: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA, PROVINCIA DE RIOJA - SAN MARTIN
: CONTRATO
Nro. 009 -DE
2011
- GRSM
- PEAM - 01.00
CONTRATO
: GOBIERNO
REGIONAL
SAN
MARTIN
ENTIDAD
: GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA : CONSORCIO ALIANZA
VALORIZACION DE OBRA N 01
CORRESPONDIENTE AL MES DE NOVIEMBRE 2,011 (DEL 13/11/11 AL 30/11/11)
PRESUPUESTO
Item
Descripcin
Und.
Metrado
P. U.
S/.
Parcial
S/.
OBRAS PROVISIONALES
CAMPAMENTO PROVISIONAL DE OBRA
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
CARTEL DE IDENTIFICACION DE OBRA
GLB
UND
UND
1.00
1.00
1.00
6,300.00
10,000.00
1,517.07
TRABAJOS PRELIMINARES
MOVILIZACION DE EQUIPO
TRANSPORTE DE MATERIALES DESDE LIMA A OBRA
GLB
GLB
1.00
1.00
92,783.68
871,298.25
OBRAS PROVISIONALES
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS P/OBRA
TRABAJOS PRELIMINARES
LIMPIEZA Y DESBROCE DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO INICIAL
100.00%
100.00%
100.00%
0.00
0.00
0.00
92,783.68
871,298.25
100.00%
100.00%
0.00
0.00
10,000.00
3,728.23
201,273.46
0.00
0.00
0.00
0.80
0.19
1.00
0.00
0.00
0.20
0.20
0.00
10,000.00
3,728.23
100.00%
100.00%
0.00
0.00
0.00
0.00
Metrado
Metrado
201,273.46
0.80
0.19
1.00
5040.00
1900.00
1517.07
0.20
0.81
0.00
18,556.74
174,259.65
0.20
0.20
18556.74
174259.65
0.80
0.80
10,000.00
3,728.23
50,057.09
1.00
1.00
Parcial
S/.
780,625.54
5,040.00
1,900.00
1,517.07
50,057.09
1.00
1.00
Parcial
S/.
1,260.00
8,100.00
0.00
80.00%
19.00%
100.00%
74,226.94
697,038.60
20.00%
20.00%
31,184.31
10000.00
3728.23
0.00
0.00
0.00
0.00
100.00%
100.00%
67.68
27.99
25.16
12.96
2.69
2.16
67.68
27.99
100.00%
100.00%
0.00
0.00
0.00
0.00
25.16
12.96
67.68
27.99
25.16
12.96
0.00
0.00
0.00
0.00
100.00%
100.00%
M2
M2
M3
M3K
UND
4,027.20
4,027.27
1,006.80
241.63
1.00
2.16
4.04
5.15
17.86
297.14
8,698.75
16,270.17
5,185.02
4,315.51
297.14
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4027.20
4027.27
345.89
123.00
1.00
8,698.75
16,270.17
1,781.33
2,196.78
297.14
4,027.20
4,027.27
345.89
123.00
1.00
8698.75
16270.17
1781.33
2196.78
297.14
0.00
0.00
660.91
118.63
0.00
0.00
0.00
3,403.69
2,118.73
0.00
100.00%
100.00%
34.36%
50.90%
100.00%
MOVIMIENTO DE TIERRAS
EXCAVACION EN ROCA SUELTA EN LECHO DE RIO
EXCAVACION P/ENCAUZAMIENTO DE RIO EN TERRENO EN ROCA SUELTA
ELIMINACION DE MATERIAL EXCEDENTE
M3
M3
M3K
7.20
12.58
20.77
209.33
173.62
17.86
1,507.18
2,184.14
370.95
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
7.20
12.58
20.77
1,507.18
2,184.14
370.95
7.20
12.58
20.77
1507.18
2184.14
370.95
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
M3
9.96
293.85
2,926.75
100.00%
0.00
0.00
9.96
2,926.75
9.96
2926.75
0.00
0.00
100.00%
M3
KG
2.67
134.36
411.63
5.30
1,099.05
712.11
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.67
134.36
1,099.05
712.11
0.00%
0.00%
MUROS Y PLACAS
CONCRETO F'C=245KG/CM2 PARA MUROS REFORZADOS (CEMENTO PI)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA MUROS REFORZADOS
ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS)
M3
M2
KG
3.05
30.29
346.36
445.91
50.90
5.33
1,360.03
1,541.76
1,846.10
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.05
30.29
346.36
1,360.03
1,541.76
1,846.10
0.00%
0.00%
0.00%
VIGAS
CONCRETO F'C=245KG/CM2 PARA VIGAS (CEMENTO PI)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES
ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)
M3
M2
KG
0.59
7.60
99.84
418.37
53.11
5.33
246.84
403.64
532.15
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.59
7.60
99.84
246.84
403.64
532.15
0.00%
0.00%
0.00%
LOSAS DE TECHO
CONCRETO F'C=245KG/CM2 PARA LOSAS MACIZAS
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS
ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)
M3
M2
KG
1.62
10.00
117.42
418.37
42.25
5.33
677.76
422.50
625.85
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.62
10.00
117.42
677.76
422.50
625.85
0.00%
0.00%
0.00%
M2
M2
M2
5.83
31.52
7.80
26.27
37.30
25.15
153.15
1,175.70
196.17
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.83
31.52
7.80
153.15
1,175.70
196.17
0.00%
0.00%
0.00%
PZA
UND
UND
M
GLB
2.00
1.00
1.00
10.00
1.00
354.00
119.92
150.00
358.93
4,138.85
708.00
119.92
150.00
3,589.30
4,138.85
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
1.00
10.00
1.00
708.00
119.92
150.00
3,589.30
4,138.85
0.00%
0.00%
0.00%
0.00%
0.00%
40.00
1.49
59.60
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
40.00
59.60
0.00%
M
M
M
M
M3K
40.00
40.00
40.00
40.00
10.36
12.13
1.86
4.26
14.94
17.86
485.20
74.40
170.40
597.60
185.03
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
40.00
40.00
40.00
10.36
485.20
74.40
170.40
597.60
185.03
0.00%
0.00%
0.00%
0.00%
0.00%
M
M
40.00
40.00
99.15
3.31
3,966.00
132.40
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
7.31
292.40
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
40.00
0.00
40.00
0.00
3,966.00
132.40
0.00
292.40
0.00
0.00%
0.00%
PRUEBAS
PRUEBA HIDRAULICA P/TUB. DE DESAGUE DN 400 - 450
M
M
306.00
306.00
1.49
1.07
455.94
327.42
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
306.00
306.00
455.94
327.42
0.00%
0.00%
M
M
M
M
M3K
306.00
306.00
306.00
306.00
39.51
9.93
1.60
4.00
16.48
17.86
3,038.58
489.60
1,224.00
5,042.88
705.65
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
306.00
306.00
306.00
306.00
39.51
3,038.58
489.60
1,224.00
5,042.88
705.65
0.00%
0.00%
0.00%
0.00%
0.00%
M
M
306.00
306.00
110.14
5.41
33,702.84
1,655.46
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
306.00
306.00
33,702.84
1,655.46
0.00%
0.00%
2.00
1.00
2.00
5.00
811.79
856.68
811.79
17.63
1,623.58
856.68
1,623.58
88.15
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
2.00
5.00
1,623.58
856.68
1,623.58
88.15
0.00%
0.00%
0.00%
0.00%
INSTALACIONES HIDRAULICAS
NIPLE DE HDPE DN 560, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m
COMPUERTA DE MADERA DE 0.50 X 1.10m E=2"
COMPUERTA DE MADERA DE 0.70 X 0.90m E=2"
TUBERIA HDPE DN 560mm
MONTAJE DE INSTALACIONES HIDRAULICAS DE CAPTACION
LINEA DE REBOSE
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIALES DEL PROYECTO
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 400 - 450de 1.01 a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 400 - 450 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 400 - 450 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 400 - 450 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE
M2
M2
1.00
1.00
6,300.00
10,000.00
1,517.07
ACUMULADO ACTUAL
Parcial
S/.
Metrado
0.00
81,241.41
UND
GLB
PRESENTE VALORIZACION
ACUMULADO ANTERIOR
Parcial
S/.
Metrado
981,899.00
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIALES DEL PROYECTO
TRAZO Y REPLANTEO FINALES DE OBRA
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 315 - 350 de 1.00m a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 315 - 350 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 315 - 350 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 315 - 350 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE
SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4422
TUBERIA PVC-UF NTP ISO 4422 C-7.5 DN 350 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/AGUA POTABLE DN 315 - 350
61,279.00
UND
UND
UND
UND
UND
PRUEBAS
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 315 - 350
VARIOS
CONCRETO f'c=140 kg/cm2 P/ANCLAJE DE ACCESORIO DN 315 -350
UND
1.00
7,724.04
7,724.04
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
7,724.04
0.00%
6.70
2,050.20
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
306.00
2,050.20
0.00%
5.00
134.08
670.40
100.00%
0.00
0.00
0.00
0.00
0.00
5.00
0.00
670.40
0.00%
0.00
0.00
0.00
6,997,248.97
15,683.95
15,683.95
1.49
1.07
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15,683.95
15,683.95
23,369.09
16,781.83
6,997,248.96
M
M
0.00%
306.00
0.00
23,369.09
16,781.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
04.01.03
04.01.04
04.02
04.02.01
04.02.02
04.02.04
04.02.11
04.03
04.03.01
04.03.02
04.04
04.04.01
04.04.02
04.05
04.05.01
04.05.02
04.05.03
04.05.04
04.05.05
04.06
04.06.01
04.06.02
04.06.03
04.06.04
04.07
04.07.01
04.08
04.08.01
04.08.02
04.08.03
04.09
04.09.01
04.09.01.01
04.09.01.02
04.09.02
04.09.02.01
04.09.02.02
04.09.02.03
04.10
04.10.01
GLB
GLB
1.00
1.00
1,026.16
1,758.99
1,026.16
1,758.99
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1,026.16
1,758.99
0.00%
0.00%
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 500 - 600 de 1.51m a 2.00m PROF.
PERFILADO DE ZANJA PULSO P/INST. DE TUBERIA ADOSADA EN T-SEMIROCOSO DN 500 - 630, h=0.15m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 500 - 630 PARA TODA PROF.
ELIMINACION DE MATERIAL EXCEDENTE
M
M
M
M3K
12,870.86
686.14
12,870.86
9,722.19
21.83
2.46
2.20
17.86
280,970.87
1,687.90
28,315.89
173,638.31
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12,870.86
686.14
12,870.86
9,722.19
280,970.87
1,687.90
28,315.89
173,638.31
0.00%
0.00%
0.00%
0.00%
M
M
12,870.86
12,870.86
250.29
24.08
3,221,447.55
309,930.31
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12,870.86
12,870.86
3,221,447.55
309,930.31
0.00%
0.00%
M
M
2,813.09
2,813.09
355.45
107.37
999,912.84
302,041.47
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,813.09
2,813.09
999,912.84
302,041.47
0.00%
0.00%
UND
UND
UND
UND
UND
24.00
29.00
24.00
1.00
78.00
2,473.28
2,768.28
3,240.28
3,476.99
84.67
59,358.72
80,280.12
77,766.72
3,476.99
6,604.26
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
29.00
24.00
1.00
78.00
59,358.72
80,280.12
77,766.72
3,476.99
6,604.26
0.00%
0.00%
0.00%
0.00%
0.00%
UND
UND
UND
UND
17.00
16.00
9.00
42.00
5,923.13
5,923.13
5,922.42
751.69
100,693.21
94,770.08
53,301.78
31,570.98
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100,693.21
94,770.08
53,301.78
31,570.98
0.00%
0.00%
0.00%
0.00%
UND
5.00
2,124.00
10,620.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
17.00
16.00
9.00
42.00
0.00
5.00
10,620.00
0.00%
UND
UND
UND
25.00
6.00
18.00
17,845.79
19,369.09
18,050.79
446,144.75
116,214.54
324,914.22
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.00
6.00
18.00
446,144.75
116,214.54
324,914.22
0.00%
0.00%
0.00%
PROTECCION DE TUBERIAS
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.
M
M
159.00
106.00
22.79
72.22
3,623.61
7,655.32
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
159.00
106.00
3,623.61
7,655.32
0.00%
0.00%
CONCRETO ARMADO
CONCRETO F'C 210 KG/CM2 PARA ESTRUCTURAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA ESTRUCTURAS
ACERO ESTRUC. TRABAJADO PARA ESTRUCTURAS (COSTO PROM. INCL. DESPERDICIOS)
M3
M2
KG
71.58
212.12
5,626.10
377.36
43.78
5.36
27,011.43
9,286.61
30,155.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
71.58
212.12
5,626.10
27,011.43
9,286.61
30,155.90
0.00%
0.00%
0.00%
PRUEBAS
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 500 - 630
15,683.95
9.75
152,918.51
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
15,683.95
0.00
152,918.51
0.00%
25,063.48
0.00
0.00
0.00
0.00
248,723.29
273,786.75
25,063.48
M2
301.72
2.16
651.72
100.00%
0.00
0.00
301.72
651.72
301.72
651.72
0.00
0.00
100.00%
M2
1,666.00
2.69
4,481.54
100.00%
0.00
0.00
1,666.00
4,481.54
1,666.00
4481.54
0.00
0.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
145.11
4.49
651.54
100.00%
0.00
0.00
145.11
651.54
145.11
651.54
0.00
0.00
100.00%
M3
M2
M3
M3K
116.11
260.16
326.65
326.65
38.04
1.36
5.42
17.86
4,416.82
353.82
1,770.44
5,833.97
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
116.11
260.16
326.65
326.65
4,416.82
353.82
1,770.44
5,833.97
116.11
260.16
326.65
326.65
4416.82
353.82
1770.44
5833.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
M2
M2
66.03
66.03
2.16
2.69
142.62
177.62
100.00%
100.00%
0.00
0.00
0.00
0.00
66.03
66.03
142.62
177.62
66.03
66.03
142.62
177.62
0.00
0.00
0.00
0.00
100.00%
100.00%
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN TERRENO NORMAL A MAQUINA
EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS
REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL
RETIRO + ACOMODO DE DESMONTE EN ZONA ALEDAA C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE
M3
M3
M2
M3
M3K
44.86
19.47
66.03
53.83
53.83
4.49
38.04
1.36
5.42
17.86
201.42
740.64
89.80
291.76
961.40
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.86
19.47
66.03
53.83
53.83
201.42
740.64
89.80
291.76
961.40
44.86
19.47
66.03
53.83
53.83
201.42
740.64
89.80
291.76
961.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
M3
M3
M2
M2
11.48
2.63
22.46
66.03
198.75
221.07
34.48
25.45
2,281.65
581.41
774.42
1,680.46
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.35
2.63
22.46
66.03
1,262.06
581.41
774.42
1,680.46
6.35
2.63
22.46
66.03
1262.06
581.41
774.42
1680.46
5.13
0.00
0.00
0.00
1,019.59
0.00
0.00
0.00
55.31%
100.00%
100.00%
100.00%
M3
KG
4.36
91.20
354.74
5.30
1,546.67
483.36
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.36
91.20
1,546.67
483.36
0.00%
0.00%
COLUMNAS
CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA COLUMNAS
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS
M3
M2
KG
1.66
13.46
368.93
420.33
45.63
5.33
697.75
614.18
1,966.40
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.66
13.46
368.93
697.75
614.18
1,966.40
0.00%
0.00%
0.00%
VIGAS
CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I)
ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES
M3
KG
M2
3.55
22.54
468.47
392.79
5.33
53.11
1,394.40
120.14
24,880.44
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.55
22.54
468.47
1,394.40
120.14
24,880.44
0.00%
0.00%
0.00%
LOSAS MACIZAS
CONCRETO F'C 210 KG/CM2 PARA LOSAS MACIZAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS
ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)
M3
M2
KG
9.90
66.00
467.91
392.80
42.25
5.33
3,888.72
2,788.50
2,493.96
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.90
66.00
467.91
3,888.72
2,788.50
2,493.96
0.00%
0.00%
0.00%
M3
M2
KG
0.47
4.38
52.01
372.39
31.30
5.33
175.02
137.09
277.21
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.47
4.38
52.01
175.02
137.09
277.21
0.00%
0.00%
0.00%
CAJAS DE DISTRIBUCION
CAJA REBOSE-PURGA TERRENO NORMAL INC. ELIMINACION DESMONTE
UND
1.00
4,814.99
4,814.99
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
4,814.99
0.00%
INSTALACIONES HIDRAULICAS
TUBERIAS
TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 350
TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 400
TUBERIA PVC-UF NTP ISO 4435 S-25 DN 400
M
M
M
32.53
19.00
6.00
666.08
790.05
79.46
21,667.58
15,010.95
476.76
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.53
19.00
6.00
21,667.58
15,010.95
476.76
0.00%
0.00%
0.00%
VALVULAS
VALVULA DE CPTA. BB. Ho. DUCTIL DN 350mm ISO 5996
VALVULA DE CPTA. BB. Ho. DUCTIL DN 400mm ISO 5996
UND
UND
3.00
2.00
4,484.00
7,074.10
13,452.00
14,148.20
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
2.00
13,452.00
14,148.20
0.00%
0.00%
ACCESORIOS
CODO 22.5 HIERRO DUCTIL BRIDADO DN 350
CODO 45 HIERRO DCTIL BRIDADO DN 350
CODO 45 HIERRO DCTIL BRIDADO DN 400
CODO 90 HIERRO DCTIL BRIDADO DN 350
CODO 90 HIERRO DCTIL BRIDADO DN 400
TEE Ho DUCTIL BRIDADO DN 350x350
TEE Ho DUCTIL BRIDADO DN 400x400
REDUCCION Ho DUCTIL BRIDADO DN 400x350mm
CANASTILLA DE ACERO INOXIDABLE BRIDADA DN 16" (400mm)
UND
UND
UND
UND
UND
UND
UND
UND
UND
1.00
3.00
2.00
3.00
1.00
1.00
2.00
1.00
1.00
885.00
1,416.00
1,810.12
1,622.50
2,129.90
2,586.56
3,262.70
1,871.72
2,596.00
885.00
4,248.00
3,620.24
4,867.50
2,129.90
2,586.56
6,525.40
1,871.72
2,596.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
3.00
2.00
3.00
1.00
1.00
2.00
1.00
1.00
885.00
4,248.00
3,620.24
4,867.50
2,129.90
2,586.56
6,525.40
1,871.72
2,596.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
UND
1.00
861.40
861.40
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
861.40
0.00%
05.02.03.03.11
05.02.03.04
05.02.03.04.01
05.02.03.04.02
05.02.03.04.03
05.02.03.04.04
05.02.03.05
05.02.03.05.01
05.02.03.05.02
05.02.03.05.03
05.02.03.05.04
05.02.03.05.05
05.02.03.05.06
05.02.03.06
05.02.03.06.01
05.02.03.07
05.02.03.07.01
05.02.03.07.02
05.02.03.07.03
05.02.03
05.02.03.01
05.02.03.01.01
05.02.03.01.02
05.02.03.01.03
05.02.02.02
05.02.02.02.01
05.02.02.02.02
05.02.02.02.03
05.02.02.02.04
05.02.02.03
05.02.02.03.01
05.02.02.03.02
05.02.02.03.03
05.02.02.03.04
05.02.02.03.05
05.02.02.03.06
05.02.02.04
05.02.02.04.01
05.02.02.04.02
UND
1.00
896.80
896.80
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
896.80
0.00%
UND
UND
UND
UND
2.00
1.00
1.00
1.00
590.00
655.25
2,596.00
3,219.75
1,180.00
655.25
2,596.00
3,219.75
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
1.00
1.00
1,180.00
655.25
2,596.00
3,219.75
0.00%
0.00%
0.00%
0.00%
UND
UND
UND
UND
UND
UND
27.00
25.00
432.00
400.00
27.00
25.00
247.80
589.41
9.44
14.75
25.96
34.22
6,690.60
14,735.25
4,078.08
5,900.00
700.92
855.50
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
25.00
432.00
400.00
27.00
25.00
6,690.60
14,735.25
4,078.08
5,900.00
700.92
855.50
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
MEDIDORES
MEDIDOR DE CAUDAL ELECTROMAGNETICO BRIDADO DE 16"
UND
1.00
12,614.20
12,614.20
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
12,614.20
0.00%
VARIOS
REJILLA SUMIDERO 1.40 X 1.40, PLATINA 1 1/4" X 1/4" @ 1/2" Y MARCO "L" 1 1/4"
CONCRETO F'C 175 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)
MONTAJE DE INSTALACIONES HIDRAULICAS DE RESERVORIO
UND
M3
GLB
1.00
4.60
1.00
88.50
346.38
4,140.51
88.50
1,593.35
4,140.51
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
4.60
1.00
88.50
1,593.35
4,140.51
0.00%
0.00%
0.00%
226.98
309.76
107.78
26.27
37.30
45.01
5,962.76
11,554.05
4,851.18
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
226.98
309.76
107.78
5,962.76
11,554.05
4,851.18
0.00%
0.00%
0.00%
6.67
1.00
4.00
6.00
239.28
465.93
99.25
257.92
1,596.00
465.93
397.00
1,547.52
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.67
1.00
4.00
6.00
1,596.00
465.93
397.00
1,547.52
0.00%
0.00%
0.00%
0.00%
499.92
160.22
1,200.00
1,200.00
644.52
57.80
5,009.20
1,749.60
2,580.00
900.00
580.07
2,873.24
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2.00
2,006.00
4,460.40
0.00%
0.00%
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES
TARRAJEO CON IMPERMEABILIZANTE DE MUROS
TARRAJEO CON IMPERMEABILIZANTE DE CIELO RASO
CARPINTERIA METALICA
ESCALERA DE TUBO FO. GALV. CON PARANTESDE 1 1/4" POR PELDAOS DE 3/4"
M2
M2
M2
M2
M
M3
M3
M2
M2
499.92
160.22
1,200.00
1,200.00
644.52
57.80
10.02
10.92
2.15
0.75
0.90
49.71
5,009.20
1,749.60
2,580.00
900.00
580.07
2,873.24
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PZA
PZA
1.00
2.00
2,006.00
2,230.20
2,006.00
4,460.40
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
MARCO Y TAPA DE PLANCHA LAC 1/4" CONMECANISMO DE SEGURIDAD DE 0,90 X 1,50 MSEGN DISEO
M
UND
UND
UND
16.60%
2.40%
S/.
S/.
S/.
S/.
8,395,455.12
1,393,645.55
201,490.92
9,990,591.59
S/.
9,990,591.59
100.00%
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
276,394.03
45,881.41
6,633.46
328,908.90
-
S/.
S/.
S/.
S/.
S/.
260,476.55
43,239.11
6,251.44
309,967.10
-
S/.
S/.
S/.
S/.
S/.
8,057,782.11
1,337,591.83
193,386.77
9,588,760.71
-
S/.
S/.
328,908.90
S/.
309,967.10
S/.
9,588,760.71
OBRA
: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA, PROVINCIA DE RIOJA - SAN MARTIN
: CONTRATO
Nro. 009 -DE
2011
- GRSM
- PEAM - 01.00
CONTRATO
: GOBIERNO
REGIONAL
SAN
MARTIN
ENTIDAD
: GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA : CONSORCIO ALIANZA
VALORIZACION DE OBRA N 02
CORRESPONDIENTE AL MES DE DICIEMBRE 2,011 (DEL 1/12/ AL 30/12/11)
PRESUPUESTO
Item
Descripcin
Und.
Metrado
P. U.
S/.
GLB
UND
UND
1.00
1.00
1.00
6,300.00
10,000.00
1,517.07
TRABAJOS PRELIMINARES
MOVILIZACION DE EQUIPO
TRANSPORTE DE MATERIALES DESDE LIMA A OBRA
GLB
GLB
1.00
1.00
92,783.68
871,298.25
OBRAS PROVISIONALES
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS P/OBRA
TRABAJOS PRELIMINARES
LIMPIEZA Y DESBROCE DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO INICIAL
Parcial
S/.
Metrado
UND
GLB
M2
M2
1.00
1.00
10,000.00
3,728.23
ACUMULADO ACTUAL
Parcial
S/.
Metrado
201,273.46
Metrado
Metrado
476,929.91
6,300.00
10,000.00
1,517.07
100.00%
100.00%
100.00%
0.80
0.19
1.00
5,040.00
1,900.00
1,517.07
0.10
0.23
0.00
630.00
2,300.00
0.00
0.90
0.42
1.00
5670.00
4200.00
1517.07
92,783.68
871,298.25
100.00%
100.00%
0.20
0.20
18,556.74
174,259.65
0.31
0.28
28,762.94
243,963.51
0.51
0.48
47319.68
418223.16
8,293.92
10,000.00
3,728.23
100.00%
100.00%
1.00
1.00
10,000.00
3,728.23
0.00
0.00
0.00
0.00
Parcial
S/.
275,656.45
81,241.41
504,969.09
0.10
0.58
0.00
0.49
0.52
58,351.01
1.00
1.00
Parcial
S/.
630.00
5,800.00
0.00
90.00%
42.00%
100.00%
45,464.00
453,075.09
51.00%
48.00%
22,890.40
10000.00
3728.23
0.00
0.00
0.00
0.00
100.00%
100.00%
67.68
27.99
25.16
12.96
2.69
2.16
67.68
27.99
100.00%
100.00%
25.16
12.96
67.68
27.99
0.00
0.00
0.00
0.00
25.16
12.96
0.00
0.00
0.00
0.00
100.00%
100.00%
4,027.20
4,027.27
1,006.80
241.63
1.00
2.16
4.04
5.15
17.86
297.14
8,698.75
16,270.17
5,185.02
4,315.51
297.14
100.00%
100.00%
100.00%
100.00%
100.00%
4,027.20
4,027.27
345.89
123.00
1.00
8,698.75
16,270.17
1,781.33
2,196.78
297.14
0.00
0.00
422.00
29.00
0.00
0.00
0.00
2,173.30
517.94
0.00
4,027.20
4,027.27
767.89
152.00
1.00
8698.75
16270.17
3954.63
2714.72
297.14
0.00
0.00
238.91
89.63
0.00
0.00
0.00
1,230.39
1,600.79
0.00
100.00%
100.00%
76.27%
62.91%
100.00%
1,507.18
2,184.14
370.95
0.00
0.00
0.00
0.00
0.00
0.00
7.20
12.58
20.77
1507.18
2184.14
370.95
0.00
0.00
0.00
100.00%
100.00%
100.00%
MOVIMIENTO DE TIERRAS
EXCAVACION EN ROCA SUELTA EN LECHO DE RIO
EXCAVACION P/ENCAUZAMIENTO DE RIO EN TERRENO EN ROCA SUELTA
ELIMINACION DE MATERIAL EXCEDENTE
M3
M3
M3K
7.20
12.58
20.77
209.33
173.62
17.86
1,507.18
2,184.14
370.95
100.00%
100.00%
100.00%
M3
9.96
293.85
2,926.75
100.00%
7.20
12.58
20.77
0.00
9.96
2,926.75
0.00
0.00
9.96
2926.75
0.00
0.00
0.00
0.00
0.00
0.00
M3
KG
2.67
134.36
411.63
5.30
1,099.05
712.11
100.00%
100.00%
0.00
0.00
0.00
0.00
0.60
37.56
246.98
199.07
0.60
37.56
246.98
199.07
2.07
96.80
852.07
513.04
22.47%
27.95%
MUROS Y PLACAS
CONCRETO F'C=245KG/CM2 PARA MUROS REFORZADOS (CEMENTO PI)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA MUROS REFORZADOS
ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS)
M3
M2
KG
3.05
30.29
346.36
445.91
50.90
5.33
1,360.03
1,541.76
1,846.10
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.43
12.45
31.98
191.74
633.71
170.45
0.43
12.45
31.98
191.74
633.71
170.45
2.62
17.84
314.38
1,168.28
908.06
1,675.65
14.10%
41.10%
9.23%
VIGAS
CONCRETO F'C=245KG/CM2 PARA VIGAS (CEMENTO PI)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES
ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)
M3
M2
KG
0.59
7.60
99.84
418.37
53.11
5.33
246.84
403.64
532.15
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.11
2.12
26.57
46.02
112.59
141.62
0.11
2.12
26.57
46.02
112.59
141.62
0.48
5.48
73.27
200.82
291.04
390.53
18.64%
27.89%
26.61%
LOSAS DE TECHO
CONCRETO F'C=245KG/CM2 PARA LOSAS MACIZAS
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS
ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)
M3
M2
KG
1.62
10.00
117.42
418.37
42.25
5.33
677.76
422.50
625.85
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.37
2.66
35.22
154.80
112.39
187.72
0.37
2.66
35.22
154.80
112.39
187.72
1.25
7.34
82.20
522.96
310.12
438.13
22.84%
26.60%
29.99%
M2
M2
M2
5.83
31.52
7.80
26.27
37.30
25.15
153.15
1,175.70
196.17
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.22
15.00
1.21
5.78
559.50
30.43
0.22
15.00
1.21
5.78
559.50
30.43
5.61
16.52
6.59
147.37
616.20
165.74
3.77%
47.59%
15.51%
PZA
UND
UND
M
GLB
2.00
1.00
1.00
10.00
1.00
354.00
119.92
150.00
358.93
4,138.85
708.00
119.92
150.00
3,589.30
4,138.85
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.66
0.30
0.30
0.30
0.22
233.64
35.98
45.00
107.68
910.55
0.66
0.30
0.30
0.30
0.22
233.64
35.98
45.00
107.68
910.55
1.34
0.70
0.70
9.70
0.78
474.36
83.94
105.00
3,481.62
3,228.30
33.00%
30.00%
30.00%
3.00%
22.00%
40.00
1.49
59.60
100.00%
0.00
0.00
25.00
37.25
25.00
37.25
15.00
22.35
62.50%
M
M
M
M
M3K
40.00
40.00
40.00
40.00
10.36
12.13
1.86
4.26
14.94
17.86
485.20
74.40
170.40
597.60
185.03
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
12.00
12.00
12.00
3.00
145.56
22.32
51.12
179.28
53.58
12.00
12.00
12.00
12.00
3.00
145.56
22.32
51.12
179.28
53.58
28.00
28.00
28.00
28.00
7.36
339.64
52.08
119.28
418.32
131.45
30.00%
30.00%
30.00%
30.00%
28.96%
M
M
40.00
40.00
99.15
3.31
3,966.00
132.40
100.00%
100.00%
0.00
0.00
0.00
0.00
9.00
9.00
892.35
29.79
9.00
9.00
892.35
29.79
40.00
7.31
292.40
100.00%
0.00
0.00
9.00
17,905.08
9.00
0.00
65.79
0.00
31.00
31.00
0.00
31.00
0.00
3,073.65
102.61
0.00
226.61
0.00
22.50%
22.50%
PRUEBAS
PRUEBA HIDRAULICA P/TUB. DE DESAGUE DN 400 - 450
M
M
306.00
306.00
1.49
1.07
455.94
327.42
100.00%
100.00%
0.00
0.00
0.00
0.00
168.00
168.00
250.32
179.76
168.00
168.00
250.32
179.76
138.00
138.00
205.62
147.66
54.90%
54.90%
M
M
M
M
M3K
306.00
306.00
306.00
306.00
39.51
9.93
1.60
4.00
16.48
17.86
3,038.58
489.60
1,224.00
5,042.88
705.65
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
78.00
78.00
78.00
78.00
23.00
774.54
124.80
312.00
1,285.44
410.78
78.00
78.00
78.00
78.00
23.00
774.54
124.80
312.00
1285.44
410.78
228.00
228.00
228.00
228.00
16.51
2,264.04
364.80
912.00
3,757.44
294.87
25.49%
25.49%
25.49%
25.49%
58.21%
M
M
306.00
306.00
110.14
5.41
33,702.84
1,655.46
100.00%
100.00%
0.00
0.00
0.00
0.00
56.00
56.00
6,167.84
302.96
56.00
56.00
6167.84
302.96
250.00
250.00
27,535.00
1,352.50
18.30%
18.30%
2.00
1.00
2.00
5.00
811.79
856.68
811.79
17.63
1,623.58
856.68
1,623.58
88.15
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
2.00
5.00
1,623.58
856.68
1,623.58
88.15
2.00
1.00
2.00
5.00
1623.58
856.68
1623.58
88.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
INSTALACIONES HIDRAULICAS
NIPLE DE HDPE DN 560, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m
COMPUERTA DE MADERA DE 0.50 X 1.10m E=2"
COMPUERTA DE MADERA DE 0.70 X 0.90m E=2"
TUBERIA HDPE DN 560mm
MONTAJE DE INSTALACIONES HIDRAULICAS DE CAPTACION
LINEA DE REBOSE
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIALES DEL PROYECTO
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 400 - 450de 1.01 a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 400 - 450 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 400 - 450 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 400 - 450 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE
981,899.00
OBRAS PROVISIONALES
CAMPAMENTO PROVISIONAL DE OBRA
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
CARTEL DE IDENTIFICACION DE OBRA
PRESENTE VALORIZACION
ACUMULADO ANTERIOR
Parcial
S/.
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIALES DEL PROYECTO
TRAZO Y REPLANTEO FINALES DE OBRA
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 315 - 350 de 1.00m a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 315 - 350 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 315 - 350 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 315 - 350 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE
SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4422
TUBERIA PVC-UF NTP ISO 4422 C-7.5 DN 350 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/AGUA POTABLE DN 315 - 350
61,279.00
UND
UND
UND
UND
UND
PRUEBAS
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 315 - 350
VARIOS
CONCRETO f'c=140 kg/cm2 P/ANCLAJE DE ACCESORIO DN 315 -350
UND
1.00
7,724.04
7,724.04
100.00%
0.00
0.00
0.45
3,475.82
0.45
3475.82
0.55
4,248.22
45.00%
6.70
2,050.20
100.00%
0.00
0.00
375.20
56.00
375.20
250.00
1,675.00
18.30%
5.00
134.08
670.40
100.00%
0.00
0.00
56.00
0.80
0.40
53.63
53.63
4.60
0.00
616.77
2,523,211.72
0.40
0.00
4,474,037.25
15,683.95
15,683.95
1.49
1.07
100.00%
100.00%
0.00
0.00
0.00
0.00
8,345.00
8,345.00
12,434.05
8,929.15
8,345.00
8,345.00
7,338.95
7,338.95
10,935.04
7,852.68
6,997,248.96
M
M
22.50%
306.00
65.79
100.00%
23,369.09
16,781.83
2,523,211.72
12434.05
8929.15
8.00%
53.21%
53.21%
04.01.03
04.01.04
04.02
04.02.01
04.02.02
04.02.04
04.02.11
04.03
04.03.01
04.03.02
04.04
04.04.01
04.04.02
04.05
04.05.01
04.05.02
04.05.03
04.05.04
04.05.05
04.06
04.06.01
04.06.02
04.06.03
04.06.04
04.07
04.07.01
04.08
04.08.01
04.08.02
04.08.03
04.09
04.09.01
04.09.01.01
04.09.01.02
04.09.02
04.09.02.01
04.09.02.02
04.09.02.03
04.10
04.10.01
GLB
GLB
1.00
1.00
1,026.16
1,758.99
1,026.16
1,758.99
100.00%
100.00%
0.00
0.00
0.00
0.00
0.30
0.30
307.85
527.70
0.30
0.30
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 500 - 600 de 1.51m a 2.00m PROF.
M
PERFILADO DE ZANJA PULSO P/INST. DE TUBERIA ADOSADA EN T-SEMIROCOSO DN 500 - 630, h=0.15m PROF.M
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 500 - 630 PARA TODA PROF.
M
ELIMINACION DE MATERIAL EXCEDENTE
M3K
12,870.86
686.14
12,870.86
9,722.19
21.83
2.46
2.20
17.86
280,970.87
1,687.90
28,315.89
173,638.31
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
362.00
198.00
362.00
3,875.00
7,902.46
487.08
796.40
69,207.50
362.00
198.00
362.00
3,875.00
M
M
12,870.86
12,870.86
250.29
24.08
3,221,447.55
309,930.31
100.00%
100.00%
0.00
0.00
5,987.00
5,987.00
1,498,486.23
144,166.96
M
M
307.85
527.70
0.70
0.70
718.31
1,231.29
30.00%
30.00%
7902.46
487.08
796.40
69207.50
12,508.86
488.14
12,508.86
5,847.19
273,068.41
1,200.82
27,519.49
104,430.81
2.81%
28.86%
2.81%
39.86%
5,987.00
5,987.00
1498486.23
144166.96
6,883.86
6,883.86
1,722,961.32
165,763.35
46.52%
46.52%
2,813.09
2,813.09
355.45
107.37
999,912.84
302,041.47
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
567.40
567.40
201,682.33
60,921.74
567.40
567.40
201682.33
60921.74
2,245.69
2,245.69
798,230.51
241,119.74
20.17%
20.17%
UND
UND
UND
UND
UND
24.00
29.00
24.00
1.00
78.00
2,473.28
2,768.28
3,240.28
3,476.99
84.67
59,358.72
80,280.12
77,766.72
3,476.99
6,604.26
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
7.00
5.00
1.00
35.00
12,366.40
19,377.96
16,201.40
3,476.99
2,963.45
5.00
7.00
5.00
1.00
35.00
12366.40
19377.96
16201.40
3476.99
2963.45
19.00
22.00
19.00
0.00
43.00
46,992.32
60,902.16
61,565.32
0.00
3,640.81
20.83%
24.14%
20.83%
100.00%
44.87%
UND
UND
UND
UND
17.00
16.00
9.00
42.00
5,923.13
5,923.13
5,922.42
751.69
100,693.21
94,770.08
53,301.78
31,570.98
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
6.00
3.00
2.00
17,769.39
35,538.78
17,767.26
1,503.38
3.00
6.00
3.00
2.00
17769.39
35538.78
17767.26
1503.38
UND
5.00
2,124.00
10,620.00
100.00%
0.00
0.00
1.00
2,124.00
1.00
2124.00
82,923.82
59,231.30
35,534.52
30,067.60
0.00
8,496.00
17.65%
37.50%
33.33%
4.76%
14.00
10.00
6.00
40.00
0.00
4.00
UND
UND
UND
25.00
6.00
18.00
17,845.79
19,369.09
18,050.79
446,144.75
116,214.54
324,914.22
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
11.00
2.00
7.00
196,303.69
38,738.18
126,355.53
11.00
2.00
7.00
196303.69
38738.18
126355.53
14.00
4.00
11.00
249,841.06
77,476.36
198,558.69
44.00%
33.33%
38.89%
PROTECCION DE TUBERIAS
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.
M
M
159.00
106.00
22.79
72.22
3,623.61
7,655.32
100.00%
100.00%
0.00
0.00
0.00
0.00
56.00
42.00
1,276.24
3,033.24
56.00
42.00
1276.24
3033.24
103.00
64.00
2,347.37
4,622.08
35.22%
39.62%
CONCRETO ARMADO
CONCRETO F'C 210 KG/CM2 PARA ESTRUCTURAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA ESTRUCTURAS
ACERO ESTRUC. TRABAJADO PARA ESTRUCTURAS (COSTO PROM. INCL. DESPERDICIOS)
M3
M2
KG
71.58
212.12
5,626.10
377.36
43.78
5.36
27,011.43
9,286.61
30,155.90
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
24.00
45.00
765.00
9,056.64
1,970.10
4,100.40
24.00
45.00
765.00
9056.64
1970.10
4100.40
47.58
167.12
4,861.10
17,954.79
7,316.51
26,055.50
33.53%
21.21%
13.60%
PRUEBAS
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 500 - 630
15,683.95
9.75
152,918.51
100.00%
0.00
0.00
763.00
0.00
7,439.25
763.00
0.00
7439.25
14,920.95
0.00
145,479.26
4.86%
247,995.86
273,786.75
727.43
25,790.91
20.00%
M2
301.72
2.16
651.72
100.00%
301.72
651.72
0.00
0.00
301.72
651.72
0.00
0.00
100.00%
M2
1,666.00
2.69
4,481.54
100.00%
1,666.00
4,481.54
0.00
0.00
1,666.00
4481.54
0.00
0.00
100.00%
0.00
0.00
0.00
0.00
0.00
M3
145.11
4.49
651.54
100.00%
145.11
651.54
0.00
0.00
145.11
651.54
0.00
0.00
100.00%
M3
M2
M3
M3K
116.11
260.16
326.65
326.65
38.04
1.36
5.42
17.86
4,416.82
353.82
1,770.44
5,833.97
100.00%
100.00%
100.00%
100.00%
116.11
260.16
326.65
326.65
4,416.82
353.82
1,770.44
5,833.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
116.11
260.16
326.65
326.65
4416.82
353.82
1770.44
5833.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
M2
M2
66.03
66.03
2.16
2.69
142.62
177.62
100.00%
100.00%
66.03
66.03
142.62
177.62
0.00
0.00
0.00
0.00
66.03
66.03
142.62
177.62
0.00
0.00
0.00
0.00
100.00%
100.00%
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN TERRENO NORMAL A MAQUINA
EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS
REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL
RETIRO + ACOMODO DE DESMONTE EN ZONA ALEDAA C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE
M3
M3
M2
M3
M3K
44.86
19.47
66.03
53.83
53.83
4.49
38.04
1.36
5.42
17.86
201.42
740.64
89.80
291.76
961.40
100.00%
100.00%
100.00%
100.00%
100.00%
44.86
19.47
66.03
53.83
53.83
201.42
740.64
89.80
291.76
961.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.86
19.47
66.03
53.83
53.83
201.42
740.64
89.80
291.76
961.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
M3
M3
M2
M2
11.48
2.63
22.46
66.03
198.75
221.07
34.48
25.45
2,281.65
581.41
774.42
1,680.46
100.00%
100.00%
100.00%
100.00%
6.35
2.63
22.46
66.03
1,262.06
581.41
774.42
1,680.46
3.66
0.00
0.00
0.00
727.43
0.00
0.00
0.00
10.01
2.63
22.46
66.03
1989.49
581.41
774.42
1680.46
1.47
0.00
0.00
0.00
292.16
0.00
0.00
0.00
87.20%
100.00%
100.00%
100.00%
M3
KG
4.36
91.20
354.74
5.30
1,546.67
483.36
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.36
91.20
1,546.67
483.36
0.00%
0.00%
COLUMNAS
CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA COLUMNAS
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS
M3
M2
KG
1.66
13.46
368.93
420.33
45.63
5.33
697.75
614.18
1,966.40
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.66
13.46
368.93
697.75
614.18
1,966.40
0.00%
0.00%
0.00%
VIGAS
CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I)
ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES
M3
KG
M2
3.55
22.54
468.47
392.79
5.33
53.11
1,394.40
120.14
24,880.44
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.55
22.54
468.47
1,394.40
120.14
24,880.44
0.00%
0.00%
0.00%
LOSAS MACIZAS
CONCRETO F'C 210 KG/CM2 PARA LOSAS MACIZAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS
ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)
M3
M2
KG
9.90
66.00
467.91
392.80
42.25
5.33
3,888.72
2,788.50
2,493.96
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.90
66.00
467.91
3,888.72
2,788.50
2,493.96
0.00%
0.00%
0.00%
M3
M2
KG
0.47
4.38
52.01
372.39
31.30
5.33
175.02
137.09
277.21
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.47
4.38
52.01
175.02
137.09
277.21
0.00%
0.00%
0.00%
1.00
4,814.99
4,814.99
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
UND
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CAJAS DE DISTRIBUCION
CAJA REBOSE-PURGA TERRENO NORMAL INC. ELIMINACION DESMONTE
0.00
0.00
0.00
0.00
1.00
4,814.99
0.00%
INSTALACIONES HIDRAULICAS
TUBERIAS
TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 350
TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 400
TUBERIA PVC-UF NTP ISO 4435 S-25 DN 400
M
M
M
32.53
19.00
6.00
666.08
790.05
79.46
21,667.58
15,010.95
476.76
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.53
19.00
6.00
21,667.58
15,010.95
476.76
0.00%
0.00%
0.00%
VALVULAS
VALVULA DE CPTA. BB. Ho. DUCTIL DN 350mm ISO 5996
VALVULA DE CPTA. BB. Ho. DUCTIL DN 400mm ISO 5996
UND
UND
3.00
2.00
4,484.00
7,074.10
13,452.00
14,148.20
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
2.00
13,452.00
14,148.20
0.00%
0.00%
ACCESORIOS
CODO 22.5 HIERRO DUCTIL BRIDADO DN 350
CODO 45 HIERRO DCTIL BRIDADO DN 350
CODO 45 HIERRO DCTIL BRIDADO DN 400
CODO 90 HIERRO DCTIL BRIDADO DN 350
CODO 90 HIERRO DCTIL BRIDADO DN 400
TEE Ho DUCTIL BRIDADO DN 350x350
TEE Ho DUCTIL BRIDADO DN 400x400
REDUCCION Ho DUCTIL BRIDADO DN 400x350mm
CANASTILLA DE ACERO INOXIDABLE BRIDADA DN 16" (400mm)
UND
UND
UND
UND
UND
UND
UND
UND
UND
1.00
3.00
2.00
3.00
1.00
1.00
2.00
1.00
1.00
885.00
1,416.00
1,810.12
1,622.50
2,129.90
2,586.56
3,262.70
1,871.72
2,596.00
885.00
4,248.00
3,620.24
4,867.50
2,129.90
2,586.56
6,525.40
1,871.72
2,596.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
3.00
2.00
3.00
1.00
1.00
2.00
1.00
1.00
885.00
4,248.00
3,620.24
4,867.50
2,129.90
2,586.56
6,525.40
1,871.72
2,596.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
UND
1.00
861.40
861.40
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
861.40
0.00%
05.02.03.03.11
05.02.03.04
05.02.03.04.01
05.02.03.04.02
05.02.03.04.03
05.02.03.04.04
05.02.03.05
05.02.03.05.01
05.02.03.05.02
05.02.03.05.03
05.02.03.05.04
05.02.03.05.05
05.02.03.05.06
05.02.03.06
05.02.03.06.01
05.02.03.07
05.02.03.07.01
05.02.03.07.02
05.02.03.07.03
05.02.03
05.02.03.01
05.02.03.01.01
05.02.03.01.02
05.02.03.01.03
05.02.02.02
05.02.02.02.01
05.02.02.02.02
05.02.02.02.03
05.02.02.02.04
05.02.02.03
05.02.02.03.01
05.02.02.03.02
05.02.02.03.03
05.02.02.03.04
05.02.02.03.05
05.02.02.03.06
05.02.02.04
05.02.02.04.01
05.02.02.04.02
UND
1.00
896.80
896.80
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
896.80
0.00%
UND
UND
UND
UND
2.00
1.00
1.00
1.00
590.00
655.25
2,596.00
3,219.75
1,180.00
655.25
2,596.00
3,219.75
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
1.00
1.00
1,180.00
655.25
2,596.00
3,219.75
0.00%
0.00%
0.00%
0.00%
UND
UND
UND
UND
UND
UND
27.00
25.00
432.00
400.00
27.00
25.00
247.80
589.41
9.44
14.75
25.96
34.22
6,690.60
14,735.25
4,078.08
5,900.00
700.92
855.50
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
25.00
432.00
400.00
27.00
25.00
6,690.60
14,735.25
4,078.08
5,900.00
700.92
855.50
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
MEDIDORES
MEDIDOR DE CAUDAL ELECTROMAGNETICO BRIDADO DE 16"
UND
1.00
12,614.20
12,614.20
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
12,614.20
0.00%
VARIOS
REJILLA SUMIDERO 1.40 X 1.40, PLATINA 1 1/4" X 1/4" @ 1/2" Y MARCO "L" 1 1/4"
CONCRETO F'C 175 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)
MONTAJE DE INSTALACIONES HIDRAULICAS DE RESERVORIO
UND
M3
GLB
1.00
4.60
1.00
88.50
346.38
4,140.51
88.50
1,593.35
4,140.51
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
4.60
1.00
88.50
1,593.35
4,140.51
0.00%
0.00%
0.00%
226.98
309.76
107.78
26.27
37.30
45.01
5,962.76
11,554.05
4,851.18
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
226.98
309.76
107.78
5,962.76
11,554.05
4,851.18
0.00%
0.00%
0.00%
6.67
1.00
4.00
6.00
239.28
465.93
99.25
257.92
1,596.00
465.93
397.00
1,547.52
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.67
1.00
4.00
6.00
1,596.00
465.93
397.00
1,547.52
0.00%
0.00%
0.00%
0.00%
499.92
160.22
1,200.00
1,200.00
644.52
57.80
5,009.20
1,749.60
2,580.00
900.00
580.07
2,873.24
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2.00
2,006.00
4,460.40
0.00%
0.00%
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES
TARRAJEO CON IMPERMEABILIZANTE DE MUROS
TARRAJEO CON IMPERMEABILIZANTE DE CIELO RASO
CARPINTERIA METALICA
ESCALERA DE TUBO FO. GALV. CON PARANTESDE 1 1/4" POR PELDAOS DE 3/4"
M2
M2
M2
M2
M
M3
M3
M2
M2
499.92
160.22
1,200.00
1,200.00
644.52
57.80
10.02
10.92
2.15
0.75
0.90
49.71
5,009.20
1,749.60
2,580.00
900.00
580.07
2,873.24
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PZA
PZA
1.00
2.00
2,006.00
2,230.20
2,006.00
4,460.40
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
MARCO Y TAPA DE PLANCHA LAC 1/4" CONMECANISMO DE SEGURIDAD DE 0,90 X 1,50 MSEGN DISEO
M
UND
UND
UND
16.60%
2.40%
S/.
S/.
S/.
S/.
S/.
8,395,455.12
1,393,645.55
201,490.92
9,990,591.59
-
S/.
9,990,591.59
100.00%
S/.
S/.
S/.
S/.
S/.
201,273.46
33,411.39
4,830.56
239,515.41
-
S/.
S/.
S/.
S/.
S/.
2,825,794.59
469,081.90
67,819.07
3,362,695.56
-
S/.
S/.
S/.
S/.
S/.
3,085,543.72
512,200.26
74,053.05
3,671,797.03
-
S/.
S/.
S/.
S/.
S/.
5,249,892.60
871,482.17
125,997.42
6,247,372.19
-
S/.
239,515.41
S/.
3,362,695.56
S/.
3,671,797.03
S/.
6,247,372.19
OBRA
: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA, PROVINCIA DE RIOJA - SAN MARTIN
Nro.REGIONAL
009 - 2011 DE
- GRSM
PEAM - 01.00
CONTRATO : CONTRATO
: GOBIERNO
SAN -MARTIN
ENTIDAD
: GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA : CONSORCIO ALIANZA
VALORIZACION DE OBRA N 02
Descripcin
Und.
Metrado
P. U.
S/.
Parcial
S/.
PRESENTE VALORIZACION
ACUMULADO ANTERIOR
Parcial
S/.
Metrado
981,899.00
Metrado
476,929.91
ACUMULADO ACTUAL
Parcial
S/.
Metrado
Parcial
S/.
504,969.09
Metrado
981,899.00
Parcial
S/.
0.00
GLB
UND
1.00
1.00
6,300.00
10,000.00
6,300.00
10,000.00
100.00%
100.00%
0.90
0.42
5,670.00
4,200.00
0.10
0.58
630.00
5,800.00
1.00
1.00
6300.00
10000.00
0.00
0.00
0.00
0.00
100.00%
100.00%
UND
1.00
1,517.07
1,517.07
100.00%
1.00
1,517.07
0.00
0.00
1.00
1517.07
0.00
0.00
100.00%
GLB
GLB
1.00
1.00
92,783.68
871,298.25
92,783.68
871,298.25
100.00%
100.00%
0.51
0.48
47,319.68
418,223.16
0.49
0.52
45,464.00
453,075.09
1.00
1.00
92783.68
871298.25
0.00
0.00
0.00
0.00
100.00%
100.00%
81,241.41
22,890.40
81,241.41
0.00
UND
1.00
10,000.00
10,000.00
100.00%
1.00
10,000.00
0.00
0.00
1.00
10000.00
0.00
0.00
100.00%
GLB
1.00
3,728.23
3,728.23
100.00%
1.00
3,728.23
0.00
0.00
1.00
3728.23
0.00
0.00
100.00%
M2
25.16
2.69
67.68
100.00%
25.16
67.68
0.00
0.00
25.16
67.68
0.00
0.00
100.00%
M2
12.96
2.16
27.99
100.00%
12.96
27.99
0.00
0.00
12.96
27.99
0.00
0.00
100.00%
M2
M2
4,027.20
4,027.27
2.16
4.04
8,698.75
16,270.17
100.00%
100.00%
4,027.20
4,027.27
8,698.75
16,270.17
0.00
0.00
0.00
0.00
4,027.20
4,027.27
8698.75
16270.17
0.00
0.00
0.00
0.00
100.00%
100.00%
02.03.03 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO (CANTERA UBICADA A MENOS DE 100 METROS)
02.03.04 ELIMINACION DE MATERIAL EXCEDENTE
M3
M3K
1,006.80
241.63
5.15
17.86
5,185.02
4,315.51
100.00%
100.00%
767.89
152.00
3,954.63
2,714.72
238.91
89.63
1,230.39
1,600.79
1,006.80
241.63
5185.02
4315.51
0.00
0.00
0.00
0.00
100.00%
100.00%
UND
1.00
297.14
297.14
100.00%
1.00
297.14
0.00
0.00
1.00
297.14
0.00
0.00
100.00%
M3
7.20
209.33
1,507.18
100.00%
7.20
1,507.18
0.00
0.00
7.20
1507.18
0.00
0.00
100.00%
M3
12.58
173.62
2,184.14
100.00%
12.58
2,184.14
0.00
0.00
12.58
2184.14
0.00
0.00
100.00%
M3K
20.77
17.86
370.95
100.00%
20.77
370.95
0.00
0.00
20.77
370.95
0.00
0.00
100.00%
100.00%
M3
9.96
293.85
2,926.75
100.00%
9.96
2,926.75
0.00
0.00
9.96
2926.75
0.00
0.00
0.00
M3
KG
2.67
134.36
411.63
5.30
1,099.05
712.11
100.00%
100.00%
0.60
37.56
246.98
199.07
2.07
96.80
852.07
513.04
2.67
134.36
1099.05
712.11
0.00
0.00
0.00
0.00
100.00%
100.00%
M3
M2
KG
3.05
30.29
346.36
445.91
50.90
5.33
1,360.03
1,541.76
1,846.10
100.00%
100.00%
100.00%
0.43
12.45
31.98
191.74
633.71
170.45
2.62
17.84
314.38
1,168.28
908.06
1,675.65
3.05
30.29
346.36
1360.03
1541.76
1846.10
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
M3
M2
KG
0.59
7.60
99.84
418.37
53.11
5.33
246.84
403.64
532.15
100.00%
100.00%
100.00%
0.11
2.12
26.57
46.02
112.59
141.62
0.48
5.48
73.27
200.82
291.04
390.53
0.59
7.60
99.84
246.84
403.64
532.15
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
M3
M2
KG
1.62
10.00
117.42
418.37
42.25
5.33
677.76
422.50
625.85
100.00%
100.00%
100.00%
0.37
2.66
35.22
154.80
112.39
187.72
1.25
7.34
82.20
522.96
310.12
438.13
1.62
10.00
117.42
677.76
422.50
625.85
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
M2
M2
M2
5.83
31.52
7.80
26.27
37.30
25.15
153.15
1,175.70
196.17
100.00%
100.00%
100.00%
0.22
15.00
1.21
5.78
559.50
30.43
5.61
16.52
6.59
147.37
616.20
165.74
5.83
31.52
7.80
153.15
1175.70
196.17
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
PZA
UND
2.00
1.00
354.00
119.92
708.00
119.92
100.00%
100.00%
0.66
0.30
233.64
35.98
1.34
0.70
474.36
83.94
2.00
1.00
708.00
119.92
0.00
0.00
0.00
0.00
100.00%
100.00%
UND
M
GLB
1.00
10.00
1.00
150.00
358.93
4,138.85
150.00
3,589.30
4,138.85
100.00%
100.00%
100.00%
0.30
0.30
0.22
45.00
107.68
910.55
0.70
9.70
0.78
105.00
3,481.62
3,228.30
1.00
10.00
1.00
150.00
3589.30
4138.85
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
40.00
1.49
59.60
100.00%
25.00
37.25
40.00
59.60
0.00
0.00
100.00%
40.00
40.00
40.00
40.00
10.36
12.13
1.86
4.26
14.94
17.86
485.20
74.40
170.40
597.60
185.03
100.00%
100.00%
100.00%
100.00%
100.00%
12.00
12.00
12.00
12.00
3.00
145.56
22.32
51.12
179.28
53.58
15.00
0.00
28.00
28.00
28.00
28.00
7.36
22.35
M
M
M
M
M3K
339.64
52.08
119.28
418.32
131.45
40.00
40.00
40.00
40.00
10.36
485.20
74.40
170.40
597.60
185.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
M
M
40.00
40.00
99.15
3.31
3,966.00
132.40
100.00%
100.00%
9.00
9.00
892.35
29.79
31.00
31.00
3,073.65
102.61
40.00
40.00
3966.00
132.40
0.00
0.00
0.00
0.00
100.00%
100.00%
65.79
0.00
31.00
0.00
0.00
0.00
100.00%
INSTALACIONES HIDRAULICAS
NIPLE DE HDPE DN 560, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m
COMPUERTA DE MADERA DE 0.50 X 1.10m E=2"
LINEA DE REBOSE
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIALES DEL PROYECTO
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 400 - 450de 1.01 a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 400 - 450 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 400 - 450 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 400 - 450 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE
SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4435
TUBERIA PVC-UF NTP ISO 4435 S-25 DN 450 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/DESAGUE DN 400 - 450
02.09.04 PRUEBAS
02.09.04.01 PRUEBA HIDRAULICA P/TUB. DE DESAGUE DN 400 - 450
40.00
7.31
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 315 - 350 de 1.00m a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 315 - 350 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 315 - 350 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 315 - 350 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE
SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4422
TUBERIA PVC-UF NTP ISO 4422 C-7.5 DN 350 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/AGUA POTABLE DN 315 - 350
SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF ISO 4422
CODO 11.25 PVC-UF DN 350
CODO 90 PVC-UF DN 350
292.40
100.00%
9.00
61,279.00
43,373.92
40.00
0.00
292.40
0.00
0.00
0.00
0.00
226.61
M
M
306.00
306.00
1.49
1.07
455.94
327.42
100.00%
100.00%
168.00
168.00
250.32
179.76
138.00
138.00
205.62
147.66
306.00
306.00
455.94
327.42
0.00
0.00
0.00
0.00
100.00%
100.00%
M
M
M
M
M3K
306.00
306.00
306.00
306.00
39.51
9.93
1.60
4.00
16.48
17.86
3,038.58
489.60
1,224.00
5,042.88
705.65
100.00%
100.00%
100.00%
100.00%
100.00%
78.00
78.00
78.00
78.00
23.00
774.54
124.80
312.00
1,285.44
410.78
228.00
228.00
228.00
228.00
16.51
2,264.04
364.80
912.00
3,757.44
294.87
306.00
306.00
306.00
306.00
39.51
3038.58
489.60
1224.00
5042.88
705.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
M
M
306.00
306.00
110.14
5.41
33,702.84
1,655.46
100.00%
100.00%
56.00
56.00
6,167.84
302.96
250.00
250.00
27,535.00
1,352.50
306.00
306.00
33702.84
1655.46
0.00
0.00
0.00
0.00
100.00%
100.00%
UND
UND
2.00
1.00
811.79
856.68
1,623.58
856.68
100.00%
100.00%
2.00
1.00
1,623.58
856.68
0.00
0.00
0.00
0.00
2.00
1.00
1623.58
856.68
0.00
0.00
0.00
0.00
100.00%
100.00%
UND
UND
2.00
5.00
811.79
17.63
1,623.58
88.15
100.00%
100.00%
2.00
5.00
1,623.58
88.15
0.00
0.00
0.00
0.00
2.00
5.00
1623.58
88.15
0.00
0.00
0.00
0.00
100.00%
100.00%
UND
1.00
7,724.04
7,724.04
100.00%
0.45
3,475.82
0.55
4,248.22
1.00
7724.04
0.00
0.00
100.00%
03.07 VARIOS
03.07.01 CONCRETO f'c=140 kg/cm2 P/ANCLAJE DE ACCESORIO DN 315 -350
UND
306.00
6.70
2,050.20
100.00%
56.00
375.20
250.00
1,675.00
306.00
2050.20
0.00
0.00
100.00%
5.00
134.08
670.40
100.00%
0.40
53.63
4.60
616.77
670.40
0.00
0.00
0.00
100.00%
4,474,037.25
5.00
0.00
0.00
15,683.95
1.49
23,369.09
100.00%
8,345.00
12,434.05
7,338.95
10,935.04
15,683.95
23369.09
0.00
0.00
100.00%
M
GLB
GLB
15,683.95
1.00
1.00
1.07
1,026.16
1,758.99
16,781.83
1,026.16
1,758.99
100.00%
100.00%
100.00%
8,345.00
0.30
0.30
8,929.15
307.85
527.70
7,338.95
0.70
0.70
7,852.68
718.31
1,231.29
15,683.95
1.00
1.00
16781.83
1026.16
1758.99
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
12,870.86
21.83
7,902.46
12,508.86
273,068.41
12,870.86
280970.87
6,997,248.96
280,970.87
100.00%
0.00
0.00
100.00%
686.14
2.46
1,687.90
100.00%
198.00
487.08
488.14
1,200.82
686.14
1687.90
0.00
0.00
100.00%
M
M3K
12,870.86
9,722.19
2.20
17.86
28,315.89
173,638.31
100.00%
100.00%
362.00
3,875.00
796.40
69,207.50
12,508.86
5,847.19
27,519.49
104,430.81
12,870.86
9,722.19
28315.89
173638.31
0.00
0.00
0.00
0.00
100.00%
100.00%
362.00
6,997,248.97
12,870.86
250.29
3,221,447.55
100.00%
5,987.00
1,498,486.23
6,883.86
1,722,961.32
12,870.86
3221447.55
0.00
0.00
100.00%
12,870.86
24.08
309,930.31
100.00%
5,987.00
144,166.96
6,883.86
165,763.35
12,870.86
309930.31
0.00
0.00
100.00%
M
M
2,813.09
2,813.09
355.45
107.37
999,912.84
302,041.47
100.00%
100.00%
567.40
567.40
201,682.33
60,921.74
2,245.69
2,245.69
798,230.51
241,119.74
2,813.09
2,813.09
999912.84
302041.47
0.00
0.00
0.00
0.00
100.00%
100.00%
UND
24.00
2,473.28
59,358.72
100.00%
5.00
12,366.40
19.00
46,992.32
24.00
59358.72
0.00
0.00
100.00%
UND
29.00
2,768.28
80,280.12
100.00%
7.00
19,377.96
22.00
60,902.16
29.00
80280.12
0.00
0.00
100.00%
UND
UND
24.00
1.00
3,240.28
3,476.99
77,766.72
3,476.99
100.00%
100.00%
5.00
1.00
16,201.40
3,476.99
19.00
0.00
61,565.32
0.00
24.00
1.00
77766.72
3476.99
0.00
0.00
0.00
0.00
100.00%
100.00%
UND
78.00
84.67
6,604.26
100.00%
35.00
2,963.45
43.00
3,640.81
78.00
6604.26
0.00
0.00
100.00%
UND
UND
17.00
16.00
5,923.13
5,923.13
100,693.21
94,770.08
100.00%
100.00%
3.00
6.00
17,769.39
35,538.78
14.00
10.00
82,923.82
59,231.30
17.00
16.00
100693.21
94770.08
0.00
0.00
0.00
0.00
100.00%
100.00%
UND
UND
9.00
42.00
5,922.42
751.69
53,301.78
31,570.98
100.00%
100.00%
3.00
2.00
17,767.26
1,503.38
6.00
40.00
35,534.52
30,067.60
9.00
42.00
53301.78
31570.98
0.00
0.00
0.00
0.00
100.00%
100.00%
0.00
0.00
UND
5.00
2,124.00
10,620.00
100.00%
1.00
2,124.00
4.00
8,496.00
5.00
10620.00
0.00
0.00
100.00%
UND
25.00
17,845.79
446,144.75
100.00%
11.00
196,303.69
14.00
249,841.06
25.00
446144.75
0.00
0.00
100.00%
UND
6.00
19,369.09
116,214.54
100.00%
2.00
38,738.18
4.00
77,476.36
6.00
116214.54
0.00
0.00
100.00%
UND
18.00
18,050.79
324,914.22
100.00%
7.00
126,355.53
11.00
198,558.69
18.00
324914.22
0.00
0.00
100.00%
M
M
159.00
106.00
22.79
72.22
3,623.61
7,655.32
100.00%
100.00%
56.00
42.00
1,276.24
3,033.24
103.00
64.00
2,347.37
4,622.08
159.00
106.00
3623.61
7655.32
0.00
0.00
0.00
0.00
100.00%
100.00%
M3
M2
KG
71.58
212.12
5,626.10
377.36
43.78
5.36
27,011.43
9,286.61
30,155.90
100.00%
100.00%
100.00%
24.00
45.00
765.00
9,056.64
1,970.10
4,100.40
47.58
167.12
4,861.10
17,954.79
7,316.51
26,055.50
71.58
212.12
5,626.10
27011.43
9286.61
30155.90
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
15,683.95
9.75
152,918.51
100.00%
763.00
7,439.25
14,920.95
145,479.26
15,683.95
0.00
152918.51
0.00
0.00
0.00
100.00%
173,246.98
05.02.01.04.01.01
05.02.01.04.01.02
05.02.01.04.02
05.02.01.04.02.01
05.02.01.04.02.02
05.02.01.04.02.03
05.02.01.04.03
05.02.01.04.03.01
05.02.01.04.03.02
05.02.01.04.03.03
05.02.01.04.04
05.02.01.04.04.01
05.02.01.04.04.02
05.02.01.04.04.03
05.02.01.04.05
05.02.01.04.05.01
05.02.01.04.05.02
05.02.01.04.05.03
74,748.88
100,539.79
M2
301.72
2.16
651.72
100.00%
301.72
651.72
0.00
0.00
301.72
651.72
0.00
0.00
100.00%
M2
1,666.00
2.69
4,481.54
100.00%
1,666.00
4,481.54
0.00
M3
M3
M2
M3
M3K
145.11
116.11
260.16
326.65
326.65
4.49
38.04
1.36
5.42
17.86
651.54
4,416.82
353.82
1,770.44
5,833.97
100.00%
100.00%
100.00%
100.00%
100.00%
145.11
116.11
260.16
326.65
326.65
651.54
4,416.82
353.82
1,770.44
5,833.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,666.00
0.00
145.11
116.11
260.16
326.65
326.65
4481.54
0.00
651.54
4416.82
353.82
1770.44
5833.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN TERRENO NORMAL A MAQUINA
EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS
REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL
RETIRO + ACOMODO DE DESMONTE EN ZONA ALEDAA C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE
M2
M2
66.03
66.03
2.16
2.69
142.62
177.62
100.00%
100.00%
66.03
66.03
142.62
177.62
0.00
0.00
0.00
0.00
66.03
66.03
142.62
177.62
0.00
0.00
0.00
0.00
100.00%
100.00%
M3
M3
M2
M3
M3K
44.86
19.47
66.03
53.83
53.83
4.49
38.04
1.36
5.42
17.86
201.42
740.64
89.80
291.76
961.40
100.00%
100.00%
100.00%
100.00%
100.00%
44.86
19.47
66.03
53.83
53.83
201.42
740.64
89.80
291.76
961.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.86
19.47
66.03
53.83
53.83
201.42
740.64
89.80
291.76
961.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
M3
M3
M2
M2
11.48
2.63
22.46
66.03
198.75
221.07
34.48
25.45
2,281.65
581.41
774.42
1,680.46
100.00%
100.00%
100.00%
100.00%
10.01
2.63
22.46
66.03
1,989.49
581.41
774.42
1,680.46
1.47
0.00
0.00
0.00
292.16
0.00
0.00
0.00
11.48
2.63
22.46
66.03
2281.65
581.41
774.42
1680.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00%
100.00%
100.00%
100.00%
M3
KG
4.36
91.20
354.74
5.30
1,546.67
483.36
100.00%
100.00%
2.10
45.00
744.95
238.50
2.26
46.20
801.71
244.86
48.17%
49.34%
1.66
13.46
368.93
420.33
45.63
5.33
697.75
614.18
1,966.40
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
744.95
238.50
M3
M2
KG
0.00
0.00
0.00
0.00
0.00
0.00
2.10
45.00
COLUMNAS
CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA COLUMNAS
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS
0.87
7.22
265.00
365.69
329.45
1,412.45
0.87
7.22
265.00
365.69
329.45
1412.45
0.79
6.24
103.93
332.06
284.73
553.95
52.41%
53.64%
71.83%
VIGAS
CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I)
ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES
M3
KG
M2
3.55
22.54
468.47
392.79
5.33
53.11
1,394.40
120.14
24,880.44
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.20
14.66
259.00
471.35
78.14
13,755.49
1.20
14.66
259.00
471.35
78.14
13755.49
2.35
7.88
209.47
923.06
42.00
11,124.95
33.80%
65.04%
55.29%
LOSAS MACIZAS
CONCRETO F'C 210 KG/CM2 PARA LOSAS MACIZAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS
ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)
M3
M2
KG
9.90
66.00
467.91
392.80
42.25
5.33
3,888.72
2,788.50
2,493.96
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
4.87
43.00
258.44
1,912.94
1,816.75
1,377.49
4.87
43.00
258.44
1912.94
1816.75
1377.49
5.03
23.00
209.47
1,975.78
971.75
1,116.48
49.19%
65.15%
55.23%
M3
M2
KG
0.47
4.38
52.01
372.39
31.30
5.33
175.02
137.09
277.21
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.22
2.45
35.09
81.93
76.69
187.03
0.22
2.45
35.09
81.93
76.69
187.03
0.25
1.93
16.92
93.10
60.41
90.18
46.81%
55.94%
67.47%
0.00
0.00
0.50
2,407.50
0.50
2407.50
0.50
2,407.50
50.00%
0.00
13.33
8,878.85
13.33
8878.85
19.20
12,788.74
40.98%
273,786.75
UND
1.00
4,814.99
4,814.99
100.00%
0.00
0.00
32.53
666.08
21,667.58
100.00%
0.00
100.00%
100.00%
100.00%
100.00%
100.00%
19.00
790.05
15,010.95
100.00%
0.00
0.00
12.11
9,567.51
12.11
9567.51
6.89
5,443.44
63.74%
6.00
79.46
476.76
100.00%
230.43
2.90
230.43
3.10
246.33
48.33%
3.00
4,484.00
13,452.00
100.00%
0.00
0.00
0.00
2.90
UND
0.00
0.00
0.00
1.00
4,484.00
1.00
4484.00
2.00
8,968.00
33.33%
UND
2.00
7,074.10
14,148.20
100.00%
0.00
0.00
1.00
7,074.10
1.00
7074.10
1.00
7,074.10
50.00%
UND
UND
UND
1.00
3.00
2.00
885.00
1,416.00
1,810.12
885.00
4,248.00
3,620.24
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
3.00
2.00
885.00
4,248.00
3,620.24
0.00%
0.00%
0.00%
UND
3.00
1,622.50
4,867.50
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
3.00
4,867.50
0.00%
UND
1.00
2,129.90
2,129.90
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2,129.90
0.00%
UND
1.00
2,586.56
2,586.56
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2,586.56
0.00%
UND
UND
UND
2.00
1.00
1.00
3,262.70
1,871.72
2,596.00
6,525.40
1,871.72
2,596.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
1.00
6,525.40
1,871.72
2,596.00
0.00%
0.00%
0.00%
UND
1.00
861.40
861.40
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
861.40
0.00%
UND
1.00
896.80
896.80
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
896.80
0.00%
UND
UND
2.00
1.00
590.00
655.25
1,180.00
655.25
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
1,180.00
655.25
0.00%
0.00%
UND
1.00
2,596.00
2,596.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2,596.00
0.00%
05.02.03.04.04 UNION FLEXIBLE AUTOPORTANTE SIMILAR SMIT BLAIR DN 16" (400 MM)
UND
1.00
3,219.75
3,219.75
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
3,219.75
0.00%
UND
UND
27.00
25.00
247.80
589.41
6,690.60
14,735.25
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
25.00
6,690.60
14,735.25
0.00%
0.00%
05.02.03.05.03 PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 14" (350MM)
UND
432.00
9.44
4,078.08
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
432.00
4,078.08
0.00%
05.02.03.05.04 PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 16" (400MM)
UND
400.00
14.75
5,900.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
400.00
5,900.00
0.00%
UND
UND
27.00
25.00
25.96
34.22
700.92
855.50
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27.00
25.00
700.92
855.50
0.00%
0.00%
05.02.03.06 MEDIDORES
05.02.03.06.01 MEDIDOR DE CAUDAL ELECTROMAGNETICO BRIDADO DE 16"
UND
1.00
12,614.20
12,614.20
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
12,614.20
0.00%
05.02.03.07 VARIOS
05.02.03.07.01 REJILLA SUMIDERO 1.40 X 1.40, PLATINA 1 1/4" X 1/4" @ 1/2" Y MARCO "L" 1 1/4"
05.02.03.07.02 CONCRETO F'C 175 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)
UND
M3
1.00
4.60
88.50
346.38
88.50
1,593.35
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
4.60
88.50
1,593.35
0.00%
0.00%
GLB
1.00
4,140.51
4,140.51
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1.00
4,140.51
0.00%
05.02.03 ARQUITECTURA
05.02.03.01 REVOQUES ENLUCIDOS Y MOLDURAS
05.02.03.01.01 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES
05.02.03.01.02 TARRAJEO CON IMPERMEABILIZANTE DE MUROS
M2
M2
226.98
309.76
26.27
37.30
5,962.76
11,554.05
100.00%
100.00%
0.00
0.00
0.00
0.00
122.00
149.00
3,204.94
5,557.70
122.00
149.00
3204.94
5557.70
104.98
160.76
2,757.82
5,996.35
53.75%
48.10%
M2
107.78
45.01
4,851.18
100.00%
1,565.00
34.77
1565.00
73.01
3,286.18
32.26%
239.28
465.93
99.25
257.92
1,596.00
465.93
397.00
1,547.52
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
34.77
6.67
1.00
4.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
5,009.20
1,749.60
2,580.00
900.00
580.07
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
610.16
465.93
198.50
515.84
0.00
1883.76
975.48
1584.98
552.90
259.60
38.23%
100.00%
50.00%
33.33%
10.02
10.92
2.15
0.75
0.90
2.55
1.00
2.00
2.00
0.00
188.00
89.33
737.20
737.20
288.44
985.83
0.00
198.50
1,031.68
499.92
160.22
1,200.00
1,200.00
644.52
610.16
465.93
198.50
515.84
0.00
1,883.76
975.48
1,584.98
552.90
259.60
4.12
0.00
2.00
4.00
M2
M
M3
M3
M2
2.55
1.00
2.00
2.00
0.00
188.00
89.33
737.20
737.20
288.44
311.92
70.89
462.80
462.80
356.08
3,125.44
774.12
995.02
347.10
320.47
37.61%
55.75%
61.43%
61.43%
44.75%
VEREDA DE CONCRETO F'C 175 KG/CM2 E=10CM PASTA 1:2 (P-I), C/EMPLEO DE MEZCLADORA
M2
57.80
49.71
2,873.24
100.00%
0.00
0.00
32.00
1,590.72
32.00
1590.72
25.80
1,282.52
55.36%
PZA
PZA
1.00
2.00
2,006.00
2,230.20
2,006.00
4,460.40
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2.00
2,006.00
4,460.40
0.00%
0.00%
05.02.03.01.03
05.02.02.02
05.02.02.02.01
05.02.02.02.02
05.02.02.02.03
05.02.02.02.04
05.02.02.03
05.02.02.03.01
05.02.02.03.02
05.02.02.03.03
05.02.02.03.04
05.02.02.03.05
05.02.02.03.06
05.02.02.04
05.02.02.04.01
05.02.02.04.02
M
UND
UND
UND
16.60%
2.40%
S/.
S/.
S/.
S/.
S/.
8,334,176.12
1,383,473.24
200,020.23
9,917,669.59
-
S/.
9,917,669.59
100.00%
S/.
S/.
S/.
S/.
S/.
476,929.91
476,929.91
-
S/.
S/.
S/.
S/.
S/.
5,120,019.54
849,923.24
122,880.47
6,092,823.25
-
S/.
S/.
S/.
S/.
S/.
8,069,535.38
1,339,542.87
193,668.85
9,602,747.10
-
S/.
S/.
S/.
S/.
S/.
173,246.98
28,759.00
4,157.93
206,163.91
-
S/.
476,929.91
S/.
6,092,823.25
S/.
9,602,747.10
S/.
206,163.91
OBRA
: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA, PROVINCIA DE RIOJA - SAN MARTIN
Nro.REGIONAL
009 - 2011 DE
- GRSM
PEAM - 01.00
CONTRATO : CONTRATO
: GOBIERNO
SAN -MARTIN
ENTIDAD
: GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA : CONSORCIO ALIANZA
VALORIZACION DE OBRA N 02
Descripcin
Und.
Metrado
P. U.
S/.
Parcial
S/.
PRESENTE VALORIZACION
ACUMULADO ANTERIOR
Parcial
S/.
Metrado
981,899.00
Metrado
981,899.00
ACUMULADO ACTUAL
Parcial
S/.
Metrado
0.00
Parcial
S/.
981,899.00
Parcial
S/.
0.00
GLB
1.00
6,300.00
6,300.00
100.00%
1.00
6,300.00
0.00
1.00
6300.00
0.00
0.00
100.00%
UND
1.00
10,000.00
10,000.00
100.00%
1.00
10,000.00
0.00
0.00
1.00
10000.00
0.00
0.00
100.00%
UND
1.00
1,517.07
1,517.07
100.00%
1.00
1,517.07
0.00
0.00
1.00
1517.07
0.00
0.00
100.00%
GLB
1.00
92,783.68
92,783.68
100.00%
1.00
92,783.68
0.00
0.00
1.00
92783.68
0.00
0.00
100.00%
GLB
1.00
871,298.25
871,298.25
100.00%
1.00
871,298.25
0.00
0.00
1.00
871298.25
0.00
0.00
100.00%
81,241.41
0.00
81,241.41
0.00
UND
1.00
10,000.00
10,000.00
100.00%
1.00
10,000.00
0.00
0.00
1.00
10000.00
0.00
0.00
100.00%
GLB
1.00
3,728.23
3,728.23
100.00%
1.00
3,728.23
0.00
0.00
1.00
3728.23
0.00
0.00
100.00%
M2
25.16
2.69
67.68
100.00%
25.16
67.68
0.00
0.00
25.16
67.68
0.00
0.00
100.00%
M2
12.96
2.16
27.99
100.00%
12.96
27.99
0.00
0.00
12.96
27.99
0.00
0.00
100.00%
M2
4,027.20
2.16
8,698.75
100.00%
4,027.20
8,698.75
0.00
0.00
4,027.20
8698.75
0.00
0.00
100.00%
M2
4,027.27
4.04
16,270.17
100.00%
4,027.27
16,270.17
0.00
0.00
4,027.27
16270.17
0.00
0.00
100.00%
02.03.03 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO (CANTERA UBICADA A MENOS DE 100 METROS)
M3
1,006.80
5.15
5,185.02
100.00%
1,006.80
5,185.02
0.00
0.00
1,006.80
5185.02
0.00
0.00
100.00%
M3K
241.63
17.86
4,315.51
100.00%
241.63
4,315.51
0.00
0.00
241.63
4315.51
0.00
0.00
100.00%
UND
1.00
297.14
297.14
100.00%
1.00
297.14
0.00
0.00
1.00
297.14
0.00
0.00
100.00%
M3
7.20
209.33
1,507.18
100.00%
7.20
1,507.18
0.00
0.00
7.20
1507.18
0.00
0.00
100.00%
M3
12.58
173.62
2,184.14
100.00%
12.58
2,184.14
0.00
0.00
12.58
2184.14
0.00
0.00
100.00%
M3K
20.77
17.86
370.95
100.00%
20.77
370.95
0.00
0.00
20.77
370.95
0.00
0.00
100.00%
0.00
0.00
M3
9.96
293.85
2,926.75
100.00%
9.96
2,926.75
0.00
0.00
9.96
2926.75
0.00
0.00
100.00%
M3
2.67
411.63
1,099.05
100.00%
2.67
1,099.05
0.00
0.00
2.67
1099.05
0.00
0.00
100.00%
02.06.01.02 ACERO ESTRUCT. TRABAJADO P/ LOSA DE FONDO-PISO (COSTO PROM. INCL. DESPERDICIOS)
KG
134.36
5.30
712.11
100.00%
134.36
712.11
0.00
0.00
134.36
712.11
0.00
0.00
100.00%
M3
3.05
445.91
1,360.03
100.00%
3.05
1,360.03
0.00
0.00
3.05
1360.03
0.00
0.00
100.00%
M2
30.29
50.90
1,541.76
100.00%
30.29
1,541.76
0.00
0.00
30.29
1541.76
0.00
0.00
100.00%
02.06.02.03 ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS)
KG
346.36
5.33
1,846.10
100.00%
346.36
1,846.10
0.00
0.00
346.36
1846.10
0.00
0.00
100.00%
02.06.03 VIGAS
02.06.03.01 CONCRETO F'C=245KG/CM2 PARA VIGAS (CEMENTO PI)
M3
0.59
418.37
246.84
100.00%
0.59
246.84
0.00
0.00
0.59
246.84
0.00
0.00
100.00%
M2
7.60
53.11
403.64
100.00%
7.60
403.64
0.00
0.00
7.60
403.64
0.00
0.00
100.00%
02.06.03.03 ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)
KG
99.84
5.33
532.15
100.00%
99.84
532.15
0.00
0.00
99.84
532.15
0.00
0.00
100.00%
M3
1.62
418.37
677.76
100.00%
1.62
677.76
0.00
0.00
1.62
677.76
0.00
0.00
100.00%
M2
10.00
42.25
422.50
100.00%
10.00
422.50
0.00
0.00
10.00
422.50
0.00
0.00
100.00%
02.06.04.03 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)
KG
117.42
5.33
625.85
100.00%
117.42
625.85
0.00
0.00
117.42
625.85
0.00
0.00
100.00%
M2
5.83
26.27
153.15
100.00%
5.83
153.15
0.00
0.00
5.83
153.15
0.00
0.00
100.00%
M2
31.52
37.30
1,175.70
100.00%
31.52
1,175.70
0.00
0.00
31.52
1175.70
0.00
0.00
100.00%
02.07.03 TARRAJEO EXTERIOR CON MORTERO 1:5 X 1.5 cm (INCLUYE COLUMNAS EMPOTRADAS)
M2
7.80
25.15
196.17
100.00%
7.80
196.17
0.00
0.00
7.80
196.17
0.00
0.00
100.00%
PZA
2.00
354.00
708.00
100.00%
2.00
708.00
0.00
0.00
2.00
708.00
0.00
0.00
100.00%
UND
1.00
119.92
119.92
100.00%
1.00
119.92
0.00
0.00
1.00
119.92
0.00
0.00
100.00%
UND
1.00
150.00
150.00
100.00%
1.00
150.00
0.00
0.00
1.00
150.00
0.00
0.00
100.00%
10.00
358.93
3,589.30
100.00%
10.00
3,589.30
0.00
0.00
10.00
3589.30
0.00
0.00
100.00%
GLB
1.00
4,138.85
4,138.85
100.00%
1.00
4,138.85
0.00
0.00
1.00
4138.85
0.00
0.00
100.00%
40.00
1.49
59.60
100.00%
40.00
59.60
0.00
0.00
40.00
59.60
0.00
0.00
100.00%
40.00
12.13
485.20
100.00%
40.00
485.20
0.00
0.00
40.00
485.20
0.00
0.00
100.00%
02.09.02.02 REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 400 - 450 PARA TODA PROF.
40.00
1.86
74.40
100.00%
40.00
74.40
0.00
0.00
40.00
74.40
0.00
0.00
100.00%
02.09.02.03 PREPARACION DE CAMA DE APOYO P/TUB. DN 400 - 450 PARA TODA PROF.
40.00
4.26
170.40
100.00%
40.00
170.40
0.00
0.00
40.00
170.40
0.00
0.00
100.00%
02.09.02.04 RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 400 - 450 de 1.01m a 1.50m PROF.
40.00
14.94
597.60
100.00%
40.00
597.60
0.00
0.00
40.00
597.60
0.00
0.00
100.00%
M3K
10.36
17.86
185.03
100.00%
10.36
185.03
0.00
0.00
10.36
185.03
0.00
0.00
100.00%
40.00
99.15
3,966.00
100.00%
40.00
3,966.00
0.00
0.00
40.00
3966.00
0.00
0.00
100.00%
40.00
3.31
132.40
100.00%
40.00
132.40
0.00
0.00
40.00
132.40
0.00
0.00
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
02.09.04 PRUEBAS
02.09.04.01 PRUEBA HIDRAULICA P/TUB. DE DESAGUE DN 400 - 450
0.00
0.00
M
40.00
7.31
292.40
100.00%
40.00
292.40
0.00
61,279.00
0.00
40.00
0.00
0.00
292.40
61,279.00
100.00%
306.00
1.49
455.94
100.00%
306.00
455.94
0.00
0.00
306.00
455.94
0.00
0.00
100.00%
306.00
1.07
327.42
100.00%
306.00
327.42
0.00
0.00
306.00
327.42
0.00
0.00
100.00%
306.00
9.93
3,038.58
100.00%
306.00
3,038.58
0.00
0.00
306.00
3038.58
0.00
0.00
100.00%
03.02.02 REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 315 - 350 PARA TODA PROF.
306.00
1.60
489.60
100.00%
306.00
489.60
0.00
0.00
306.00
489.60
0.00
0.00
100.00%
03.02.03 PREPARACION DE CAMA DE APOYO P/TUB. DN 315 - 350 PARA TODA PROF.
306.00
4.00
1,224.00
100.00%
306.00
1,224.00
0.00
0.00
306.00
1224.00
0.00
0.00
100.00%
03.02.04 RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 315 - 350 de 1.01m a 1.50m PROF.
306.00
16.48
5,042.88
100.00%
306.00
5,042.88
0.00
0.00
306.00
5042.88
0.00
0.00
100.00%
M3K
39.51
17.86
705.65
100.00%
39.51
705.65
0.00
0.00
39.51
705.65
0.00
0.00
100.00%
306.00
110.14
33,702.84
100.00%
306.00
33,702.84
0.00
0.00
306.00
33702.84
0.00
0.00
100.00%
306.00
5.41
1,655.46
100.00%
306.00
1,655.46
0.00
0.00
306.00
1655.46
0.00
0.00
100.00%
1,623.58
100.00%
2.00
1,623.58
0.00
0.00
2.00
1623.58
0.00
0.00
100.00%
UND
2.00
811.79
UND
1.00
856.68
856.68
100.00%
1.00
856.68
0.00
0.00
1.00
856.68
0.00
0.00
100.00%
UND
2.00
811.79
1,623.58
100.00%
2.00
1,623.58
0.00
0.00
2.00
1623.58
0.00
0.00
100.00%
UND
5.00
17.63
88.15
100.00%
5.00
88.15
0.00
0.00
5.00
88.15
0.00
0.00
100.00%
UND
M
UND
1.00
7,724.04
7,724.04
100.00%
1.00
7,724.04
0.00
0.00
1.00
7724.04
0.00
0.00
100.00%
306.00
6.70
2,050.20
100.00%
306.00
2,050.20
0.00
0.00
306.00
2050.20
0.00
0.00
100.00%
5.00
134.08
670.40
100.00%
5.00
670.40
0.00
0.00
5.00
670.40
0.00
0.00
100.00%
0.00
0.00
0.00
0.00
6,997,248.96
6,997,248.97
15,683.95
1.49
23,369.09
100.00%
15,683.95
23,369.09
0.00
0.00
15,683.95
23369.09
0.00
0.00
100.00%
15,683.95
1.07
16,781.83
100.00%
15,683.95
16,781.83
0.00
0.00
15,683.95
16781.83
0.00
0.00
100.00%
1.00
1,026.16
1,026.16
100.00%
1.00
1,026.16
0.00
0.00
1.00
1026.16
0.00
0.00
100.00%
1.00
1,758.99
1,758.99
100.00%
1.00
1,758.99
0.00
0.00
1.00
1758.99
0.00
0.00
100.00%
12,870.86
21.83
280,970.87
100.00%
12,870.86
280,970.87
0.00
0.00
12,870.86
280970.87
0.00
0.00
100.00%
04.01.03 ACARREO DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR P/INST. L.CONDUCCION
GLB
GLB
04.02.02 PERFILADO DE ZANJA PULSO P/INST. DE TUBERIA ADOSADA EN T-SEMIROCOSO DN 500 - 630, h=0.15m PROF.
686.14
2.46
1,687.90
100.00%
686.14
1,687.90
0.00
0.00
686.14
1687.90
0.00
0.00
100.00%
04.02.04 REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 500 - 630 PARA TODA PROF.
12,870.86
2.20
28,315.89
100.00%
12,870.86
28,315.89
0.00
0.00
12,870.86
28315.89
0.00
0.00
100.00%
M3K
9,722.19
17.86
173,638.31
100.00%
9,722.19
173,638.31
0.00
0.00
9,722.19
173638.31
0.00
0.00
100.00%
12,870.86
250.29
3,221,447.55
100.00%
12,870.86
3,221,447.55
0.00
0.00
12,870.86
3221447.55
0.00
0.00
100.00%
12,870.86
24.08
309,930.31
100.00%
12,870.86
309,930.31
0.00
0.00
12,870.86
309930.31
0.00
0.00
100.00%
0.00
M
2,813.09
355.45
999,912.84
100.00%
2,813.09
999,912.84
0.00
0.00
2,813.09
999912.84
0.00
0.00
100.00%
2,813.09
107.37
302,041.47
100.00%
2,813.09
302,041.47
0.00
0.00
2,813.09
302041.47
0.00
0.00
100.00%
UND
24.00
2,473.28
59,358.72
100.00%
24.00
59,358.72
0.00
0.00
24.00
59358.72
0.00
0.00
100.00%
UND
29.00
2,768.28
80,280.12
100.00%
29.00
80,280.12
0.00
0.00
29.00
80280.12
0.00
0.00
100.00%
UND
24.00
3,240.28
77,766.72
100.00%
24.00
77,766.72
0.00
0.00
24.00
77766.72
0.00
0.00
100.00%
UND
1.00
3,476.99
3,476.99
100.00%
1.00
3,476.99
0.00
0.00
1.00
3476.99
0.00
0.00
100.00%
UND
78.00
84.67
6,604.26
100.00%
78.00
6,604.26
0.00
0.00
78.00
6604.26
0.00
0.00
100.00%
UND
17.00
5,923.13
100,693.21
100.00%
17.00
100,693.21
0.00
0.00
17.00
100693.21
0.00
0.00
100.00%
UND
16.00
5,923.13
94,770.08
100.00%
16.00
94,770.08
0.00
0.00
16.00
94770.08
0.00
0.00
100.00%
UND
9.00
5,922.42
53,301.78
100.00%
9.00
53,301.78
0.00
0.00
9.00
53301.78
0.00
0.00
100.00%
UND
42.00
751.69
31,570.98
100.00%
42.00
31,570.98
0.00
0.00
42.00
31570.98
0.00
0.00
100.00%
0.00
0.00
UND
5.00
2,124.00
10,620.00
100.00%
5.00
UND
25.00
17,845.79
446,144.75
100.00%
25.00
446,144.75
UND
6.00
19,369.09
116,214.54
100.00%
6.00
UND
18.00
18,050.79
324,914.22
100.00%
18.00
04.09.01.01 EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.
159.00
22.79
3,623.61
100.00%
04.09.01.02 RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.
106.00
72.22
7,655.32
100.00%
M3
71.58
377.36
27,011.43
100.00%
10,620.00
0.00
5.00
10620.00
0.00
0.00
100.00%
0.00
0.00
25.00
446144.75
0.00
0.00
100.00%
116,214.54
0.00
0.00
6.00
116214.54
0.00
0.00
100.00%
324,914.22
0.00
0.00
18.00
324914.22
0.00
0.00
100.00%
159.00
3,623.61
0.00
0.00
159.00
3623.61
0.00
0.00
100.00%
106.00
7,655.32
0.00
0.00
106.00
7655.32
0.00
0.00
100.00%
71.58
27,011.43
0.00
0.00
71.58
27011.43
0.00
0.00
100.00%
0.00
0.00
0.00
M2
212.12
43.78
9,286.61
100.00%
212.12
9,286.61
0.00
0.00
212.12
9286.61
0.00
0.00
100.00%
04.09.02.03 ACERO ESTRUC. TRABAJADO PARA ESTRUCTURAS (COSTO PROM. INCL. DESPERDICIOS)
KG
5,626.10
5.36
30,155.90
100.00%
5,626.10
30,155.90
0.00
0.00
5,626.10
30155.90
0.00
0.00
100.00%
152,918.51
0.00
0.00
15,683.95
152918.51
0.00
0.00
100.00%
173,246.98
0.00
0.00
0.00
04.10 PRUEBAS
04.10.01 PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 500 - 630
0.00
M
15,683.95
9.75
152,918.51
100.00%
15,683.95
273,786.75
273,786.77
M2
301.72
2.16
651.72
100.00%
301.72
651.72
0.00
0.00
301.72
651.72
0.00
0.00
100.00%
M2
1,666.00
2.69
4,481.54
100.00%
1,666.00
4,481.54
0.00
0.00
1,666.00
4481.54
0.00
0.00
100.00%
0.00
0.00
0.00
0.00
0.00
M3
145.11
4.49
651.54
100.00%
145.11
651.54
0.00
0.00
145.11
651.54
0.00
0.00
100.00%
M3
116.11
38.04
4,416.82
100.00%
116.11
4,416.82
0.00
0.00
116.11
4416.82
0.00
0.00
100.00%
M2
260.16
1.36
353.82
100.00%
260.16
353.82
0.00
0.00
260.16
353.82
0.00
0.00
100.00%
M3
326.65
5.42
1,770.44
100.00%
326.65
1,770.44
0.00
0.00
326.65
1770.44
0.00
0.00
100.00%
M3K
326.65
17.86
5,833.97
100.00%
326.65
5,833.97
0.00
0.00
326.65
5833.97
0.00
0.00
100.00%
M2
66.03
2.16
142.62
100.00%
66.03
142.62
0.00
0.00
66.03
142.62
0.00
0.00
100.00%
M2
66.03
2.69
177.62
100.00%
66.03
177.62
0.00
0.00
66.03
177.62
0.00
0.00
100.00%
M3
44.86
4.49
201.42
100.00%
44.86
201.42
0.00
0.00
44.86
201.42
0.00
0.00
100.00%
M3
19.47
38.04
740.64
100.00%
19.47
740.64
0.00
0.00
19.47
740.64
0.00
0.00
100.00%
M2
66.03
1.36
89.80
100.00%
66.03
89.80
0.00
0.00
66.03
89.80
0.00
0.00
100.00%
M3
53.83
5.42
291.76
100.00%
53.83
291.76
0.00
0.00
53.83
291.76
0.00
0.00
100.00%
M3K
53.83
17.86
961.40
100.00%
53.83
961.40
0.00
0.00
53.83
961.40
0.00
0.00
100.00%
M3
11.48
198.75
2,281.65
100.00%
11.48
2,281.65
0.00
0.00
11.48
2281.65
0.00
0.00
100.00%
M3
2.63
221.07
581.41
100.00%
2.63
581.41
0.00
0.00
2.63
581.41
0.00
0.00
100.00%
M2
22.46
34.48
774.42
100.00%
22.46
774.42
0.00
0.00
22.46
774.42
0.00
0.00
100.00%
M2
66.03
25.45
1,680.46
100.00%
66.03
1,680.46
0.00
0.00
66.03
1680.46
0.00
0.00
100.00%
M3
4.36
354.74
1,546.67
100.00%
2.10
744.95
2.26
801.71
4.36
1546.67
0.00
0.00
100.00%
05.02.01.04.01.02 ACERO ESTRUC. TRABAJADO PARA ZAPATAS (COSTO PROM. INCL. DESPERDICIOS)
KG
91.20
5.30
483.36
100.00%
45.00
238.50
46.20
244.86
91.20
483.36
0.00
0.00
100.00%
05.02.01.04.02 COLUMNAS
05.02.01.04.02.01 CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I)
M3
1.66
420.33
697.75
100.00%
0.87
365.69
0.79
332.06
1.66
697.75
0.00
0.00
100.00%
M2
13.46
45.63
614.18
100.00%
7.22
329.45
6.24
284.73
13.46
614.18
0.00
0.00
100.00%
KG
368.93
5.33
1,966.40
100.00%
265.00
1,412.45
103.93
553.95
368.93
1966.40
0.00
0.00
100.00%
05.02.01.04.03 VIGAS
05.02.01.04.03.01 CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I)
M3
3.55
392.79
1,394.40
100.00%
1.20
471.35
2.35
923.06
3.55
1394.40
0.00
0.00
100.00%
05.02.01.04.03.02 ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)
KG
22.54
5.33
120.14
100.00%
14.66
78.14
7.88
42.00
22.54
120.14
0.00
0.00
100.00%
M2
468.47
53.11
24,880.44
100.00%
259.00
13,755.49
209.47
11,124.95
468.47
24880.44
0.00
0.00
100.00%
M3
9.90
392.80
3,888.72
100.00%
4.87
1,912.94
5.03
1,975.78
9.90
3888.72
0.00
0.00
100.00%
M2
66.00
42.25
2,788.50
100.00%
43.00
1,816.75
23.00
971.75
66.00
2788.50
0.00
0.00
100.00%
05.02.01.04.04.03 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)
KG
467.91
5.33
2,493.96
100.00%
258.44
1,377.49
209.47
1,116.48
467.91
2493.96
0.00
0.00
100.00%
M3
0.47
372.39
175.02
100.00%
0.22
81.93
0.25
93.10
0.47
175.02
0.00
0.00
100.00%
M2
4.38
31.30
137.09
100.00%
2.45
76.69
1.93
60.41
4.38
137.09
0.00
0.00
100.00%
05.02.01.04.05.03 ACERO ESTRUC. TRABAJADO PARA ANCLAJES Y/O DADOS (COSTO PROM. INCL. DESPERDICIOS)
KG
52.01
5.33
277.21
100.00%
35.09
187.03
16.92
90.18
52.01
277.21
0.00
0.00
100.00%
UND
1.00
4,814.99
4,814.99
100.00%
0.50
2,407.50
0.50
2,407.50
1.00
4814.99
0.00
0.00
100.00%
32.53
666.08
21,667.58
100.00%
13.33
8,878.85
19.20
12,788.74
32.53
21667.58
0.00
0.00
100.00%
19.00
790.05
15,010.95
100.00%
12.11
9,567.51
6.89
5,443.44
19.00
15010.95
0.00
0.00
100.00%
6.00
79.46
476.76
100.00%
2.90
230.43
3.10
246.33
6.00
476.76
0.00
0.00
100.00%
05.02.02.02 VALVULAS
05.02.02.02.01 VALVULA DE CPTA. BB. Ho. DUCTIL DN 350mm ISO 5996
UND
3.00
4,484.00
13,452.00
100.00%
1.00
4,484.00
2.00
8,968.00
3.00
13452.00
0.00
0.00
100.00%
UND
2.00
7,074.10
14,148.20
100.00%
1.00
7,074.10
1.00
7,074.10
2.00
14148.20
0.00
0.00
100.00%
05.02.02.03 ACCESORIOS
05.02.03.03.01 CODO 22.5 HIERRO DUCTIL BRIDADO DN 350
UND
1.00
885.00
885.00
100.00%
0.00
0.00
1.00
885.00
1.00
885.00
0.00
0.00
100.00%
UND
3.00
1,416.00
4,248.00
100.00%
0.00
0.00
3.00
4,248.00
3.00
4248.00
0.00
0.00
100.00%
UND
2.00
1,810.12
3,620.24
100.00%
0.00
0.00
2.00
3,620.24
2.00
3620.24
0.00
0.00
100.00%
UND
3.00
1,622.50
4,867.50
100.00%
0.00
0.00
3.00
4,867.50
3.00
4867.50
0.00
0.00
100.00%
UND
1.00
2,129.90
2,129.90
100.00%
0.00
0.00
1.00
2,129.90
1.00
2129.90
0.00
0.00
100.00%
UND
1.00
2,586.56
2,586.56
100.00%
0.00
0.00
1.00
2,586.56
1.00
2586.56
0.00
0.00
100.00%
UND
2.00
3,262.70
6,525.40
100.00%
0.00
0.00
2.00
6,525.40
2.00
6525.40
0.00
0.00
100.00%
UND
1.00
1,871.72
1,871.72
100.00%
0.00
0.00
1.00
1,871.72
1.00
1871.72
0.00
0.00
100.00%
UND
1.00
2,596.00
2,596.00
100.00%
0.00
0.00
1.00
2,596.00
1.00
2596.00
0.00
0.00
100.00%
UND
1.00
861.40
861.40
100.00%
0.00
0.00
1.00
861.40
1.00
861.40
0.00
0.00
100.00%
UND
1.00
896.80
896.80
100.00%
0.00
0.00
1.00
896.80
1.00
896.80
0.00
0.00
100.00%
UND
2.00
590.00
1,180.00
100.00%
0.00
0.00
2.00
1,180.00
2.00
1180.00
0.00
0.00
100.00%
UND
1.00
655.25
655.25
100.00%
0.00
0.00
1.00
655.25
1.00
655.25
0.00
0.00
100.00%
UND
1.00
2,596.00
2,596.00
100.00%
0.00
0.00
1.00
2,596.00
1.00
2596.00
0.00
0.00
100.00%
05.02.03.04.04 UNION FLEXIBLE AUTOPORTANTE SIMILAR SMIT BLAIR DN 16" (400 MM)
UND
1.00
3,219.75
3,219.75
100.00%
0.00
0.00
1.00
3,219.75
1.00
3219.75
0.00
0.00
100.00%
UND
27.00
247.80
6,690.60
100.00%
0.00
0.00
27.00
6,690.60
27.00
6690.60
0.00
0.00
100.00%
05.02.03.05.02 BRIDA DE HIERRO DUCTIL PARA SOLDAR Y EMPERNAR DN 16" (400 mm)
UND
25.00
589.41
14,735.25
100.00%
0.00
0.00
25.00
14,735.25
25.00
14735.25
0.00
0.00
100.00%
05.02.03.05.03 PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 14" (350MM)
UND
432.00
9.44
4,078.08
100.00%
0.00
0.00
432.00
4,078.08
432.00
4078.08
0.00
0.00
100.00%
05.02.03.05.04 PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 16" (400MM)
UND
400.00
14.75
5,900.00
100.00%
0.00
0.00
400.00
5,900.00
400.00
5900.00
0.00
0.00
100.00%
UND
27.00
25.96
700.92
100.00%
0.00
0.00
27.00
700.92
27.00
700.92
0.00
0.00
100.00%
UND
25.00
34.22
855.50
100.00%
0.00
0.00
25.00
855.50
25.00
855.50
0.00
0.00
100.00%
05.02.03.06 MEDIDORES
05.02.03.06.01 MEDIDOR DE CAUDAL ELECTROMAGNETICO BRIDADO DE 16"
UND
1.00
12,614.20
12,614.20
100.00%
0.00
0.00
1.00
12,614.20
1.00
12614.20
0.00
0.00
100.00%
05.02.03.07 VARIOS
05.02.03.07.01 REJILLA SUMIDERO 1.40 X 1.40, PLATINA 1 1/4" X 1/4" @ 1/2" Y MARCO "L" 1 1/4"
UND
1.00
88.50
88.50
100.00%
0.00
0.00
1.00
88.50
1.00
88.50
0.00
0.00
100.00%
05.02.03.07.02 CONCRETO F'C 175 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)
M3
4.60
346.38
1,593.35
100.00%
0.00
0.00
4.60
1,593.35
4.60
1593.35
0.00
0.00
100.00%
GLB
1.00
4,140.51
4,140.51
100.00%
0.00
0.00
1.00
4,140.51
1.00
4140.51
0.00
0.00
100.00%
M2
226.98
26.27
5,962.76
100.00%
122.00
3,204.94
104.98
2,757.82
226.98
5962.76
0.00
0.00
100.00%
M2
309.76
37.30
11,554.05
100.00%
149.00
5,557.70
160.76
5,996.35
309.76
11554.05
0.00
0.00
100.00%
M2
107.78
45.01
4,851.18
100.00%
34.77
1,565.00
73.01
3,286.18
107.78
4851.18
0.00
0.00
100.00%
6.67
239.28
1,596.00
100.00%
2.55
610.16
4.12
985.83
6.67
1596.00
0.00
0.00
100.00%
05.02.02.02.02 MARCO Y TAPA DE PLANCHA LAC 1/4" CONMECANISMO DE SEGURIDAD DE 0,90 X 1,50 MSEGN DISEO
UND
1.00
465.93
465.93
100.00%
1.00
465.93
0.00
0.00
1.00
465.93
0.00
0.00
100.00%
UND
4.00
99.25
397.00
100.00%
2.00
198.50
2.00
198.50
4.00
397.00
0.00
0.00
100.00%
UND
6.00
257.92
1,547.52
100.00%
2.00
515.84
4.00
1,031.68
6.00
1547.52
0.00
0.00
100.00%
0.00
0.00
0.00
311.92
3,125.44
499.92
5009.20
0.00
0.00
100.00%
05.02.03 ARQUITECTURA
05.02.03.01 REVOQUES ENLUCIDOS Y MOLDURAS
M2
499.92
10.02
5,009.20
100.00%
188.00
1,883.76
160.22
10.92
1,749.60
100.00%
89.33
975.48
70.89
774.12
160.22
1749.60
0.00
0.00
100.00%
M3
1,200.00
2.15
2,580.00
100.00%
737.20
1,584.98
462.80
995.02
1,200.00
2580.00
0.00
0.00
100.00%
M3
1,200.00
0.75
900.00
100.00%
737.20
552.90
462.80
347.10
1,200.00
900.00
0.00
0.00
100.00%
M2
644.52
0.90
580.07
100.00%
288.44
259.60
356.08
320.47
644.52
580.07
0.00
0.00
100.00%
05.02.02.03.06 VEREDA DE CONCRETO F'C 175 KG/CM2 E=10CM PASTA 1:2 (P-I), C/EMPLEO DE MEZCLADORA
M2
57.80
49.71
2,873.24
100.00%
32.00
1,590.72
25.80
1,282.52
57.80
2873.24
0.00
0.00
100.00%
05.02.02.04.02 NIPLE DE Ho DUCTIL DN 16" (400mm), TIPO BRIDA-BRIDA, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m
PZA
2.00
2,230.20
4,460.40
100.00%
0.00
0.00
2.00
4,460.40
2.00
4460.40
0.00
0.00
100.00%
16.60%
2.40%
S/.
S/.
S/.
S/.
S/.
8,395,455.12
1,393,645.55
201,490.92
9,990,591.59
-
S/.
9,990,591.59
100.00%
S/.
S/.
S/.
S/.
S/.
981,899.00
91.78
13.27
982,004.05
-
S/.
S/.
S/.
S/.
S/.
173,246.98
28,759.00
4,157.93
206,163.91
-
S/.
S/.
S/.
S/.
S/.
8,130,814.37
1,349,715.19
195,139.54
9,675,669.10
-
S/.
S/.
S/.
S/.
S/.
S/.
982,004.05
S/.
206,163.91
S/.
9,675,669.10
S/.
VALORIZACION DE OBRA N 01
CORRESPONDIENTE AL MES DE NOVIEMBRE DEL 2,011 (DEL 13/11/10 AL 30/11/10)
OBRA
CONTRATO
ENTIDAD
MONTO DE OBRA
: S/. 38,087,743.33
CONTRATISTA
: CONSORCIO ALIANZA
INSPECCION
FECHA DE INICIO
: 13/11/2011
PLAZO DE EJECUCION
FECHA DE TERMINO
: 26/002/2012
DESCRIPCION
PARCIALES
201,273.46
02
50,057.09
03
0.00
04
0.00
05
25,063.48
COSTO DIRECTO
GASTOS GENERALES (16.60%)
UTILIDAD (2.40%)
TOTAL
276,394.03
45,881.41
6,633.46
328,908.90
REAJUSTE
S/.
S/.
S/.
9,990,591.59
328,908.90
1,998,118.32
1.00
1.012
REAJUSTE = V (K-1) =
DEDUCCION = ((AD * V)/C*Ka) * (K-Ka)
S/.
S/.
3,946.91
789.38
VALORIZACION BRUTA =
AMORTIZACION = %ADELANTO * V
S/.
S/.
332,066.42
65,781.78
VALORIZACION NETA = VB - AM =
I.G.V. (18%) =
S/.
S/.
266,284.64
47,931.24
S/.
314,215.88
VALORIZACION DE OBRA N 02
CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2,011 (DEL 01/12/11 AL 30/12/11)
OBRA
CONTRATO
ENTIDAD
MONTO DE OBRA
: S/. 38,087,743.33
CONTRATISTA
: CONSORCIO ALIANZA
INSPECCION
FECHA DE INICIO
: 13/11/2011
PLAZO DE EJECUCION
FECHA DE TERMINO
: 26/002/2012
ITEM
DESCRIPCION
PARCIALES
02
8,293.92
03
17,905.08
04
05
275,656.45
2,523,211.72
727.43
COSTO DIRECTO
GASTOS GENERALES (16.60%)
UTILIDAD (2.40%)
TOTAL
2,825,794.59
469,081.90
67,819.07
3,362,695.57
REAJUSTE
S/.
S/.
S/.
9,990,591.59
3,362,695.57
1.136
1.149
REAJUSTE = V (K-1) =
DEDUCCION = ((AD * V)/C*Ka) * (K-Ka)
S/.
S/.
501,041.64
-
VALORIZACION BRUTA =
AMORTIZACION = %ADELANTO * V
S/.
S/.
3,863,737.21
672,539.11
VALORIZACION NETA = VB - AM =
I.G.V. (18%) =
S/.
S/.
3,191,198.09
574,415.66
S/.
3,765,613.75
S/.
3,765,613.75
VALORIZACION DE OBRA N 03
CORRESPONDIENTE AL MES DE ENERO DEL 2,012 (DEL 01/01/12 AL 30/01/112)
OBRA
CONTRATO
ENTIDAD
MONTO DE OBRA
: S/. 38,087,743.33
CONTRATISTA
: CONSORCIO ALIANZA
INSPECCION
FECHA DE INICIO
: 13/11/2011
PLAZO DE EJECUCION
FECHA DE TERMINO
: 26/002/2012
ITEM
DESCRIPCION
PARCIALES
504,969.09
02
22,890.40
03
43,373.92
04
05
4,474,037.25
74,748.88
COSTO DIRECTO
GASTOS GENERALES (16.60%)
UTILIDAD (2.40%)
TOTAL
5,120,019.54
849,923.24
122,880.47
6,092,823.25
REAJUSTE
S/.
S/.
S/.
9,990,591.59
6,092,823.25
1.297
1.318
REAJUSTE = V (K-1) =
DEDUCCION = ((AD * V)/C*Ka) * (K-Ka)
S/.
S/.
1,937,517.79
-
VALORIZACION BRUTA =
AMORTIZACION = %ADELANTO * V
S/.
S/.
8,030,341.04
1,218,564.65
VALORIZACION NETA = VB - AM =
I.G.V. (18%) =
S/.
S/.
6,811,776.39
1,226,119.75
S/.
8,037,896.14
VALORIZACION DE OBRA N 04
CORRESPONDIENTE AL MES DE FEBRERO DEL 2,012 (DEL 01/02/12 AL 26/02/112)
OBRA
CONTRATO
ENTIDAD
MONTO DE OBRA
: S/. 38,087,743.33
CONTRATISTA
: CONSORCIO ALIANZA
INSPECCION
FECHA DE INICIO
: 13/11/2011
PLAZO DE EJECUCION
FECHA DE TERMINO
: 26/002/2012
ITEM
DESCRIPCION
PARCIALES
981,899.00
02
81,241.41
03
61,279.00
04
05
6,997,248.97
273,786.77
COSTO DIRECTO
GASTOS GENERALES (16.60%)
UTILIDAD (2.40%)
TOTAL
8,395,455.15
1,393,645.55
201,490.92
9,675,669.10
REAJUSTE
S/.
S/.
S/.
9,990,591.59
9,675,669.10
1.019
1.041
REAJUSTE = V (K-1) =
DEDUCCION = ((AD * V)/C*Ka) * (K-Ka)
S/.
S/.
396,702.43
-
VALORIZACION BRUTA =
AMORTIZACION = %ADELANTO * V
S/.
S/.
10,072,371.54
1,935,133.82
VALORIZACION NETA = VB - AM =
I.G.V. (18%) =
S/.
S/.
8,137,237.72
1,464,702.79
S/.
9,601,940.51