Está en la página 1de 2

PLANILLA DE MOVIMIENTO DE TIERRAS

:01..

HOJA N
CALCULADO POR :
ENTIDAD

FECHA DE EMISION: JULIO 2013

:
PROYECTO:
PROGRESIVA:0+000.

LABOR REALIZADA:

PROGRESIVA (KM)

""
0+045.50

CORTE Y RELLENO EN CARRETERA A CONSTRUIR

DIST

AREAS DE
CORTE
AREA
Area Media
5.66

AREAS DE
RELLENO
AREA
Area Media

VOLUMENES
(M3)
CORTE
RELLENO

0+

1.3906

0+

20

20

5.75

5.70

1.3625

1.38

114.08

27.53

0+

40

20

11.59

8.67

0.7528

1.06

173.37

21.15

0+

60

20

9.64

10.61

0.38

212.22

7.53

0+

80

20

10.39

10.01

0.0627

0.03

200.23

0.63

0+

100

20

9.13

9.76

0.0312

0.05

195.21

0.94

0+

115.19

15.19

7.11

8.12

0.5456

0.29

123.35

4.38

0+

124.77

9.58

5.22

6.16

1.008

0.78

59.04

7.44

0+

130

5.23

2.20

3.71

2.1593

1.58

19.40

8.28

0+

150

20

0.00

1.10

23.9146

13.04

21.99

260.74

0+

170

20

0.02

0.01

5.8247

14.87

0.17

297.39

0+

190

20

3.21

1.61

2.7658

4.30

32.27

85.91

0+

194.82

4.82

0.41

1.81

7.5842

5.18

8.72

24.94

0+

200

5.18

0.12

0.26

9.4986

8.54

1.36

44.24

0+

210

10

0.69

0.41

6.2594

7.88

4.06

78.79

0+

220

10

6.26

3.48

2.3731

4.32

34.77

43.16

0+

240

200

17.18

14.38

0.38

2876.61

75.28

0+

260

20

23.14

20.16

0.00

403.22

0.00

0+

275.21

15.21

3.79

13.46

2.0072

1.00

204.77

15.26

0+

280

85.18

2.44

1.42

1.0525

4.32

121.12

367.84

0+

290

10

4.10

3.27

2.2525

1.65

32.68

16.53

0+

300

10

4.60

4.35

0.6844

1.47

43.50

14.68

0+

320

20

3.79

4.19

1.3972

1.04

83.85

20.82

0+

340

20

19.20

11.49

0.70

229.85

13.97

0+

351.85

11.85

21.26

19.22

0.00

227.74

0.00

0+

360

11.85

5.48

14.31

1.2857

0.64

169.57
5,593.17

aqu
coloca
r las
progre
sivas

aqu
aqu
colocar las colocar
longitudes las areas
entre
corte
progresiva encontrad
s
as

aqu
colocar las
areas
relleno
encontrada
s

7.62
1,445.06