CENTRO DE ACOPIO

Descripcin

Und.

Metrado

Precio S/.

Parcial S/.

LIMPIEZA TERRENO NATURAL

M2

280.000

2.950

826.000

TRAZO, NIVELES Y REPLANTEO

GLB

280.000

2.180

610.400

EXCAVACION PARA RAMPA

M3

40.000

45.980

1839.200

EXCAVACION PARA CIMIENTOS

M3

8.292

30.160

250.087

EXCAVACION PARA ZAPATAS

M3

8.320

34.460

286.707

RELLENO CON MATERIAL PROPIO

M3

20.396

37.920

773.416

ELIMINACION DE MATERIAL EXCEDENTE

M3

56.612

20.100

1137.901

PISO DE CEMENTO PULIDO E= 4" MEZCLA 1:4

M2

189.676

37.290

7073.007

SOLADO CONCRETO CICLOPEO 1:10 + 30% P.G. E = 2" PARA ZAPATAS

M2

13.560

21.180

287.201

CONCRETO PARA CIMIENTOS

M3

18.00

375.000

6750.000

CONCRETO PARA SOBRECIMIENTOS

M3

1.14

375.000

427.500

CONCRETO PARA COLUMAS

M3

3.25

375.000

1218.750

CONCRETO PARA VIGAS

M3

2.40

375.000

900.000

CONCRETO PARA RAMPA

M3

8.81

375.000

3303.750

Item
TRABAJOS PRELIMINARES

1436.400

MOVIMIENTO DE TIERRAS

4287.311

OBRAS DE CONCRETO SIMPLE

7360.208

OBRAS DE CONCRETO ARMADO

36917.025

CONCRETO PARA MURO DE CONTENCION

M3

20.91

375.000

7841.250

ACERO PARA COLUMNAS 1/2"

KG

403.00

4.350

1753.050

ACERO PARA VIGAS 1/2"

KG

135.38

4.350

588.903

ACERO PARA ESTRIBOS

KG

29.30

4.350

127.455

ACERO PARA RAMPA 3/8"

KG

135.38

4.350

588.903

ACERO PARA ESTRIBOS DE ZAPATA COBERT. METALICA

KG

5.00

4.350

21.750

ACERO PARA ZAPATA ESTRUCT. METALICA

KG

8.10

4.350

35.235

ACERO PARA MURO DE CONTENCION 1/2"

KG

1272.69

4.350

5536.202

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

M2

11.36

56.880

646.157

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

M2

52.00

51.480

2676.960

ENCOFRADO Y DESENCOFRADO DE VIGA

M2

29.65

58.650

1738.973

ENCOFRADO Y DESENCOFRADO DE MURO DE CONTENCION

M2

54.24

50.930

2762.189

M2

123.000

50.110

6163.530

SALIDA PARA TECHO CENTRO DE LUZ

UND.

6.000

71.330

427.980

TABLERO GENERAL

UND.

1.000

326.810

326.810

INST. LUMINARIAS CASETAS

UND.

2.000

69.080

138.160

BRAQUETES DE ILUMINACION

UND.

3.000

101.650

304.950

TUBO RECTANGULAR ACERO 40 X 80 X 2 MM.

ML

111.100

12.050

1338.755

TUBO RECTANGULAR ACERO 2" X 4" X 3 MM.

ML

30.100

21.517

647.652

TUBO RECTANGULAR ACERO 3" X 3" X 3 MM.

ML

20.000

22.050

441.000

UND.

1.000

246.900

246.900

ML

14.000

5.000

70.000

SOLDADURA CELLOCORP X LATA 20 KG.

UND.

8.000

250.000

2000.000

PERNO 5/16 X 2 1/2"

CTO.

0.500

26.000

13.000

PLANCHA DE ACERO DE 1.2 X 2.4 M. X 2.00 MM.

UND.

1.000

105.300

105.300

PINTURA BASE EPOXICA

JGO.

7.000

245.000

1715.000

PINTURA ESMALTE EPOXICA

JGO.

7.000

235.000

1645.000

MANO DE OBRA

GLB.

1.000

7000.000

7000.000

PUERTAS

UND.

1.000

1500.000

1500.000

CASETA DRYWALL

GLB.

1.000

3000.000

3000.000

COBERTURA DE CALAMINA

GLB.

25.000

45.000

1125.000

ARENA GRUESA

M3

4.750

25.000

118.750

GRAVA 1/2"

M3

4.750

30.000

142.500

TUBO F G 1/2"

M3

25.000

3.833

95.833

COSTO DIRECTO

78567.064

IGV 18%

14142.072

ARQUITECTURA
MURO DE SOGA LADRILLO KING KONG

6163.53

INSTALACIONES ELECTRICAS

1197.900

CARPINTERIA METLICA (COBERTURA)

PLANCHA DE ACERO 1.2 X 2.4 X 3/16"


ESPARRAGOS 3/4"

15222.607

OTROS

5982.083

TOTAL

92709.136

OFICINA DE INFRAESTRUCTURA Y OBRAS

Presupuesto
Presupuesto
AMPLIACION DE CERCO PERIMTRICO CAMPUS CENTRAL UCV - TRUJILLO
PropietarioUNIVERSIDAD CESAR VALLEJO SAC
Lugar

Costo a

Mayo 2012

TRUJILLO

Item

Descripcin

Und.

Metrado

Precio S/.

TRABAJOS PRELIMINARES

Parcial S/.
39076.52

LIMPIEZA TERRENO NATURAL

M2

4584.97

2.36

10820.53

PICADO DE PISOS

M2

187.00

20.00

3740.00

DEMOLICION DE MUROS EXISTENTES

M2

367.10

9.87

3623.28

DEMOLICION DE CIMENTACION Y ZAPATAS

M3

15.19

180.00

2733.84

TRAZO, NIVELES Y REPLANTEO

M2

4584.97

2.18

9995.23

CERCO PROVISIONAL

ML

146.84

35.50

5212.82

CASETA

M2

9.00

66.58

599.22

ELIMINACION Y ACARREO DE DESMONTE

M3

40.00

58.79

2351.60

M3

1833.99

37.92

M3

14.35

27.56

395.49

M3

4.95

300.00

1485.00

EXCAVACION PARA ZAPATAS M1

M3

3.40

27.56

RELLENO CON MATERIAL PROPIO

M3

0.47

37.92

17.90

ELIMINACION Y ACARREO DE MATERIAL EXCEDENTE

M3

5.50

58.79

323.33

SOLADO CONCRETO CICLOPEO 1:12

M3

0.29

20.62

5.89

CONCRETO F'C= 210 KG/CM2 EN ZAPATAS

M3

1.33

375.00

498.75

CONCRETO F'C= 210 KG/CM2 EN SOBRECIMIENTOS

M3

0.70

375.00

262.50

CONCRETO F'C= 210 KG/CM2 EN COLUMNAS

M3

1.40

375.00

525.00

CONCRETO F'C= 210 KG/CM2 EN PLACA

M3

1.33

375.00

498.75

CONCRETO F'C= 175 KG/CM2 PARA SARDINELES

M3

2.56

310.00

793.60

ACERO FY= 4200 KG/CM2 PARA ZAPATAS 1/2"

KG

15.39

4.51

69.41

ACERO FY= 4200 KG/CM2 PARA COLUMNAS TIPO 1 , 1/2"

KG

118.80

4.51

535.79

ACERO FY= 4200 KG/CM2 DE 1/4" PARA ESTRIBOS

KG

28.90

4.51

130.34

ACERO FY= 4200 KG/CM2 PAO TRAPEZOIDAL 3/8"

KG

18.20

4.51

82.08

ESTRIBOS FY= 4200 KG/CM2 PARA PAO TRAPEZOIDAL 1/4"

KG

7.00

4.51

31.57

ACERO FY= 4200 KG/CM2 EN PLACA 3/8"

KG

48.55

4.51

218.96

ACERO FY= 4200 KG/CM2 EN SARDINEL 3/8"

KG

8.50

4.51

38.34

ACERO FY= 4200 KG/CM2 SARDINEL 1/4"

KG

5.40

4.51

24.35

MURO DE SOGA LADRILLO KING KONG MODULO 1

M2

6.70

55.72

373.32

ENCOFRADO EN SOBRECIMIENTO

M2

1.38

55.00

75.63

ENCOFRADO EN COLUMNAS

M2

9.88

60.00

592.80

MOVIMIENTO DE TIERRAS
RELLENO Y COMPACTADO GENERAL

69544.82
69544.82

CERCO PERIMTRICO AV. LARCO


MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS

395.49

OBRAS DE CONCRETO SIMPLE


CONCRETO EN CIMIENTOS C.C. 1:10 + 30% P.G.

1485.00

MODULO 1

10131.59
93.70

ENCOFRADO EN PLACA

M2

33.90

60.00

ENCOFRADO EN SARDINELES

M2

3.39

60.00

203.40

TARRAJEO EN MUROS BRUADO

M2

37.13

28.84

1070.68

TARRAJEO EN COLUMNAS, VIGAS Y PLACAS

M2

37.3496

27.73

1035.67

PINTURA EN MODULO 1

M2

74.48

8.00

595.84

EXCAVACION PARA ZAPATAS M2 - M3

M3

3.02

27.56

83.34

RELLENO CON MATERIAL COMPACTADO

M3

1.40

37.92

53.09

ELIMINACION Y ACARREO DE MATERIAL EXCEDENTE

M3

14.30

58.79

840.65

SOLADO DE CONCRETO CICLOPEO 1:12

M3

0.58

20.62

11.96

CONCRETO F'C= 210 KG/CM2 EN ZAPATAS

M3

7.67

375.00

2876.25

CONCRETO F'C= 210 KG/CM2 EN COLUMNAS CIRCULARES

M3

0.17

375.00

63.75

CONCRETO F'C= 210 KG/CM2 EN VIGAS

M3

0.50

375.00

187.50

CONCRETO F'C= 210 KG/CM2 EN PLACA TIPO 2

M3

1.45

375.00

543.75
131.32

MODULO 2 Y 3

2034.00

12168.92

CONCRETO F'C= 175 KG/CM2 PARA SARDINELES

M3

0.42

310.00

ACERO FY= 4200 PARA ZAPATAS 1/2"

KG

11.29

4.51

50.92

ACERO FY= 4200 PARA COLUMNAS 1/2"

KG

31.20

4.51

140.71

ACERO FY= 4200 DE 1/4" PARA ESTRIBOS

KG

8.00

4.51

36.08

ACERO FY= 4200 EN PLACA 3/8"

KG

264.00

4.51

1190.64

ACERO FY= 4200 EN VIGAS 1/2"

KG

66.43

4.51

299.61

ACERO FY= 4200 ES VIGAS 1/4"

KG

59.26

4.51

267.25

ENCOFRADO EN SOBRECIMIENTOS

M2

11.20

55.00

616.00

ENCOFRADO EN COLUMNAS CIRCULARES

M2

12.65

60.00

759.25

ENCOFRADO EN VIGAS

M2

3.90

60.00

234.24

ENCOFRADO EN PLACAS

M2

33.90

60.00

2034.00

ENCOFRADO EN SARDINELES

M2

3.39

60.00

203.40

TARRAJEO EN COLUMNAS, VIGAS, PLACAS

M2

43.25

27.73

1199.22

PINTURA EN MODULO 2 - 3

M2

43.25

8.00

345.98

EXCAVACION CIMENTACION 0.80 MT

M3

2.00

27.56

55.12

EXCAVACION DE ZAPATAS

M3

12.34

27.56

340.15

RELLENO CON MATERIAL COMPACTADO

M3

6.41

37.92

243.07

ELIMINIACION Y ACAREEO DE MATERIAL EXCEDENTE

M3

7.69

58.79

452.19

SOLADO PARA PLACAS Y COLUMNAS C.C. 1:12

M3

0.79

20.62

16.32

CONCRETO F'C= 210 KG/CM2 PARA CIMIENTOS

M3

1.97

375.00

738.94

CONCRETO F'C= 210 KG/CM2 PARA SOBRECIMIENTOS

M3

0.91

300.00

273.60

CONCRETO F'C= 210 KG/CM2 PARA ZAPATAS

M3

7.85

375.00

2945.25

CONCRETO F'C= 210 KG/CM2 PARA COLUMNAS Y PLACAS

M3

3.96

375.00

1484.25

CONCRETO F'C= 210 KG/CM2 PARA VIGAS

M3

18.15

375.00

6805.54

CONCRETO F'C= 210 KG/CM2 PARA LOSA DE 0.20 CM

M3

3.94

310.00

1220.87

ACERO FY= 4200 DE 1/2" PARA ZAPATAS

KG

93.41

4.51

421.28

ACERO FY= 4200 PARA COLUMNAS 5/8"

KG

333.25

4.51

1502.96

ACERO FY= 4200 PARA COLUMNAS Y PLACAS DE 3/8"

KG

274.20

4.51

1236.64

ACERO FY= 4200 PARA COLUMNAS DE 1/2"

KG

138.60

4.51

625.09

ACERO FY= 4200 PARA COLUMNAS 1/4"

KG

24.15

4.51

108.92

ACERO FY= 4200 PARA VIGA DE 1/2"

KG

223.40

4.51

1007.53

ACERO FY= 4200PARA VIGA DE 1/4"

KG

173.90

4.51

784.29

ACERO FY= 4200PARA VIGA DE 5/8"

KG

257.00

4.51

1159.07

INGRESO SECUNDARIO

36921.35

ACERO FY= 4200 PARA VIGA DE 3/8"

KG

251.00

4.51

1132.01

ACERO FY= 4200 DE TEMPERATURA DE 1/4"

KG

48.00

4.51

216.48

ACERO FY= 4200 PARA VIGUETAS DE 3/8"

KG

101.00

4.51

455.51

LADRILLO PARA TECHO DE 0.15X 0.30X 0.30

PZA

325.00

1.86

603.20

MURO DE SOGA LADRILLO KING KONG MODULO 1

M2

12.46

55.72

694.27

ENCOFRADO DE SOBRECIMIENTOS

M2

3.84

45.00

172.80

ENCOFRADO DE COLUMNAS Y PLACAS

M2

82.51

55.00

4538.00

ENCOFRADO DE VIGAS

M2

60.64

55.00

3335.06

ENCOFRADO DE LOSA

M2

3.84

55.00

211.20

TARRAJEO EN INGRESO SECUNDARIO

M2

78.04

27.73

2164.06

TARRAJEO BRUADO EN INGRESO SECUNDARIO

M2

36.74

28.84

1059.43

PINTURA EN INGRESO SECUDNARIO

M2

114.78

8.00

918.26

CERCO PERIMETRICO EN URB. LAS FLORES


CERCO LAS FLORES

175121.27

EXCAVACION PARA CIMIENTOS CERCO LAS FLORES

M3

66.43

27.56

1830.81

EXCAVACION PARA ZAPATAS CERCO LAS FLORES

M3

27.28

27.56

751.84

RELLENO CON MATERIAL COMPACTADO

M3

4.04

37.92

153.21

ELIMINACION Y ACARREO DE MATERIAL EXCEDENTE

M3

79.96

58.79

4700.61

SOLADO PARA ZAPATAS C.C. 1:10 + 30% P.G.

M3

3.95

21.18

83.62

CONCRETO F'C= 210 KG/CM2 PARA ZAPATAS

M3

1.28

375.00

480.00

CONCRETO F'C= 210 KG/CM2 PARA CIMIENTOS

M3

66.43

375.00

24912.00

CONCRETO F'C= 210 KG/CM2 PARA SOBRECIMIENTOS

M3

32.65

375.00

12243.75

CONCRETO F'C= 210 KG/CM2 PARA COLUMNAS

M3

45.09

375.00

16908.75

CONCRETO F'C= 210 KG/CM2 PARA VIGAS

M3

35.43

375.00

13286.25

ACERO FY= 4200 PARA ZAPATAS 1/2"

KG

326.70

4.51

1473.42

ACERO FY= 4200 PARA VIGAS DE CIMENTACION 1/2"

KG

87.12

4.10

357.19

ACERO FY= 4200 PARA ESTRIBOS VIGAS DE CIMENTACION 3/8"

KG

48.96

4.51

220.81

ACERO FY= 4200 EN COLUMNAS DE 1/2"

KG

930.00

4.51

4194.30

ACERO FY= 4200 EN COLUMNAS DE 5/8"

KG

186.00

4.51

838.86

ESTRIBOS FY= 4200 PARA COLUMNAS DE 3/8"

KG

513.00

4.51

2313.63

ACERO FY= 4200 PARA VIGAS DE 1/2"

KG

463.00

4.51

2088.13

ACERO FY= 4200 PARA ESTRIBOS DE VIGAS DE 3/8"

KG

315.00

4.51

1420.65

ENCOFRADO DE SOBRECIMIENTOS

M2

119.72

35.77

4282.53

ENCOFRADO DE COLUMNAS

M2

187.20

51.48

9637.06

ENCOFRADO DE VIGAS

M2

118.80

58.65

6967.62

MURO DE SOGA LADRILLO KING KONG

M2

177.39

55.72

9884.17

MURO DE CABEZA LADRILLO KING KONG

M2

398.74

92.92

37050.92

TARRAJEO EN MURO SOGA

M2

120.60

18.47

2227.48

TARRAJEO EN MURO CABEZA ESCARCHADO

M2

274.50

16.66

4573.17

TARRAJEO EN INTERIOR

M2

430.00

12.63

5430.90

PINTURA URB. LAS FLORES

M2

851.20

8.00

6809.60

M2

118.00

27.07

PISOS Y PAVIMENTOS
PISO DE CONCRETO PULIDO E=2" MEZCLA 1:4

3194.26

CARPINTERIA METALICA

3194.26
33850.00

CONFECCION DE REJAS LARCO MODULO 1

UND.

3.00

2250.00

6750.00

CONFECCION DE REJAS LARCO MODULO 2 -3

UND.

4.00

3750.00

15000.00

CONFECCION DE PUERTA DE INGRESO LATERAL LARCO

GLB.

1.00

3500.00

3500.00

CONFECCION DE PORTONES CALLE LOS PAUJILES

GLB.

2.00

3300.00

6600.00

CONFECCIONES DE PUERTA METALICA 1 X 3 M.

GLB.

1.00

2000.00

2000.00

SALIDA DE TECHO (CENTRO DE LUZ)

UND.

20.00

52.31

1046.20

TABLERO GENERAL

UND.

1.00

261.45

261.45

ALIMEN. GENERAL, APERTURA DE ZANJAS

UND.

1.00

90.00

90.00

TABLEROS ELECTRICOS

UND.

1.00

120.00

120.00

INST. ELEC. ALAMEDA

UND.

1.00

1000.00

1000.00

CAJA MET. GALV. PESADA 8X8X4" C/ TAPA

UND.

9.00

12.00

108.00

EXCAVAC. PARA COLOCACION DE POSTES

M3

9.00

25.00

225.00

COLOC. CAJAS METALICAS POSTES

UND.

5.76

85.00

489.60

PASADA DE CABLE DEL MURO DEL POSTE

UND.

9.00

5.00

45.00

CAJAS METALICAS CON TAPA PARA POSTES

UND.

9.00

11.50

103.50

INS. ELEC. POSTES DE FIERRO EN AV. LARCO

GLB

1.00

860.00

860.00

INST. LUMINARIAS CASETAS - PORTADAS

GLB

1.00

5000.00

5000.00

POSTE DE ACERO LARCO

UND.

9.00

1000.00

9000.00

INSTALACIONES ELECTRICAS

18348.75

OTROS

41886.15

GUARDIANIA

DIA

190.00

15.00

2850.00

COLOCACION DE AFIRMADO

M2

3500.00

6.28

21980.00

TRABAJOS MENORES ADICIONALES

GLB

1.00

500.00

500.00

RESANES

M2

125.00

6.00

750.00

PISO ADOQUINADO

M2

82.18

44.96

3694.73

BASES PARA POSTES

UND.

9.00

30.00

270.00

SUB TABLERO ELECTRICO AV. LARCO

UND.

1.00

450.00

450.00

SEMBRADO DE GRASS

GLB

1994.28

1.50

2991.42

COLOCACION DE GRAVILLA DE 3/8" PARA ESTACIONAMIENTO

M3

30.00

35.00

1050.00

COBERTURAS POLICARBONATO

UD

6.00

1200.00

7200.00

UND.

15.00

10.00

150.00

COSTO DIRECTO

442124.12

JUNTA DE TECNOPOR 1/2"

IGV

0.18

79582.34

COSTO TOTAL S/. 521,706.46