OBRA
A.D.S.
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
P. OFERTADO
P. REFORMULADO
PLAZO DE EJECUCION
F. R.
SUPERVISOR
RESIDENTE
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY,
REGION ANCASH
: LP N 03-2011-GRA
: CONSORCIO ALLI ALLPA
: HUAMAS - YANAMA - YUNGAY - ANCASH
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
: ING FIDEL G. APARICIO ROQUE
CIP N 33716
ITEM
DESCRIPCION
PARCIAL
ABRIL
(30 d)
01-30 dias
SETIEMBRE
(30 d)
01 -30 dias
OCTUBRE
(28 d)
01 -28 dias
S/. 1,756.51
S/. 257.00
1,756.51
257.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/. 122,843.45
S/. 15,056.89
S/. 62,660.82
122,843.45
15,056.89
48,349.09
0.00
0.00
9,877.56
0.00
0.00
4,434.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/. 61,157.36
S/. 8,505.15
S/. 43,339.36
S/. 12,815.20
31,336.95
3,689.07
0.00
0.00
6,491.91
4,816.08
0.00
0.00
23,328.50
0.00
0.00
0.00
0.00
0.00
0.00
3,270.14
0.00
0.00
0.00
8,479.46
0.00
0.00
43,339.36
1,065.60
0.00
0.00
0.00
0.00
S/. 34,109.61
S/. 24,516.99
S/. 149,731.74
S/. 103,678.85
S/. 51,543.70
S/. 6,732.97
34,109.61
20,214.91
78,518.01
0.00
0.00
0.00
0.00
0.00
34,742.55
67,530.92
26,938.48
0.00
0.00
4,302.09
36,471.17
23,058.26
24,605.21
3,366.49
0.00
0.00
0.00
13,089.66
0.00
3,366.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ESTRUCTURAS
01.00.00
01.01.00
01.02.00
02.00.00
02.01.00
02.02.00
03.00.00
04.00.00
04.01.00
04.02.00
04.03.00
04.04.00
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
OBRAS PROVISIONALES
CAMPAMENTO Y CARTEL DE OBRAS
INSTALACIONES PROVISIONALES
OBRAS PRELIMINARES
DEMOLICION DE INFRAESTRUCTURA
LIMPIEZA Y TRAZO
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CIMIENTOS Y SOBRECIMIENTOS
SOLADOS
PATIO DE HONOR
CANALETAS
CONCRETO ARMADO
ZAPATAS
VIGAS DE CIMENTACION
COLUMNAS
VIGAS
LOSAS ALIGERADAS
ESCALERAS
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY,
REGION ANCASH
: LP N 03-2011-GRA
: CONSORCIO ALLI ALLPA
: HUAMAS - YANAMA - YUNGAY - ANCASH
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
: ING FIDEL G. APARICIO ROQUE
CIP N 33716
ITEM
05.07.00
05.08.00
DESCRIPCION
MURO DE CONTENCION
MURO FRONTAL
S/. 95,909.32
S/. 5,748.36
ABRIL
(30 d)
01-30 dias
0.00
0.00
S/. 59,850.73
S/. 26,132.70
0.00
0.00
39,572.91
0.00
17,735.67
10,489.14
2,542.15
9,679.85
0.00
0.00
0.00
5,963.71
0.00
0.00
S/. 98,895.41
S/. 8,960.14
S/. 61,182.34
0.00
0.00
0.00
0.00
0.00
0.00
31,949.77
2,017.59
22,672.42
52,009.36
6,942.55
38,509.92
14,936.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/. 98,351.53
S/. 8,646.11
0.00
0.00
6,101.47
0.00
0.00
0.00
16,615.65
0.00
69,452.24
8,646.11
6,182.16
0.00
0.00
0.00
S/. 10,515.56
S/. 5,784.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,979.61
10,515.56
3,804.55
0.00
0.00
S/. 9,408.76
S/. 1,658.44
S/. 16,335.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,291.84
16,335.44
9,408.76
366.60
0.00
0.00
0.00
0.00
PARCIAL
SETIEMBRE
(30 d)
01 -30 dias
0.00
0.00
OCTUBRE
(28 d)
01 -28 dias
0.00
0.00
ARQUITECTURA
01.00.00
01.01.00
01.02.00
02.00.00
02.01.00
02.02.00
03.00.00
04.00.00
04.01.00
04.02.00
05.00.00
05.01.00
05.02.00
06.00.00
06.01.00
06.02.00
06.03.00
MUROS Y TABIQUES
MUROS
MURO DE PIEDRA
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO DE MUROS, COLUMNAS Y VIGAS
DERRAMES Y BRUAS
CIELO RASO
PISOS Y VEREDAS
PISOS
VEREDAS
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
CONTRAZOCALOS
CARPINTERIA METALICA Y CERRAJERIA
PUERTAS Y MALLAS
ACCESORIOS
CERRAJERIA
ITEM
07.00.00
07.01.00
07.02.00
08.00.00
08.01.00
08.02.00
09.00.00
10.00.00
10.01.00
10.02.00
11.00.00
11.01.00
11.02.00
11.03.00
12.00.00
12.01.00
12.02.00
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY,
REGION ANCASH
: LP N 03-2011-GRA
: CONSORCIO ALLI ALLPA
: HUAMAS - YANAMA - YUNGAY - ANCASH
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
: ING FIDEL G. APARICIO ROQUE
CIP N 33716
DESCRIPCION
ESTRUCTURA DE TECHO Y COBERTURAS
ESTRUCTURA DE MADERA
COBERTURAS
CARPINTERIA DE MADERA
PUERTAS Y VENTANAS
BARANDAS
VIDRIOS, CRISTALES Y SIMILARES
PINTURA
PINTURA LATEX
SELLADOR Y/O BARNIZ
VARIOS
CANALETA PLUVIAL
MESA DE LAVADEROS EN LABORATORIO
MOBILIARIO - PIZARRAS
MITIGACION DE IMPACTOS
AMBIENTALES
SEGURIDAD INDUSTRIAL
PARCIAL
ABRIL
(30 d)
01-30 dias
SETIEMBRE
(30 d)
01 -30 dias
OCTUBRE
(28 d)
01 -28 dias
S/. 68,734.56
S/. 49,566.99
0.00
0.00
0.00
0.00
22,456.42
12,755.08
43,807.27
33,595.60
2,470.87
0.00
0.00
3,216.31
0.00
0.00
S/. 88,220.73
S/. 13,957.75
S/. 11,602.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,424.08
0.00
88,220.73
2,250.29
0.00
0.00
4,283.37
11,602.07
0.00
0.00
0.00
S/. 48,132.05
S/. 7,019.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32,168.02
5,179.10
15,964.03
1,840.64
0.00
0.00
S/. 10,602.00
S/. 3,074.17
S/. 106,385.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,414.50
2,665.60
0.00
6,187.50
408.57
106,385.50
0.00
0.00
0.00
S/. 5,750.00
S/. 6,538.20
1,210.00
6,538.20
1,085.00
0.00
1,022.50
0.00
960.00
0.00
285.00
0.00
1,187.50
0.00
0.00
0.00
S/. 4,802.22
S/. 30,377.39
0.00
0.00
0.00
5,224.46
0.00
9,131.41
0.00
2,064.86
4,034.78
13,364.34
767.44
592.32
0.00
0.00
INSTALACIONES ELECTRICAS
01.00.00
01.01.00
01.02.00
INSTALACIONES ELECTRICAS
ACOMETIDA
DISTRIBUCION
ITEM
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY,
REGION ANCASH
: LP N 03-2011-GRA
: CONSORCIO ALLI ALLPA
: HUAMAS - YANAMA - YUNGAY - ANCASH
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
: ING FIDEL G. APARICIO ROQUE
CIP N 33716
DESCRIPCION
PARCIAL
ABRIL
(30 d)
01-30 dias
SETIEMBRE
(30 d)
01 -30 dias
OCTUBRE
(28 d)
01 -28 dias
S/. 1,980.81
S/. 2,598.30
S/. 1,278.47
0.00
0.00
0.00
926.41
1,925.63
0.00
102.80
0.00
0.00
661.48
672.67
0.00
290.12
0.00
1,278.47
0.00
0.00
0.00
0.00
0.00
0.00
S/. 98,775.83
64,204.29
14,816.37
11,853.10
7,902.07
0.00
0.00
0.00
S/. 428,083.98
S/. 17,654.81
36,165.05
34,246.72
516,150.56
92,907.10
S/. 609,057.66
24.89%
24.89%
S/. 273,761.72
S/. 283,491.17
S/. 233,081.55
S/. 0.00
23,127.72
21,900.94
318,790.38
57,382.27
S/. 376,172.65
15.37%
40.27%
25,677.99
20,538.55
24,315.93
19,449.10
353,943.08
283,101.45
63,709.75
50,958.26
S/. 417,652.83 S/. 334,059.71
17.07%
13.65%
57.34%
70.99%
23,949.68
22,679.29
330,120.14
59,421.63
S/. 389,541.77
15.92%
86.91%
19,691.01
18,646.52
271,419.08
48,855.43
S/. 320,274.51
13.09%
100.00%
0.00
0.00
0.00
0.00
S/. 0.00
0.00%
100.00%
INSTALACIONES SANITARIAS
01.00.00
01.01.00
01.02.00
01.03.00
INSTALACIONES SANITARIAS
SISTEMA DE DESAGUE
SISTEMA DE AGUA FRIA
APARATOS Y ACCESORIOS SANITARIOS
COSTO DIRECTO
S/. 1,765,481.38
OBTENCION DE LA LICENCIA DE CONSTRUCCION TUPA MPY S/. 17,654.81
GASTOS GENERALES (8.45%)
149,150.00
UTILIDADES (8%)
141,238.51
SUB TOTAL
2,073,524.70
IGV 18%
373,234.45
TOTAL GENERAL
S/. 2,446,759.15
AVANCE PARCIAL
AVANCE ACUMULADO %
ITEM
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY,
REGION ANCASH
: LP N 03-2011-GRA
: CONSORCIO ALLI ALLPA
: HUAMAS - YANAMA - YUNGAY - ANCASH
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
: ING FIDEL G. APARICIO ROQUE
CIP N 33716
DESCRIPCION
PARCIAL
ABRIL
(30 d)
01-30 dias
SETIEMBRE
(30 d)
01 -30 dias
OCTUBRE
(28 d)
01 -28 dias
ITEM
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY,
REGION ANCASH
: LP N 03-2011-GRA
: CONSORCIO ALLI ALLPA
: HUAMAS - YANAMA - YUNGAY - ANCASH
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
: ING FIDEL G. APARICIO ROQUE
CIP N 33716
DESCRIPCION
ESTRUCTURAS
ARQUITECTURA
INSTALACIONES ELECTRICAS
INSTALACIONES SANITARIAS
FLETE + LICENCIA
PARCIAL
CONTRACTUAL
MANO DE OBRA
305825.46
319034.24
16003.91
3345.24
0
644208.85
###########
###########
S/. 88,536.32
###########
S/. 2,073,524.70
S/. 373,234.45
ABRIL
(30 d)
01-30 dias
MATERIALES
432,714.54
480,438.49
18,437.82
2,369.53
116,430.64
1050391.02
EQUIPOS
61,823.24
25,832.38
737.88
142.82
0.00
88536.32
644,208.85
1,050,391.02
ADICIONAL
MANO DE OBRA MATERIALES
0
0.00
657,765.95
1,086,209.35
88,536.32
90,483.85
290,388.51
288,936.48
S/. 2,073,524.70
S/. 2,123,395.63
S/. 373,234.45
S/. 382,211.22
SETIEMBRE
(30 d)
01 -30 dias
EQUIPOS
0.00
OCTUBRE
(28 d)
01 -28 dias
28036.36
194413.79
222450.15
ITEM
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY,
REGION ANCASH
: LP N 03-2011-GRA
: CONSORCIO ALLI ALLPA
: HUAMAS - YANAMA - YUNGAY - ANCASH
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
: ING FIDEL G. APARICIO ROQUE
CIP N 33716
DESCRIPCION
PARCIAL
S/. 2,446,759.15
ABRIL
(30 d)
01-30 dias
S/. 2,505,606.85
SETIEMBRE
(30 d)
01 -30 dias
OCTUBRE
(28 d)
01 -28 dias
ENTIDAD CONTRATANTE
FINANCIAMINRO
CONTRATISTA
GENERALIDADES
VALOR REFERENCIAL
PRESUPESTO CONTRATADO
FACTOR DE RELACIN
PLAZO DE EJECUCIN
FECHA DE INCIO DE LA OBRA
FECHA DE TERMINO DE LA OBRA
SISTEMA DE EJECUCIN
: S/. 2467,494.40
: S/. 2'446,759.15
: 1.00000
: 210 das calendarios
: 01/04/11
: 28/10/11
: SUMA ALZADA
K = 0.069*(MTr / MTo) + 0.078*(MEr / MEo) + 0.133*(Ar / Ao) + 0.141*(Cr / Co) + 0.198*(ACr / ACo) + 0.381*(Mr / Mo)
I.-
AUTORIZADO Y CANCELADO
1.-
AUTORIZADO
a) Valorizaciones correspondientes a:
Contrato Principal
2,073,524.70
b) Reintegros, reajustes
Contrato Principal
c) IGV
Contrato Principal
Reintegros, Rreajustes
2.-
CANCELADO
a) Valorizaciones correspondientes a:
Contrato Principal
b) Reintegros, reajustes
Contrato Principal
c) IGV
Contrato Principal
Reintegros, Rreajustes
3.-
SALDO
a) Neto
b) IGV
TOTAL
II.-
CANCELADO
a) RETENIDO
b) POR RETENIDO
c) SALDO A FAVOR DEL CONTRATISTA
2,073,524.70
49,870.93
49,870.93
373,234.45
8,976.76
TOTAL
382,211.21
2,505,606.84
2,073,524.70
2,073,524.70
44,487.30
44,487.30
373,234.45
8,007.70
TOTAL
381,242.15
2,499,254.15
5,383.63
969.06
6,352.69
6,352.69
0.00
6,352.69
GENERALIDADES
VALOR REFERENCIAL
PRESUPUESTO CONTRATADO
FACTOR DE RELACIN
PLAZO DE EJECUCIN
FECHA DE INCIO DE LA OBRA
FECHA DE TERMINO DE LA OBRA
SISTEMA DE EJECUCIN
: S/. 2467,494.40
: S/. 2'446,759.15
: 1.00000
: 210 das calendarios
: 01/04/11
: 28/10/11
: SUMA ALZADA
VALOR DE LA INVERSIN
I.-
COSTO DIRECTO
VALORIZACIN MENSUAL CONTRACTUAL
REAJUSTE VALORIZACIN CONTRACTUAL
TOTAL COSTO DIRECTO
S/.
S/.
S/.
2,073,524.70
49,870.93
2,123,395.63
II.-
IGV
VALORIZACIN CONTRATO PRINCIPAL
REAJUSTES, REINTEGROS
TOTAL IGV
S/.
S/.
S/.
373,234.45
8,976.76
382,211.21
COSTO TOTAL
S/.
2,505,606.84
S/.
2,499,254.15
S/.
6,352.69
ENTIDAD
: HUAMAS, 2012
ITEM
DESCRIPCION
IMPORTES
AUTORIZADOS S/.
IMPORTES
PAGADOS S/.
SALDO A PAGAR
S/.
DE LAS VALORIZACIONES
Del Presupuesto Contractual
Adicional
Deductivo
TOTAL VALORIZACIONES
2,073,524.70
0.00
0.00
2,073,524.70
2,073,524.70
0.00
0.00
2,073,524.70
0.00
0.00
0.00
0.00
II
RETENCIN
Del Presupuesto Contractual
Adicional
Deductivo
TOTAL RETENCIN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
III
REAJUSTE
Del Presupuesto Contractual
Adicional
Deductivo
TOTAL REAJUSTE
49,870.93
0.00
0.00
49,870.93
44,487.30
0.00
0.00
44,487.30
5,383.63
0.00
0.00
5,383.63
IV
ADELANTOS OTORGADOS
Del Presupuesto Contractual
Adicional N 1
Deductivo N 1
TOTAL ADELANTOS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DEDUCCIONES Y REINTEGROS
Del Presupuesto Contractual
Adicional
Deductivo
TOTAL DEDUCCIONES Y REINTEGROS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,123,395.63
2,118,012.00
5,383.63
382,211.21
381,242.15
969.06
2,505,606.84
2,499,254.15
6,352.69
TOTAL GENERAL
VI
I.G.V. (18 %)
COSTO DE OBRA
6,352.69
UBICACIN
: LP N 03-2011-GRA
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL
FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA,
PROVINCIA DE YUNGAY, REGION ANCASH
: HUAMAS - YANAMA - YUNGAY - ANCASH
VALOR REFERENCIAL
: S/. 2467,494.40
PRESUPESTO OFERTADO
: S/. 2467,494.40
PRESUPESTO REFORMULADO
: S/. 2446,759.15
FACTOR DE RELACIN
: 1.00000
PLAZO DE EJECUCIN
: S/. 2446,759.15
S/. 2,073,524.70
CONTRATISTA
OBRA
ITEM
DESCRIPCION
I.G.V. (S/.)
CONTRATO PRINCIPAL
ADICIONAL N 1
0.00
DEDUCTIVO N 1
0.00
0.00
0.00
49,870.93
8,976.76
58,847.69
0.00
0.00
0.00
0.00
0.00
0.00
DAOS Y PERJUICIOS
0.00
0.00
0.00
INTERESES
0.00
0.00
0.00
0.00
0.00
0.00
10
CONTRATO VIGENTE
2,123,395.63
382,211.21
2,505,606.84
11
2,073,524.70
373,234.45
2,505,606.84
2,446,759.15
UBICACIN
: LP N 03-2011-GRA
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL
FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE
YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
: HUAMAS - YANAMA - YUNGAY - ANCASH
VALOR REFERENCIAL
: S/. 2467,494.40
PRESUPESTO OFERTADO
: S/. 2467,494.40
PRESUPESTO REFORMULADO
: S/. 2446,759.15
FACTOR DE RELACIN
: 1.00000
PLAZO DE EJECUCIN
S/. 2,073,524.70
S/. 2,446,759.15
CONTRATISTA
FECHA
: HUAMAS, 2012
OBRA
DESCRIPCION
VALOR REFERENCIAL
PRESUPUESTO CONTRATADO
CON IGV
SIN IGV
CON IGV
SIN IGV
CONSTRUCCION DE LA INFRAESTRUCTURA
EDUCATIVA PUBLICA CORONEL FRANCISCO
BOLOGNESI DE LA LOCALIDAD DE HUAMAS,
DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
2,446,759.15
2,073,524.70
2,505,606.84
2,123,395.63
TOTAL S/.
2,446,759.15
2,073,524.70
2,505,606.84
2,123,395.63
Obra
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
: LP N 03-2011-GRA
FECHA DE PAGO
S/FACTURA
CANCELADA
MONTO
VALORIZADO S/.
(PAGADO)
VALORIZACION N 01
(01/04/11 - 30/04/11)
Apr-11
516,150.57
9,195.77
VALORIZACION N 02
(01/05/11 - 31/05/11)
May-11
318,790.39
VALORIZACION N 03
(01/06/11 - 30/06/11)
Jun-11
VALORIZACION N 04
(01/07/11 - 31/07/11)
DESCRIPCION
EFECTIVO
S/.
MATERIALES
S/.
En Efectivo
I.G.V.
TOTAL
En Efectivo
I.G.V.
TOTAL
10,088.34
0.00
0.00
525,346.34
94,562.34
619,908.68
892.57
160.67
1,053.24
6,679.79
5,617.72
0.00
0.00
325,470.18
58,584.63
384,054.81
-1,062.07
-191.17
-1,253.24
353,943.08
5,566.66
5,692.11
0.00
0.00
359,509.74
64,711.75
424,221.49
125.44
22.58
148.02
Jul-11
283,101.45
3,680.43
8,748.10
0.00
0.00
286,781.88
51,620.74
338,402.62
5,067.67
912.18
5,979.85
VALORIZACION N 05
(01/08/11 - 31/08/11)
Aug-11
330,120.14
10,349.77
11,073.12
0.00
0.00
340,469.91
61,284.58
401,754.49
723.35
130.20
853.55
VALORIZACION N 06
(01/09/11 - 29/09/11)
Sep-11
271,419.07
9,014.88
8,651.54
0.00
0.00
280,433.95
50,478.11
330,912.06
-363.33
-65.40
-428.73
2,073,524.70
44,487.30
49,870.93
0.00
0.00
2,118,012.00
381,242.15
2,499,254.15
5,383.63
969.06
6,352.69
TOTAL VALORIZACION
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: LP N 03-2011-GRA
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
PRESUPUESTO BASE
ITEM
01.00.00
01.01.00
DESCRIPCION
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
UND
Metrado
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
SALDO
S/.
ESTRUCTURAS
OBRAS PROVISIONALES
CAMPAMENTO Y CARTEL DE OBRAS
01.01.01
01.01.02
01.02.00
GLB
UND
1.00
1.00
1,012.50
744.01
1,012.50
744.01
1.00
1.00
1,012.50
744.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1,012.50
744.01
0.00
0.00
0.00
0.00
01.02.01
02.00.00
02.01.00
50.00
5.14
257.00
50.00
257.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00
257.00
0.00
0.00
M2
M2
M3
M2
M3
848.72
848.72
738.68
319.84
1,058.52
10.45
69.81
38.62
18.10
19.28
8,869.12
59,249.14
28,527.82
5,789.10
20,408.27
848.72
848.72
738.68
319.84
1,058.52
8,869.12
59,249.14
28,527.82
5,789.10
20,408.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
848.72
848.72
738.68
319.84
1,058.52
8,869.12
59,249.14
28,527.82
5,789.10
20,408.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
02.02.00
DESTECHADO DE COBERTURA
DESARME DE ESTRUCTURA DE TECHO
DEMOLICION DE OBRAS DE MUROS
DEMOLICION DE VEREDAS Y PISOS DE CONCRETO
ELIMINACION DE MATERIAL DEMOLIDO
LIMPIEZA Y TRAZO
02.02.01
02.02.02
03.00.00
03.01.00
M2
M2
2,179.00
2,179.00
3.38
3.53
7,365.02
7,691.87
2,179.00
2,179.00
7,365.02
7,691.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,179.00
2,179.00
7,365.02
7,691.87
0.00
0.00
0.00
0.00
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.01.08
04.00.00
04.01.00
M3
M3
M3
M2
M2
M3
M2
M3
304.50
169.04
649.00
109.64
359.73
304.50
243.60
878.94
32.80
32.80
32.80
6.50
6.38
16.40
3.67
19.28
9,987.60
5,544.51
21,287.20
712.66
2,295.08
4,993.80
894.01
16,945.96
304.50
169.04
437.72
109.64
107.53
176.40
0.00
734.86
9,987.60
5,544.51
14,357.22
712.66
686.04
2,892.96
0.00
14,168.10
0.00
0.00
146.52
0.00
180.25
85.40
161.20
100.08
0.00
0.00
4,805.86
0.00
1,150.00
1,400.56
591.60
1,929.54
0.00
0.00
64.76
0.00
71.95
42.70
82.40
44.00
0.00
0.00
2,124.13
0.00
459.04
700.28
302.41
848.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
304.50
169.04
649.00
109.64
359.73
304.50
243.60
878.94
9,987.60
5,544.51
21,287.20
712.66
2,295.08
4,993.80
894.01
16,945.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
04.01.01
04.01.02
04.01.03
04.01.04
04.02.00
M3
M3
M2
M2
268.76
23.67
201.66
201.66
186.08
255.11
23.64
1.69
50,010.86
6,038.45
4,767.24
340.81
150.72
7.19
57.51
57.51
28,045.98
1,834.24
1,359.54
97.19
0.00
14.18
113.48
113.48
0.00
3,617.46
2,682.67
191.78
118.04
2.30
30.67
30.67
21,964.88
586.75
725.04
51.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
268.76
23.67
201.66
201.66
50,010.86
6,038.45
4,767.24
340.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
04.02.01
04.02.02
04.03.00
M3
M2
264.73
259.66
30.47
1.69
8,066.32
438.83
114.71
114.71
3,495.21
193.86
150.02
144.95
4,571.11
244.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
264.73
259.66
8,066.32
438.83
0.00
0.00
0.00
0.00
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.04.00
ENCOFRADO Y DESENCOFRADO
CONCRETO F'C=175 KG/CM2
FROTACHADO
JUNTAS DE DILATACION
CURADO DE CONCRETO
CANALETAS
M2
M3
M2
M
M2
78.00
78.75
630.00
399.00
630.00
35.52
338.61
15.54
7.64
1.69
2,770.56
26,665.54
9,790.20
3,048.36
1,064.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
78.00
78.75
630.00
399.00
630.00
2,770.56
26,665.54
9,790.20
3,048.36
1,064.70
78.00
78.75
630.00
399.00
630.00
2,770.56
26,665.54
9,790.20
3,048.36
1,064.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05
05.00.00
ENCOFRADO Y DESENCOFRADO
CONCRETO F'C=175 KG/CM2
VESTIDURA DE CANAL
JUNTAS DE DILATACION
REJILLAS
CONCRETO ARMADO
M2
M3
M2
M
M2
117.54
15.97
124.18
31.05
30.00
35.52
338.61
15.54
7.64
35.52
4,175.02
5,407.60
1,929.76
237.22
1,065.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.40
5.00
0.00
0.00
0.00
1,577.09
1,693.05
0.00
0.00
0.00
73.14
10.97
124.18
31.05
0.00
2,597.93
3,714.55
1,929.76
237.22
0.00
0.00
0.00
0.00
0.00
30.00
0.00
0.00
0.00
0.00
1,065.60
117.54
15.97
124.18
31.05
30.00
4,175.02
5,407.60
1,929.76
237.22
1,065.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: LP N 03-2011-GRA
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
PRESUPUESTO BASE
ITEM
DESCRIPCION
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
UND
Metrado
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
SALDO
S/.
05.01.00
ZAPATAS
05.01.01
05.01.02
05.01.03
05.02.00
M3
KG
M2
68.83
1,765.67
114.71
389.11
4.04
1.69
26,782.44
7,133.31
193.86
68.83
1,765.67
114.71
26,782.44
7,133.31
193.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
68.83
1,765.67
114.71
26,782.44
7,133.31
193.86
0.00
0.00
0.00
0.00
0.00
0.00
05.02.01
05.02.02
05.02.03
05.02.04
05.03.00
M3
M2
KG
M2
23.12
184.98
2,190.56
59.42
389.11
35.52
4.04
1.69
8,996.22
6,570.49
8,849.86
100.42
18.61
148.86
1,883.03
46.52
7,241.34
5,287.51
7,607.44
78.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.51
36.12
307.53
12.90
1,754.89
1,282.98
1,242.42
21.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23.12
184.98
2,190.56
59.42
8,996.22
6,570.49
8,849.86
100.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.03.01
05.03.02
05.03.03
05.03.04
05.04.00
M3
M2
KG
M2
126.12
729.85
19,425.73
729.85
349.62
35.52
4.04
1.69
44,094.07
25,924.27
78,479.95
1,233.45
42.12
259.39
13,401.02
259.39
14,725.99
9,213.53
54,140.12
438.37
35.73
209.00
3,582.61
209.00
12,491.92
7,423.68
14,473.74
353.21
48.27
261.46
2,442.10
261.46
16,876.16
9,287.06
9,866.08
441.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
126.12
729.85
19,425.73
729.85
44,094.07
25,924.27
78,479.95
1,233.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.04.01
05.04.02
05.04.03
05.04.03
05.05.00
M3
M2
KG
M2
83.06
838.75
9,937.99
838.75
389.11
35.52
4.04
1.69
32,319.48
29,792.40
40,149.48
1,417.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52.72
523.21
6,818.91
523.21
20,513.88
18,584.42
27,548.40
884.22
17.52
181.81
2,345.52
181.81
6,817.21
6,457.89
9,475.90
307.26
12.82
133.73
773.56
133.73
4,988.39
4,750.09
3,125.18
226.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
83.06
838.75
9,937.99
838.75
32,319.48
29,792.40
40,149.48
1,417.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.05.01
05.05.02
05.05.03
05.05.04
05.05.04
05.06.00
38.09
423.20
423.20
3,372.34
423.20
389.11
35.52
17.37
4.04
1.69
14,821.20
15,032.06
7,350.98
13,624.25
715.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.19
243.31
243.31
1,821.52
243.31
6,299.69
8,642.37
4,226.29
7,358.94
411.19
21.90
179.89
179.89
1,550.82
179.89
8,521.51
6,389.69
3,124.69
6,265.31
304.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38.09
423.20
423.20
3,372.34
423.20
14,821.20
15,032.06
7,350.98
13,624.25
715.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.06.01
05.06.02
05.06.03
05.06.04
05.07.00
M3
M2
KG
M2
6.44
81.00
300.27
81.00
389.11
35.52
4.04
1.69
2,505.87
2,877.12
1,213.09
136.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.22
40.50
150.14
40.50
1,252.93
1,438.56
606.55
68.45
3.22
40.50
150.14
40.50
1,252.93
1,438.56
606.55
68.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.44
81.00
300.27
81.00
2,505.87
2,877.12
1,213.09
136.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.07.01
05.07.02
05.07.03
05.07.04
05.07.05
05.08.00
M3
M2
KG
M
M2
153.65
363.68
5,515.95
40.00
363.68
389.11
35.52
4.04
7.64
1.69
59,786.75
12,917.91
22,284.44
305.60
614.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
82.13
194.40
3,556.42
20.00
194.40
31,957.60
6,905.09
14,367.94
152.80
328.54
71.52
169.28
1,959.53
20.00
169.28
27,829.15
6,012.83
7,916.50
152.80
286.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
153.65
363.68
5,515.95
40.00
363.68
59,786.75
12,917.91
22,284.44
305.60
614.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05.08.01
05.08.02
05.08.03
05.08.04
M3
M2
KG
M2
9.41
53.20
26.55
53.20
389.11
35.52
4.04
1.69
3,661.53
1,889.66
107.26
89.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.41
53.20
26.55
53.20
3,661.53
1,889.66
107.26
89.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.41
53.20
26.55
53.20
3,661.53
1,889.66
107.26
89.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
351.46
376.74
99.18
66.34
34,857.80
24,992.93
0.00
0.00
0.00
0.00
243.94
231.82
24,193.97
15,378.94
107.52
106.60
10,663.83
7,071.84
0.00
38.32
0.00
2,542.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
351.46
376.74
34,857.80
24,992.93
0.00
0.00
0.00
0.00
181.15
144.26
26,132.70
0.00
0.00
0.00
0.00
72.71
10,489.14
67.10
9,679.85
0.00
0.00
41.34
5,963.71
181.15
26,132.70
0.00
0.00
01.00.00
01.01.00
01.01.01
01.01.02
01.02.00
01.02.01
02.00.00
M3
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: LP N 03-2011-GRA
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
PRESUPUESTO BASE
ITEM
02.01.00
02.01.01
02.01.02
02.01.03
02.02.00
DESCRIPCION
UND
Metrado
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
SALDO
S/.
72,270.64
6,896.11
19,728.66
0.00
0.00
0.00
0.00
0.00
0.00
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
24.91
29.54
29.93
72,270.64
6,896.11
19,728.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
964.16
100.80
165.55
24,017.23
2,977.63
4,954.91
1,337.50
132.65
493.61
33,317.13
3,918.48
14,773.75
599.61
0.00
0.00
14,936.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,901.27
233.45
659.16
02.02.01
02.02.02
02.02.03
02.02.04
03.00.00
03.01.00
512.10
81.00
582.79
81.00
9.76
24.56
3.15
1.69
4,998.10
1,989.36
1,835.79
136.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
180.00
0.00
82.79
0.00
1,756.80
0.00
260.79
0.00
332.10
81.00
500.00
81.00
3,241.30
1,989.36
1,575.00
136.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
512.10
81.00
582.79
81.00
4,998.10
1,989.36
1,835.79
136.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03.01.01
03.01.02
04.00.00
04.01.00
M2
M2
814.21
796.01
50.79
24.91
41,353.73
19,828.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250.21
400.01
12,708.17
9,964.25
564.00
396.00
28,645.56
9,864.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
814.21
796.01
41,353.73
19,828.61
0.00
0.00
0.00
0.00
M2
M2
M2
M2
M2
M2
159.85
220.15
221.33
673.38
94.96
72.68
38.17
53.45
62.53
82.25
53.45
85.06
6,101.47
11,767.02
13,839.76
55,385.51
5,075.61
6,182.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
159.85
0.00
0.00
0.00
0.00
0.00
6,101.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
202.01
0.00
0.00
0.00
0.00
0.00
16,615.65
0.00
0.00
0.00
220.15
221.33
471.37
94.96
0.00
0.00
11,767.02
13,839.76
38,769.85
5,075.61
0.00
0.00
0.00
0.00
0.00
0.00
72.68
0.00
0.00
0.00
0.00
0.00
6,182.16
159.85
220.15
221.33
673.38
94.96
72.68
6,101.47
11,767.02
13,839.76
55,385.51
5,075.61
6,182.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M2
M2
M
M2
118.86
41.09
24.00
118.86
57.23
35.52
7.64
1.69
6,802.36
1,459.52
183.36
200.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
118.86
41.09
24.00
118.86
6,802.36
1,459.52
183.36
200.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
118.86
41.09
24.00
118.86
6,802.36
1,459.52
183.36
200.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M2
M
M2
33.26
10.26
95.61
80.72
11.03
80.72
2,684.75
113.17
7,717.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.26
10.26
95.61
2,684.75
113.17
7,717.64
33.26
10.26
95.61
2,684.75
113.17
7,717.64
0.00
0.00
0.00
0.00
0.00
0.00
1,631.01
3,221.48
931.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.50
58.60
40.50
777.62
840.32
361.67
77.37
166.05
63.83
853.39
2,381.16
570.00
147.87
224.65
104.33
1,631.01
3,221.48
931.67
0.00
0.00
0.00
0.00
0.00
0.00
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.02.00
04.02.01
04.02.02
04.02.03
04.02.04
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
05.02.00
05.02.01
05.02.02
05.02.03
06.00.00
06.01.00
06.01.01
06.01.02
06.01.03
06.02.00
06.02.01
06.02.02
06.03.00
06.03.01
06.03.02
06.03.03
06.03.04
06.03.05
M2
M2
M2
UND
UND
PZA
UND
UND
91.58
9.00
4.50
92.12
72.03
72.03
8,436.35
648.27
324.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
91.58
9.00
4.50
8,436.35
648.27
324.14
91.58
9.00
4.50
8,436.35
648.27
324.14
0.00
0.00
0.00
0.00
0.00
0.00
12.00
88.00
30.55
14.68
366.60
1,291.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
88.00
0.00
1,291.84
12.00
0.00
366.60
0.00
12.00
88.00
366.60
1,291.84
0.00
0.00
0.00
0.00
84.00
456.00
21.00
152.00
21.00
28.25
20.25
93.96
14.38
27.12
2,373.00
9,234.00
1,973.16
2,185.76
569.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
84.00
456.00
21.00
152.00
21.00
2,373.00
9,234.00
1,973.16
2,185.76
569.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
84.00
456.00
21.00
152.00
21.00
2,373.00
9,234.00
1,973.16
2,185.76
569.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: LP N 03-2011-GRA
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
PRESUPUESTO BASE
ITEM
07.00.00
07.01.00
07.01.01
07.01.02
07.01.03
07.01.04
07.01.05
07.02.00
07.02.01
07.02.02
07.02.03
08.00.00
08.01.00
08.01.01
08.01.02
08.01.03
08.01.04
08.02.00
DESCRIPCION
UND
Metrado
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
SALDO
S/.
11,788.65
2,470.87
45,900.41
7,107.62
1,467.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
13.74
16.26
35.94
129.30
17.81
11,788.65
2,470.87
45,900.41
7,107.62
1,467.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
425.06
0.00
443.25
0.00
38.50
5,840.32
0.00
15,930.41
0.00
685.69
432.92
0.00
833.89
54.97
43.87
5,948.32
0.00
29,970.01
7,107.62
781.32
0.00
151.96
0.00
0.00
0.00
0.00
2,470.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
857.98
151.96
1,277.14
54.97
82.37
M2
M
M2
929.89
96.50
79.20
47.50
22.60
40.61
44,169.78
2,180.90
3,216.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
250.21
38.50
0.00
11,884.98
870.10
0.00
679.68
58.00
0.00
32,284.80
1,310.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
79.20
0.00
0.00
3,216.31
929.89
96.50
79.20
44,169.78
2,180.90
3,216.31
0.00
0.00
0.00
0.00
0.00
0.00
M2
M2
M2
M2
53.90
16.17
7.84
150.03
673.64
444.02
673.64
262.95
36,309.20
7,179.80
5,281.34
39,450.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53.90
16.17
7.84
150.03
36,309.20
7,179.80
5,281.34
39,450.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53.90
16.17
7.84
150.03
36,309.20
7,179.80
5,281.34
39,450.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
08.02.01
08.02.02
08.02.03
08.02.04
09.00.00
09.01.00
M
M
M
M
97.20
75.24
4.25
93.60
46.94
67.94
61.50
42.97
4,562.57
5,111.81
261.38
4,021.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.45
60.60
0.00
0.00
3,306.92
4,117.16
0.00
0.00
26.75
14.64
0.00
0.00
1,255.65
994.64
0.00
0.00
0.00
0.00
4.25
93.60
0.00
0.00
261.38
4,021.99
97.20
75.24
4.25
93.60
4,562.57
5,111.81
261.38
4,021.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
09.01.01
10.00.00
10.01.00
VIDRIOS SEMIDOBLES
PINTURA
PINTURA LATEX
P2
1,829.98
6.34
11,602.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,829.98
11,602.07
1,829.98
11,602.07
0.00
0.00
M2
M2
M2
M2
M
796.01
2,759.04
233.45
599.24
521.10
12.63
9.32
10.18
10.18
7.46
10,053.61
25,714.25
2,376.52
6,100.26
3,887.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
796.01
1,560.00
130.00
344.52
367.91
10,053.61
14,539.20
1,323.40
3,507.20
2,744.61
0.00
1,199.04
103.45
254.72
153.19
0.00
11,175.05
1,053.12
2,593.06
1,142.80
796.01
2,759.04
233.45
599.24
521.10
10,053.61
25,714.25
2,376.52
6,100.26
3,887.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M2
488.16
14.38
7,019.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
360.16
5,179.10
128.00
1,840.64
488.16
7,019.74
0.00
0.00
M
M
165.00
162.00
37.50
27.25
6,187.50
4,414.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
162.00
0.00
4,414.50
165.00
0.00
6,187.50
0.00
165.00
162.00
6,187.50
4,414.50
0.00
0.00
0.00
0.00
6.75
5.13
6.41
99.18
389.11
63.74
669.47
1,996.13
408.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.75
5.13
0.00
669.47
1,996.13
0.00
0.00
0.00
6.41
0.00
0.00
408.57
6.75
5.13
6.41
669.47
1,996.13
408.57
0.00
0.00
0.00
0.00
0.00
0.00
UND
UND
MOD
11.00
1.00
11.00
243.00
202.50
9,410.00
2,673.00
202.50
103,510.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
1.00
11.00
2,673.00
202.50
103,510.00
11.00
1.00
11.00
2,673.00
202.50
103,510.00
0.00
0.00
0.00
0.00
0.00
0.00
GLB
1.00
1,250.00
1,250.00
0.00
0.00
0.30
375.00
0.25
312.50
0.20
250.00
0.10
125.00
0.15
187.50
1.00
1,250.00
0.00
0.00
10.01.01
10.01.02
10.01.03
10.01.04
10.01.05
10.02.00
10.02.01
11.00.00
11.01.00
11.01.01
11.01.02
11.02.00
11.02.01
11.02.02
11.02.03
11.03.00
11.03.01
11.03.02
11.03.03
12.00.00
12.01.00
12.01.01
PIZARRA ACRILICA
PLACA RECORDATORIA
MOBILIARIO DE MADERA TORNILLO
MITIGACION DE IMPACTOS
AMBIENTALES
LIMPIEZA GENERAL DE LA OBRA
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: LP N 03-2011-GRA
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
PRESUPUESTO BASE
ITEM
12.01.02
12.01.03
12.01.04
12.02.00
12.02.01
01.00.00
01.01.00
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
01.01.08
01.01.09
01.01.10
01.01.11
01.01.12
01.01.13
01.01.14
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.00.00
01.01.00
DESCRIPCION
GESTION DE RESIDUOS
MITIGACION DE IMPACTO AMBIENTAL - CHARLAS
CERCO VIVO
SEGURIDAD INDUSTRIAL
EQUIPOS E IMPLEMENTOS DE SEGURIDAD
INSTALACIONES ELECTRICAS
ACOMETIDA
CABLE AWG-TW 16 MM
CABLE AWG-TW 6 MM
CABLE AWG-TW 4 MM
TUBERIA PVC SAP 40 MM
TUBERIA PVC SAP 25 MM
POZO CONEXIN A TIERRA
TABLERO GENERAL (TG) 1-2x90A, 5-2x45A
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x90A
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x45A
TABLERO DE DISTRIBUCION (TD) 1-2x45A, 2-2x45A, 2-2x20A
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x45A
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x15A
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x20A
CAJA DE PASO CUADRADA 100x50 mm
DISTRIBUCION
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
SALDO
S/.
2,500.00
1,000.00
1,000.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
6,538.20
0.00
0.00
0.00
0.00
287.58
0.00
0.00
479.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.30
332.46
166.23
12.65
166.23
1.00
1.00
1.00
5.00
5.00
5.00
10.00
10.00
11.00
129.03
748.04
287.58
76.53
831.15
479.86
295.55
63.93
279.15
410.80
279.15
436.80
436.80
47.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
592.32
181.21
1,738.78
830.81
105.00
23.00
28.00
40.00
34.00
31.00
3.00
6.00
313.49
2,086.54
3,979.58
7,334.25
3,693.57
4,440.52
3,192.00
2,866.20
1,553.72
325.20
592.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
UND
Metrado
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
GLB
GLB
GLB
1.00
1.00
1.00
2,500.00
1,000.00
1,000.00
2,500.00
1,000.00
1,000.00
0.40
0.21
0.00
1,000.00
210.00
0.00
0.20
0.21
0.00
500.00
210.00
0.00
0.20
0.21
0.00
500.00
210.00
0.00
0.20
0.21
0.00
500.00
210.00
0.00
0.00
0.16
0.00
0.00
160.00
0.00
0.00
0.00
1.00
0.00
0.00
1,000.00
1.00
1.00
1.00
GLB
1.00
6,538.20
6,538.20
1.00
6,538.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M
M
M
M
M
UND
UND
PZA
PZA
UND
PZA
PZA
PZA
UND
25.30
332.46
166.23
12.65
166.23
1.00
1.00
1.00
5.00
5.00
5.00
10.00
10.00
11.00
5.10
2.25
1.73
6.05
5.00
479.86
295.55
63.93
55.83
82.16
55.83
43.68
43.68
4.35
129.03
748.04
287.58
76.53
831.15
479.86
295.55
63.93
279.15
410.80
279.15
436.80
436.80
47.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.30
332.46
0.00
12.65
166.23
0.00
1.00
1.00
5.00
5.00
5.00
10.00
10.00
11.00
129.03
748.04
0.00
76.53
831.15
0.00
295.55
63.93
279.15
410.80
279.15
436.80
436.80
47.85
0.00
0.00
166.23
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.73
1.20
4.79
69.85
160.59
158.59
79.80
84.30
50.12
108.40
98.72
313.49
2,086.54
3,979.58
7,334.25
3,693.57
4,440.52
3,192.00
2,866.20
1,553.72
325.20
592.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
434.49
45.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,081.21
3,143.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
183.98
45.00
12.00
18.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
881.26
3,143.25
1,927.08
2,854.62
0.00
0.00
0.00
325.20
0.00
0.00
0.00
212.34
15.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,017.11
1,047.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
181.21
1,738.78
0.00
0.00
11.00
10.00
40.00
34.00
31.00
0.00
0.00
313.49
2,086.54
0.00
0.00
1,766.49
1,585.90
3,192.00
2,866.20
1,553.72
0.00
0.00
CABLE AWG-TW 4 MM
M
181.21
CABLE AWG-TW 2.5 MM
M
1,738.78
TUBERIA PVC - SEL 20 MM
M
830.81
SALIDA DE TECHO
PTO
105.00
TOMACORRIENTE DOBLE CON LINEA A TIERRA
UND
23.00
TOMACORRIENTE SIMPLE CON LINEA A TIERRA
UND
28.00
FLUORESCENTE RECTO ISPE 2x40 W INCLUYENDO EQUIPO Y PANTALLA
UND
40.00
FLUORESCENTE COLGANTE ISPE 2x40 W INCLUYENDO EQUIPO Y UND
PANTALLA34.00
FLUORESCENTE CIRCULAR ISPE 1x40 W INCLUYENDO EQUIPO Y PANTALLA
UND
31.00
SALIDA DE PARED (BRAQUETES) CON PVC
PTO
3.00
LUMINARIAS EN POSTES DE CEMENTO
UND
6.00
INSTALACIONES SANITARIAS
SISTEMA DE DESAGUE
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
01.02.00
7.00
1.00
4.00
2.00
52.80
39.60
2.00
65.43
73.81
52.92
39.22
10.28
7.68
155.98
458.01
73.81
211.68
78.44
542.78
304.13
311.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
1.00
0.00
0.00
8.80
39.60
0.00
458.01
73.81
0.00
0.00
90.46
304.13
0.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
102.80
0.00
0.00
0.00
0.00
0.00
0.00
34.00
0.00
2.00
0.00
0.00
0.00
0.00
349.52
0.00
311.96
0.00
0.00
4.00
2.00
0.00
0.00
0.00
0.00
0.00
211.68
78.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
1.00
4.00
2.00
52.80
39.60
2.00
458.01
73.81
211.68
78.44
542.78
304.13
311.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
01.02.01
01.02.02
01.02.03
01.02.04
01.03.00
8.00
48.95
3.00
1.00
43.68
32.20
173.58
151.93
349.44
1,576.19
520.74
151.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
48.95
0.00
0.00
349.44
1,576.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
1.00
0.00
0.00
520.74
151.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
48.95
3.00
1.00
349.44
1,576.19
520.74
151.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
149.85
149.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
149.85
0.00
0.00
1.00
149.85
0.00
0.00
01.03.01
ML
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: LP N 03-2011-GRA
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
PRESUPUESTO BASE
ITEM
01.03.02
01.03.03
01.03.04
01.03.05
01.00.00
01.01.00
01.01.01
DESCRIPCION
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
SALDO
S/.
121.50
690.00
158.56
158.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
98,775.83
0.00
0.00
UND
Metrado
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
ML
ML
ML
M3
1.00
6.00
8.00
8.00
121.50
115.00
19.82
19.82
121.50
690.00
158.56
158.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
6.00
8.00
8.00
121.50
690.00
158.56
158.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
6.00
8.00
8.00
GLB
1.00
98,775.83
98,775.83
0.65
64,204.29
0.15
14,816.37
0.12
11,853.10
0.08
7,902.07
0.00
0.00
0.00
0.00
1.00
1,765,481.38
428,083.99
17,654.81
17,654.81
149,150.00
36,165.05
23,127.72
25,677.99
20,538.55
23,949.68
19,691.01
149,150.00
0.00
UTILIDADES (8%)
141238.51
34246.72
21900.94
24315.93
19449.10
22679.29
18646.52
141238.51
0.00
SUB-TOTAL
2,073,524.70
516,150.57
318,790.39
353,943.08
283,101.45
330,120.14
271,419.07
2,073,524.70
0.00
2,073,524.70
516,150.57
318,790.39
353,943.08
283,101.45
330,120.14
271,419.07
2,073,524.70
0.00
373,234.45
92,907.10
57,382.27
63,709.75
50,958.26
59,421.63
48,855.43
373,234.45
0.00
2,446,759.15
609,057.67
376,172.66
417,652.83
334,059.71
389,541.77
320,274.50
2,446,759.15
0.00
273,761.73
303,949.16
243,113.80
283,491.17
233,081.54
1,765,481.38
0.00
17,654.81
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANC
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: S/. 2467,494.40
: S/. 2467,494.40
: 1.00000
: NOVIEMBRE DEL 2010
: 210 DIAS CALENDARIOS
: LP N 03-2011-GRA
: 01 de Abril del 2011
: 29 de Setiembre del 2011
Obra
Entidad
Contratista
Presupuesto Base
Presupuesto Contratado
Factor de Relacion
Fecha Presup. Ref.
Plazo de Ejecucin Contractual
Adjudicacin Directa Selectiva
Fecha de Inicio de Obra
Fecha de Termino real de Obra
AVANCE
REAJUSTE
REAJUSTE
* PERIODO
** FECHA
DE
DE PAGO
** EJECUTADO
ACUMULADO
MES/PAGO
VALORIZ.
VALORIZ.
PROGRAM.
"V"
* PROGRAMADO ** EJECUTADO
"K"
01
27/06/08 al
31/07/08
609,057.66
614,219.18
609,057.66
614,219.18
1.090
54,815.19
55,279.73
25.00
55,279.73
55,279.73 55,279.73
0.00
0.00
55,279.73
02
01/07/08 al
31/08/08
..
376,172.65
379,360.56
985,230.31
993,579.74
1.108
40,626.65
40,970.94
95,441.84
96,250.67
96,250.67 40,970.94
0.00
0.00
40,970.94
03
01/09/08 al
30/09/08
..
417,652.83
421,192.27
1,402,883.14
1,414,772.01
1.114
47,612.42
48,015.92
143,054.26
144,266.59
144,266.59 48,015.92
0.00
0.00
48,015.92
04
01/10/08 al
24/10/08
..
334,059.71
336,890.73
1,736,942.85
1,751,662.74
1.097
32,403.79
32,678.40
175,458.05
176,944.99
176,944.99 32,678.40
0.00
0.00
176,944.99
########
176,944.99
########
0.00
0.00
321,211.58
TOTAL
REAJUSTE
DEDUCCIONES
VAL
######### 1,751,662.74
PROGRAM
EJECUTADO
Vx(K-1)
PROGRAMADO
NOTA :
- La Contatista amparado en Articulo N 256: De los Reajustes, del Sub Capitulo V: Valorizaciones y Pagos de la Ley de Contrataciones
BRUTO
ACUMULADO
EJECUTADO
AUTORIZADO
ACUMULADO
MES
EFECTIVO MATERIALES
REAJUSTE
NETO
AUTORIZADO
A.D.S. N
: LP N 03-2011-GRA
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
P. REFORMULADO
: S/. 2446,759.15
F. R.
: 1.00000
SUPERVISOR
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
RESIDENTE
CIP N 33716
MONTOS
REGULARIZACION
SUB TOTAL
IGV
49,870.93
8,976.76
ADICIONAL
0.00
0.00
0.00
DEDUCTIVO
0.00
0.00
0.00
49,870.93
8,976.76
DEL REINTEGRO
CONTRACTUAL
TOTAL
TOTAL
58,847.69
58,847.69
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE
YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 1.00000
: NOVIEMBRE DEL 2010
: 210 DIAS CALENDARIOS
: LP N 03-2011-GRA
: 01 de Abril del 2011
: 29 de Setiembre del 2011
: Estructuras
K = 0.069*(Mr / Mo) + 0.078*(Mr / Mo) + 0.133*(Ar / Ao) + 0.141*(Cr / Co) + 0.198*(Ar / Ao) + 0.381*(Mr / Mo)
INDICE
CREPCO
DESCRIPCION
% DE
COEF. DE INDICE BASE
SIMB.
INDICES
INCIDENCIA
INCIDENCIA NOV.-10 Io
MES
Apr-11
May-11
Io/Ir
INDICES
MES
Jun-11
Io/Ir
INDICES
MES
Jul-11
Io/Ir
INDICES
MES
Aug-11
Io/Ir
INDICES
MES
Sep-11
Io/Ir
INDICES
MES
Io/Ir
45
100
0.069
314.56
312.57
0.994
0.069
313.14
0.995
0.069
313.14
0.995
0.069
313.14
0.995
0.069
313.14
0.995
0.069
313.13
0.995
0.069
49
100
0.078
240.48
243.55
1.013
0.079
240.64
1.001
0.078
239.68
0.997
0.078
238.23
0.991
0.077
238.59
0.992
0.077
239.12
0.994
0.078
AGREGADO GRUESO
100
0.133
210.97
211.81
1.004
0.134
211.16
1.001
0.133
211.27
1.001
0.133
211.00
1.000
0.133
213.98
1.014
0.135
213.98
1.014
0.135
21
100
0.141
335.42
332.68
0.992
0.140
332.68
0.992
0.140
332.68
0.992
0.140
332.68
0.992
0.140
332.68
0.992
0.140
332.68
0.992
0.140
100
0.198
520.51
591.89
1.137
0.225
583.48
1.121
0.222
580.78
1.116
0.221
570.55
1.096
0.217
570.13
1.095
0.217
541.66
1.041
0.206
47
100
0.381
430.83
427.68
0.993
0.378
427.68
0.993
0.378
427.68
0.993
0.378
448.29
1.041
0.396
448.29
1.041
0.396
448.29
1.041
0.396
FACTOR DE REAJUSTE
1.000
1.024
1.020
1.019
1.032
1.034
1.023
Entidad
Contratista
Presupuesto Base
Presupuesto Contratado
Presupuesto Reformulado
Factor de Relacion
Fecha Presup. Ref.
Plazo de Ejecucin Contractual
Adjudicacin Directa Selectiva
Fecha de Inicio de Obra
Fecha de Termino real de Obra
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE
YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 1.00000
: NOVIEMBRE DEL 2010
: 210 DIAS CALENDARIOS
: LP N 03-2011-GRA
: 01 de Abril del 2011
: 29 de Setiembre del 2011
Formula 01
: Arquitectura
Obra
K = 0.063*(AMr / AMo) + 0.059*(Ar / Ao) + 0.136*(Dr / Do) + 0.146*(Ir / Io) + 0.203*(Mr / Mo) + 0.393*(Mr / Mo)
INDICE
CREPCO
2
49
5
30
39
43
47
% DE
COEF. DE INDICE BASE
SIMB.
INDICES
INCIDENCIA
INCIDENCIA NOV-10 Io
MES
ACERO DE CONSTRUCCION LISO
50.794
520.51
591.89
AM
0.063
MAQUINARIA Y EQUIPO NACIONAL
49.206
240.48
243.55
AGREGADO GRUESO
100.000
A
0.059
210.97
211.81
DLAR (GENERAL PONDERADO)
100.000
D
0.136
357.53
366.61
INDICE GENERAL DE PRECIOS AL CONSUMIDOR100.000
I
0.146
354.04
362.38
MADERA NACIONAL PARA ENCOF. Y CARPINT. 100.000
M
0.203
527.06
540.19
MANO DE OBRA INC. LEYES SOCIALES
100.000
M
0.393
430.83
427.68
FACTOR DE REAJUSTE
1.000
DESCRIPCION
Apr-11
Io/Ir
1.137
1.013
1.004
1.025
1.024
1.025
0.993
May-11
K
0.069
0.059
0.139
0.149
0.208
0.390
1.015
INDICES
MES
583.48
240.64
211.16
363.73
362.29
541.48
427.68
Io/Ir
1.121
1.001
1.001
1.017
1.023
1.027
0.993
Jun-11
K
0.068
0.059
0.138
0.149
0.209
0.390
1.014
INDICES
MES
580.78
239.68
211.27
363.98
362.65
542.65
427.68
Io/Ir
1.116
0.997
1.001
1.018
1.024
1.030
0.993
Jul-11
K
0.068
0.059
0.138
0.150
0.209
0.390
1.014
INDICES
MES
570.55
238.23
211.00
360.57
365.52
542.31
448.29
Io/Ir
1.096
0.991
1.000
1.009
1.032
1.029
1.041
Aug-11
K
0.067
0.059
0.137
0.151
0.209
0.409
1.032
INDICES
MES
570.13
238.59
213.98
360.63
366.50
544.01
448.29
Io/Ir
1.095
0.992
1.014
1.009
1.035
1.032
1.041
Sep-11
K
0.067
0.060
0.137
0.151
0.210
0.409
1.034
INDICES
MES
541.66
239.12
213.98
362.16
367.72
548.53
448.29
Io/Ir
1.041
0.994
1.014
1.013
1.039
1.041
1.041
K
0.065
0.060
0.138
0.152
0.211
0.409
1.034
Entidad
Contratista
Presupuesto Base
Presupuesto Contratado
Presupuesto Reformulado
Factor de Relacion
Fecha Presup. Ref.
Plazo de Ejecucin Contractual
Adjudicacin Directa Selectiva
Fecha de Inicio de Obra
Fecha de Termino real de Obra
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE
YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 1.00000
: NOVIEMBRE DEL 2010
: 210 DIAS CALENDARIOS
: LP N 03-2011-GRA
: 01 de Abril del 2011
: 29 de Setiembre del 2011
Formula 01
: Instalaciones Electricas
Obra
% DE
COEF. DE INDICE BASE
SIMB.
INDICES
INCIDENCIA
INCIDENCIA NOV-10 Io
MES
HERRAMIENTA MANUAL
4.375
273.14
283.02
MH
0.480
MANO DE OBRA INC. LEYES SOCIALES
95.625
430.83
427.68
DLAR GENERAL (PONDERADO)
1.538
357.53
366.61
ID
0.520
INDICE GENERAL DE PRECIOS AL CONSUMIDOR98.462
354.04
362.38
FACTOR DE REAJUSTE
1.000
DESCRIPCION
Apr-11
Io/Ir
1.036
0.993
1.025
1.024
May-11
K
0.485
0.533
1.017
INDICES
MES
280.64
427.68
363.73
362.29
Io/Ir
1.027
0.993
1.017
1.023
Jun-11
K
0.483
0.531
1.014
INDICES
MES
279.78
427.68
363.98
362.65
Io/Ir
1.024
0.993
1.018
1.024
Jul-11
K
0.482
0.531
1.013
INDICES
MES
279.22
448.29
360.57
365.52
Io/Ir
1.022
1.041
1.009
1.032
Aug-11
K
0.496
0.531
1.027
INDICES
MES
279.17
448.29
360.63
366.50
Io/Ir
1.022
1.041
1.009
1.035
Sep-11
K
0.496
0.531
1.027
INDICES
MES
279.28
448.29
362.16
367.72
Io/Ir
1.022
1.041
1.013
1.039
K
0.496
0.533
1.029
Entidad
Contratista
Presupuesto Base
Presupuesto Contratado
Presupuesto Reformulado
Factor de Relacion
Fecha Presup. Ref.
Plazo de Ejecucin Contractual
Adjudicacin Directa Selectiva
Fecha de Inicio de Obra
Fecha de Termino real de Obra
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE
YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 1.00000
: NOVIEMBRE DEL 2010
: 210 DIAS CALENDARIOS
: LP N 03-2011-GRA
: 01 de Abril del 2011
: 29 de Setiembre del 2011
Formula 01
: Instalaciones Sanitarias
Obra
DESCRIPCION
APARATO SANITARIOS CON GRIFERIA
HERRAMIENTA MANUAL
DLAR GENERAL (PONDERADO)
MANO DE OBRA INC. LEYES SOCIALES
FACTOR DE REAJUSTE
% DE
COEF. DE INDICE BASE
SIMB.
INDICES
INCIDENCIA
INCIDENCIA NOV-10 Io
MES
68.750
319.65
334.51
AH
0.080
31.250
273.14
283.02
100.000
D
0.342
357.53
366.61
100.000
M
0.578
430.83
427.68
1.000
Apr-11
Io/Ir
1.046
1.036
1.025
0.993
May-11
K
0.083
0.351
0.574
1.008
INDICES
MES
335.00
280.64
363.73
427.68
Io/Ir
1.393
1.330
1.084
0.822
Jun-11
K
0.083
0.348
0.574
1.005
INDICES
MES
335.45
279.78
363.98
427.68
Io/Ir
1.049
1.024
1.018
0.993
Jul-11
K
0.083
0.348
0.574
1.005
INDICES
MES
334.97
279.22
360.57
448.29
Io/Ir
1.048
1.022
1.320
1.641
Aug-11
K
0.083
0.345
0.601
1.029
INDICES
MES
336.26
279.17
360.63
448.29
Io/Ir
1.052
1.022
1.009
1.041
Sep-11
K
0.083
0.345
0.601
1.029
INDICES
MES
336.96
279.28
362.16
448.29
Io/Ir
1.054
0.987
1.013
1.041
K
0.083
0.346
0.601
1.031
ESTRUCTURAS
01.00.00 OBRAS PROVISIONALES
01.01.00
CAMPAMENTO Y CARTEL DE OBRAS
01.01.01
OFICINA, ALMACEN Y GUARDIANIA
01.01.02
CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40x3.60M
01.02.00
INSTALACIONES PROVISIONALES
01.02.01
INSTALACION DE AGUA POTABLE PARA LA CONSTRUCCION
02.00.00 OBRAS PRELIMINARES
02.01.00
DEMOLICION DE INFRAESTRUCTURA
02.01.01
DESTECHADO DE COBERTURA
02.01.02
DESARME DE ESTRUCTURA DE TECHO
02.01.03
DEMOLICION DE OBRAS DE MUROS
02.01.04
DEMOLICION DE VEREDAS Y PISOS DE CONCRETO
02.01.05
ELIMINACION DE MATERIAL DEMOLIDO
02.02.00
LIMPIEZA Y TRAZO
02.02.01
LIMPIEZA DE TERRENO MANUAL
02.02.02
TRAZO Y REPLANTEO
03.00.00 MOVIMIENTO DE TIERRAS
03.01.00
MOVIMIENTO DE TIERRAS
03.01.01
EXCAVACION MANUAL DE PLATAFORMA
03.01.02
EXCAVACION DE ZANJA PARA ZAPATA
03.01.03
EXCAVACION DE ZANJA PARA CIMIENTO
03.01.04
REFINE Y NIVELACION EN FONDO DE ZAPATA
03.01.05
REFINE Y NIVELACION EN ZANJA PARA CIMIENTO
03.01.06
RELLENO CON MATERIAL PROPIO
03.01.07
NIVELACION Y COMPACTACION DE MATERIAL DE RELLENO
03.01.08
ELIMINACION DE MATERIAL EXCEDENTE
04.00.00 CONCRETO SIMPLE
04.01.00
CIMIENTOS Y SOBRECIMIENTOS
04.01.01
CONCRETO 1:10+30% P. G. PARA CIMIENTOS CORRIDOS
04.01.02
CONCRETO 1:8+25% P. M. PARA SOBRECIMIENTOS
04.01.03
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS
04.01.04
CURADO DE CONCRETO
04.02.00
SOLADOS
Und
METRADO
SEGN
PROYECTO
VALORIZACION N 01 - 06
01 ABRIL-28 OCTUBRE 2011
METRADO
%
VALORIZACION
ACUMULADA
METRADO
SALDO
%
METRADO
GLB
UND
1.00
1.00
1.00
1.00
100.00%
100.00%
1.00
1.00
100.00%
100.00%
0.00
0.00
0.00%
0.00%
50.00
50.00
100.00%
50.00
100.00%
0.00
0.00%
M2
M2
M3
M2
848.72
848.72
738.68
319.84
M3
1,058.52
848.72
848.72
738.68
319.84
1,058.52
100.00%
100.00%
100.00%
100.00%
100.00%
848.72
848.72
738.68
319.84
1,058.52
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
M2
M2
2,179.00
2,179.00
2,179.00
2,179.00
100.00%
100.00%
2,179.00
2,179.00
100.00%
100.00%
0.00
0.00
0.00%
0.00%
M3
M3
M3
M2
304.50
169.04
649.00
109.64
M2
M3
359.73
304.50
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
304.50
169.04
649.00
109.64
359.73
304.50
243.60
878.94
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
268.76
23.67
201.66
201.66
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
M2
M3
243.60
878.94
304.50
169.04
649.00
109.64
359.73
304.50
243.60
878.94
M3
M3
M2
M2
268.76
23.67
201.66
201.66
268.76
23.67
201.66
201.66
04.02.01
04.02.02
04.03.00
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.04.00
04.04.01
04.04.02
04.04.03
04.04.04
04.04.05
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
05.02.00
05.02.01
05.02.02
05.02.03
05.02.04
05.03.00
05.03.01
05.03.02
05.03.03
05.03.04
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
Und
METRADO
SEGN
PROYECTO
VALORIZACION N 01 - 06
01 ABRIL-28 OCTUBRE 2011
METRADO
%
VALORIZACION
ACUMULADA
METRADO
SALDO
%
METRADO
M3
M2
264.73
259.66
264.73
259.66
100.00%
100.00%
264.73
259.66
100.00%
100.00%
0.00
0.00
0.00%
0.00%
M2
M3
M2
M
M2
78.00
78.75
630.00
399.00
630.00
78.00
78.75
630.00
399.00
630.00
100.00%
100.00%
100.00%
100.00%
100.00%
78.00
78.75
630.00
399.00
630.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
M2
M3
117.54
15.97
M2
M
M2
124.18
31.05
30.00
117.54
15.97
124.18
31.05
30.00
100.00%
100.00%
100.00%
100.00%
100.00%
117.54
15.97
124.18
31.05
30.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
M3
KG
M2
68.83
1,765.67
114.71
68.83
1,765.67
114.71
100.00%
100.00%
100.00%
68.83
1,765.67
114.71
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
M3
M2
KG
M2
23.12
184.98
2,190.56
59.42
23.12
184.98
2,190.56
59.42
100.00%
100.00%
100.00%
100.00%
23.12
184.98
2,190.56
59.42
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
M3
M2
KG
M2
126.12
729.85
19,425.73
729.85
126.12
729.85
19,425.73
729.85
100.00%
100.00%
100.00%
100.00%
126.12
729.85
19,425.73
729.85
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
M3
M2
KG
M2
83.06
838.75
9,937.99
838.75
83.06
838.75
9,937.99
838.75
100.00%
100.00%
100.00%
100.00%
83.06
838.75
9,937.99
838.75
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
05.05.00
LOSAS ALIGERADAS
05.05.01
CONCRETO 210 KG/CM2
05.05.02
ENCOFRADO Y DESENCOFRADO
05.05.03
LADRILLO HUECO DE ARCILLA 15x30x30 cm PARA TECHO ALIGERADO
05.05.04
ACERO DE REFUERZO FY=4200 KG/CM2.
05.05.04
CURADO DE CONCRETO
05.06.00
ESCALERAS
05.06.01
CONCRETO F'C=210 KG/CM2
05.06.02
ENCOFRADO Y DESENCOFRADO
05.06.03
ACERO DE REFUERZO FY=4200 KG/CM2.
05.06.04
CURADO DE CONCRETO
05.07.00
MURO DE CONTENCION
05.07.01
CONCRETO F'C=210 KG/CM2
05.07.02
ENCOFRADO Y DESENCOFRADO
05.07.03
ACERO DE REFUERZO FY=4200 KG/CM2.
05.07.04
JUNTA DE DILATACION
05.07.05
CURADO DE CONCRETO
05.08.00
MURO FRONTAL
05.08.01
CONCRETO F'C=210 KG/CM2
05.08.02
ENCOFRADO Y DESENCOFRADO
05.08.03
ACERO DE REFUERZO FY=4200 KG/CM2.
05.08.04
CURADO DE CONCRETO
ARQUITECTURA
01.00.00 MUROS Y TABIQUES
01.01.00
MUROS
01.01.01
MURO DE CABEZA LADILLO K.K. 18 HUECOS CON CEMENTO ARENA
01.01.02
MURO DE SOGA LADILLO K.K. 18 HUECOS CON CEMENTO ARENA
01.02.00
MURO DE PIEDRA
01.02.01
MURO DE PIEDRA PARTIDA ASENTADA CON MORTERO 1:8
02.00.00 REVOQUES, ENLUCIDOS Y MOLDURAS
02.01.00
TARRAJEO DE MUROS, COLUMNAS Y VIGAS
02.01.01
TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO:ARENA
02.01.02
TARRAJEO DE SUPERF. COLUMNAS
02.01.03
TARRAJEO DE SUPERF. VIGAS
Und
METRADO
SEGN
PROYECTO
VALORIZACION N 01 - 06
01 ABRIL-28 OCTUBRE 2011
METRADO
%
VALORIZACION
ACUMULADA
METRADO
100.00%
100.00%
100.00%
100.00%
100.00%
SALDO
%
METRADO
38.09
423.20
423.20
3,372.34
423.20
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
M3
38.09
M2
423.20
M2
KG
M2
423.20
3,372.34
423.20
38.09
423.20
423.20
3,372.34
423.20
M3
M2
KG
M2
6.44
81.00
300.27
81.00
6.44
81.00
300.27
81.00
100.00%
100.00%
100.00%
100.00%
6.44
81.00
300.27
81.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
M3
M2
KG
M
M2
153.65
363.68
5,515.95
40.00
363.68
153.65
363.68
5,515.95
40.00
363.68
100.00%
100.00%
100.00%
100.00%
100.00%
153.65
363.68
5,515.95
40.00
363.68
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
M3
M2
KG
M2
9.41
53.20
26.55
53.20
9.41
53.20
26.55
53.20
100.00%
100.00%
100.00%
100.00%
9.41
53.20
26.55
53.20
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
M2
M2
351.46
376.74
351.46
376.74
100.00%
100.00%
351.46
376.74
100.00%
100.00%
0.00
0.00
0.00%
0.00%
M3
181.15
181.15
100.00%
181.15
100.00%
0.00
0.00%
M2
M2
2,901.27
233.45
M2
659.16
2,901.27
233.45
659.16
100.00%
100.00%
100.00%
2,901.27
233.45
659.16
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
02.02.00
02.02.01
02.02.02
02.02.03
02.02.04
03.00.00
03.01.00
03.01.01
03.01.02
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.02.00
04.02.01
04.02.02
04.02.03
04.02.04
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
05.02.00
05.02.01
05.02.02
05.02.03
06.00.00
06.01.00
06.01.01
Und
DERRAMES Y BRUAS
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS
M
VESTIDURA DE SUPERF. DE FONDO DE ESCALERA CON CEMENTO-ARENA
M2
BRUADO DE MURO
M
CURADO DE CONCRETO
M2
CIELO RASO
CIELO RASO
CIELO RASO DE MADERA PINO MACHIHEMBRADA 3/4"
M2
ENLUCIDO DE CIELO RASO CON MORTERO 1:4
M2
PISOS Y VEREDAS
PISOS
FALSO PISO DE 4" DE CONCRETO 1:10
M2
PISO DE CEMENTO PULIDO E=1" BRUADO 2
M2
PISO CERAMICO DE 30x30 EN INTERIORES
M2
PISO DE MADERA MACHIHEMBRADA TORNILLO 1"
M2
PISO DE CEMENTO FROTACHADO EN CIRCULACION
M2
PISO DE PIEDRA ASENTADA EN CONCRETO
M2
VEREDAS
VEREDA DE CONCRETO DE e=4"
M2
ENCOFRADO PARA VEREDAS
M2
JUNTAS DE DILATACION
M
CURADO DE CONCRETO
M2
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE LAJA (PIEDRA) DE LA ZONA H=30 cm
M2
ZOCALO DE CERAMICA EN LABORATORIO
M
ZOCALO DE LAJA EN COLUMNAS H=30 cm
M2
CONTRAZOCALOS
CONTRAZOCALO DE CERAMICA H=10cm
M
CONTRAZOCALO DE MADERA H=10cm
M
CONTRAZOCALO DE CEMENTO PULIDO C/MORTERO 1:2 C:A, E=2cm y H=30cm (EN INTERIORES)
M
CARPINTERIA METALICA Y CERRAJERIA
PUERTAS Y MALLAS
MALLA EN CERCO PERIMETRICO FRONTAL
M2
METRADO
SEGN
PROYECTO
512.10
81.00
81.00
VALORIZACION N 01 - 06
01 ABRIL-28 OCTUBRE 2011
METRADO
%
VALORIZACION
ACUMULADA
METRADO
SALDO
%
METRADO
81.00
512.10
81.00
81.00
81.00
100.00%
100.00%
100.00%
100.00%
512.10
81.00
81.00
81.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
814.21
796.01
814.21
796.01
100.00%
100.00%
814.21
796.01
100.00%
100.00%
0.00
0.00
0.00%
0.00%
159.85
220.15
221.33
159.85
220.15
221.33
673.38
94.96
72.68
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
159.85
220.15
221.33
673.38
94.96
72.68
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
118.86
41.09
24.00
118.86
100.00%
100.00%
100.00%
100.00%
118.86
41.09
24.00
118.86
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
33.26
10.26
95.61
100.00%
100.00%
100.00%
33.26
10.26
95.61
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
104.33
147.87
224.65
104.33
100.00%
100.00%
100.00%
147.87
224.65
104.33
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
91.58
91.58
100.00%
91.58
100.00%
0.00
0.00%
673.38
94.96
72.68
118.86
41.09
24.00
118.86
33.26
10.26
95.61
147.87
224.65
06.01.02
06.01.03
06.02.00
06.02.01
06.02.02
06.03.00
06.03.01
06.03.02
06.03.03
06.03.04
06.03.05
07.00.00
07.01.00
07.01.01
07.01.02
07.01.03
07.01.04
07.01.05
07.02.00
07.02.01
07.02.02
07.02.03
08.00.00
08.01.00
08.01.01
08.01.02
08.01.03
08.01.04
08.02.00
08.02.01
08.02.02
08.02.03
08.02.04
09.00.00
Und
METRADO
SEGN
PROYECTO
VALORIZACION N 01 - 06
01 ABRIL-28 OCTUBRE 2011
METRADO
%
VALORIZACION
ACUMULADA
METRADO
SALDO
%
METRADO
M2
9.00
M2
4.50
9.00
4.50
100.00%
100.00%
9.00
4.50
100.00%
100.00%
0.00
0.00
0.00%
0.00%
M
UND
12.00
88.00
12.00
88.00
100.00%
100.00%
12.00
88.00
100.00%
100.00%
0.00
0.00
0.00%
0.00%
UND
UND
84.00
456.00
PZA
UND
UND
21.00
152.00
21.00
84.00
456.00
21.00
152.00
21.00
100.00%
100.00%
100.00%
100.00%
100.00%
84.00
456.00
21.00
152.00
21.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
857.98
M
M
151.96
1,277.14
M
M
54.97
82.37
857.98
151.96
1,277.14
54.97
82.37
100.00%
100.00%
100.00%
100.00%
100.00%
857.98
151.96
1,277.14
54.97
82.37
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
M2
M
M2
929.89
96.50
79.20
929.89
96.50
79.20
100.00%
100.00%
100.00%
929.89
96.50
79.20
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
M2
M2
M2
M2
53.90
16.17
7.84
150.03
53.90
16.17
7.84
150.03
100.00%
100.00%
100.00%
100.00%
53.90
16.17
7.84
150.03
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
M
M
M
97.20
75.24
4.25
93.60
97.20
75.24
4.25
93.60
100.00%
100.00%
100.00%
100.00%
97.20
75.24
4.25
93.60
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
ITEM
09.01.00
09.01.01
10.00.00
10.01.00
10.01.01
10.01.02
10.01.03
10.01.04
10.01.05
10.02.00
10.02.01
11.00.00
11.01.00
11.01.01
11.01.02
11.02.00
11.02.01
11.02.02
11.02.03
11.03.00
11.03.01
11.03.02
11.03.03
12.00.00
DESCRIPCION
VIDRIOS
VIDRIOS SEMIDOBLES
PINTURA
PINTURA LATEX
PINTURA LATEX EN CIELO RASO
PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES
PINTURA LATEX EN SUPERFICIE DE COLUMNAS
PINTURA LATEX EN SUPERFICIE DE VIGAS
PINTURA LATEX EN DERRAME DE PUERTA Y VENTANAS
SELLADOR Y/O BARNIZ
PINTURA BARNIZ EN CARPINTERIA DE MADERA
VARIOS
CANALETA PLUVIAL
CANALETA PLUVIAL DE 6"
TUBERIA DE BAJADA PVC 3"
MESA DE LAVADEROS EN LABORATORIO
ASENTADO DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4x1.5cm
CONCRETO F'C=210 KG/CM2
ASENTADO DE MAYOLICA 20x20 cm BLANCA DE 1RA
METRADO
SEGN
PROYECTO
VALORIZACION N 01 - 06
01 ABRIL-28 OCTUBRE 2011
METRADO
%
VALORIZACION
ACUMULADA
METRADO
P2
1,829.98
1,829.98
100.00%
M2
M2
M2
M2
796.01
2,759.04
233.45
599.24
521.10
796.01
2,759.04
233.45
599.24
521.10
M2
488.16
165.00
Und
SALDO
%
METRADO
1,829.98
100.00%
0.00
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
796.01
2,759.04
233.45
599.24
521.10
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
488.16
100.00%
488.16
100.00%
0.00
0.00%
162.00
165.00
162.00
100.00%
100.00%
165.00
162.00
100.00%
100.00%
0.00
0.00
0.00%
0.00%
M2
M3
M2
6.75
5.13
6.41
6.75
5.13
6.41
100.00%
100.00%
100.00%
6.75
5.13
6.41
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
UND
11.00
UND
MOD
1.00
11.00
11.00
1.00
11.00
100.00%
100.00%
100.00%
11.00
1.00
11.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
GLB
GLB
GLB
GLB
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100.00%
100.00%
100.00%
100.00%
1.00
1.00
1.00
1.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
GLB
1.00
1.00
100.00%
1.00
100.00%
0.00
0.00%
MOBILIARIO - PIZARRAS
PIZARRA ACRILICA
PLACA RECORDATORIA
MOBILIARIO DE MADERA TORNILLO
MITIGACION DE IMPACTOS
12.01.00
AMBIENTALES
12.01.01
LIMPIEZA GENERAL DE LA OBRA
12.01.02
GESTION DE RESIDUOS
12.01.03
MITIGACION DE IMPACTO AMBIENTAL - CHARLAS
12.01.04
CERCO VIVO
12.02.00
SEGURIDAD INDUSTRIAL
12.02.01
EQUIPOS E IMPLEMENTOS DE SEGURIDAD
INSTALACIONES ELECTRICAS
01.00.00 INSTALACIONES ELECTRICAS
01.01.00
ACOMETIDA
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
CABLE AWG-TW 16 MM
CABLE AWG-TW 6 MM
CABLE AWG-TW 4 MM
TUBERIA PVC SAP 40 MM
TUBERIA PVC SAP 25 MM
POZO CONEXIN A TIERRA
TABLERO GENERAL (TG) 1-2x90A, 5-2x45A
01.01.08
01.01.09
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x45A
01.01.10
TABLERO DE DISTRIBUCION (TD) 1-2x45A, 2-2x45A, 2-2x20A
01.01.11
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x45A
01.01.12
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x15A
01.01.13
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x20A
01.01.14
CAJA DE PASO CUADRADA 100x50 mm
01.02.00
DISTRIBUCION
01.02.01
CABLE AWG-TW 4 MM
01.02.02
CABLE AWG-TW 2.5 MM
01.02.03
TUBERIA PVC - SEL 20 MM
01.02.04
SALIDA DE TECHO
01.02.05
TOMACORRIENTE DOBLE CON LINEA A TIERRA
01.02.06
TOMACORRIENTE SIMPLE CON LINEA A TIERRA
01.02.07
FLUORESCENTE RECTO ISPE 2x40 W INCLUYENDO EQUIPO Y PANTALLA
01.02.08
FLUORESCENTE COLGANTE ISPE 2x40 W INCLUYENDO EQUIPO Y PANTALLA
01.02.09
FLUORESCENTE CIRCULAR ISPE 1x40 W INCLUYENDO EQUIPO Y PANTALLA
01.02.10
SALIDA DE PARED (BRAQUETES) CON PVC
01.02.11
LUMINARIAS EN POSTES DE CEMENTO
INSTALACIONES SANITARIAS
01.00.00 INSTALACIONES SANITARIAS
01.01.00
SISTEMA DE DESAGUE
01.01.01
SALIDA DE DESAGUE EN PVC SAL 2"
01.01.02
SALIDA DE DESAGUE EN PVC SAL 4"
01.01.03
SUMIDEROS CROMADOS DE 2", PROVISION Y COLOCACION
01.01.04
REGISTRO CROMADO DE 2", PROVISION Y COLOCACION
01.01.05
TUBERIA DE PVC SAL 4" (DESAGUE)
Und
M
M
METRADO
SEGN
PROYECTO
25.30
332.46
VALORIZACION N 01 - 06
01 ABRIL-28 OCTUBRE 2011
METRADO
%
VALORIZACION
ACUMULADA
METRADO
SALDO
%
METRADO
PZA
10.00
UND
11.00
25.30
332.46
166.23
12.65
166.23
1.00
1.00
1.00
5.00
5.00
5.00
10.00
10.00
11.00
M
M
M
PTO
UND
UND
UND
UND
UND
PTO
UND
181.21
1,738.78
830.81
105.00
23.00
28.00
40.00
34.00
31.00
3.00
6.00
181.21
1,738.78
830.81
105.00
23.00
28.00
40.00
34.00
31.00
3.00
6.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
181.21
1,738.78
830.81
105.00
23.00
28.00
40.00
34.00
31.00
3.00
6.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
pza
pza
pza
pza
pza
7.00
1.00
4.00
2.00
52.80
7.00
1.00
4.00
2.00
52.80
100.00%
100.00%
100.00%
100.00%
100.00%
7.00
1.00
4.00
2.00
52.80
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
M
M
166.23
12.65
M
UND
UND
PZA
166.23
1.00
1.00
1.00
PZA
5.00
UND
PZA
PZA
5.00
5.00
10.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
25.30
332.46
166.23
12.65
166.23
1.00
1.00
1.00
5.00
5.00
5.00
10.00
10.00
11.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
01.01.06
01.01.07
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.03.00
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.00.00
01.01.00
01.01.01
Und
METRADO
SEGN
PROYECTO
VALORIZACION N 01 - 06
01 ABRIL-28 OCTUBRE 2011
METRADO
%
VALORIZACION
ACUMULADA
METRADO
SALDO
%
METRADO
UND
pza
39.60
2.00
39.60
2.00
100.00%
100.00%
39.60
2.00
100.00%
100.00%
0.00
0.00
0.00%
0.00%
pto
pto
pto
pto
8.00
48.95
3.00
1.00
8.00
48.95
3.00
1.00
100.00%
100.00%
100.00%
100.00%
8.00
48.95
3.00
1.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
ML
ML
ML
ML
M3
1.00
1.00
6.00
8.00
8.00
1.00
1.00
6.00
8.00
8.00
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
1.00
6.00
8.00
8.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
GLB
1.00
1.00
100.00%
1.00
100.00%
0.00
0.00%
PRESUPUESTO DE OBRA
OBRA
A.D.S.
: LP N 03-2011-GRA
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
PRESUP. REFORMULADO
: S/. 2446,759.15
F. R.
: 1.00000
SUPERVISOR
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
RESIDENTE
ITEM
ESTRUCTURAS
01.00.00
01.01.00
01.01.01
01.01.02
01.02.00
01.02.01
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
02.01.04
02.01.05
02.02.00
02.02.01
02.02.02
03.00.00
03.01.00
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.01.08
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
04.02.00
04.02.01
04.02.02
04.03.00
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.04.00
04.04.01
CIP N 33716
DESCRIPCION
OBRAS PROVISIONALES
CAMPAMENTO Y CARTEL DE OBRAS
OFICINA, ALMACEN Y GUARDIANIA
CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40x3.60M
INSTALACIONES PROVISIONALES
INSTALACION DE AGUA POTABLE PARA LA CONSTRUCCION
OBRAS PRELIMINARES
DEMOLICION DE INFRAESTRUCTURA
DESTECHADO DE COBERTURA
DESARME DE ESTRUCTURA DE TECHO
DEMOLICION DE OBRAS DE MUROS
DEMOLICION DE VEREDAS Y PISOS DE CONCRETO
ELIMINACION DE MATERIAL DEMOLIDO
LIMPIEZA Y TRAZO
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE PLATAFORMA
EXCAVACION DE ZANJA PARA ZAPATA
EXCAVACION DE ZANJA PARA CIMIENTO
REFINE Y NIVELACION EN FONDO DE ZAPATA
REFINE Y NIVELACION EN ZANJA PARA CIMIENTO
RELLENO CON MATERIAL PROPIO
NIVELACION Y COMPACTACION DE MATERIAL DE RELLENO
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
CIMIENTOS Y SOBRECIMIENTOS
CONCRETO 1:10+30% P. G. PARA CIMIENTOS CORRIDOS
CONCRETO 1:8+25% P. M. PARA SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS
CURADO DE CONCRETO
SOLADOS
SOLADOS PARA ZAPATAS e=10 cm MEZCLA 1:12 C:H
CURADO DE CONCRETO
PATIO DE HONOR
ENCOFRADO Y DESENCOFRADO
CONCRETO F'C=175 KG/CM2
FROTACHADO
JUNTAS DE DILATACION
CURADO DE CONCRETO
CANALETAS
ENCOFRADO Y DESENCOFRADO
PRESUPUESTO BASE
UND
Metrado
Precio Unit
GLB
UND
1.00
1.00
1,012.50
744.01
50.00
5.14
M2
M2
M3
M2
M3
848.72
848.72
738.68
319.84
1,058.52
10.45
69.81
38.62
18.10
19.28
M2
M2
2,179.00
2,179.00
3.38
3.53
122,843.45
8,869.12
59,249.14
28,527.82
5,789.10
20,408.27
15,056.89
7,365.02
7,691.87
M3
M3
M3
M2
M2
M3
M2
M3
304.50
169.04
649.00
109.64
359.73
304.50
243.60
878.94
32.80
32.80
32.80
6.50
6.38
16.40
3.67
19.28
62,660.82
9,987.60
5,544.51
21,287.20
712.66
2,295.08
4,993.80
894.01
16,945.96
M3
M3
M2
M2
268.76
23.67
201.66
201.66
186.08
255.11
23.64
M3
M2
264.73
259.66
30.47
1.69
M2
M3
M2
M
M2
78.00
78.75
630.00
399.00
630.00
35.52
338.61
15.54
7.64
1.69
M2
117.54
35.52
1.69
Subtotal (S/.)
1,756.51
1,012.50
744.01
257.00
257.00
61,157.36
50,010.86
6,038.45
4,767.24
340.81
8,505.15
8,066.32
438.83
43,339.36
2,770.56
26,665.54
9,790.20
3,048.36
1,064.70
12,815.20
4,175.02
PRESUPUESTO DE OBRA
OBRA
A.D.S.
: LP N 03-2011-GRA
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
PRESUP. REFORMULADO
: S/. 2446,759.15
F. R.
: 1.00000
SUPERVISOR
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
RESIDENTE
ITEM
04.04.02
04.04.03
04.04.04
04.04.05
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
05.02.00
05.02.01
05.02.02
05.02.03
05.02.04
05.03.00
05.03.01
05.03.02
05.03.03
05.03.04
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
05.05.00
05.05.01
05.05.02
05.05.03
05.05.04
05.05.04
05.06.00
05.06.01
05.06.02
05.06.03
05.06.04
05.07.00
05.07.01
05.07.02
05.07.03
05.07.04
05.07.05
05.08.00
05.08.01
05.08.02
05.08.03
CIP N 33716
DESCRIPCION
PRESUPUESTO BASE
UND
M3
M2
M
M2
Metrado
15.97
124.18
31.05
30.00
Precio Unit
68.83
1,765.67
114.71
389.11
4.04
1.69
23.12
184.98
2,190.56
59.42
338.61
15.54
7.64
35.52
389.11
35.52
4.04
1.69
126.12
729.85
19,425.73
729.85
349.62
83.06
838.75
9,937.99
838.75
389.11
35.52
4.04
1.69
38.09
423.20
423.20
3,372.34
423.20
389.11
35.52
17.37
4.04
1.69
6.44
81.00
300.27
81.00
389.11
35.52
4.04
1.69
153.65
363.68
5,515.95
40.00
363.68
389.11
35.52
4.04
7.64
1.69
9.41
53.20
26.55
389.11
35.52
4.04
35.52
4.04
1.69
Subtotal (S/.)
5,407.60
1,929.76
237.22
1,065.60
34,109.61
26,782.44
7,133.31
193.86
24,516.99
8,996.22
6,570.49
8,849.86
100.42
149,731.74
44,094.07
25,924.27
78,479.95
1,233.45
103,678.85
32,319.48
29,792.40
40,149.48
1,417.49
51,543.70
14,821.20
15,032.06
7,350.98
13,624.25
715.21
6,732.97
2,505.87
2,877.12
1,213.09
136.89
95,909.32
59,786.75
12,917.91
22,284.44
305.60
614.62
5,748.36
3,661.53
1,889.66
107.26
PRESUPUESTO DE OBRA
OBRA
A.D.S.
: LP N 03-2011-GRA
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
PRESUP. REFORMULADO
: S/. 2446,759.15
F. R.
: 1.00000
SUPERVISOR
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
RESIDENTE
ITEM
05.08.04
ARQUITECTURA
01.00.00
01.01.00
01.01.01
01.01.02
01.02.00
01.02.01
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
02.02.00
02.02.01
02.02.02
02.02.03
02.02.04
03.00.00
03.01.00
03.01.01
03.01.02
04.00.00
04.01.00
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.02.00
04.02.01
04.02.02
04.02.03
04.02.04
05.00.00
05.01.00
05.01.01
05.01.02
05.01.03
05.02.00
05.02.01
05.02.02
05.02.03
06.00.00
CIP N 33716
DESCRIPCION
CURADO DE CONCRETO
PRESUPUESTO BASE
UND
M2
Metrado
53.20
Precio Unit
1.69
MUROS Y TABIQUES
MUROS
MURO DE CABEZA LADILLO K.K. 18 HUECOS CON CEMENTO ARENAM2
351.46
99.18
MURO DE SOGA LADILLO K.K. 18 HUECOS CON CEMENTO ARENA M2
376.74
66.34
MURO DE PIEDRA
MURO DE PIEDRA PARTIDA ASENTADA CON MORTERO 1:8
M3
181.15
144.26
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO DE MUROS, COLUMNAS Y VIGAS
TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO:ARENA
M2
2,901.27
24.91
TARRAJEO DE SUPERF. COLUMNAS
M2
233.45
29.54
TARRAJEO DE SUPERF. VIGAS
M2
659.16
29.93
DERRAMES Y BRUAS
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS
M
512.10
9.76
VESTIDURA DE SUPERF. DE FONDO DE ESCALERA CON CEMENTO-ARENA
M2
81.00
24.56
BRUADO DE MURO
M
582.79
3.15
CURADO DE CONCRETO
M2
81.00
1.69
CIELO RASO
CIELO RASO
CIELO RASO DE MADERA PINO MACHIHEMBRADA 3/4"
M2
814.21
50.79
ENLUCIDO DE CIELO RASO CON MORTERO 1:4
M2
796.01
24.91
PISOS Y VEREDAS
PISOS
FALSO PISO DE 4" DE CONCRETO 1:10
M2
159.85
38.17
PISO DE CEMENTO PULIDO E=1" BRUADO 2
M2
220.15
53.45
PISO CERAMICO DE 30x30 EN INTERIORES
M2
221.33
62.53
PISO DE MADERA MACHIHEMBRADA TORNILLO 1"
M2
673.38
82.25
PISO DE CEMENTO FROTACHADO EN CIRCULACION
M2
94.96
53.45
PISO DE PIEDRA ASENTADA EN CONCRETO
M2
72.68
85.06
VEREDAS
VEREDA DE CONCRETO DE e=4"
M2
118.86
57.23
ENCOFRADO PARA VEREDAS
M2
41.09
35.52
JUNTAS DE DILATACION
M
24.00
7.64
CURADO DE CONCRETO
M2
118.86
1.69
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE LAJA (PIEDRA) DE LA ZONA H=30 cm
M2
33.26
80.72
ZOCALO DE CERAMICA EN LABORATORIO
M
10.26
11.03
ZOCALO DE LAJA EN COLUMNAS H=30 cm
M2
95.61
80.72
CONTRAZOCALOS
CONTRAZOCALO DE CERAMICA H=10cm
M
147.87
11.03
CONTRAZOCALO DE MADERA H=10cm
M
224.65
14.34
CONTRAZOCALO DE CEMENTO PULIDO C/MORTERO 1:2 C:A, E=2cmMy H=30cm (EN
104.33
INTERIORES) 8.93
CARPINTERIA METALICA Y CERRAJERIA
Subtotal (S/.)
89.91
59,850.73
34,857.80
24,992.93
26,132.70
26,132.70
98,895.41
72,270.64
6,896.11
19,728.66
8,960.14
4,998.10
1,989.36
1,835.79
136.89
61,182.34
41,353.73
19,828.61
98,351.53
6,101.47
11,767.02
13,839.76
55,385.51
5,075.61
6,182.16
8,646.11
6,802.36
1,459.52
183.36
200.87
10,515.56
2,684.75
113.17
7,717.64
5,784.16
1,631.01
3,221.48
931.67
PRESUPUESTO DE OBRA
OBRA
A.D.S.
: LP N 03-2011-GRA
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
PRESUP. REFORMULADO
: S/. 2446,759.15
F. R.
: 1.00000
SUPERVISOR
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
RESIDENTE
ITEM
06.01.00
06.01.01
06.01.02
06.01.03
06.02.00
06.02.01
06.02.02
06.03.00
06.03.01
06.03.02
06.03.03
06.03.04
06.03.05
07.00.00
07.01.00
07.01.01
07.01.02
07.01.03
07.01.04
07.01.05
07.02.00
07.02.01
07.02.02
07.02.03
08.00.00
08.01.00
08.01.01
08.01.02
08.01.03
08.01.04
08.02.00
08.02.01
08.02.02
08.02.03
08.02.04
09.00.00
09.01.00
09.01.01
10.00.00
10.01.00
10.01.01
10.01.02
10.01.03
10.01.04
10.01.05
CIP N 33716
DESCRIPCION
PRESUPUESTO BASE
UND
Metrado
PUERTAS Y MALLAS
MALLA EN CERCO PERIMETRICO FRONTAL
M2
91.58
PUERTAS METALICA PRINCIPAL
M2
9.00
PUERTAS METALICA SECUNDARIA
M2
4.50
ACCESORIOS
ASTAS PARA BANDERAS DE 4"
M
12.00
COLOCADO DE ANGULOS DE ANCLAJE DE 5" PARA VIGAS DE MADERA
UND
88.00
CERRAJERIA
BISAGRA CAPUCHINA DE 4"x4"
UND
84.00
BISAGRA CAPUCHINA DE 2"x2"
UND
456.00
CERRADURA PARA PUERTA
PZA
21.00
CERROJO DE ALUMINIO DE 2"
UND
152.00
MANIJA DE BRONCE PARA PUERTA
UND
21.00
ESTRUCTURA DE TECHO Y COBERTURAS
ESTRUCTURA DE MADERA
CORREAS DE MADERA TORNILLO 2"x2"
M
857.98
CORREAS DE MADERA TORNILLO 2.5"x2.5" PARA TECHO ESCALERAMCEPILLADO
151.96
VIGUETAS DE MADERA TORNILLO 4"x6"
M
1,277.14
VIGUETAS DE MADERA DE 6"x6" PARA ALEROS
M
54.97
VIGAS DE MADERA DE EUCALIPTO DE 10"
M
82.37
COBERTURAS
COBERTURA DE TEJA ANDINA
M2
929.89
CUMBRERA CON TEJA ANDINA
M
96.50
COBERTURA CON FIBRAFORTE TRANSLUCIDO
M2
79.20
CARPINTERIA DE MADERA
PUERTAS Y VENTANAS
PUERTA DE MADER CEDRO APANELADA (DE UNA HOJA)
M2
53.90
MAMPARA DE MADERA CALADA
M2
16.17
PUERTA DE MADER CEDRO APANELADA (DE DOS HOJAS)
M2
7.84
VENTANA DE MADERA CEDRO C/SEGURO)
M2
150.03
BARANDAS
BARANDA DE MADERA CEDRO DE 4"x3"
M
97.20
COLUMNAS DE MADERA EN PASADIZO Y ESCALERAS DE 6"x3 1/2" M
75.24
COLUMNA CIRCULAR DE MADERA PARA ESCALERA DE 8"
M
4.25
TABLONES DE MADERA TORNILLO 1.5"x12"
M
93.60
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS
VIDRIOS SEMIDOBLES
P2
1,829.98
PINTURA
PINTURA LATEX
PINTURA LATEX EN CIELO RASO
M2
796.01
PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES
M2
2,759.04
PINTURA LATEX EN SUPERFICIE DE COLUMNAS
M2
233.45
PINTURA LATEX EN SUPERFICIE DE VIGAS
M2
599.24
PINTURA LATEX EN DERRAME DE PUERTA Y VENTANAS
M
521.10
Precio Unit
92.12
72.03
72.03
30.55
14.68
28.25
20.25
93.96
14.38
27.12
13.74
16.26
35.94
129.30
17.81
47.50
22.60
40.61
Subtotal (S/.)
9,408.76
8,436.35
648.27
324.14
1,658.44
366.60
1,291.84
16,335.44
2,373.00
9,234.00
1,973.16
2,185.76
569.52
68,734.56
11,788.65
2,470.87
45,900.41
7,107.62
1,467.01
49,566.99
44,169.78
2,180.90
3,216.31
46.94
67.94
61.50
42.97
88,220.73
36,309.20
7,179.80
5,281.34
39,450.39
13,957.75
4,562.57
5,111.81
261.38
4,021.99
6.34
11,602.07
11,602.07
12.63
9.32
10.18
10.18
7.46
48,132.05
10,053.61
25,714.25
2,376.52
6,100.26
3,887.41
673.64
444.02
673.64
262.95
PRESUPUESTO DE OBRA
OBRA
A.D.S.
: LP N 03-2011-GRA
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
PRESUP. REFORMULADO
: S/. 2446,759.15
F. R.
: 1.00000
SUPERVISOR
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
RESIDENTE
ITEM
CIP N 33716
DESCRIPCION
PRESUPUESTO BASE
UND
10.02.00
SELLADOR Y/O BARNIZ
10.02.01
PINTURA BARNIZ EN CARPINTERIA DE MADERA
M2
11.00.00
VARIOS
11.01.00
CANALETA PLUVIAL
11.01.01
CANALETA PLUVIAL DE 6"
M
11.01.02
TUBERIA DE BAJADA PVC 3"
M
11.02.00
MESA DE LAVADEROS EN LABORATORIO
11.02.01
ASENTADO DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4x1.5cm M2
11.02.02
CONCRETO F'C=210 KG/CM2
M3
11.02.03
ASENTADO DE MAYOLICA 20x20 cm BLANCA DE 1RA
M2
11.03.00
MOBILIARIO - PIZARRAS
11.03.01
PIZARRA ACRILICA
UND
11.03.02
PLACA RECORDATORIA
UND
11.03.03
MOBILIARIO DE MADERA TORNILLO
MOD
12.00.00
MITIGACION DE IMPACTOS
12.01.00
AMBIENTALES
12.01.01
LIMPIEZA GENERAL DE LA OBRA
GLB
12.01.02
GESTION DE RESIDUOS
GLB
12.01.03
MITIGACION DE IMPACTO AMBIENTAL - CHARLAS
GLB
12.01.04
CERCO VIVO
GLB
12.02.00
SEGURIDAD INDUSTRIAL
12.02.01
EQUIPOS E IMPLEMENTOS DE SEGURIDAD
GLB
INSTALACIONES ELECTRICAS
01.00.00
INSTALACIONES ELECTRICAS
01.01.00
ACOMETIDA
01.01.01
CABLE AWG-TW 16 MM
M
01.01.02
CABLE AWG-TW 6 MM
M
01.01.03
CABLE AWG-TW 4 MM
M
01.01.04
TUBERIA PVC SAP 40 MM
M
01.01.05
TUBERIA PVC SAP 25 MM
M
01.01.06
POZO CONEXIN A TIERRA
UND
01.01.07
TABLERO GENERAL (TG) 1-2x90A, 5-2x45A
UND
01.01.08
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x90A
PZA
01.01.09
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x45A
PZA
01.01.10
TABLERO DE DISTRIBUCION (TD) 1-2x45A, 2-2x45A, 2-2x20A
UND
01.01.11
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x45A
PZA
01.01.12
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x15A
PZA
01.01.13
INTERRUPTOR THERMOMAGNETICO MONOFASICA 2x20A
PZA
01.01.14
CAJA DE PASO CUADRADA 100x50 mm
UND
01.02.00
DISTRIBUCION
Metrado
Precio Unit
488.16
14.38
165.00
162.00
37.50
27.25
6.75
5.13
6.41
99.18
389.11
63.74
11.00
1.00
11.00
243.00
202.50
9,410.00
1.00
1.00
1.00
1.00
1,250.00
2,500.00
1,000.00
1,000.00
1.00
6,538.20
25.30
332.46
166.23
12.65
166.23
1.00
1.00
1.00
5.00
5.00
5.00
10.00
10.00
11.00
5.10
2.25
1.73
6.05
5.00
479.86
295.55
63.93
55.83
82.16
55.83
43.68
43.68
4.35
Subtotal (S/.)
7,019.74
7,019.74
10,602.00
6,187.50
4,414.50
3,074.17
669.47
1,996.13
408.57
106,385.50
2,673.00
202.50
103,510.00
5,750.00
1,250.00
2,500.00
1,000.00
1,000.00
6,538.20
6,538.20
4,802.22
129.03
748.04
287.58
76.53
831.15
479.86
295.55
63.93
279.15
410.80
279.15
436.80
436.80
47.85
30,377.39
PRESUPUESTO DE OBRA
OBRA
A.D.S.
: LP N 03-2011-GRA
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
PRESUP. REFORMULADO
: S/. 2446,759.15
F. R.
: 1.00000
SUPERVISOR
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
RESIDENTE
ITEM
CIP N 33716
DESCRIPCION
PRESUPUESTO BASE
UND
Metrado
01.02.01
CABLE AWG-TW 4 MM
M
181.21
01.02.02
CABLE AWG-TW 2.5 MM
M
1,738.78
01.02.03
TUBERIA PVC - SEL 20 MM
M
830.81
01.02.04
SALIDA DE TECHO
PTO
105.00
01.02.05
TOMACORRIENTE DOBLE CON LINEA A TIERRA
UND
23.00
01.02.06
TOMACORRIENTE SIMPLE CON LINEA A TIERRA
UND
28.00
01.02.07
FLUORESCENTE RECTO ISPE 2x40 W INCLUYENDO EQUIPO Y PANTALLA
UND
40.00
01.02.08
FLUORESCENTE COLGANTE ISPE 2x40 W INCLUYENDO EQUIPO YUND
PANTALLA 34.00
01.02.09
FLUORESCENTE CIRCULAR ISPE 1x40 W INCLUYENDO EQUIPO Y PANTALLA
UND
31.00
01.02.10
SALIDA DE PARED (BRAQUETES) CON PVC
PTO
3.00
01.02.11
LUMINARIAS EN POSTES DE CEMENTO
UND
6.00
INSTALACIONES SANITARIAS
01.00.00
INSTALACIONES SANITARIAS
01.01.00
SISTEMA DE DESAGUE
01.01.01
SALIDA DE DESAGUE EN PVC SAL 2"
pza
7.00
01.01.02
SALIDA DE DESAGUE EN PVC SAL 4"
pza
1.00
01.01.03
SUMIDEROS CROMADOS DE 2", PROVISION Y COLOCACION
pza
4.00
01.01.04
REGISTRO CROMADO DE 2", PROVISION Y COLOCACION
pza
2.00
01.01.05
TUBERIA DE PVC SAL 4" (DESAGUE)
pza
52.80
01.01.06
TUBERIA DE PVC SAL 2" (DESAGUE)
UND
39.60
01.01.07
CAJA DE REGISTRO DE DESAGUE 12"x24" PRE FABRICADO Y TAPApza
F F
2.00
01.02.00
SISTEMA DE AGUA FRIA
01.02.01
SALIDA DE AGUA FRIA CON TUBERIA DE PVC SAP 1/2"
pto
8.00
01.02.02
TUBERIA DE PVC SAP 1/2"
pto
48.95
01.02.03
VALVULA COMPUERTA DE UNION ROSCADA DE 1/2"
pto
3.00
01.02.04
CAJA DE REGISTRO PRE FABRICADO Y TAPA F F P/MEDIDOR DE AGUA
pto
1.00
01.03.00
APARATOS Y ACCESORIOS SANITARIOS
01.03.01
INODORO TANQUE BAJO DE COLOR INC/ACCESORIOS
ML
1.00
01.03.02
LAVATORIOS DE PEDESTAL DE COLOR INC/ACCESORIOS
ML
1.00
01.03.03
LAVATORIO DE ACERO INC/ACCESORIOS
ML
6.00
01.03.04
COLOCACION DE APARATOS SANITARIOS
ML
8.00
01.03.05
COLOCACION DE ACCESORIOS SANITARIOS
M3
8.00
01.00.00
FLETE GLOBAL DE OBRA
01.01.00
FLETE TERRESTRE
01.01.01
FLETE TERRESTRE HUARAZ - HUAMAS
GLB
1.00
COSTO DIRECTO
Precio Unit
1.73
1.20
4.79
69.85
160.59
158.59
79.80
84.30
50.12
108.40
98.72
Subtotal (S/.)
313.49
2,086.54
3,979.58
7,334.25
3,693.57
4,440.52
3,192.00
2,866.20
1,553.72
325.20
592.32
149.85
121.50
115.00
19.82
19.82
1,980.81
458.01
73.81
211.68
78.44
542.78
304.13
311.96
2,598.30
349.44
1,576.19
520.74
151.93
1,278.47
149.85
121.50
690.00
158.56
158.56
98,775.83
98,775.83
98,775.83
65.43
73.81
52.92
39.22
10.28
7.68
155.98
43.68
32.20
173.58
151.93
S/. 1,765,481.38
S/. 17,654.81
S/. 149,150.00
UTILIDADES (8%)
SUBTOTAL
IMPUESTO IGV (18%)
TOTAL PRESUPUESTO CONTRATADO
S/. 141,238.51
S/. 2,073,524.70
S/. 373,234.45
S/. 2,446,759.15
CALCULO DE LA MULTA
OBRA
A.D.M.C.
: LP N 03-2011-GRA
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
: S/. 2467,494.40
: S/. 2467,494.40
P. OFERTADO
PRESUP. REFORMULADO
: S/. 2446,759.15
F. R.
: 1.00000
SUPERVISOR
: CONSORCIO YANAMA - REP. LEGAL: ING JUAN CARLOS GALLO ZEGARRA CIP N 71538
RESIDENTE
CIP N 33716
Atrazo total
4/1/2011
210
10/28/2011
0
210
10/28/2011
9/29/2011
0 Das calendario
0 Das calendario
S/.
S/.
S/.
2,446,759.15
244,675.92
0.00
S/.
0.00
S/.
0.00
Obra
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
: LP N 03-2011-GRA
MONTO
VALORIZADO
SIN IGV S/.
MONTO
VALORIZADO
CON IGV S/.
En Efectivo
I.G.V.
TOTAL
En Efectivo
I.G.V.
TOTAL
SALDO DE
DIFERENCIA A
CANCELAR
3 = (1) - (2)
VALORIZACION N 01
525,346.34
619,908.68
526,238.91
94,723.00
620,961.91
525,346.34
94,562.34
619,908.68
1,053.23
VALORIZACION N 02
325,470.18
384,054.81
324,408.11
58,393.46
382,801.57
325,470.18
58,584.63
384,054.81
-1,253.24
VALORIZACION N 03
359,509.74
424,221.49
359,635.18
64,734.33
424,369.51
359,509.74
64,711.75
424,221.49
148.02
VALORIZACION N 04
286,781.88
338,402.62
291,849.55
52,532.92
344,382.47
286,781.88
51,620.74
338,402.62
5,979.85
VALORIZACION N 05
340,469.91
401,754.49
341,193.26
61,414.79
402,608.05
340,469.91
61,284.58
401,754.49
853.57
VALORIZACION N 06
280,433.95
330,912.06
280,070.61
50,412.71
330,483.32
280,433.95
50,478.11
330,912.06
-428.74
TOTAL VALORIZACION
2,118,012.00
2,499,254.15
2,123,395.63
382,211.21
2,505,606.84
2,118,012.00
381,242.15
2,499,254.15
6,352.69
2,123,395.63
382,211.21
2,505,606.84
2,118,012.00
381,242.15
2,499,254.15
6,352.69
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
ITEM
DESCRIPCION
PRESUPUESTO BASE
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
UND
Metrado
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
SALDO
S/.
ESTRUCTURAS
01.00.00
01.01.00
OBRAS PROVISIONALES
CAMPAMENTO Y CARTEL DE OBRAS
01.01.01
GLB
1.00
1,012.50
1,012.50
1.00
1,012.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1,012.50
0.00
0.00
01.01.02
1.00
744.01
744.01
1.00
744.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
744.01
0.00
0.00
50.00
5.14
257.00
50.00
257.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50.00
257.00
0.00
0.00
01.02.00
01.02.01
02.00.00
02.01.00
INSTALACIONES PROVISIONALES
INSTALACION DE AGUA POTABLE PARA LA CONSTRUCCION
M
OBRAS PRELIMINARES
DEMOLICION DE INFRAESTRUCTURA
02.01.01
DESTECHADO DE COBERTURA
M2
848.72
10.45
8,869.12
848.72
8,869.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
848.72
8,869.12
0.00
0.00
02.01.02
M2
848.72
69.81
59,249.14
848.72
59,249.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
848.72
59,249.14
0.00
0.00
02.01.03
M3
738.68
38.62
28,527.82
738.68
28,527.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
738.68
28,527.82
0.00
0.00
02.01.04
319.84
18.10
5,789.10
319.84
5,789.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
319.84
5,789.10
0.00
0.00
02.01.05
M3
1,058.52
19.28
20,408.27
1,058.52
20,408.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,058.52
20,408.27
0.00
0.00
02.02.00
LIMPIEZA Y TRAZO
02.02.01
M2
2,179.00
3.38
7,365.02
2,179.00
7,365.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,179.00
7,365.02
0.00
0.00
02.02.02
TRAZO Y REPLANTEO
M2
2,179.00
3.53
7,691.87
2,179.00
7,691.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,179.00
7,691.87
0.00
0.00
03.00.00
03.01.00
MOVIMIENTO DE TIERRAS
MOVIMIENTO DE TIERRAS
03.01.01
M3
304.50
32.80
9,987.60
304.50
9,987.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
304.50
9,987.60
0.00
0.00
03.01.02
M3
169.04
32.80
5,544.51
169.04
5,544.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
169.04
5,544.51
0.00
0.00
03.01.03
M3
649.00
32.80
21,287.20
437.72
14,357.22
146.52
4,805.86
64.76
2,124.13
0.00
0.00
0.00
0.00
0.00
0.00
649.00
21,287.20
0.00
0.00
03.01.04
M2
109.64
6.50
712.66
109.64
712.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
109.64
712.66
0.00
0.00
03.01.05
M2
359.73
6.38
2,295.08
107.53
686.04
180.25
1,150.00
71.95
459.04
0.00
0.00
0.00
0.00
0.00
0.00
359.73
2,295.08
0.00
0.00
03.01.06
M3
304.50
16.40
4,993.80
176.40
2,892.96
85.40
1,400.56
42.70
700.28
0.00
0.00
0.00
0.00
0.00
0.00
304.50
4,993.80
0.00
0.00
03.01.07
243.60
3.67
894.01
0.00
0.00
161.20
591.60
82.40
302.41
0.00
0.00
0.00
0.00
0.00
0.00
243.60
894.01
0.00
0.00
03.01.08
M3
878.94
19.28
16,945.96
734.86
14,168.10
100.08
1,929.54
44.00
848.32
0.00
0.00
0.00
0.00
0.00
0.00
878.94
16,945.96
0.00
0.00
04.01.01
268.76
186.08
50,010.86
150.72
28,045.98
0.00
0.00
118.04
21,964.88
0.00
0.00
0.00
0.00
0.00
0.00
268.76
50,010.86
0.00
0.00
04.01.02
23.67
255.11
6,038.45
7.19
1,834.24
14.18
3,617.46
2.30
586.75
0.00
0.00
0.00
0.00
0.00
0.00
23.67
6,038.45
0.00
0.00
04.01.03
201.66
23.64
4,767.24
57.51
1,359.54
113.48
2,682.67
30.67
725.04
0.00
0.00
0.00
0.00
0.00
0.00
201.66
4,767.24
0.00
0.00
04.01.04
CURADO DE CONCRETO
M2
201.66
1.69
340.81
57.51
97.19
113.48
191.78
30.67
51.83
0.00
0.00
0.00
0.00
0.00
0.00
201.66
340.81
0.00
0.00
04.02.01
264.73
30.47
8,066.32
114.71
3,495.21
150.02
4,571.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
264.73
8,066.32
0.00
0.00
04.02.02
CURADO DE CONCRETO
M2
259.66
1.69
438.83
114.71
193.86
144.95
244.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
259.66
438.83
0.00
0.00
M2
78.00
35.52
2,770.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
78.00
2,770.56
78.00
2,770.56
0.00
0.00
04.00.00
04.01.00
04.02.00
04.03.00
04.03.01
CONCRETO SIMPLE
CIMIENTOS Y SOBRECIMIENTOS
SOLADOS
PATIO DE HONOR
ENCOFRADO Y DESENCOFRADO
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
ITEM
DESCRIPCION
PRESUPUESTO BASE
UND
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
Metrado
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
VALORIZACION 06
Metrado
S/.
ACUMULADO
Metrado
S/.
SALDO
S/.
04.03.02
M3
78.75
338.61
26,665.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
78.75
26,665.54
78.75
26,665.54
0.00
0.00
04.03.03
FROTACHADO
M2
630.00
15.54
9,790.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
630.00
9,790.20
630.00
9,790.20
0.00
0.00
04.03.04
JUNTAS DE DILATACION
399.00
7.64
3,048.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
399.00
3,048.36
399.00
3,048.36
0.00
0.00
04.03.05
CURADO DE CONCRETO
M2
630.00
1.69
1,064.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
630.00
1,064.70
630.00
1,064.70
0.00
0.00
04.04.00
CANALETAS
04.04.01
ENCOFRADO Y DESENCOFRADO
M2
117.54
35.52
4,175.02
0.00
0.00
0.00
0.00
0.00
0.00
44.40
1,577.09
73.14
2,597.93
0.00
0.00
117.54
4,175.02
0.00
0.00
04.04.02
M3
15.97
338.61
5,407.60
0.00
0.00
0.00
0.00
0.00
0.00
5.00
1,693.05
10.97
3,714.55
0.00
0.00
15.97
5,407.60
0.00
0.00
04.04.03
VESTIDURA DE CANAL
M2
124.18
15.54
1,929.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
124.18
1,929.76
0.00
0.00
124.18
1,929.76
0.00
0.00
04.04.04
JUNTAS DE DILATACION
31.05
7.64
237.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31.05
237.22
0.00
0.00
31.05
237.22
0.00
0.00
04.04.05
REJILLAS
M2
30.00
35.52
1,065.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30.00
1,065.60
30.00
1,065.60
0.00
0.00
05.00.00
05.01.00
CONCRETO ARMADO
ZAPATAS
05.01.01
M3
68.83
389.11
26,782.44
68.83
26,782.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
68.83
26,782.44
0.00
0.00
05.01.02
KG
1,765.67
4.04
7,133.31
1,765.67
7,133.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,765.67
7,133.31
0.00
0.00
05.01.03
CURADO DE CONCRETO
M2
114.71
1.69
193.86
114.71
193.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
114.71
193.86
0.00
0.00
05.02.00
VIGAS DE CIMENTACION
05.02.01
M3
23.12
389.11
8,996.22
18.61
7,241.34
0.00
0.00
4.51
1,754.89
0.00
0.00
0.00
0.00
0.00
0.00
23.12
8,996.22
0.00
0.00
05.02.02
ENCOFRADO Y DESENCOFRADO
M2
184.98
35.52
6,570.49
148.86
5,287.51
0.00
0.00
36.12
1,282.98
0.00
0.00
0.00
0.00
0.00
0.00
184.98
6,570.49
0.00
0.00
05.02.03
KG
2,190.56
4.04
8,849.86
1,883.03
7,607.44
0.00
0.00
307.53
1,242.42
0.00
0.00
0.00
0.00
0.00
0.00
2,190.56
8,849.86
0.00
0.00
05.02.04
CURADO DE CONCRETO
M2
59.42
1.69
100.42
46.52
78.62
0.00
0.00
12.90
21.80
0.00
0.00
0.00
0.00
0.00
0.00
59.42
100.42
0.00
0.00
05.03.00
COLUMNAS
05.03.01
M3
126.12
349.62
44,094.07
42.12
14,725.99
35.73
12,491.92
48.27
16,876.16
0.00
0.00
0.00
0.00
0.00
0.00
126.12
44,094.07
0.00
0.00
05.03.02
ENCOFRADO Y DESENCOFRADO
M2
729.85
35.52
25,924.27
259.39
9,213.53
209.00
7,423.68
261.46
9,287.06
0.00
0.00
0.00
0.00
0.00
0.00
729.85
25,924.27
0.00
0.00
05.03.03
KG
19,425.73
4.04
78,479.95
13,401.02
54,140.12
3,582.61
14,473.74
2,442.10
9,866.08
0.00
0.00
0.00
0.00
0.00
0.00
19,425.73
78,479.95
0.00
0.00
05.03.04
CURADO DE CONCRETO
M2
729.85
1.69
1,233.45
259.39
438.37
209.00
353.21
261.46
441.87
0.00
0.00
0.00
0.00
0.00
0.00
729.85
1,233.45
0.00
0.00
05.04.00
VIGAS
05.04.01
M3
83.06
389.11
32,319.48
0.00
0.00
52.72
20,513.88
17.52
6,817.21
12.82
4,988.39
0.00
0.00
0.00
0.00
83.06
32,319.48
0.00
0.00
05.04.02
ENCOFRADO Y DESENCOFRADO
M2
838.75
35.52
29,792.40
0.00
0.00
523.21
18,584.42
181.81
6,457.89
133.73
4,750.09
0.00
0.00
0.00
0.00
838.75
29,792.40
0.00
0.00
05.04.03
KG
9,937.99
4.04
40,149.48
0.00
0.00
6,818.91
27,548.40
2,345.52
9,475.90
773.56
3,125.18
0.00
0.00
0.00
0.00
9,937.99
40,149.48
0.00
0.00
05.04.03
CURADO DE CONCRETO
M2
838.75
1.69
1,417.49
0.00
0.00
523.21
884.22
181.81
307.26
133.73
226.00
0.00
0.00
0.00
0.00
838.75
1,417.49
0.00
0.00
05.05.00
LOSAS ALIGERADAS
05.05.01
M3
38.09
389.11
14,821.20
0.00
0.00
16.19
6,299.69
21.90
8,521.51
0.00
0.00
0.00
0.00
0.00
0.00
38.09
14,821.20
0.00
0.00
05.05.02
ENCOFRADO Y DESENCOFRADO
M2
423.20
35.52
15,032.06
0.00
0.00
243.31
8,642.37
179.89
6,389.69
0.00
0.00
0.00
0.00
0.00
0.00
423.20
15,032.06
0.00
0.00
05.05.03
17.37
7,350.98
0.00
0.00
243.31
4,226.29
179.89
3,124.69
0.00
0.00
0.00
0.00
0.00
0.00
423.20
7,350.98
0.00
0.00
05.05.04
KG
3,372.34
4.04
13,624.25
0.00
0.00
1,821.52
7,358.94
1,550.82
6,265.31
0.00
0.00
0.00
0.00
0.00
0.00
3,372.34
13,624.25
0.00
0.00
05.05.04
CURADO DE CONCRETO
M2
423.20
1.69
715.21
0.00
0.00
243.31
411.19
179.89
304.01
0.00
0.00
0.00
0.00
0.00
0.00
423.20
715.21
0.00
0.00
05.06.00
ESCALERAS
05.06.01
M3
6.44
389.11
2,505.87
0.00
0.00
0.00
0.00
3.22
1,252.93
3.22
1,252.93
0.00
0.00
0.00
0.00
6.44
2,505.87
0.00
0.00
05.06.02
ENCOFRADO Y DESENCOFRADO
M2
81.00
35.52
2,877.12
0.00
0.00
0.00
0.00
40.50
1,438.56
40.50
1,438.56
0.00
0.00
0.00
0.00
81.00
2,877.12
0.00
0.00
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
ITEM
DESCRIPCION
05.06.03
05.06.04
05.07.00
PRESUPUESTO BASE
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
SALDO
S/.
1,213.09
0.00
0.00
136.89
0.00
0.00
UND
Metrado
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
KG
300.27
4.04
1,213.09
0.00
0.00
0.00
0.00
150.14
606.55
150.14
606.55
0.00
0.00
0.00
0.00
300.27
CURADO DE CONCRETO
M2
81.00
1.69
136.89
0.00
0.00
0.00
0.00
40.50
68.45
40.50
68.45
0.00
0.00
0.00
0.00
81.00
MURO DE CONTENCION
05.07.01
M3
153.65
389.11
59,786.75
0.00
0.00
82.13
31,957.60
71.52
27,829.15
0.00
0.00
0.00
0.00
0.00
0.00
153.65
59,786.75
0.00
0.00
05.07.02
ENCOFRADO Y DESENCOFRADO
M2
363.68
35.52
12,917.91
0.00
0.00
194.40
6,905.09
169.28
6,012.83
0.00
0.00
0.00
0.00
0.00
0.00
363.68
12,917.91
0.00
0.00
05.07.03
KG
5,515.95
4.04
22,284.44
0.00
0.00
3,556.42
14,367.94
1,959.53
7,916.50
0.00
0.00
0.00
0.00
0.00
0.00
5,515.95
22,284.44
0.00
0.00
05.07.04
JUNTA DE DILATACION
40.00
7.64
305.60
0.00
0.00
20.00
152.80
20.00
152.80
0.00
0.00
0.00
0.00
0.00
0.00
40.00
305.60
0.00
0.00
05.07.05
CURADO DE CONCRETO
M2
363.68
1.69
614.62
0.00
0.00
194.40
328.54
169.28
286.08
0.00
0.00
0.00
0.00
0.00
0.00
363.68
614.62
0.00
0.00
05.08.00
MURO FRONTAL
05.08.01
M3
9.41
389.11
3,661.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.41
3,661.53
0.00
0.00
9.41
3,661.53
0.00
0.00
05.08.02
ENCOFRADO Y DESENCOFRADO
M2
53.20
35.52
1,889.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53.20
1,889.66
0.00
0.00
53.20
1,889.66
0.00
0.00
05.08.03
KG
26.55
4.04
107.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.55
107.26
0.00
0.00
26.55
107.26
0.00
0.00
05.08.04
CURADO DE CONCRETO
M2
53.20
1.69
89.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53.20
89.91
0.00
0.00
53.20
89.91
0.00
0.00
01.01.01
99.18
34,857.80
0.00
0.00
243.94
24,193.97
107.52
10,663.83
0.00
0.00
0.00
0.00
0.00
0.00
351.46
34,857.80
0.00
0.00
01.01.02
66.34
24,992.93
0.00
0.00
231.82
15,378.94
106.60
7,071.84
38.32
2,542.15
0.00
0.00
0.00
0.00
376.74
24,992.93
0.00
0.00
144.26
26,132.70
0.00
0.00
0.00
0.00
72.71
10,489.14
67.10
9,679.85
0.00
0.00
41.34
5,963.71
181.15
26,132.70
0.00
0.00
ARQUITECTURA
01.00.00
01.01.00
01.02.00
01.02.01
02.00.00
02.01.00
MUROS Y TABIQUES
MUROS
MURO DE PIEDRA
MURO DE PIEDRA PARTIDA ASENTADA CON MORTERO
M31:8
181.15
02.01.01
24.91
72,270.64
0.00
0.00
0.00
0.00
964.16
24,017.23
1,337.50
33,317.13
599.61
14,936.29
0.00
0.00
2,901.27
72,270.64
0.00
0.00
02.01.02
M2
233.45
29.54
6,896.11
0.00
0.00
0.00
0.00
100.80
2,977.63
132.65
3,918.48
0.00
0.00
0.00
0.00
233.45
6,896.11
0.00
0.00
02.01.03
M2
659.16
29.93
19,728.66
0.00
0.00
0.00
0.00
165.55
4,954.91
493.61
14,773.75
0.00
0.00
0.00
0.00
659.16
19,728.66
0.00
0.00
02.02.00
DERRAMES Y BRUAS
02.02.01
9.76
4,998.10
0.00
0.00
0.00
0.00
180.00
1,756.80
332.10
3,241.30
0.00
0.00
0.00
0.00
512.10
4,998.10
0.00
0.00
02.02.02
24.56
1,989.36
0.00
0.00
0.00
0.00
0.00
0.00
81.00
1,989.36
0.00
0.00
0.00
0.00
81.00
1,989.36
0.00
0.00
02.02.03
BRUADO DE MURO
582.79
3.15
1,835.79
0.00
0.00
0.00
0.00
82.79
260.79
500.00
1,575.00
0.00
0.00
0.00
0.00
582.79
1,835.79
0.00
0.00
02.02.04
CURADO DE CONCRETO
M2
81.00
1.69
136.89
0.00
0.00
0.00
0.00
0.00
0.00
81.00
136.89
0.00
0.00
0.00
0.00
81.00
136.89
0.00
0.00
03.01.01
814.21
50.79
41,353.73
0.00
0.00
0.00
0.00
250.21
12,708.17
564.00
28,645.56
0.00
0.00
0.00
0.00
814.21
41,353.73
0.00
0.00
03.01.02
M2
796.01
24.91
19,828.61
0.00
0.00
0.00
0.00
400.01
9,964.25
396.00
9,864.36
0.00
0.00
0.00
0.00
796.01
19,828.61
0.00
0.00
03.00.00
03.01.00
04.00.00
04.01.00
CIELO RASO
CIELO RASO
PISOS Y VEREDAS
PISOS
04.01.01
M2
159.85
38.17
6,101.47
0.00
0.00
159.85
6,101.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
159.85
6,101.47
0.00
0.00
04.01.02
M2
220.15
53.45
11,767.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
220.15
11,767.02
0.00
0.00
220.15
11,767.02
0.00
0.00
04.01.03
M2
221.33
62.53
13,839.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
221.33
13,839.76
0.00
0.00
221.33
13,839.76
0.00
0.00
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
ITEM
DESCRIPCION
PRESUPUESTO BASE
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
UND
Metrado
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
SALDO
S/.
04.01.04
M2
673.38
82.25
55,385.51
0.00
0.00
0.00
0.00
0.00
0.00
202.01
16,615.65
471.37
38,769.85
0.00
0.00
673.38
55,385.51
0.00
0.00
04.01.05
94.96
53.45
5,075.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
94.96
5,075.61
0.00
0.00
94.96
5,075.61
0.00
0.00
04.01.06
M2
72.68
85.06
6,182.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
72.68
6,182.16
72.68
6,182.16
0.00
0.00
04.02.00
VEREDAS
04.02.01
M2
118.86
57.23
6,802.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
118.86
6,802.36
0.00
0.00
118.86
6,802.36
0.00
0.00
04.02.02
M2
41.09
35.52
1,459.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41.09
1,459.52
0.00
0.00
41.09
1,459.52
0.00
0.00
04.02.03
JUNTAS DE DILATACION
24.00
7.64
183.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
183.36
0.00
0.00
24.00
183.36
0.00
0.00
04.02.04
CURADO DE CONCRETO
M2
118.86
1.69
200.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
118.86
200.87
0.00
0.00
118.86
200.87
0.00
0.00
05.00.00
05.01.00
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
05.01.01
M2
33.26
80.72
2,684.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.26
2,684.75
33.26
2,684.75
0.00
0.00
05.01.02
10.26
11.03
113.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.26
113.17
10.26
113.17
0.00
0.00
05.01.03
M2
95.61
80.72
7,717.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
95.61
7,717.64
95.61
7,717.64
0.00
0.00
05.02.00
CONTRAZOCALOS
05.02.01
147.87
11.03
1,631.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
70.50
777.62
77.37
853.39
147.87
1,631.01
0.00
0.00
05.02.02
224.65
14.34
3,221.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
58.60
840.32
166.05
2,381.16
224.65
3,221.48
0.00
0.00
05.02.03
931.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.50
361.67
63.83
570.00
104.33
931.67
0.00
0.00
06.00.00
06.01.00
06.01.01
M2
91.58
92.12
8,436.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
91.58
8,436.35
91.58
8,436.35
0.00
0.00
06.01.02
M2
9.00
72.03
648.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
648.27
9.00
648.27
0.00
0.00
06.01.03
M2
4.50
72.03
324.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.50
324.14
4.50
324.14
0.00
0.00
12.00
30.55
366.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
366.60
12.00
366.60
0.00
0.00
14.68
1,291.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
88.00
1,291.84
0.00
0.00
88.00
1,291.84
0.00
0.00
06.02.00
ACCESORIOS
06.02.01
06.02.02
06.03.00
CERRAJERIA
06.03.01
UND
84.00
28.25
2,373.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
84.00
2,373.00
0.00
0.00
84.00
2,373.00
0.00
0.00
06.03.02
UND
456.00
20.25
9,234.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
456.00
9,234.00
0.00
0.00
456.00
9,234.00
0.00
0.00
06.03.03
PZA
21.00
93.96
1,973.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
1,973.16
0.00
0.00
21.00
1,973.16
0.00
0.00
06.03.04
UND
152.00
14.38
2,185.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
152.00
2,185.76
0.00
0.00
152.00
2,185.76
0.00
0.00
06.03.05
UND
21.00
27.12
569.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
569.52
0.00
0.00
21.00
569.52
0.00
0.00
857.98
07.00.00
07.01.00
07.01.01
13.74
11,788.65
0.00
0.00
0.00
0.00
425.06
5,840.32
432.92
5,948.32
0.00
0.00
0.00
0.00
857.98
11,788.65
0.00
0.00
07.01.02
2,470.87
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
151.96
2,470.87
0.00
0.00
151.96
2,470.87
0.00
0.00
07.01.03
1,277.14
35.94
45,900.41
0.00
0.00
0.00
0.00
443.25
15,930.41
833.89
29,970.01
0.00
0.00
0.00
0.00
1,277.14
45,900.41
0.00
0.00
07.01.04
54.97
129.30
7,107.62
0.00
0.00
0.00
0.00
0.00
0.00
54.97
7,107.62
0.00
0.00
0.00
0.00
54.97
7,107.62
0.00
0.00
07.01.05
82.37
17.81
1,467.01
0.00
0.00
0.00
0.00
38.50
685.69
43.87
781.32
0.00
0.00
0.00
0.00
82.37
1,467.01
0.00
0.00
07.02.00
COBERTURAS
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
ITEM
DESCRIPCION
PRESUPUESTO BASE
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
UND
Metrado
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
SALDO
S/.
07.02.01
M2
929.89
47.50
44,169.78
0.00
0.00
0.00
0.00
250.21
11,884.98
679.68
32,284.80
0.00
0.00
0.00
0.00
929.89
44,169.78
0.00
0.00
07.02.02
96.50
22.60
2,180.90
0.00
0.00
0.00
0.00
38.50
870.10
58.00
1,310.80
0.00
0.00
0.00
0.00
96.50
2,180.90
0.00
0.00
07.02.03
M2
79.20
40.61
3,216.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
79.20
3,216.31
79.20
3,216.31
0.00
0.00
08.01.01
53.90
673.64
36,309.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53.90
36,309.20
0.00
0.00
53.90
36,309.20
0.00
0.00
08.01.02
16.17
444.02
7,179.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.17
7,179.80
0.00
0.00
16.17
7,179.80
0.00
0.00
08.01.03
7.84
673.64
5,281.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.84
5,281.34
0.00
0.00
7.84
5,281.34
0.00
0.00
08.01.04
M2
150.03
262.95
39,450.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150.03
39,450.39
0.00
0.00
150.03
39,450.39
0.00
0.00
08.00.00
08.01.00
08.02.00
CARPINTERIA DE MADERA
PUERTAS Y VENTANAS
M2
BARANDAS
08.02.01
97.20
46.94
4,562.57
0.00
0.00
0.00
0.00
0.00
0.00
70.45
3,306.92
26.75
1,255.65
0.00
0.00
97.20
4,562.57
0.00
0.00
08.02.02
67.94
5,111.81
0.00
0.00
0.00
0.00
0.00
0.00
60.60
4,117.16
14.64
994.64
0.00
0.00
75.24
5,111.81
0.00
0.00
08.02.03
4.25
61.50
261.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.25
261.38
4.25
261.38
0.00
0.00
08.02.04
93.60
42.97
4,021.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
93.60
4,021.99
93.60
4,021.99
0.00
0.00
P2
1,829.98
6.34
11,602.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,829.98
11,602.07
1,829.98
11,602.07
0.00
0.00
09.00.00
09.01.00
09.01.01
10.00.00
10.01.00
VIDRIOS SEMIDOBLES
PINTURA
PINTURA LATEX
10.01.01
10.01.02
10.01.03
10.01.04
10.01.05
10.02.00
11.01.00
796.01
12.63
10,053.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
796.01
10,053.61
0.00
0.00
796.01
10,053.61
0.00
0.00
2,759.04
9.32
25,714.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,560.00
14,539.20
1,199.04
11,175.05
2,759.04
25,714.25
0.00
0.00
M2
233.45
10.18
2,376.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
130.00
1,323.40
103.45
1,053.12
233.45
2,376.52
0.00
0.00
M2
599.24
10.18
6,100.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
344.52
3,507.20
254.72
2,593.06
599.24
6,100.26
0.00
0.00
521.10
7.46
3,887.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
367.91
2,744.61
153.19
1,142.80
521.10
3,887.41
0.00
0.00
M2
488.16
14.38
7,019.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
360.16
5,179.10
128.00
1,840.64
488.16
7,019.74
0.00
0.00
10.02.01
11.00.00
M2
11.01.01
165.00
37.50
6,187.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
165.00
6,187.50
165.00
6,187.50
0.00
0.00
11.01.02
162.00
27.25
4,414.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
162.00
4,414.50
0.00
0.00
162.00
4,414.50
0.00
0.00
11.02.00
11.02.01
99.18
669.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.75
669.47
0.00
0.00
6.75
669.47
0.00
0.00
11.02.02
M3
5.13
389.11
1,996.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.13
1,996.13
0.00
0.00
5.13
1,996.13
0.00
0.00
11.02.03
6.41
63.74
408.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.41
408.57
6.41
408.57
0.00
0.00
11.03.00
MOBILIARIO - PIZARRAS
11.03.01
PIZARRA ACRILICA
UND
11.00
243.00
2,673.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
2,673.00
11.00
2,673.00
0.00
0.00
11.03.02
PLACA RECORDATORIA
UND
1.00
202.50
202.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
202.50
1.00
202.50
0.00
0.00
11.03.03
MOD
11.00
9,410.00
103,510.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
103,510.00
11.00
103,510.00
0.00
0.00
12.00.00
MITIGACION DE IMPACTOS
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
ITEM
12.01.00
DESCRIPCION
PRESUPUESTO BASE
VALORIZACION 01
UND
Metrado
Precio Unit
Subtotal (S/.)
Metrado
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
SALDO
S/.
AMBIENTALES
12.01.01
GLB
1.00
1,250.00
1,250.00
0.00
0.00
0.30
375.00
0.25
312.50
0.20
250.00
0.10
125.00
0.15
187.50
1.00
1,250.00
0.00
0.00
12.01.02
GESTION DE RESIDUOS
GLB
1.00
2,500.00
2,500.00
0.40
1,000.00
0.20
500.00
0.20
500.00
0.20
500.00
0.00
0.00
0.00
0.00
1.00
2,500.00
0.00
0.00
12.01.03
GLB
1.00
1,000.00
1,000.00
0.21
210.00
0.21
210.00
0.21
210.00
0.21
210.00
0.16
160.00
0.00
0.00
1.00
1,000.00
0.00
0.00
12.01.04
CERCO VIVO
GLB
1.00
1,000.00
1,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1,000.00
1.00
1,000.00
0.00
0.00
GLB
1.00
6,538.20
6,538.20
1.00
6,538.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
6,538.20
0.00
0.00
12.02.00
12.02.01
SEGURIDAD INDUSTRIAL
EQUIPOS E IMPLEMENTOS DE SEGURIDAD
INSTALACIONES ELECTRICAS
01.00.00
01.01.00
INSTALACIONES ELECTRICAS
ACOMETIDA
01.01.01
CABLE AWG-TW 16 MM
25.30
5.10
129.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.30
129.03
0.00
0.00
25.30
129.03
0.00
0.00
01.01.02
CABLE AWG-TW 6 MM
332.46
2.25
748.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
332.46
748.04
0.00
0.00
332.46
748.04
0.00
0.00
01.01.03
CABLE AWG-TW 4 MM
166.23
1.73
287.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
166.23
287.58
166.23
287.58
0.00
0.00
01.01.04
12.65
6.05
76.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.65
76.53
0.00
0.00
12.65
76.53
0.00
0.00
01.01.05
166.23
5.00
831.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
166.23
831.15
0.00
0.00
166.23
831.15
0.00
0.00
01.01.06
UND
1.00
479.86
479.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
479.86
1.00
479.86
0.00
0.00
01.01.07
UND
1.00
295.55
295.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
295.55
0.00
0.00
1.00
295.55
0.00
0.00
01.01.08
1.00
63.93
63.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
63.93
0.00
0.00
1.00
63.93
0.00
0.00
01.01.09
5.00
55.83
279.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
279.15
0.00
0.00
5.00
279.15
0.00
0.00
01.01.10
5.00
82.16
410.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
410.80
0.00
0.00
5.00
410.80
0.00
0.00
01.01.11
5.00
55.83
279.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
279.15
0.00
0.00
5.00
279.15
0.00
0.00
01.01.12
10.00
43.68
436.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
436.80
0.00
0.00
10.00
436.80
0.00
0.00
01.01.13
10.00
43.68
436.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
436.80
0.00
0.00
10.00
436.80
0.00
0.00
01.01.14
11.00
4.35
47.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.00
47.85
0.00
0.00
11.00
47.85
0.00
0.00
01.02.00
UND
DISTRIBUCION
01.02.01
CABLE AWG-TW 4 MM
181.21
1.73
313.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
181.21
313.49
0.00
0.00
181.21
313.49
0.00
0.00
01.02.02
1,738.78
1.20
2,086.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,738.78
2,086.54
0.00
0.00
1,738.78
2,086.54
0.00
0.00
01.02.03
830.81
4.79
3,979.58
0.00
0.00
434.49
2,081.21
183.98
881.26
212.34
1,017.11
0.00
0.00
0.00
0.00
830.81
3,979.58
0.00
0.00
01.02.04
SALIDA DE TECHO
PTO
105.00
69.85
7,334.25
0.00
0.00
45.00
3,143.25
45.00
3,143.25
15.00
1,047.75
0.00
0.00
0.00
0.00
105.00
7,334.25
0.00
0.00
01.02.05
UND
23.00
160.59
3,693.57
0.00
0.00
0.00
0.00
12.00
1,927.08
0.00
0.00
11.00
1,766.49
0.00
0.00
23.00
3,693.57
0.00
0.00
01.02.06
UND
28.00
158.59
4,440.52
0.00
0.00
0.00
0.00
18.00
2,854.62
0.00
0.00
10.00
1,585.90
0.00
0.00
28.00
4,440.52
0.00
0.00
01.02.07
79.80
3,192.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
3,192.00
0.00
0.00
40.00
3,192.00
0.00
0.00
01.02.08
84.30
2,866.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34.00
2,866.20
0.00
0.00
34.00
2,866.20
0.00
0.00
01.02.09
50.12
1,553.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31.00
1,553.72
0.00
0.00
31.00
1,553.72
0.00
0.00
01.02.10
PTO
3.00
108.40
325.20
0.00
0.00
0.00
0.00
3.00
325.20
0.00
0.00
0.00
0.00
0.00
0.00
3.00
325.20
0.00
0.00
01.02.11
UND
6.00
98.72
592.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
592.32
6.00
592.32
0.00
0.00
INSTALACIONES SANITARIAS
01.00.00
01.01.00
INSTALACIONES SANITARIAS
SISTEMA DE DESAGUE
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
ITEM
PRESUPUESTO BASE
DESCRIPCION
VALORIZACION 01
VALORIZACION 02
VALORIZACION 03
VALORIZACION 04
VALORIZACION 05
VALORIZACION 06
ACUMULADO
UND
Metrado
Precio Unit
Subtotal (S/.)
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
Metrado
S/.
SALDO
S/.
01.01.01
pza
7.00
65.43
458.01
0.00
0.00
7.00
458.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
458.01
0.00
0.00
01.01.02
pza
1.00
73.81
73.81
0.00
0.00
1.00
73.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
73.81
0.00
0.00
01.01.03
4.00
52.92
211.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
211.68
0.00
0.00
4.00
211.68
0.00
0.00
01.01.04
2.00
39.22
78.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
78.44
0.00
0.00
2.00
78.44
0.00
0.00
01.01.05
pza
52.80
10.28
542.78
0.00
0.00
8.80
90.46
10.00
102.80
34.00
349.52
0.00
0.00
0.00
0.00
52.80
542.78
0.00
0.00
01.01.06
UND
39.60
7.68
304.13
0.00
0.00
39.60
304.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.60
304.13
0.00
0.00
01.01.07
155.98
311.96
0.00
0.00
0.00
0.00
0.00
0.00
2.00
311.96
0.00
0.00
0.00
0.00
2.00
311.96
0.00
0.00
01.02.00
01.02.01
8.00
43.68
349.44
0.00
0.00
8.00
349.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
349.44
0.00
0.00
01.02.02
pto
48.95
32.20
1,576.19
0.00
0.00
48.95
1,576.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48.95
1,576.19
0.00
0.00
01.02.03
3.00
173.58
520.74
0.00
0.00
0.00
0.00
0.00
0.00
3.00
520.74
0.00
0.00
0.00
0.00
3.00
520.74
0.00
0.00
01.02.04
151.93
151.93
0.00
0.00
0.00
0.00
0.00
0.00
1.00
151.93
0.00
0.00
0.00
0.00
1.00
151.93
0.00
0.00
01.03.00
01.03.01
1.00
149.85
149.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
149.85
0.00
0.00
1.00
149.85
0.00
0.00
01.03.02
1.00
121.50
121.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
121.50
0.00
0.00
1.00
121.50
0.00
0.00
01.03.03
ML
6.00
115.00
690.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
690.00
0.00
0.00
6.00
690.00
0.00
0.00
01.03.04
ML
8.00
19.82
158.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
158.56
0.00
0.00
8.00
158.56
0.00
0.00
01.03.05
M3
8.00
19.82
158.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
158.56
0.00
0.00
8.00
158.56
0.00
0.00
GLB
1.00
98,775.83
98,775.83
0.65
64,204.29
0.15
14,816.37
0.12
11,853.10
0.08
7,902.07
0.00
0.00
0.00
0.00
1.00
98,775.83
0.00
0.00
01.00.00
01.01.00
01.01.01
COSTO DIRECTO
S/.
1,765,481.38
428,083.98
17,654.81
17,654.81
273,761.73
303,949.16
243,113.80
283,491.17
233,081.54
1,765,481.38
0.00
17,654.81
S/.
149,150.00
36,165.05
23,127.72
25,677.99
20,538.55
23,949.68
19,691.01
149,150.00
0.00
UTILIDADES (8%)
S/.
141,238.51
34,246.72
21,900.94
24,315.93
19,449.10
22,679.29
18,646.52
141,238.51
0.00
SUBTOTAL
S/.
2,073,524.70
516,150.56
318,790.39
353,943.08
283,101.45
330,120.14
271,419.07
2,073,524.70
0.00
S/.
373,234.45
92,907.10
57,382.27
63,709.75
50,958.26
59,421.63
48,855.43
373,234.45
0.00
S/.
2,446,759.15
609,057.66
376,172.66
417,652.83
334,059.71
389,541.77
320,274.50
2,446,759.15
0.00
S/.
2,446,759.15
609,057.66
376,172.66
417,652.83
334,059.71
389,541.77
320,274.50
2,446,759.15
0.00
FORMULA POLINOMICA
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL
FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA,
PROVINCIA DE YUNGAY, REGION ANCASH
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 1.00000
: NOVIEMBRE DEL 2010
: 210 DIAS CALENDARIOS
: LP N 03-2011-GRA
: 01 de Abril del 2011
: 29 de Setiembre del 2011
: ESTRUCTURAS
Obra
Entidad
Contratista
Presupuesto Base
Presupuesto Contratado
Presupuesto Reformulado
Factor de Relacion
Fecha Presup. Ref.
Plazo de Ejecucin Contractual
Adjudicacin Menor Cuantia
Fecha de Inicio de Obra
Fecha de Termino real de Obra
FORMULA 01
K= 0.069*(Mr / Mo) + 0.078*(Mr / Mo) + 0.133*(Ar / Ao) + 0.141*(Cr / Co) + 0.198*(Ar / Ao)
+ 0.381*(Mr / Mo)
INDICE
CREPCO
DESCRIPCION
% DE
INCIDENCIA
SIMB.
COEF.
DE
INCID.
45
100.000
0.069
49
100.000
0.078
AGREGADO GRUESO
100.000
0.133
21
100.000
0.141
100.000
0.198
47
100.000
0.381
1.000
FORMULA POLINOMICA
Obra
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
: LP N 03-2011-GRA
FORMULA 02
: ARQUITECTURA
K= 0.063*(Amr / Amo) + 0.059*(Ar / Ao) + 0.136*(Dr / Do) + 0.146*(Ir /Io) + 0.203*(Mr / Mo)
+ 0.393*(Mr / Mo)
INDICE
CREPCO
DESCRIPCION
% DE
INCIDENCIA
50.794
48
49.206
SIMB.
COEF.
DE
INCID.
AM
0.063
AGREGADO GRUESO
100.000
0.059
30
100.000
0.136
39
100.000
0.146
43
100.000
0.203
47
100.000
0.393
1.000
FORMULA POLINOMICA
Obra
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
: LP N 03-2011-GRA
FORMULA 03
: INSTALACIONES ELECTRICAS
INDICE
CREPCO
DESCRIPCION
% DE
INCIDENCIA
37
HERRAMIENTA MANUAL
4.375
47
95.625
30
1.538
39
98.462
SIMB.
COEF.
DE
INCID.
MH
0.480
ID
0.520
1.000
FORMULA POLINOMICA
Obra
Entidad
Contratista
Presupuesto Base
: S/. 2467,494.40
Presupuesto Contratado
: S/. 2467,494.40
Presupuesto Reformulado
: S/. 2446,759.15
Factor de Relacion
: 1.00000
: LP N 03-2011-GRA
FORMULA 04
: INSTALACIONES SANITARIAS
INDICE
CREPCO
DESCRIPCION
% DE
INCIDENCIA
SIMB.
COEF.
DE
INCID.
AH
0.080
10
68.750
37
HERRAMIENTA MANUAL
31.250
30
100.000
0.342
47
100.000
0.578
1.000
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
Presupuesto Contratado
Presupuesto Reformulado
Factor de Relacion
Fecha Presup. Ref.
Plazo de Ejecucin Contractual
Adjudicacin Directa Selectiva
Fecha de Inicio de Obra
Fecha de Termino real de Obra
Formula 01
K = 0.069*(Mr / Mo) + 0.078*(Mr / Mo) + 0.133*(Ar / Ao) + 0.141*(Cr / Co) + 0.198*(Ar / Ao) + 0.381*(Mr / Mo)
INDICE
CREPCO
45
49
5
21
2
47
DESCRIPCION
MADERA TERCIADA PARA ENCOFRADO
MAQUINARIA Y EQUIPO IMPORTADO
AGREGADO GRUESO
CEMENTO PORTLAND TIPO 1
ACERO DE CONSTRUCCION LISO
MANO DE OBRA INC. LEYES SOCIALES
FACTOR DE REAJUSTE
% DE
INCIDENCIA
SIMB.
100
100
100
100
100
100
M
M
A
C
A
M
INDICE
COEF. DE
BASE NOV.- INDICES
INCIDENCIA
10 Io
MES
0.069
314.56
313.05
0.078
240.48
240.07
0.133
210.97
211.81
0.141
335.42
332.68
0.198
520.51
586.17
0.381
430.83
427.68
1.000
Mar-11
Apr-11
Io/Ir
0.995
0.998
1.004
0.992
1.126
0.993
0.069
0.078
0.134
0.140
0.223
0.378
1.022
INDICES
MES
312.57
243.55
211.81
332.68
591.89
427.68
May-11
Io/Ir
0.994
1.013
1.004
0.992
1.137
0.993
0.069
0.079
0.134
0.140
0.225
0.378
1.025
INDICES
MES
313.14
240.64
211.16
332.68
583.48
427.68
Jun-11
Io/Ir
0.995
1.001
1.001
0.992
1.121
0.993
0.069
0.078
0.133
0.140
0.222
0.378
1.020
INDICES
MES
313.14
239.68
211.27
332.68
580.78
427.68
Jul-11
Io/Ir
0.995
0.997
1.001
0.992
1.116
0.993
0.069
0.078
0.133
0.140
0.221
0.378
1.019
INDICES
MES
313.14
238.53
211.00
332.68
570.55
448.29
Aug-11
Io/Ir
0.995
0.992
1.000
0.992
1.096
1.041
0.069
0.077
0.133
0.140
0.217
0.396
1.032
INDICES
MES
313.14
238.59
213.98
332.68
570.13
448.29
Io/Ir
0.995
0.992
1.014
0.992
1.095
1.041
0.069
0.077
0.135
0.140
0.217
0.396
1.034
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
Presupuesto Contratado
Presupuesto Reformulado
Factor de Relacion
Fecha Presup. Ref.
Plazo de Ejecucin Contractual
Adjudicacin Directa Selectiva
Fecha de Inicio de Obra
Fecha de Termino real de Obra
Formula 01
Formula 01
: Arquitectura
K = 0.063*(AMr / AMo) + 0.059*(Ar / Ao) + 0.136*(Dr / Do) + 0.146*(Ir / Io) + 0.203*(Mr / Mo) + 0.393*(Mr / Mo)
INDICE
CREPCO
2
48
5
30
39
43
47
DESCRIPCION
ACERO DE CONSTRUCCION LISO
MAQUINARIA Y EQUIPO NACIONAL
AGREGADO GRUESO
DLAR (GENERAL PONDERADO)
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
MADERA NACIONAL PARA ENCOF. Y CARPINT.
MANO DE OBRA INC. LEYES SOCIALES
FACTOR DE REAJUSTE
% DE
INCIDENCIA
50.794
49.206
100.000
100.000
100.000
100.000
100.000
SIMB.
AM
A
D
I
M
M
INDICE
COEF. DE
BASE NOV- INDICES
INCIDENCIA
10 Io
MES
520.51
586.17
0.063
331.70
332.16
0.059
210.97
211.81
0.136
357.53
358.42
0.146
354.04
359.92
0.203
527.06
540.61
0.393
430.83
427.68
1.000
Mar-11
Io/Ir
1.126
1.001
1.004
1.002
1.017
1.026
0.993
Apr-11
K
0.067
0.059
0.136
0.148
0.208
0.390
1.008
INDICES
MES
591.89
334.30
211.81
366.61
362.68
540.19
427.68
Io/Ir
1.137
1.008
1.004
1.025
1.024
1.025
0.993
May-11
K
0.067
0.059
0.139
0.150
0.208
0.390
1.013
INDICES
MES
583.48
331.87
211.16
363.73
362.29
541.48
427.68
Io/Ir
1.121
1.001
1.001
1.017
1.023
1.027
0.993
Jun-11
K
0.067
0.059
0.138
0.149
0.209
0.390
1.012
INDICES
MES
580.78
332.12
211.27
363.98
362.65
542.65
427.68
Io/Ir
1.116
1.001
1.001
1.018
1.024
1.030
0.993
Jul-11
K
0.067
0.059
0.138
0.150
0.209
0.390
1.013
INDICES
MES
570.55
330.88
211.00
360.57
366.20
542.31
448.29
Io/Ir
1.096
0.998
1.000
1.009
1.034
1.029
1.041
Aug-11
K
0.066
0.059
0.137
0.151
0.209
0.409
1.031
INDICES
MES
570.13
330.79
213.98
360.13
366.50
544.01
448.29
Io/Ir
1.095
0.997
1.014
1.007
1.035
1.032
1.041
K
0.066
0.060
0.137
0.151
0.210
0.409
1.033
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
Presupuesto Contratado
Presupuesto Reformulado
Factor de Relacion
Fecha Presup. Ref.
Plazo de Ejecucin Contractual
Adjudicacin Directa Selectiva
Fecha de Inicio de Obra
Fecha de Termino real de Obra
Formula 01
Formula 01
: Instalaciones Electricas
DESCRIPCION
HERRAMIENTA MANUAL
MANO DE OBRA INC. LEYES SOCIALES
DLAR GENERAL (PONDERADO)
INDICE GENERAL DE PRECIOS AL CONSUMIDOR
FACTOR DE REAJUSTE
% DE
INCIDENCIA
4.375
95.625
1.538
98.462
SIMB.
MH
ID
INDICE
COEF. DE
BASE NOV- INDICES
INCIDENCIA
10 Io
MES
273.14
283.86
0.480
430.83
427.68
357.53
358.42
0.520
354.04
359.92
1.000
Mar-11
Io/Ir
1.039
0.993
1.002
1.017
Apr-11
K
0.484
0.523
1.007
INDICES
MES
283.02
427.68
366.61
362.38
Io/Ir
1.036
0.993
1.025
1.024
May-11
K
0.481
0.529
1.010
INDICES
MES
280.64
427.68
363.73
362.29
Io/Ir
1.027
0.993
1.017
1.023
Jun-11
K
0.481
0.529
1.010
INDICES
MES
279.78
427.68
363.98
362.65
Io/Ir
1.024
0.993
1.018
1.024
Jul-11
K
0.480
0.530
1.010
INDICES
MES
279.22
448.29
360.57
365.52
Io/Ir
1.022
1.041
1.009
1.032
Aug-11
K
0.499
0.537
1.036
INDICES
MES
279.17
448.29
360.63
366.50
Io/Ir
1.022
1.041
1.009
1.035
K
0.499
0.538
1.037
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE YUNGAY, REGION ANCASH
Entidad
Contratista
Presupuesto Base
Presupuesto Contratado
Presupuesto Reformulado
Factor de Relacion
Fecha Presup. Ref.
Plazo de Ejecucin Contractual
Adjudicacin Directa Selectiva
Fecha de Inicio de Obra
Fecha de Termino real de Obra
Formula 01
Formula 01
: Instalaciones Sanitarias
DESCRIPCION
APARATO SANITARIOS CON GRIFERIA
HERRAMIENTA MANUAL
DLAR GENERAL (PONDERADO)
MANO DE OBRA INC. LEYES SOCIALES
FACTOR DE REAJUSTE
% DE
INCIDENCIA
68.750
31.250
100.000
100.000
SIMB.
AH
D
M
INDICE
COEF. DE
BASE NOV- INDICES
INCIDENCIA
10 Io
MES
319.65
332.94
0.080
273.14
283.86
0.342
357.53
358.42
0.578
430.83
427.68
1.000
Mar-11
Io/Ir
1.042
1.039
1.002
0.993
Apr-11
K
0.083
0.343
0.574
1.000
INDICES
MES
334.51
283.02
366.61
427.68
Io/Ir
1.391
1.342
1.093
0.822
May-11
K
0.084
0.351
0.574
1.009
INDICES
MES
335.00
280.64
363.73
427.68
Io/Ir
1.048
1.027
1.017
0.993
Jun-11
K
0.084
0.348
0.574
1.006
INDICES
MES
335.45
279.78
363.98
427.68
Io/Ir
1.049
1.024
1.333
1.566
Jul-11
K
0.084
0.348
0.574
1.006
INDICES
MES
334.97
279.22
360.57
448.29
Io/Ir
1.048
1.022
1.009
1.041
Aug-11
K
0.084
0.345
0.601
1.030
INDICES
MES
336.26
279.17
360.63
448.29
Io/Ir
1.052
0.983
1.009
1.041
K
0.084
0.345
0.601
1.030
REAJUSTE PAGADO
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
A.D.S.
: GOBIERNO REGIONAL DE ANCASH
CONTRATISTA
: CONSORCIO ALLI ALLPA
UBICACIN
: HUAMAS
ENTIDAD
: GOBIERNO REGIONAL DE ANCASH
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
P. REFORMULADO : S/. 2446,759.15
PLAZA DE
: 210 DIAS CALENDARIOS
EJECUCION
F. R.
: 1.00000
OBRA
VALORIZACION N 01
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
LICENCIA DE
CONSTRUCCI
ON
414,708.44
9,022.63
74,764.69
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
17,654.81
2,073,524.70
TOTALES
516,150.57
2,073,524.70
Ka
Kr
V(Kr)
A(V/C)
(1) x (5)
6
(3) x (1) /( 2)
7
1.00
1.00
1.00
1.00
1.00
1.022
1.008
1.007
1.000
1.000
423,832.03
9,094.81
74,764.69
0.00
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
0.022
0.008
0.007
-
423,832.03
9,094.81
74,764.69
TOTAL DE REAJUSTE
9,123.59
72.18
-
9,195.77
REAJUSTE PAGADO
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
A.D.S.
: GOBIERNO REGIONAL DE ANCASH
CONTRATISTA
: CONSORCIO ALLI ALLPA
UBICACIN
: HUAMAS
ENTIDAD
: GOBIERNO REGIONAL DE ANCASH
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
P. REFORMULADO : S/. 2446,759.15
PLAZA DE
: 210 DIAS CALENDARIOS
EJECUCION
F. R.
: 1.00000
OBRA
VALORIZACION N 02
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
237,681.65
54,450.42
6,083.78
3,321.15
17,253.39
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
TOTALES
318,790.39
2,073,524.70
Ka
Kr
V(Kr)
A(V/C)
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(1) x (5)
6
(3) x (1) /( 2)
7
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
1.00
1.00
1.00
1.00
1.00
1.025
1.013
1.000
1.009
1.000
243623.69
55158.28
6083.78
3351.04
17253.39
0.00
0.00
0.00
0.00
0.00
0.025
0.013
0.000
0.009
0.000
0.000
0.000
0.000
0.000
0.000
243623.69
55158.28
6083.78
3351.04
17253.39
0.00
TOTAL DE REAJUSTE
5942.04
707.86
0.00
29.89
0.00
6679.79
REAJUSTE PAGADO
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
A.D.S.
: GOBIERNO REGIONAL DE ANCASH
CONTRATISTA
: CONSORCIO ALLI ALLPA
UBICACIN
: HUAMAS
ENTIDAD
: GOBIERNO REGIONAL DE ANCASH
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
P. REFORMULADO : S/. 2446,759.15
PLAZA DE
: 210 DIAS CALENDARIOS
EJECUCION
F. R.
: 1.00000
OBRA
VALORIZACION N 03
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
Ka
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
188,370.28
141,017.04
10,633.35
119.70
13,802.71
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
0
0
0
0
0
TOTALES
353,943.08
2,073,524.70
Kr
V(Kr)
A(V/C)
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(1) x (5)
6
(3) x (1) /( 2)
7
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
1.00
1.00
1.00
1.00
1.00
1.020
1.012
1.010
1.006
1.000
192137.69
142709.24
10739.68
120.42
13802.71
0.00
0.00
0.00
0.00
0.00
0.020
0.012
0.010
0.006
0.000
0.000
0.000
0.000
0.000
0.000
192137.69
142709.24
10739.68
120.42
13802.71
0.00
TOTAL DE REAJUSTE
3767.41
1692.20
106.33
0.72
0.00
5566.66
REAJUSTE PAGADO
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
A.D.S.
: GOBIERNO REGIONAL DE ANCASH
CONTRATISTA
: CONSORCIO ALLI ALLPA
UBICACIN
: HUAMAS
ENTIDAD
: GOBIERNO REGIONAL DE ANCASH
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
P. REFORMULADO : S/. 2446,759.15
PLAZA DE
: 210 DIAS CALENDARIOS
EJECUCION
F. R.
: 1.00000
OBRA
VALORIZACION N 04
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
Ka
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
22,970.89
246,970.66
2,404.49
1,553.59
9,201.82
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
0
0
0
0
0
TOTALES
283,101.45
2073524.7
Kr
V(Kr)
A(V/C)
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(1) x (5)
6
(3) x (1) /( 2)
7
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
1.00
1.00
1.00
1.00
1.00
1.019
1.013
1.010
1.006
1.000
23407.34
250181.28
2428.53
1562.91
9201.82
0.00
0.00
0.00
0.00
0.00
0.019
0.013
0.010
0.006
0.000
0.000
0.000
0.000
0.000
0.000
23407.34
250181.28
2428.53
1562.91
9201.82
0.00
TOTAL DE REAJUSTE
436.45
3210.62
24.04
9.32
0.00
3680.43
REAJUSTE PAGADO
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
A.D.S.
: GOBIERNO REGIONAL DE ANCASH
CONTRATISTA
: CONSORCIO ALLI ALLPA
UBICACIN
: HUAMAS
ENTIDAD
: GOBIERNO REGIONAL DE ANCASH
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
P. REFORMULADO : S/. 2446,759.15
PLAZA DE
: 210 DIAS CALENDARIOS
EJECUCION
F. R.
: 1.00000
OBRA
VALORIZACION N 05
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
Ka
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
16,568.01
291,464.58
20,260.95
1,826.60
0.00
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
0
0
0
0
0
TOTALES
330,120.14
2073524.7
Kr
V(Kr)
A(V/C)
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(1) x (5)
6
(3) x (1) /( 2)
7
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
1.00
1.00
1.00
1.00
1.00
1.032
1.031
1.036
1.030
1.000
17098.19
300499.98
20990.34
1881.40
0.00
0.00
0.00
0.00
0.00
0.00
0.032
0.031
0.036
0.030
0.000
0.000
0.000
0.000
0.000
0.000
17098.19
300499.98
20990.34
1881.40
0.00
0.00
TOTAL DE REAJUSTE
530.18
9035.40
729.39
54.80
0.00
10349.77
REAJUSTE PAGADO
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
A.D.S.
: GOBIERNO REGIONAL DE ANCASH
CONTRATISTA
: CONSORCIO ALLI ALLPA
UBICACIN
: HUAMAS
ENTIDAD
: GOBIERNO REGIONAL DE ANCASH
P. BASE
: S/. 2467,494.40
P. OFERTADO
: S/. 2467,494.40
P. REFORMULADO : S/. 2446,759.15
PLAZA DE
: 210 DIAS CALENDARIOS
EJECUCION
F. R.
: 1.00000
OBRA
VALORIZACION N 06
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
Ka
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
51,708.72
218,126.92
1,583.43
0.00
0.00
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
0
0
0
0
0
TOTALES
271,419.07
2073524.7
Kr
V(Kr)
A(V/C)
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(1) x (5)
6
(3) x (1) /( 2)
7
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
1.00
1.00
1.00
1.00
1.00
1.034
1.033
1.037
1.030
1.000
53466.82
225325.11
1642.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.034
0.033
0.037
0.030
0.000
0.000
0.000
0.000
0.000
0.000
53466.82
225325.11
1642.02
0.00
0.00
0.00
TOTAL DE REAJUSTE
1758.10
7198.19
58.59
0.00
0.00
9014.88
REAJUSTE REGULARIZADO
OBRA
A.D.S.
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
P. OFERTADO
P. REFORMULADO
PLAZA DE EJECUCION
F. R.
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: HUAMAS
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
VALORIZACION N 01
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
LICENCIA DE
CONSTRUCCION
414,708.44
9,022.63
74,764.69
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
17,654.81
2,073,524.70
TOTALES
516,150.57
2,073,524.70
Ka
Kr
V(Kr)
A(V/C)
(1) x (5)
6
(3) x (1) /( 2)
7
1.00
1.00
1.00
1.00
1.00
1.024
1.015
1.017
1.008
1.000
424,661.44
9,157.97
74,764.69
0.00
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
0.02
0.01
0.02
0.01
-
424,661.44
9,157.97
74,764.69
TOTAL DE REAJUSTE
9,953.00
135.34
-
10,088.34
REAJUSTE REGULARIZADO
OBRA
A.D.S.
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
P. OFERTADO
P. REFORMULADO
PLAZA DE EJECUCION
F. R.
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: HUAMAS
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
VALORIZACION N 02
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
237,681.65
54,450.42
6,083.78
3,321.15
17,253.39
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
TOTALES
318,790.39
2,073,524.70
Ka
Kr
V(Kr)
A(V/C)
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(1) x (5)
6
(3) x (1) /( 2)
7
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
1.00
1.00
1.00
1.00
1.00
1.020
1.014
1.014
1.005
1.000
242435.28
55212.73
6168.95
3337.76
17253.39
0.00
0.00
0.00
0.00
0.00
0.020
0.014
0.014
0.005
0.000
0.000
0.000
0.000
0.000
0.000
242435.28
55212.73
6168.95
3337.76
17253.39
4753.63
762.31
85.17
16.61
0.00
0.00
TOTAL DE REAJUSTE
5617.72
REAJUSTE REGULARIZADO
OBRA
A.D.S.
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
P. OFERTADO
P. REFORMULADO
PLAZA DE EJECUCION
F. R.
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: HUAMAS
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
VALORIZACION N 03
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
Ka
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
188,370.28
141,017.04
10,633.35
119.70
13,802.71
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
0
0
0
0
0
TOTALES
353,943.08
2073524.7
Kr
V(Kr)
A(V/C)
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(1) x (5)
6
(3) x (1) /( 2)
7
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
1.00
1.00
1.00
1.00
1.00
1.019
1.014
1.013
1.005
1.000
0.00
0.00
0.00
0.00
0.00
0.019
0.014
0.013
0.005
0.000
0.000
0.000
0.000
0.000
0.000
191,949.32
142,991.28
10,771.58
120.30
13,802.71
0.00
191,949.32
142,991.28
10,771.58
120.30
13,802.71
TOTAL DE REAJUSTE
3,579.04
1,974.24
138.23
0.60
0.00
5692.11
REAJUSTE REGULARIZADO
OBRA
A.D.S.
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
P. OFERTADO
P. REFORMULADO
PLAZA DE EJECUCION
F. R.
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: HUAMAS
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
VALORIZACION N 04
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
Ka
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
22,970.89
246,970.66
2,404.49
1,553.59
9,201.82
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
0
0
0
0
0
TOTALES
283,101.45
2073524.7
Kr
V(Kr)
A(V/C)
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(1) x (5)
6
(3) x (1) /( 2)
7
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
1.00
1.00
1.00
1.00
1.00
1.032
1.032
1.027
1.029
1.000
23705.96
254873.72
2469.41
1598.64
9201.82
0.00
0.00
0.00
0.00
0.00
0.032
0.032
0.027
0.029
0.000
0.000
0.000
0.000
0.000
0.000
23705.96
254873.72
2469.41
1598.64
9201.82
0.00
TOTAL DE REAJUSTE
735.07
7903.06
64.92
45.05
0.00
8748.10
REAJUSTE REGULARIZADO
OBRA
A.D.S.
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
P. OFERTADO
P. REFORMULADO
PLAZA DE EJECUCION
F. R.
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: HUAMAS
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
VALORIZACION N 05
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
Ka
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
16,568.01
291,464.58
20,260.95
1,826.60
0.00
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
0
0
0
0
0
TOTALES
330,120.14
2073524.7
Kr
V(Kr)
A(V/C)
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(1) x (5)
6
(3) x (1) /( 2)
7
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
1.00
1.00
1.00
1.00
1.00
1.034
1.034
1.027
1.029
1.000
17131.32
301374.37
20808.00
1879.57
0.00
0.00
0.00
0.00
0.00
0.00
0.034
0.034
0.027
0.029
0.000
0.000
0.000
0.000
0.000
0.000
17131.32
301374.37
20808.00
1879.57
0.00
0.00
TOTAL DE REAJUSTE
563.31
9909.80
547.05
52.97
0.00
11073.12
REAJUSTE REGULARIZADO
OBRA
A.D.S.
CONTRATISTA
UBICACIN
ENTIDAD
P. BASE
P. OFERTADO
P. REFORMULADO
PLAZA DE EJECUCION
F. R.
: CONSTRUCCION DE LA INFRAESTRUCTURA EDUCATIVA PUBLICA CORONEL FRANCISCO BOLOGNESI DE LA LOCALIDAD DE HUAMAS, DISTRITO DE YANAMA, PROVINCIA DE
YUNGAY, REGION ANCASH
: GOBIERNO REGIONAL DE ANCASH
: CONSORCIO ALLI ALLPA
: HUAMAS
: GOBIERNO REGIONAL DE ANCASH
: S/. 2467,494.40
: S/. 2467,494.40
: S/. 2446,759.15
: 210 DIAS CALENDARIOS
: 1.00000
VALORIZACION N 06
VALORIZACION
VALORIZACION
MONTO
ADEL. EN
BRUTA
1
CONTRATO
2
EFECTIVO
3
Ka
ESTRUCTURA
ARQUITECTURA
INST. ELECTRICAS
INST. SANITARIAS
FLETE
51,708.72
218,126.92
1,583.43
0.00
0.00
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
2,073,524.70
0
0
0
0
0
TOTALES
271,419.07
2073524.7
Kr
V(Kr)
A(V/C)
(Kr/Ka)-1
REAJ. ADEL
Vcr
REAJUSTE
(1) x (5)
6
(3) x (1) /( 2)
7
(7) X(8)
9
(6) -(9)
10
VALORIZACION
(10) -(1)
1.00
1.00
1.00
1.00
1.00
1.023
1.034
1.029
1.031
1.000
52898.02
225543.24
1629.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.023
0.034
0.029
0.031
0.000
0.000
0.000
0.000
0.000
0.000
52898.02
225543.24
1629.35
0.00
0.00
0.00
TOTAL DE REAJUSTE
1189.30
7416.32
45.92
0.00
0.00
8651.54
MANO DE OBRA
MATERIALES
EQUIPOS
ESTRUCTURAS
305,825.59
432,714.54
61,823.24
ARQUITECTURA
319,034.24
480,438.49
25,832.38
INSTALACIONES ELECTRICAS
16,003.91
18,437.82
737.88
INSTALACIONES SANITARIAS
3,345.24
2,368.53
142.82
FLETE
98,775.83
644,208.98
1,032,735.21
88,536.32
800,363.37
825,305.11
35,179.61
5,856.59
98,775.83
1,765,480.51