.47
53,692.80
42,606.59
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
90.00
997.11
11,128.08
36,056.70
75,531.08
54,527.59
36.85%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
90.00
997.11
11,128.08
36,056.70
75,531.08
54,527.59
36.85%
100.00%
100.00%
154.21
0.00
0.00
61,781.15
0.00
0.00
63.15%
0.00%
0.00%
8.5000
28.40
270.86
2,214.92
12,402.56
21,687.76
10,853.11
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
28.40
270.86
2,214.92
12,402.56
21,687.76
10,853.11
100.00%
100.00%
100.00%
0.00
0.00
-0.01
0.00
0.00
-0.05
0.00%
0.00%
0.00%
8.5000
1.72
21.50
144.52
269.00
680.31
971.80
682.13
637.53
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.72
21.50
144.52
269.00
680.31
971.80
682.13
637.53
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.5000
0.00
0.00
201.30
0.00
0.00
960.20
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
201.30
0.00
0.00
960.20
0.00%
0.00%
100.00%
1.40
22.84
0.00
534.02
1,053.84
0.00
100.00%
100.00%
0.00%
8.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.36
4.72
151.49
448.60
254.46
742.30
100.00%
100.00%
100.00%
8.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.65
45.12
6.36
0.00
0.00
0.00
0.00
0.00
889.02
0.00
0.00
431.63
0.00
0.00
0.00
0.00
59.20
0.00
0.00
0.00
9.18
0.00
0.00
0.00
294.19
0.00
0.00
0.00
765.00
0.00
0.00
0.00
241.40
0.00
0.00
0.00
14.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
A. CORRUGADO
1.0500
1.0500
1.0700
1.0700
1.0700
1.0700
1.0700
1.0700
1.0500
1.0700
03 (KG)
SUB TOTAL ALAMBRE DE C. SUB TOTAL CLAVO DE C.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,854.76
0.00
0.00
0.00
4,597.54
0.00
0.00
0.00
0.00
390.69
0.00
0.00
0.00
199.07
0.00
0.00
0.00
8,505.42
0.00
0.00
0.00
11,907.05
0.00
0.00
0.00
2,369.96
0.00
0.00
0.00
154.64
0.00
0.00
0.00
0.00
211.37
0.00
0.00
0.00
0.00
0.1000
0.0600
0.3000
0.0500
0.3000
0.0600
0.2500
0.0600
0.2500
0.0600
0.2100
0.0600
0.2100
0.0600
0.0600
0.3000
0.0600
0.4500
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
163.13
0.00
0.00
101.56
218.93
0.00
0.00
0.00
30.92
21.91
0.00
0.00
0.19
11.16
0.00
0.00
152.23
476.94
0.00
0.00
209.39
667.68
0.00
0.00
56.88
132.90
0.00
0.00
0.00
8.67
0.00
0.00
0.00
0.00
12.08
0.00
0.00
0.00
0.00
0.0360
0.0100
0.2000
0.1500
0.3100
0.2000
0.2000
0.2500
0.2500
0.1100
0.1700
0.3000
Obra
Form.
Cliente
Ubicac.
01
01.05
01.05.01
01.05.02
01.05.03
01.06
01.06.01
01.07
01.07.01
01.07.01.01
01.07.02
01.07.02.01
01.07.02.02
01.07.02.03
01.07.02.04
01.07.03
01.07.03.01
01.07.03.02
01.07.03.03
01.07.03.04
01.07.03.05
01.07.03.06
01.07.03.07
01.07.03.08
02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.03
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
02.04.02.04
02.04.03
02.04.03.01
02.04.03.02
02.04.03.03
02.04.04
02.04.04.01
02.04.04.02
02.04.04.03
02.04.05
02.04.05.01
02.04.05.02
02.04.05.03
ACUMULADO ANTERIOR
ESTRUCTURA METALICA Y COBERTURA
545,096.95
0.00%
COBERTURA AUTOPORTANTE CURVA DE ACERO GALVANIZADO G90 PREPINTADO
m2
CALIBRE
1,470.20 20 (0.93mm)
285.00 (LUZ=29.69m
419,007.00- FLECHA=6m)
0.00
0.00
0.00%
CERRAMIENTO DE TIMPANO FRONTAL Y POSTERIOR DE ACERO GALVANIZADO
m2
G90 PREPINTADO
243.24
180.00
CALIBRE 2443,783.20
(0.60mm)
0.00
0.00
0.00%
ESTRUCTURA METALICA PERIMETRAL DE CANALETA
ML
159.76
515.19
82,306.75
0.00
0.00
MUROS Y TABIQUES DE ALBAILERIA
7,655.47
0.00%
MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N8
m2C/3 HILADAS)
83.96
91.18
7,655.47
0.00
0.00
LOSA DEPORTIVA
76,538.44
TRABAJOS PRELIMINARES
3,009.60
100.00%
TRAZO, NIVELES Y REPLANTEO INICIAL
m2
720.00
4.18
3,009.60
720.00
3,009.60
MOVIMIENTO DE TIERRAS
12,221.42
CORTE A NIVEL DE SUBRASANTE CON MAQUINARIA
m3
144.00
7.28
1,048.32
144.00
1,048.32 100.00%
PERFILADO Y COMPACTADO EN ZONA DE CORTE
m2
720.00
1.51
1,087.20
720.00
1,087.20 100.00%
0.00%
BASE COMPACTADA CON AFIRMADO E=0.20 M EN LOSA
m2
720.00
11.00
7,920.00
0.00
0.00
ELIMINACION DE MATERIAL EXCEDENTE
m3
187.20
11.57
2,165.90
187.20
2,165.90 100.00%
OBRAS DE CONCRETO ARMADO
61,307.42
0.00%
LOSA DE CONCRETO F'C= 210 KG/CM2 SEMI PULIDO
m3
108.00
410.30
44,312.40
0.00
0.00
0.00%
ENCOFRADO Y DESENCOFRADO DE LOSAS
m2
33.60
44.32
1,489.15
0.00
0.00
LOSA DE CONCRETO, ACERO FY=4200 KG/CM2
kg
1,179.00
4.86
5,729.94
1,179.00
5,729.94 100.00%
0.00%
ANCLAJES DE POSTES, TENSORES Y ARCOS, CONCRETO F'C=210 KG/CM2m3
0.18
375.72
67.63
0.00
0.00
0.00%
SARDINELES DE BORDE DE LOSA CONCRETO DE F'C=210 KG/CM2
m3
4.20
351.69
1,477.10
0.00
0.00
0.00%
JUNTAS DE LOSA TIPO J1
m
304.00
8.25
2,508.00
0.00
0.00
0.00%
JUNTAS DE LOSA TIPO J2
m
168.00
29.08
4,885.44
0.00
0.00
0.00%
JUNTAS DE DILACIN HORIZONTAL + SELLO ASFALTICO 1"
m
112.00
7.48
837.76
0.00
0.00
SERVICIOS HIGIENICOS Y VESTIDORES
111,050.41
TRABAJOS PRELIMINARES
636.00
LIMPIEZA DE TERRENO MANUAL
M2
120.00
1.12
134.40
120.00
134.40 100.00%
TRAZO, NIVELES Y REPLANTEO INICIAL
M2
120.00
4.18
501.60
120.00
501.60 100.00%
MOVIMIENTO DE TIERRAS
8,338.59
EXCAVACION DE ZANJAS
m3
116.37
33.34
3,879.78
116.37
3,879.78 100.00%
CORTE O RELLENO DE TERRENO HASTA 0.20 M DE PROFUNDIDAD SIN APISONADO
m2
116.62
2.50
291.55
116.62
291.55 100.00%
RELLENO Y COMPACTADO C/ MATERIAL PROPIO
m3
73.33
23.67
1,735.72
73.33
1,735.72 100.00%
ACARREO INTERNO MAT. PROCED. DE EXCAVACIONES Dprom=30M
m3
51.65
17.00
878.05
51.65
878.05 100.00%
ELIMINACION MATERIAL EXCEDENTE CON MAQUINARIA VOLQUETE 15M3 V=30KM/h
m3
D=3KM
51.65
7.91
408.55
51.65
408.55 100.00%
NIVELACION Y APISONADO PARA FALSO PISO O PISO
m2
116.62
2.18
254.23
116.62
254.23 100.00%
RELLENO CON AFIRMADO DE e=4" (100% COMPACTACION)
m3
11.66
76.39
890.71
11.66
890.71 100.00%
OBRAS DE CONCRETO SIMPLE
9,018.48
SOLADO fc=100 KG/CM2 e=10CM
m2
35.48
28.91
1,025.73
35.48
1,025.73 100.00%
CIMIENTO CORRIDO F'c=140 kg/cm2
m3
11.12
303.68
3,376.92
11.12
3,376.92 100.00%
70.77%
FALSO PISO e= 4" (10CM.) 1:6 C:H
m2
113.05
40.83
4,615.83
80.00
3,266.40
OBRAS DE CONCRETO ARMADO
81,572.95
ZAPATAS
8,024.52
ZAPATAS, CONCRETO F'C=210 KG/CM2
m3
17.74
349.47
6,199.60
17.74
6,199.60 100.00%
ZAPATAS, ACERO FY=4200KG/CM2
kg
377.83
4.83
1,824.92
377.83
1,824.92 100.00%
VIGAS DE CIMENTACION
8,407.77
VIGAS DE CIMENTACION, CONCRETO F'C= 210 KG/CM2
m3
4.46
371.88
1,658.58
4.46
1,658.58 100.00%
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
39.72
54.27
2,155.60
39.72
2,155.60 100.00%
VIGAS DE CIMENTACION, ACERO FY=4200 KG/CM2.
kg
858.66
4.96
4,258.95
858.66
4,258.95 100.00%
VIGAS DE CIMENTACION, BASE CON POLIESTILENO EXPANDIDO (TECNOPORT)
m2
19.86
16.85
334.64
19.86
334.64 100.00%
SOBRECIMIENTOS REFORZADOS
9,498.21
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 175 KG/CM2
m3
9.73
404.49
3,935.69
9.73
3,935.69 100.00%
9.59%
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
111.90
31.61
3,537.16
10.73
339.18
3.03%
SOBRECIMIENTO, ACERO FY=4200 KG/CM2 .
kg
386.52
5.24
2,025.36
11.73
61.47
COLUMNAS
19,332.47
COLUMNAS, CONCRETO F'C=210 KG/CM2
m3
11.14
507.07
5,648.76
11.14
5,648.76 100.00%
COLUMNAS, ENCOFRADO Y DESENCOFRADO
m2
118.15
56.37
6,660.12
118.15
6,660.12 100.00%
COLUMNAS, ACERO FY=4200 KG/CM2.
kg
1,390.81
5.05
7,023.59
1,390.81
7,023.59 100.00%
COLUMNETAS
8,162.29
COLUMNETAS, CONCRETO F'C= 175 KG/CM2
m3
4.86
381.44
1,853.80
4.86
1,853.80 100.00%
COLUMNETAS, ENCOFRADO Y DESENCOFRADO
m2
63.52
46.14
2,930.81
63.52
2,930.81 100.00%
COLUMNETAS, ACERO FY=4200 KG/CM2
kg
708.11
4.77
3,377.68
708.11
3,377.68 100.00%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
ACUMULADO ACTUAL
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
21 (und)
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1,470.20
243.24
159.76
419,007.00
43,783.20
82,306.75
100.00%
100.00%
100.00%
0.00
0.00%
0.00
0.00
0.00%
83.96
7,655.47
100.00%
0.00
0.00%
720.00
3,009.60
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
144.00
720.00
0.00
187.20
1,048.32
1,087.20
0.00
2,165.90
100.00%
100.00%
0.00%
100.00%
0.00
0.00
720.00
0.00
0.00
0.00
7,920.00
0.00
0.00%
0.00%
100.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
1,179.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5,729.94
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
108.00
33.60
0.00
0.18
4.20
304.00
168.00
112.00
44,312.40
1,489.15
0.00
67.63
1,477.10
2,508.00
4,885.44
837.76
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00%
0.00%
120.00
120.00
134.40
501.60
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
116.37
116.62
73.33
51.65
51.65
116.62
11.66
3,879.78
291.55
1,735.72
878.05
408.55
254.23
890.71
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
35.48
11.12
80.00
1,025.73
3,376.92
3,266.40
100.00%
100.00%
70.77%
0.00
0.00
33.05
0.00
0.00
1,349.43
0.00%
0.00%
29.23%
0.6500
6.5000
0.6500
0.00
0.00
0.00%
0.00%
17.74
377.83
6,199.60
1,824.92
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
8.5000
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
4.46
39.72
858.66
19.86
1,658.58
2,155.60
4,258.95
334.64
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.5000
0.00
0.00
0.00
0.00%
0.00%
0.00%
9.73
10.73
11.73
3,935.69
339.18
61.47
100.00%
9.59%
3.03%
0.00
101.17
374.79
0.00
3,197.98
1,963.89
0.00%
90.41%
96.97%
8.0000
0.00
0.00
0.00
0.00%
0.00%
0.00%
11.14
118.15
1,390.81
5,648.76
6,660.12
7,023.59
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.86
63.52
708.11
1,853.80
2,930.81
3,377.68
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
0.2180
8.6000
8.6000
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23.06
72.28
52.00
0.00
0.00
150.79
0.00
0.00
37.91
0.00
0.00
0.00
0.00
77.84
0.00
0.00
0.00
94.69
0.00
0.00
0.00
38.88
0.00
0.00
1.0700
0.8000
1.0500
1.0500
1.0700
1.0700
1.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,261.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
396.72
0.00
0.00
0.00
901.59
0.00
0.00
0.00
0.00
12.55
0.00
0.00
0.00
1,488.17
0.00
0.00
0.00
743.52
03 (KG)
0.5000
0.2200
0.0600
0.0600
0.3000
0.0500
0.2700
0.0600
0.4500
0.0600
0.3000
0.0600
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.67
0.00
0.00
11.92
42.93
0.00
0.00
0.00
2.90
0.70
0.00
0.00
53.17
83.45
0.00
0.00
19.06
42.49
0.0200
0.0036
0.1000
0.0036
0.0100
0.1500
0.1500
0.3000
0.1700
Obra
Form.
Cliente
Ubicac.
01
02.04.06
02.04.06.01
02.04.06.02
02.04.06.03
02.04.07
02.04.07.01
02.04.07.02
02.04.07.03
02.04.08
02.04.08.01
02.04.08.02
02.04.08.03
02.04.08.04
02.04.09
02.04.09.01
02.04.09.02
02.04.09.03
02.04.10
02.04.10.01
02.04.10.02
02.04.10.03
02.05
02.05.01
02.05.02
VIGAS
VIGAS, CONCRETO F'C=210 KG/CM2
m3
9.36
391.02
VIGAS, ENCOFRADO Y DESENCOFRADO
m2
85.39
59.62
VIGAS, ACERO FY=4200 KG/CM2.
kg
704.90
4.90
VIGUETAS DE ARRIOSTRE
VIGUETAS DE ARRIOSTRE, CONCRETO F'c= 175KG/CM2
m3
1.05
329.85
VIGUETAS DE ARRIOSTRE, ENCOFRADO Y DESENCOFRADO
m2
9.71
53.91
VIGA DE ARRIOSTRE, ACERO FY=4200 KG/CM2.
kg
137.58
4.90
LOSA ALIGERADA
LOSA ALIGERADA, CONCRETO F'C=210 KG/CM2
m3
6.21
395.53
LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO
m2
77.60
45.20
LOSA ALIGERADA, ACERO FY=4200 KG/CM2.
kg
296.10
4.72
LOSA ALIGERADA, LADRILLO DE CONCRETO PARA TECHO DE 20X30X15 und
970.00
2.69
MUEBLE DE CONCRETO
MUEBLE DE CONCRETO, CONCRETO F'c= 175KG/CM2
m3
1.21
372.72
MUEBLE DE CONCRETO, ENCOFRADO Y DESENCOFRADO
m2
12.06
75.32
MUEBLE DE CONCRETO, ACERO FY=4200 KG/CM2.
kg
88.14
7.44
CANALETA DE CONCRETO EN TECHO
CANALETA DE CONCRETO EN TECHO, CONCRETO F'C=210 KG/CM2 CON ADITIVO
m3
IMPERMEABILIZANTE
1.15
412.67
CANALETA DE CONCRETO EN TECHO, ENCOFRADO Y DESENCOFRADO m2
20.05
72.87
CANALETA DE CONCRETO EN TECHO, ACERO FY=4200 KG/CM2.
kg
97.44
4.90
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA CON LADRILLO DE ARCILLA 9x13x24 CM (CON ALAMBRE N8
m2C/3 HILADAS)
71.40
91.18
MURO DE CABEZA CON LADRILLO DE ARCILLA 9X13X24 (CON ALAMBRE N8
m2C/3 HILADAS)
33.60
148.04
COSTO DIRECTO
12,204.91
3,659.95
5,090.95
3,454.01
1,543.95
346.34
523.47
674.14
9,970.65
2,456.24
3,507.52
1,397.59
2,609.30
2,015.11
450.99
908.36
655.76
2,413.07
474.57
1,461.04
477.46
11,484.39
6,510.25
4,974.14
1,318,518.24
ACUMULADO ANTERIOR
9.36
3,659.95 100.00%
85.39
5,090.95 100.00%
704.90
3,454.01 100.00%
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
ACUMULADO ACTUAL
21
03
05
43
17
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
21 (und)
0.00
0.00
0.00
0.00%
0.00%
0.00%
9.36
85.39
704.90
3,659.95
5,090.95
3,454.01
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.05
9.71
137.58
346.34
523.47
674.14
100.00%
100.00%
100.00%
8.0000
6.21
77.60
296.10
970.00
2,456.24
3,507.52
1,397.59
2,609.30
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
6.21
77.60
296.10
970.00
2,456.24
3,507.52
1,397.59
2,609.30
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
8.5000
1.21
12.06
88.14
450.99
908.36
655.76
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.21
12.06
88.14
450.99
908.36
655.76
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.0000
1.15
20.05
97.44
474.57
1,461.04
477.46
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.15
20.05
97.44
474.57
1,461.04
477.46
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.5000
6,510.25
4,974.14
100.00%
100.00%
0.00
0.00
0.00%
0.00%
71.40
33.60
6,510.25
4,974.14
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.2180
0.4100
46.17%
0.00
0.00%
608,722.37
46.17%
709,795.87
53.83%
71.40
33.60
608,722.37
0.00
79.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52.79
0.00
0.00
0.00
0.00
9.68
0.00
0.00
0.00
9.78
0.00
0.00
0.00
15.57
13.78
3,521.95
1.0700
1.0700
1.0700
1.0700
1.0700
0.00
0.00
0.00
754.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
316.83
0.00
0.00
0.00
0.00
94.31
0.00
0.00
0.00
104.26
0.00
0.00
0.00
37,264.21
03 (KG)
0.4500
0.0600
0.4500
0.0600
0.6000
0.4500
0.4500
0.2100
0.0600
0.5000
0.5000
0.00
0.00
38.43
42.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
177.66
0.00
0.00
0.00
5.43
39.66
0.00
0.00
4.21
5.85
0.00
35.70
16.80
2,980.61
0.3000
0.3000
0.1100
0.2000
0.2500
0.0200
0.0220
05 (M3)
43 (P2)
17 (und)
SUB TOTAL PIEDRA S. 1/2" SUB TOTAL HORMIGON SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL LADRILLO A. SUB TOTAL
0.00
60.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.78
0.00
0.00
0.00
0.00
31.95
0.00
0.00
0.00
0.15
0.00
0.00
0.00
121.78
0.00
0.00
0.00
249.28
0.00
0.00
0.00
67.72
0.00
0.00
0.00
2.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.9100
0.7500
0.6500
0.6500
0.6500
0.6500
0.6500
0.6500
0.6500
0.6500
0.6500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
78.44
0.00
0.00
33.01
0.00
0.00
0.00
0.00
4.81
0.00
0.00
0.00
0.70
0.00
0.00
0.00
22.50
0.00
0.00
0.00
58.50
0.00
0.00
0.00
18.46
0.00
0.00
0.00
1.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1250
1.3800
0.1250
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.15
10.38
1.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
0.5000
0.5000
0.5000
0.4200
0.5000
0.4200
0.4200
0.5000
0.5000
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52.30
0.00
0.00
25.39
0.00
0.00
0.00
0.00
3.70
0.00
0.00
0.00
0.45
0.00
0.00
0.00
17.31
0.00
0.00
0.00
37.80
0.00
0.00
0.00
11.93
0.00
0.00
0.00
0.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0020
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5000
2.3000
0.1000
5.4700
4.8300
2.2500
3.9000
5.4700
1.3000
4.9700
1.1300
4.9700
5.1500
4.9500
4.9700
0.00
842.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.08
1,851.76
0.00
0.00
0.00
0.00
497.88
0.00
0.00
2.43
2.93
0.00
0.00
0.00
3,330.68
0.00
0.00
117.00
4,955.64
0.00
0.00
32.09
1,346.17
0.00
0.00
0.00
110.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.0500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
282.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.43
0.00
0.00
0.00
0.00
0.00
0.00
1.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.96
0.00
0.00
0.00
0.00
1.61
0.00
0.00
0.00
35.45
0.00
0.00
0.00
10.80
0.00
0.7600
0.8500
0.8500
0.6500
0.6500
0.6500
0.6500
0.6500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.53
0.00
0.00
2.90
0.00
0.00
0.00
0.00
6.32
0.00
0.00
0.00
7.24
0.00
0.00
0.00
3.16
0.00
0.00
0.1250
1.3500
0.1250
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.44
15.01
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05 (M3)
0.3100
0.5100
0.4200
0.4900
0.5000
0.5000
0.5000
0.5000
0.5000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.87
0.00
0.00
2.23
0.00
0.00
0.00
0.00
4.87
0.00
0.00
0.00
5.57
0.00
0.00
0.00
2.43
0.00
0.00
0.0020
0.0020
0.0020
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
0.5800
0.5000
3.5000
0.5000
0.1000
5.4700
4.8300
4.9500
4.9500
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
360.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.45
217.27
0.00
0.00
0.00
0.00
51.83
0.00
0.00
0.00
584.84
0.00
0.00
0.00
314.42
0.00
17 (und)
39.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.54
0.00
0.00
0.00
0.00
2.41
0.00
0.00
0.00
5.01
0.00
0.00
1.43
0.74
686.45
0.6500
0.6500
0.6500
0.6000
0.6500
0.00
6.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.04
0.00
0.00
0.00
0.00
0.73
0.00
0.00
0.00
0.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
260.28
67.78
05 (M3)
0.5000
0.5000
0.5000
0.5400
0.4200
0.0310
0.0580
0.00
4.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.11
0.00
0.00
0.00
0.00
0.65
0.00
0.00
0.00
0.48
0.00
0.00
0.00
2.21
1.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
186.78
0.00
0.00
43 (P2)
4.9700
4.9700
5.1500
4.2400
1.1300
4.9700
0.5800
0.5800
0.00
0.00
424.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
399.64
0.00
0.00
0.00
0.00
51.13
0.00
0.00
1.30
99.65
0.00
0.00
41.41
19.49
15,721.00
17 (und)
1.5000
39.0000
66.0000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,455.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,784.60
2,217.60
6,739.65
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.01.01
01.01.02
01.01.03
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.02.02
02.01.02.03
02.01.02.04
02.01.02.05
02.01.03
02.01.03.01
02.01.03.02
02.01.03.03
02.01.04
02.01.04.01
02.01.04.02
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.04.04
02.01.04.05
02.01.04.06
02.01.06
02.01.06.01
02.01.06.02
02.01.06.03
02.01.06.04
02.01.07
02.01.07.01
02.01.07.02
02.01.07.03
02.01.07.04
02.01.07.05
02.02
02.02.01
02.02.01.01
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.02.04
02.02.02.05
02.02.03
02.02.03.01
und
Metrado
P.unit
POLIDEPORTIVO
SISTEMA DE AGUA DE LLUVIA
TUBERIA PVC-SAP 4" DE DESCARGA PLUVIAL DE TECHO
m
409.87
61.80
CODO PVC-SAP 4" * 90
und
106.00
24.22
CODO PVC SAL 4"X45
und
18.00
24.94
SERVICIOS HIGIENICOS Y VESTIDORES
RED DE AGUA FRIA
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DE REDES DE AGUA
m
59.85
2.83
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS MANUAL TN, HASTA 1.0 M
m
59.85
28.58
REFINE Y NIVELACION ZANJA T.N.
m
59.85
1.61
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIOm
ZARANDEADO
59.85 E=10CM.
1.98
RELLENO Y COMPACTADO DE ZANJA, HASTA 1.00 m CON MATERIAL
m
PROPIO
59.85
29.51
ACARREO MATERIAL EXCEDENTE HASTA UN DISTANCIA PROMEDIO
m3
DE
3.50
30 M
28.58
TUBERIAS Y ACCESORIOS
TUBERIA PVC SAP DE 3/4" C- 10 C/R
m
9.10
5.15
TUBERIA PVC SAP DE 1/2" C- 10 C/R
m
66.65
4.10
PRUEBA HIDRAULICA Y DESINFECCIN
m
75.50
1.34
VALVULAS
VALVULA COMPUERTA DE 3/4".
und
2.00
91.92
VALVULA COMPUERTA DE 1/2"
und
6.00
83.62
SALIDAS DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - INODORO
pto
7.00
69.27
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - LAVATORIO
pto
2.00
69.27
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - LAVADERO
pto
CORRIDO
1.00
68.28
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - URINARIO
pto
CORRIDO
6.00
107.78
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - DUCHA
pto
4.00
70.08
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" - LAVADERO
pto
DE1.00
OLLAS 68.28
ACCESORIOS VARIOS
REDUCCION PVC SAP 3/4" - 1/2"
und
2.00
21.77
CODO PVC U.R. SAP 1/2"X90
und
28.00
14.65
CODO PVC U.R. SAP 3/4"X90
und
2.00
15.65
TEE PVC U.R. SAP 1/2"
und
22.00
33.81
SUMINISTRO E INSTALACION DE APARATOS Y ACCESORIOS SANITARIOS
INODORO TIPO SIFON JET COLOR BLANCO (SIN COLOCACION)
pza
6.00
215.05
LAVATORIO DE LOSA TIPO OVALIN BLANCO COMERCIAL (SIN
pza
COLOCACION
7.00
287.00
DUCHA CROMADA 1 LLAVE INCLUYE ACCESORIOS
und
4.00
175.12
CAO DE BRONCE STANDARD - LLAVE DE 1/2"
und
8.00
55.00
COLOCACION DE APARATOS Y ACCESORIOS SANITARIOS pza
25.00
70.08
RED DE DESAGUES
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO RED DE DESAGUES
m
48.65
2.83
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS MANUAL TN 2"-6", HASTA 1.0 M m
48.65
50.02
REFINE Y NIVELACION ZANJA TERR.NORMAL"C" PARA TUB. 2"-6"
m
48.65
1.61
PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIOm
ZARANDEADO
48.65 E=10CM.
1.98
RELLENO Y COMPACTADO DE ZANJA, HASTA 1.00 m CON MATERIAL
m
PROPIO
48.65
29.51
ACARREO MATERIAL EXCEDENTE HASTA UN DISTANCIA PROMEDIO
m3
DE
2.85
30 M
28.58
TUBERIAS
TUBERIA PVC SAL 2"
m
30.10
10.69
02.02.03.02
02.02.03.03
02.02.04
02.02.04.01
02.02.04.02
02.02.04.03
02.02.04.04
02.02.04.05
02.02.04.06
02.02.04.07
02.02.04.08
02.02.04.09
02.02.04.10
02.02.05
02.02.05.01
02.02.05.02
02.02.05.03
02.02.05.04
02.02.05.05
02.02.05.06
02.02.05.07
02.03
02.03.01
02.03.02
02.03.03
18.55
48.65
9.79
1.55
6.00
7.00
2.00
1.00
1.00
4.00
18.20
1.00
3.00
6.00
92.73
58.85
73.85
58.85
66.85
81.85
115.63
53.43
65.93
59.16
6.00
3.00
16.00
8.00
1.00
10.00
6.00
26.55
28.05
14.22
35.72
24.45
12.94
16.44
14.31
6.00
1.00
61.80
24.22
242.05
Parcial
28,346.21
25,329.97
2,567.32
448.92
25,577.88
14,175.45
169.38
169.38
3,791.57
1,710.51
96.36
118.50
1,766.17
100.03
421.31
46.87
273.27
101.17
685.56
183.84
501.72
1,686.99
484.89
138.54
68.28
646.68
280.32
68.28
1,228.86
43.54
410.20
31.30
743.82
6,191.78
1,290.30
2,009.00
700.48
440.00
1,752.00
11,402.43
137.68
137.68
4,125.24
2,433.47
78.33
96.33
1,435.66
81.45
578.78
321.77
ACUMULADO ANTERIOR
METRADO
S/.
%
METRADO
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
MES ACTUAL
S/.
ACUMULADO ACTUAL
METRADO
S/.
200.00
12,360.00
0.00
0.00
48.80%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
200.00
0.00
0.00
12,360.00
0.00
0.00
59.85
169.38
100.00%
0.00
0.00%
59.85
169.38
59.85
59.85
59.85
59.85
3.50
1,710.51
96.36
118.50
1,766.17
100.03
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
59.85
59.85
59.85
59.85
3.50
1,710.51
96.36
118.50
1,766.17
100.03
9.10
66.65
75.50
46.87
273.27
101.17
99.99%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
9.10
66.65
75.50
46.87
273.27
101.17
2.00
6.00
183.84
501.72
100.00%
100.00%
0.00
0.00
0.00%
0.00%
2.00
6.00
183.84
501.72
6.00
2.00
1.00
6.00
4.00
1.00
415.62
138.54
68.28
646.68
280.32
68.28
85.71%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6.00
2.00
1.00
6.00
4.00
1.00
415.62
138.54
68.28
646.68
280.32
68.28
2.00
28.00
2.00
22.00
43.54
410.20
31.30
743.82
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
2.00
28.00
2.00
22.00
43.54
410.20
31.30
743.82
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.60
41.30
30.00%
0.00
0.00%
14.60
41.30
14.60
14.60
24.33
24.33
1.43
730.04
23.50
48.16
717.83
40.73
30.00%
30.00%
50.00%
50.00%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
14.60
14.60
24.33
24.33
1.43
730.04
23.50
48.16
717.83
40.73
9.03
96.53
30.00%
0.00
0.00%
9.03
96.53
181.60
75.41
4,279.78
556.38
411.95
147.70
58.85
66.85
327.40
2,104.47
53.43
197.79
354.96
1,009.22
159.30
84.15
227.52
285.76
24.45
129.40
98.64
1,271.73
884.36
145.32
242.05
53,924.09
5.57
54.48
0.00
30.00%
0.00%
0.00
0.00
0.00%
0.00%
5.57
0.00
54.48
0.00
6.00
7.00
2.00
1.00
1.00
4.00
18.20
556.38
411.95
147.70
58.85
66.85
327.40
2,104.47
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6.00
7.00
2.00
1.00
1.00
4.00
18.20
0.00
0.00
0.00
556.38
411.95
147.70
58.85
66.85
327.40
2,104.47
0.00
0.00
0.00
6.00
3.00
16.00
8.00
1.00
10.00
6.00
159.30
84.15
227.52
285.76
24.45
129.40
98.64
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6.00
3.00
16.00
8.00
1.00
10.00
6.00
159.30
84.15
227.52
285.76
24.45
129.40
98.64
0.30
0.00
0.00
72.62
0.00%
0.00%
30.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.30
0.00
0.00
72.62
26,782.40
49.67%
0.00
0.00%
26,782.40
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ONTO DE CONTRATO
ACUMULADO ACTUAL
%
21
03
05
43
17
21 (und)
CEMENTO SUB TOTAL A. CORRUGADO SUB TOTAL
48.80%
0.00%
0.00%
209.87
106.00
18.00
12,969.97
2,567.32
448.92
51.20%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
0.00
0.00
0.00%
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
99.99%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.01%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
85.71%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
0.00
0.00
0.00
0.00
0.00
69.27
0.00
0.00
0.00
0.00
0.00
14.29%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
6.00
7.00
4.00
8.00
25.00
1,290.30
2,009.00
700.48
440.00
1,752.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00%
34.06
96.38
70.00%
0.00
0.00
30.00%
30.00%
50.00%
50.00%
50.00%
34.06
34.06
24.33
24.33
1.43
1,703.43
54.83
48.17
717.83
40.72
70.00%
70.00%
50.00%
50.00%
50.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00%
21.07
225.24
70.00%
0.00
0.00
03 (KG)
30.00%
0.00%
12.99
48.65
127.12
75.41
70.00%
100.00%
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
3.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53.43
197.79
354.96
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
30.00%
14.31
6.00
0.70
884.36
145.32
169.44
100.00%
100.00%
70.00%
0.00
0.00
0.42
0.00
0.00
3.53
27,141.69
50.33%
49.67%
1.4000
0.42
11.7500
3.53
ES Y ADELANTO DIRECTO
JULIO 2013
A ENCOFRADO Y CARPINTERIA
03 (KG)
ALAMBRE DE C. SUB TOTAL CLAVO DE C. SUB TOTAL PIEDRA S. 1/2" SUB TOTAL HORMIGON
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05 (M3)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2000
05 (M3)
43 (P2)
SUB TOTAL A. GRUESA SUB TOTAL A. FINA SUB TOTAL TIERRA ORG. SUB TOTAL M.NACIONAL E.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.06
0.00
0.00
0.00
0.00
0.00
0.03
0.00
0.00
0.00
0.06
0.00
0.03
0.00
0.1100
16.0000
43 (P2)
17 (und)
SUB TOTAL LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.80
0.00
0.00
0.00
4.80
0.00
BASE DE DATOS D
COR
Obra
Form.
Cliente
Ubicac.
Item
01
01.01
01.02
01.03
01.04
03
03.01
03.02
03.03
02
02.01
02.02
02.03
02.04
04
04.01
04.02
05
05.01
05.02
05.03
05.04
05.05
05.06
06
06.01
06.02
06.03
06.04
06.05
07
07.01
07.02
07.03
07.04
07.05
08
08.01
08.02
08.03
08.04
08.05
08.06
08.07
08.08
08.09
08.10
09
09.01
09.02
10
10.01
10.02
10.03
Metrado
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
glb
1.00
INGENIERIA DE DETALLE
Exp
1.00
ACABADO Y SEALIZACION
m2
1.00
PRUEBAS Y PUESTA EN SERVICIO
glb
1.00
ALIMENTADORES
CONDUCTOR NYY UNIPOLAR 3-1X6+N6 mm2, 1 KV
ml
65.00
CONDUCTOR NYY UNIPOLAR 1-1X4+N4 mm2, 1 KV
ml
60.00
CONDUCTOR NYY UNIPOLAR 1-1X2.5+N2.5 mm2, 1 KV
ml
140.00
TABLEROS
SUMINISTRO E INSTALAC. DE TG/SEG ESPECIF. EN EL PLANO
JGO
1.00
SUMINISTRO E INSTALAC. DE TD 11/SEG ESPECIF. EN EL
JGO
PLANO 1.00
SUMINISTRO E INSTALAC. DE TD 12/SEG ESPECIF. EN EL
JGO
PLANO 1.00
SUMINISTRO E INSTALAC. DE TCI/SEG ESPECIF. EN EL PLANO
JGO
1.00
SISTEMA DE PROTECCION A TIERRA
SISTEMA DE PUESTA TIERRA TIPO 01
JGO
1.00
TENDIDO DE CONDUCTOR DE CU DESNUDO PARA SISTEMA
ml TIERRA
28.00
TUBERIAS Y CAJAS DE PASO
TUBERIA PVC-P DIAM 20 mm (3/4"x3m)
m
281.90
TUBERIA PVC-P DIAM 20 mm (3/4"x3m) ADOSADO A ARCOmTECHO 82.55
TUBERIA PVC-P DIAM 25 mm (1"x3m) ADOSADO A ARCO TECHO
m
267.53
TUBERIA PVC-P DIAM 40 mm (11/2"x3m) ADOSADO A ARCO
m TECHO 24.51
CAJA DE PASE -DERIVACION EN ARCO TECHO
und
13.00
CAJA DE PASE -DERIVACION EN MURO Y TECHO
und
6.00
CONDUCTORES Y CABLES
CONDUCTOR TW 2-1X2.5 mm2
m
285.50
CONDUCTOR TW 3-1X2.5 mm2
m
5.00
CONDUCTOR THW 3-1X2.5 mm2
m
120.75
CONDUCTOR THW 3-1X4 mm2
m
154.91
CONDUCTOR THW 2-1X10+T6 mm2
m
24.51
SALIDAS PARA ALUMBRADO
SALIDA PARA CENTRO DE LUZ EN TECHO
und
11.00
SALIDA PARA CENTRO DE LUZ EN ARCOTECHO
und
24.00
SALIDA PARA CENTRO DE LUZ EN PARED
und
14.00
SALIDA PARA LUZ DE EMERGENCIA
und
6.00
SALIDA PARA INTERRUPTORES EN PARED
und
7.00
ILUMINACION
SALIDA PARA LUMINARIA TIPO A
und
8.00
SALIDA PARA LUMINARIA TIPO B
und
5.00
SALIDA PARA LUMINARIA TIPO C
und
14.00
SALIDA PARA LUMINARIA TIPO D
und
10.00
SALIDA PARA LUMINARIA TIPO E
und
4.00
SALIDA PARA LUMINARIA TIPO F
und
12.00
SALIDA PARA LUMINARIA TIPO G
und
2.00
SALIDA PARA LUMINARIA TIPO K
und
6.00
INSTALACION DE INTERRUPTOR SIMPLE
und
9.00
INSTALACION DE INTERRUPTOR DOBLE
und
1.00
FUERZA Y TOMACORRIENTES
SALIDA PARA TOMACORRIENTE DOBLE CON P/TIERRA 1.2
undMts
5.00
SALIDA PARA TOMACORRIENTE DOBLE CON P/TIERRA 0.40
und Mts
4.00
AUDIO VIDEO Y SONIDO
SALIDA PARA CENTRAL DE SONIDO
und
1.00
SALIDA PARA SONIDO
und
6.00
CABLES DE SONIDO
ml
84.35
COSTO DIRECTO
P.unit
771.60
1,027.60
253.94
154.24
102.04
66.29
66.19
940.73
1,207.06
372.06
687.59
936.13
21.90
3.14
34.92
35.45
35.76
94.94
74.43
3.74
5.19
5.78
7.24
25.97
10.30
70.67
10.80
29.73
21.81
64.78
76.03
115.78
527.33
543.70
709.56
693.97
179.92
29.14
36.42
59.56
48.55
78.21
169.60
17.73
Parcial
2,207.38
771.60
1,027.60
253.94
154.24
19,876.60
6,632.60
3,977.40
9,266.60
3,207.44
940.73
1,207.06
372.06
687.59
1,549.33
936.13
613.20
15,809.04
885.17
2,882.65
9,483.94
876.48
1,234.22
446.58
3,549.73
1,067.77
25.95
697.94
1,121.55
636.52
2,291.63
113.30
1,696.08
151.20
178.38
152.67
21,248.27
518.24
380.15
1,620.92
5,273.30
2,174.80
8,514.72
1,387.94
1,079.52
262.26
36.42
492.00
297.80
194.20
2,591.34
78.21
1,017.60
1,495.53
72,822.76
ACUMULADO ANTERIOR
METRADO
S/.
%
MES ACTUAL
METRADO
S/.
N DE CONTRATO
FECHA
MONTO DE CONTRATO
PLAZO EJECUCION
: 036-2012/GOREMAD/GGR.
: 03/07/2012
: S/. 23,508,980.65
(INC. IGV.)
: 548 DIAS CALENDARIOS
ACUMULADO ACTUAL
METRADO S/.
%
0.70 540.12
0.00
0.00
0.00
70.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.70 540.12
0.00
0.00
0.00
0.00
0.00
0.00
70.00%
0.00%
0.00%
0.00%
0.30
1.00
1.00
1.00
231.48
1,027.60
253.94
154.24
30.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
65.00
60.00
140.00
6,632.60
3,977.40
9,266.60
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
1.00
1.00
1.00
940.73
1,207.06
372.06
687.59
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
28.00
936.13
613.20
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
281.90
82.55
267.53
24.51
13.00
6.00
885.17
2,882.65
9,483.94
876.48
1,234.22
446.58
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
285.50
5.00
120.75
154.91
24.51
1,067.77
25.95
697.94
1,121.55
636.52
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
24.00
14.00
6.00
7.00
0.00
1,696.08
151.20
178.38
152.67
0.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.00
5.00
14.00
10.00
4.00
12.00
2.00
6.00
9.00
1.00
518.24
380.15
1,620.92
5,273.30
2,174.80
8,514.72
1,387.94
1,079.52
262.26
36.42
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
5.00
4.00
297.80
194.20
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
6.00
84.35
78.21
1,017.60
1,495.53
100.00%
100.00%
100.00%
653.42
0.90%
0.00
0.00%
653.42
0.90%
72,169.34
99.10%
21
03
05
43
17
21 (und)
03 (KG)
CEMENTO
SUB TOTAL A. CORRUGADO SUB TOTAL ALAMBRE DE C. SUB TOTAL
CLAVO DE C.
AFIRMADO
SUB TOTAL
05 (M3)
A. GRUESA SUB TOTAL
A. FINA
SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43 (P2)
TIERRA ORG. SUB TOTAL M.NACIONAL E. SUB TOTAL
17 (und)
LADRILLO A. SUB TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CONCEPTO
Monto valorizado del presente mes
CORRESPONDIENTE AL MES DE JULIO 2013
Amortizaciones
Del adelanto directo en la presente valorizacin
Del adelanto de materiales de la presente valorizacin.
II TOTAL RETENCIONES
III MONTO NETO A PAGAR (I+II) (Sin I.G.V)
IV I.G.V. (18.00 %)
V MONTO FACTURABLE (III + IV)
S/.
0.00
0.00
-7,633.66
-7,633.66
414,018.36
234,584.24
179,434.12
0.00
0.00
0.00
-7,633.66
0.00
0.00
0.00
414,018.36
-421,652.02
-75,897.36
-497,549.38
CONTRATISTA
SUPERVISOR
PRESUP. BASE
AREA GEOGRAFICA
23,508,980.65
19,922,864.96
4,701,796.13
3,984,572.99
ADELANTO OTORGADO:
N
DESCRIPCION
FECHA
1.00
ADELANTO DIRECTO
16/07/2012
3,984,572.99
20.00
VALORIZACIONES
N
PERIODO
AMORTIZAC.
(ADEL*V/C)
ACUMULADO
SALDO
(S/.)
(S/.)
01
Valorizacin 01 31/08/12
691,247.78
138,249.56
138,249.56
3,846,323.43
02
Valorizacin 02 30/09/12
1,349,121.57
269,824.31
408,073.87
3,576,499.12
03
Valorizacin 03 31/10/12
1,122,668.18
224,533.64
632,607.51
3,351,965.48
04
Valorizacin 04 30/11/12
899,526.44
179,905.29
812,512.80
3,172,060.19
05
Valorizacin 05 31/12/12
634,122.11
126,824.42
939,337.22
3,045,235.77
06
Valorizacin 06 31/01/13
566,452.78
113,290.56
1,052,627.78
2,931,945.21
07
Valorizacin 07 28/02/13
508,910.88
101,782.18
1,154,409.96
2,830,163.03
08
Valorizacin 08 31/03/13
1,172,921.19
234,584.24
1,388,994.20
2,595,578.79
09
Valorizacin 09 30/04/13
861,405.92
172,281.18
1,561,275.38
2,423,297.61
10
Valorizacin 10 31/05/13
947,487.91
189,497.58
1,750,772.96
2,233,800.03
11
Valorizacin 11 30/06/13
1,134,383.26
226,876.65
1,977,649.61
2,006,923.38
12
Valorizacin 12 31/07/13
0.00
0.00
1,977,649.61
2,006,923.38
13
TOTALES
9,888,248.02
1,977,649.61
1,977,649.61
2,006,923.38
CONTRATISTA
SUPERVISOR
PRESUP. BASE
AREA GEOGRAFICA
23,508,980.65
19,922,864.96
3,984,572.99
ADELANTO OTORGADO:
N
DESCRIPCION
FECHA
MONTO SIN
IGV
1.00
ADELANTO
DIRECTO
16/07/2012
3,984,572.99
20.00
Ka
D=(V*ADEL/C)(K/Ka-1)
VALORIZACION
No.
COEFIC. REAJUSTE
MONTO
PPTO
PRINCIPAL
ADELAN.
DIRECTO
V (S/.)
Ka
DESCRIPCION
DEDUCCION (D)
VALORIZ.
01
Valorizacin 01 31/08/12
691,247.78
0.985
0.985
0.00
02
Valorizacin 02 30/09/12
1,349,121.57
0.987
0.987
0.00
03
Valorizacin 03 31/10/12
1,122,668.18
0.990
0.990
0.00
04
Valorizacin 04 30/11/12
899,526.44
0.990
0.990
0.00
05
Valorizacin 05 31/12/12
634,122.11
0.990
0.990
0.00
06
Valorizacin 06 31/01/13
566,452.78
0.990
0.990
0.00
07
Valorizacin 07 28/02/13
508,910.88
0.989
0.989
0.00
08
Valorizacin 08 31/03/13
1,172,921.19
09
Valorizacin 09 30/04/13
861,405.92
10
Valorizacin 10 31/05/13
947,487.91
11
Valorizacin 11 30/06/13
1,134,383.26
12
Valorizacin 12 31/07/13
0.00
TOTALES
9,888,248.02
0.00
REAL
0.00
Form.
Cliente
Ubicac.
: 01 PRESUPUESTO GENERAL
: GOBIERNO REGIONAL DE MADRE DE DIOS
: TAMBOPATA - TAMBOPATA - MADRE DE DIOS.
Presupuesto base
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
046 (XL) VOL 11 - POLIDEPORTIVO (B10) - ESTRUCTURAS
054 (LI) VOL 13 - OBRAS EXTERIORES - ESTRUCTURAS
058 (XVII) VOL 4 - PAB. DE LABORATORIOS - AULAS (B3) - ESTRUCTURA
TOTAL EN MATERIALES
21
03
05
43
17
05 (M3)
EJECUCION21 (und)
03 (KG)
MARZO
CEMENTO
A. CORRUGADO
ALAMBRE DE C.
CLAVO DE C.
PIEDRA S. 1/2"
AFIRMADO
A. GRUESA
A. FINA
29.58
319.71
50.00
15.00
3.70
1.73
#REF!
#REF!
4,151.26
124.54
#REF!
402.05
25.00
35.48
80.85
16.56
#REF!
266.00
30.40
9.50
#REF!
121.13
10.00
11.40
5.70
#REF!
0.00
15.48
144.52
50.00
5.00
1.38
0.69
0.00
640.00
15.00
64.00
20.00
865,541.65
3,210.00
0.00
0.00
20.00
195.66
61.15
#REF!
4,684.24
4,615.49
224.54
90.00
342.01
80.85
115.31
121,790.11
15,692.67
1,122.69
495.00
16,074.59
2,182.95
5,189.11
43 (P2)
TIERRA ORG.
M.NACIONAL E.
56.56
17 (und)
LADRILLO A.
648.18
312.92
35.27
19.51
188.67
134.96
747.90
2,094.11
9,213.75
9,861.93
14,792.90
179,434.12
CONTRATISTA
SUPERVISOR
PRESUP. BASE
AREA GEOGRAFICA
VALORIZACIONES
PROGRAMADO(SIN IGV)
No.
EJECUTADO(SIN IGV)
DESCRIPCION
MES
ACUM.
MES
ACUM.
COEF.
REAJ.
PRESUP
. PRINC.
REINTEGRO
K-1
(K)
PROGRAMADO(SIN IGV)
MES
ACUM.
AUTORIZADO(SIN IGV)
MES
ESTADO
DE LA
OBRA
ACUM.
Valorizac. 01-31/08/12
583,387.66
583,387.66
691,247.78
691,247.78
0.985
-0.015
-8,750.81
-8,750.81
-10,368.72
-10,368.72 ADELANTADA
Valorizac. 02-30/09/12
893,234.32
1,476,621.98
1,349,121.57
2,040,369.35
0.987
-0.013
-11,612.05
-20,362.86
-16,848.67
-27,217.39 ADELANTADA
Valorizac. 03-31/10/12
589,879.64
2,066,501.63
1,122,668.78
3,163,038.14
0.990
-0.010
-5,898.80
-26,261.66
-11,396.71
-38,614.10 ADELANTADA
Valorizac. 04-30/11/12
567,044.29
2,633,545.91
899,526.44
4,062,564.58
0.990
-0.010
-5,670.44
-31,932.10
-8,267.08
-46,881.18 ADELANTADA
Valorizac. 05-31/12/12
673,101.15
3,306,647.06
634,122.11
4,696,686.68
0.989
-0.011
-7,404.11
-39,336.21
-6,158.88
-53,040.06 ADELANTADA
Valorizac. 06-31/01/13
560,148.49
3,866,795.54
572,859.27
5,269,545.95
0.985
-0.015
-8,402.23
-47,738.44
-9,152.42
-62,192.48 ADELANTADA
Valorizac. 07-28/02/13
722,940.18
4,589,735.72
508,910.88
5,778,456.83
0.985
-0.015
-10,844.10
-58,582.54
-7,633.66
-69,826.15 ADELANTADA
Valorizac. 08-31/03/13
896,502.73
5,486,238.45
0.985
-0.015
-13,447.54
-72,030.08
-6,781.45
-76,607.59
TOTALES
5,486,238.45
#REF!
#REF!
#REF!
-72,030.08
-76,607.59
#REF!
:
:
:
:
:
:
(I.U.)o
MON.
SIMB.
ELEMENTO REPRESENTATIVO
I.U.
COEF. DE
INCID.
% DE
INCIDENC.
PPTO BASE
Mar -13
Feb-12
Ir
448.25
471.44
0.304
47
0.289
100.000%
M1
49
0.062
100.000%
234.94
227.27
0.060
M2
43
0.065
100.000%
835.52
845.88
0.066
M3
AGREGADO GRUESO
05
0.070
100.000%
604.24
621.52
0.072
M4
BLOQUE Y LADRILLO
17
0.065
100.000%
912.56
862.58
0.061
M5
21
0.157
100.000%
410.96
410.96
0.157
M6
03
0.159
100.000%
517.80
432.33
0.133
GGU
39
0.133
100.000%
372.30
381.42
0.136
COEFICIENTE DE REAJUSTE:
Ka =
1.000
0.989
CONTRATISTA
SUPERVISOR
PRECIO BASE
FECHA PAGO ADELANTO DIRECTO
AREA GEOGRAFICA
:
:
:
:
:
K= 0.405* (Jr/Jo) + 0.120* (M1r/M1o) + 0.081* (M2r/M2o) + 0.070 (M3r/M3o) + 0.064* (M4r/M4o) + 0.054* (M5r/M5o) + 0.073* (M6r/M6o) +0.133* (GGUr/GGUo)
COEF. DE
INCID.
47
0.405
100.00%
448.25
471.44
0.426
M1
21
0.120
100.00%
410.96
410.96
0.120
M2
51
0.081
100.00%
335.06
288.30
0.070
M3
02
0.070
100.00%
522.59
437.05
0.059
M4
43
0.064
100.00%
835.52
845.88
0.065
M5
AGREGADO FINO
04
0.054
100.00%
749.04
746.34
0.054
M6
PINTURA
54
0.073
100.00%
349.48
374.03
0.078
GGU
39
0.133
100.00%
372.30
381.42
0.136
SIMB.
ELEMENTO REPRESENTATIVO
COEFICIENTE DE REAJUSTE:
K=
1.000
% DE
INCIDENC.
(I.U.)o
PPTO BASE
Feb-12
I.U.
MON.
1.007
:
:
:
:
:
:
K = 0.465*(Mr/Mo)+0.098*(Tr/To)+0.089*(Cr/Co)+0.084*(Ar/Ao)+0.072*(Tr/To)+0.064*(Ar/Ao)+0.064*(Mr/Mo)+0.064*(Dr/Do)
I.U.
COEF. DE
INCID.
Feb-12
Ir
47
0.465
100.000%
448.25
471.44
0.489
65
0.098
100.000%
260.92
240.34
0.090
22
0.089
100.000%
367.30
367.30
0.089
02
0.084
100.000%
522.59
437.05
0.070
TUBERIA PVC
72
0.072
100.000%
342.06
353.50
0.074
AGREGADO
04
0.064
100.000%
749.04
746.34
0.064
0.064
0.064
1.000
337.28
354.60
0.067
10
39
100.000%
100.000%
372.30
381.42
0.066
1.009
SIMB.
% DE
INCIDENC.
(I.U.)o
PPTO BASE
ELEMENTO REPRESENTATIVO
MON.
:
:
:
:
:
:
K= 0.282* (Mr/Mo) + 0.098* (Cr/Co) + 0.092* (FAr/FAo) + 0.095* (AIr/ALo) + 0.062* (Tr/To) + 0.238* (Dr/Do) +0.133* (GGUr/GGUo)
(I.U.)o
MON.
1
2
3
4
5
6
7
SIMB.
M
C
FA
AI
T
D
GGU
ELEMENTO REPRESENTATIVO
COEFICIENTE DE REAJUSTE:
K=
I.U.
47
65
11
12
72
30
39
COEF. DE
INCID.
0.282
0.098
0.092
0.095
0.062
0.238
0.133
1.000
% DE
INCIDENC.
100.000%
100.000%
100.000%
100.000%
100.000%
100.000%
100.000%
PPTO BASE
Feb-12
448.25
260.92
208.78
291.98
342.06
354.43
372.30
Mar -13
Ir
471.44
240.34
192.61
287.46
353.50
345.99
381.42
K
0.297
0.090
0.085
0.094
0.064
0.232
0.136
0.998
CONTRATISTA
SUPERVISOR
PRECIO BASE
FECHA PAGO ADELANTO DIRECTO
AREA GEOGRAFICA
:
:
:
:
:
K= 0.289* (Jr/Jo) + 0.062* (M1r/M1o) + 0.065* (M2r/M2o) + 0.070 (M3r/M3o) + 0.065* (M4r/M4o) + 0.157* (M5r/M5o) + 0.159* (M6r/M6o) + 133*(GGUr/GGUO)
(I.U.)o
MON.
SIMB.
ELEMENTO REPRESENTATIVO
I.U.
47
M1
49
M2
43
M3
AGREGADO GRUESO
05
M4
BLOQUE Y LADRILLO
17
M5
21
M6
03
GGU
39
COEFICIENTE DE REAJUSTE:
K=
COEF. DE
INCID.
0.289
0.062
0.065
0.070
0.065
0.157
0.159
0.133
1.000
% DE
INCIDENC.
PPTO BASE
Mar-13
Feb-12
Ir
100.000%
448.25
471.44
0.304
100.000%
234.94
227.27
0.060
100.000%
835.52
845.88
0.066
100.000%
604.24
621.52
0.072
100.000%
912.56
862.58
0.061
100.000%
410.96
410.96
0.157
100.000%
517.80
432.33
0.133
100.000%
372.30
381.42
0.136
0.989
CONTRATISTA
SUPERVISOR
PRECIO BASE
FECHA PAGO ADELANTO DIRECTO
AREA GEOGRAFICA
:
:
:
:
:
K= 0.405* (Jr/Jo) + 0.120* (M1r/M1o) + 0.081* (M2r/M2o) + 0.070 (M3r/M3o) + 0.064* (M4r/M4o) + 0.054* (M5r/M5o) + 0.073* (M6r/M6o) +0.133* (GGUr/GGUo)
(I.U.)o
MON.
SIMB.
ELEMENTO REPRESENTATIVO
I.U.
COEF. DE
INCID.
% DE
INCIDENC.
PPTO BASE
Mar-13
Feb-12
Ir
47
0.405
100.000%
448.25
471.44
0.426
M1
21
0.120
100.000%
410.96
410.96
0.120
M2
51
0.081
100.000%
335.06
288.30
0.070
M3
02
0.070
100.000%
517.80
437.05
0.059
M4
43
0.064
100.000%
835.52
845.88
0.065
M5
AGREGADO FINO
04
0.054
100.000%
749.04
746.34
0.054
M6
PINTURA
54
0.073
100.000%
349.48
374.03
0.078
GGU
39
0.133
100.000%
372.30
381.42
0.136
COEFICIENTE DE REAJUSTE:
K=
1.000
1.008
CONTRATISTA
SUPERVISOR
PRECIO BASE
FECHA PAGO ADELANTO DIRECTO
AREA GEOGRAFICA
:
:
:
:
:
K = 0.465*(Mr/Mo)+0.098*(Tr/To)+0.089*(Cr/Co)+0.084*(Ar/Ao)+0.072*(Tr/To)+0.064*(Ar/Ao)+0.064*(Mr/Mo)+0.064*(Dr/Do)
(I.U.)o
MON.
1
2
3
4
5
6
7
8
SIMB.
J
T
C
A
T
A
M
D
ELEMENTO REPRESENTATIVO
COEFICIENTE DE REAJUSTE:
K=
I.U.
47
65
22
02
72
04
10
39
COEF. DE
INCID.
0.465
0.098
0.089
0.084
0.072
0.064
0.064
0.064
1.000
% DE
INCIDENC.
100.000%
100.000%
100.000%
100.000%
100.000%
100.000%
100.000%
100.000%
PPTO BASE
Feb-12
448.25
260.92
367.30
522.59
342.06
749.04
337.28
372.30
Mar-13
Ir
471.44
240.34
367.30
437.05
353.50
746.34
354.60
381.42
K
0.489
0.090
0.089
0.070
0.074
0.064
0.067
0.066
1.009
:
:
:
:
:
:
K= 0.282* (Mr/Mo) + 0.098* (Cr/Co) + 0.092* (FAr/FAo) + 0.095* (AIr/ALo) + 0.062* (Tr/To) + 0.238* (Dr/Do) +0.133* (GGUr/GGUo)
(I.U.)o
MON.
1
2
3
4
5
6
7
SIMB.
M
C
FA
AI
T
D
GGU
ELEMENTO REPRESENTATIVO
MANO DE OBRA INC. LEYES SOCIALES
CONDUCTORES Y CABLES
FERRETERIA Y ACCESORIOS
ARTEFACTOS DE ILUMINACION
TUBERIA PVC
DLAR (GENERAL PONDERADO)
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
COEFICIENTE DE REAJUSTE:
K=
I.U.
47
65
11
12
72
30
39
COEF. DE
INCID.
0.282
0.098
0.092
0.095
0.062
0.238
0.133
1.000
% DE
INCIDENC.
100.000%
100.000%
100.000%
100.000%
100.000%
100.000%
100.000%
PPTO BASE
Feb-12
448.25
260.92
208.78
291.98
342.06
354.43
372.30
Mar-13
Ir
471.44
240.34
192.61
287.46
353.50
345.99
381.42
K
0.297
0.090
0.085
0.094
0.064
0.232
0.136
0.998
CONTRATISTA
SUPERVISOR
PRESUP. BASE
AREA GEOGRAFICA
No.
DESCRIPCION
PROGRAMADO(SIN IGV)
MES
ACUM.
EJECUTADO(SIN IGV)
MES
ACUM.
COEF. REAJ.
PRESUP.
PRINC.
(K)
REINTEGRO
K-1
PROGRAMADO(SIN IGV)
MES
ACUM.
AUTORIZADO(SIN IGV)
MES
ACUM.
ESTADO
DE LA
OBRA
Valorizac. 01-31/08/12
583,387.66
583,387.66
691,247.78
691,247.78
0.985
-0.015
-8,750.81
-8,750.81
-10,368.72
-10,368.72 ADELANTADA
Valorizac. 02-30/09/12
893,234.32
1,476,621.98
1,349,121.57
2,040,369.35
0.987
-0.013
-11,612.05
-20,362.86
-16,848.67
-27,217.39 ADELANTADA
0.987
-0.013
ESTRUCTURAS
1,316,268.70
INST. SANITARIAS
3
Valorizac. 03-31/10/12
32,852.87
589,879.64
2,066,501.63
ESTRUCTURAS
Valoriz- 04-30/11/2012
58,900.75
567,044.29
2,633,545.92
ESTRUCTURAS
ARQUITECTURA
INST. SANITARIAS
INST. ELECTRICAS
Valoriz- 05-31/12/2012
3,163,038.14
890,262.28
ARQUITECTURA
4
1,122,668.78
3,306,647.06
0.008
0.990
-0.010
0.987
-0.013
262.82
-5,898.80
-26,261.66
-11,396.71
0.003
0.990
-0.010
696,693.27
0.987
-0.013
24,850.20
1.003
0.003
74.55
107,134.60
1.008
0.008
857.08
0.998
-0.002
0.989
-0.011
4,062,564.57
634,122.10
4,696,686.68
176.70
-5,670.44
-31,932.10
-8,267.08
-141.70
-7,404.11
-39,336.22
-6,158.88
540,295.59
0.985
-0.015
ARQUITECTURA
73,169.19
1.004
0.004
292.97
INST. SANITARIAS
20,657.32
1.080
0.080
1,652.59
0.984
-0.016
0.983
-0.017
560,148.49
3,866,795.55
ESTRUCTURAS
5,269,545.95
542,752.19
ARQUITECTURA
Valoriz- 07-28/02/2013
572,859.26
30,107.07
722,940.18
4,589,735.73
ESTRUCTURAS
508,910.88
5,778,456.84
508,910.88
ARQUITECTURA
Valoriz- 08-31/03/2013
1.002
0.002
0.985
-0.015
0.985
-0.015
0.000
896,502.73
5,486,238.45
#REF!
#REF!
#REF!
ESTRUCTURAS
828,098.24
0.989
ARQUITECTURA
310,770.99
34,051.95
ELECTRICAS
-8,962.38
-48,298.59
-9,152.42
5,486,238.45
5,778,456.82
-62,192.48 ADELANTADA
-9,226.79
74.36
-10,844.10
-59,142.69
-7,633.66
-69,826.15 ADELANTADA
-7,633.66
0.00
#REF!
#REF!
-6,781.45
-0.011
-9,109.08
1.008
0.008
2,398.21
0.998
-0.002
-70.57
TOTAL
TOTALES
-53,040.06 ADELANTADA
-8,104.43
-1.000
#REF!
-46,881.18 ADELANTADA
-9,057.01
ESTRUCTURAS
Valoriz- 06-31/01/2013
-38,614.10 ADELANTADA
-11,573.41
1.003
899,526.44
70,848.37
673,101.15
1.008
-17,111.49
-59,142.69
-76,607.59
-76,607.59 ADELANTADA
No.
01
02
03
04
05
06
07
08
O B R A
CONTRATISTA
SUPERVISOR
N CONTRATO
MONTO DE CONTRATO
PLAZO DE EJECUCION
DESCRIPCION
Valorizac. 01-31/08/12
Valorizac. 02-30/09/12
Valorizac. 03-31/10/12
Valoriz- 04-30/11/2012
Valorizac. 05-31/12/12
Valorizac. 06-31/01/13
Valorizac. 07-28/02/13
Valorizac. 08-31/03/13
MONTO TOTAL
MONTO
BRUTO
(S/.)
REINTEGRO
REAJUSTES
PPTO PRINCIP.
(S/.)
AMORTIZ.
ADELANTO
DIRECTO
(S/.)
FECHA DE INICIO:
FECHA DE TERMINO:
DEDUCCION
ADELANTO
DIRECTO
(S/.)
AMORT.
ADEL.
MAT.
N 01
DEDUCCION
ADEL.
MAT.
N 01
INTERES
RETRASO
PAGO VAL.
8/9/2012
2/7/2014
MONTO NETO
SUB TOTAL
(S/.)
IGV
(S/.)
PRESENTE
VALORIZAC.
691,247.78
1,349,121.57
1,122,668.78
899,526.44
634,122.11
560,148.49
508,910.88
0.00
-10,368.72
-16,848.67
-11,396.71
-8,267.08
-6,158.88
-9,152.42
-7,633.66
-6,781.45
-138,249.56
-269,824.31
-224,533.76
-179,905.29
-126,824.42
-114,571.85
-101,782.18
-234,584.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-142,357.22
-240,784.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
542,629.50
1,062,448.59
886,738.31
711,354.07
501,138.81
436,424.22
257,137.82
-482,150.16
97,673.31
191,240.75
159,612.90
128,043.73
90,204.99
78,556.36
46,284.81
-86,787.03
640,302.81
1,253,689.34
1,046,351.21
839,397.79
591,343.80
514,980.58
303,422.63
-568,937.19
5,765,746.06
-69,826.14
-1,155,691.37
0.00
-142,357.22
0.00
0.00 3,915,721.17
704,829.82
4,620,550.98
-S/. 568,937.19
O B R A
CONTRATISTA
SUPERVISOR
:
:
:
:
:
:
:
MONTO DE CONTRATO
MONTO CONTRACTUAL DE OBRA
PRECIO BASE
FECHA PAGO ADELANTO DIRECTO
AREA GEOGRAFICA
ITEM
001
002
005
014
015
018
019
024
026
030
038
046
054
058
MONTOS
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
865,541.65
#REF!
TOTAL VALORIZADO
GASTOS GENERALES
7.8500000%
UTILIDAD
SUB TOTAL
7.5000000%
#REF!
#REF!
#REF!
IGV 18%
#REF!
#REF!
PORCENTAJE DE AVANCE
#REF!
DEPARTAMENTO
ENTIDAD
CONTRATISTA
SUPERVISOR
PROVINCIA
: TAMBOPATA
DISTRITO
: TAMBOPATA
: MADRE DE DIOS
INICIO DE OBRA
: 09/08/2012
FIN DE OBRA
PLAZO DE EJECUCIN
: 07/02/2014
: 548 DIAS CALENDARIO.
CONTROL DE VALORIZACIONES
MES EVALUADO:
31- MARZO 13
7,000,000.00
6,000,000.00
5,784,212.52
5,000,000.00
5,269,545.95
4,000,000.00
5,486,238.45
4,589,735.73
3,866,795.55
3,000,000.00
3,306,647.06
2,633,545.92
2,000,000.00
2,066,501.63
691,247.78
1,000,000.00
0.00
AVANCE PROGRAMADO
0.00
1,476,621.98
583,387.66
0.00
0.00
MES
AVANCE EJECUTADO
9-Aug
31-Aug
30-Sep
31-Oct
30-Nov
31-Dec
31-Jan
28-Feb
31-Mar
CONTRATISTA
SUPERVISOR
PRESUP. BASE
AREA GEOGRAFICA
VALORIZACIONES
No.
DESCRIPCION
PROGRAMADO(SIN IGV)
MES
ACUM.
% PROGRAMADOS
MES
ACUM
2.93%
4.48%
2.96%
2.85%
2.93%
7.41%
10.37%
13.22%
16.60%
19.41%
23.04%
27.54%
Valorizac. 01-31/08/12
583,387.66
583,387.66
Valorizac. 02-30/09/12
893,234.32
1,476,621.98
Valorizac. 03-31/10/12
589,879.64
2,066,501.63
Valoriz- 04-30/11/2012
567,044.29
2,633,545.92
Valorizac. 05-31/12/12
673,101.15
3,306,647.06
3.38%
Valorizac. 06-31/01/13
560,148.49
3,866,795.55
2.81%
Valorizac. 07-28/02/13
722,940.18
4,589,735.73
3.63%
Valorizac. 08-31/03/13
896,502.73
5,486,238.45
4.50%
TOTALES
23508980.65
5,486,238.45
ACUM.
691,247.78
691,247.78
1,349,121.57
2,040,369.35
1,122,668.78
3,163,038.14
899,526.44
4,062,564.58
634,122.10
4,696,686.68
572,859.26
5,269,545.94
514,666.58
5,784,212.52
#REF!
#REF!
#REF!
% REALES
MES
ACUM
3.47%
6.77%
5.64%
4.52%
3.18%
2.88%
2.58%
#REF!
3.47%
10.24%
15.88%
20.39%
23.57%
26.45%
29.03%
#REF!
ESTADO
DE LA
OBRA
ADELANTADA
ADELANTADA
ADELANTADA
ADELANTADA
ADELANTADA
ADELANTADA
ADELANTADA
#REF!
6.98%
#REF!
6.00%
01
`01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.02.12
01.02.13
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.03.07
01.03.08
01.03.09
01.03.10
01.03.11
01.03.12
01.03.13
01.03.14
01.03.15
01.03.16
01.03.17
01.03.18
01.03.19
01.03.20
01.03.21
01.03.22
01.03.23
01.03.24
01.03.25
01.03.26
01.03.27
01.03.29
01.04
01.04.01
01.04.02
01.04.03
01.05
01.05.01
01.05.02
01.06
01.06.01
01.07
01.07.01
COLECTOR PRINCIPAL
OBRAS PROVISIONALES
Cartel de identificacin de Obra 2.40 x 3.60 m
Und
Caseta para Almacn y Guardiana
M2
Sealizacin y desvo de Trnsito
Und
Cinta Sealizadora d/peligro inc. Postes 2" x 2" x 1.20 m
M
Puente madera cruce peatonal
Und
TRABAJOS PRELIMINARES
Trazo y Replanteo durante la ejecucin de la Obra
Ml
Movilizacin y Desmovilizacin de Equipos y Herramientas
Glb
Demolicin de losa de concreto, veredas y sardineles
M3
Corte y retiro de Carpeta Asfltica
M2
Demolicion de cerco de ladrillo y resposicin
M2
Excavacin de Calicatas para ubicacin de lneas exist. De agua y alc. Telef.
Und
Proteccin de redes existentes telefnica inc. Retiro y reposicin de cajas telefnicas
Und
Proteccin de postes de baja y media tensin de alumbrado
Und
Retiro y reubicacin de postes de alumbrado
Und
Proteccin de tubera de alc. 200mm en sub colectores
Glb
Proteccin de tubera de AP Dn=400mm en cruce Colector Principal y Santa Martha
Glb
Corte y reposicin de rboles
Und
Proteccin, retiro y/o reparaciones de redes y conexiones domiciliarias de agua potable Glb
MOVIMIENTO DE TIERRAS Y ADECUACION DE ZANJAS
Excavacin a Mquina c/interf. Tn. H= 3.51m - 4.00m
Ml
Excavacin a Mquina c/interf. Tn. H= 4.01m - 4.50m
Ml
Excavacin a Mquina c/interf. Tn. H= 4.51m - 5.00m
Ml
Excavacin a Mquina c/interf. Tn. H= 5.01m - 5.50m
Ml
Excavacin a Mquina c/interf. Tn. H= 5.51m - 6.00m
Ml
Excavacin a Mquina c/interf. Tn. H= 6.01m - 6.50m
Ml
Excavacin a Mquina c/interf. Tn. H= 6.51m - 7.00m
Ml
Excavacin a Mquina c/interf. Tn. H= 7.01m - 7.50m
Ml
Excavacin a Mquina c/interf. Tn. H= 7.51m - 8.00m
Ml
Refine y nivelacin de fondo de zanja
Ml
Cama de apoyo E=40cm con Over 2" ancho promedio de 2.00m
Ml
Relleno lateral y sobre la clave de tub. E=30cm GRP de 900mm, con material propio zarandeado
Ml
Relleno compactado con material propio hasta 2.51m - 3.00m
Ml
Relleno compactado con material propio hasta 3.01m - 4.00m
Ml
Relleno compactado con material propio hasta 4.01m - 4.50m
Ml
Relleno compactado con material propio hasta 4.51m - 5.00m
Ml
Relleno compactado con material propio hasta 5.01m - 5.50m
Ml
Relleno compactado con material propio hasta 5.51m - 6.00m
Ml
Eliminacin de material excedente c/equipo D=3km
M3
Entibado y desentibado corrido hasta h=3.01m - 4.00m
Ml
Entibado y desentibado corrido hasta h=4.01m - 5.00m
Ml
Entibado y desentibado corrido hasta h=5.01m - 6.00m
Ml
Entibado y desentibado corrido hasta h=6.01m - 7.00m
Ml
Entibado y desentibado corrido hasta h=7.01m - 8.00m
Ml
Trasvase de aguas servidas en renovacin de colector principal
Hm
Trasvase de aguas servidas en renovacin de subcolectores
Hm
Depresin de Napa fretica Wellpoint c/bomba de vaco 8"
Hm
Depresin Napa fretica c/bomba de 4" y 6"
Hm
SUMINISTRO TUBERIA DE ALCANTARILLADO
Suministro tuberia GRP, Dn=900mm. PN1, UF/sn 5000, ISO 10467
Ml
Acople GRP, Dn=900mm. PN1, incl. Anillo
Und
Suministro tuberia PVC SN4, UF/ISO, NTP 4435, Dn= 400mm
Ml
INSTALACION TUBERIA ALCANTARILLADO+PRUEBA HIDRAULICA
Instalacin de Tubera GRP, DN=900mm + Prueba Hidrulica
Ml
Instalacin de Tubera GRP, DN=400mm + Prueba Hidrulica
Ml
DEMOLICION DE BUZONES EXISTENTES
Demolicin de buzones existentes, h=6.50m
Und
CONSTRUCCION DE BUZONES C/MARCO FF Y TAPA DE CONCRETO
Excavacin de buzones
M3
1.00
24.00
10.00
3,000.00
10.00
885.79
77.34
61.53
3.39
337.08
1,451.41
1.00
480.93
7,011.66
90.00
30.00
2.00
11.00
9.00
1.00
1.00
22.00
1.00
1.24
2,500.00
87.51
5.62
129.14
55.42
674.27
500.00
800.00
7,306.68
4,907.30
564.67
13,314.38
114.05
116.25
75.67
67.93
97.28
369.52
200.12
303.85
66.01
1,410.68
1,410.68
1,410.68
230.30
143.60
255.03
342.35
289.24
150.16
2,568.48
114.05
191.92
165.21
569.64
369.86
168.00
744.00
768.00
1,512.00
75.79
92.26
106.10
124.83
141.47
163.24
176.85
212.21
235.78
2.94
58.24
16.94
28.96
59.11
69.26
79.68
92.98
109.37
13.40
155.49
182.68
311.60
327.38
337.21
59.98
44.91
428.62
47.20
1,410.68
180.00
18.00
931.64
878.16
111.31
1,410.68
18.00
22.25
8.79
3.00
1,137.78
700.23
17.70
3,234,509.41
16,898.05
885.79
1,856.16
615.30
10,170.00
3,370.80
151,076.30
1,799.75
2,500.00
42,086.18
39,405.53
11,622.60
1,662.60
1,348.54
5,500.00
7,200.00
7,306.68
4,907.30
12,422.74
13,314.38
1,332,949.58
8,643.85
10,725.23
8,028.59
8,479.70
13,762.20
60,320.44
35,391.22
64,480.01
15,563.84
4,147.40
82,158.00
23,896.92
6,669.49
8,488.20
17,663.38
27,278.45
26,893.54
16,423.00
34,417.63
17,733.63
35,059.95
51,479.44
186,488.74
124,720.49
10,076.64
33,413.04
329,180.16
71,366.40
1,474,318.30
1,314,245.92
158,068.80
2,003.58
31,545.85
31,387.63
158.22
3,413.34
3,413.34
190,009.89
12,394.07
01.07.02
01.07.03
01.07.04
01.07.05
01.07.06
01.07.07
01.07.08
01.07.09
01.07.10
01.07.11
01.08
01.08.01
01.08.02
01.08.03
01.09
01.09.01
01.09.02
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.02.09
02.02.10
02.02.11
02.02.12
02.02.13
02.02.14
02.02.15
02.02.16
02.02.17
02.02.18
02.02.19
02.02.20
02.02.21
02.02.22
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.04.06
02.05
02.05.01
02.06
02.06.01
02.06.02
02.07
M3
Und
Und
Und
Und
Und
Und
Und
Und
Und
45.25
3.00
1.00
2.00
1.00
5.00
2.00
6.00
2.00
3.00
78.60
4,959.47
5,268.72
5,597.39
5,949.80
6,331.55
7,046.58
7,582.01
8,786.58
9,317.11
Und
Und
Und
10.00
10.00
10.00
32.67
22.15
14.21
Und
Und
54.00
2.00
602.37
539.91
Ml
752.76
1.24
Ml
Ml
Ml
Ml
Ml
Ml
Ml
Ml
Ml
Ml
Ml
Ml
Ml
Ml
Ml
Ml
Ml
Ml
M3
Ml
Ml
Ml
162.87
148.67
170.44
195.23
17.88
21.04
31.11
5.52
752.76
752.76
162.87
148.67
170.44
195.23
17.88
21.04
31.11
5.52
30.00
365.57
39.28
36.63
7.95
11.86
13.30
15.45
16.88
19.59
30.46
35.38
2.09
7.94
10.58
12.03
13.98
15.47
23.81
59.11
71.46
83.28
13.40
110.92
155.49
182.68
Ml
Ml
727.85
24.00
29.65
74.46
Ml
Ml
727.85
24.00
1.85
2.22
Und
Und
Und
Und
Und
Und
3.00
5.00
6.00
5.00
1.00
1.00
1,872.65
1,994.20
2,119.36
2,771.47
3,591.49
4,004.01
Und
7.00
286.84
Und
Und
60.00
2.00
122.95
216.60
3,556.65
14,878.41
5,268.72
11,194.78
5,949.80
31,657.75
14,093.16
45,492.06
17,573.16
27,951.33
690.30
326.70
221.50
142.10
33,607.80
32,527.98
1,079.82
217,524.18
933.42
933.42
84,765.35
1,294.82
1,763.23
2,266.85
3,016.30
301.81
412.17
947.61
195.30
1,573.27
5,976.91
1,723.16
1,788.50
2,382.75
3,020.21
425.72
1,243.67
2,223.12
459.71
402.00
40,549.02
6,107.65
6,691.57
24,767.59
23,367.79
21,580.75
1,787.04
1,399.80
1,346.52
53.28
49,757.96
5,617.95
9,971.00
12,716.16
13,857.35
3,591.49
4,004.01
2,007.88
2,007.88
7,810.20
7,377.00
433.20
376.90
02.07.01
02.07.02
02.08
02.08.01
02.08.02
02.08.03
02.08.04
02.08.05
02.08.06
02.09
02.09.01
02.09.02
02.09.03
02.09.04
02.09.05
02.09.06
02.09.07
02.09.08
02.09.09
02.09.10
02.09.11
02.09.12
02.09.13
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
03.11
03.12
03.13
03.14
03.15
04
04.01
04.01.01
04.01.02
04.01.03
04.02
04.02.01
Und
Und
10.00
10.00
21.81
15.88
Ml
Ml
Ml
Ml
Und
Ml
378.00
378.00
378.00
378.00
63.00
378.00
22.77
1.34
7.94
8.56
331.78
1.56
Ml
Ml
Ml
Ml
Und
Und
Und
Und
Und
Und
Und
Und
M3
320.00
50.00
320.00
50.00
2.00
50.00
50.00
4.00
2.00
2.00
10.00
20.00
20.00
14.92
27.36
1.00
1.39
21.86
1.83
23.64
36.02
28.81
23.73
50.00
24.76
58.45
M2
Glb
M2
M2
M2
M2
M2
M2
M2
kg
M3
M2
M2
M2
Ml
8,231.54
1.00
8,231.54
7,011.66
8,231.54
7,011.66
7,011.66
1,219.89
1,219.89
1,856.00
123.30
616.50
46.16
461.55
150.00
1.84
2,500.00
3.26
10.62
14.12
9.55
29.39
74.21
34.86
4.43
378.62
40.96
41.64
26.73
4.82
M3
M2
Kg
67.50
337.50
3,750.00
389.10
52.33
4.43
M3
28.80
389.10
218.10
158.80
36,842.40
8,607.06
506.52
3,001.32
3,235.68
20,902.14
589.68
10,262.48
4,774.40
1,368.00
320.00
69.50
43.72
91.50
1,182.00
144.08
57.62
47.46
500.00
495.20
1,169.00
736,401.57
15,146.03
2,500.00
26,834.82
74,463.83
116,229.34
66,961.35
206,072.69
90,528.04
42,525.37
8,222.08
46,683.85
25,251.84
1,922.10
12,337.23
723.00
88,600.96
60,538.13
26,264.25
17,661.38
16,612.50
22,387.49
11,206.08
MONTO CONTRATADO
C/IGV
23,508,980.65
23,508,980.65
II
MONTO CONTRATADO
S/IGV
19,922,864.96
19,922,864.96
III
C/IGV
4,701,796.13
4,701,796.13
IV
S/IGV
3,984,572.99
3,984,572.99
C/IGV
VI
S/IGV
C/IGV
815,672.38
1,591,963.45
S/IGV
691,247.78
1,349,121.57
IX
AVANCE ACTUAL
3.47%
6.77%
691,247.78
1,349,121.57
10,368.72
18,164.94
680,879.06
1,330,956.63
138,249.56
269,824.31
138,249.56
269,824.31
542,629.50
1,061,132.32
542,629.50
1,061,132.32
97,673.31
191,003.82
640,302.81
1,252,136.14
640,302.81
1,252,136.14
0.00
0.00
23,508,980.65
23,508,980.65
23,508,980.65
23,508,980.65
23,508,980.65
23,508,980.65
19,922,864.96
19,922,864.96
19,922,864.96
19,922,864.96
19,922,864.96
19,922,864.96
4,701,796.13
4,701,796.13
4,701,796.13
4,701,796.13
4,701,796.13
4,701,796.13
3,984,572.99
3,984,572.99
3,984,572.99
3,984,572.99
3,984,572.99
3,984,572.99
4,701,796.13
4,701,796.13
3,984,572.99
3,984,572.99
1,324,748.45
1,061,441.20
748,264.09
668,414.28
600,514.84
1,384,047.00
1,122,668.18
899,526.44
634,122.11
566,452.78
508,910.88
1,172,921.19
5.64%
4.52%
3.18%
2.84%
2.55%
5.89%
1,122,668.18
899,526.44
634,122.11
566,452.78
508,910.88
1,172,921.19
12,363.60
8,267.08
6,158.88
9,152.42
7,633.66
7,633.66
1,110,304.58
891,259.36
627,963.23
557,300.36
501,277.22
1,165,287.53
224,533.76
179,905.29
126,824.42
113,290.56
244,139.40
475,368.71
224,533.76
179,905.29
126,824.42
113,290.56
101,782.18
234,584.24
142,357.22
240,784.47
885,770.82
711,354.07
501,138.81
444,009.80
257,137.82
689,918.82
885,770.82
711,354.07
501,138.81
444,009.80
257,137.82
689,918.82
159,438.75
128,043.73
90,204.99
79,921.76
46,284.81
124,185.39
1,045,209.57
839,397.80
591,343.80
523,931.56
303,422.63
814,104.21
1,045,210.28
839,397.79
591,343.80
523,931.56
303,422.63
814,104.20
0.71
-0.01
0.00
0.00
0.00
-0.01
DEDUCTIVOS PAGOS INDEBIDOS
DEDUCTIVOS CAMBIO LAD/BLO
TOTAL DEDUCTIVOS
10
11
12
ACUM ANT
ACUMULADO TOTAL
23,508,980.65
23,508,980.65
23,508,980.65
23,508,980.65
23,508,980.65
19,922,864.96
19,922,864.96
19,922,864.96
19,922,864.96
19,922,864.96
4,701,796.13
4,701,796.13
4,701,796.13
4,701,796.13
4,701,796.13
3,984,572.99
3,984,572.99
3,984,572.99
3,984,572.99
3,984,572.99
4,701,796.13
4,701,796.13
4,701,796.13
4,701,796.13
4,701,796.13
3,984,572.99
3,984,572.99
3,984,572.99
3,984,572.99
3,984,572.99
1,016,458.99
1,118,035.73
1,338,572.25
861,405.92
947,487.91
1,134,383.26
4.32%
4.76%
5.69%
0.00%
-
11,668,132.66
12,786,168.39
9,888,248.02
10,835,735.93
49.63%
54.39%
9,888,248.02
10,835,735.93
85,979.85
89,082.99
861,405.92
947,487.91
1,134,383.26
2,237.37
3,103.14
896.38
859,168.55
944,384.77
1,133,486.88
9,802,268.17
10,746,652.94
274,557.55
378,995.16
453,753.30
2,879,442.02
3,258,437.18
172,281.18
189,497.58
226,876.65
1,977,649.73
2,167,147.31
102,276.37
189,497.58
226,876.65
901,792.29
1,091,289.87
584,611.00
565,389.61
679,733.58
6,922,826.15
7,488,215.76
584,611.00
565,389.61
679,733.58
6,922,826.15
7,488,215.76
105,229.98
101,770.13
122,352.04
1,246,108.71
1,347,878.84
689,840.98
667,159.74
802,085.62
8,168,934.85
8,836,094.59
689,840.98
418,849.26
802,085.62
7,920,625.07
8,339,474.33
0.00
-248,310.48
0.00
-248,309.78
-496,620.26
226,778.36
21,532.12
248,310.48
0.00
0.00