Está en la página 1de 13

CEDULA DE CULTIVOS SIN Y CON PROYECTO

CUADRO N
CULTIVO
PRINCIPAL
Arroz

TOTAL

CRONOGRAMA MENSUAL SIN PROYECTO


AREAS (HAS)

Area
(Has)
24.41

24.41

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

24.41

24.41

24.41

24.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.20

12.20

12.20

12.20

24.41

24.41

24.41

24.41

0.00

12.20

12.20

12.20

12.20

Fuente: Elaboracin Propia

CUADRO N
CULTIVO
PRINCIPAL
Aj Pprika

TOTAL

CRONOGRAMA MENSUAL CON PROYECTO


Area
(Has)
24.41

24.41

Fuente: Elaboracin Propia

AREAS (HAS)
ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

0.00

0.00

24.41

24.41

24.41

24.41

24.41

24.41

0.00

24.41

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

24.41

0.00

24.41

24.41

24.41

24.41

24.41

24.41

0.00

VOS SIN Y CON PROYECTO

AREAS (HAS)
OCT

NOV

DIC

0.00

24.41

24.41

0.00

0.00

0.00

0.00

24.41

24.41

AREAS (HAS)
OCT

NOV

DIC

0.00

0.00

0.00

0.00

24.41

24.41

0.00

24.41

24.41

Area
(Has)

CULTIVO
ROTACION

12.20

Frijol

Area
(Has)

CULTIVO
ROTACION

24.41

Frijol

EVAPOTRANSPIRACIN POTENCIAL (mm/da)


Estacin
Jayanca (La Via)

MESES
Ene.

Feb.

Mar.

Abr.

May.

Jun.

Jul.

Ago.

Set.

5.16

5.19

5.08

4.83

4.16

3.83

3.57

3.89

4.36

160.0

145.3

157.5

144.9

129.0

114.9

110.7

120.6

130.8

Estacin

Jayanca (La Via)

Latitud Sur

Departamento

Lambayeque

Longitud Oeste

Provincia

Lambayeque

Altitud

Distrito

Jayanca

RACIN POTENCIAL (mm/da)


MESES
Oct.

Nov.

Dic.

4.68

4.81

4.78

145.1

144.3

148.2

06.32 S
79.78 W
75 msnm

COEFICIENTE DE CULTIVOS SIN Y CON PROYEC


CUADRO N
CULTIVO
PRINCIPAL
Arroz

Kc. Ponderado

Kc DE LOS CULTIVOS SIN PROYECTO


Area
(Has)
24.41

24.41

AREAS (HAS)
ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

1.20

1.20

1.17

0.99

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.40

0.70

0.94

0.90

1.20

1.20

1.17

0.99

0.00

0.40

0.70

0.94

0.90

Fuente: FAO.

CUADRO N
CULTIVO
PRINCIPAL
Aj Pprika

Kc.
Fuente: FAO.

Kc DE LOS CULTIVOS CON PROYECTO


Area
(Has)
24.41

24.41

AREAS (HAS)
ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

0.00

0.00

0.40

0.75

0.90

1.00

0.90

0.80

0.00

0.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.61

0.00

0.40

0.75

0.90

1.00

0.90

0.80

0.00

LTIVOS SIN Y CON PROYECTO

AREAS (HAS)
OCT

NOV

DIC

0.00

1.05

1.13

0.00

0.00

0.00

0.00

1.05

1.13

AREAS (HAS)
OCT

NOV

DIC

0.00

0.00

0.00

0.00

0.75

0.65

0.00

0.75

0.65

Area
(Has)

CULTIVO
ROTACION

12.20 Frijol

Area
(Has)

CULTIVO
ROTACION

24.41 Frijol

DEMANDA DE AGUA SIN PROYECTO


PARAMETRO
1. Evotransp. Potencial

UNIDAD

ENE

FEB

MAR

ABR

MAY

JUN

JUL

(mm/dia)

5.16

5.19

5.08

4.83

4.16

3.83

3.57

1.20

1.20

1.17

0.99

0.00

0.40

0.70

(mm/dia)

6.19

6.23

5.94

4.78

0.00

1.53

2.50

(mm/dia)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(mm/dia)

6.19

6.23

5.94

4.78

0.00

1.53

2.50

(%)

0.30

0.30

0.30

0.30

0.30

0.30

0.30

(dias)

31.00

28.00

31.00

30.00

31.00

30.00

31.00

(mm/dia)

20.64

20.76

19.81

15.94

0.00

5.11

8.33

2. Kc ponderado
3. Evotranp. Real o Uso consuntivo (1*2)
4. Precip. Efect.
5. Dficit de Humedad

(3-4)

6. Eficiencia de riego
7. N dias del mes
8. Requerimiento de agua (5/6)

9.-Area total
10. Volumen demandado

(m3/ha/dia)

206.40

207.60

198.12

159.39

0.00

51.07

83.30

(m3/ha/mes)

6,398.40

5,812.80

6,141.72

4,781.70

0.00

1,532.00

2,582.30

has

24.41

24.41

24.41

24.41

0.00

12.20

12.20

0.00

18,690.40

31,504.06

m3/mes

156,184.94 141,890.45 149,919.39 116,721.30

La mayor demanda sin proyecto se observa en el mes de Enero


Fuente: Elaboracin propia

DEMANDA DE AGUA CON PROYECTO


PARAMETRO
1. Evotransp. Potencial

UNIDAD
(mm/dia)

2. Kc ponderado

ENE

FEB

MAR

ABR

MAY

JUN

JUL

5.16

5.19

5.08

4.83

4.16

3.83

3.57

0.61

0.00

0.40

0.75

0.90

1.00

0.90

3. Evotranp. Real o Uso consuntivo (1*2)

(mm/dia)

3.15

0.00

2.03

3.62

3.74

3.83

3.21

4. Precip. Efect.

(mm/dia)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(mm/dia)

3.15

0.00

2.03

3.62

3.74

3.83

3.21

5. Dficit de Humedad

(3-4)

6. Eficiencia de riego
7. N dias del mes
8. Requerimiento de agua (5/6)

9.-Area total
10. Volumen demandado

(%)

0.90

0.90

0.90

0.90

0.90

0.90

0.90

(dias)

31.00

28.00

31.00

30.00

31.00

30.00

31.00

(mm/dia)

3.50

0.00

2.26

4.03

4.16

4.26

3.57

(m3/ha/dia)

34.97

0.00

22.58

40.25

41.60

42.56

35.70

(m3/ha/mes)

1,084.17

0.00

699.91

1,207.50

1,289.60

1,276.67

1,106.70

24.41

0.00

24.41

24.41

24.41

26,464.67

0.00

17,084.83

has
m3/mes

La mayor demanda con proyecto se observa en el mes de Mayo


Fuente: Elaboracin propia

29,475.08 31,479.14

24.41
31,163.43

24.41
27,014.55

AGUA SIN PROYECTO


AGO

SEP

OCT

NOV

DIC

3.89

4.36

4.68

4.81

4.78

0.94

0.90

0.00

1.05

1.13

3.66

3.92

0.00

5.05

5.40

0.00

0.00

0.00

0.00

0.00

3.66

3.92

0.00

5.05

5.40

0.30

0.30

0.30

0.30

0.30

31.00

30.00

31.00

30.00

31.00

12.19

13.08

0.00

16.84

18.00

121.89

130.80

0.00

168.35

180.05

3,778.49

3,924.00

0.00

5,050.50

5,581.45

12.20

12.20

0.00

24.41

24.41

46,097.54

47,872.80

0.00

123,282.71 136,243.11

Demanda maxima

207.60

Demanda minima

0.00

Demanda promedio

125.58

GUA CON PROYECTO


AGO

SEP

OCT

NOV

DIC

3.89

4.36

4.68

4.81

4.78

0.80

0.00

0.00

0.75

0.65

3.11

0.00

0.00

3.61

3.11

0.00

0.00

0.00

0.00

0.00

3.11

0.00

0.00

3.61

3.11

0.90

0.90

0.90

0.90

0.90

31.00

30.00

31.00

30.00

31.00

3.46

0.00

0.00

4.01

3.45

34.58

0.00

0.00

40.08

34.52

1,071.91

0.00

0.00

1,202.50

1,070.19

24.41

0.00

0.00

24.41

24.41

26,165.35

0.00

0.00

29,353.03

26,123.31

Demanda maxima

42.56

Demanda minima

0.00

Demanda promedio

27.24

OFERTA DE AGUA SIN PROYECTO


AREA

24.41 ha.

DESCRIPCION
1. Caudal
2. Tiempo de riego

UNID

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

lts/seg

160.00

160.00

160.00

160.00

160.00

160.00

160.00

160.00

160.00

160.00

160.00

160.00

m3/hr

576.00

576.00

576.00

576.00

576.00

576.00

576.00

576.00

576.00

576.00

576.00

576.00

horas/ha

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

3. Dotacin de riego

dias

15.00

15.00

15.00

15.00

15.00

15.00

15.00

15.00

15.00

15.00

15.00

15.00

4. Numero de das al mes

dias

31.00

28.00

31.00

30.00

31.00

30.00

31.00

31.00

30.00

31.00

30.00

31.00

5. Numero de dotacin al mes ( 4/3 )

dias

2.07

1.87

2.07

2.00

2.07

2.00

2.07

2.07

2.00

2.07

2.00

2.07

6. Volumen promedio (5 x 2 x 1 )
7. Area
8. Volumen Ofertado ( 6 x 7 )
Fuente: Elaboracin propia

m3/ha/mes

2,380.80 2,150.40 2,380.80 2,304.00 2,380.80 2,304.00 2,380.80 2,380.80 2,304.00 2,380.80 2,304.00 2,380.80

Ha

24.41

24.41

24.41

24.41

24.41

24.41

24.41

24.41

24.41

24.41

24.41

24.41

m3/mes

58,115.33

52,491.26

58,115.33

56,240.64

58,115.33

56,240.64

58,115.33

58,115.33

56,240.64

58,115.33

56,240.64

58,115.33

OFERTA DE AGUA CON PROYECTO


DESCRIPCION

UNID

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

lts/seg

160.00

160.00

160.00

160.00

160.00

160.00

160.00

160.00

160.00

160.00

160.00

160.00

m3/h

576.00

576.00

576.00

576.00

576.00

576.00

576.00

576.00

576.00

576.00

576.00

576.00

horas/ha

0.53

0.53

0.53

0.53

0.53

0.53

0.53

0.53

0.53

0.53

0.53

0.53

3. Dotacin de riego

dias

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4.00

4. Numero de das al mes

dias

31.00

28.00

31.00

30.00

31.00

30.00

31.00

31.00

30.00

31.00

30.00

31.00

7.75

7.00

7.75

7.50

7.75

7.50

7.75

7.75

7.50

7.75

7.50

7.75

1. caudal
2. Tiempo de riego

5. Numero de dotacin al mes (4/3 )


6. Volumen promedio (5 x 2 x 1 )
7. Area
8. Volumen Ofertado ( 6 x 7 )
Fuente: Elaboracin propia

dias
m3/ha/mes

2,380.80 2,150.40 2,380.80 2,304.00 2,380.80 2,304.00 2,380.80 2,380.80 2,304.00 2,380.80 2,304.00 2,380.80

Ha

24.41

24.41

24.41

24.41

24.41

24.41

24.41

24.41

24.41

24.41

24.41

24.41

m3/mes

58,115.33

52,491.26

58,115.33

56,240.64

58,115.33

56,240.64

58,115.33

58,115.33

56,240.64

58,115.33

56,240.64

58,115.33

BALANCE DE AGUA SIN PROYECTO


PARAMETRO

UNIDAD

ENE

FEB

MAR

ABR

MAY

JUN

JUL

DEMANDA

(m3/mes)

156,184.94

141,890.45

149,919.39

116,721.30

0.00

18,690.40

31,504.06

OFERTA

(m3/mes)

58,115.33

52,491.26

58,115.33

56,240.64

58,115.33

56,240.64

58,115.33

BALANCE

(m3/ha/mes)

-98,069.616

-89,399.184

-91,804.057

-60,480.657

58,115.33

37,550.240

26,611.268

180,000.00
160,000.00
140,000.00
120,000.00
100,000.00
Volumen de agua (m3/mes)
80,000.00
60,000.00
40,000.00
20,000.00
-

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

BALANCE DE AGUA CON PROYECTO


PARAMETRO

UNIDAD

ENE

DEMANDA

(m3/mes)

26,464.67

OFERTA

(m3/mes)

58,115.33

BALANCE

(m3/ha/mes)

31,650.66

FEB

MAR
-

ABR

MAY

JUN

JUL

17,084.83

29,475.08

31,479.14

31,163.43

27,014.55

52,491.26

58,115.33

56,240.64

58,115.33

56,240.64

58,115.33

52,491.26

41,030.50

26,765.56

26,636.19

25,077.21

31,100.78

70,000.00
60,000.00
50,000.00
40,000.00
Volumen de agua (m3/mes)
30,000.00
20,000.00
10,000.00
-

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

DIC

AGO

SEP

46,097.54

47,872.80

0.00

123,282.71

136,243.11

58,115.33

56,240.64

58,115.33

56,240.64

58,115.33

12,017.791

8,367.840

58,115.33

-67,042.065

-78,127.785

Row 5

Row 6

OCT

NOV

DIC

OV

AGO

SEP

26,165.35

OCT
-

NOV
-

DIC

29,353.03

26,123.31

58,115.33

56,240.64

58,115.33

56,240.64

58,115.33

31,949.98

56,240.64

58,115.33

26,887.61

31,992.02

DIC

Row 30

Row 31

También podría gustarte