Documentos de Académico
Documentos de Profesional
Documentos de Cultura
OBRA
LOCALIDAD
EJECUTA
FECHA
ITEM
PESO
kg.
CANTIDAD
PESO
TOTAL
INCIDENCIA
IDA VUELTA
FLETE
COSTO PARCIAL
IDA
VUELTA
TOTAL
ACUMULADO
1.00
2.00
3.00
4.00
MOTONIVELADORA DE 125 HP
CARGADOR DE RUEDAS CAT 38G; 4YD3
RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T.
TRACTOR S/ORUGAS CAT-D7R
16,922.00
16,800.00
5,400.00
20,630.00
19,000.00
12,000.00
1.00
1.00
1.00
1.00
1.00
3.00
HR IDA
0.50
0.50
16,922.00
16,800.00
5,400.00
20,630.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.10
0.10
0.10
0.10
1,200.00
1,200.00
1,000.00
1,800.00
1,200.00
1,200.00
1,000.00
1,800.00
2,400.00
2,400.00
2,000.00
3,600.00
HR VUELTA
0.50
0.50
1.00
1.00
1.00
1.00
x HORA
90.00
90.00
45.00
135.00
45.00
135.00
90.00
270.00
TOTAL ACUMULADO
5,380.00
5,380.00
10,760.00