Está en la página 1de 19

OBRA

: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA, PROVINCIA DE RIOJA - SAN MARTIN
: CONTRATO
Nro. 009 -DE
2011
- GRSM
- PEAM - 01.00
CONTRATO
: GOBIERNO
REGIONAL
SAN
MARTIN
ENTIDAD
: GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA : CONSORCIO ALIANZA

VALORIZACION DE OBRA N 01
CORRESPONDIENTE AL MES DE NOVIEMBRE 2,011 (DEL 13/11/11 AL 30/11/11)
PRESUPUESTO

Item

Descripcin

Und.

Metrado

P. U.
S/.

Parcial
S/.

01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES PARA TODA LA OBRA


01.01
01.01.01
01.01.02
01.01.03
01.02
01.02.01
01.02.02

OBRAS PROVISIONALES
CAMPAMENTO PROVISIONAL DE OBRA
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
CARTEL DE IDENTIFICACION DE OBRA

GLB
UND
UND

1.00
1.00
1.00

6,300.00
10,000.00
1,517.07

TRABAJOS PRELIMINARES
MOVILIZACION DE EQUIPO
TRANSPORTE DE MATERIALES DESDE LIMA A OBRA

GLB
GLB

1.00
1.00

92,783.68
871,298.25

OBRAS PROVISIONALES
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS P/OBRA
TRABAJOS PRELIMINARES
LIMPIEZA Y DESBROCE DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO INICIAL

100.00%
100.00%
100.00%

0.00
0.00
0.00

92,783.68
871,298.25

100.00%
100.00%

0.00
0.00

10,000.00
3,728.23

201,273.46

0.00
0.00
0.00

0.80
0.19
1.00

0.00
0.00

0.20
0.20

0.00

10,000.00
3,728.23

100.00%
100.00%

0.00
0.00

0.00
0.00

Metrado

Metrado

201,273.46
0.80
0.19
1.00

5040.00
1900.00
1517.07

0.20
0.81
0.00

18,556.74
174,259.65

0.20
0.20

18556.74
174259.65

0.80
0.80

10,000.00
3,728.23

50,057.09
1.00
1.00

Parcial
S/.

780,625.54

5,040.00
1,900.00
1,517.07

50,057.09
1.00
1.00

SALDO POR VALORIZAR

Parcial
S/.

1,260.00
8,100.00
0.00

80.00%
19.00%
100.00%

74,226.94
697,038.60

20.00%
20.00%

31,184.31

10000.00
3728.23

0.00
0.00

0.00
0.00

100.00%
100.00%

67.68
27.99

25.16
12.96

2.69
2.16

67.68
27.99

100.00%
100.00%

0.00
0.00

0.00
0.00

25.16
12.96

67.68
27.99

25.16
12.96

0.00
0.00

0.00
0.00

100.00%
100.00%

VIA DE ACCESO A ZONA DE CAPTACION


TRAZO, NIVELACION Y REPLANTEO INICIAL
CORTE Y LIMPIEZA DE MALEZA
CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO (CANTERA UBICADA A MENOS DE 100 METROS)
ELIMINACION DE MATERIAL EXCEDENTE
PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA

M2
M2
M3
M3K
UND

4,027.20
4,027.27
1,006.80
241.63
1.00

2.16
4.04
5.15
17.86
297.14

8,698.75
16,270.17
5,185.02
4,315.51
297.14

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

4027.20
4027.27
345.89
123.00
1.00

8,698.75
16,270.17
1,781.33
2,196.78
297.14

4,027.20
4,027.27
345.89
123.00
1.00

8698.75
16270.17
1781.33
2196.78
297.14

0.00
0.00
660.91
118.63
0.00

0.00
0.00
3,403.69
2,118.73
0.00

100.00%
100.00%
34.36%
50.90%
100.00%

MOVIMIENTO DE TIERRAS
EXCAVACION EN ROCA SUELTA EN LECHO DE RIO
EXCAVACION P/ENCAUZAMIENTO DE RIO EN TERRENO EN ROCA SUELTA
ELIMINACION DE MATERIAL EXCEDENTE

M3
M3
M3K

7.20
12.58
20.77

209.33
173.62
17.86

1,507.18
2,184.14
370.95

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

7.20
12.58
20.77

1,507.18
2,184.14
370.95

7.20
12.58
20.77

1507.18
2184.14
370.95

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

OBRAS DE CONCRETO SIMPLE


CONCRETO F'C 100 KG/CM2 PARA SOLADOS Y/O SUB BASES (CEMENTO PI)

M3

9.96

293.85

2,926.75

100.00%

0.00

0.00

9.96

2,926.75

9.96

2926.75

0.00

0.00

100.00%

OBRAS DE CONCRETO ARMADO


LOSAS DE FONDO - PISO
CONCRETO F'C=245KG/CM2 PARA LOSAS DE FONDO (CEMENTO PI)
ACERO ESTRUCT. TRABAJADO P/ LOSA DE FONDO-PISO (COSTO PROM. INCL. DESPERDICIOS)

M3
KG

2.67
134.36

411.63
5.30

1,099.05
712.11

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

2.67
134.36

1,099.05
712.11

0.00%
0.00%

MUROS Y PLACAS
CONCRETO F'C=245KG/CM2 PARA MUROS REFORZADOS (CEMENTO PI)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA MUROS REFORZADOS
ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

3.05
30.29
346.36

445.91
50.90
5.33

1,360.03
1,541.76
1,846.10

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

3.05
30.29
346.36

1,360.03
1,541.76
1,846.10

0.00%
0.00%
0.00%

VIGAS
CONCRETO F'C=245KG/CM2 PARA VIGAS (CEMENTO PI)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES
ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

0.59
7.60
99.84

418.37
53.11
5.33

246.84
403.64
532.15

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.59
7.60
99.84

246.84
403.64
532.15

0.00%
0.00%
0.00%

LOSAS DE TECHO
CONCRETO F'C=245KG/CM2 PARA LOSAS MACIZAS
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS
ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

1.62
10.00
117.42

418.37
42.25
5.33

677.76
422.50
625.85

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

1.62
10.00
117.42

677.76
422.50
625.85

0.00%
0.00%
0.00%

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES
TARRAJEO CON IMPERMEABILIZANTE DE MUROS
TARRAJEO EXTERIOR CON MORTERO 1:5 X 1.5 cm (INCLUYE COLUMNAS EMPOTRADAS)

M2
M2
M2

5.83
31.52
7.80

26.27
37.30
25.15

153.15
1,175.70
196.17

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

5.83
31.52
7.80

153.15
1,175.70
196.17

0.00%
0.00%
0.00%

PZA
UND
UND
M
GLB

2.00
1.00
1.00
10.00
1.00

354.00
119.92
150.00
358.93
4,138.85

708.00
119.92
150.00
3,589.30
4,138.85

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

2.00
1.00
1.00
10.00
1.00

708.00
119.92
150.00
3,589.30
4,138.85

0.00%
0.00%
0.00%
0.00%
0.00%

40.00

1.49

59.60

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

40.00

59.60

0.00%

M
M
M
M
M3K

40.00
40.00
40.00
40.00
10.36

12.13
1.86
4.26
14.94
17.86

485.20
74.40
170.40
597.60
185.03

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

40.00
40.00
40.00
40.00
10.36

485.20
74.40
170.40
597.60
185.03

0.00%
0.00%
0.00%
0.00%
0.00%

SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4435


TUBERIA PVC-UF NTP ISO 4435 S-25 DN 450 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/DESAGUE DN 400 - 450

M
M

40.00
40.00

99.15
3.31

3,966.00
132.40

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

40.00

7.31

292.40

100.00%

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

40.00
40.00
0.00
40.00
0.00

3,966.00
132.40
0.00
292.40
0.00

0.00%
0.00%

PRUEBAS
PRUEBA HIDRAULICA P/TUB. DE DESAGUE DN 400 - 450

M
M

306.00
306.00

1.49
1.07

455.94
327.42

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

306.00
306.00

455.94
327.42

0.00%
0.00%

M
M
M
M
M3K

306.00
306.00
306.00
306.00
39.51

9.93
1.60
4.00
16.48
17.86

3,038.58
489.60
1,224.00
5,042.88
705.65

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

306.00
306.00
306.00
306.00
39.51

3,038.58
489.60
1,224.00
5,042.88
705.65

0.00%
0.00%
0.00%
0.00%
0.00%

M
M

306.00
306.00

110.14
5.41

33,702.84
1,655.46

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

306.00
306.00

33,702.84
1,655.46

0.00%
0.00%

2.00
1.00
2.00
5.00

811.79
856.68
811.79
17.63

1,623.58
856.68
1,623.58
88.15

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

2.00
1.00
2.00
5.00

1,623.58
856.68
1,623.58
88.15

0.00%
0.00%
0.00%
0.00%

INSTALACIONES HIDRAULICAS
NIPLE DE HDPE DN 560, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m
COMPUERTA DE MADERA DE 0.50 X 1.10m E=2"
COMPUERTA DE MADERA DE 0.70 X 0.90m E=2"
TUBERIA HDPE DN 560mm
MONTAJE DE INSTALACIONES HIDRAULICAS DE CAPTACION
LINEA DE REBOSE
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIALES DEL PROYECTO
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 400 - 450de 1.01 a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 400 - 450 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 400 - 450 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 400 - 450 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE

M2
M2

1.00
1.00

03 LINEA DE IMPULSION PROYECTADA LI-01


03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02
03.04.03
03.04.04
03.05
03.05.01
03.06
03.06.01
03.07
03.07.01

6,300.00
10,000.00
1,517.07

ACUMULADO ACTUAL

Parcial
S/.

Metrado

0.00

81,241.41
UND
GLB

PRESENTE VALORIZACION

ACUMULADO ANTERIOR
Parcial
S/.

Metrado

981,899.00

02 CAPTACION PROYECTADA RIO NEGRO CAP-01


02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.06
02.06.01
02.06.01.01
02.06.01.02
02.06.02
02.06.02.01
02.06.02.02
02.06.02.03
02.06.03
02.06.03.01
02.06.03.02
02.06.03.03
02.06.04
02.06.04.01
02.06.04.02
02.06.04.03
02.07
02.07.01
02.07.02
02.07.03
02.08
02.08.01
02.08.02
02.08.03
02.08.04
02.08.05
2.09
02.09.01
02.10.01.01
02.09.02
02.09.02.01
02.09.02.02
02.09.02.03
02.09.02.04
02.09.02.05
02.09.03
02.09.03.01
02.09.03.02
02.09.04
02.09.04.01

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIALES DEL PROYECTO
TRAZO Y REPLANTEO FINALES DE OBRA
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 315 - 350 de 1.00m a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 315 - 350 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 315 - 350 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 315 - 350 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE
SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4422
TUBERIA PVC-UF NTP ISO 4422 C-7.5 DN 350 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/AGUA POTABLE DN 315 - 350

61,279.00

SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF ISO 4422


CODO 11.25 PVC-UF DN 350
CODO 90 PVC-UF DN 350
CODO 45 PVC-UF DN 350
INSTALACION DE ACCESORIOS PVC-UF DN 315 - 350

UND
UND
UND
UND

SUMINISTRO E INSTALACION DE VALVULAS


VALVULA AIRE DN 80 TRIPLE EFECTO, EN TUBERIA DN 350 (INCLUY. CAMARA)

UND

PRUEBAS
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 315 - 350

VARIOS
CONCRETO f'c=140 kg/cm2 P/ANCLAJE DE ACCESORIO DN 315 -350

UND

1.00

7,724.04

7,724.04

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

7,724.04

0.00%

6.70

2,050.20

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

306.00

2,050.20

0.00%

5.00

134.08

670.40

100.00%

0.00

0.00

0.00

0.00

0.00

5.00
0.00

670.40

0.00%

0.00

0.00
0.00

6,997,248.97

15,683.95
15,683.95

1.49
1.07

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

15,683.95
15,683.95

23,369.09
16,781.83

6,997,248.96
M
M

0.00%

306.00

04 LINEA DE CONDUCCION PROYECTADA RIO NEGRO LC-01


04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO INICIALES DEL PROYECTO
04.01.02 TRAZO Y REPLANTEO FINALES DE OBRA

0.00

23,369.09
16,781.83

0.00
0.00
0.00

0.00
0.00

0.00

0.00%
0.00%

04.01.03
04.01.04
04.02
04.02.01
04.02.02
04.02.04
04.02.11
04.03
04.03.01
04.03.02
04.04
04.04.01
04.04.02
04.05
04.05.01
04.05.02
04.05.03
04.05.04
04.05.05
04.06
04.06.01
04.06.02
04.06.03
04.06.04
04.07
04.07.01
04.08
04.08.01
04.08.02
04.08.03
04.09
04.09.01
04.09.01.01
04.09.01.02
04.09.02
04.09.02.01
04.09.02.02
04.09.02.03
04.10
04.10.01

ACARREO DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR P/INST. L.CONDUCCION


MOVILIZACION/DESMOVILIZACION DE EQUIPO MECANICO P/INST. L.CONDUCCION

GLB
GLB

1.00
1.00

1,026.16
1,758.99

1,026.16
1,758.99

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

1.00
1.00

1,026.16
1,758.99

0.00%
0.00%

MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 500 - 600 de 1.51m a 2.00m PROF.
PERFILADO DE ZANJA PULSO P/INST. DE TUBERIA ADOSADA EN T-SEMIROCOSO DN 500 - 630, h=0.15m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 500 - 630 PARA TODA PROF.
ELIMINACION DE MATERIAL EXCEDENTE

M
M
M
M3K

12,870.86
686.14
12,870.86
9,722.19

21.83
2.46
2.20
17.86

280,970.87
1,687.90
28,315.89
173,638.31

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

12,870.86
686.14
12,870.86
9,722.19

280,970.87
1,687.90
28,315.89
173,638.31

0.00%
0.00%
0.00%
0.00%

M
M

12,870.86
12,870.86

250.29
24.08

3,221,447.55
309,930.31

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

12,870.86
12,870.86

3,221,447.55
309,930.31

0.00%
0.00%

M
M

SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4422


TUBERIA PVC-UF NTP ISO 4422 C-5 DN 560 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/AGUA POTABLE DN 500 - 630
SUMINISTRO E INSTALACION DE TUBERIAS DE HDPE
TUBERIA HDPE NTP ISO 4427 SDR 21 PN 6 DN 560 + 2% de desperdicios
INSTALACION DE TUB. HDPE P/AGUA POTABLE DN 500-630 (TERMOFUSION)

2,813.09
2,813.09

355.45
107.37

999,912.84
302,041.47

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

2,813.09
2,813.09

999,912.84
302,041.47

0.00%
0.00%

SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF ISO 4422


CODO 11.25 PVC-UF DN 560
CODO 22.5 PVC-UF DN 560
CODO 45 PVC-UF DN 560
CODO 90 PVC-UF DN 560
INSTALACION DE ACCESORIOS PVC-UF DN 500 - 630

UND
UND
UND
UND
UND

24.00
29.00
24.00
1.00
78.00

2,473.28
2,768.28
3,240.28
3,476.99
84.67

59,358.72
80,280.12
77,766.72
3,476.99
6,604.26

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

24.00
29.00
24.00
1.00
78.00

59,358.72
80,280.12
77,766.72
3,476.99
6,604.26

0.00%
0.00%
0.00%
0.00%
0.00%

SUMINISTRO E INSTALACION DE ACCESORIOS DE HDPE


CURVA 11.25 HDPE DN 560
CURVA 22.5 HDPE DN 560
CURVA 45 HDPE DN 560
INSTALACION DE ACCESORIOS HDPE DN 560 (TERMOFUSION)

UND
UND
UND
UND

17.00
16.00
9.00
42.00

5,923.13
5,923.13
5,922.42
751.69

100,693.21
94,770.08
53,301.78
31,570.98

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100,693.21
94,770.08
53,301.78
31,570.98

0.00%
0.00%
0.00%
0.00%

SUMINISTRO E INSTALACION DE UNIONES


ACOPLE FLEXIBLE DN 560mm

UND

5.00

2,124.00

10,620.00

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

17.00
16.00
9.00
42.00
0.00
5.00

10,620.00

0.00%

SUMINISTRO E INSTALACION DE VALVULAS


VALVULA DE AIRE DN 80,EN TUBERIA DN 560 (INCLUY. CAMARA)
VALVULA DE PURGA DN 100 , EN TUBERIA HDPE DN 560 (INCLUY. CMARA)
VALVULA DE PURGA DN 100 , EN TUBERIA PVC DN 560 (INCLUY. CMARA)

UND
UND
UND

25.00
6.00
18.00

17,845.79
19,369.09
18,050.79

446,144.75
116,214.54
324,914.22

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

25.00
6.00
18.00

446,144.75
116,214.54
324,914.22

0.00%
0.00%
0.00%

PROTECCION DE TUBERIAS
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.

M
M

159.00
106.00

22.79
72.22

3,623.61
7,655.32

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

159.00
106.00

3,623.61
7,655.32

0.00%
0.00%

CONCRETO ARMADO
CONCRETO F'C 210 KG/CM2 PARA ESTRUCTURAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA ESTRUCTURAS
ACERO ESTRUC. TRABAJADO PARA ESTRUCTURAS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

71.58
212.12
5,626.10

377.36
43.78
5.36

27,011.43
9,286.61
30,155.90

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

71.58
212.12
5,626.10

27,011.43
9,286.61
30,155.90

0.00%
0.00%
0.00%

PRUEBAS
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 500 - 630

15,683.95

9.75

152,918.51

100.00%

0.00
0.00

0.00

0.00
0.00

0.00

15,683.95
0.00

152,918.51

0.00%

25,063.48

0.00
0.00

0.00

0.00

248,723.29

05 RESERVORIO APOYADO PROYECTADO RIO NEGRO RAP-01 VOL=1,200M3

273,786.75

25,063.48

5.01 RESERVORIO APOYADO PROYECTADO RAP-01


05.01.01.01 OBRAS PRELIMINARES
05.01.01.01.01 TRAZO, NIVELACION Y REPLANTEO INICIAL

M2

301.72

2.16

651.72

100.00%

0.00

0.00

301.72

651.72

301.72

651.72

0.00

0.00

100.00%

05.01.01.01.02 LIMPIEZA Y DESBROCE DE TERRENO MANUAL

M2

1,666.00

2.69

4,481.54

100.00%

0.00

0.00

1,666.00

4,481.54

1,666.00

4481.54

0.00

0.00

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

05.01.01.02 MOVIMIENTO DE TIERRAS


05.01.01.02.01 EXCAVACION MASIVA EN TERRENO NORMAL A MAQUINA
05.01.01.02.02
05.01.01.02.03
05.01.01.02.04
05.01.01.02.05
5.02
05.02.01
05.02.01.01
05.02.01.01.01
05.02.01.01.02
05.02.01.02
05.02.01.02.01
05.02.01.02.02
05.02.01.02.03
05.02.01.02.04
05.02.01.02.05
05.02.01.03
05.02.01.03.01
05.02.01.03.02
05.02.01.03.03
05.02.01.03.04
05.02.01.04
05.02.01.04.01
05.02.01.04.01.01
05.02.01.04.01.02
05.02.01.04.02
05.02.01.04.02.01
05.02.01.04.02.02
05.02.01.04.02.03
05.02.01.04.03
05.02.01.04.03.01
05.02.01.04.03.02
05.02.01.04.03.03
05.02.01.04.04
05.02.01.04.04.01
05.02.01.04.04.02
05.02.01.04.04.03
05.02.01.04.05
05.02.01.04.05.01
05.02.01.04.05.02
05.02.01.04.05.03
05.02.01.05
05.02.01.05.01
05.02.02
05.02.02.01
05.02.02.01.01
05.02.02.01.02
05.02.02.01.03
05.02.02.02
05.02.02.02.01
05.02.02.02.02
05.02.02.03
05.02.03.03.01
05.02.03.03.02
05.02.03.03.03
05.02.03.03.04
05.02.03.03.05
05.02.03.03.06
05.02.03.03.07
05.02.03.03.08
05.02.03.03.09

M3

145.11

4.49

651.54

100.00%

0.00

0.00

145.11

651.54

145.11

651.54

0.00

0.00

100.00%

EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS


REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL
RETIRO + ACOMODO DE DESMONTE EN ZONA ALEDAA C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE

M3
M2
M3
M3K

116.11
260.16
326.65
326.65

38.04
1.36
5.42
17.86

4,416.82
353.82
1,770.44
5,833.97

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

116.11
260.16
326.65
326.65

4,416.82
353.82
1,770.44
5,833.97

116.11
260.16
326.65
326.65

4416.82
353.82
1770.44
5833.97

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

CASETA DE RESERVORIO APOYADO RAP-01


ESTRUCTURAS
OBRAS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO INICIAL
LIMPIEZA Y DESBROCE DE TERRENO MANUAL

M2
M2

66.03
66.03

2.16
2.69

142.62
177.62

100.00%
100.00%

0.00
0.00

0.00
0.00

66.03
66.03

142.62
177.62

66.03
66.03

142.62
177.62

0.00
0.00

0.00
0.00

100.00%
100.00%

MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN TERRENO NORMAL A MAQUINA
EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS
REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL
RETIRO + ACOMODO DE DESMONTE EN ZONA ALEDAA C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE

M3
M3
M2
M3
M3K

44.86
19.47
66.03
53.83
53.83

4.49
38.04
1.36
5.42
17.86

201.42
740.64
89.80
291.76
961.40

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

44.86
19.47
66.03
53.83
53.83

201.42
740.64
89.80
291.76
961.40

44.86
19.47
66.03
53.83
53.83

201.42
740.64
89.80
291.76
961.40

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

OBRAS DE CONCRETO SIMPLE


CONCRETO 1:10 + 30% PIEDRA GRANDE PARA CIMIENTO CORRIDO (CEMENTO P-I)
CONCRETO 1:8 + 25% P.M. P/SOBRECIMIENTOS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACIN DE MADERA) DE SOBRECIMIENTOS REFORZADOS
FALSO PISO DE CONCRETO 1:10 DE ESPESOR 4" (CEMENTO P-I)

M3
M3
M2
M2

11.48
2.63
22.46
66.03

198.75
221.07
34.48
25.45

2,281.65
581.41
774.42
1,680.46

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

6.35
2.63
22.46
66.03

1,262.06
581.41
774.42
1,680.46

6.35
2.63
22.46
66.03

1262.06
581.41
774.42
1680.46

5.13
0.00
0.00
0.00

1,019.59
0.00
0.00
0.00

55.31%
100.00%
100.00%
100.00%

OBRAS DE CONCRETO ARMADO


ZAPATAS
CONCRETO F'C=210KG/CM2 PARA ZAPATA (CEMENTO PI)
ACERO ESTRUC. TRABAJADO PARA ZAPATAS (COSTO PROM. INCL. DESPERDICIOS)

M3
KG

4.36
91.20

354.74
5.30

1,546.67
483.36

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

4.36
91.20

1,546.67
483.36

0.00%
0.00%

COLUMNAS
CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA COLUMNAS
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

M3
M2
KG

1.66
13.46
368.93

420.33
45.63
5.33

697.75
614.18
1,966.40

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

1.66
13.46
368.93

697.75
614.18
1,966.40

0.00%
0.00%
0.00%

VIGAS
CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I)
ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES

M3
KG
M2

3.55
22.54
468.47

392.79
5.33
53.11

1,394.40
120.14
24,880.44

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

3.55
22.54
468.47

1,394.40
120.14
24,880.44

0.00%
0.00%
0.00%

LOSAS MACIZAS
CONCRETO F'C 210 KG/CM2 PARA LOSAS MACIZAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS
ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

9.90
66.00
467.91

392.80
42.25
5.33

3,888.72
2,788.50
2,493.96

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

9.90
66.00
467.91

3,888.72
2,788.50
2,493.96

0.00%
0.00%
0.00%

DADOS DE APOYO Y/O ANCLAJE


CONCRETO F'C 210 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA ANCLAJES Y/O DADOS
ACERO ESTRUC. TRABAJADO PARA ANCLAJES Y/O DADOS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

0.47
4.38
52.01

372.39
31.30
5.33

175.02
137.09
277.21

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.47
4.38
52.01

175.02
137.09
277.21

0.00%
0.00%
0.00%

CAJAS DE DISTRIBUCION
CAJA REBOSE-PURGA TERRENO NORMAL INC. ELIMINACION DESMONTE

UND

1.00

4,814.99

4,814.99

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

4,814.99

0.00%

INSTALACIONES HIDRAULICAS
TUBERIAS
TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 350
TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 400
TUBERIA PVC-UF NTP ISO 4435 S-25 DN 400

M
M
M

32.53
19.00
6.00

666.08
790.05
79.46

21,667.58
15,010.95
476.76

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

32.53
19.00
6.00

21,667.58
15,010.95
476.76

0.00%
0.00%
0.00%

VALVULAS
VALVULA DE CPTA. BB. Ho. DUCTIL DN 350mm ISO 5996
VALVULA DE CPTA. BB. Ho. DUCTIL DN 400mm ISO 5996

UND
UND

3.00
2.00

4,484.00
7,074.10

13,452.00
14,148.20

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

3.00
2.00

13,452.00
14,148.20

0.00%
0.00%

ACCESORIOS
CODO 22.5 HIERRO DUCTIL BRIDADO DN 350
CODO 45 HIERRO DCTIL BRIDADO DN 350
CODO 45 HIERRO DCTIL BRIDADO DN 400
CODO 90 HIERRO DCTIL BRIDADO DN 350
CODO 90 HIERRO DCTIL BRIDADO DN 400
TEE Ho DUCTIL BRIDADO DN 350x350
TEE Ho DUCTIL BRIDADO DN 400x400
REDUCCION Ho DUCTIL BRIDADO DN 400x350mm
CANASTILLA DE ACERO INOXIDABLE BRIDADA DN 16" (400mm)

UND
UND
UND
UND
UND
UND
UND
UND
UND

1.00
3.00
2.00
3.00
1.00
1.00
2.00
1.00
1.00

885.00
1,416.00
1,810.12
1,622.50
2,129.90
2,586.56
3,262.70
1,871.72
2,596.00

885.00
4,248.00
3,620.24
4,867.50
2,129.90
2,586.56
6,525.40
1,871.72
2,596.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.00
3.00
2.00
3.00
1.00
1.00
2.00
1.00
1.00

885.00
4,248.00
3,620.24
4,867.50
2,129.90
2,586.56
6,525.40
1,871.72
2,596.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

05.02.03.03.10 TRANSICION TIPO LUFLEX HD, DN 350

UND

1.00

861.40

861.40

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

861.40

0.00%

05.02.03.03.11
05.02.03.04
05.02.03.04.01
05.02.03.04.02
05.02.03.04.03
05.02.03.04.04
05.02.03.05
05.02.03.05.01
05.02.03.05.02
05.02.03.05.03
05.02.03.05.04
05.02.03.05.05
05.02.03.05.06
05.02.03.06
05.02.03.06.01
05.02.03.07
05.02.03.07.01
05.02.03.07.02
05.02.03.07.03
05.02.03
05.02.03.01
05.02.03.01.01
05.02.03.01.02
05.02.03.01.03
05.02.02.02
05.02.02.02.01
05.02.02.02.02
05.02.02.02.03
05.02.02.02.04
05.02.02.03
05.02.02.03.01
05.02.02.03.02
05.02.02.03.03
05.02.02.03.04
05.02.02.03.05
05.02.02.03.06
05.02.02.04
05.02.02.04.01
05.02.02.04.02

TRANSICION TIPO LUFLEX HD, DN 400

UND

1.00

896.80

896.80

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

896.80

0.00%

ELEMENTOS DE UNION Y MONTAJE


UNION FLEXIBLE TIPO DRESSER DE 14" (350MM)
UNION FLEXIBLE TIPO DRESSER DE 16" (400MM)
UNION FLEXIBLE AUTOPORTANTE SIMILAR SMIT BLAIR DN 14" (350MM)
UNION FLEXIBLE AUTOPORTANTE SIMILAR SMIT BLAIR DN 16" (400 MM)

UND
UND
UND
UND

2.00
1.00
1.00
1.00

590.00
655.25
2,596.00
3,219.75

1,180.00
655.25
2,596.00
3,219.75

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

2.00
1.00
1.00
1.00

1,180.00
655.25
2,596.00
3,219.75

0.00%
0.00%
0.00%
0.00%

BRIDAS, PERNOS Y EMPAQUETADURAS


BRIDA DE HIERRO DUCTIL PARA SOLDAR Y EMPERNAR DN 14" (350 mm)
BRIDA DE HIERRO DUCTIL PARA SOLDAR Y EMPERNAR DN 16" (400 mm)
PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 14" (350MM)
PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 16" (400MM)
EMPAQUETADURA DE JEBE ENLONADO DE 14" (350 mm)
EMPAQUETADURA DE JEBE ENLONADO DE 16" (400 mm)

UND
UND
UND
UND
UND
UND

27.00
25.00
432.00
400.00
27.00
25.00

247.80
589.41
9.44
14.75
25.96
34.22

6,690.60
14,735.25
4,078.08
5,900.00
700.92
855.50

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

27.00
25.00
432.00
400.00
27.00
25.00

6,690.60
14,735.25
4,078.08
5,900.00
700.92
855.50

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

MEDIDORES
MEDIDOR DE CAUDAL ELECTROMAGNETICO BRIDADO DE 16"

UND

1.00

12,614.20

12,614.20

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

12,614.20

0.00%

VARIOS
REJILLA SUMIDERO 1.40 X 1.40, PLATINA 1 1/4" X 1/4" @ 1/2" Y MARCO "L" 1 1/4"
CONCRETO F'C 175 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)
MONTAJE DE INSTALACIONES HIDRAULICAS DE RESERVORIO

UND
M3
GLB

1.00
4.60
1.00

88.50
346.38
4,140.51

88.50
1,593.35
4,140.51

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

1.00
4.60
1.00

88.50
1,593.35
4,140.51

0.00%
0.00%
0.00%

226.98
309.76
107.78

26.27
37.30
45.01

5,962.76
11,554.05
4,851.18

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

226.98
309.76
107.78

5,962.76
11,554.05
4,851.18

0.00%
0.00%
0.00%

6.67
1.00
4.00
6.00

239.28
465.93
99.25
257.92

1,596.00
465.93
397.00
1,547.52

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6.67
1.00
4.00
6.00

1,596.00
465.93
397.00
1,547.52

0.00%
0.00%
0.00%
0.00%

499.92
160.22
1,200.00
1,200.00
644.52
57.80

5,009.20
1,749.60
2,580.00
900.00
580.07
2,873.24

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

1.00
2.00

2,006.00
4,460.40

0.00%
0.00%

ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES
TARRAJEO CON IMPERMEABILIZANTE DE MUROS
TARRAJEO CON IMPERMEABILIZANTE DE CIELO RASO
CARPINTERIA METALICA
ESCALERA DE TUBO FO. GALV. CON PARANTESDE 1 1/4" POR PELDAOS DE 3/4"

M2
M2
M2

PINTURA, ADITAMENTOS Y VARIOS


PINTADO EXTERIOR C/TEKNOMATE O SIMILAR DE RESERVORIO APOYADO INCL. MENSAJE
PROVISIN Y COLOCADO DE JUNTA WATER STOP DE P.V.C. E=15 CM ( 6")
PRUEBA HIDRAULICA CON EMPLEO DE LA LINEA DE INGRESO (CAPTACION)
EVACUACION DEL AGUA DE PRUEBA CON EMPLEO DE LA LINEA DE SALIDA
LIMPIEZA Y DESINFECCION DE RESERVORIOS APOYADOS
VEREDA DE CONCRETO F'C 175 KG/CM2 E=10CM PASTA 1:2 (P-I), C/EMPLEO DE MEZCLADORA

M2
M
M3
M3
M2
M2

499.92
160.22
1,200.00
1,200.00
644.52
57.80

10.02
10.92
2.15
0.75
0.90
49.71

5,009.20
1,749.60
2,580.00
900.00
580.07
2,873.24

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PASES PARA TUBERIAS


NIPLE DE Ho DUCTIL DN 14" (350mm), TIPO BRIDA-BRIDA, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m
NIPLE DE Ho DUCTIL DN 16" (400mm), TIPO BRIDA-BRIDA, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m

PZA
PZA

1.00
2.00

2,006.00
2,230.20

2,006.00
4,460.40

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

MARCO Y TAPA DE PLANCHA LAC 1/4" CONMECANISMO DE SEGURIDAD DE 0,90 X 1,50 MSEGN DISEO

VENTILACION CON TUBERIA DE ACERO SEGUN DISEO DN 150


SOPORTE METALICO TIPO ABRAZADERA PARA TUBERIA DN 300 A 350

TOTAL COSTO DIRECTO


GASTOS GENERALES
UTILIDAD
SUB-TOTAL
IMPUESTO GENERAL A LAS VENTAS (EXONERADO)
TOTAL PRESUPUESTO

M
UND
UND
UND

16.60%
2.40%

S/.
S/.
S/.
S/.

8,395,455.12
1,393,645.55
201,490.92
9,990,591.59

S/.

9,990,591.59

100.00%

S/.
S/.
S/.
S/.
S/.

S/.
S/.
S/.
S/.
S/.

276,394.03
45,881.41
6,633.46
328,908.90
-

S/.
S/.
S/.
S/.
S/.

260,476.55
43,239.11
6,251.44
309,967.10
-

S/.
S/.
S/.
S/.
S/.

8,057,782.11
1,337,591.83
193,386.77
9,588,760.71
-

S/.

S/.

328,908.90

S/.

309,967.10

S/.

9,588,760.71

OBRA
: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA, PROVINCIA DE RIOJA - SAN MARTIN
: CONTRATO
Nro. 009 -DE
2011
- GRSM
- PEAM - 01.00
CONTRATO
: GOBIERNO
REGIONAL
SAN
MARTIN
ENTIDAD
: GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA : CONSORCIO ALIANZA

VALORIZACION DE OBRA N 02
CORRESPONDIENTE AL MES DE DICIEMBRE 2,011 (DEL 1/12/ AL 30/12/11)
PRESUPUESTO

Item

Descripcin

Und.

Metrado

P. U.
S/.

01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES PARA TODA LA OBRA


01.01
01.01.01
01.01.02
01.01.03
01.02
01.02.01
01.02.02

GLB
UND
UND

1.00
1.00
1.00

6,300.00
10,000.00
1,517.07

TRABAJOS PRELIMINARES
MOVILIZACION DE EQUIPO
TRANSPORTE DE MATERIALES DESDE LIMA A OBRA

GLB
GLB

1.00
1.00

92,783.68
871,298.25

02 CAPTACION PROYECTADA RIO NEGRO CAP-01


02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
02.06
02.06.01
02.06.01.01
02.06.01.02
02.06.02
02.06.02.01
02.06.02.02
02.06.02.03
02.06.03
02.06.03.01
02.06.03.02
02.06.03.03
02.06.04
02.06.04.01
02.06.04.02
02.06.04.03
02.07
02.07.01
02.07.02
02.07.03
02.08
02.08.01
02.08.02
02.08.03
02.08.04
02.08.05
2.09
02.09.01
02.10.01.01
02.09.02
02.09.02.01
02.09.02.02
02.09.02.03
02.09.02.04
02.09.02.05
02.09.03
02.09.03.01
02.09.03.02
02.09.04
02.09.04.01

OBRAS PROVISIONALES
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS P/OBRA
TRABAJOS PRELIMINARES
LIMPIEZA Y DESBROCE DE TERRENO MANUAL
TRAZO, NIVELACION Y REPLANTEO INICIAL

Parcial
S/.

Metrado

UND
GLB
M2
M2

VIA DE ACCESO A ZONA DE CAPTACION


TRAZO, NIVELACION Y REPLANTEO INICIAL
M2
CORTE Y LIMPIEZA DE MALEZA
M2
CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO (CANTERA UBICADA A MENOS DE 100 METROS)
M3
ELIMINACION DE MATERIAL EXCEDENTE
M3K
PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA
UND

1.00
1.00

10,000.00
3,728.23

ACUMULADO ACTUAL

Parcial
S/.

Metrado

201,273.46

Metrado

Metrado

476,929.91

6,300.00
10,000.00
1,517.07

100.00%
100.00%
100.00%

0.80
0.19
1.00

5,040.00
1,900.00
1,517.07

0.10
0.23
0.00

630.00
2,300.00
0.00

0.90
0.42
1.00

5670.00
4200.00
1517.07

92,783.68
871,298.25

100.00%
100.00%

0.20
0.20

18,556.74
174,259.65

0.31
0.28

28,762.94
243,963.51

0.51
0.48

47319.68
418223.16

8,293.92

10,000.00
3,728.23

100.00%
100.00%

1.00
1.00

10,000.00
3,728.23

0.00
0.00

0.00
0.00

SALDO POR VALORIZAR

Parcial
S/.

275,656.45

81,241.41

504,969.09
0.10
0.58
0.00
0.49
0.52

58,351.01
1.00
1.00

Parcial
S/.

630.00
5,800.00
0.00

90.00%
42.00%
100.00%

45,464.00
453,075.09

51.00%
48.00%

22,890.40

10000.00
3728.23

0.00
0.00

0.00
0.00

100.00%
100.00%

67.68
27.99

25.16
12.96

2.69
2.16

67.68
27.99

100.00%
100.00%

25.16
12.96

67.68
27.99

0.00
0.00

0.00
0.00

25.16
12.96

0.00
0.00

0.00
0.00

100.00%
100.00%

4,027.20
4,027.27
1,006.80
241.63
1.00

2.16
4.04
5.15
17.86
297.14

8,698.75
16,270.17
5,185.02
4,315.51
297.14

100.00%
100.00%
100.00%
100.00%
100.00%

4,027.20
4,027.27
345.89
123.00
1.00

8,698.75
16,270.17
1,781.33
2,196.78
297.14

0.00
0.00
422.00
29.00
0.00

0.00
0.00
2,173.30
517.94
0.00

4,027.20
4,027.27
767.89
152.00
1.00

8698.75
16270.17
3954.63
2714.72
297.14

0.00
0.00
238.91
89.63
0.00

0.00
0.00
1,230.39
1,600.79
0.00

100.00%
100.00%
76.27%
62.91%
100.00%

1,507.18
2,184.14
370.95

0.00
0.00
0.00

0.00
0.00
0.00

7.20
12.58
20.77

1507.18
2184.14
370.95

0.00
0.00
0.00

100.00%
100.00%
100.00%

MOVIMIENTO DE TIERRAS
EXCAVACION EN ROCA SUELTA EN LECHO DE RIO
EXCAVACION P/ENCAUZAMIENTO DE RIO EN TERRENO EN ROCA SUELTA
ELIMINACION DE MATERIAL EXCEDENTE

M3
M3
M3K

7.20
12.58
20.77

209.33
173.62
17.86

1,507.18
2,184.14
370.95

100.00%
100.00%
100.00%

OBRAS DE CONCRETO SIMPLE


CONCRETO F'C 100 KG/CM2 PARA SOLADOS Y/O SUB BASES (CEMENTO PI)

M3

9.96

293.85

2,926.75

100.00%

7.20
12.58
20.77
0.00
9.96

2,926.75

0.00

0.00

9.96

2926.75

0.00

0.00
0.00
0.00
0.00
0.00

OBRAS DE CONCRETO ARMADO


LOSAS DE FONDO - PISO
CONCRETO F'C=245KG/CM2 PARA LOSAS DE FONDO (CEMENTO PI)
ACERO ESTRUCT. TRABAJADO P/ LOSA DE FONDO-PISO (COSTO PROM. INCL. DESPERDICIOS)

M3
KG

2.67
134.36

411.63
5.30

1,099.05
712.11

100.00%
100.00%

0.00
0.00

0.00
0.00

0.60
37.56

246.98
199.07

0.60
37.56

246.98
199.07

2.07
96.80

852.07
513.04

22.47%
27.95%

MUROS Y PLACAS
CONCRETO F'C=245KG/CM2 PARA MUROS REFORZADOS (CEMENTO PI)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA MUROS REFORZADOS
ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

3.05
30.29
346.36

445.91
50.90
5.33

1,360.03
1,541.76
1,846.10

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.43
12.45
31.98

191.74
633.71
170.45

0.43
12.45
31.98

191.74
633.71
170.45

2.62
17.84
314.38

1,168.28
908.06
1,675.65

14.10%
41.10%
9.23%

VIGAS
CONCRETO F'C=245KG/CM2 PARA VIGAS (CEMENTO PI)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES
ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

0.59
7.60
99.84

418.37
53.11
5.33

246.84
403.64
532.15

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.11
2.12
26.57

46.02
112.59
141.62

0.11
2.12
26.57

46.02
112.59
141.62

0.48
5.48
73.27

200.82
291.04
390.53

18.64%
27.89%
26.61%

LOSAS DE TECHO
CONCRETO F'C=245KG/CM2 PARA LOSAS MACIZAS
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS
ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

1.62
10.00
117.42

418.37
42.25
5.33

677.76
422.50
625.85

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.37
2.66
35.22

154.80
112.39
187.72

0.37
2.66
35.22

154.80
112.39
187.72

1.25
7.34
82.20

522.96
310.12
438.13

22.84%
26.60%
29.99%

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES
TARRAJEO CON IMPERMEABILIZANTE DE MUROS
TARRAJEO EXTERIOR CON MORTERO 1:5 X 1.5 cm (INCLUYE COLUMNAS EMPOTRADAS)

M2
M2
M2

5.83
31.52
7.80

26.27
37.30
25.15

153.15
1,175.70
196.17

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.22
15.00
1.21

5.78
559.50
30.43

0.22
15.00
1.21

5.78
559.50
30.43

5.61
16.52
6.59

147.37
616.20
165.74

3.77%
47.59%
15.51%

PZA
UND
UND
M
GLB

2.00
1.00
1.00
10.00
1.00

354.00
119.92
150.00
358.93
4,138.85

708.00
119.92
150.00
3,589.30
4,138.85

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.66
0.30
0.30
0.30
0.22

233.64
35.98
45.00
107.68
910.55

0.66
0.30
0.30
0.30
0.22

233.64
35.98
45.00
107.68
910.55

1.34
0.70
0.70
9.70
0.78

474.36
83.94
105.00
3,481.62
3,228.30

33.00%
30.00%
30.00%
3.00%
22.00%

40.00

1.49

59.60

100.00%

0.00

0.00

25.00

37.25

25.00

37.25

15.00

22.35

62.50%

M
M
M
M
M3K

40.00
40.00
40.00
40.00
10.36

12.13
1.86
4.26
14.94
17.86

485.20
74.40
170.40
597.60
185.03

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

12.00
12.00
12.00
12.00
3.00

145.56
22.32
51.12
179.28
53.58

12.00
12.00
12.00
12.00
3.00

145.56
22.32
51.12
179.28
53.58

28.00
28.00
28.00
28.00
7.36

339.64
52.08
119.28
418.32
131.45

30.00%
30.00%
30.00%
30.00%
28.96%

SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4435


TUBERIA PVC-UF NTP ISO 4435 S-25 DN 450 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/DESAGUE DN 400 - 450

M
M

40.00
40.00

99.15
3.31

3,966.00
132.40

100.00%
100.00%

0.00
0.00

0.00
0.00

9.00
9.00

892.35
29.79

9.00
9.00

892.35
29.79

40.00

7.31

292.40

100.00%

0.00

0.00

9.00

17,905.08

9.00
0.00

65.79
0.00

31.00
31.00
0.00
31.00
0.00

3,073.65
102.61
0.00
226.61
0.00

22.50%
22.50%

PRUEBAS
PRUEBA HIDRAULICA P/TUB. DE DESAGUE DN 400 - 450

M
M

306.00
306.00

1.49
1.07

455.94
327.42

100.00%
100.00%

0.00
0.00

0.00
0.00

168.00
168.00

250.32
179.76

168.00
168.00

250.32
179.76

138.00
138.00

205.62
147.66

54.90%
54.90%

M
M
M
M
M3K

306.00
306.00
306.00
306.00
39.51

9.93
1.60
4.00
16.48
17.86

3,038.58
489.60
1,224.00
5,042.88
705.65

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

78.00
78.00
78.00
78.00
23.00

774.54
124.80
312.00
1,285.44
410.78

78.00
78.00
78.00
78.00
23.00

774.54
124.80
312.00
1285.44
410.78

228.00
228.00
228.00
228.00
16.51

2,264.04
364.80
912.00
3,757.44
294.87

25.49%
25.49%
25.49%
25.49%
58.21%

M
M

306.00
306.00

110.14
5.41

33,702.84
1,655.46

100.00%
100.00%

0.00
0.00

0.00
0.00

56.00
56.00

6,167.84
302.96

56.00
56.00

6167.84
302.96

250.00
250.00

27,535.00
1,352.50

18.30%
18.30%

2.00
1.00
2.00
5.00

811.79
856.68
811.79
17.63

1,623.58
856.68
1,623.58
88.15

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

2.00
1.00
2.00
5.00

1,623.58
856.68
1,623.58
88.15

2.00
1.00
2.00
5.00

1623.58
856.68
1623.58
88.15

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

INSTALACIONES HIDRAULICAS
NIPLE DE HDPE DN 560, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m
COMPUERTA DE MADERA DE 0.50 X 1.10m E=2"
COMPUERTA DE MADERA DE 0.70 X 0.90m E=2"
TUBERIA HDPE DN 560mm
MONTAJE DE INSTALACIONES HIDRAULICAS DE CAPTACION
LINEA DE REBOSE
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIALES DEL PROYECTO
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 400 - 450de 1.01 a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 400 - 450 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 400 - 450 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 400 - 450 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE

03 LINEA DE IMPULSION PROYECTADA LI-01


03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02
03.04.03
03.04.04
03.05
03.05.01
03.06
03.06.01
03.07
03.07.01

981,899.00

OBRAS PROVISIONALES
CAMPAMENTO PROVISIONAL DE OBRA
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
CARTEL DE IDENTIFICACION DE OBRA

PRESENTE VALORIZACION

ACUMULADO ANTERIOR

Parcial
S/.

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIALES DEL PROYECTO
TRAZO Y REPLANTEO FINALES DE OBRA
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 315 - 350 de 1.00m a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 315 - 350 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 315 - 350 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 315 - 350 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE
SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4422
TUBERIA PVC-UF NTP ISO 4422 C-7.5 DN 350 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/AGUA POTABLE DN 315 - 350

61,279.00

SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF ISO 4422


CODO 11.25 PVC-UF DN 350
CODO 90 PVC-UF DN 350
CODO 45 PVC-UF DN 350
INSTALACION DE ACCESORIOS PVC-UF DN 315 - 350

UND
UND
UND
UND

SUMINISTRO E INSTALACION DE VALVULAS


VALVULA AIRE DN 80 TRIPLE EFECTO, EN TUBERIA DN 350 (INCLUY. CAMARA)

UND

PRUEBAS
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 315 - 350

VARIOS
CONCRETO f'c=140 kg/cm2 P/ANCLAJE DE ACCESORIO DN 315 -350

UND

1.00

7,724.04

7,724.04

100.00%

0.00

0.00

0.45

3,475.82

0.45

3475.82

0.55

4,248.22

45.00%

6.70

2,050.20

100.00%

0.00

0.00

375.20

56.00

375.20

250.00

1,675.00

18.30%

5.00

134.08

670.40

100.00%

0.00

0.00

56.00
0.80
0.40

53.63

53.63

4.60
0.00

616.77

2,523,211.72

0.40
0.00

4,474,037.25

15,683.95
15,683.95

1.49
1.07

100.00%
100.00%

0.00
0.00

0.00
0.00

8,345.00
8,345.00

12,434.05
8,929.15

8,345.00
8,345.00

7,338.95
7,338.95

10,935.04
7,852.68

6,997,248.96
M
M

22.50%

306.00

04 LINEA DE CONDUCCION PROYECTADA RIO NEGRO LC-01


04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO INICIALES DEL PROYECTO
04.01.02 TRAZO Y REPLANTEO FINALES DE OBRA

65.79

100.00%

23,369.09
16,781.83

2,523,211.72
12434.05
8929.15

8.00%

53.21%
53.21%

04.01.03
04.01.04
04.02
04.02.01
04.02.02
04.02.04
04.02.11
04.03
04.03.01
04.03.02
04.04
04.04.01
04.04.02
04.05
04.05.01
04.05.02
04.05.03
04.05.04
04.05.05
04.06
04.06.01
04.06.02
04.06.03
04.06.04
04.07
04.07.01
04.08
04.08.01
04.08.02
04.08.03
04.09
04.09.01
04.09.01.01
04.09.01.02
04.09.02
04.09.02.01
04.09.02.02
04.09.02.03
04.10
04.10.01

ACARREO DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR P/INST. L.CONDUCCION


MOVILIZACION/DESMOVILIZACION DE EQUIPO MECANICO P/INST. L.CONDUCCION

GLB
GLB

1.00
1.00

1,026.16
1,758.99

1,026.16
1,758.99

100.00%
100.00%

0.00
0.00

0.00
0.00

0.30
0.30

307.85
527.70

0.30
0.30

MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 500 - 600 de 1.51m a 2.00m PROF.
M
PERFILADO DE ZANJA PULSO P/INST. DE TUBERIA ADOSADA EN T-SEMIROCOSO DN 500 - 630, h=0.15m PROF.M
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 500 - 630 PARA TODA PROF.
M
ELIMINACION DE MATERIAL EXCEDENTE
M3K

12,870.86
686.14
12,870.86
9,722.19

21.83
2.46
2.20
17.86

280,970.87
1,687.90
28,315.89
173,638.31

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

362.00
198.00
362.00
3,875.00

7,902.46
487.08
796.40
69,207.50

362.00
198.00
362.00
3,875.00

SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4422


TUBERIA PVC-UF NTP ISO 4422 C-5 DN 560 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/AGUA POTABLE DN 500 - 630

M
M

12,870.86
12,870.86

250.29
24.08

3,221,447.55
309,930.31

100.00%
100.00%

0.00
0.00

5,987.00
5,987.00

1,498,486.23
144,166.96

M
M

307.85
527.70

0.70
0.70

718.31
1,231.29

30.00%
30.00%

7902.46
487.08
796.40
69207.50

12,508.86
488.14
12,508.86
5,847.19

273,068.41
1,200.82
27,519.49
104,430.81

2.81%
28.86%
2.81%
39.86%

5,987.00
5,987.00

1498486.23
144166.96

6,883.86
6,883.86

1,722,961.32
165,763.35

46.52%
46.52%

2,813.09
2,813.09

355.45
107.37

999,912.84
302,041.47

100.00%
100.00%

0.00
0.00

0.00
0.00
0.00
0.00
0.00

567.40
567.40

201,682.33
60,921.74

567.40
567.40

201682.33
60921.74

2,245.69
2,245.69

798,230.51
241,119.74

20.17%
20.17%

SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF ISO 4422


CODO 11.25 PVC-UF DN 560
CODO 22.5 PVC-UF DN 560
CODO 45 PVC-UF DN 560
CODO 90 PVC-UF DN 560
INSTALACION DE ACCESORIOS PVC-UF DN 500 - 630

UND
UND
UND
UND
UND

24.00
29.00
24.00
1.00
78.00

2,473.28
2,768.28
3,240.28
3,476.99
84.67

59,358.72
80,280.12
77,766.72
3,476.99
6,604.26

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

5.00
7.00
5.00
1.00
35.00

12,366.40
19,377.96
16,201.40
3,476.99
2,963.45

5.00
7.00
5.00
1.00
35.00

12366.40
19377.96
16201.40
3476.99
2963.45

19.00
22.00
19.00
0.00
43.00

46,992.32
60,902.16
61,565.32
0.00
3,640.81

20.83%
24.14%
20.83%
100.00%
44.87%

SUMINISTRO E INSTALACION DE ACCESORIOS DE HDPE


CURVA 11.25 HDPE DN 560
CURVA 22.5 HDPE DN 560
CURVA 45 HDPE DN 560
INSTALACION DE ACCESORIOS HDPE DN 560 (TERMOFUSION)

UND
UND
UND
UND

17.00
16.00
9.00
42.00

5,923.13
5,923.13
5,922.42
751.69

100,693.21
94,770.08
53,301.78
31,570.98

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

3.00
6.00
3.00
2.00

17,769.39
35,538.78
17,767.26
1,503.38

3.00
6.00
3.00
2.00

17769.39
35538.78
17767.26
1503.38

UND

5.00

2,124.00

10,620.00

100.00%

0.00

0.00

1.00

2,124.00

1.00

2124.00

82,923.82
59,231.30
35,534.52
30,067.60
0.00
8,496.00

17.65%
37.50%
33.33%
4.76%

SUMINISTRO E INSTALACION DE UNIONES


ACOPLE FLEXIBLE DN 560mm

14.00
10.00
6.00
40.00
0.00
4.00

SUMINISTRO E INSTALACION DE VALVULAS


VALVULA DE AIRE DN 80,EN TUBERIA DN 560 (INCLUY. CAMARA)
VALVULA DE PURGA DN 100 , EN TUBERIA HDPE DN 560 (INCLUY. CMARA)
VALVULA DE PURGA DN 100 , EN TUBERIA PVC DN 560 (INCLUY. CMARA)

UND
UND
UND

25.00
6.00
18.00

17,845.79
19,369.09
18,050.79

446,144.75
116,214.54
324,914.22

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

11.00
2.00
7.00

196,303.69
38,738.18
126,355.53

11.00
2.00
7.00

196303.69
38738.18
126355.53

14.00
4.00
11.00

249,841.06
77,476.36
198,558.69

44.00%
33.33%
38.89%

PROTECCION DE TUBERIAS
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.

M
M

159.00
106.00

22.79
72.22

3,623.61
7,655.32

100.00%
100.00%

0.00
0.00

0.00
0.00

56.00
42.00

1,276.24
3,033.24

56.00
42.00

1276.24
3033.24

103.00
64.00

2,347.37
4,622.08

35.22%
39.62%

CONCRETO ARMADO
CONCRETO F'C 210 KG/CM2 PARA ESTRUCTURAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA ESTRUCTURAS
ACERO ESTRUC. TRABAJADO PARA ESTRUCTURAS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

71.58
212.12
5,626.10

377.36
43.78
5.36

27,011.43
9,286.61
30,155.90

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

24.00
45.00
765.00

9,056.64
1,970.10
4,100.40

24.00
45.00
765.00

9056.64
1970.10
4100.40

47.58
167.12
4,861.10

17,954.79
7,316.51
26,055.50

33.53%
21.21%
13.60%

PRUEBAS
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 500 - 630

15,683.95

9.75

152,918.51

100.00%

0.00

0.00

763.00
0.00

7,439.25

763.00
0.00

7439.25

14,920.95
0.00

145,479.26

4.86%

247,995.86

SUMINISTRO E INSTALACION DE TUBERIAS DE HDPE


TUBERIA HDPE NTP ISO 4427 SDR 21 PN 6 DN 560 + 2% de desperdicios
INSTALACION DE TUB. HDPE P/AGUA POTABLE DN 500-630 (TERMOFUSION)

05 RESERVORIO APOYADO PROYECTADO RIO NEGRO RAP-01 VOL=1,200M3

273,786.75

727.43

25,790.91

20.00%

5.01 RESERVORIO APOYADO PROYECTADO RAP-01


05.01.01.01 OBRAS PRELIMINARES
05.01.01.01.01 TRAZO, NIVELACION Y REPLANTEO INICIAL

M2

301.72

2.16

651.72

100.00%

301.72

651.72

0.00

0.00

301.72

651.72

0.00

0.00

100.00%

05.01.01.01.02 LIMPIEZA Y DESBROCE DE TERRENO MANUAL

M2

1,666.00

2.69

4,481.54

100.00%

1,666.00

4,481.54

0.00

0.00

1,666.00

4481.54

0.00

0.00

100.00%

0.00

0.00

0.00

0.00

0.00

05.01.01.02 MOVIMIENTO DE TIERRAS


05.01.01.02.01 EXCAVACION MASIVA EN TERRENO NORMAL A MAQUINA
05.01.01.02.02
05.01.01.02.03
05.01.01.02.04
05.01.01.02.05
5.02
05.02.01
05.02.01.01
05.02.01.01.01
05.02.01.01.02
05.02.01.02
05.02.01.02.01
05.02.01.02.02
05.02.01.02.03
05.02.01.02.04
05.02.01.02.05
05.02.01.03
05.02.01.03.01
05.02.01.03.02
05.02.01.03.03
05.02.01.03.04
05.02.01.04
05.02.01.04.01
05.02.01.04.01.01
05.02.01.04.01.02
05.02.01.04.02
05.02.01.04.02.01
05.02.01.04.02.02
05.02.01.04.02.03
05.02.01.04.03
05.02.01.04.03.01
05.02.01.04.03.02
05.02.01.04.03.03
05.02.01.04.04
05.02.01.04.04.01
05.02.01.04.04.02
05.02.01.04.04.03
05.02.01.04.05
05.02.01.04.05.01
05.02.01.04.05.02
05.02.01.04.05.03
05.02.01.05
05.02.01.05.01
05.02.02
05.02.02.01
05.02.02.01.01
05.02.02.01.02
05.02.02.01.03
05.02.02.02
05.02.02.02.01
05.02.02.02.02
05.02.02.03
05.02.03.03.01
05.02.03.03.02
05.02.03.03.03
05.02.03.03.04
05.02.03.03.05
05.02.03.03.06
05.02.03.03.07
05.02.03.03.08
05.02.03.03.09

M3

145.11

4.49

651.54

100.00%

145.11

651.54

0.00

0.00

145.11

651.54

0.00

0.00

100.00%

EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS


REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL
RETIRO + ACOMODO DE DESMONTE EN ZONA ALEDAA C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE

M3
M2
M3
M3K

116.11
260.16
326.65
326.65

38.04
1.36
5.42
17.86

4,416.82
353.82
1,770.44
5,833.97

100.00%
100.00%
100.00%
100.00%

116.11
260.16
326.65
326.65

4,416.82
353.82
1,770.44
5,833.97

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

116.11
260.16
326.65
326.65

4416.82
353.82
1770.44
5833.97

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

CASETA DE RESERVORIO APOYADO RAP-01


ESTRUCTURAS
OBRAS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO INICIAL
LIMPIEZA Y DESBROCE DE TERRENO MANUAL

M2
M2

66.03
66.03

2.16
2.69

142.62
177.62

100.00%
100.00%

66.03
66.03

142.62
177.62

0.00
0.00

0.00
0.00

66.03
66.03

142.62
177.62

0.00
0.00

0.00
0.00

100.00%
100.00%

MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN TERRENO NORMAL A MAQUINA
EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS
REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL
RETIRO + ACOMODO DE DESMONTE EN ZONA ALEDAA C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE

M3
M3
M2
M3
M3K

44.86
19.47
66.03
53.83
53.83

4.49
38.04
1.36
5.42
17.86

201.42
740.64
89.80
291.76
961.40

100.00%
100.00%
100.00%
100.00%
100.00%

44.86
19.47
66.03
53.83
53.83

201.42
740.64
89.80
291.76
961.40

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

44.86
19.47
66.03
53.83
53.83

201.42
740.64
89.80
291.76
961.40

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

OBRAS DE CONCRETO SIMPLE


CONCRETO 1:10 + 30% PIEDRA GRANDE PARA CIMIENTO CORRIDO (CEMENTO P-I)
CONCRETO 1:8 + 25% P.M. P/SOBRECIMIENTOS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACIN DE MADERA) DE SOBRECIMIENTOS REFORZADOS
FALSO PISO DE CONCRETO 1:10 DE ESPESOR 4" (CEMENTO P-I)

M3
M3
M2
M2

11.48
2.63
22.46
66.03

198.75
221.07
34.48
25.45

2,281.65
581.41
774.42
1,680.46

100.00%
100.00%
100.00%
100.00%

6.35
2.63
22.46
66.03

1,262.06
581.41
774.42
1,680.46

3.66
0.00
0.00
0.00

727.43
0.00
0.00
0.00

10.01
2.63
22.46
66.03

1989.49
581.41
774.42
1680.46

1.47
0.00
0.00
0.00

292.16
0.00
0.00
0.00

87.20%
100.00%
100.00%
100.00%

OBRAS DE CONCRETO ARMADO


ZAPATAS
CONCRETO F'C=210KG/CM2 PARA ZAPATA (CEMENTO PI)
ACERO ESTRUC. TRABAJADO PARA ZAPATAS (COSTO PROM. INCL. DESPERDICIOS)

M3
KG

4.36
91.20

354.74
5.30

1,546.67
483.36

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

4.36
91.20

1,546.67
483.36

0.00%
0.00%

COLUMNAS
CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA COLUMNAS
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

M3
M2
KG

1.66
13.46
368.93

420.33
45.63
5.33

697.75
614.18
1,966.40

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

1.66
13.46
368.93

697.75
614.18
1,966.40

0.00%
0.00%
0.00%

VIGAS
CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I)
ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES

M3
KG
M2

3.55
22.54
468.47

392.79
5.33
53.11

1,394.40
120.14
24,880.44

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

3.55
22.54
468.47

1,394.40
120.14
24,880.44

0.00%
0.00%
0.00%

LOSAS MACIZAS
CONCRETO F'C 210 KG/CM2 PARA LOSAS MACIZAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS
ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

9.90
66.00
467.91

392.80
42.25
5.33

3,888.72
2,788.50
2,493.96

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

9.90
66.00
467.91

3,888.72
2,788.50
2,493.96

0.00%
0.00%
0.00%

DADOS DE APOYO Y/O ANCLAJE


CONCRETO F'C 210 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA ANCLAJES Y/O DADOS
ACERO ESTRUC. TRABAJADO PARA ANCLAJES Y/O DADOS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

0.47
4.38
52.01

372.39
31.30
5.33

175.02
137.09
277.21

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.47
4.38
52.01

175.02
137.09
277.21

0.00%
0.00%
0.00%

1.00

4,814.99

4,814.99

100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

UND

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

CAJAS DE DISTRIBUCION
CAJA REBOSE-PURGA TERRENO NORMAL INC. ELIMINACION DESMONTE

0.00

0.00

0.00

0.00

1.00

4,814.99

0.00%

INSTALACIONES HIDRAULICAS
TUBERIAS
TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 350
TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 400
TUBERIA PVC-UF NTP ISO 4435 S-25 DN 400

M
M
M

32.53
19.00
6.00

666.08
790.05
79.46

21,667.58
15,010.95
476.76

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

32.53
19.00
6.00

21,667.58
15,010.95
476.76

0.00%
0.00%
0.00%

VALVULAS
VALVULA DE CPTA. BB. Ho. DUCTIL DN 350mm ISO 5996
VALVULA DE CPTA. BB. Ho. DUCTIL DN 400mm ISO 5996

UND
UND

3.00
2.00

4,484.00
7,074.10

13,452.00
14,148.20

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

3.00
2.00

13,452.00
14,148.20

0.00%
0.00%

ACCESORIOS
CODO 22.5 HIERRO DUCTIL BRIDADO DN 350
CODO 45 HIERRO DCTIL BRIDADO DN 350
CODO 45 HIERRO DCTIL BRIDADO DN 400
CODO 90 HIERRO DCTIL BRIDADO DN 350
CODO 90 HIERRO DCTIL BRIDADO DN 400
TEE Ho DUCTIL BRIDADO DN 350x350
TEE Ho DUCTIL BRIDADO DN 400x400
REDUCCION Ho DUCTIL BRIDADO DN 400x350mm
CANASTILLA DE ACERO INOXIDABLE BRIDADA DN 16" (400mm)

UND
UND
UND
UND
UND
UND
UND
UND
UND

1.00
3.00
2.00
3.00
1.00
1.00
2.00
1.00
1.00

885.00
1,416.00
1,810.12
1,622.50
2,129.90
2,586.56
3,262.70
1,871.72
2,596.00

885.00
4,248.00
3,620.24
4,867.50
2,129.90
2,586.56
6,525.40
1,871.72
2,596.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.00
3.00
2.00
3.00
1.00
1.00
2.00
1.00
1.00

885.00
4,248.00
3,620.24
4,867.50
2,129.90
2,586.56
6,525.40
1,871.72
2,596.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

05.02.03.03.10 TRANSICION TIPO LUFLEX HD, DN 350

UND

1.00

861.40

861.40

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

861.40

0.00%

05.02.03.03.11
05.02.03.04
05.02.03.04.01
05.02.03.04.02
05.02.03.04.03
05.02.03.04.04
05.02.03.05
05.02.03.05.01
05.02.03.05.02
05.02.03.05.03
05.02.03.05.04
05.02.03.05.05
05.02.03.05.06
05.02.03.06
05.02.03.06.01
05.02.03.07
05.02.03.07.01
05.02.03.07.02
05.02.03.07.03
05.02.03
05.02.03.01
05.02.03.01.01
05.02.03.01.02
05.02.03.01.03
05.02.02.02
05.02.02.02.01
05.02.02.02.02
05.02.02.02.03
05.02.02.02.04
05.02.02.03
05.02.02.03.01
05.02.02.03.02
05.02.02.03.03
05.02.02.03.04
05.02.02.03.05
05.02.02.03.06
05.02.02.04
05.02.02.04.01
05.02.02.04.02

TRANSICION TIPO LUFLEX HD, DN 400

UND

1.00

896.80

896.80

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

896.80

0.00%

ELEMENTOS DE UNION Y MONTAJE


UNION FLEXIBLE TIPO DRESSER DE 14" (350MM)
UNION FLEXIBLE TIPO DRESSER DE 16" (400MM)
UNION FLEXIBLE AUTOPORTANTE SIMILAR SMIT BLAIR DN 14" (350MM)
UNION FLEXIBLE AUTOPORTANTE SIMILAR SMIT BLAIR DN 16" (400 MM)

UND
UND
UND
UND

2.00
1.00
1.00
1.00

590.00
655.25
2,596.00
3,219.75

1,180.00
655.25
2,596.00
3,219.75

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

2.00
1.00
1.00
1.00

1,180.00
655.25
2,596.00
3,219.75

0.00%
0.00%
0.00%
0.00%

BRIDAS, PERNOS Y EMPAQUETADURAS


BRIDA DE HIERRO DUCTIL PARA SOLDAR Y EMPERNAR DN 14" (350 mm)
BRIDA DE HIERRO DUCTIL PARA SOLDAR Y EMPERNAR DN 16" (400 mm)
PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 14" (350MM)
PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 16" (400MM)
EMPAQUETADURA DE JEBE ENLONADO DE 14" (350 mm)
EMPAQUETADURA DE JEBE ENLONADO DE 16" (400 mm)

UND
UND
UND
UND
UND
UND

27.00
25.00
432.00
400.00
27.00
25.00

247.80
589.41
9.44
14.75
25.96
34.22

6,690.60
14,735.25
4,078.08
5,900.00
700.92
855.50

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

27.00
25.00
432.00
400.00
27.00
25.00

6,690.60
14,735.25
4,078.08
5,900.00
700.92
855.50

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

MEDIDORES
MEDIDOR DE CAUDAL ELECTROMAGNETICO BRIDADO DE 16"

UND

1.00

12,614.20

12,614.20

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

12,614.20

0.00%

VARIOS
REJILLA SUMIDERO 1.40 X 1.40, PLATINA 1 1/4" X 1/4" @ 1/2" Y MARCO "L" 1 1/4"
CONCRETO F'C 175 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)
MONTAJE DE INSTALACIONES HIDRAULICAS DE RESERVORIO

UND
M3
GLB

1.00
4.60
1.00

88.50
346.38
4,140.51

88.50
1,593.35
4,140.51

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

1.00
4.60
1.00

88.50
1,593.35
4,140.51

0.00%
0.00%
0.00%

226.98
309.76
107.78

26.27
37.30
45.01

5,962.76
11,554.05
4,851.18

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

226.98
309.76
107.78

5,962.76
11,554.05
4,851.18

0.00%
0.00%
0.00%

6.67
1.00
4.00
6.00

239.28
465.93
99.25
257.92

1,596.00
465.93
397.00
1,547.52

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6.67
1.00
4.00
6.00

1,596.00
465.93
397.00
1,547.52

0.00%
0.00%
0.00%
0.00%

499.92
160.22
1,200.00
1,200.00
644.52
57.80

5,009.20
1,749.60
2,580.00
900.00
580.07
2,873.24

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00
0.00

0.00
0.00

0.00
0.00

1.00
2.00

2,006.00
4,460.40

0.00%
0.00%

ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES
TARRAJEO CON IMPERMEABILIZANTE DE MUROS
TARRAJEO CON IMPERMEABILIZANTE DE CIELO RASO
CARPINTERIA METALICA
ESCALERA DE TUBO FO. GALV. CON PARANTESDE 1 1/4" POR PELDAOS DE 3/4"

M2
M2
M2

PINTURA, ADITAMENTOS Y VARIOS


PINTADO EXTERIOR C/TEKNOMATE O SIMILAR DE RESERVORIO APOYADO INCL. MENSAJE
PROVISIN Y COLOCADO DE JUNTA WATER STOP DE P.V.C. E=15 CM ( 6")
PRUEBA HIDRAULICA CON EMPLEO DE LA LINEA DE INGRESO (CAPTACION)
EVACUACION DEL AGUA DE PRUEBA CON EMPLEO DE LA LINEA DE SALIDA
LIMPIEZA Y DESINFECCION DE RESERVORIOS APOYADOS
VEREDA DE CONCRETO F'C 175 KG/CM2 E=10CM PASTA 1:2 (P-I), C/EMPLEO DE MEZCLADORA

M2
M
M3
M3
M2
M2

499.92
160.22
1,200.00
1,200.00
644.52
57.80

10.02
10.92
2.15
0.75
0.90
49.71

5,009.20
1,749.60
2,580.00
900.00
580.07
2,873.24

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PASES PARA TUBERIAS


NIPLE DE Ho DUCTIL DN 14" (350mm), TIPO BRIDA-BRIDA, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m
NIPLE DE Ho DUCTIL DN 16" (400mm), TIPO BRIDA-BRIDA, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m

PZA
PZA

1.00
2.00

2,006.00
2,230.20

2,006.00
4,460.40

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

MARCO Y TAPA DE PLANCHA LAC 1/4" CONMECANISMO DE SEGURIDAD DE 0,90 X 1,50 MSEGN DISEO

VENTILACION CON TUBERIA DE ACERO SEGUN DISEO DN 150


SOPORTE METALICO TIPO ABRAZADERA PARA TUBERIA DN 300 A 350

TOTAL COSTO DIRECTO


GASTOS GENERALES
UTILIDAD
SUB-TOTAL
IMPUESTO GENERAL A LAS VENTAS (EXONERADO)
TOTAL PRESUPUESTO

M
UND
UND
UND

16.60%
2.40%

S/.
S/.
S/.
S/.
S/.

8,395,455.12
1,393,645.55
201,490.92
9,990,591.59
-

S/.

9,990,591.59

100.00%

S/.
S/.
S/.
S/.
S/.

201,273.46
33,411.39
4,830.56
239,515.41
-

S/.
S/.
S/.
S/.
S/.

2,825,794.59
469,081.90
67,819.07
3,362,695.56
-

S/.
S/.
S/.
S/.
S/.

3,085,543.72
512,200.26
74,053.05
3,671,797.03
-

S/.
S/.
S/.
S/.
S/.

5,249,892.60
871,482.17
125,997.42
6,247,372.19
-

S/.

239,515.41

S/.

3,362,695.56

S/.

3,671,797.03

S/.

6,247,372.19

OBRA
: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA, PROVINCIA DE RIOJA - SAN MARTIN
Nro.REGIONAL
009 - 2011 DE
- GRSM
PEAM - 01.00
CONTRATO : CONTRATO
: GOBIERNO
SAN -MARTIN
ENTIDAD
: GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA : CONSORCIO ALIANZA

VALORIZACION DE OBRA N 02

CORRESPONDIENTE AL MES DE ENERO 2,012 (DEL 1/01/ AL 30/01/12)


PRESUPUESTO
Item

Descripcin

Und.

Metrado

P. U.
S/.

Parcial
S/.

01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES PARA TODA LA OBRA

PRESENTE VALORIZACION

ACUMULADO ANTERIOR
Parcial
S/.

Metrado

981,899.00

Metrado

476,929.91

ACUMULADO ACTUAL

Parcial
S/.

Metrado

SALDO POR VALORIZAR

Parcial
S/.

504,969.09

Metrado

981,899.00

Parcial
S/.

0.00

01.01 OBRAS PROVISIONALES


01.01.01 CAMPAMENTO PROVISIONAL DE OBRA
01.01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO

GLB
UND

1.00
1.00

6,300.00
10,000.00

6,300.00
10,000.00

100.00%
100.00%

0.90
0.42

5,670.00
4,200.00

0.10
0.58

630.00
5,800.00

1.00
1.00

6300.00
10000.00

0.00
0.00

0.00
0.00

100.00%
100.00%

01.01.03 CARTEL DE IDENTIFICACION DE OBRA

UND

1.00

1,517.07

1,517.07

100.00%

1.00

1,517.07

0.00

0.00

1.00

1517.07

0.00

0.00

100.00%

01.02 TRABAJOS PRELIMINARES


01.02.01 MOVILIZACION DE EQUIPO
01.02.02 TRANSPORTE DE MATERIALES DESDE LIMA A OBRA

GLB
GLB

1.00
1.00

92,783.68
871,298.25

92,783.68
871,298.25

100.00%
100.00%

0.51
0.48

47,319.68
418,223.16

0.49
0.52

45,464.00
453,075.09

1.00
1.00

92783.68
871298.25

0.00
0.00

0.00
0.00

100.00%
100.00%

02 CAPTACION PROYECTADA RIO NEGRO CAP-01

81,241.41

22,890.40

81,241.41

0.00

02.01 OBRAS PROVISIONALES


02.01.01 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO

UND

1.00

10,000.00

10,000.00

100.00%

1.00

10,000.00

0.00

0.00

1.00

10000.00

0.00

0.00

100.00%

02.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS P/OBRA

GLB

1.00

3,728.23

3,728.23

100.00%

1.00

3,728.23

0.00

0.00

1.00

3728.23

0.00

0.00

100.00%

02.02 TRABAJOS PRELIMINARES


02.02.01 LIMPIEZA Y DESBROCE DE TERRENO MANUAL

M2

25.16

2.69

67.68

100.00%

25.16

67.68

0.00

0.00

25.16

67.68

0.00

0.00

100.00%

02.02.02 TRAZO, NIVELACION Y REPLANTEO INICIAL

M2

12.96

2.16

27.99

100.00%

12.96

27.99

0.00

0.00

12.96

27.99

0.00

0.00

100.00%

02.03 VIA DE ACCESO A ZONA DE CAPTACION


02.03.01 TRAZO, NIVELACION Y REPLANTEO INICIAL
02.03.02 CORTE Y LIMPIEZA DE MALEZA

M2
M2

4,027.20
4,027.27

2.16
4.04

8,698.75
16,270.17

100.00%
100.00%

4,027.20
4,027.27

8,698.75
16,270.17

0.00
0.00

0.00
0.00

4,027.20
4,027.27

8698.75
16270.17

0.00
0.00

0.00
0.00

100.00%
100.00%

02.03.03 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO (CANTERA UBICADA A MENOS DE 100 METROS)
02.03.04 ELIMINACION DE MATERIAL EXCEDENTE

M3
M3K

1,006.80
241.63

5.15
17.86

5,185.02
4,315.51

100.00%
100.00%

767.89
152.00

3,954.63
2,714.72

238.91
89.63

1,230.39
1,600.79

1,006.80
241.63

5185.02
4315.51

0.00
0.00

0.00
0.00

100.00%
100.00%

02.03.05 PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA

UND

1.00

297.14

297.14

100.00%

1.00

297.14

0.00

0.00

1.00

297.14

0.00

0.00

100.00%

M3

7.20

209.33

1,507.18

100.00%

7.20

1,507.18

0.00

0.00

7.20

1507.18

0.00

0.00

100.00%

02.04.02 EXCAVACION P/ENCAUZAMIENTO DE RIO EN TERRENO EN ROCA SUELTA

M3

12.58

173.62

2,184.14

100.00%

12.58

2,184.14

0.00

0.00

12.58

2184.14

0.00

0.00

100.00%

02.04.03 ELIMINACION DE MATERIAL EXCEDENTE

M3K

20.77

17.86

370.95

100.00%

20.77

370.95

0.00

0.00

20.77

370.95

0.00

0.00

100.00%
100.00%

02.04 MOVIMIENTO DE TIERRAS


02.04.01 EXCAVACION EN ROCA SUELTA EN LECHO DE RIO

02.05 OBRAS DE CONCRETO SIMPLE


02.05.01 CONCRETO F'C 100 KG/CM2 PARA SOLADOS Y/O SUB BASES (CEMENTO PI)
02.06 OBRAS DE CONCRETO ARMADO
02.06.01 LOSAS DE FONDO - PISO
02.06.01.01 CONCRETO F'C=245KG/CM2 PARA LOSAS DE FONDO (CEMENTO PI)
02.06.01.02 ACERO ESTRUCT. TRABAJADO P/ LOSA DE FONDO-PISO (COSTO PROM. INCL. DESPERDICIOS)
02.06.02 MUROS Y PLACAS
02.06.02.01 CONCRETO F'C=245KG/CM2 PARA MUROS REFORZADOS (CEMENTO PI)
02.06.02.02 ENCOFRADO (INCL. HABILITACION DE MADERA) PARA MUROS REFORZADOS
02.06.02.03 ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS)
02.06.03 VIGAS
02.06.03.01 CONCRETO F'C=245KG/CM2 PARA VIGAS (CEMENTO PI)
02.06.03.02 ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES
02.06.03.03 ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)
02.06.04 LOSAS DE TECHO
02.06.04.01
02.06.04.02
02.06.04.03
02.07
02.07.01
02.07.02
02.07.03
02.08
02.08.01
02.08.02

M3

9.96

293.85

2,926.75

100.00%

9.96

2,926.75

0.00

0.00

9.96

2926.75

0.00

0.00
0.00

M3
KG

2.67
134.36

411.63
5.30

1,099.05
712.11

100.00%
100.00%

0.60
37.56

246.98
199.07

2.07
96.80

852.07
513.04

2.67
134.36

1099.05
712.11

0.00
0.00

0.00
0.00

100.00%
100.00%

M3
M2
KG

3.05
30.29
346.36

445.91
50.90
5.33

1,360.03
1,541.76
1,846.10

100.00%
100.00%
100.00%

0.43
12.45
31.98

191.74
633.71
170.45

2.62
17.84
314.38

1,168.28
908.06
1,675.65

3.05
30.29
346.36

1360.03
1541.76
1846.10

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

M3
M2
KG

0.59
7.60
99.84

418.37
53.11
5.33

246.84
403.64
532.15

100.00%
100.00%
100.00%

0.11
2.12
26.57

46.02
112.59
141.62

0.48
5.48
73.27

200.82
291.04
390.53

0.59
7.60
99.84

246.84
403.64
532.15

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

CONCRETO F'C=245KG/CM2 PARA LOSAS MACIZAS


ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS
ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

1.62
10.00
117.42

418.37
42.25
5.33

677.76
422.50
625.85

100.00%
100.00%
100.00%

0.37
2.66
35.22

154.80
112.39
187.72

1.25
7.34
82.20

522.96
310.12
438.13

1.62
10.00
117.42

677.76
422.50
625.85

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES
TARRAJEO CON IMPERMEABILIZANTE DE MUROS
TARRAJEO EXTERIOR CON MORTERO 1:5 X 1.5 cm (INCLUYE COLUMNAS EMPOTRADAS)

M2
M2
M2

5.83
31.52
7.80

26.27
37.30
25.15

153.15
1,175.70
196.17

100.00%
100.00%
100.00%

0.22
15.00
1.21

5.78
559.50
30.43

5.61
16.52
6.59

147.37
616.20
165.74

5.83
31.52
7.80

153.15
1175.70
196.17

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

PZA
UND

2.00
1.00

354.00
119.92

708.00
119.92

100.00%
100.00%

0.66
0.30

233.64
35.98

1.34
0.70

474.36
83.94

2.00
1.00

708.00
119.92

0.00
0.00

0.00
0.00

100.00%
100.00%

UND
M
GLB

1.00
10.00
1.00

150.00
358.93
4,138.85

150.00
3,589.30
4,138.85

100.00%
100.00%
100.00%

0.30
0.30
0.22

45.00
107.68
910.55

0.70
9.70
0.78

105.00
3,481.62
3,228.30

1.00
10.00
1.00

150.00
3589.30
4138.85

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

40.00

1.49

59.60

100.00%

25.00

37.25

40.00

59.60

0.00

0.00

100.00%

40.00
40.00
40.00
40.00
10.36

12.13
1.86
4.26
14.94
17.86

485.20
74.40
170.40
597.60
185.03

100.00%
100.00%
100.00%
100.00%
100.00%

12.00
12.00
12.00
12.00
3.00

145.56
22.32
51.12
179.28
53.58

15.00
0.00
28.00
28.00
28.00
28.00
7.36

22.35

M
M
M
M
M3K

339.64
52.08
119.28
418.32
131.45

40.00
40.00
40.00
40.00
10.36

485.20
74.40
170.40
597.60
185.03

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

M
M

40.00
40.00

99.15
3.31

3,966.00
132.40

100.00%
100.00%

9.00
9.00

892.35
29.79

31.00
31.00

3,073.65
102.61

40.00
40.00

3966.00
132.40

0.00
0.00

0.00
0.00

100.00%
100.00%

65.79

0.00
31.00

0.00
0.00
0.00

100.00%

INSTALACIONES HIDRAULICAS
NIPLE DE HDPE DN 560, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m
COMPUERTA DE MADERA DE 0.50 X 1.10m E=2"

02.08.03 COMPUERTA DE MADERA DE 0.70 X 0.90m E=2"


02.08.04 TUBERIA HDPE DN 560mm
02.08.05 MONTAJE DE INSTALACIONES HIDRAULICAS DE CAPTACION
2.09
02.09.01
02.10.01.01
02.09.02
02.09.02.01
02.09.02.02
02.09.02.03
02.09.02.04
02.09.02.05
02.09.03
02.09.03.01
02.09.03.02

LINEA DE REBOSE
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICIALES DEL PROYECTO
MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 400 - 450de 1.01 a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 400 - 450 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 400 - 450 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 400 - 450 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE
SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4435
TUBERIA PVC-UF NTP ISO 4435 S-25 DN 450 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/DESAGUE DN 400 - 450

02.09.04 PRUEBAS
02.09.04.01 PRUEBA HIDRAULICA P/TUB. DE DESAGUE DN 400 - 450

40.00

7.31

03 LINEA DE IMPULSION PROYECTADA LI-01


03.01 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO INICIALES DEL PROYECTO
03.01.02 TRAZO Y REPLANTEO FINALES DE OBRA
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02

MOVIMIENTO DE TIERRAS
EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 315 - 350 de 1.00m a 1.50m PROF.
REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 315 - 350 PARA TODA PROF.
PREPARACION DE CAMA DE APOYO P/TUB. DN 315 - 350 PARA TODA PROF.
RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 315 - 350 de 1.01m a 1.50m PROF.
ELIMINACION DE MATERIAL EXCEDENTE
SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4422
TUBERIA PVC-UF NTP ISO 4422 C-7.5 DN 350 incluye anillo + 2% de desperdicios.
INSTALACION DE TUB. PVC-UF P/AGUA POTABLE DN 315 - 350
SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF ISO 4422
CODO 11.25 PVC-UF DN 350
CODO 90 PVC-UF DN 350

03.04.03 CODO 45 PVC-UF DN 350


03.04.04 INSTALACION DE ACCESORIOS PVC-UF DN 315 - 350
03.05 SUMINISTRO E INSTALACION DE VALVULAS
03.05.01 VALVULA AIRE DN 80 TRIPLE EFECTO, EN TUBERIA DN 350 (INCLUY. CAMARA)
03.06 PRUEBAS

292.40

100.00%

9.00

61,279.00

43,373.92

40.00
0.00

292.40
0.00

0.00
0.00
0.00

226.61

M
M

306.00
306.00

1.49
1.07

455.94
327.42

100.00%
100.00%

168.00
168.00

250.32
179.76

138.00
138.00

205.62
147.66

306.00
306.00

455.94
327.42

0.00
0.00

0.00
0.00

100.00%
100.00%

M
M
M
M
M3K

306.00
306.00
306.00
306.00
39.51

9.93
1.60
4.00
16.48
17.86

3,038.58
489.60
1,224.00
5,042.88
705.65

100.00%
100.00%
100.00%
100.00%
100.00%

78.00
78.00
78.00
78.00
23.00

774.54
124.80
312.00
1,285.44
410.78

228.00
228.00
228.00
228.00
16.51

2,264.04
364.80
912.00
3,757.44
294.87

306.00
306.00
306.00
306.00
39.51

3038.58
489.60
1224.00
5042.88
705.65

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

M
M

306.00
306.00

110.14
5.41

33,702.84
1,655.46

100.00%
100.00%

56.00
56.00

6,167.84
302.96

250.00
250.00

27,535.00
1,352.50

306.00
306.00

33702.84
1655.46

0.00
0.00

0.00
0.00

100.00%
100.00%

UND
UND

2.00
1.00

811.79
856.68

1,623.58
856.68

100.00%
100.00%

2.00
1.00

1,623.58
856.68

0.00
0.00

0.00
0.00

2.00
1.00

1623.58
856.68

0.00
0.00

0.00
0.00

100.00%
100.00%

UND
UND

2.00
5.00

811.79
17.63

1,623.58
88.15

100.00%
100.00%

2.00
5.00

1,623.58
88.15

0.00
0.00

0.00
0.00

2.00
5.00

1623.58
88.15

0.00
0.00

0.00
0.00

100.00%
100.00%

UND

1.00

7,724.04

7,724.04

100.00%

0.45

3,475.82

0.55

4,248.22

1.00

7724.04

0.00

0.00

100.00%

03.06.01 PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 315 - 350

03.07 VARIOS
03.07.01 CONCRETO f'c=140 kg/cm2 P/ANCLAJE DE ACCESORIO DN 315 -350

UND

306.00

6.70

2,050.20

100.00%

56.00

375.20

250.00

1,675.00

306.00

2050.20

0.00

0.00

100.00%

5.00

134.08

670.40

100.00%

0.40

53.63

4.60

616.77

670.40

0.00
0.00

0.00

100.00%

4,474,037.25

5.00
0.00

0.00

15,683.95

1.49

23,369.09

100.00%

8,345.00

12,434.05

7,338.95

10,935.04

15,683.95

23369.09

0.00

0.00

100.00%

M
GLB
GLB

15,683.95
1.00
1.00

1.07
1,026.16
1,758.99

16,781.83
1,026.16
1,758.99

100.00%
100.00%
100.00%

8,345.00
0.30
0.30

8,929.15
307.85
527.70

7,338.95
0.70
0.70

7,852.68
718.31
1,231.29

15,683.95
1.00
1.00

16781.83
1026.16
1758.99

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

12,870.86

21.83

7,902.46

12,508.86

273,068.41

12,870.86

280970.87

04 LINEA DE CONDUCCION PROYECTADA RIO NEGRO LC-01


04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO INICIALES DEL PROYECTO
04.01.02 TRAZO Y REPLANTEO FINALES DE OBRA
04.01.03 ACARREO DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR P/INST. L.CONDUCCION
04.01.04 MOVILIZACION/DESMOVILIZACION DE EQUIPO MECANICO P/INST. L.CONDUCCION
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 500 - 600 de 1.51m a 2.00m PROF.
04.02.02 PERFILADO DE ZANJA PULSO P/INST. DE TUBERIA ADOSADA EN T-SEMIROCOSO DN 500 - 630, h=0.15m PROF.
04.02.04 REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 500 - 630 PARA TODA PROF.
04.02.11 ELIMINACION DE MATERIAL EXCEDENTE
04.03 SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4422
04.03.01 TUBERIA PVC-UF NTP ISO 4422 C-5 DN 560 incluye anillo + 2% de desperdicios.

6,997,248.96

280,970.87

100.00%

0.00

0.00

100.00%

686.14

2.46

1,687.90

100.00%

198.00

487.08

488.14

1,200.82

686.14

1687.90

0.00

0.00

100.00%

M
M3K

12,870.86
9,722.19

2.20
17.86

28,315.89
173,638.31

100.00%
100.00%

362.00
3,875.00

796.40
69,207.50

12,508.86
5,847.19

27,519.49
104,430.81

12,870.86
9,722.19

28315.89
173638.31

0.00
0.00

0.00
0.00

100.00%
100.00%

362.00

6,997,248.97

12,870.86

250.29

3,221,447.55

100.00%

5,987.00

1,498,486.23

6,883.86

1,722,961.32

12,870.86

3221447.55

0.00

0.00

100.00%

04.03.02 INSTALACION DE TUB. PVC-UF P/AGUA POTABLE DN 500 - 630

12,870.86

24.08

309,930.31

100.00%

5,987.00

144,166.96

6,883.86

165,763.35

12,870.86

309930.31

0.00

0.00

100.00%

04.04 SUMINISTRO E INSTALACION DE TUBERIAS DE HDPE


04.04.01 TUBERIA HDPE NTP ISO 4427 SDR 21 PN 6 DN 560 + 2% de desperdicios
04.04.02 INSTALACION DE TUB. HDPE P/AGUA POTABLE DN 500-630 (TERMOFUSION)

M
M

2,813.09
2,813.09

355.45
107.37

999,912.84
302,041.47

100.00%
100.00%

567.40
567.40

201,682.33
60,921.74

2,245.69
2,245.69

798,230.51
241,119.74

2,813.09
2,813.09

999912.84
302041.47

0.00
0.00

0.00
0.00

100.00%
100.00%

04.05 SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF ISO 4422


04.05.01 CODO 11.25 PVC-UF DN 560

UND

24.00

2,473.28

59,358.72

100.00%

5.00

12,366.40

19.00

46,992.32

24.00

59358.72

0.00

0.00

100.00%

04.05.02 CODO 22.5 PVC-UF DN 560

UND

29.00

2,768.28

80,280.12

100.00%

7.00

19,377.96

22.00

60,902.16

29.00

80280.12

0.00

0.00

100.00%

04.05.03 CODO 45 PVC-UF DN 560


04.05.04 CODO 90 PVC-UF DN 560

UND
UND

24.00
1.00

3,240.28
3,476.99

77,766.72
3,476.99

100.00%
100.00%

5.00
1.00

16,201.40
3,476.99

19.00
0.00

61,565.32
0.00

24.00
1.00

77766.72
3476.99

0.00
0.00

0.00
0.00

100.00%
100.00%

04.05.05 INSTALACION DE ACCESORIOS PVC-UF DN 500 - 630

UND

78.00

84.67

6,604.26

100.00%

35.00

2,963.45

43.00

3,640.81

78.00

6604.26

0.00

0.00

100.00%

04.06 SUMINISTRO E INSTALACION DE ACCESORIOS DE HDPE


04.06.01 CURVA 11.25 HDPE DN 560
04.06.02 CURVA 22.5 HDPE DN 560

UND
UND

17.00
16.00

5,923.13
5,923.13

100,693.21
94,770.08

100.00%
100.00%

3.00
6.00

17,769.39
35,538.78

14.00
10.00

82,923.82
59,231.30

17.00
16.00

100693.21
94770.08

0.00
0.00

0.00
0.00

100.00%
100.00%

04.06.03 CURVA 45 HDPE DN 560


04.06.04 INSTALACION DE ACCESORIOS HDPE DN 560 (TERMOFUSION)

UND
UND

9.00
42.00

5,922.42
751.69

53,301.78
31,570.98

100.00%
100.00%

3.00
2.00

17,767.26
1,503.38

6.00
40.00

35,534.52
30,067.60

9.00
42.00

53301.78
31570.98

0.00
0.00

0.00
0.00

100.00%
100.00%

0.00

0.00

UND

5.00

2,124.00

10,620.00

100.00%

1.00

2,124.00

4.00

8,496.00

5.00

10620.00

0.00

0.00

100.00%

UND

25.00

17,845.79

446,144.75

100.00%

11.00

196,303.69

14.00

249,841.06

25.00

446144.75

0.00

0.00

100.00%

UND

6.00

19,369.09

116,214.54

100.00%

2.00

38,738.18

4.00

77,476.36

6.00

116214.54

0.00

0.00

100.00%

UND

18.00

18,050.79

324,914.22

100.00%

7.00

126,355.53

11.00

198,558.69

18.00

324914.22

0.00

0.00

100.00%

M
M

159.00
106.00

22.79
72.22

3,623.61
7,655.32

100.00%
100.00%

56.00
42.00

1,276.24
3,033.24

103.00
64.00

2,347.37
4,622.08

159.00
106.00

3623.61
7655.32

0.00
0.00

0.00
0.00

100.00%
100.00%

M3
M2
KG

71.58
212.12
5,626.10

377.36
43.78
5.36

27,011.43
9,286.61
30,155.90

100.00%
100.00%
100.00%

24.00
45.00
765.00

9,056.64
1,970.10
4,100.40

47.58
167.12
4,861.10

17,954.79
7,316.51
26,055.50

71.58
212.12
5,626.10

27011.43
9286.61
30155.90

0.00
0.00
0.00

0.00
0.00
0.00

100.00%
100.00%
100.00%

15,683.95

9.75

152,918.51

100.00%

763.00

7,439.25

14,920.95

145,479.26

15,683.95
0.00

152918.51

0.00
0.00

0.00

100.00%

173,246.98

04.07 SUMINISTRO E INSTALACION DE UNIONES


04.07.01 ACOPLE FLEXIBLE DN 560mm
04.08 SUMINISTRO E INSTALACION DE VALVULAS
04.08.01 VALVULA DE AIRE DN 80,EN TUBERIA DN 560 (INCLUY. CAMARA)
04.08.02 VALVULA DE PURGA DN 100 , EN TUBERIA HDPE DN 560 (INCLUY. CMARA)
04.08.03 VALVULA DE PURGA DN 100 , EN TUBERIA PVC DN 560 (INCLUY. CMARA)
04.09 PROTECCION DE TUBERIAS
04.09.01 MOVIMIENTO DE TIERRAS
04.09.01.01 EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.
04.09.01.02 RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.
04.09.02 CONCRETO ARMADO
04.09.02.01 CONCRETO F'C 210 KG/CM2 PARA ESTRUCTURAS (CEMENTO P-I)
04.09.02.02 ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA ESTRUCTURAS
04.09.02.03 ACERO ESTRUC. TRABAJADO PARA ESTRUCTURAS (COSTO PROM. INCL. DESPERDICIOS)
04.10 PRUEBAS
04.10.01 PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 500 - 630

05 RESERVORIO APOYADO PROYECTADO RIO NEGRO RAP-01 VOL=1,200M3


5.01 RESERVORIO APOYADO PROYECTADO RAP-01
05.01.01.01 OBRAS PRELIMINARES
05.01.01.01.01 TRAZO, NIVELACION Y REPLANTEO INICIAL
05.01.01.01.02
05.01.01.02
05.01.01.02.01
05.01.01.02.02
05.01.01.02.03
05.01.01.02.04
05.01.01.02.05
5.02
05.02.01
05.02.01.01

05.02.01.04.01.01
05.02.01.04.01.02
05.02.01.04.02
05.02.01.04.02.01
05.02.01.04.02.02
05.02.01.04.02.03
05.02.01.04.03
05.02.01.04.03.01
05.02.01.04.03.02
05.02.01.04.03.03
05.02.01.04.04
05.02.01.04.04.01
05.02.01.04.04.02
05.02.01.04.04.03
05.02.01.04.05
05.02.01.04.05.01
05.02.01.04.05.02
05.02.01.04.05.03

74,748.88

100,539.79

M2

301.72

2.16

651.72

100.00%

301.72

651.72

0.00

0.00

301.72

651.72

0.00

0.00

100.00%

LIMPIEZA Y DESBROCE DE TERRENO MANUAL

M2

1,666.00

2.69

4,481.54

100.00%

1,666.00

4,481.54

0.00

M3
M3
M2
M3
M3K

145.11
116.11
260.16
326.65
326.65

4.49
38.04
1.36
5.42
17.86

651.54
4,416.82
353.82
1,770.44
5,833.97

100.00%
100.00%
100.00%
100.00%
100.00%

145.11
116.11
260.16
326.65
326.65

651.54
4,416.82
353.82
1,770.44
5,833.97

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1,666.00
0.00
145.11
116.11
260.16
326.65
326.65

4481.54
0.00
651.54
4416.82
353.82
1770.44
5833.97

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

100.00%

MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN TERRENO NORMAL A MAQUINA
EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS
REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL
RETIRO + ACOMODO DE DESMONTE EN ZONA ALEDAA C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE

M2
M2

66.03
66.03

2.16
2.69

142.62
177.62

100.00%
100.00%

66.03
66.03

142.62
177.62

0.00
0.00

0.00
0.00

66.03
66.03

142.62
177.62

0.00
0.00

0.00
0.00

100.00%
100.00%

EXCAVACION MASIVA EN TERRENO NORMAL A MAQUINA


EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS
REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL
RETIRO + ACOMODO DE DESMONTE EN ZONA ALEDAA C/EQUIPO
ELIMINACION DE MATERIAL EXCEDENTE

M3
M3
M2
M3
M3K

44.86
19.47
66.03
53.83
53.83

4.49
38.04
1.36
5.42
17.86

201.42
740.64
89.80
291.76
961.40

100.00%
100.00%
100.00%
100.00%
100.00%

44.86
19.47
66.03
53.83
53.83

201.42
740.64
89.80
291.76
961.40

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

44.86
19.47
66.03
53.83
53.83

201.42
740.64
89.80
291.76
961.40

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%
100.00%

OBRAS DE CONCRETO SIMPLE


CONCRETO 1:10 + 30% PIEDRA GRANDE PARA CIMIENTO CORRIDO (CEMENTO P-I)
CONCRETO 1:8 + 25% P.M. P/SOBRECIMIENTOS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACIN DE MADERA) DE SOBRECIMIENTOS REFORZADOS
FALSO PISO DE CONCRETO 1:10 DE ESPESOR 4" (CEMENTO P-I)

M3
M3
M2
M2

11.48
2.63
22.46
66.03

198.75
221.07
34.48
25.45

2,281.65
581.41
774.42
1,680.46

100.00%
100.00%
100.00%
100.00%

10.01
2.63
22.46
66.03

1,989.49
581.41
774.42
1,680.46

1.47
0.00
0.00
0.00

292.16
0.00
0.00
0.00

11.48
2.63
22.46
66.03

2281.65
581.41
774.42
1680.46

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

100.00%
100.00%
100.00%
100.00%

OBRAS DE CONCRETO ARMADO


ZAPATAS
CONCRETO F'C=210KG/CM2 PARA ZAPATA (CEMENTO PI)
ACERO ESTRUC. TRABAJADO PARA ZAPATAS (COSTO PROM. INCL. DESPERDICIOS)

M3
KG

4.36
91.20

354.74
5.30

1,546.67
483.36

100.00%
100.00%

2.10
45.00

744.95
238.50

2.26
46.20

801.71
244.86

48.17%
49.34%

1.66
13.46
368.93

420.33
45.63
5.33

697.75
614.18
1,966.40

100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

744.95
238.50

M3
M2
KG

0.00
0.00
0.00
0.00
0.00
0.00

2.10
45.00

COLUMNAS
CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA COLUMNAS
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

0.87
7.22
265.00

365.69
329.45
1,412.45

0.87
7.22
265.00

365.69
329.45
1412.45

0.79
6.24
103.93

332.06
284.73
553.95

52.41%
53.64%
71.83%

VIGAS
CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I)
ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)
ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES

M3
KG
M2

3.55
22.54
468.47

392.79
5.33
53.11

1,394.40
120.14
24,880.44

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

1.20
14.66
259.00

471.35
78.14
13,755.49

1.20
14.66
259.00

471.35
78.14
13755.49

2.35
7.88
209.47

923.06
42.00
11,124.95

33.80%
65.04%
55.29%

LOSAS MACIZAS
CONCRETO F'C 210 KG/CM2 PARA LOSAS MACIZAS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS
ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

9.90
66.00
467.91

392.80
42.25
5.33

3,888.72
2,788.50
2,493.96

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

4.87
43.00
258.44

1,912.94
1,816.75
1,377.49

4.87
43.00
258.44

1912.94
1816.75
1377.49

5.03
23.00
209.47

1,975.78
971.75
1,116.48

49.19%
65.15%
55.23%

DADOS DE APOYO Y/O ANCLAJE


CONCRETO F'C 210 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)
ENCOFRADO (INCL. HABILITACION DE MADERA) PARA ANCLAJES Y/O DADOS
ACERO ESTRUC. TRABAJADO PARA ANCLAJES Y/O DADOS (COSTO PROM. INCL. DESPERDICIOS)

M3
M2
KG

0.47
4.38
52.01

372.39
31.30
5.33

175.02
137.09
277.21

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.22
2.45
35.09

81.93
76.69
187.03

0.22
2.45
35.09

81.93
76.69
187.03

0.25
1.93
16.92

93.10
60.41
90.18

46.81%
55.94%
67.47%

0.00
0.00

0.50

2,407.50

0.50

2407.50

0.50

2,407.50

50.00%

0.00

13.33

8,878.85

13.33

8878.85

19.20

12,788.74

40.98%

CASETA DE RESERVORIO APOYADO RAP-01


ESTRUCTURAS
OBRAS PRELIMINARES
05.02.01.01.01 TRAZO, NIVELACION Y REPLANTEO INICIAL
05.02.01.01.02 LIMPIEZA Y DESBROCE DE TERRENO MANUAL
05.02.01.02 MOVIMIENTO DE TIERRAS
05.02.01.02.01
05.02.01.02.02
05.02.01.02.03
05.02.01.02.04
05.02.01.02.05
05.02.01.03
05.02.01.03.01
05.02.01.03.02
05.02.01.03.03
05.02.01.03.04
05.02.01.04
05.02.01.04.01

273,786.75

05.02.01.05 CAJAS DE DISTRIBUCION


05.02.01.05.01 CAJA REBOSE-PURGA TERRENO NORMAL INC. ELIMINACION DESMONTE
05.02.02 INSTALACIONES HIDRAULICAS
05.02.02.01 TUBERIAS
05.02.02.01.01 TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 350

UND

1.00

4,814.99

4,814.99

100.00%

0.00
0.00

32.53

666.08

21,667.58

100.00%

0.00

100.00%
100.00%
100.00%
100.00%
100.00%

05.02.02.01.02 TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 400

19.00

790.05

15,010.95

100.00%

0.00

0.00

12.11

9,567.51

12.11

9567.51

6.89

5,443.44

63.74%

05.02.02.01.03 TUBERIA PVC-UF NTP ISO 4435 S-25 DN 400


05.02.02.02 VALVULAS
05.02.02.02.01 VALVULA DE CPTA. BB. Ho. DUCTIL DN 350mm ISO 5996

6.00

79.46

476.76

100.00%

230.43

2.90

230.43

3.10

246.33

48.33%

3.00

4,484.00

13,452.00

100.00%

0.00
0.00
0.00

2.90

UND

0.00
0.00
0.00

1.00

4,484.00

1.00

4484.00

2.00

8,968.00

33.33%

05.02.02.02.02 VALVULA DE CPTA. BB. Ho. DUCTIL DN 400mm ISO 5996


05.02.02.03 ACCESORIOS
05.02.03.03.01 CODO 22.5 HIERRO DUCTIL BRIDADO DN 350
05.02.03.03.02 CODO 45 HIERRO DCTIL BRIDADO DN 350
05.02.03.03.03 CODO 45 HIERRO DCTIL BRIDADO DN 400

UND

2.00

7,074.10

14,148.20

100.00%

0.00

0.00

1.00

7,074.10

1.00

7074.10

1.00

7,074.10

50.00%

UND
UND
UND

1.00
3.00
2.00

885.00
1,416.00
1,810.12

885.00
4,248.00
3,620.24

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

1.00
3.00
2.00

885.00
4,248.00
3,620.24

0.00%
0.00%
0.00%

05.02.03.03.04 CODO 90 HIERRO DCTIL BRIDADO DN 350

UND

3.00

1,622.50

4,867.50

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

3.00

4,867.50

0.00%

05.02.03.03.05 CODO 90 HIERRO DCTIL BRIDADO DN 400

UND

1.00

2,129.90

2,129.90

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

2,129.90

0.00%

05.02.03.03.06 TEE Ho DUCTIL BRIDADO DN 350x350

UND

1.00

2,586.56

2,586.56

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

2,586.56

0.00%

05.02.03.03.07 TEE Ho DUCTIL BRIDADO DN 400x400


05.02.03.03.08 REDUCCION Ho DUCTIL BRIDADO DN 400x350mm
05.02.03.03.09 CANASTILLA DE ACERO INOXIDABLE BRIDADA DN 16" (400mm)

UND
UND
UND

2.00
1.00
1.00

3,262.70
1,871.72
2,596.00

6,525.40
1,871.72
2,596.00

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

2.00
1.00
1.00

6,525.40
1,871.72
2,596.00

0.00%
0.00%
0.00%

05.02.03.03.10 TRANSICION TIPO LUFLEX HD, DN 350

UND

1.00

861.40

861.40

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

861.40

0.00%

05.02.03.03.11 TRANSICION TIPO LUFLEX HD, DN 400

UND

1.00

896.80

896.80

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

896.80

0.00%

05.02.03.04 ELEMENTOS DE UNION Y MONTAJE


05.02.03.04.01 UNION FLEXIBLE TIPO DRESSER DE 14" (350MM)
05.02.03.04.02 UNION FLEXIBLE TIPO DRESSER DE 16" (400MM)

UND
UND

2.00
1.00

590.00
655.25

1,180.00
655.25

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

2.00
1.00

1,180.00
655.25

0.00%
0.00%

05.02.03.04.03 UNION FLEXIBLE AUTOPORTANTE SIMILAR SMIT BLAIR DN 14" (350MM)

UND

1.00

2,596.00

2,596.00

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

2,596.00

0.00%

05.02.03.04.04 UNION FLEXIBLE AUTOPORTANTE SIMILAR SMIT BLAIR DN 16" (400 MM)

UND

1.00

3,219.75

3,219.75

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

3,219.75

0.00%

05.02.03.05 BRIDAS, PERNOS Y EMPAQUETADURAS


05.02.03.05.01 BRIDA DE HIERRO DUCTIL PARA SOLDAR Y EMPERNAR DN 14" (350 mm)
05.02.03.05.02 BRIDA DE HIERRO DUCTIL PARA SOLDAR Y EMPERNAR DN 16" (400 mm)

UND
UND

27.00
25.00

247.80
589.41

6,690.60
14,735.25

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

27.00
25.00

6,690.60
14,735.25

0.00%
0.00%

05.02.03.05.03 PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 14" (350MM)

UND

432.00

9.44

4,078.08

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

432.00

4,078.08

0.00%

05.02.03.05.04 PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 16" (400MM)

UND

400.00

14.75

5,900.00

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

400.00

5,900.00

0.00%

05.02.03.05.05 EMPAQUETADURA DE JEBE ENLONADO DE 14" (350 mm)


05.02.03.05.06 EMPAQUETADURA DE JEBE ENLONADO DE 16" (400 mm)

UND
UND

27.00
25.00

25.96
34.22

700.92
855.50

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

27.00
25.00

700.92
855.50

0.00%
0.00%

05.02.03.06 MEDIDORES
05.02.03.06.01 MEDIDOR DE CAUDAL ELECTROMAGNETICO BRIDADO DE 16"

UND

1.00

12,614.20

12,614.20

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

12,614.20

0.00%

05.02.03.07 VARIOS
05.02.03.07.01 REJILLA SUMIDERO 1.40 X 1.40, PLATINA 1 1/4" X 1/4" @ 1/2" Y MARCO "L" 1 1/4"
05.02.03.07.02 CONCRETO F'C 175 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)

UND
M3

1.00
4.60

88.50
346.38

88.50
1,593.35

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

1.00
4.60

88.50
1,593.35

0.00%
0.00%

05.02.03.07.03 MONTAJE DE INSTALACIONES HIDRAULICAS DE RESERVORIO

GLB

1.00

4,140.51

4,140.51

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

1.00

4,140.51

0.00%

05.02.03 ARQUITECTURA
05.02.03.01 REVOQUES ENLUCIDOS Y MOLDURAS
05.02.03.01.01 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES
05.02.03.01.02 TARRAJEO CON IMPERMEABILIZANTE DE MUROS

M2
M2

226.98
309.76

26.27
37.30

5,962.76
11,554.05

100.00%
100.00%

0.00
0.00

0.00
0.00

122.00
149.00

3,204.94
5,557.70

122.00
149.00

3204.94
5557.70

104.98
160.76

2,757.82
5,996.35

53.75%
48.10%

M2

107.78

45.01

4,851.18

100.00%

1,565.00

34.77

1565.00

73.01

3,286.18

32.26%

239.28
465.93
99.25
257.92

1,596.00
465.93
397.00
1,547.52

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00

34.77

6.67
1.00
4.00
6.00

0.00
0.00
0.00
0.00
0.00
0.00

5,009.20
1,749.60
2,580.00
900.00
580.07

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

610.16
465.93
198.50
515.84
0.00
1883.76
975.48
1584.98
552.90
259.60

38.23%
100.00%
50.00%
33.33%

10.02
10.92
2.15
0.75
0.90

2.55
1.00
2.00
2.00
0.00
188.00
89.33
737.20
737.20
288.44

985.83
0.00
198.50
1,031.68

499.92
160.22
1,200.00
1,200.00
644.52

610.16
465.93
198.50
515.84
0.00
1,883.76
975.48
1,584.98
552.90
259.60

4.12
0.00
2.00
4.00

M2
M
M3
M3
M2

2.55
1.00
2.00
2.00
0.00
188.00
89.33
737.20
737.20
288.44

311.92
70.89
462.80
462.80
356.08

3,125.44
774.12
995.02
347.10
320.47

37.61%
55.75%
61.43%
61.43%
44.75%

VEREDA DE CONCRETO F'C 175 KG/CM2 E=10CM PASTA 1:2 (P-I), C/EMPLEO DE MEZCLADORA

M2

57.80

49.71

2,873.24

100.00%

0.00

0.00

32.00

1,590.72

32.00

1590.72

25.80

1,282.52

55.36%

PASES PARA TUBERIAS


NIPLE DE Ho DUCTIL DN 14" (350mm), TIPO BRIDA-BRIDA, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m
NIPLE DE Ho DUCTIL DN 16" (400mm), TIPO BRIDA-BRIDA, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m

PZA
PZA

1.00
2.00

2,006.00
2,230.20

2,006.00
4,460.40

100.00%
100.00%

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

1.00
2.00

2,006.00
4,460.40

0.00%
0.00%

05.02.03.01.03
05.02.02.02
05.02.02.02.01
05.02.02.02.02
05.02.02.02.03
05.02.02.02.04
05.02.02.03
05.02.02.03.01
05.02.02.03.02
05.02.02.03.03
05.02.02.03.04
05.02.02.03.05
05.02.02.03.06
05.02.02.04
05.02.02.04.01
05.02.02.04.02

TARRAJEO CON IMPERMEABILIZANTE DE CIELO RASO


CARPINTERIA METALICA
ESCALERA DE TUBO FO. GALV. CON PARANTESDE 1 1/4" POR PELDAOS DE 3/4"
MARCO Y TAPA DE PLANCHA LAC 1/4" CONMECANISMO DE SEGURIDAD DE 0,90 X 1,50 MSEGN DISEO

VENTILACION CON TUBERIA DE ACERO SEGUN DISEO DN 150


SOPORTE METALICO TIPO ABRAZADERA PARA TUBERIA DN 300 A 350
PINTURA, ADITAMENTOS Y VARIOS
PINTADO EXTERIOR C/TEKNOMATE O SIMILAR DE RESERVORIO APOYADO INCL. MENSAJE
PROVISIN Y COLOCADO DE JUNTA WATER STOP DE P.V.C. E=15 CM ( 6")
PRUEBA HIDRAULICA CON EMPLEO DE LA LINEA DE INGRESO (CAPTACION)
EVACUACION DEL AGUA DE PRUEBA CON EMPLEO DE LA LINEA DE SALIDA
LIMPIEZA Y DESINFECCION DE RESERVORIOS APOYADOS

TOTAL COSTO DIRECTO


GASTOS GENERALES
UTILIDAD
SUB-TOTAL
IMPUESTO GENERAL A LAS VENTAS (EXONERADO)
TOTAL PRESUPUESTO

M
UND
UND
UND

16.60%
2.40%

S/.
S/.
S/.
S/.
S/.

8,334,176.12
1,383,473.24
200,020.23
9,917,669.59
-

S/.

9,917,669.59

100.00%

S/.
S/.
S/.
S/.
S/.

476,929.91
476,929.91
-

S/.
S/.
S/.
S/.
S/.

5,120,019.54
849,923.24
122,880.47
6,092,823.25
-

S/.
S/.
S/.
S/.
S/.

8,069,535.38
1,339,542.87
193,668.85
9,602,747.10
-

S/.
S/.
S/.
S/.
S/.

173,246.98
28,759.00
4,157.93
206,163.91
-

S/.

476,929.91

S/.

6,092,823.25

S/.

9,602,747.10

S/.

206,163.91

OBRA
: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA, PROVINCIA DE RIOJA - SAN MARTIN
Nro.REGIONAL
009 - 2011 DE
- GRSM
PEAM - 01.00
CONTRATO : CONTRATO
: GOBIERNO
SAN -MARTIN
ENTIDAD
: GOBIERNO REGIONAL DE SAN MARTIN
CONTRATISTA : CONSORCIO ALIANZA

VALORIZACION DE OBRA N 02

CORRESPONDIENTE AL MES DEFEBRERO 2,012 (DEL 1/02/ AL 30/02/12)


PRESUPUESTO
Item

Descripcin

Und.

Metrado

P. U.
S/.

Parcial
S/.

01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES PARA TODA LA OBRA

PRESENTE VALORIZACION

ACUMULADO ANTERIOR
Parcial
S/.

Metrado

981,899.00

Metrado

981,899.00

ACUMULADO ACTUAL

Parcial
S/.

Metrado

0.00

Parcial
S/.

SALDO POR VALORIZAR


Metrado

981,899.00

Parcial
S/.

0.00

01.01 OBRAS PROVISIONALES


01.01.01 CAMPAMENTO PROVISIONAL DE OBRA

GLB

1.00

6,300.00

6,300.00

100.00%

1.00

6,300.00

0.00

1.00

6300.00

0.00

0.00

100.00%

01.01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO

UND

1.00

10,000.00

10,000.00

100.00%

1.00

10,000.00

0.00

0.00

1.00

10000.00

0.00

0.00

100.00%

01.01.03 CARTEL DE IDENTIFICACION DE OBRA

UND

1.00

1,517.07

1,517.07

100.00%

1.00

1,517.07

0.00

0.00

1.00

1517.07

0.00

0.00

100.00%

01.02 TRABAJOS PRELIMINARES


01.02.01 MOVILIZACION DE EQUIPO

GLB

1.00

92,783.68

92,783.68

100.00%

1.00

92,783.68

0.00

0.00

1.00

92783.68

0.00

0.00

100.00%

01.02.02 TRANSPORTE DE MATERIALES DESDE LIMA A OBRA

GLB

1.00

871,298.25

871,298.25

100.00%

1.00

871,298.25

0.00

0.00

1.00

871298.25

0.00

0.00

100.00%

02 CAPTACION PROYECTADA RIO NEGRO CAP-01

81,241.41

0.00

81,241.41

0.00

02.01 OBRAS PROVISIONALES


02.01.01 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO

UND

1.00

10,000.00

10,000.00

100.00%

1.00

10,000.00

0.00

0.00

1.00

10000.00

0.00

0.00

100.00%

02.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS P/OBRA

GLB

1.00

3,728.23

3,728.23

100.00%

1.00

3,728.23

0.00

0.00

1.00

3728.23

0.00

0.00

100.00%

02.02 TRABAJOS PRELIMINARES


02.02.01 LIMPIEZA Y DESBROCE DE TERRENO MANUAL

M2

25.16

2.69

67.68

100.00%

25.16

67.68

0.00

0.00

25.16

67.68

0.00

0.00

100.00%

02.02.02 TRAZO, NIVELACION Y REPLANTEO INICIAL

M2

12.96

2.16

27.99

100.00%

12.96

27.99

0.00

0.00

12.96

27.99

0.00

0.00

100.00%

02.03 VIA DE ACCESO A ZONA DE CAPTACION


02.03.01 TRAZO, NIVELACION Y REPLANTEO INICIAL

M2

4,027.20

2.16

8,698.75

100.00%

4,027.20

8,698.75

0.00

0.00

4,027.20

8698.75

0.00

0.00

100.00%

02.03.02 CORTE Y LIMPIEZA DE MALEZA

M2

4,027.27

4.04

16,270.17

100.00%

4,027.27

16,270.17

0.00

0.00

4,027.27

16270.17

0.00

0.00

100.00%

02.03.03 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO (CANTERA UBICADA A MENOS DE 100 METROS)

M3

1,006.80

5.15

5,185.02

100.00%

1,006.80

5,185.02

0.00

0.00

1,006.80

5185.02

0.00

0.00

100.00%

02.03.04 ELIMINACION DE MATERIAL EXCEDENTE

M3K

241.63

17.86

4,315.51

100.00%

241.63

4,315.51

0.00

0.00

241.63

4315.51

0.00

0.00

100.00%

02.03.05 PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA

UND

1.00

297.14

297.14

100.00%

1.00

297.14

0.00

0.00

1.00

297.14

0.00

0.00

100.00%

M3

7.20

209.33

1,507.18

100.00%

7.20

1,507.18

0.00

0.00

7.20

1507.18

0.00

0.00

100.00%

02.04.02 EXCAVACION P/ENCAUZAMIENTO DE RIO EN TERRENO EN ROCA SUELTA

M3

12.58

173.62

2,184.14

100.00%

12.58

2,184.14

0.00

0.00

12.58

2184.14

0.00

0.00

100.00%

02.04.03 ELIMINACION DE MATERIAL EXCEDENTE

M3K

20.77

17.86

370.95

100.00%

20.77

370.95

0.00

0.00

20.77

370.95

0.00

0.00

100.00%

02.04 MOVIMIENTO DE TIERRAS


02.04.01 EXCAVACION EN ROCA SUELTA EN LECHO DE RIO

02.05 OBRAS DE CONCRETO SIMPLE


02.05.01 CONCRETO F'C 100 KG/CM2 PARA SOLADOS Y/O SUB BASES (CEMENTO PI)

0.00

0.00
M3

9.96

293.85

2,926.75

100.00%

9.96

2,926.75

0.00

0.00

9.96

2926.75

0.00

0.00

100.00%

02.06 OBRAS DE CONCRETO ARMADO


02.06.01 LOSAS DE FONDO - PISO
02.06.01.01 CONCRETO F'C=245KG/CM2 PARA LOSAS DE FONDO (CEMENTO PI)

M3

2.67

411.63

1,099.05

100.00%

2.67

1,099.05

0.00

0.00

2.67

1099.05

0.00

0.00

100.00%

02.06.01.02 ACERO ESTRUCT. TRABAJADO P/ LOSA DE FONDO-PISO (COSTO PROM. INCL. DESPERDICIOS)

KG

134.36

5.30

712.11

100.00%

134.36

712.11

0.00

0.00

134.36

712.11

0.00

0.00

100.00%

02.06.02 MUROS Y PLACAS


02.06.02.01 CONCRETO F'C=245KG/CM2 PARA MUROS REFORZADOS (CEMENTO PI)

M3

3.05

445.91

1,360.03

100.00%

3.05

1,360.03

0.00

0.00

3.05

1360.03

0.00

0.00

100.00%

02.06.02.02 ENCOFRADO (INCL. HABILITACION DE MADERA) PARA MUROS REFORZADOS

M2

30.29

50.90

1,541.76

100.00%

30.29

1,541.76

0.00

0.00

30.29

1541.76

0.00

0.00

100.00%

02.06.02.03 ACERO ESTRUC. TRABAJADO P/MURO REFORZADO (COSTO PROM. INCL. DESPERDICIOS)

KG

346.36

5.33

1,846.10

100.00%

346.36

1,846.10

0.00

0.00

346.36

1846.10

0.00

0.00

100.00%

02.06.03 VIGAS
02.06.03.01 CONCRETO F'C=245KG/CM2 PARA VIGAS (CEMENTO PI)

M3

0.59

418.37

246.84

100.00%

0.59

246.84

0.00

0.00

0.59

246.84

0.00

0.00

100.00%

02.06.03.02 ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES

M2

7.60

53.11

403.64

100.00%

7.60

403.64

0.00

0.00

7.60

403.64

0.00

0.00

100.00%

02.06.03.03 ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)

KG

99.84

5.33

532.15

100.00%

99.84

532.15

0.00

0.00

99.84

532.15

0.00

0.00

100.00%

02.06.04 LOSAS DE TECHO


02.06.04.01 CONCRETO F'C=245KG/CM2 PARA LOSAS MACIZAS

M3

1.62

418.37

677.76

100.00%

1.62

677.76

0.00

0.00

1.62

677.76

0.00

0.00

100.00%

02.06.04.02 ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS

M2

10.00

42.25

422.50

100.00%

10.00

422.50

0.00

0.00

10.00

422.50

0.00

0.00

100.00%

02.06.04.03 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)

KG

117.42

5.33

625.85

100.00%

117.42

625.85

0.00

0.00

117.42

625.85

0.00

0.00

100.00%

02.07 REVOQUES ENLUCIDOS Y MOLDURAS


02.07.01 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES

M2

5.83

26.27

153.15

100.00%

5.83

153.15

0.00

0.00

5.83

153.15

0.00

0.00

100.00%

02.07.02 TARRAJEO CON IMPERMEABILIZANTE DE MUROS

M2

31.52

37.30

1,175.70

100.00%

31.52

1,175.70

0.00

0.00

31.52

1175.70

0.00

0.00

100.00%

02.07.03 TARRAJEO EXTERIOR CON MORTERO 1:5 X 1.5 cm (INCLUYE COLUMNAS EMPOTRADAS)

M2

7.80

25.15

196.17

100.00%

7.80

196.17

0.00

0.00

7.80

196.17

0.00

0.00

100.00%

02.08 INSTALACIONES HIDRAULICAS


02.08.01 NIPLE DE HDPE DN 560, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m

PZA

2.00

354.00

708.00

100.00%

2.00

708.00

0.00

0.00

2.00

708.00

0.00

0.00

100.00%

02.08.02 COMPUERTA DE MADERA DE 0.50 X 1.10m E=2"

UND

1.00

119.92

119.92

100.00%

1.00

119.92

0.00

0.00

1.00

119.92

0.00

0.00

100.00%

02.08.03 COMPUERTA DE MADERA DE 0.70 X 0.90m E=2"

UND

1.00

150.00

150.00

100.00%

1.00

150.00

0.00

0.00

1.00

150.00

0.00

0.00

100.00%

10.00

358.93

3,589.30

100.00%

10.00

3,589.30

0.00

0.00

10.00

3589.30

0.00

0.00

100.00%

GLB

1.00

4,138.85

4,138.85

100.00%

1.00

4,138.85

0.00

0.00

1.00

4138.85

0.00

0.00

100.00%

02.10.01.01 TRAZO Y REPLANTEO INICIALES DEL PROYECTO

40.00

1.49

59.60

100.00%

40.00

59.60

0.00

0.00

40.00

59.60

0.00

0.00

100.00%

02.09.02 MOVIMIENTO DE TIERRAS


02.09.02.01 EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 400 - 450de 1.01 a 1.50m PROF.

40.00

12.13

485.20

100.00%

40.00

485.20

0.00

0.00

40.00

485.20

0.00

0.00

100.00%

02.09.02.02 REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 400 - 450 PARA TODA PROF.

40.00

1.86

74.40

100.00%

40.00

74.40

0.00

0.00

40.00

74.40

0.00

0.00

100.00%

02.09.02.03 PREPARACION DE CAMA DE APOYO P/TUB. DN 400 - 450 PARA TODA PROF.

40.00

4.26

170.40

100.00%

40.00

170.40

0.00

0.00

40.00

170.40

0.00

0.00

100.00%

02.09.02.04 RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 400 - 450 de 1.01m a 1.50m PROF.

40.00

14.94

597.60

100.00%

40.00

597.60

0.00

0.00

40.00

597.60

0.00

0.00

100.00%

M3K

10.36

17.86

185.03

100.00%

10.36

185.03

0.00

0.00

10.36

185.03

0.00

0.00

100.00%

02.09.03 SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4435


02.09.03.01 TUBERIA PVC-UF NTP ISO 4435 S-25 DN 450 incluye anillo + 2% de desperdicios.

40.00

99.15

3,966.00

100.00%

40.00

3,966.00

0.00

0.00

40.00

3966.00

0.00

0.00

100.00%

02.09.03.02 INSTALACION DE TUB. PVC-UF P/DESAGUE DN 400 - 450

40.00

3.31

132.40

100.00%

40.00

132.40

0.00

0.00

40.00

132.40

0.00

0.00

100.00%

0.00

0.00

0.00

0.00

0.00

0.00

02.08.04 TUBERIA HDPE DN 560mm


02.08.05 MONTAJE DE INSTALACIONES HIDRAULICAS DE CAPTACION
2.09 LINEA DE REBOSE
02.09.01 TRABAJOS PRELIMINARES

02.09.02.05 ELIMINACION DE MATERIAL EXCEDENTE

02.09.04 PRUEBAS
02.09.04.01 PRUEBA HIDRAULICA P/TUB. DE DESAGUE DN 400 - 450

0.00

0.00
M

40.00

7.31

03 LINEA DE IMPULSION PROYECTADA LI-01

292.40

100.00%

40.00

292.40

0.00

61,279.00

0.00

40.00

0.00

0.00

292.40

61,279.00

100.00%

03.01 TRABAJOS PRELIMINARES


03.01.01 TRAZO Y REPLANTEO INICIALES DEL PROYECTO

306.00

1.49

455.94

100.00%

306.00

455.94

0.00

0.00

306.00

455.94

0.00

0.00

100.00%

03.01.02 TRAZO Y REPLANTEO FINALES DE OBRA

306.00

1.07

327.42

100.00%

306.00

327.42

0.00

0.00

306.00

327.42

0.00

0.00

100.00%

03.02 MOVIMIENTO DE TIERRAS


03.02.01 EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 315 - 350 de 1.00m a 1.50m PROF.

306.00

9.93

3,038.58

100.00%

306.00

3,038.58

0.00

0.00

306.00

3038.58

0.00

0.00

100.00%

03.02.02 REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 315 - 350 PARA TODA PROF.

306.00

1.60

489.60

100.00%

306.00

489.60

0.00

0.00

306.00

489.60

0.00

0.00

100.00%

03.02.03 PREPARACION DE CAMA DE APOYO P/TUB. DN 315 - 350 PARA TODA PROF.

306.00

4.00

1,224.00

100.00%

306.00

1,224.00

0.00

0.00

306.00

1224.00

0.00

0.00

100.00%

03.02.04 RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL DN 315 - 350 de 1.01m a 1.50m PROF.

306.00

16.48

5,042.88

100.00%

306.00

5,042.88

0.00

0.00

306.00

5042.88

0.00

0.00

100.00%

M3K

39.51

17.86

705.65

100.00%

39.51

705.65

0.00

0.00

39.51

705.65

0.00

0.00

100.00%

03.03 SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4422


03.03.01 TUBERIA PVC-UF NTP ISO 4422 C-7.5 DN 350 incluye anillo + 2% de desperdicios.

306.00

110.14

33,702.84

100.00%

306.00

33,702.84

0.00

0.00

306.00

33702.84

0.00

0.00

100.00%

03.03.02 INSTALACION DE TUB. PVC-UF P/AGUA POTABLE DN 315 - 350

306.00

5.41

1,655.46

100.00%

306.00

1,655.46

0.00

0.00

306.00

1655.46

0.00

0.00

100.00%

1,623.58

100.00%

2.00

1,623.58

0.00

0.00

2.00

1623.58

0.00

0.00

100.00%

03.02.05 ELIMINACION DE MATERIAL EXCEDENTE

03.04 SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF ISO 4422


03.04.01 CODO 11.25 PVC-UF DN 350

UND

2.00

811.79

03.04.02 CODO 90 PVC-UF DN 350

UND

1.00

856.68

856.68

100.00%

1.00

856.68

0.00

0.00

1.00

856.68

0.00

0.00

100.00%

03.04.03 CODO 45 PVC-UF DN 350

UND

2.00

811.79

1,623.58

100.00%

2.00

1,623.58

0.00

0.00

2.00

1623.58

0.00

0.00

100.00%

03.04.04 INSTALACION DE ACCESORIOS PVC-UF DN 315 - 350

UND

5.00

17.63

88.15

100.00%

5.00

88.15

0.00

0.00

5.00

88.15

0.00

0.00

100.00%

03.05 SUMINISTRO E INSTALACION DE VALVULAS


03.05.01 VALVULA AIRE DN 80 TRIPLE EFECTO, EN TUBERIA DN 350 (INCLUY. CAMARA)
03.06 PRUEBAS
03.06.01 PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 315 - 350
03.07 VARIOS
03.07.01 CONCRETO f'c=140 kg/cm2 P/ANCLAJE DE ACCESORIO DN 315 -350

UND
M
UND

1.00

7,724.04

7,724.04

100.00%

1.00

7,724.04

0.00

0.00

1.00

7724.04

0.00

0.00

100.00%

306.00

6.70

2,050.20

100.00%

306.00

2,050.20

0.00

0.00

306.00

2050.20

0.00

0.00

100.00%

5.00

134.08

670.40

100.00%

5.00

670.40

0.00

0.00

5.00

670.40

0.00

0.00

100.00%

0.00

0.00

0.00

0.00

04 LINEA DE CONDUCCION PROYECTADA RIO NEGRO LC-01


04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO Y REPLANTEO INICIALES DEL PROYECTO
04.01.02 TRAZO Y REPLANTEO FINALES DE OBRA

6,997,248.96

6,997,248.97

15,683.95

1.49

23,369.09

100.00%

15,683.95

23,369.09

0.00

0.00

15,683.95

23369.09

0.00

0.00

100.00%

15,683.95

1.07

16,781.83

100.00%

15,683.95

16,781.83

0.00

0.00

15,683.95

16781.83

0.00

0.00

100.00%

1.00

1,026.16

1,026.16

100.00%

1.00

1,026.16

0.00

0.00

1.00

1026.16

0.00

0.00

100.00%

1.00

1,758.99

1,758.99

100.00%

1.00

1,758.99

0.00

0.00

1.00

1758.99

0.00

0.00

100.00%

12,870.86

21.83

280,970.87

100.00%

12,870.86

280,970.87

0.00

0.00

12,870.86

280970.87

0.00

0.00

100.00%

04.01.03 ACARREO DE MATERIALES, HER-EQUIPOS EN ZONA SIN ACCESO VEHICULAR P/INST. L.CONDUCCION

GLB

04.01.04 MOVILIZACION/DESMOVILIZACION DE EQUIPO MECANICO P/INST. L.CONDUCCION

GLB

04.02 MOVIMIENTO DE TIERRAS


04.02.01 EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL DN 500 - 600 de 1.51m a 2.00m PROF.

04.02.02 PERFILADO DE ZANJA PULSO P/INST. DE TUBERIA ADOSADA EN T-SEMIROCOSO DN 500 - 630, h=0.15m PROF.

686.14

2.46

1,687.90

100.00%

686.14

1,687.90

0.00

0.00

686.14

1687.90

0.00

0.00

100.00%

04.02.04 REFINE Y NIVELACION DE ZANJA T-NORMAL P/TUB. DN 500 - 630 PARA TODA PROF.

12,870.86

2.20

28,315.89

100.00%

12,870.86

28,315.89

0.00

0.00

12,870.86

28315.89

0.00

0.00

100.00%

M3K

9,722.19

17.86

173,638.31

100.00%

9,722.19

173,638.31

0.00

0.00

9,722.19

173638.31

0.00

0.00

100.00%

04.03 SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4422


04.03.01 TUBERIA PVC-UF NTP ISO 4422 C-5 DN 560 incluye anillo + 2% de desperdicios.

12,870.86

250.29

3,221,447.55

100.00%

12,870.86

3,221,447.55

0.00

0.00

12,870.86

3221447.55

0.00

0.00

100.00%

04.03.02 INSTALACION DE TUB. PVC-UF P/AGUA POTABLE DN 500 - 630

12,870.86

24.08

309,930.31

100.00%

12,870.86

309,930.31

0.00

0.00

12,870.86

309930.31

0.00

0.00

100.00%

04.02.11 ELIMINACION DE MATERIAL EXCEDENTE

04.04 SUMINISTRO E INSTALACION DE TUBERIAS DE HDPE


04.04.01 TUBERIA HDPE NTP ISO 4427 SDR 21 PN 6 DN 560 + 2% de desperdicios

0.00
M

2,813.09

355.45

999,912.84

100.00%

2,813.09

999,912.84

0.00

0.00

2,813.09

999912.84

0.00

0.00

100.00%

04.04.02 INSTALACION DE TUB. HDPE P/AGUA POTABLE DN 500-630 (TERMOFUSION)

2,813.09

107.37

302,041.47

100.00%

2,813.09

302,041.47

0.00

0.00

2,813.09

302041.47

0.00

0.00

100.00%

04.05 SUMINISTRO E INSTALACION DE ACCESORIOS PVC-UF ISO 4422


04.05.01 CODO 11.25 PVC-UF DN 560

UND

24.00

2,473.28

59,358.72

100.00%

24.00

59,358.72

0.00

0.00

24.00

59358.72

0.00

0.00

100.00%

04.05.02 CODO 22.5 PVC-UF DN 560

UND

29.00

2,768.28

80,280.12

100.00%

29.00

80,280.12

0.00

0.00

29.00

80280.12

0.00

0.00

100.00%

04.05.03 CODO 45 PVC-UF DN 560

UND

24.00

3,240.28

77,766.72

100.00%

24.00

77,766.72

0.00

0.00

24.00

77766.72

0.00

0.00

100.00%

04.05.04 CODO 90 PVC-UF DN 560

UND

1.00

3,476.99

3,476.99

100.00%

1.00

3,476.99

0.00

0.00

1.00

3476.99

0.00

0.00

100.00%

04.05.05 INSTALACION DE ACCESORIOS PVC-UF DN 500 - 630

UND

78.00

84.67

6,604.26

100.00%

78.00

6,604.26

0.00

0.00

78.00

6604.26

0.00

0.00

100.00%

04.06 SUMINISTRO E INSTALACION DE ACCESORIOS DE HDPE


04.06.01 CURVA 11.25 HDPE DN 560

UND

17.00

5,923.13

100,693.21

100.00%

17.00

100,693.21

0.00

0.00

17.00

100693.21

0.00

0.00

100.00%

04.06.02 CURVA 22.5 HDPE DN 560

UND

16.00

5,923.13

94,770.08

100.00%

16.00

94,770.08

0.00

0.00

16.00

94770.08

0.00

0.00

100.00%

04.06.03 CURVA 45 HDPE DN 560

UND

9.00

5,922.42

53,301.78

100.00%

9.00

53,301.78

0.00

0.00

9.00

53301.78

0.00

0.00

100.00%

04.06.04 INSTALACION DE ACCESORIOS HDPE DN 560 (TERMOFUSION)

UND

42.00

751.69

31,570.98

100.00%

42.00

31,570.98

0.00

0.00

42.00

31570.98

0.00

0.00

100.00%

0.00

0.00

04.07 SUMINISTRO E INSTALACION DE UNIONES


04.07.01 ACOPLE FLEXIBLE DN 560mm

UND

5.00

2,124.00

10,620.00

100.00%

5.00

04.08 SUMINISTRO E INSTALACION DE VALVULAS


04.08.01 VALVULA DE AIRE DN 80,EN TUBERIA DN 560 (INCLUY. CAMARA)

UND

25.00

17,845.79

446,144.75

100.00%

25.00

446,144.75

04.08.02 VALVULA DE PURGA DN 100 , EN TUBERIA HDPE DN 560 (INCLUY. CMARA)

UND

6.00

19,369.09

116,214.54

100.00%

6.00

04.08.03 VALVULA DE PURGA DN 100 , EN TUBERIA PVC DN 560 (INCLUY. CMARA)

UND

18.00

18,050.79

324,914.22

100.00%

18.00

04.09.01.01 EXCAV. ZANJA (MAQ.) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.

159.00

22.79

3,623.61

100.00%

04.09.01.02 RELLENO COMP. ZANJA (PULSO) P/TUB. T-NORMAL SATURADO DN 500 - 630 de 2.01m a 2.50m PROF.

106.00

72.22

7,655.32

100.00%

04.09.02 CONCRETO ARMADO


04.09.02.01 CONCRETO F'C 210 KG/CM2 PARA ESTRUCTURAS (CEMENTO P-I)

M3

71.58

377.36

27,011.43

100.00%

10,620.00

0.00

5.00

10620.00

0.00

0.00

100.00%

0.00

0.00

25.00

446144.75

0.00

0.00

100.00%

116,214.54

0.00

0.00

6.00

116214.54

0.00

0.00

100.00%

324,914.22

0.00

0.00

18.00

324914.22

0.00

0.00

100.00%

159.00

3,623.61

0.00

0.00

159.00

3623.61

0.00

0.00

100.00%

106.00

7,655.32

0.00

0.00

106.00

7655.32

0.00

0.00

100.00%

71.58

27,011.43

0.00

0.00

71.58

27011.43

0.00

0.00

100.00%

0.00

0.00
0.00

04.09 PROTECCION DE TUBERIAS


04.09.01 MOVIMIENTO DE TIERRAS

04.09.02.02 ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA ESTRUCTURAS

M2

212.12

43.78

9,286.61

100.00%

212.12

9,286.61

0.00

0.00

212.12

9286.61

0.00

0.00

100.00%

04.09.02.03 ACERO ESTRUC. TRABAJADO PARA ESTRUCTURAS (COSTO PROM. INCL. DESPERDICIOS)

KG

5,626.10

5.36

30,155.90

100.00%

5,626.10

30,155.90

0.00

0.00

5,626.10

30155.90

0.00

0.00

100.00%

152,918.51

0.00

0.00

15,683.95

152918.51

0.00

0.00

100.00%

173,246.98

0.00

0.00

0.00

04.10 PRUEBAS
04.10.01 PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA DN 500 - 630

0.00
M

15,683.95

9.75

05 RESERVORIO APOYADO PROYECTADO RIO NEGRO RAP-01 VOL=1,200M3

152,918.51

100.00%

15,683.95

273,786.75

273,786.77

5.01 RESERVORIO APOYADO PROYECTADO RAP-01


05.01.01.01 OBRAS PRELIMINARES
05.01.01.01.01 TRAZO, NIVELACION Y REPLANTEO INICIAL

M2

301.72

2.16

651.72

100.00%

301.72

651.72

0.00

0.00

301.72

651.72

0.00

0.00

100.00%

05.01.01.01.02 LIMPIEZA Y DESBROCE DE TERRENO MANUAL

M2

1,666.00

2.69

4,481.54

100.00%

1,666.00

4,481.54

0.00

0.00

1,666.00

4481.54

0.00

0.00

100.00%

0.00

0.00

0.00

0.00

0.00

05.01.01.02 MOVIMIENTO DE TIERRAS


05.01.01.02.01 EXCAVACION MASIVA EN TERRENO NORMAL A MAQUINA

M3

145.11

4.49

651.54

100.00%

145.11

651.54

0.00

0.00

145.11

651.54

0.00

0.00

100.00%

05.01.01.02.02 EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS

M3

116.11

38.04

4,416.82

100.00%

116.11

4,416.82

0.00

0.00

116.11

4416.82

0.00

0.00

100.00%

05.01.01.02.03 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL

M2

260.16

1.36

353.82

100.00%

260.16

353.82

0.00

0.00

260.16

353.82

0.00

0.00

100.00%

05.01.01.02.04 RETIRO + ACOMODO DE DESMONTE EN ZONA ALEDAA C/EQUIPO

M3

326.65

5.42

1,770.44

100.00%

326.65

1,770.44

0.00

0.00

326.65

1770.44

0.00

0.00

100.00%

05.01.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE

M3K

326.65

17.86

5,833.97

100.00%

326.65

5,833.97

0.00

0.00

326.65

5833.97

0.00

0.00

100.00%

05.02.01.01 OBRAS PRELIMINARES


05.02.01.01.01 TRAZO, NIVELACION Y REPLANTEO INICIAL

M2

66.03

2.16

142.62

100.00%

66.03

142.62

0.00

0.00

66.03

142.62

0.00

0.00

100.00%

05.02.01.01.02 LIMPIEZA Y DESBROCE DE TERRENO MANUAL

M2

66.03

2.69

177.62

100.00%

66.03

177.62

0.00

0.00

66.03

177.62

0.00

0.00

100.00%

05.02.01.02 MOVIMIENTO DE TIERRAS


05.02.01.02.01 EXCAVACION MASIVA EN TERRENO NORMAL A MAQUINA

M3

44.86

4.49

201.42

100.00%

44.86

201.42

0.00

0.00

44.86

201.42

0.00

0.00

100.00%

05.02.01.02.02 EXCAVACION DE ZANJAS P/ZAPATAS Y CIMIENTOS

M3

19.47

38.04

740.64

100.00%

19.47

740.64

0.00

0.00

19.47

740.64

0.00

0.00

100.00%

05.02.01.02.03 REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL

M2

66.03

1.36

89.80

100.00%

66.03

89.80

0.00

0.00

66.03

89.80

0.00

0.00

100.00%

05.02.01.02.04 RETIRO + ACOMODO DE DESMONTE EN ZONA ALEDAA C/EQUIPO

M3

53.83

5.42

291.76

100.00%

53.83

291.76

0.00

0.00

53.83

291.76

0.00

0.00

100.00%

05.02.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE

M3K

53.83

17.86

961.40

100.00%

53.83

961.40

0.00

0.00

53.83

961.40

0.00

0.00

100.00%

05.02.01.03 OBRAS DE CONCRETO SIMPLE


05.02.01.03.01 CONCRETO 1:10 + 30% PIEDRA GRANDE PARA CIMIENTO CORRIDO (CEMENTO P-I)

M3

11.48

198.75

2,281.65

100.00%

11.48

2,281.65

0.00

0.00

11.48

2281.65

0.00

0.00

100.00%

05.02.01.03.02 CONCRETO 1:8 + 25% P.M. P/SOBRECIMIENTOS (CEMENTO P-I)

M3

2.63

221.07

581.41

100.00%

2.63

581.41

0.00

0.00

2.63

581.41

0.00

0.00

100.00%

05.02.01.03.03 ENCOFRADO (INCL. HABILITACIN DE MADERA) DE SOBRECIMIENTOS REFORZADOS

M2

22.46

34.48

774.42

100.00%

22.46

774.42

0.00

0.00

22.46

774.42

0.00

0.00

100.00%

05.02.01.03.04 FALSO PISO DE CONCRETO 1:10 DE ESPESOR 4" (CEMENTO P-I)

M2

66.03

25.45

1,680.46

100.00%

66.03

1,680.46

0.00

0.00

66.03

1680.46

0.00

0.00

100.00%

5.02 CASETA DE RESERVORIO APOYADO RAP-01


05.02.01 ESTRUCTURAS

05.02.01.04 OBRAS DE CONCRETO ARMADO


05.02.01.04.01 ZAPATAS
05.02.01.04.01.01 CONCRETO F'C=210KG/CM2 PARA ZAPATA (CEMENTO PI)

M3

4.36

354.74

1,546.67

100.00%

2.10

744.95

2.26

801.71

4.36

1546.67

0.00

0.00

100.00%

05.02.01.04.01.02 ACERO ESTRUC. TRABAJADO PARA ZAPATAS (COSTO PROM. INCL. DESPERDICIOS)

KG

91.20

5.30

483.36

100.00%

45.00

238.50

46.20

244.86

91.20

483.36

0.00

0.00

100.00%

05.02.01.04.02 COLUMNAS
05.02.01.04.02.01 CONCRETO F'C 210 KG/CM2 PARA COLUMNAS (CEMENTO P-I)

M3

1.66

420.33

697.75

100.00%

0.87

365.69

0.79

332.06

1.66

697.75

0.00

0.00

100.00%

05.02.01.04.02.02 ENCOFRADO (INCL. HABILITACION DE MADERA) PARA COLUMNAS

M2

13.46

45.63

614.18

100.00%

7.22

329.45

6.24

284.73

13.46

614.18

0.00

0.00

100.00%

05.02.01.04.02.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS

KG

368.93

5.33

1,966.40

100.00%

265.00

1,412.45

103.93

553.95

368.93

1966.40

0.00

0.00

100.00%

05.02.01.04.03 VIGAS
05.02.01.04.03.01 CONCRETO F'C 210 KG/CM2 PARA VIGAS (CEMENTO P-I)

M3

3.55

392.79

1,394.40

100.00%

1.20

471.35

2.35

923.06

3.55

1394.40

0.00

0.00

100.00%

05.02.01.04.03.02 ACERO ESTRUC. TRABAJADO PARA VIGAS (COSTO PROM. INCL. DESPERDICIOS)

KG

22.54

5.33

120.14

100.00%

14.66

78.14

7.88

42.00

22.54

120.14

0.00

0.00

100.00%

05.02.01.04.03.03 ENCOFRADO (INCL. HABILITACIN DE MADERA) PARA VIGAS RECTAS Y DINTELES

M2

468.47

53.11

24,880.44

100.00%

259.00

13,755.49

209.47

11,124.95

468.47

24880.44

0.00

0.00

100.00%

05.02.01.04.04 LOSAS MACIZAS


05.02.01.04.04.01 CONCRETO F'C 210 KG/CM2 PARA LOSAS MACIZAS (CEMENTO P-I)

M3

9.90

392.80

3,888.72

100.00%

4.87

1,912.94

5.03

1,975.78

9.90

3888.72

0.00

0.00

100.00%

05.02.01.04.04.02 ENCOFRADO (INCL. HABILITACION DE MADERA) PARA LOSAS MACIZAS

M2

66.00

42.25

2,788.50

100.00%

43.00

1,816.75

23.00

971.75

66.00

2788.50

0.00

0.00

100.00%

05.02.01.04.04.03 ACERO ESTRUC. TRABAJADO P/LOSAS MACIZAS (COSTO PROM. INCL. DESPERDICIOS)

KG

467.91

5.33

2,493.96

100.00%

258.44

1,377.49

209.47

1,116.48

467.91

2493.96

0.00

0.00

100.00%

05.02.01.04.05 DADOS DE APOYO Y/O ANCLAJE


05.02.01.04.05.01 CONCRETO F'C 210 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)

M3

0.47

372.39

175.02

100.00%

0.22

81.93

0.25

93.10

0.47

175.02

0.00

0.00

100.00%

05.02.01.04.05.02 ENCOFRADO (INCL. HABILITACION DE MADERA) PARA ANCLAJES Y/O DADOS

M2

4.38

31.30

137.09

100.00%

2.45

76.69

1.93

60.41

4.38

137.09

0.00

0.00

100.00%

05.02.01.04.05.03 ACERO ESTRUC. TRABAJADO PARA ANCLAJES Y/O DADOS (COSTO PROM. INCL. DESPERDICIOS)

KG

52.01

5.33

277.21

100.00%

35.09

187.03

16.92

90.18

52.01

277.21

0.00

0.00

100.00%

UND

1.00

4,814.99

4,814.99

100.00%

0.50

2,407.50

0.50

2,407.50

1.00

4814.99

0.00

0.00

100.00%

05.02.02 INSTALACIONES HIDRAULICAS


05.02.02.01 TUBERIAS
05.02.02.01.01 TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 350

32.53

666.08

21,667.58

100.00%

13.33

8,878.85

19.20

12,788.74

32.53

21667.58

0.00

0.00

100.00%

05.02.02.01.02 TUBERIA HIERRO DUCTIL ISO 2531 K-9 DN 400

19.00

790.05

15,010.95

100.00%

12.11

9,567.51

6.89

5,443.44

19.00

15010.95

0.00

0.00

100.00%

05.02.02.01.03 TUBERIA PVC-UF NTP ISO 4435 S-25 DN 400

6.00

79.46

476.76

100.00%

2.90

230.43

3.10

246.33

6.00

476.76

0.00

0.00

100.00%

05.02.02.02 VALVULAS
05.02.02.02.01 VALVULA DE CPTA. BB. Ho. DUCTIL DN 350mm ISO 5996

UND

3.00

4,484.00

13,452.00

100.00%

1.00

4,484.00

2.00

8,968.00

3.00

13452.00

0.00

0.00

100.00%

05.02.02.02.02 VALVULA DE CPTA. BB. Ho. DUCTIL DN 400mm ISO 5996

UND

2.00

7,074.10

14,148.20

100.00%

1.00

7,074.10

1.00

7,074.10

2.00

14148.20

0.00

0.00

100.00%

05.02.02.03 ACCESORIOS
05.02.03.03.01 CODO 22.5 HIERRO DUCTIL BRIDADO DN 350

UND

1.00

885.00

885.00

100.00%

0.00

0.00

1.00

885.00

1.00

885.00

0.00

0.00

100.00%

05.02.03.03.02 CODO 45 HIERRO DCTIL BRIDADO DN 350

UND

3.00

1,416.00

4,248.00

100.00%

0.00

0.00

3.00

4,248.00

3.00

4248.00

0.00

0.00

100.00%

05.02.03.03.03 CODO 45 HIERRO DCTIL BRIDADO DN 400

UND

2.00

1,810.12

3,620.24

100.00%

0.00

0.00

2.00

3,620.24

2.00

3620.24

0.00

0.00

100.00%

05.02.03.03.04 CODO 90 HIERRO DCTIL BRIDADO DN 350

UND

3.00

1,622.50

4,867.50

100.00%

0.00

0.00

3.00

4,867.50

3.00

4867.50

0.00

0.00

100.00%

05.02.03.03.05 CODO 90 HIERRO DCTIL BRIDADO DN 400

UND

1.00

2,129.90

2,129.90

100.00%

0.00

0.00

1.00

2,129.90

1.00

2129.90

0.00

0.00

100.00%

05.02.03.03.06 TEE Ho DUCTIL BRIDADO DN 350x350

UND

1.00

2,586.56

2,586.56

100.00%

0.00

0.00

1.00

2,586.56

1.00

2586.56

0.00

0.00

100.00%

05.02.03.03.07 TEE Ho DUCTIL BRIDADO DN 400x400

UND

2.00

3,262.70

6,525.40

100.00%

0.00

0.00

2.00

6,525.40

2.00

6525.40

0.00

0.00

100.00%

05.02.03.03.08 REDUCCION Ho DUCTIL BRIDADO DN 400x350mm

UND

1.00

1,871.72

1,871.72

100.00%

0.00

0.00

1.00

1,871.72

1.00

1871.72

0.00

0.00

100.00%

05.02.03.03.09 CANASTILLA DE ACERO INOXIDABLE BRIDADA DN 16" (400mm)

UND

1.00

2,596.00

2,596.00

100.00%

0.00

0.00

1.00

2,596.00

1.00

2596.00

0.00

0.00

100.00%

05.02.03.03.10 TRANSICION TIPO LUFLEX HD, DN 350

UND

1.00

861.40

861.40

100.00%

0.00

0.00

1.00

861.40

1.00

861.40

0.00

0.00

100.00%

05.02.03.03.11 TRANSICION TIPO LUFLEX HD, DN 400

UND

1.00

896.80

896.80

100.00%

0.00

0.00

1.00

896.80

1.00

896.80

0.00

0.00

100.00%

05.02.03.04 ELEMENTOS DE UNION Y MONTAJE


05.02.03.04.01 UNION FLEXIBLE TIPO DRESSER DE 14" (350MM)

UND

2.00

590.00

1,180.00

100.00%

0.00

0.00

2.00

1,180.00

2.00

1180.00

0.00

0.00

100.00%

05.02.03.04.02 UNION FLEXIBLE TIPO DRESSER DE 16" (400MM)

UND

1.00

655.25

655.25

100.00%

0.00

0.00

1.00

655.25

1.00

655.25

0.00

0.00

100.00%

05.02.03.04.03 UNION FLEXIBLE AUTOPORTANTE SIMILAR SMIT BLAIR DN 14" (350MM)

UND

1.00

2,596.00

2,596.00

100.00%

0.00

0.00

1.00

2,596.00

1.00

2596.00

0.00

0.00

100.00%

05.02.03.04.04 UNION FLEXIBLE AUTOPORTANTE SIMILAR SMIT BLAIR DN 16" (400 MM)

UND

1.00

3,219.75

3,219.75

100.00%

0.00

0.00

1.00

3,219.75

1.00

3219.75

0.00

0.00

100.00%

05.02.03.05 BRIDAS, PERNOS Y EMPAQUETADURAS


05.02.03.05.01 BRIDA DE HIERRO DUCTIL PARA SOLDAR Y EMPERNAR DN 14" (350 mm)

UND

27.00

247.80

6,690.60

100.00%

0.00

0.00

27.00

6,690.60

27.00

6690.60

0.00

0.00

100.00%

05.02.03.05.02 BRIDA DE HIERRO DUCTIL PARA SOLDAR Y EMPERNAR DN 16" (400 mm)

UND

25.00

589.41

14,735.25

100.00%

0.00

0.00

25.00

14,735.25

25.00

14735.25

0.00

0.00

100.00%

05.02.03.05.03 PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 14" (350MM)

UND

432.00

9.44

4,078.08

100.00%

0.00

0.00

432.00

4,078.08

432.00

4078.08

0.00

0.00

100.00%

05.02.03.05.04 PERNO DE ACERO INCLUYE TUERCA PARA UNIR BRIDAS DE 16" (400MM)

UND

400.00

14.75

5,900.00

100.00%

0.00

0.00

400.00

5,900.00

400.00

5900.00

0.00

0.00

100.00%

05.02.03.05.05 EMPAQUETADURA DE JEBE ENLONADO DE 14" (350 mm)

UND

27.00

25.96

700.92

100.00%

0.00

0.00

27.00

700.92

27.00

700.92

0.00

0.00

100.00%

05.02.03.05.06 EMPAQUETADURA DE JEBE ENLONADO DE 16" (400 mm)

UND

25.00

34.22

855.50

100.00%

0.00

0.00

25.00

855.50

25.00

855.50

0.00

0.00

100.00%

05.02.03.06 MEDIDORES
05.02.03.06.01 MEDIDOR DE CAUDAL ELECTROMAGNETICO BRIDADO DE 16"

UND

1.00

12,614.20

12,614.20

100.00%

0.00

0.00

1.00

12,614.20

1.00

12614.20

0.00

0.00

100.00%

05.02.03.07 VARIOS
05.02.03.07.01 REJILLA SUMIDERO 1.40 X 1.40, PLATINA 1 1/4" X 1/4" @ 1/2" Y MARCO "L" 1 1/4"

UND

1.00

88.50

88.50

100.00%

0.00

0.00

1.00

88.50

1.00

88.50

0.00

0.00

100.00%

05.02.03.07.02 CONCRETO F'C 175 KG/CM2 PARA ANCLAJES Y/O DADOS (CEMENTO P-I)

M3

4.60

346.38

1,593.35

100.00%

0.00

0.00

4.60

1,593.35

4.60

1593.35

0.00

0.00

100.00%

05.02.03.07.03 MONTAJE DE INSTALACIONES HIDRAULICAS DE RESERVORIO

GLB

1.00

4,140.51

4,140.51

100.00%

0.00

0.00

1.00

4,140.51

1.00

4140.51

0.00

0.00

100.00%

05.02.03.01.01 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO, CANALES

M2

226.98

26.27

5,962.76

100.00%

122.00

3,204.94

104.98

2,757.82

226.98

5962.76

0.00

0.00

100.00%

05.02.03.01.02 TARRAJEO CON IMPERMEABILIZANTE DE MUROS

M2

309.76

37.30

11,554.05

100.00%

149.00

5,557.70

160.76

5,996.35

309.76

11554.05

0.00

0.00

100.00%

05.02.03.01.03 TARRAJEO CON IMPERMEABILIZANTE DE CIELO RASO

M2

107.78

45.01

4,851.18

100.00%

34.77

1,565.00

73.01

3,286.18

107.78

4851.18

0.00

0.00

100.00%

05.02.02.02 CARPINTERIA METALICA


05.02.02.02.01 ESCALERA DE TUBO FO. GALV. CON PARANTESDE 1 1/4" POR PELDAOS DE 3/4"

6.67

239.28

1,596.00

100.00%

2.55

610.16

4.12

985.83

6.67

1596.00

0.00

0.00

100.00%

05.02.02.02.02 MARCO Y TAPA DE PLANCHA LAC 1/4" CONMECANISMO DE SEGURIDAD DE 0,90 X 1,50 MSEGN DISEO

UND

1.00

465.93

465.93

100.00%

1.00

465.93

0.00

0.00

1.00

465.93

0.00

0.00

100.00%

05.02.02.02.03 VENTILACION CON TUBERIA DE ACERO SEGUN DISEO DN 150

UND

4.00

99.25

397.00

100.00%

2.00

198.50

2.00

198.50

4.00

397.00

0.00

0.00

100.00%

05.02.02.02.04 SOPORTE METALICO TIPO ABRAZADERA PARA TUBERIA DN 300 A 350

UND

6.00

257.92

1,547.52

100.00%

2.00

515.84

4.00

1,031.68

6.00

1547.52

0.00

0.00

100.00%

0.00

0.00

0.00

311.92

3,125.44

499.92

5009.20

0.00

0.00

100.00%

05.02.01.05 CAJAS DE DISTRIBUCION


05.02.01.05.01 CAJA REBOSE-PURGA TERRENO NORMAL INC. ELIMINACION DESMONTE

05.02.03 ARQUITECTURA
05.02.03.01 REVOQUES ENLUCIDOS Y MOLDURAS

05.02.02.03 PINTURA, ADITAMENTOS Y VARIOS


05.02.02.03.01 PINTADO EXTERIOR C/TEKNOMATE O SIMILAR DE RESERVORIO APOYADO INCL. MENSAJE

M2

499.92

10.02

5,009.20

100.00%

188.00

1,883.76

05.02.02.03.02 PROVISIN Y COLOCADO DE JUNTA WATER STOP DE P.V.C. E=15 CM ( 6")

160.22

10.92

1,749.60

100.00%

89.33

975.48

70.89

774.12

160.22

1749.60

0.00

0.00

100.00%

05.02.02.03.03 PRUEBA HIDRAULICA CON EMPLEO DE LA LINEA DE INGRESO (CAPTACION)

M3

1,200.00

2.15

2,580.00

100.00%

737.20

1,584.98

462.80

995.02

1,200.00

2580.00

0.00

0.00

100.00%

05.02.02.03.04 EVACUACION DEL AGUA DE PRUEBA CON EMPLEO DE LA LINEA DE SALIDA

M3

1,200.00

0.75

900.00

100.00%

737.20

552.90

462.80

347.10

1,200.00

900.00

0.00

0.00

100.00%

05.02.02.03.05 LIMPIEZA Y DESINFECCION DE RESERVORIOS APOYADOS

M2

644.52

0.90

580.07

100.00%

288.44

259.60

356.08

320.47

644.52

580.07

0.00

0.00

100.00%

05.02.02.03.06 VEREDA DE CONCRETO F'C 175 KG/CM2 E=10CM PASTA 1:2 (P-I), C/EMPLEO DE MEZCLADORA

M2

57.80

49.71

2,873.24

100.00%

32.00

1,590.72

25.80

1,282.52

57.80

2873.24

0.00

0.00

100.00%

05.02.02.04.02 NIPLE DE Ho DUCTIL DN 16" (400mm), TIPO BRIDA-BRIDA, CON ANCLAJE Y ESTANQUEIDAD, L=1.00m

PZA

2.00

2,230.20

4,460.40

100.00%

0.00

0.00

2.00

4,460.40

2.00

4460.40

0.00

0.00

100.00%

TOTAL COSTO DIRECTO


GASTOS GENERALES
UTILIDAD
SUB-TOTAL
IMPUESTO GENERAL A LAS VENTAS (EXONERADO)
TOTAL PRESUPUESTO

16.60%
2.40%

S/.
S/.
S/.
S/.
S/.

8,395,455.12
1,393,645.55
201,490.92
9,990,591.59
-

S/.

9,990,591.59

100.00%

S/.
S/.
S/.
S/.
S/.

981,899.00
91.78
13.27
982,004.05
-

S/.
S/.
S/.
S/.
S/.

173,246.98
28,759.00
4,157.93
206,163.91
-

S/.
S/.
S/.
S/.
S/.

8,130,814.37
1,349,715.19
195,139.54
9,675,669.10
-

S/.
S/.
S/.
S/.
S/.

S/.

982,004.05

S/.

206,163.91

S/.

9,675,669.10

S/.

VALORIZACION DE OBRA N 01
CORRESPONDIENTE AL MES DE NOVIEMBRE DEL 2,011 (DEL 13/11/10 AL 30/11/10)
OBRA

: "MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA"

CONTRATO

: CONTRATO Nro. 009 - 2011 - GRSM - PEAM - 01.00

ENTIDAD

: GOBIERNO REGIONAL DE SAN MARTIN

MONTO DE OBRA

: S/. 38,087,743.33

CONTRATISTA

: CONSORCIO ALIANZA

INSPECCION

: ING. ERBIN JORGE DIAZ NAVARRO

FECHA DE INICIO

: 13/11/2011

PLAZO DE EJECUCION

: 120 DIAS CALENDARIO

FECHA DE TERMINO

: 26/002/2012

RESUMEN DE SUB PRESUPUESTOS


ITEM

DESCRIPCION

PARCIALES

MEJ. Y AMPL. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA


01

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES PARA TODA LA OBRA

201,273.46

02

CAPTACION PROYECTADA RIO NEGRO CAP-01

50,057.09

03

LINEA DE IMPULSION PROYECTADA LI-01

0.00

04

LINEA DE CONDUCCION PROYECTADA RIO NEGRO LC-01

0.00

05

RESERVORIO APOYADO PROYECTADO RIO NEGRO RAP-01 VOL=1,200M3

25,063.48

COSTO DIRECTO
GASTOS GENERALES (16.60%)
UTILIDAD (2.40%)
TOTAL

276,394.03
45,881.41
6,633.46
328,908.90

REAJUSTE

MONTO DEL CONTRATTO =


VALORIZACION =
MONTO DE ADELANTO DIRECTO (5%) =
VALOR CALCULADO DEL Ka DE MARZO =
VALOR CALCULADO DEL K DE NOVIEMBRE =

S/.
S/.
S/.

9,990,591.59
328,908.90
1,998,118.32
1.00
1.012

REAJUSTE = V (K-1) =
DEDUCCION = ((AD * V)/C*Ka) * (K-Ka)

S/.
S/.

3,946.91
789.38

VALORIZACION BRUTA =
AMORTIZACION = %ADELANTO * V

S/.
S/.

332,066.42
65,781.78

VALORIZACION NETA = VB - AM =
I.G.V. (18%) =

S/.
S/.

266,284.64
47,931.24

A CANCELAR A CONTRATISTA = VN + I.G.V. =

S/.

314,215.88

VALORIZACION DE OBRA N 02
CORRESPONDIENTE AL MES DE DICIEMBRE DEL 2,011 (DEL 01/12/11 AL 30/12/11)
OBRA

: "MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA"

CONTRATO

: CONTRATO Nro. 009 - 2011 - GRSM - PEAM - 01.00

ENTIDAD

: GOBIERNO REGIONAL DE SAN MARTIN

MONTO DE OBRA

: S/. 38,087,743.33

CONTRATISTA

: CONSORCIO ALIANZA

INSPECCION

: ING. ERBIN JORGE DIAZ NAVARRO

FECHA DE INICIO

: 13/11/2011

PLAZO DE EJECUCION

: 120 DIAS CALENDARIO

FECHA DE TERMINO

: 26/002/2012

RESUMEN DE SUB PRESUPUESTOS

ITEM

DESCRIPCION

PARCIALES

MEJ. Y AMPL. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA


01

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES PARA TODA LA OBRA

02

CAPTACION PROYECTADA RIO NEGRO CAP-01

8,293.92

03

LINEA DE IMPULSION PROYECTADA LI-01

17,905.08

04

LINEA DE CONDUCCION PROYECTADA RIO NEGRO LC-01

05

RESERVORIO APOYADO PROYECTADO RIO NEGRO RAP-01 VOL=1,200M3

275,656.45

2,523,211.72
727.43

COSTO DIRECTO
GASTOS GENERALES (16.60%)
UTILIDAD (2.40%)
TOTAL

2,825,794.59
469,081.90
67,819.07
3,362,695.57
REAJUSTE

MONTO DEL CONTRATTO =


VALORIZACION =
MONTO DE ADELANTO DIRECTO (20%) =
VALOR CALCULADO DEL Ka DE MARZO =
VALOR CALCULADO DEL K DE NOVIEMBRE =

S/.
S/.
S/.

9,990,591.59
3,362,695.57
1.136
1.149

REAJUSTE = V (K-1) =
DEDUCCION = ((AD * V)/C*Ka) * (K-Ka)

S/.
S/.

501,041.64
-

VALORIZACION BRUTA =
AMORTIZACION = %ADELANTO * V

S/.
S/.

3,863,737.21
672,539.11

VALORIZACION NETA = VB - AM =
I.G.V. (18%) =

S/.
S/.

3,191,198.09
574,415.66

A CANCELAR A CONTRATISTA = VN + I.G.V. =

S/.

3,765,613.75

S/.

3,765,613.75

VALORIZACION DE OBRA N 03
CORRESPONDIENTE AL MES DE ENERO DEL 2,012 (DEL 01/01/12 AL 30/01/112)
OBRA

: "MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA"

CONTRATO

: CONTRATO Nro. 009 - 2011 - GRSM - PEAM - 01.00

ENTIDAD

: GOBIERNO REGIONAL DE SAN MARTIN

MONTO DE OBRA

: S/. 38,087,743.33

CONTRATISTA

: CONSORCIO ALIANZA

INSPECCION

: ING. ERBIN JORGE DIAZ NAVARRO

FECHA DE INICIO

: 13/11/2011

PLAZO DE EJECUCION

: 120 DIAS CALENDARIO

FECHA DE TERMINO

: 26/002/2012

RESUMEN DE SUB PRESUPUESTOS

ITEM

DESCRIPCION

PARCIALES

MEJ. Y AMPL. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA


01

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES PARA TODA LA OBRA

504,969.09

02

CAPTACION PROYECTADA RIO NEGRO CAP-01

22,890.40

03

LINEA DE IMPULSION PROYECTADA LI-01

43,373.92

04

LINEA DE CONDUCCION PROYECTADA RIO NEGRO LC-01

05

RESERVORIO APOYADO PROYECTADO RIO NEGRO RAP-01 VOL=1,200M3

4,474,037.25
74,748.88

COSTO DIRECTO
GASTOS GENERALES (16.60%)
UTILIDAD (2.40%)
TOTAL

5,120,019.54
849,923.24
122,880.47
6,092,823.25
REAJUSTE

MONTO DEL CONTRATTO =


VALORIZACION =
MONTO DE ADELANTO DIRECTO (20%) =
VALOR CALCULADO DEL Ka DE MARZO =
VALOR CALCULADO DEL K DE NOVIEMBRE =

S/.
S/.
S/.

9,990,591.59
6,092,823.25
1.297
1.318

REAJUSTE = V (K-1) =
DEDUCCION = ((AD * V)/C*Ka) * (K-Ka)

S/.
S/.

1,937,517.79
-

VALORIZACION BRUTA =
AMORTIZACION = %ADELANTO * V

S/.
S/.

8,030,341.04
1,218,564.65

VALORIZACION NETA = VB - AM =
I.G.V. (18%) =

S/.
S/.

6,811,776.39
1,226,119.75

A CANCELAR A CONTRATISTA = VN + I.G.V. =

S/.

8,037,896.14

VALORIZACION DE OBRA N 04
CORRESPONDIENTE AL MES DE FEBRERO DEL 2,012 (DEL 01/02/12 AL 26/02/112)
OBRA

: "MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA"

CONTRATO

: CONTRATO Nro. 009 - 2011 - GRSM - PEAM - 01.00

ENTIDAD

: GOBIERNO REGIONAL DE SAN MARTIN

MONTO DE OBRA

: S/. 38,087,743.33

CONTRATISTA

: CONSORCIO ALIANZA

INSPECCION

: ING. ERBIN JORGE DIAZ NAVARRO

FECHA DE INICIO

: 13/11/2011

PLAZO DE EJECUCION

: 120 DIAS CALENDARIO

FECHA DE TERMINO

: 26/002/2012

RESUMEN DE SUB PRESUPUESTOS

ITEM

DESCRIPCION

PARCIALES

MEJ. Y AMPL. DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DE LA CIUDAD DE RIOJA


01

OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES PARA TODA LA OBRA

981,899.00

02

CAPTACION PROYECTADA RIO NEGRO CAP-01

81,241.41

03

LINEA DE IMPULSION PROYECTADA LI-01

61,279.00

04

LINEA DE CONDUCCION PROYECTADA RIO NEGRO LC-01

05

RESERVORIO APOYADO PROYECTADO RIO NEGRO RAP-01 VOL=1,200M3

6,997,248.97
273,786.77

COSTO DIRECTO
GASTOS GENERALES (16.60%)
UTILIDAD (2.40%)
TOTAL

8,395,455.15
1,393,645.55
201,490.92
9,675,669.10

REAJUSTE

MONTO DEL CONTRATTO =


VALORIZACION =
MONTO DE ADELANTO DIRECTO (20%) =
VALOR CALCULADO DEL Ka DE MARZO =
VALOR CALCULADO DEL K DE NOVIEMBRE =

S/.
S/.
S/.

9,990,591.59
9,675,669.10
1.019
1.041

REAJUSTE = V (K-1) =
DEDUCCION = ((AD * V)/C*Ka) * (K-Ka)

S/.
S/.

396,702.43
-

VALORIZACION BRUTA =
AMORTIZACION = %ADELANTO * V

S/.
S/.

10,072,371.54
1,935,133.82

VALORIZACION NETA = VB - AM =
I.G.V. (18%) =

S/.
S/.

8,137,237.72
1,464,702.79

A CANCELAR A CONTRATISTA = VN + I.G.V. =

S/.

9,601,940.51

También podría gustarte