TABLA DOSIFICADORA DE CEMENTO

DOSIF. CONCRETO DE REV. DE 10 CM. MUROS Y PISOS F'C=100 KG/CM2 CASTILLOS Y DALAS F'C=150 KG/CM2 LOSAS Y ZAPATAS F'C=200 KG/CM2 COLUMNAS Y TECHOS F'C=250 KG/CM2 RESISTENCIA POR M3 DE CONCRETO F'C=100 KG/CM2 F'C=150 KG/CM2 F'C=200 KG/CM2 F'C=250 KG/CM2 SACO CEMENTO 1.0 1.0 1.0 1.0 AGUA BOTE 19 LTS. 3.0 2.5 2.0 1.5 ARENA BOTE GRAVA BOTE 19 19 LTS. LTS. 8.0 5.5 4.0 3.5 8.5 6.5 6.0 4.5 2 5 5 4 6 6 6 6 5 6 6 6 GPO.

RENDIMIENTOS PROMEDIO DE TRABAJOS DE ALBAILERA


UNI REND. (JOR) CONCEPTO

PISOS
M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 ML ML 10.00 35.00 18.00 50.00 5.00 7.00 7.00 13.00 11.00 9.50 18.00 18.00 FIRMES DE CONCRETO P/PISOS, ESPESOR DE 8-10 CM ACABADO ESCOBILLADO INTEGRAL SOBRE FIRMES FINO NO INTEGRAL ACABADO PULIDO ARMADO CON MALLA EN PISOS PISOS CERMICA SIN FIRME PISOS LOSETA 15X15X1.0 CM, A 2 CM PISOS LOSETA 10X20X1.0 CM, A 2 CM PISOS LOSETA 30X30X2.50 CM PISOS MOSAICO 20X20X2.0 CM PISO MOSAICO TERRAZO S/JTA MET. 50X50X2.50 CM ZOCLO MOSAICO 10X20X2.0 CM ZOCLO LOSETA 10X15X30 A 40 CM

TABLA DISIFICADORA PARA RESISTENCIA DE CONCRETO


SACO CEMENTO 5.0 6.5 7.5 8.0 AGUA BOTE 19 LTS. 12.0 12.5 13.0 11.3 ARENA BOTE GRAVA BOTE 19 19 LTS. LTS. 32.0 27.5 26.0 26.3 34.0 32.5 39.0 33.8

TABLA DOSIFICADORA DE MORTERO


ARENA (BOTES DE 19 LTS) 3 3 3 8 a 10 7a9 8 a 10 9 a 11 1 SACO DE 50 KG + No. DE BOTES DE ARENA DE 19 LTS. (Aada la cantidad suficiente de agua para formar una masa plstica de consistencia similar a la de una pasta de dientes). PISOS, FIRMES, BANQUETAS Y GUARNICIONES (Aadir 4 botes de grava de 19 lts. Por saco de 50 kg.) APLANADOS Y RECUBRIMIENTOS EN PANELES DE POLIESTILENO APLANADOS Y RECUBRIMIENTOS DE ALTA RESISTENCIA APLANADOS, ENJARRES, REPELLADOS Y ENTORTADOS JUNTEO DE BLOCK, TABIQUES Y MOSAICO CIMENTACIONES DE PIEDRA BRAZA PLANTILLAS

MARTELINADOS
1 1 1 1 1 5 5 5 5 3 6 5 5 2 5 5 2 M2 M2 M2 M2 M3 M2 M2 M2 ML PZA M2 PZA PZA ML ML M2 M2 4.00 2.00 3.00 2.00 2.00 20.00 11.00 7.00 24.00 19.00 3.50 2.00 6.00 35.00 26.00 7.50 30.00 MARTELINADO FINO SOBRE PISO MARTELINADO FINO SOBRE COLUMNAS MARTELINADO FINO SOBRE MUROS MARTELINADO FINO SOBRE TRABES Y LOSAS

AZOTEAS
RELLENOS DE TEZONTLE EN AZOTEAS ENTORTADO SOBRE CASCO ENLADRILLADO Y ESCOBILLADO ENLADRILLADO APARENTE CHAFLANES DE PEDACERA PERMETRO EN CM. ----2.48 2.98 3.99 5 6 7.98 9.99 11.97 KG X M. L. 0.100 0.133 0.250 0.384 0.384 0.557 0.996 1.580 2.250 3.975 6.225 8.938 PZA X TON 1666 1253 667 434 217 150 84 53 37 21 13 9 1.300 0.900

TABLA DE REAS, PERMETROS Y PESOS TERICOS DE VARILLAS


No. *********2.5 *3 *4 *5 *6 *8 *10 *12 ** * DIAM. NOMINAL PUL. ----7.9 9.5 12.7 15.9 19.1 25.4 31.8 38.1 PULGADAS 5 / 32 3 / 16 1/4 5 / 16 5 / 16 3/8 1/2 5/8 3/4 1 1 1/4 1 1/2 REA EN CM2 0.12 0.18 0.32 0.49 0.49 0.71 1.27 1.99 2.87 5.07 7094 11.4

VARIOS
HECHURA DE TARIMAS 50X100 CM MURO BLOCK VIDRIO 10X20X20 CM. INC. RFZO. JUNTAS REGISTROS DE 40X60 CM. CON PROF. PROM. 1.25 M TAPA DE REGISTROS DE 40X60 CM. IMPERMEABILIZACIN EN CIMIENTOS ALBAALES DE 15 CM DE DIAM. TENDIDO Y JUNTEO COLOCACIN DE HERRERA IMPERMEABILIZACIN AZOTEA POR CAPA UNIDAD TON M3 UNIDAD TON M3 UNIDAD TON M3 UNIDAD TON TON M3 CANTIDAD 1.339 1.170 CANTIDAD 1.545 0.910 CANTIDAD 0.834 1.170 CANTIDAD 0.556 2.205 0.364

LECHADA CEMENTO GRIS O BLANCO


CONCEPTO TON CEMENTO + 3% DE DESP. M3 DE AGUA + 30% DE DESP. CONCEPTO 1.500 0.700 TON CEMENTO + 3% DE DESP. M3 DE AGUA + 30% DE DESP.

= R-6000 (VARILLAS DE 6 METROS DE LONGITUD) = R-42 (VARILLAS DE 12 METROS DE LONGITUD)

DIMETRO MNIMO DE DOBLEZ


VARILLA # 3, 4 Y 5 #6Y8 # 10 # 12 1 2 3 4 5 6 DIMETRO MNIMO 3.5 D 5D 7D 8D No. VAR 3 4 5 6 D= DIMETRO NOMINAL CM 3.320 4.445 5.570 9.549 No. VAR 8 10 12 CM 12.701 22.259 30.481

PASTA DE CEMENTO GRIS O BLANCO

PASTA DE YESO
CONCEPTO 0.810 0.900 TON YESO + 3% DE DESP. M3 DE AGUA + 30% DE DESP. CONCEPTO 0.540 2.100 0.280 TON CEMENTO BLANCO + 3% DE DESP. TON DE POLVO DE MRMOL + 5% DE DESP. M3 DE AGUA + 30% DE DESP.

TABLA DE INTEGRACIN DE CUADRILLAS


0.10 CABO+1.0 PEN 0.25 OFICIAL +1.0 PEN 1.0 OF. CARPINTERO + 1.0 AYUDANTE 0.5 OF. FIERRERO + 1.0 AYUDANTE 1.0 OFICIAL + 1.0 PEN 1.0 OF. ESPECIALISTA + 1.0 PEN

PASTA CEMENTO BLANCO POLVO DE MRMOL 1:3

RENDIMIENTOS PROMEDIO DE TRABAJOS DE ALBAILERA


GPO U REND. (JOR) CONCEPTO PRELIMINARES Y CIMENTACIN 2 1 1 1 1 1 1 2 5 4 4 4 3 3 3 3 3 M2 M3 M3 M3 M3 M3 M2 M2 M3 TON TON TON M2 M2 M2 M2 M2 50.00 4.00 2.00 18.00 5.00 7.00 35.00 14.00 3.00 0.17 0.16 0.13 9.50 7.50 6.00 8.50 9.00 LIMPIA Y TRAZO EXC. TIERRA 0.00-2.00 M EXC.TEPETATE BLANDO 0.00-2.00 M TRASPALEO 0.00-2.00 M ACARREO CON CARRETILLA 20.00 M RELLENOS POR CAPAS, COMPACTADAS CON PISN COMPACTACIN DE CEPAS CON PISN PLANTILLAS ENTRE 0.07 Y 0.10 M CIMIENTOS DE PIEDRA BRAZA EN CIMENTACIN EN ESTRUCTURA HAB. Y ARMADO DE ALAMBRN DE 1/4" Y 5/16" EN CIMIENTOS EN COLUMNAS RECTANGULARES EN COLUMNAS CIRCULARES EN TRABES EN LOSAS 0.270 0.125 2.100 0.280

PASTAS CEMENTO BLANCO POLVO DE MRMOL


CONCEPTO PROPORCIN PROPORCIN PROPORCIN 1:3 1:4 1:5 CEM (TON) 0.540 0.440 0.380 P. MR. (TON) 2.100 2.200 2.300 UNIDAD TON TON TON M3 CAL ( TON) 0.125 0.100 0.085 0.075 P. MR. (TON) 2.100 2.200 2.300 2.400 AGUA 0.280 0.275 0.272 CANTIDAD 0.278 0.129 2.205 0.364 AGUA 0.280 0.278 0.276 0.274

PASTA CEMENTO BLANCO-CAL-POLVO MRMOL 1:1:6


CONCEPTO TON CEMENTO BLANCO + 3% DE DESP. TON DE CALHIDRA + 3% DE DESP. TON DE POLVO DE MRMOL + 5% DE DESP. M3 DE AGUA + 30% DE DESP. CONCEPTO PROPORCIN PROPORCIN PROPORCIN PROPORCIN 1:1:6 1:1:8 1:1:10 1:1:12 CEM (TON) 0.270 0.220 0.190 0.135

PASTA CEMENTO BLANCO-CAL-POLVO MRMOL

HABILITADO Y ARMADO DE ACERO DE REFUERZO

CIMBRAR Y DESCIMBRAR, ACABADO NO APARENTE

FORMULA PARA CONVERTIR A PIE TABLN. A= DIMENSIN CORTA EN PULGADAS

PT=

A" X B" X C mts. 3.66

B= DIMENSIN LARGA EN PULGADAS C= DIMENSIN EN METROS DE LA PIEZA

PINTURAS E IMPERMEABILIZANTES

MEZCLA CALHIDRA-ARENA 1:3

REND. 1/8 M2 2/1 LT PRI 1/4 M2

UNIDAD LT LT LT

CONCEPTO PRIMARIO THINNER PINTURA 0.250 1.000 0.270

CONCEPTO TON CALHIDRA + 3% DE DESP. M3 DE ARENA + 8% DE DESP. M3 DE AGUA + 30% DE DESP.

UNIDAD TON M3 M3

CANTIDAD 0.258 1.080 0.351

RENDIMIENTOS PROMEDIO DE TRABAJOS DE ALBAILERA


GPO U REND. (JOR) CONCEPTO HECHURA DE CIMBRA 3 3 3 3 3 3 2 2 2 2 2 2 2 2 1 1 1 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 6 5 6 3 M2 M2 M2 M2 M2 ML CAJA CAJA CAJA CAJA M3 M3 M3 M3 M3 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 ML ML ML ML ML M2 M2 M2 M2 M2 M2 M2 M2 M2 17.00 8.50 4.00 10.00 10.00 15.00 100.00 EN CIMIENTOS EN COLUMNAS RECTANGULARES EN COLUMNAS CIRCULARES EN TRABES EN LOSAS CIMBRAR Y DESCIMBRAR CON SONOTUBO LOSAS RETICULARES COLOC.BLOCK HASTA 20X40X40 CM 0.300 1.150 0.290 CONCEPTO PROPORCIN PROPORCIN PROPORCIN PROPORCIN PROPORCIN PROPORCIN PROPORCIN PROPORCIN

MEZCLA CALHIDRA-ARENA
CAL (TON) 1:3 1:4 1:5 1:6 1:7 1:8 1:9 1:10 0.250 0.200 0.170 0.145 0.125 0.110 0.100 0.090 ARENA (M3) 1.000 1.070 1.130 1.180 1.220 1.250 1.270 1.285 UNIDAD TON M3 M3 MORT. (TON) 0.300 0.260 0.225 0.195 0.170 ARENA (M3) 1.150 1.200 1.240 1.270 1.290 UNIDAD TON M3 M3 CEM. (TON) 0.600 0.510 0.430 0.360 0.300 0.250 0.210 ARENA (M3) 1.000 1.100 1.120 1.150 1.190 1.240 1.300 UNIDAD TON M3 M3 CEM. (TON) 0.630 0.540 0.440 0.380 0.310 ARENA (M3) 1.000 1.050 1.100 1.150 1.170 UNIDAD TON TON M3 M3 AGUA (M3) 0.270 0.260 0.255 0.250 0.245 0.240 0.235 0.230 CANTIDAD 0.309 1.242 0.377 AGUA (M3) 0.290 0.285 0.280 0.275 0.270 CANTIDAD 0.618 1.080 0.358 AGUA (M3) 0.275 0.272 0.266 0.261 0.257 0.252 0.246 CANTIDAD 0.649 1.350 0.370 AGUA (M3) 0.285 0.280 0.278 0.275 0.273 CANTIDAD 0.309 0.155 1.080 0.364

MEZCLA MORTERO-ARENA 1:4


CONCEPTO TON MORTERO + 3% DE DESP. M3 DE ARENA + 8% DE DESP. M3 DE AGUA + 30% DE DESP.

40.00 COLOC.BLOCK HASTA 35X60X60 CM 40.00 ENTREPISO RETICULAR CELULADO LNEA MENOR 30.00 ENTREPISO RETICULAR CELULADO LNEA MAYOR COLADOS ( NO INCLUYE LA FABRICACIN DEL CONCRETO) 1.50 EN CIMIENTOS 0.85 EN COLUMNAS Y MUROS 0.95 EN TRABES Y LOSAS 0.80 EN LOSAS RETICULARES 10.00 CURADO CONCRETO C/AGUA EN SUP. HORIZONTALES 300.00 CURADO CONCRETO CON AGUA 100.00 CURADO CONCRETO C/AGUA EN SUP. VERTICALES MUROS TABIQUE COMN O LIGERO NO APARENTE 11.00 DE 0.07 M DE ESPESOR 10.00 DE 0.14 M DE ESPESOR 8.00 DE 0.21 M DE ESPESOR 6.00 DE 0.28 M DE ESPESOR 40.00 SOBREPRECIO PARA CARA APARENTE MUROS DE BLOCK TIPO PIRMIDE 10.00 DE 0.10 M DE ESPESOR 9.50 DE 0.12 M DE ESPESOR 9.00 DE 0.15 M DE ESPESOR 8.50 DE 0.20 M DE ESPESOR 80.00 SOBREPRECIO PARA CARA APARENTE MURO DE BLOCK EXTRUIDO 4.50 DE 5X10X15 EN 10 CM DE ESPESOR 5.00 DE 6X10X20 EN 10 CM DE ESPESOR 5.50 DE 10X10X20 EN 10 CM DE ESPESOR 5.50 DE 10X15X20 EN 15 CM DE ESPESOR 55.00 SOBREPRECIO PARA CARA APARENTE CASTILLOS Y CADENAS 30.00 CASTILLO CENTRO DE BLOCK 1 DIAM. (3/8") 10.00 CASTILLOS Y CADENAS 15 X 15 CON 4 DIAM. (3/8") 9.50 CASTILLOS Y CADENAS 15 X 20 CON 4 DIAM. (3/8") 8.00 CASTILLOS Y CADENAS 15 X 30 CON 4 DIAM. (3/8") 25.00 SOBREPRECIO PARA CARA APARENTE CAST. Y CAD. RECUBRIMIENTOS 19.00 REPELLADOS DE MEZCLA 14.00 APLANADOS DE MEZCLA (ROSTREADOS) 11.00 APLANADOS FINOS DE MEZCLA 10.00 APLANADOS PULIDOS DE CEMENTO A LLANA 23.00 CONFITILLO SOBRE APLANADOS RECUBRIMIENTO DE CERMICA O MOSAICO VENECIANO, 4.00 INCLUYE REPELLADO 4.50 RECUBRIMIENTO CINTILLA 5.5 X 22 X 1 A 6 X 24 X 1 CM 5.00 RECUB. FACHALETA 10 X 20 X 1 A 11 X 22 X 1 CM 5.50 RECUBRIMIENTO AZULEJO

MEZCLA MORTERO-ARENA
CONCEPTO PROPORCIN PROPORCIN PROPORCIN PROPORCIN PROPORCIN 1:4 1:5 1:6 1:7 1:8

MEZCLA CEMENTO-ARENA 1:2


0.600 1.000 0.275 CONCEPTO TON CEMENTO + 3% DE DESP. M3 DE ARENA + 8% DE DESP. M3 DE AGUA + 30% DE DESP.

MEZCLA CEMENTO-ARENA
CONCEPTO PROPORCIN PROPORCIN PROPORCIN PROPORCIN PROPORCIN PROPORCIN PROPORCIN 1:2 1:3 1:4 1:5 1:6 1:7 1:8

MEZCLA CEMENTO-ARENA CERNIDA 1:2


0.630 1.000 0.285 CONCEPTO TON CEMENTO + 3% DE DESP. M3 DE ARENA + 8% DE DESP. M3 DE AGUA + 30% DE DESP. CONCEPTO PROPORCIN PROPORCIN PROPORCIN PROPORCIN PROPORCIN

MEZCLA CEMENTO-ARENA CERNIDA


1:2 1:3 1:4 1:5 1:6

MEZCLA CEMENTO-CALHIDA-ARENA 1:1:4


0.300 0.150 1.000 0.280 CONCEPTO TON CEMENTO + 3% DE DESP. TON DE CALHIDRA + 3% DE DESP. M3 DE ARENA + 8% DE DESP. M3 DE AGUA + 30% DE DESP.

MEZCLA CEMENTO-CALHIDA-ARENA
CONCEPTO PROPORCIN PROPORCIN PROPORCIN PROPORCIN PROPORCIN 1:1:4 1:1:6 1:1:8 1:1:10 1:1:12
CEM (TON)

CAL ( TON) 0.150 0.125 0.100 0.085 0.075

ARENA (M3) 1.000 1.050 1.095 1.065 1.185

AGUA 0.280 0.279 0.278 0.275 0.273

M2 4.50 RECUBRIMIENTO TIPO VITRICOTA 6 X 20 X 18 CM M2 5.00 RECUBRIMIENTO TIPO VITRICOTA 6 X 20 X 1.8 CM M2 9.00 RECUBRIMIENTO MOSAICO 20 X 20 X 2 CM ML 16.00 BOQUILLA INCL. CORTES A 45 MATERIAL VERIFICADOS M2 43.00 SOBREPRECIO POR TENDIDO EN FACHADAS RENDIMIENTOS DE EQUIPOS Y MANO DE OBRA PARA LOS CORRESPONDIENTES CONCEPTOS: ACTIVIDAD
EXCAVACIN EN MAT B ACERO DE REFUERZO CIMBRA MAMPOSTERA
27.7 M3/HR DE RETRO 140 KG/JOR

0.300 0.255 0.215 0.180 0.150

MATERIALES, M. DE O. Y EQUIPO
40 M3/HR CARGADOR

CUADRILLA DE FIERRERO + AYUDANTE

12 M2/JOR

CUADRILLA DE CARPINTERO + AYUDANTE

2.5 M3/JOR 2.321 TON/M3 COMPACTO

CUADRILLA DE ALBAIL + AYUDANTE

PV ASFALTO

1.75 TON/M3 SUELTO

FORMACIN Y COMPACTACIN DE TERR ADIC. BASE HIDRULICA MEZCLADO TENDIDO CAPA SUBRAS. RIEGO DE SELLO 3-A RIEGO DE IMPREGNACIN RIEGO DE LIGA PAVIMENTOS BOYAS DEFENSA METLICA SEAL RESTRICTIVA 86X86 CM

AGUA 0.25

64 M3/HR MOTONIV 250 M3/HR COMP 815 40 M3/HR COMP VIBR 40 M3/HR COMP VIBR 125 M2/HR COMP VIBR=CAMION

96 M3/HR COMP. VIBRATORIO

AGUA 0.25 AGUA 0.25 0.013 M3/M2 MAT 3A 1.2-1.5 LT/M2 0.5 LT/M2 100 M2/HR PAVIMENTADO RA 50 PZA/JOR 15 ML/JOR 10 PZA/JOR

33.3 M3/HR MOTONIV 40 M3/HR MOTONIV

EMUL 1.03 LT/M2

169 M2/HR PETROLIZADORA

143 LT/HR PETROLIZADORA

CUADRILLA DE 1 PEN CUADRILLA DE 1 ALBAIL + 1 PEN CUADRILLA DE 1 ALBAIL + 1 PEN