Analitico de Presupuesto
Analitico de Presupuesto
PROYECTO
ENTIDAD
: GOBIERNO REGIONAL DE HUANCAVELICA
SUPERVISOR
RESIDENTE
FECHA
: ABRIL DEL 2011
MOD. EJECUC.: ADMINISTRACION DIRECTA
ESPECIFICA
DE GASTO
DESCRIPCION
UND.
CANT.
MEDIDA
SUBTOTAL
TOTAL
COSTO DIRECTO
2.6.2.2.2.3
2.6.2.2.2.4
2.6.2.2.2.5
2.6.3.2.2.2
2.6.3.2.3.1
2.6.3.2.9.5
GLOBAL
GLOBAL
GLOBAL
GLOBAL
GLOBAL
GLOBAL
1.00
1.00
S/.
S/.
290,754.75
684,446.90
S/.
S/.
290,754.75
684,446.90
1.00
1.00
1.00
S/.
S/.
S/.
24,750.00
27,700.00
90.00
S/.
S/.
S/.
24,750.00
27,700.00
90.00
2.6.8.1.4.2
2.6.8.1.4.3
2.6.8.1.4.3
GASTOS GENERALES
GASTOS POR LA COMPRA DE BIENES
GASTOS POR LA CONTRATACION DE SERVICIOS
VIATICOS
GLOBAL
GLOBAL
GLOBAL
1.00
1.00
1.00
S/.
S/.
S/.
9,153.79
97,308.23
2,000.00
S/.
S/.
S/.
9,153.79
97,308.23
2,000.00
S/.
#REF!
108,462.02
#REF!
"CONSTRUCCION Y EQUIPAMIENTO EN LA I.E. AGROPECUARIA JOSE MARIA ARGUEDAS DE LA LOCALIDAD DE PUTACCA, DISTRITO DE PALCA HUANCAVELICA"
EJECUTADO
UBICACIN
S/.1,420,820.00
ESPECIFICA DETALLE
UND
METRADO
COSTO UNITARIO
COSTO PARCIAL
2. GASTOS PRESUPUESTARIOS
6. ADQUISICION DE ACTIVOS NO FINANCIEROS
2. CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS
2. EDIFICIOS O UNIDADES NO RESIDENCIALES
2. INFRAESTRUCTURA EDUCATIVA
3. ADMINISTRACION DIRECTA PERSONAL
290,754.75
MONTO EN S/.
% APORTE
290,754.75
100.00%
729,996.30
100.00%
290,754.75
214,500.00
9
10
14
mes
mes
mes
6.00
6.00
6.00
1,430.00
1,086.80
858.00
Glb
Glb
214,500.00
214,500.00
0.0155
0.09
3,324.75
19,305.00
S/.
S/.
S/.
77,220.00
65,208.00
72,072.00
Glb
Glb
214,500.00
214,500.00
0.15
0.10
0.35550
32,175.00
21,450.00
22,629.75
53,625.00
729,996.30
MATERIALES DE CONSTRUCCION
FIERROS, ALAMBRES (PUESTO EN OBRA)
ALAMBRE RECOCIDO N 08
ALAMBRE RECOCIDO N 16
CLAVO PARA MADERA DE 1 1/2" C/C
CLAVO PARA MADERA DE 2 1/2" C/C
CLAVO PARA MADERA DE 2" C/C
CLAVO PARA MADERA DE 3" C/C
CLAVO PARA MADERA DE 4" C/C
CLAVO PARA MADERA DE 5" C/C
FIERRO CORRUGADO DE = 1/2"
FIERRO CORRUGADO DE = 1/4" Temper.
FIERRO CORRUGADO DE = 3/4"
FIERRO CORRUGADO DE = 3/8"
FIERRO CORRUGADO DE = 5/8"
SUB TOTAL
290,754.75
PERSONAL DE OBRA
PERSONAL DE OBRA
OPERARIO
OFICIAL
PEON
TOTAL
ESPECIFICA
TIPO DE TRANSACCION
GENERICA DEL GASTO
SUBGENERICA
SUBGENERICA
ESPECIFICA
SUBGENERICA
729,996.30
729,996.30
118,118.00
KG
KG
KG
KG
KG
KG
KG
KG
VARILLA
800.00
1,700.00
16.00
250.00
200.00
250.00
200.00
60.00
970.00
770.00
218.00
1,850.00
225.00
4.80
4.80
8.00
4.80
4.80
4.80
4.80
5.00
33.00
8.00
75.00
19.00
52.00
3,840.00
8,160.00
128.00
1,200.00
960.00
1,200.00
960.00
300.00
32,010.00
6,160.00
16,350.00
35,150.00
11,700.00
UND
UND
UND
UND
3,600.00
240.00
7,500.00
45,000.00
3.20
3.00
0.45
1.15
11,520.00
720.00
3,375.00
51,750.00
PZA
PZA
UND
180.00
925.00
880.00
19.00
30.00
1.10
3,420.00
27,750.00
968.00
BLS
6,140.00
22.00
135,080.00
M3
80.00
110.00
8,800.00
M3
M3
M3
M3
M3
M3
345.00
167.00
250.00
344.00
100.00
50.00
90.00
85.00
40.00
100.00
25.00
45.00
31,050.00
14,195.00
10,000.00
34,400.00
2,500.00
2,250.00
M
UND
UND
UND
UND
UND
UND
PZA
P2
P2
M
M
UND
337.00
1,930.00
100.00
2,500.00
750.00
650.00
1,200.00
92.00
1,288.00
5,000.00
337.00
965.00
201.00
6.00
15.00
22.50
14.00
9.50
11.00
8.50
4.20
3.20
3.20
2.00
1.20
24.00
2,022.00
28,950.00
2,250.00
35,000.00
7,125.00
7,150.00
10,200.00
386.40
4,121.60
16,000.00
674.00
1,158.00
4,824.00
M2
m2
kg
kg
bls
122.00
125.00
369.00
35.00
1,180.00
30.00
34.00
8.00
5.00
0.70
3,660.00
4,250.00
2,952.00
175.00
826.00
GLN
UND
UND
M
25.00
72.00
2.00
25.00
22.00
7.00
50.00
9.00
550.00
504.00
100.00
225.00
VARILLA
VARILLA
VARILLA
VARILLA
67,365.00
32,138.00
135,080.00
103,195.00
119,861.00
11,863.00
18,493.90
TIPO DE TRANSACCION
GENERICA DEL GASTO
SUBGENERICA
SUBGENERICA
ESPECIFICA
SUBGENERICA
ESPECIFICA DETALLE
UND
METRADO
CELLOCOR 1/8"
KG
15.00
CHAPAS DE PARCHE DETRES GOLPES
UND
20.00
COLA SINTETICA FULLER
GLN
3.00
CRUCETAS DE PLASTICO
UND.
2,128.00
CORDEL
M
680.00
GANCHO GALVANIZADO PARA TEJA ANDINA
PZA
247.00
GRANALLA / CONFITILLO
BOL
47.00
IMPERMEAB.MORTERO/CONCRETO CHEMA 1 POLVO
KG
70.00
LIJA DE AGUA PARA METAL #60
PZA
93.00
LIJA DE FIERRO #80
PZA
335.00
LIJA PARA MEDERA # 100
UND
12.00
MARMOLINA
BOL
16.00
MEDIDRO DE LUZ TRIFASICO
UND
1.00
NIPLE DE FG DE 1/2"X2"
UND
14.00
PEGAMENTO PARA PVC
GLN
3.00
PERNOS DE 5/8"X4" CON DOS ARANDELAS Y TUERCA
PZA
490.00
PERNOS TIPO "U"DE 3/4 X H=12"CON 2 TUERCAS MAS 4 ARANDELAS PARA FIJACION
PZA
TIJERAL 10.00
PLANCHA METALICA LONG. PROM. 0.35X0.55M DE E=1/8"
PZA
120.00
RED DE VOLEY INCLUIDO PARANTES CUERDAS
UND
1.00
RODOPLAST PARA BORDE CERAMICOS
ML
14.00
SAL INDUSTRIAL
KG
40.00
SELLADOR DE MADERA
und
7.00
SELLADOR PARA MUROS
GLN
26.00
SILICONA TRANSPARENTE DE 300 ML
UND
10.00
SOLUCION DE THORGEL O PRAT GEL
UND
4.00
PLASTICO DE 3MT
MTS
50.00
TELA ARPILLERA (YUTE) DE 2MT
MTS
100.00
TAPA DE CONCRETO 50X50X5CM
UND
2.00
TEKNOPOR DE 1"X4"X8'
PLN
22.00
TIRAFON 4" CON ARANDELA Y TAPA DE PLASTICO
UND
1,400.00
VARILLA DE COBRE COPERWELD 3/4"X2.40M
PZA
2.00
YESO EN BOLSA DE 25 KG
BOL
32.00
APARATOS SANITARIOS(PUESTO EN OBRA)
INODORO TQUE. BAJO COLOR BLANCO INCLUI. ACCESORIOS
UND
9.00
TUBERIAS Y ACCESORIOS (PUESTO EN OBRA)
ADAPTADOR PVC SAP DE 1/2"
CAJA DE DESAGUE DE 12"X24"
CODO DE 90 PVC SAL DE 4"
CODO PVC SAL 1/2" PARA AGUA
CODO PVC SAL 2"X90
CODO PVC SAL 3" X 90
CODO PVC SAL 4"X45
CODO PVC SAL 4"X90
SOMBRERO DE VENTILACION PVC SAL 2"
SUMIDERO DE BRONCE DE 2"
TAPA C/MARCO FF DE DESAGUE 12" X 24"
TEE PVC SAL 2"X2
TEE PVC SAL 4" CON REDUCCION A 2
TEE PVC SAL 4"X4"
TEE PVC SAP 1/2" PARA AGUA
TRAMPA "P" DE 2" PARA DESAGUE
TUBERIA PVC SAL 2"
TUBERIA PVC SAL 3"
TUBERIA PVC SAL 4"
TUBERIA PVC SAP PRESION C-10 DE 1/2"
TUBO DE FIERRO GALVANIZADO DE 2"X6M
TUBO DE FIERRO GALVANIZADO DE 3"X6M
TUBO FIERRO NEGRO CUADRADO DE 1"X3/4"X1/16X6M
TUB. PVC SAP P/INS. ELECT. DE 1"
TUB. PVC SEL P/INST. ELECT. DE 3/4"X3MTS
GRIFO DE LAVADERO PESADO CROMADO 1/2"
REGISTRO DE BRONCE DE 4"
UNION UNIVERSAL DE F G DE 1/2"
VALVULA COMPUERTA BRONCE 1/2"
YEE PVC SAL 2"
YEE PVC SAL 4"
YEE PVC SAL DE 4" X 2"
ACCESORIOS P/INST. ELECTRICAS (PUESTO EN OBRA
CABLE DESNUDO CU-TW10
CABLE ELECTRICO TWT2X6 MM2
CABLE ELLECTRICO NYY 1X70MM2
CABLE MELLIZO BIPOLAR # 16
CABLE TW # 12 AWG - 4 MM2
CABLE TW # 14 AWG 2.5 MM2
CAJA DE TOMA PARA RED DATA
CAJA OCTAGONO GALVANIZADA 4"X4"X2X1/2
CAJA RECTAGULAR GALVANIZADA DE 4"X2 1/4"X21/2"
CAJA RECTANGULAR GALVANIZ. PARA TOMACORRIENTE RED DATA
CINTA AISLANTE
CINTA TEFLON
CONDUCTOR DE CABLE DESNUDO 1O MM2
CONECTOR DE COBRE O BRONCE
CURVA PVC SAP P/INS. ELECT. DE 1"
CURVA PVC SAP P/INST. ELECTRICAS DE 3/4"
FLORESCENTE 2X40W INC. EQUIPO COMPLETO Y PANTALLA
FOCOS 100W
INTERRRUPTOR DE CONMUTACION
INTERRUPTOR +TOMACORRIENTE BIPOLAR
INTERRUPTOR DOBLE
INTERRUPTOR SIMPLE
INTERRUPTOR TERMOMAGNETICO DE 2x15AX220 VOLT.
INTERRUPTOR TERMOMAGNETICO DE 2x20AX220 VOLT.
INTERRUPTOR TERMOMAGNETICO DE 2x40AX220 VOLT.
SOCKETS COLGANTES
TOTAL
ESPECIFICA
COSTO UNITARIO
COSTO PARCIAL
15.00
71.00
40.00
0.80
0.10
3.50
6.00
35.00
2.00
2.00
2.00
13.00
450.00
2.00
45.00
3.00
55.00
12.00
700.00
3.00
0.50
42.00
30.00
12.00
24.00
3.00
3.20
50.00
18.00
1.00
90.00
7.00
225.00
1,420.00
120.00
1,702.40
68.00
864.50
282.00
2,450.00
186.00
670.00
24.00
208.00
450.00
28.00
135.00
1,470.00
550.00
1,440.00
700.00
42.00
20.00
294.00
780.00
120.00
96.00
150.00
320.00
100.00
396.00
1,400.00
180.00
224.00
225.00
2,025.00
SUB TOTAL
2,025.00
18,747.40
UND
UND
UND
UND
PZA
UND
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
UND
M
M
M
M
PZA
PZA
PZA
M
PZA
UND
UND
UND
UND
UND
UND
PZA
14.00
5.00
1.00
79.00
23.00
52.00
1.00
18.00
5.00
5.00
5.00
4.00
2.00
20.00
35.00
10.00
102.00
58.00
192.00
222.00
22.00
33.00
24.00
187.00
399.00
18.00
14.00
14.00
7.00
2.00
2.00
17.00
0.80
18.00
5.80
1.00
1.50
2.50
5.00
5.00
3.50
4.00
28.00
3.00
3.00
6.00
1.30
3.50
3.20
5.00
7.50
11.50
50.00
250.00
53.00
4.50
3.00
15.00
9.00
3.00
13.00
4.00
7.00
5.00
11.20
90.00
5.80
79.00
34.50
130.00
5.00
90.00
17.50
20.00
140.00
12.00
6.00
120.00
45.50
35.00
326.40
290.00
1,440.00
2,553.00
1,100.00
8,250.00
1,272.00
841.50
1,197.00
270.00
126.00
42.00
91.00
8.00
14.00
85.00
M
M
M
M
M
M
PZA
UND
UND
UND
RLL
RLL
M
PZA
pza
PZA
EQP
PZA
UND
UND
UND
14.00
218.00
110.00
50.00
1,431.00
2,851.00
78.00
133.00
25.00
78.00
29.00
3.00
3.00
2.00
23.00
328.00
133.00
15.00
4.00
5.00
13.00
6.00
2.30
16.00
2.50
1.60
1.60
11.00
1.50
1.50
14.00
3.00
1.50
9.50
9.00
1.50
1.50
100.00
2.50
9.50
9.00
11.00
84.00
501.40
1,760.00
125.00
2,289.60
4,561.60
858.00
199.50
37.50
1,092.00
87.00
4.50
28.50
18.00
34.50
492.00
13,300.00
37.50
38.00
45.00
143.00
UND
UND
UND
UND
PZA
8.00
9.00
13.00
1.00
7.00
7.00
45.00
45.00
200.00
1.20
28,365.00
56.00
405.00
585.00
200.00
8.40
MONTO EN S/.
% APORTE
TIPO DE TRANSACCION
GENERICA DEL GASTO
SUBGENERICA
SUBGENERICA
ESPECIFICA
SUBGENERICA
ESPECIFICA DETALLE
TOTAL
ESPECIFICA
UND
METRADO
COSTO UNITARIO
COSTO PARCIAL
UND
UND
UND
1.00
4.00
78.00
110.00
160.00
8.00
110.00
640.00
624.00
GLN
KG
GLN
GLN
GLN
GLN
GLN
GLN
7.00
568.00
9.00
5.00
33.00
154.00
3.00
49.00
33.00
5.00
40.00
60.00
30.00
20.00
40.00
14.00
231.00
2,840.00
360.00
300.00
990.00
3,080.00
120.00
686.00
MONTO EN S/.
SUB TOTAL
% APORTE
8,607.00
780.00
GLB
EQP
1.00
3.00
180.00
200.00
180.00
600.00
UND.
UND.
UND
UND
UND
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND
UND.
UND.
UND.
UND.
UND.
UND
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND
UND.
UND.
UND.
UND.
UND.
MTS
MTS
UND.
UND.
CAJA
UND.
RLL
UND
UND.
UND.
UND.
UND
UND.
UND.
UND.
30.00
4.00
2.00
5.00
5.00
6.00
2.00
4.00
8.00
5.00
8.00
7.00
2.00
4.00
2.00
1.00
2.00
2.00
2.00
2.00
2.00
7.00
2.00
3.00
4.00
2.00
10.00
2.00
2.00
5.00
4.00
2.00
6.00
6.00
4.00
2.00
50.00
1.00
18.00
4.00
12.00
100.00
100.00
2.00
2.00
2.00
18.00
2.00
10.00
8.00
1.00
1.00
1.00
1.00
1.00
2.00
5.00
12.00
5.00
20.00
7.00
45.00
10.00
5.00
6.00
18.00
8.00
150.00
48.00
30.00
20.00
750.00
10.00
15.00
10.00
15.00
30.00
50.00
35.00
60.00
40.00
50.00
2.00
65.00
109.00
45.00
15.00
8.00
13.00
8.00
35.00
15.00
2.00
18.00
35.00
62.00
29.00
1.00
5.00
19.00
17.00
9.00
35.00
80.00
70.00
12.00
25.00
80.00
7.00
40.00
30.00
80.00
150.00
48.00
10.00
100.00
35.00
270.00
20.00
20.00
48.00
90.00
64.00
1,050.00
96.00
120.00
40.00
750.00
20.00
30.00
20.00
30.00
60.00
350.00
70.00
180.00
160.00
100.00
20.00
130.00
218.00
225.00
60.00
16.00
78.00
48.00
140.00
30.00
100.00
18.00
630.00
248.00
348.00
100.00
500.00
38.00
34.00
18.00
630.00
160.00
700.00
96.00
25.00
80.00
7.00
40.00
30.00
160.00
GLB
1.00
56,500.00
#REF!
56,500.00
8,858.00
56,500.00
145,790.00
92,390.00
10.00
2.00
2.00
2.00
1.00
750.00
550.00
650.00
350.00
145,790.00
92,390.00
10,600.00
7,500.00
1,100.00
1,300.00
700.00
8,640.00
8.00
73.00
350.00
80.00
2,800.00
5,840.00
VERIFICAR PRECIO
4,000.00
100.00%
ESPECIFICA DETALLE
UND
METRADO
COSTO UNITARIO
COSTO PARCIAL
UND
UND
2.00
2.00
500.00
1,500.00
1,000.00
3,000.00
UND
UND
UND
225.00
4.00
3.00
20.00
30.00
40.00
4,500.00
120.00
120.00
M2
263.00
87.00
22,881.00
M2
11.00
120.00
1,320.00
HE
238.00
15.00
3,570.00
HM
HM
HE
HM
HM
HM
171.00
31.00
739.00
106.00
375.00
532.00
15.00
25.00
6.00
10.00
25.00
15.00
2,565.00
775.00
4,434.00
1,060.00
9,375.00
7,980.00
HM
HM
62.00
25.00
100.00
170.00
6,200.00
4,250.00
SUB TOTAL
1,320.00
3,570.00
26,189.00
10,450.00
53,400.00
53,400.00
GLB
1.00
53,400.00
#REF!
53,400.00
55,500.00
55,500.00
1.00
120.00
21.00
21.00
30,000.00
160.00
100.00
200.00
1,200.00000
52,500.00
21.00
2,500.00
25,000.00
1.00
25,000.00
126,449.50
4,000.00
1,800.00
2,200.00
28,000.00
10,800.00
13,200.00
4,520.00
UND
10.00
5.00
50.00
UND.
10.00
3.00
30.00
2. 6. 8. 1. 4. 2.
GUANTES DE CUERO
PAR
20.00
12.00
240.00
2. 6. 8. 1. 4. 2.
GUANTES DE JEBE
PAR
20.00
9.00
180.00
2. 6. 8. 1. 4. 2.
UND
30.00
20.00
600.00
2. 6. 8. 1. 4. 2.
BOTAS DE JEBE 38 - 40
PAR
30.00
29.00
870.00
UND
UND
10.00
30.00
90.00
55.00
900.00
1,650.00
UND
1.00
3,000.00
3,000.00
UND.
UND
UND.
UND
CAJA
UND
12.00
50.00
10.00
7.00
0.50
50.00
0.50
0.50
0.50
20.00
9.00
4.00
5.00
1.00
3.00
60.00
20.00
0.50
30.00
30.00
30.00
0.50
30.00
31.00
60.00
50.00
30.00
420.00
10.00
25.00
15.00
15.00
15.00
10.00
270.00
124.00
MATERIALES DE ESCRITORIO
ARCHIVADORES DE PALANCA GRANDE LOMO ANCHO
CD REGRABABLE
2. 6. 8. 1. 4. 2. CORRECTOR
2. 6. 8. 1. 4. 2. CUADERNO DE OBRA 100 FOLIOS CUADRUPLIC.
2. 6. 8. 1. 4. 2. FASTENER - CAJA
2. 6. 8. 1. 4. 2. FOLDER MANILA
2. 6. 8. 1. 4. 2. HOJAS BOND A4 75 gr COLOR AMARILLO
2. 6. 8. 1. 4. 2. HOJAS BOND A4 75 gr COLOR CELESTE
2. 6. 8. 1. 4. 2. HOJAS BOND A4 75 gr COLOR VERDE
2. 6. 8. 1. 4. 2. LAPICEROS FC PTA FINA
2. 6. 8. 1. 4. 2. PAPEL BOND A4 75 gr COLOR BLANCO
2. 6. 8. 1. 4. 2. PAPEL BOND A4 80 gr COLOR BLANCO
2. 6. 8. 1. 4. 2.
2. 6. 8. 1. 4. 2.
126,449.50
100.00%
70,035.50
7.00
6.00
6.00
TAPA OIDOS
100.00%
126,449.50
52,000.00
MES
MES
MES
GAFAS DE PROTECCION
2. 6. 8. 1. 4. 2.
25,000.00
25,000.00
25,000.00
126,449.50
2. 6. 8. 1. 4. 2.
CASACAS IMPERMEABLE
2. 6. 8. 1. 4. 2. MAMELUCOS SEGN DESIO
100.00%
25,000.00
2. 6. 8. 1. 4. 2.
2. 6. 8. 1. 4. 2.
52,500.00
52,500.00
52,500.00
52,500.00
25,000.00
GLB
100.00%
30,000.00
19,200.00
2,100.00
4,200.00
52,500.00
UND.
55,500.00
55,500.00
55,500.00
% APORTE
22,881.00
GASTOS GENERALES
2. 6. 8. 1. 4. 3.
MONTO EN S/.
4,740.00
TOTAL
ESPECIFICA
TIPO DE TRANSACCION
GENERICA DEL GASTO
SUBGENERICA
SUBGENERICA
ESPECIFICA
SUBGENERICA
3,000.00
1,685.50
MILLAR
MILLAR
MILLAR
UND.
MILLAR
MILLAR
TIPO DE TRANSACCION
GENERICA DEL GASTO
SUBGENERICA
SUBGENERICA
ESPECIFICA
SUBGENERICA
ESPECIFICA DETALLE
PAPEL CARBON
PLUMON PARA PIZARRA ACRILICA (NEGRO, AZUL, ROJO)
PAPEL LUSTRE
2. 6. 8. 1. 4. 2. RESALTADOR
2. 6. 8. 1. 4. 2. TABLERO PLASTIFICADO A-4
2. 6. 8. 1. 4. 2. TAMPON (Rojo y Azul)
2. 6. 8. 1. 4. 2. TONER PARA IMPRESORA
2. 6. 8. 1. 4. 2. VINIFAN TAMAO OFICIO
UND
METRADO
COSTO UNITARIO
COSTO PARCIAL
CAJA
UND.
UND
UND.
UND
UND
UND
UND
1.00
2.00
5.00
10.00
4.00
2.00
2.00
2.00
20.00
3.00
0.30
3.00
12.00
10.00
250.00
8.00
20.00
6.00
1.50
30.00
48.00
20.00
500.00
16.00
GLN
GLN
200.00
200.00
12.00
12.00
2,400.00
2,400.00
7.00
30.00
5,000.00
15.00
1,000.00
1.00
60.00
20.00
6.50
0.10
3.00
0.30
150.00
5.00
140.00
195.00
500.00
45.00
300.00
150.00
300.00
UND
1.00
2,000.00
2,000.00
GLB
1.00
400.00
400.00
2. 6. 8. 1. 4. 2.
2. 6. 8. 1. 4. 2.
2. 6. 8. 1. 4. 2.
2. 6. 8. 1. 4. 2.
2. 6. 8. 1. 4. 2.
COMBUSTIBLE
GASOLINA DE 90 OCTANOS
PETROLEO DIESEL 2
2. 6. 8. 1. 4. 2.
ASIGNACION DE VIATICOS
VIATICOS
GASTOS DE IMPREVISTOS
IMPREVISTOS
GASTOS DE SUPERVISION
SERVICIOS NO PERSONALES
2. 6. 8. 1. 4. 3. SUPERVISOR DE OBRA
2. 6. 8. 1. 4. 3. ASISTENTE DE SUPERVISION
2. 6. 8. 1. 4. 2.
COMBUSTIBLE
PETROLEO DIESEL 2
GASTOS ADMINISTRATIVOS
2,000.00
400.00
37,230.00
36,450.00
MES
MES
6.50
4.00
4,500.00
1,800.00
29,250.00
7,200.00
GLN
65.00
12.00
780.00
780.00
19,184.00
MES
7.00
1,500.00
10,500.00
COMBUSTIBLE
2. 6. 8. 1. 4. 2. GASOLINA DE 90 OCTANOS
2. 6. 8. 1. 4. 2. PETROLEO
GLN
GLN
200.00
250.00
12.00
12.00
2,400.00
3,000.00
UND
UND
30.00
5,000.00
5.00
0.10
150.00
500.00
HOJAS BOND A4 75 gr
2. 6. 8. 1. 4. 2. TONER PARA IMPRESORA HP LASER JET
MILLAR
UND
15.00
7.00
32.00
250.00
480.00
1,750.00
UND
UND
UND
UND
UND
2.00
12.00
12.00
12.00
20.00
10.00
1.00
3.00
3.00
15.00
20.00
12.00
36.00
36.00
300.00
2. 6. 8. 1. 4. 3.
10,500.00
5,400.00
650.00
MATERIALES DE ESCRITORIO
2. 6. 8. 1. 4. 2.
2. 6. 8. 1. 4. 2.
% APORTE
1,630.00
SERVICIOS NO PERSONALES
2. 6. 8. 1. 4. 3. ASISTENTE ADMINISTRATIVO
2. 6. 8. 1. 4. 3.
MONTO EN S/.
SUB TOTAL
4,800.00
2. 6. 8. 1. 4. 3.
2. 3. 8. 1. 4. 3.
TOTAL
ESPECIFICA
2,634.00
PRESUPUESTO TOTAL
1,425,990.55
1,425,990.55
100.00%
PLANILLA DE PAGOS
EMPRESA
DESCRIPCION
N
APELLIDOS Y NOMBRES
CATEGORIA U
OCUPACION
REMUNERACION
TOTAL
DIAS DOM.
REM.
DIAS
TRAB. TRAB. TRAB DIARIA
SUELDO
BASICO
ASIGNACION
FAMILIAR
REM.
ASEGURABLE
CTS
OPERARIO
OPERARIO
27
30
50.00
1,500.00
1,500.00
125.00
OFICIAL
OFICIAL
27
30
38.00
1,140.00
1,140.00
95.00
PEON
PEON
27
30
30.00
900.00
900.00
75.00
3,540.00
295.00
SUB TOTAL
3,540.00
RESUMEN
Retrib.y Complementos - Contratos a plazo fijo (Reg. Lab. Pb. yS/.
Priv.)
Obligaciones del Empleador - Transf. Corrientes
3,835.00
S/.
669.87
S/.
4,504.87
LA DE PAGOS
APORT EMP.
DEDUCCIONES
Otro AFP
SNP
12%
13%
SCTR
9%
1.55%
REM.
TOTAL
SEGU
RO
1,625.00
SNP
195.00
195.00
135.00
23.25
158.25
1,430.00
1,235.00
SNP
148.20
148.20
102.60
17.67
416.67
1,086.80
975.00
SNP
117.00
117.00
81.00
13.95
94.95
858.00
3,835.00
460.20
TOTAL
DESCUENTO
ESSALUD
460.20
318.60
54.87
669.87
3,374.80
RESUMEN
LIQUIDO A PAGAR
TOTAL DESCUENTO
S/.
S/.
SNP
TRANSFERENCIA CORRIENTESS/.
S/.
3,374.80
460.20
460.20
669.87
4,504.87
47.67
36.23
28.60
PEDIDO
OFICINA SOLICITANTE .: SUB GERENCIA DE OBRAS
RESPONSABLE
: ING. SUSY GIOVANA RAMOS GALLEGOS
Mneomnico
: 0357
PRESUPUESTO
: Ao 2,011
PROYECTO: CONSTRUCCION DE INFRAESTRUCTURA DE LA I. E. AGROPECUARIO JOSE MARIA
ARGUEDAS DE PUTACCA DEL DISTRITO DE PALCA - HUANCAVELICA
FECHA
ITEM
II
III
UND.MED
: ABRIL 2,011.
CANT.
Precio Unitario
TOTAL
CEMENTO
Cemento Portland Tipo I de 42.5 Kg.
Unid.
5700
22.00
125400.00
125400.00
ACEROS
Fierro Corrugado de =3/4"
Fierro Corrugado de =5/8"
Fierro Corrugado de =1/2"
Fierro Corrugado de =3/8"
Fierro Corrugado de =1/4" temperatura
Clavo para madera de 2 1/2" C/C
Clavo para madera de 2 " C/C
Clavo para madera de 3" C/C
Clavo para madera de 4" C/C
Alambre negro recocido N 16
Alambre negro recocido N 08
VAR
VAR
VAR
VAR
VAR
KG
KG
KG
KG
KG
KG
218.00
225.00
970.00
1850.00
770.00
250.00
200.00
250.00
200.00
1700.00
800.00
75.00
52.00
33.00
19.00
8.00
4.80
4.80
4.80
4.80
4.80
4.80
117690.00
16350.00
11700.00
32010.00
35150.00
6160.00
1200.00
960.00
1200.00
960.00
8160.00
3840.00
LADRILLOS
Ladrillo p/techo 15x30x30
Ladrillo p/techo 12x30x31
Ladrillo caravista de 9x12x25
Ladrillo de Arcilla
UND
UND
UND
UND
3600.00
240.00
4870.00
3400.00
3.20
3.00
1.50
0.65
TOTAL
21755.00
11520.00
720.00
7305.00
2210.00
264,845.00