Definitivo Presup y Progr 12 Abril 2011
Definitivo Presup y Progr 12 Abril 2011
CAP
1
4
5
6
ITEM
No
ALTOS DE PAYANDA
NOCAIMA-CUNDINAMARCA
TIPO
FECHA
CONSTRUCCION DE TORRES
JULIO DE 2010
VALOR UNITARIO
VIVIENDA
PRELIMINARES
1.1 LOCALIZACION Y REPLANTEO
1.2 CAMPAMENTO
1.3 DESCAPOTE TRANSPORTE
1.5 PROVISIONAL ACUEDUCTO
1.6 PROVISIONAL ENERGIA
CIMENTACION
2.1 EXCAVACION
2.2 RELLENO COMPACTADO
2.3 CONCRETO DE LIMPIEZA
2.4 VIGA DE AMARRE (0.25 * 0.40)
2.5 PLACA DE CONCRETO e= 0,25 CONTRAPISO
2.6 ACERO DE REFUERZO 37.000 PSI
2.7 ACERO DE REFUERZO 60,000 PSI
2.8 ALAMBRE NEGRO
ESTRUCTURA
3.1 BLOQUE ES TRUCTURAL
3.2 PRENSADO ESTRUCTURAL
3.3 DOVELAS EN GROUTING
3.4 ACERO DE REFUERZO 60,000 PSI
3.5 PLACA DE ENTREPISO
3.6 ACERO DE REFUERZO 60,000 PSI
3.7 ESCALERA EN CONCRETO
3.8 ACERO DE REFUERZO 37.000 PSI
3.9 ACERO DE REFUERZO 60,000 PSI
3.10 ALAMBRE NEGRO
3.11 VIGA DE CORONACION
3.12 ACERO DE REFUERZO 37,000 PSI
3.13 ALAMBRE NEGRO
MAMPOSTERIA
4.1 MUROS DE ANTEPECHO
PISOS
5.1 AFINADOS
INST. SANITARIAS
6.1 CAJAS DE INSPECCION (,80*,80)
6.2 CAJAS DE INSPECCION (1,00*1,00)
6.3 TUBERIA PVC-S 6"
6.4 TUBERIA PVC-S 4"
6.5 TUBERIA PVC-S 3"
6.6 TUBERIA PVC-S 2"
6.7 BAJANTES AGUAS NEGRAS BAN 4"
6.8 BAJANTES AGUA LLUVIAS BALL 4"
6.9 TUBERIA REVENTILACION PVC-L 2"
6.10 PUNTO SANITARIO 2"
6.11 PUNTO SANITARIO 3"
6.12 PUNTO SANITARIO 4"
INST. HIDRAULICAS
7.1 ACOMETIDA
7.2 RED SUMINSTRO PVC-P 1/2"
7.3 RED SUMINSTRO PVC-P 3/4"
7.4 RED SUMINSTRO PVC-P 1"
7.5 RED SUMINSTRO PVC-P 2"
7.6 PUNTO HIDRAULICO 1/2"
7.7 REGISTRO DE BOLA D 3/4"
7.8 REGISTRO DE BOLA D 1/2"
INSTALACIONES ELECTRICAS
8.1 ACOMETIDA
8.2 TABLERO GENERAL 4 C CON TOTALIZADOR
8.3 ACOMETIDA DE PVC 2" 3X2/0+2,1/0
8.4 ALUMBRADO EXTERIOR
8.5 PUNTOS DE ILUMINACION
8.6 TOMAS ELECTRICAS DOBLES
8.7 SALIDA TV
UNID.
M
UND
M3
UND
UND
MATERIAL Y
VALOR
CANTIDAD
EQUIPO
MANO OBRA
295.14
867,910.21
0.00
4,500.00
42,000.00
TOTAL
UNITARIO
1,089.70
2,733,959.48
16,600.00
17,000.00
227,000.00
valor parcial
233.00
1.00
103.95
1.00
1.00
794.56
1,866,049.27
16,600.00
12,500.00
185,000.00
M3
M3
M2
M3
M3
KG
KG
KG
445.50
742.50
35.50
5.33
56.82
5,600.00
646.80
200.00
16,600.00
38,000.00
11,237.39
253,314.29
267,394.64
1,750.00
1,750.00
2,045.90
7,500.00
934.75
32,857.27
20,535.79
354.17
354.17
295.14
16,600.00 7,395,300.00
45,500.00 33,783,750.00
12,172.14
432,111.05
286,171.56 1,525,294.40
287,930.43 16,360,206.87
2,104.17 11,783,366.61
2,104.17 1,360,978.84
2,341.05
468,209.34
M2
M2
ML
KG
M2
KG
M3
KG
KG
KG
M3
KG
KG
1,049.18
903.10
2,240.00
12,274.90
956.00
1,615.90
4.48
142.00
300.00
100.00
5.32
909.00
70.00
18,776.42
24,739.46
2,440.15
1,618.68
30,400.72
1,618.68
320,331.06
1,750.00
1,750.00
2,045.90
303,090.32
1,750.00
2,045.90
8,854.32
7,589.41
2,656.29
354.17
20,535.79
354.17
49,853.45
354.17
354.17
295.14
32,144.82
354.17
295.14
27,630.74
32,328.87
5,096.45
1,972.86
50,936.51
1,972.86
370,184.51
2,104.17
2,104.17
2,341.05
335,235.15
2,104.17
2,341.05
28,989,619.39
29,196,203.99
11,416,037.82
24,216,610.86
48,695,300.89
3,187,938.11
1,658,426.61
298,792.51
631,251.78
234,104.67
1,783,450.98
1,912,692.90
163,873.27
M2
20.00
29,852.58
2,991.21
32,843.79
656,875.78
956.00
8,174.74
2,991.21
11,165.94 10,674,641.89
UN
UN
ML
ML
ML
ML
ML
ML
ML
UND
UND
UND
4.00
2.00
45.00
48.00
24.00
187.00
88.00
196.80
178.20
60.00
60.00
20.00
97,877.75
148,136.14
21,572.10
17,713.83
9,990.68
9,186.56
19,470.98
12,532.74
10,240.66
9,175.94
15,086.98
24,143.04
30,990.14
29,514.42
5,707.15
6,231.68
2,853.58
1,082.71
2,656.29
5,312.59
3,541.73
7,589.41
10,625.18
13,281.47
128,867.89
177,650.56
27,279.26
23,945.52
12,844.25
10,269.27
22,127.28
17,845.33
13,782.39
16,765.35
25,712.15
37,424.51
515,471.57
355,301.12
1,227,566.68
1,149,384.75
308,262.11
1,920,353.52
1,947,200.32
3,511,961.57
2,456,021.03
1,005,920.96
1,542,729.22
748,490.24
UND
ML
ML
ML
ML
UN
UN
UN
20.00
114.00
195.00
2.60
2.60
100.00
5.60
20.00
215,514.81
5,345.64
9,334.32
11,834.07
16,111.42
9,582.68
12,131.72
9,752.36
10,625.18
3,541.73
2,656.29
2,656.29
2,656.29
5,312.59
6,294.32
5,245.27
226,139.99
8,887.37
11,990.61
14,490.36
18,767.71
14,895.27
18,426.04
14,997.63
4,522,799.74
1,013,159.67
2,338,169.61
37,674.94
48,796.05
1,489,526.68
103,185.81
299,952.50
UN
UN
ML
UN
UN
UN
UN
20.00
20.00
1.00
2.00
190.00
165.00
40.00
14,048.44
61,000.00
140,673.75
59,520.00
27,896.20
14,241.00
10,827.20
13,281.47
17,708.63
10,625.18
24,108.62
8,854.32
10,625.18
7,589.41
27,329.92
78,708.63
151,298.93
83,628.62
36,750.52
24,866.18
18,416.61
546,598.34
1,574,172.61
151,298.93
167,257.23
6,982,597.89
4,102,919.41
736,664.52
valor capitulo
VALOR X LOS 11
BLOQUES
4,957,429.49
54,531,724.34
73,109,217.12
804,201,388.30
152,384,303.78
1,676,227,341.58
656,875.78
7,225,633.61
10,674,641.89
117,421,060.78
16,688,663.08
183,575,293.88
9,853,265.01
108,385,915.12
14,261,508.93
156,876,598.26
253,900.01
2,733,959.48
1,725,570.00
17,000.00
227,000.00
2de52
CAP
9
10
11
12
13
14
15
16
17
18
19
ITEM
No
ALTOS DE PAYANDA
NOCAIMA-CUNDINAMARCA
TIPO
FECHA
CONSTRUCCION DE TORRES
JULIO DE 2010
VALOR UNITARIO
VIVIENDA
UNID.
PRELIMINARES TELEFONICAS
INSTALACIONES
9.1 ACOMETIDA RED TELEFONICA
ML
9.2 SALIDAS TOMAS DE TELEFONO
UN
9.3 STREEP TELEFONICO
UN
CUBIERTAS
10.1 TEJA ZINC TRAPEZOIDAL
M2
10.2 CORREA METALICA
ML
10.3 FLACHIN
ML
10.4 MARQUESINA
M2
10.5 CANAL
ML
10.6 BAJANTES EN 3 " PVC
ML
PAETES
11.1 PAETE IMPERMEABILIZADO
M
CARPINTERIA DE MADERA
12.1 PUERTA METALICA (INCLUYE MARCO)
M2
12.2 VENTANAS ( EN ALUMINIO)
M2
12.3 MARCOS PARA PUERTA
UN
12.4 BARANDA PARA ESCALERAS Y TERRAZA
ML
CARPINTERIA DE MADERA
13.1 PUERTA MADERA
UN
PINTURA Y LAVADO DE FACHADAS
14.1 LAVADO Y SELLANTE PARA FACHADAS
M2
ENCHAPES Y ACCESORIOS
15.1 CERAMICA MUROS Y PISOS BAO Y COCINA
M2
15.2 ENCHAPE PUNTO FIJO TABLETA ALFA
M2
15.3 GRAVILLA MONA LAVADA
ML
VIDRIOS, ESPEJOS Y CERRADURAS
16.1 VIDRIOS
M2
16.2 CERRADURA PUERTA PRINCIPAL INCLU PASADOR
UN
16.3 CERRADURA PERILLA BAO
M2
16.4 ESPEJOS
UN
MUEBLES
17.1 MUEBLES EN MADERA MESON COCINA
UN
APARATOS SANITARIOS, ACCESORIOS Y DE COCINA,
18.1 JUEGO DE SANITARIO
UN
18.2 MESON LAVAPLATOS EN ACERO INOX.
UN
18.3 DUCHA
UN
ASEO GENERAL
19.1 ASEO GENERAL Y LIMPIEZA
M2
MATERIAL Y
VALOR
CANTIDAD
EQUIPO
MANO OBRA
TOTAL
UNITARIO
valor parcial
20.00
40.00
1.00
1,232.20
9,421.28
63,630.00
5,312.59
10,625.18
149,560.36
6,544.79
20,046.46
213,190.36
130,895.78
801,858.33
213,190.36
255.00
188.72
90.76
12.00
38.00
96.00
31,464.90
16,176.95
7,465.50
187,400.00
28,690.99
13,391.37
6,428.96
3,739.01
1,328.15
0.00
7,478.02
2,656.29
37,893.86
19,915.96
8,793.65
187,400.00
36,169.01
16,047.66
9,662,935.18
3,758,539.86
798,111.43
2,248,800.00
1,374,422.32
1,540,575.64
101.80
6,669.85
3,794.71
10,464.56
1,065,291.97
40.00
282.82
20.00
108.90
153,000.00
57,200.00
60,151.79
54,440.82
10,625.18
4,330.86
7,589.41
14,956.04
20.00
79,527.68
7,589.41
87,117.10
1,742,341.91
1,049.18
4,549.56
1,082.71
5,632.27
5,909,268.18
161.00
76.00
123.00
22,292.92
19,221.42
9,180.00
4,427.16
6,640.74
8,854.32
26,720.08
25,862.15
18,034.32
4,301,933.00
1,965,523.65
2,218,220.77
282.82
20.00
20.00
20.00
34,579.59
48,500.00
18,500.00
25,141.67
3,541.73
5,312.59
5,245.27
3,541.73
38,121.31 10,781,469.57
53,812.59 1,076,251.78
23,745.27
474,905.34
28,683.40
573,667.90
20.00
130,000.00
24,208.93
154,208.93
3,084,178.51
20.00
20.00
20.00
210,600.00
136,752.00
14,790.00
35,417.26
10,827.14
10,827.14
246,017.26
147,579.14
25,617.14
4,920,345.22
2,951,582.88
512,342.88
1,332.00
1,513.01
4,821.72
6,334.73
8,437,858.22
valor capitulo
VALOR X LOS 11
BLOQUES
1,145,944.47
12,605,389.19
19,383,384.44
213,217,228.83
1,065,291.97
11,718,211.65
32,859,306.05
361,452,366.53
1,742,341.91
19,165,760.99
5,909,268.18
65,001,949.97
8,485,677.42
93,342,451.59
12,906,294.60
141,969,240.57
3,084,178.51
33,925,963.57
8,384,270.98
92,226,980.82
8,437,858.22
92,816,440.46
385,989,721.82
4,245,886,940.03
163,625.18 6,545,007.13
61,530.86 17,402,157.17
67,741.20 1,354,824.03
69,396.86 7,557,317.73
TOTAL
ITEM
NUMER
O
PRELIMINARES
CIMENTACION
CAP
VIVIENDA
UNIDAD
CANTIDAD
VR UNIT
804,201,388.30
Nov-10
12,325,500.00
Dec-10
12,325,500.00
Jan-11
Feb-11
Mar-11
Apr-11
12,325,500.00
May-11
Jun-11
14,790,600.00
445.50
16,600.00
7,395,300.00
81,348,300.00
2.2
RELLENO COMPACTADO
M3
742.50
45,500.00
33,783,750.00
371,621,250.00
56,306,250.0
56,306,250.00
56,306,250.00
2.3
CONCRETO DE LIMPIEZA
M2
35.50
12,172.14
432,111.05
4,753,221.58
720,185.1
720,185.09
720,185.09
2.4
5.33
286,171.56
1,525,294.40
16,778,238.38
2,542,157.3
2,542,157.33
2,542,157.33
2.5
M3
56.82
287,930.43
16,360,206.87
179,962,275.61
27,267,011.5
27,267,011.46
27,267,011.46
2.6
KG
5,600.00
2,104.17
11,783,366.61
129,617,032.67
19,638,944.3
19,638,944.34
19,638,944.34
2.7
KG
646.80
2,104.17
1,360,978.84
14,970,767.27
2,268,298.1
2,268,298.07
2,268,298.07
KG
200.00
2,341.05
468,209.34
152,384,303.78
5,150,302.78
1,676,227,341.58
780,348.9
780,348.91
780,348.91
2.8
ALAMBRE NEGRO
ESTRUCTURA
M3
14,790,600.00
3.1
BLOQUE ES TRUCTURAL
M2
1,049.18
27,630.74
28,989,619.39
318,885,813.30
36,237,024.2
36,237,024.24
36,237,024.24
36,237,024
3.2
PRENSADO ESTRUCTURAL
M2
903.10
32,328.87
29,196,203.99
321,158,243.92
36,495,255.0
36,495,254.99
36,495,254.99
36,495,255
3.3
DOVELAS EN GROUTING
ML
2,240.00
5,096.45
11,416,037.82
125,576,415.98
14,270,047.3
14,270,047.27
14,270,047.27
14,270,047
30,270,763.6
30,270,763.57
30,270,763.57
30,270,764
3.4
KG
12,274.90
1,972.86
24,216,610.86
266,382,719.43
3.5
PLACA DE ENTREPISO
M2
956.00
50,936.51
48,695,300.89
535,648,309.80
121,738,252.2
121,738,252.2
3.6
KG
1,615.90
1,972.86
3,187,938.11
35,067,319.19
7,969,845.3
7,969,845.3
3.7
ESCALERA EN CONCRETO
M3
4.48
370,184.51
1,658,426.61
18,242,692.69
4,146,066.5
4,146,066.5
3.8
KG
142.00
2,104.17
298,792.51
3,286,717.61
746,981.3
746,981.3
3.9
KG
300.00
2,104.17
631,251.78
6,943,769.61
1,578,129.5
1,578,129.5
3.1
ALAMBRE NEGRO
KG
100.00
2,341.05
234,104.67
2,575,151.39
585,261.7
3.11
VIGA DE CORONACION
M3
5.32
335,235.15
1,783,450.98
19,617,960.78
4,458,627.45
4,458,627.45
3.12
KG
909.00
2,104.17
1,912,692.90
21,039,621.91
4,781,732.25
4,781,732.25
163,873.27
656,875.78
1,802,605.97
7,225,633.61
409,683.18
409,683.18
1,642,189.46
1,642,189.46
17,791,069.82
17,791,069.82
17,791,069.82
70.00
2,341.05
4.1
PISOS
M2
20.00
32,843.79
5.1
AFINADOS
INST. SANITARIAS
10
73,109,217.12
Oct-10
M3
KG
54,531,724.34
EXCAVACION
VR TOTAL OBRA
4,957,429.49
2.1
VR TOTAL X TORRE
MUROS DE ANTEPECHO
956.00
11,165.94
656,875.78
7,225,633.61
10,674,641.89
117,421,060.78
10,674,641.89
117,421,060.78
16,688,663.08
183,575,293.88
585,261.7
6.1
UN
4.00
128,867.89
5,670,187.26
2,577,357.8
6.2
UN
2.00
177,650.56
355,301.12
3,908,312.29
1,776,505.6
6.3
ML
45.00
27,279.26
1,227,566.68
13,503,233.48
6,137,833.4
6.4
ML
48.00
23,945.52
1,149,384.75
12,643,232.23
5,746,923.7
6.5
ML
24.00
12,844.25
308,262.11
3,390,883.26
1,541,310.6
6.6
ML
187.00
10,269.27
1,920,353.52
21,123,888.67
9,601,767.6
6.7
ML
88.00
22,127.28
1,947,200.32
21,419,203.50
2,434,000.4
2,434,000.4
2,434,000.4
2,434,000.4
6.8
ML
196.80
17,845.33
3,511,961.57
38,631,577.31
4,389,952.0
4,389,952.0
4,389,952.0
4,389,952.0
6.9
ML
178.20
13,782.39
2,456,021.03
27,016,231.33
3,070,026.3
3,070,026.3
3,070,026.3
3,070,026.3
6.1
UND
60.00
16,765.35
1,005,920.96
11,065,130.54
1,257,401.2
1,257,401.2
1,257,401.2
1,257,401.2
6.11
UND
60.00
25,712.15
1,542,729.22
16,970,021.37
1,928,411.5
1,928,411.5
1,928,411.5
1,928,411.5
UND
20.00
37,424.51
748,490.24
9,853,265.01
8,233,392.64
108,385,915.12
935,612.8
935,612.8
935,612.8
935,612.8
515,471.57
7.1
ACOMETIDA
UND
20.00
226,139.99
4,522,799.74
49,750,797.18
5,653,499.7
5,653,499.7
5,653,499.7
5,653,499.7
7.2
ML
114.00
8,887.37
1,013,159.67
11,144,756.33
1,266,449.6
1,266,449.6
1,266,449.6
1,266,449.6
7.3
ML
195.00
11,990.61
2,338,169.61
25,719,865.74
2,922,712.0
2,922,712.0
2,922,712.0
2,922,712.0
7.4
ML
2.60
14,490.36
37,674.94
414,424.39
47,093.7
47,093.7
47,093.7
7.5
ML
2.60
18,767.71
48,796.05
536,756.60
60,995.1
60,995.1
60,995.1
60,995.1
7.6
UN
100.00
14,895.27
1,489,526.68
16,384,793.48
1,861,908.3
1,861,908.3
1,861,908.3
1,861,908.3
7.7
UN
5.60
18,426.04
103,185.81
1,135,043.86
515,929.0
7.8
REGISTRO DE BOLA D 1/2"
INSTALACIONES ELECTRICAS
UN
20.00
14,997.63
299,952.50
14,261,508.93
3,299,477.54
156,876,598.26
1,499,762.5
47,093.7
8.1
ACOMETIDA
UN
20.00
27,329.92
546,598.34
6,012,581.74
683,247.92
683,247.92
683,247.92
683,247.92
8.2
UN
20.00
78,708.63
1,574,172.61
17,315,898.69
1,967,715.76
1,967,715.76
1,967,715.76
1,967,715.76
8.3
ML
1.00
151,298.93
151,298.93
1,664,288.21
189,123.66
189,123.66
189,123.66
8.4
ALUMBRADO EXTERIOR
UN
2.00
83,628.62
167,257.23
1,839,829.57
209,071.54
209,071.54
209,071.54
209,071.54
8.5
PUNTOS DE ILUMINACION
UN
190.00
36,750.52
6,982,597.89
76,808,576.79
8,728,247.36
8,728,247.36
8,728,247.36
8,728,247.36
8.6
UN
165.00
24,866.18
4,102,919.41
45,132,113.52
5,128,649.26
5,128,649.26
5,128,649.26
5,128,649.26
UN
40.00
18,416.61
736,664.52
1,145,944.47
8,103,309.74
12,605,389.19
920,830.65
920,830.65
920,830.65
920,830.65
8.7
SALIDA TV
INSTALACIONES TELEFONICAS
189,123.66
9.1
ML
20.00
6,544.79
130,895.78
1,439,853.61
163,619.73
163,619.73
163,619.73
163,619.73
9.2
UN
40.00
20,046.46
801,858.33
8,820,441.63
1,002,322.91
1,002,322.91
1,002,322.91
1,002,322.91
UN
1.00
213,190.36
9.3
STREEP TELEFONICO
CUBIERTAS
10.1
M2
255.00
37,893.86
213,190.36
2,345,093.95
19,383,384.44
213,217,228.83
9,662,935.18
106,292,287.02
1,065,951.80
24,157,337.96
24,157,337.96
10.2
CORREA METALICA
ML
188.72
41,343,938.50
9,396,349.66
9,396,349.66
10.3
FLACHIN
ML
90.76
8,793.65
798,111.43
8,779,225.70
1,995,278.57
1,995,278.57
10.4
MARQUESINA
M2
12.00
187,400.00
2,248,800.00
24,736,800.00
5,622,000.00
5,622,000.00
10.5
CANAL
ML
38.00
36,169.01
1,374,422.32
15,118,645.53
6,872,111.61
ML
96.00
16,047.66
1,540,575.64
1,065,291.97
16,946,332.08
11,718,211.65
7,702,878.22
11
101.80
10464.55765
12
1,065,291.97
32,859,306.05
11,718,211.65
361,452,366.53
19,915.96
3,758,539.86
2,663,229.92
2,663,229.92
12.1
M2
40.00
163,625.18
6,545,007.13
71,995,078.43
16,362,517.83
16,362,517.83
12.2
VENTANAS ( EN ALUMINIO)
M2
282.82
61,530.86
17,402,157.17
191,423,728.82
29,003,595.28
29,003,595.28
29,003,595.28
12.3
UN
20.00
67,741.20
1,354,824.03
14,903,064.29
2,258,040.04
2,258,040.04
ML
108.90
69,396.86
7,557,317.73
1,742,341.91
83,130,494.99
19,165,760.99
37,786,588.63
13
UN
20.00
87,117.10
1,742,341.91
5,909,268.18
19,165,760.99
65,001,949.97
8,711,709.54
14
14.1
LAVADO Y SELLANTE PARA FACHADAS
ENCHAPES Y ACCESORIOS
M2
1,049.18
5,632.27
5,909,268.18
65,001,949.97
15
8,485,677.42
93,342,451.59
16
14,773,170.45
14,773,170.45
15.1
M2
161.00
26,720.08
4,301,933.00
47,321,263.02
10,754,832.50
10,754,832.50
15.2
M2
76.00
25,862.15
1,965,523.65
21,620,760.10
4,913,809.11
4,913,809.11
ML
123.00
18,034.32
2,218,220.77
12,906,294.60
24,400,428.48
141,969,240.57
5,545,551.93
5,545,551.93
VIDRIOS
M2
282.82
38,121.31
10,781,469.57
118,596,165.26
26,953,673.92
26,953,673.92
16.2
UN
20.00
53,812.59
1,076,251.78
11,838,769.61
2,690,629.46
2,690,629.46
16.3
1,187,263.36
1,187,263.36
M2
20.00
23,745.27
474,905.34
5,223,958.77
UN
20.00
28,683.40
17
16.4 ESPEJOS
MUEBLES
573,667.90
3,084,178.51
6,310,346.93
33,925,963.57
UN
20.00
154208.9253
18
3,084,178.51
8,384,270.98
33,925,963.57
92,226,980.82
19
2,258,040.04
2,868,340
7,710,446.27
18.1
JUEGO DE SANITARIO
UN
20.00
246,017.26
4,920,345.22
54,123,797.38
12,300,863.04
12,300,863.04
18.2
UN
20.00
147,579.14
2,951,582.88
32,467,411.72
7,378,957.21
7,378,957.21
UN
20.00
25,617.14
512,342.88
8,437,858.22
5,635,771.72
92,816,440.46
377,504,044.40
4,245,886,940.03
18.3
DUCHA
ASEO GENERAL
7,710,446.27
2,561,714.42
15,126,297.43
12,325,500.00
20,953,350.00
12,325,500.00
142,079,445.17
271,617,176.62
511,767,722.31
600,603,181.40
402,476,213.10
CAP
1
2
3
ITEM
NUMER
O
PRELIMINARES
URBANISMO
UNIDAD
CANTIDAD
VR UNIT
VR TOTAL
370,040,893.09
VR TOTAL
Oct-10
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
1.1
LOCALIZACION Y REPLANTEO
8,880.00
1,089.70
9,676,532.39
4,838,266.20
1.2
5,328.00
16,600.00
88,444,800.00
44,222,400.00
1.3
CERRAMIENTO LOTE
ML
414.04
8,500.00
3,519,340.00
799,850.00
1.4
MUROS DE CONTENCION
M3
277.57
518,510.00
143,922,820.70
47,974,273.57
47,974,273.57
47,974,273.57
9,168,600.00
9,168,600.00
9,168,600.00
4,838,266.20
959,820.00
KG
13,320.00
2,065.00
27,505,800.00
1.6
EXCAVACION
M3
5,126.00
16,600.00
85,091,600.00
1.7
FILTRO EN PIEDRA (INCLUYE EXCAVACION Y GEOTEXTIL)
ML
Mitigacion Impacto Ambiental y Control Ambiental
Redes de Acueducto
240.00
49,500.00
11,880,000.00
1.00
244,928.22
244,928.22
122,464.11
33,442,872.32
28,363,867
28,363,867
28,363,867
11,880,000.00
33,442,872.32
122,464.11
3.1
ACOMETIDA
3.2
ML
120.00
8,887.37
1,066,483.86
533,241.93
533,241.93
3.3
ML
326.88
11,990.61
3,919,491.71
1,959,745.85
1,959,745.85
3.4
ML
120.00
14,490.36
1,738,843.61
869,421.80
869,421.80
3.5
1,986,562.46
ML
211.70
18,767.71
3,973,124.93
1,986,562.46
3.6
TANQUE DE ALMACENAMIENTO
Redes de Alcantarillado
UN
1.00
22,500,000.00
22,500,000.00
24,738,023.58
22,500,000.00
4.1
ML
150.98
42,785.41
6,459,741.63
3,229,870.82
3,229,870.82
4.2
4.3
4.4
4.5
4.6
4.7
271.43
10.22
150.00
200.00
15.00
7.00
27,279.26
23,945.52
12,844.25
10,269.27
177,650.56
569,128.39
7,404,409.42
244,723.17
1,926,638.22
2,053,854.03
2,664,758.38
3,983,898.73
202,244,076.80
3,702,204.71
122,361.58
963,319.11
1,026,927.01
1,332,379.19
1,991,949.37
3,702,204.71
122,361.58
963,319.11
1,026,927.01
1,332,379.19
1,991,949.37
5.1
24,738,023.58
202,244,076.80
1.00
59.00
1.00
1.00
6.00
3.00
1.00
1.00
24,616,000.00
93,506.56
848,100.00
1,240,000.00
584,900.00
398,200.00
1,258,400.00
589,700.00
38,773,086.80
24,616,000.00
5,516,886.80
848,100.00
1,240,000.00
3,509,400.00
1,194,600.00
1,258,400.00
589,700.00
45.00
42.00
30.00
11.00
13.00
17.00
1.00
16.00
386.00
459.00
570.00
12.00
98,900.00
79,600.00
42,500.00
3,568,700.00
584,900.00
398,200.00
17,889,000.00
286,700.00
29,400.00
54,300.00
38,500.00
267,800.00
146,604,400.00
4,450,500.00
3,343,200.00
1,275,000.00
39,255,700.00
7,603,700.00
6,769,400.00
17,889,000.00
4,587,200.00
11,348,400.00
24,923,700.00
21,945,000.00
3,213,600.00
286.00
29.00
344.00
9.00
29.00
7,800.00
296,400.00
4,900.00
198,000.00
88,710.00
16,866,590.00
2,230,800.00
8,595,600.00
1,685,600.00
1,782,000.00
2,572,590.00
UN
UN
ML
UN
UN
UN
34.00
3.00
346.00
1.00
28.00
11.00
228,000.00
350,000.00
9,800.00
3,458,900.00
49,800.00
124,200.00
7,752,000.00
1,050,000.00
3,390,800.00
3,458,900.00
1,394,400.00
1,366,200.00
164,544,809.92
EXCAVACION Y NIVELACION
BASE GRANULAR COMPACTADA
IMPRIMACION
MEZCLA DENSA EN CALIENTE MDC-2 ASFALTO
Parqueaderos Publicos
M3
M3
M2
M3
961.77
577.06
2,564.00
307.77
16,598.01
68,387.58
1,195.74
344,583.33
15,963,511.50
39,463,973.39
3,065,877.36
106,051,447.67
68,046,599.71
68,046,599.71
8.1
8.2
8.3
8.4
EXCAVACION Y NIVELACION
BASE GRANULAR COMPACTADA
IMPRIMACION
MEZCLA DENSA EN CALIENTE MDC-2 ASFALTO
Andenes
M3
M3
M3
M3
373.97
299.18
119.67
119.67
16,598.01
68,387.58
1,195.74
344,583.33
6,207,158.55
20,459,921.14
143,094.68
41,236,425.33
73,686,333.00
73,686,333.00
9.1
9.2
9.3
EXCAVACION Y NIVELACION
BASE GRANULAR COMPACTADA
ANDENES
M3
M3
M2
235.88
157.25
1,572.53
16,598.01
68,387.58
37,530.00
3,915,130.77
10,754,151.33
59,017,050.90
5,1-1
5,1-2
5,1-3
5,1-4
5,1-5
5,1-6
5,1-7
5,1-8
5,2-1
5,2-2
5,2-3
5,2-4
5,2-5
5,2-6
5,2-7
5,2-8
5,2-9
5,2-10
5,2-11
5,2-12
5,3-1
5,3-2
5,3-3
5,3-4
5,3-5
6.1
6.2
6.3
6.4
6.5
6.6
7.1
7.2
7.3
7.4
5.2
5.3
Redes Telefonicas
18,412,300.00
Jun-11
44,222,400.00
799,850.00
1.5
UND
May-11
370,040,893.09
8,205,333.33
1,838,962.27
282,700.00
413,333.33
1,169,800.00
398,200.00
419,466.67
196,566.67
8,205,333.33
1,838,962.27
282,700.00
413,333.33
1,169,800.00
398,200.00
419,466.67
196,566.67
8,205,333.33
1,838,962.27
282,700.00
413,333.33
1,169,800.00
398,200.00
419,466.67
196,566.67
1,483,500.00
1,114,400.00
425,000.00
13,085,233.33
2,534,566.67
2,256,466.67
5,963,000.00
1,529,066.67
3,782,800.00
8,307,900.00
7,315,000.00
1,071,200.00
1,483,500.00
1,114,400.00
425,000.00
13,085,233.33
2,534,566.67
2,256,466.67
5,963,000.00
1,529,066.67
3,782,800.00
8,307,900.00
7,315,000.00
1,071,200.00
1,483,500.00
1,114,400.00
425,000.00
13,085,233.33
2,534,566.67
2,256,466.67
5,963,000.00
1,529,066.67
3,782,800.00
8,307,900.00
7,315,000.00
1,071,200.00
1,115,400.00
4,297,800.00
842,800.00
891,000.00
1,286,295.00
1,115,400.00
4,297,800.00
842,800.00
891,000.00
1,286,295.00
18,412,300.00
7,752,000.00
1,050,000.00
3,390,800.00
3,458,900.00
1,394,400.00
1,366,200.00
164,544,809.92
7,981,755.75
19,731,986.69
1,532,938.68
53,025,723.83
1,957,565.39
1,957,565.39
10,754,151.33
59,017,050.90
Sardineles
10
EXCAVACION Y NIVELACION
BASE GRANULAR COMPACTADA
SARDINELES
Equipamento Urbano
SALON COMUNAL Y PORTERIA
11.1-1
11.1-2
11.1-3
11.1-4
11.1-5
11.1-6
11.1-7
11.1-8
11.1-9
11.1-10
11.1-11
11.1-12
11.1-13
11.1-14
11.1-15
LOCALIZACION Y REPLANTEO
m2
ACERO 60,000 PSI Y 30.000 PSI
kg
EXCAVACION
m3
RELLENO COMPACTADO
m3
CAJAS DE INSPECCION
und
CONCRETO DE LIMPIEZA
m3
ZAPATAS Z1
und
VG CM1
ml
COLUMNAS
ml
VIGAS AEREAS
ml
PLACA CONTRAPISO
m2
PLACA ENTREPISO
m2
ESCALERAS
ml
VIGAS DE CORONAMIENTO
ml
CUBIERTA (TEJA ZINC + CORREA MET. + FLACHIN + CANAL)
m2
RED HIDRAULICA
PVC-P 1/2"
ml
PVC-P 3/4"
ml
RED SANITARIA
PVC-S 6"
ml
PVC-S 4"
ml
PVC-S 3"
ml
PVC-S 2"
ml
REVENTILACION PVC-L 2"
ml
BAN 4"
ml
PUNTOS HIDRAULICOS 1/2"
und
PUNTOS SANITARIOS
PUNTO SANITARIO 2"
und
PUNTO SANITARIO 3"
und
PUNTO SANITARIO 4"
und
APARATOS SANITARIOS
lavamanos
und
sanitario
und
lavaplatos
und
PUNTOS ELECTRICOS
punto de iluminacion
und
toma electrica
und
MAMPOSTERIA CONFINADA
ml
PAETES
m2
CARPINTERIA METALICA
VENTANAS
m2
PUERTAS METALICAS
m2
ENCHAPES
m2
11
11.10
11.1-16
11.1-17
11.1-18
11.1-19
11.1-20
11.1-21
11.1-22
11.1-23
11.1-24
11.1-25
11.1-26
11.1-27
11.1-28
11.1-29
11.1-30
11.1-31
11.1-32
11.1-33
11.1-34
11.1-35
11.1-36
11.1-37
M3
M3
ml
25.58
20.46
255.77
16,598.01
68,387.58
32,309.57
176.74
1,500.00
106.04
53.02
1.00
140.00
20.00
104.07
108.36
104.07
176.74
176.74
6.70
104.07
149.40
60.00
40.00
14.67
16.22
22.81
8.78
5.93
3.51
14.00
6.00
6.00
6.00
6.00
6.00
1.00
21.00
20.00
216.38
66.09
105.32
17.30
176.74
1,089.70
2,065.00
16,600.00
36,294.32
177,650.56
12,172.14
332,813.34
49,609.04
46,426.39
44,012.99
50,272.30
50,936.51
370,184.51
38,387.58
102,772.48
8,887.37
11,990.61
27,279.26
23,945.52
12,844.25
10,269.27
13,782.39
22,127.28
14,895.27
16,765.35
25,712.15
37,424.51
137,890.24
119,208.14
25,617.14
36,750.52
24,866.18
67,984.28
11,120.84
70,481.47
157,330.86
42,069.68
424,527.35
1,399,319.20
8,263,818.87
146,390,002.72
108,899,520.79
192,593.51
3,097,500.00
1,760,330.40
1,924,397.47
177,650.56
1,704,099.93
6,656,266.76
5,162,812.78
5,030,763.46
4,580,432.22
8,885,126.35
9,002,518.28
2,480,236.22
3,994,995.03
15,354,516.62
533,241.93
479,624.54
400,186.74
388,396.26
292,977.45
90,164.19
81,729.54
77,666.74
208,533.74
100,592.10
154,272.92
224,547.07
827,341.47
715,248.87
25,617.14
771,760.82
497,323.57
14,710,751.97
734,976.05
7,423,108.72
2,721,823.84
7,435,395.56
19.77
300.00
11.86
4.94
1.00
15.00
10.00
30.63
24.00
19.77
30.63
31.46
40.00
16.12
7.95
5.58
9.00
2.00
5.00
2.00
2.00
2.00
4.00
7.00
40.89
38.63
12.00
11.20
69.19
1,089.70
2,065.00
16,600.00
36,294.32
177,650.56
12,172.14
205,453.74
53,022.74
59,456.34
50,272.30
38,387.58
102,772.48
8,887.37
28,443.54
12,844.25
10,269.27
14,895.27
16,765.35
25,712.15
37,424.51
137,890.24
119,208.14
25,617.14
33,829.94
67,984.28
11,120.84
70,481.47
157,330.86
42,069.68
22,812,386.15
21,543.36
619,500.00
196,909.20
179,384.68
177,650.56
182,582.14
2,054,537.38
1,624,086.42
1,426,952.09
993,883.38
1,175,811.45
3,233,222.18
355,494.62
458,509.81
102,111.83
57,302.53
134,057.40
33,530.70
128,560.77
74,849.02
275,780.49
238,416.29
102,468.58
236,809.55
2,780,149.29
429,597.89
845,777.67
1,762,105.61
2,910,801.28
VESTIERES
11.2
11.2-1
11.2-2
11.2-3
11.2-4
11.2-5
11.2-6
11.2-7
11.2-8
11.2-9
11.2-10
11.2-11
11.2-12
11.2-13
11.2-14
11.2-15
11.2-16
11.2-19
11.2-20
11.2-21
11.2-22
11.2-23
11.2-24
11.2-25
11.2-26
11.2-27
11.2-28
11.2-29
11.2-30
11.2-31
11.3
10,087,665.43
10.1
10.2
10.3
LOCALIZACION Y REPLANTEO
m2
ACERO 60,000 PSI Y 30.000 PSI
kg
EXCAVACION
m3
RELLENO COMPACTADO
m3
CAJAS DE INSPECCION
und
CONCRETO DE LIMPIEZA
m3
ZAPATAS Z2 (0,80*0,80)
und
VG CM2 (0,25*0,30)
ml
COLUMNAS (0,25*0,25)
ml
PLACA CONTRAPISO
m2
VIGAS CORONAMIENTO
ml
CUBIERTA (TEJA ZINC + CORREA MET. + FLACHIN + CANAL)
m2
RED HIDRAULICA
PVC-P 1/2"
ml
RED SANITARIA
PVC-S 4"
ml
PVC-S 3"
ml
PVC-S 2"
ml
PUNTOS HIDRAULICOS 1/2"
und
PUNTOS SANITARIOS
PUNTO SANITARIO 2"
und
PUNTO SANITARIO 3"
und
PUNTO SANITARIO 4"
und
APARATOS SANITARIOS
lavamanos
und
sanitario
und
duchas
und
PUNTOS ELECTRICOS
punto de iluminacion
und
MAMPOSTERIA CONFINADA
ml
PAETES
m2
CARPINTERIA METALICA
VENTANAS
m2
PUERTAS METALICAS
m2
ENCHAPES
m2
CUARTO DE BASURAS 1
5,107,396.72
10,087,665.43
212,263.68
146,390,002.72
212,263.68
1,399,319.20
8,263,818.87
11.3-1
11.3-2
11.3-3
11.3-4
11.3-5
11.3-6
11.3-7
11.3-8
11.3-9
11.3-10
11.3-11
11.3-12
11.3-13
11.3-14
LOCALIZACION Y REPLANTEO
m2
ACERO 60,000 PSI Y 30.000 PSI
kg
CONCRETO DE LIMPIEZA
m3
PLACA CONTRAPISO
m2
CUBIERTA (TEJA ZINC + CORREA MET. + FLACHIN + CANAL)
m2
RED HIDRAULICA
PVC-P 1/2"
ml
RED SANITARIA
PVC-S 3"
ml
PUNTOS HIDRAULICOS 1/2"
und
PUNTOS SANITARIOS
PUNTO SANITARIO 3"
und
MAMPOSTERIA CONFINADA
m2
COLUMNAS (0,12*0,12)
ml
VIGUETA CONFINAMIENTO
ml
CARPINTERIA METALICA
CERRAMIENTO EN MALLA
m2
PUERTAS METALICAS
m2
9.37
250.00
9.37
9.37
13.48
1,089.70
2,065.00
12,172.14
50,272.30
102,772.48
10,210.49
516,250.00
114,052.97
471,051.45
1,385,373.01
1.80
8,887.37
15,997.26
2.30
1.00
12,844.25
14,895.27
29,541.79
14,895.27
6.00
7.79
12.66
8.66
25,712.15
67,984.28
16,520.69
8,443.17
154,272.92
529,597.57
209,151.99
73,117.85
10.89
5.60
64,539.15
157,330.86
702,831.34
881,052.80
9.37
250.00
9.37
9.37
13.48
1,089.70
2,065.00
12,172.14
50,272.30
102,772.48
5,107,396.72
10,210.49
516,250.00
114,052.97
471,051.45
1,385,373.01
1.80
8,887.37
15,997.26
2.30
1.00
12,844.25
14,895.27
29,541.79
14,895.27
6.00
7.79
12.66
8.66
25,712.15
67,984.28
16,520.69
8,443.17
154,272.92
529,597.57
209,151.99
73,117.85
10.89
5.60
64,539.15
157,330.86
702,831.34
881,052.80
1.00
4,463,302.34
4,463,302.34
14,170,362.50
2,500.00
80.00
80.00
2,115.14
68,418.84
42,612.56
5,287,850.38
5,473,507.27
3,409,004.85
81,148,582.30
CUARTO DE BASURAS 2
11.4
11.4-1
11.4-2
11.4-3
11.4-4
11.4-5
11.4-13
11.4-14
LOCALIZACION Y REPLANTEO
m2
ACERO 60,000 PSI Y 30.000 PSI
kg
CONCRETO DE LIMPIEZA
m3
PLACA CONTRAPISO
m2
CUBIERTA (TEJA ZINC + CORREA MET. + FLACHIN + CANAL)
m2
RED HIDRAULICA
PVC-P 1/2"
ml
RED SANITARIA
PVC-S 3"
ml
PUNTOS HIDRAULICOS 1/2"
und
PUNTOS SANITARIOS
PUNTO SANITARIO 3"
und
MAMPOSTERIA CONFINADA
m2
COLUMNAS (0,12*0,12)
ml
VIGUETA CONFINAMIENTO
ml
CARPINTERIA METALICA
CERRAMIENTO EN MALLA
m2
PUERTAS METALICAS
m2
11.5-1
KIOSKO
11.4-6
11.4-7
11.4-8
11.4-9
11.4-10
11.4-11
11.4-12
KIOSKO
11.5
4,463,302.34
gl
12
12.1
12.2
12.3
EMPRADIZACION
PALMAS
ARBUSTIVOS
m2
und
und
ZONA DE PISCINA
13
14,170,362.50
81,148,582.30
1,206,952,521.37
-2
57,942,723.57
799,850.00
28,363,866.67
97,386,740.23
69,511,885.36
104,302,772.62
206,362,062.33
171,870,315.56
5,452,839,461.40
92,550,830.29
70,268,223.57
21,753,200.00
40,689,366.67
239,466,185.40
341,129,061.98
616,070,494.92
806,965,243.73
574,346,528.66
272,641,973.07
163,585,183.84
6,000,000.00
2,776,524.91
6,000,000.00
2,108,046.71
6,000,000.00
652,596.00
6,000,000.00
1,220,681.00
6,000,000.00
7,183,985.56
6,000,000.00
10,233,871.86
26,293,552.56
18,482,114.85
26,293,552.56
24,208,957.31
26,293,552.56
17,230,395.86
436,227,156.91
8,776,524.91
8,108,046.71
6,652,596.00
7,220,681.00
13,183,985.56
16,233,871.86
44,775,667.41
50,502,509.88
43,523,948.42
5,889,066,618.32
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
5.00%
3.00%
8.00%
77,424,532.86
OBRAS DE URBANISMO Y CONSTRUCCION
2.60%
0%
0%
1.20%
0%
0%
141,773,826.00
65,434,073.54
-
3.80%
207,207,899.53
6,096,274,517.85
56,709,530
56,709,530.40
6,096,274,517.85
7,925,000,000.00
3
1
1
2
5
6
Notariales y de Registro
Costos comerciales
Financieros pago intereses
Honorarios de construccin
Gastos de ventas y postventas
CREDITO CONSTRUCTOR
2.5%
3.5%
2.5%
1.7%
2.0%
2.0%
198,125,000.00
277,375,000.00
198,125,000.00
163,336,000.00
158,500,000.00
158,500,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
13,500,000.00
3,000,000.00
18,312,500.00
18,312,500.00
18,312,500.00
18,312,500.00
65,968,750.00
3,000,000.00
12,000,000.00
3,000,000.00
12,000,000.00
3,000,000.00
12,000,000.00
3,000,000.00
12,000,000.00
3,000,000.00
12,000,000.00
14,350,000.00
14,350,000.00
14,350,000.00
14,350,000.00
37,812,500.00
18,000,000.00
18,000,000.00
31,500,000.00
18,000,000.00
32,662,500.00
32,662,500.00
32,662,500.00
98,631,250.00
19,812,500.00
1,201,000,000.00
14.2%
1,153,961,000.00
155,975,000.00
4
VALOR LOTE
2.0%
2.0%
158,500,000.00
0
158,500,000.00
7,408,735,517.85
UTILIDAD
5
1
6.51
6.51
516,264,482.15
0
516,264,482.15
7,925,000,000.00
110,000,000.00
110,000,000.00
660,000,000.00
82,500,000.00
82,500,000.00
82,500,000.00
82,500,000.00
82,500,000.00
82,500,000.00
82,500,000.00
82,500,000.00
1,470,000,000.00
5,685,000,000.00
800,000,000.00
7,925,000,000.00
192,500,000.00
82,500,000.00
82,500,000.00
82,500,000.00
82,500,000.00
82,500,000.00
262,500,000.00
345,000,000.00
262,500,000.00
345,000,000.00
262,500,000.00
262,500,000.00
195,849,385.60
96,376,270.27
46,405,796.00
79,410,047.67
270,650,170.96
396,568,841.19
700,052,069.69
896,673,660.96
723,045,134.43
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
-
14,790,600.00
14,790,600.00
67,567,500.0
67,567,500.00
67,567,500.00
864,222.1
864,222.11
3,050,588.8
3,050,588.80
3,050,588.80
24,540,310.3
24,540,310.31
24,540,310.31
864,222.11
24,540,310.31
17,675,049.9
17,675,049.91
17,675,049.91
17,675,049.91
2,041,468.3
2,041,468.26
2,041,468.26
2,041,468.26
702,314.0
702,314.02
702,314.02
702,314.02
57,979,238.8
57,979,238.78
57,979,238.78
58,392,408.0
58,392,407.99
58,392,407.99
22,832,075.6
22,832,075.63
48,433,221.7
48,433,221.71
97,390,601.8
97,390,601.8
97,390,601.8
6,375,876.2
6,375,876.2
6,375,876.2
3,316,853.2
3,316,853.2
3,316,853.2
597,585.0
597,585.0
597,585.0
1,262,503.6
1,262,503.6
1,262,503.6
468,209.3
468,209.3
468,209.3
1,642,189.46
17,791,069.82
22,832,075.63
48,433,221.71
5,350,352.94
5,350,352.94
5,738,078.70
5,738,078.70
491,619.81
491,619.81
1,970,627.35
1,970,627.35
21,349,283.78
21,349,283.78
21,349,283.78
3,092,829.4
2,131,806.7
7,365,400.1
6,896,308.5
1,849,572.7
11,522,121.1
2,920,800.5
2,920,800.5
2,920,800.5
2,920,800.5
5,267,942.4
5,267,942.4
5,267,942.4
5,267,942.4
3,684,031.5
3,684,031.5
3,684,031.5
3,684,031.5
1,508,881.4
1,508,881.4
1,508,881.4
1,508,881.4
2,314,093.8
2,314,093.8
2,314,093.8
2,314,093.8
1,122,735.4
1,122,735.4
1,122,735.4
1,122,735.4
6,784,199.6
6,784,199.6
6,784,199.6
6,784,199.6
1,519,739.5
1,519,739.5
1,519,739.5
1,519,739.5
3,507,254.4
3,507,254.4
3,507,254.4
3,507,254.4
56,512.4
56,512.4
56,512.4
73,194.1
73,194.1
73,194.1
73,194.1
2,234,290.0
2,234,290.0
2,234,290.0
2,234,290.0
56,512.4
619,114.8
1,799,715.0
819,897.5
819,897.5
819,897.5
819,897.5
2,361,258.9
2,361,258.9
2,361,258.9
2,361,258.9
226,948.4
226,948.4
226,948.4
226,948.4
250,885.9
250,885.9
250,885.9
250,885.9
10,473,896.8
10,473,896.8
10,473,896.8
10,473,896.8
6,154,379.1
6,154,379.1
6,154,379.1
6,154,379.1
1,104,996.8
1,104,996.8
1,104,996.8
1,104,996.8
196,343.67
196,343.67
196,343.67
196,343.67
1,202,787.50
1,202,787.50
1,202,787.50
1,202,787.50
1,279,142.16
24,157,337.96
28,988,805.55
28,988,805.55
9,396,349.66
11,275,619.59
11,275,619.59
1,995,278.57
2,394,334.28
2,394,334.28
5,622,000.00
6,746,400.00
6,746,400.00
6,872,111.61
8,246,533.93
7,702,878.22
9,243,453.86
3,195,875.91
16,362,517.83
3,195,875.91
19,635,021.39
19,635,021.39
29,003,595.28
34,804,314.33
34,804,314.33
34,804,314.33
2,258,040.04
2,709,648.05
2,709,648.05
2,709,648.05
37,786,588.63
45,343,906.36
8,711,709.54
10,454,051.45
14,773,170.45
17,727,804.54
17,727,804.54
10,754,832.50
12,905,799.01
12,905,799.01
4,913,809.11
5,896,570.94
5,896,570.94
5,545,551.93
6,654,662.31
6,654,662.31
26,953,673.92
32,344,408.71
32,344,408.71
2,690,629.46
3,228,755.35
3,228,755.35
1,187,263.36
1,424,716.03
1,424,716.03
2,868,340
3,442,007.42
7,710,446.27
9,252,535.52
14,761,035.65
14,761,035.65
8,854,748.65
8,854,748.65
9,252,535.52
3,074,057.30
402,476,213.10
14,790,600.00
203,084,561.50
467,275,096.28
569,825,719.10
677,141,549.51
324,495,027.63
4,245,886,940.03
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
4493580
nelly
959,820.00
959,820.00
8,205,333.33
1,838,962.27
282,700.00
413,333.33
1,169,800.00
398,200.00
419,466.67
196,566.67
1,483,500.00
1,114,400.00
425,000.00
13,085,233.33
2,534,566.67
2,256,466.67
5,963,000.00
1,529,066.67
3,782,800.00
8,307,900.00
7,315,000.00
1,071,200.00
1,115,400.00
4,297,800.00
842,800.00
891,000.00
1,286,295.00
7,752,000.00
1,050,000.00
3,390,800.00
3,458,900.00
1,394,400.00
1,366,200.00
7,981,755.75
19,731,986.69
1,532,938.68
53,025,723.83
7,981,755.75
19,731,986.69
1,532,938.68
53,025,723.83
3,103,579.28
3,103,579.28
20,459,921.14
143,094.68
41,236,425.33
54,449,760.40
54,449,760.40
22,812,386.15
5,107,396.72
5,107,396.72
4,463,302.34
2,643,925.19
2,736,753.64
1,704,502.42
2,643,925.19
2,736,753.64
1,704,502.42
171,870,315.56
83,232,224.96
12,192,577.97
574,346,528.66
98,022,824.96
215,277,139.46
467,275,096.28
26,293,552.56
17,230,395.86
26,293,552.56
2,940,684.75
26,293,552.56
6,458,314.18
43,523,948.42
29,234,237.31
32,751,866.75
98,127,630.82
199,435,338.43
569,825,719.10
775,269,180.33
523,930,366.06
26,293,552.56
14,018,252.89
26,293,552.56
17,094,771.57
26,293,552.56
23,258,075.41
26,293,552.56
15,717,910.98
40,311,805.45
43,388,324.14
49,551,627.97
42,011,463.55
1,206,952,521.37
436,227,156.91
85,064,295.60
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
6,543,407.35
91,607,702.95
18,312,500.00
65,968,750.00
18,312,500.00
65,968,750.00
29,718,750.00
18,312,500.00
18,312,500.00
18,312,500.00
18,312,500.00
65,968,750.00
14,350,000.00
14,350,000.00
14,350,000.00
19,700,000.00
14,350,000.00
19,700,000.00
14,350,000.00
19,700,000.00
14,350,000.00
19,700,000.00
18,312,500.00
65,968,750.00
148,593,750.00
163,336,000.00
14,350,000.00
19,700,000.00
98,631,250.00
128,350,000.00
52,362,500.00
52,362,500.00
52,362,500.00
118,331,250.00
430,261,000.00
207,207,899.53
1,153,961,000.00
262,500,000.00
262,500,000.00
400,000,000.00
840,000,000.00
62,500,000.00
1,302,500,000.00
400,000,000.00
840,000,000.00
62,500,000.00
1,302,500,000.00
400,000,000.00
840,000,000.00
262,500,000.00
262,500,000.00
840,000,000.00
62,500,000.00
902,500,000.00
400,000,000.00
840,000,000.00
262,500,000.00
262,500,000.00
1,240,000,000.00
1,240,000,000.00
723,045,134.43
262,150,469.62
306,934,913.57
566,492,809.09
672,119,950.59
949,695,465.65
1,087,810,532.56
15de52
OBRA
CIUDAD
CAP
ALTOS DE PAYANDA
NOCAIMA-CUNDINAMARCA
TIPO
FECHA
CONSTRUCCION DE TORRES
JULIO DE 2010
VALOR UNITARIO
ITEM
No
OBRAS DE URBANISMO
Und.
CANT
M
M3
ML
M3
KG
M3
ML
TOTAL
UNITARIO
valor parcial
MATERIAL Y
EQUIPO
VALOR
MANO OBRA
8,880.00
5,328.00
414.04
277.57
13,320.00
5,126.00
240.00
794.56
16,600.00
8,500.00
321,370.00
2,030.00
16,600.00
41,000.00
295.14
197,140.00
35.00
8,500.00
1,089.70
16,600.00
8,500.00
518,510.00
2,065.00
16,600.00
49,500.00
9,676,532.39
88,444,800.00
3,519,340.00
143,922,820.70
27,505,800.00
85,091,600.00
11,880,000.00
231,646.75
5,345.64
9,334.32
11,834.07
16,111.42
20,600,000.00
13,281.47
3,541.73
2,656.29
2,656.29
2,656.29
1,900,000.00
244,928.22
8,887.37
11,990.61
14,490.36
18,767.71
22,500,000.00
244,928.22
1,066,483.86
3,919,491.71
1,738,843.61
3,973,124.93
22,500,000.00
PRELIMINARES
1.1
LOCALIZACION Y REPLANTEO
1.2
DESCAPOTE, EXCAVACION, TRANSPORTE Y NIVELACION
1.3
CERRAMIENTO LOTE
1.4
MUROS DE CONTENCION
1.5
ACERO 60,000 PSI Y 30.000 PSI
1.6
EXCAVACION
1.7
FILTRO EN PIEDRA (INCLUYE EXCAVACION Y GEOTEXTIL)
Mitigacion Impacto Ambiental y Control Ambiental
Redes de Acueducto
UND
ML
ML
ML
ML
UN
1.00
120.00
326.88
120.00
211.70
1.00
3.1
ACOMETIDA
3.2
RED SUMINSTRO PVC-P 1/2"
3.3
RED SUMINSTRO PVC-P 3/4"
3.4
RED SUMINSTRO PVC-P 1"
3.5
RED SUMINSTRO PVC-P 2"
3.6
TANQUE DE ALMACENAMIENTO
Redes de Alcantarillado
ML
ML
ML
ML
ML
UND
UND
150.98
271.43
10.22
150.00
200.00
15.00
7.00
4.1
TUBERIA PVC-S 8"
4.2
TUBERIA PVC-S 6"
4.3
TUBERIA PVC-S 4"
4.4
TUBERIA PVC-S 3"
4.5
TUBERIA PVC-S 2"
4.6
CAJAS DE INSPECCION (1,0*1,0)
4.7
POZOS DE INSPECCION
Redes de Energia Electrica y Alumbrado Publico
5.1
1.00
59.00
1.00
1.00
6.00
3.00
1.00
1.00
$ 18,101,000.0
$ 65,454.6
$ 593,670.0
$ 868,000.0
$ 409,430.0
$ 278,740.0
$ 880,880.0
$ 412,790.0
$ 7,384,800.0
$ 28,052.0
$ 254,430.0
$ 372,000.0
$ 175,470.0
$ 119,460.0
$ 377,520.0
$ 176,910.0
24,616,000
93,507
848,100
1,240,000
584,900
398,200
1,258,400
589,700
24,616,000
5,516,887
848,100
1,240,000
3,509,400
1,194,600
1,258,400
589,700
5.2
5,1-1
SUBESTACIONES ELECTRICAS CAPSULADA DE 225 KVA
5,1-2
CABLE XLPE 15 KV CALIBRE 3x1/0
5,1-3
POSTE DE CONCRETO DE 12m 1050 Kg
5,1-4
ESTRUCTURA TERMINAL CON PROTECCIONES
5,1-5
CAJA DE INSPECCION CS - 276
5,1-6
CAJA DE INSPECCION CS - 275
5,1-7
PUESTA A TIERRA SUBESTACION
5,1-8
BAJANTE EN TUBERIA GALVANIZADA DE 3"
RED DE BAJA TENSION
UN
ML
ML
UN
UN
UN
UN
UN
ML
ML
ML
UN
45.00
42.00
30.00
11.00
13.00
17.00
1.00
16.00
386.00
459.00
570.00
12.00
$ 69,230.0
$ 55,720.0
$ 29,750.0
$ 2,498,090.0
$ 409,430.0
$ 278,740.0
$ 12,522,300.0
$ 200,690.0
$ 20,580.0
$ 38,010.0
$ 26,950.0
$ 187,460.0
$ 29,670.0
$ 23,880.0
$ 12,750.0
$ 1,070,610.0
$ 175,470.0
$ 119,460.0
$ 5,366,700.0
$ 86,010.0
$ 8,820.0
$ 16,290.0
$ 11,550.0
$ 80,340.0
98,900
79,600
42,500
3,568,700
584,900
398,200
17,889,000
286,700
29,400
54,300
38,500
267,800
4,450,500
3,343,200
1,275,000
39,255,700
7,603,700
6,769,400
17,889,000
4,587,200
11,348,400
24,923,700
21,945,000
3,213,600
5.3
5,2-1
BANCO DE DUCTOS TUBERIA PVC 6x4 "+ 1x3"
5,2-2
BANCO DE DUCTOS TUBERIA PVC 6x3 "+ 1x2"
5,2-3
BANCO DE DUCTOS TUBERIA PVC 3x2" + 1x1"
5,2-4
ARMARIO MEDIDORES DE ENERGIA DE 24 CTAS
5,2-5
CAJA DE INSPECCION CS - 275
5,2-6
CAJA DE INSPECCION CS - 274
5,2-7
TABLERO GENERAL ACOMETIDAS (PARA 12 ARMARIOS)
5,2-8
ACOMETIDA CABLE 2(4x4/0) MCM
5,2-9
ACOMETIDA PARCIAL EN CABLE 4x4 AWG
5,2-10
ACOMETIDA EN CABLE 3x1/0 + 1x4
5,2-11
ACOMETIDA EN CABLE 3x2 + 1x4
5,2-12
PUESTA ATIERRA ARMARIOS DE MEDIDORES
RED DE ALUMBRADO PUBLICO Y BOMBAS
ML
UN
ML
UN
JGO
286.00
29.00
344.00
9.00
29.00
$ 5,460.0
$ 207,480.0
$ 3,430.0
$ 138,600.0
$ 62,097.0
$ 2,340.0
$ 88,920.0
$ 1,470.0
$ 59,400.0
$ 26,613.0
7,800
296,400
4,900
198,000
88,710
2,230,800
8,595,600
1,685,600
1,782,000
2,572,590
5,3-1
DUCTERIA PVC DE 1x1"
5,3-2
LUMINARIA ORNAMENTAL DE 3 m x70 W
5,3-3
ACOMETIDA ALUMBRADO PUBLICO 2#4 Al
5,3-4
CAJA INSPECCION AP-280
5,3-5
PEDESTAL EN CONCRETO PARA POSTE ORNAMENTAL
Redes Telefonicas
UN
UN
ML
UN
UN
UN
34.00
3.00
346.00
1.00
28.00
11.00
$ 159,600.0
$ 245,000.0
$ 6,860.0
$ 2,421,230.0
$ 34,860.0
$ 86,940.0
$ 68,400.0
$ 105,000.0
$ 2,940.0
$ 1,037,670.0
$ 14,940.0
$ 37,260.0
228,000
350,000
9,800
3,458,900
49,800
124,200
7,752,000
1,050,000
3,390,800
3,458,900
1,394,400
1,366,200
6.1
CAJA DE PASO TELEFONICA SENCILLA
6.2
CAJA DE PASO TELEFONICA DOBLE
6.3
CABLE MULTIPAR EXTERIOR DE 50 PARES
6.4
STRIP TELEFONICO DE 300 PARES COMPLETO
6.5
CAJAS DE PASO DE PISO DE20x25x10 cm
6.6
STRIP TELEFONICO DE 30 PARES COMPLETO
Vias Vehiculares
M3
M3
M2
M3
961.77
577.06
2,564.00
307.77
790.38
64,080.00
979.20
326,583.33
15,807.63
4,307.58
216.54
18,000.00
16,598.01
68,387.58
1,195.74
344,583.33
15,963,511.50
39,463,973.39
3,065,877.36
106,051,447.67
7.1
EXCAVACION Y NIVELACION
7.2
BASE GRANULAR COMPACTADA
7.3
IMPRIMACION
7.4
MEZCLA DENSA EN CALIENTE MDC-2 ASFALTO
Parqueaderos Publicos
8.1
8.2
8.3
8.4
M3
M3
M3
M3
373.97
299.18
119.67
119.67
790.38
64,080.00
979.20
326,583.33
15,807.63
4,307.58
216.54
18,000.00
16,598.01
68,387.58
1,195.74
344,583.33
6,207,158.55
20,459,921.14
143,094.68
41,236,425.33
EXCAVACION Y NIVELACION
BASE GRANULAR COMPACTADA
IMPRIMACION
MEZCLA DENSA EN CALIENTE MDC-2 ASFALTO
$ 35,196.0
$ 21,572.1
$ 17,713.8
$ 9,990.7
$ 9,186.6
$ 148,136.1
$ 320,877.5
$ 7,589.4
$ 5,707.2
$ 6,231.7
$ 2,853.6
$ 1,082.7
$ 29,514.4
$ 248,250.9
$ 42,785.4
$ 27,279.3
$ 23,945.5
$ 12,844.3
$ 10,269.3
$ 177,650.6
$ 569,128.4
valor capitulo
$ 370,040,893.09
30.69
$ 33,442,872.32
2.77
$ 24,738,023.58
2.05
$ 202,244,076.80
16.78
$ 6,459,741.63
$ 7,404,409.42
$ 244,723.17
$ 1,926,638.22
$ 2,053,854.03
$ 2,664,758.38
$ 3,983,898.73
$ 38,773,086.80
$ 146,604,400.00
$ 16,866,590.00
$ 18,412,300.00
1.53
$ 164,544,809.92
13.65
$ 68,046,599.71
5.64
16de52
OBRA
CIUDAD
CAP
9
ALTOS DE PAYANDA
NOCAIMA-CUNDINAMARCA
CONSTRUCCION DE TORRES
JULIO DE 2010
VALOR UNITARIO
ITEM
No
OBRAS DE URBANISMO
Und.
CANT
MATERIAL Y
EQUIPO
VALOR
MANO OBRA
TOTAL
UNITARIO
valor parcial
PRELIMINARES
Andenes
11
9.1
EXCAVACION Y NIVELACION
9.2
BASE GRANULAR COMPACTADA
9.3
ANDENES
Sardineles
10.1
EXCAVACION Y NIVELACION
10.2
BASE GRANULAR COMPACTADA
10.3
SARDINELES
Equipamento Urbano
11.1
10
TIPO
FECHA
11.1-1
11.1-2
11.1-3
11.1-4
11.1-5
11.1-6
11.1-7
11.1-8
11.1-9
11.1-10
11.1-11
11.1-12
11.1-13
11.1-14
11.1-15
11.1-16
11.1-17
11.1-18
11.1-19
11.1-20
11.1-21
11.1-22
11.1-23
11.1-24
11.1-25
11.1-26
11.1-27
11.1-28
11.1-29
11.1-30
11.1-31
11.1-32
11.1-33
11.1-34
11.1-35
11.1-36
11.1-37
11.2
11.2-1
11.2-2
11.2-3
11.2-4
11.2-5
11.2-6
11.2-7
11.2-8
11.2-9
11.2-10
11.2-11
11.2-12
11.2-13
11.2-14
M3
M3
M2
235.88
157.25
1,572.53
790.38
64,080.00
33,030.00
15,807.63
4,307.58
4,500.00
16,598.01
68,387.58
37,530.00
3,915,130.77
10,754,151.33
59,017,050.90
M3
M3
ml
25.58
20.46
255.77
790.38
64,080.00
29,648.23
15,807.63
4,307.58
2,661.34
16,598.01
68,387.58
32,309.57
424,527.35
1,399,319.20
8,263,818.87
valor capitulo
$ 73,686,333.00
6.11
$ 10,087,665.43
0.84
$ 145,051,543.46
12.03
$ 108,899,520.79
LOCALIZACION Y REPLANTEO
ACERO 60,000 PSI Y 30.000 PSI
EXCAVACION
RELLENO COMPACTADO
CAJAS DE INSPECCION
CONCRETO DE LIMPIEZA
ZAPATAS Z1
VG CM1
COLUMNAS
VIGAS AEREAS
PLACA CONTRAPISO
PLACA ENTREPISO
ESCALERAS
VIGAS DE CORONAMIENTO
CUBIERTA (TEJA ZINC + CORREA MET. + FLACHIN + CANAL)
RED HIDRAULICA
PVC-P 1/2"
PVC-P 3/4"
RED SANITARIA
PVC-S 6"
PVC-S 4"
PVC-S 3"
PVC-S 2"
REVENTILACION PVC-L 2"
BAN 4"
PUNTOS HIDRAULICOS 1/2"
PUNTOS SANITARIOS
PUNTO SANITARIO 2"
PUNTO SANITARIO 3"
PUNTO SANITARIO 4"
APARATOS SANITARIOS
lavamanos
sanitario
lavaplatos
PUNTOS ELECTRICOS
punto de iluminacion
toma electrica
MAMPOSTERIA CONFINADA
PAETES
CARPINTERIA METALICA
VENTANAS
PUERTAS METALICAS
ENCHAPES
VESTIERES
m2
kg
m3
m3
und
M2
und
ml
ml
ml
M2
m2
M3
M3
m2
0
ml
ml
0
ml
ml
ml
ml
ml
ml
und
0
und
und
und
176.74
1,500.00
106.04
53.02
1.00
140.00
20.00
104.07
108.36
104.07
176.74
176.74
6.70
104.07
149.40
60.00
40.00
14.67
16.22
22.81
8.78
5.93
3.51
14.00
6.00
6.00
6.00
794.56
2,030.00
16,600.00
30,000.00
148,136.14
11,237.39
319,122.81
41,394.72
41,217.26
38,803.86
41,213.46
30,400.72
320,331.06
35,411.52
83,798.34
295.14
35.00
6,294.32
29,514.42
934.75
13,690.53
8,214.32
5,209.13
5,209.13
9,058.84
20,535.79
49,853.45
2,976.06
18,974.14
1,089.70
2,065.00
16,600.00
36,294.32
177,650.56
12,172.14
332,813.34
49,609.04
46,426.39
44,012.99
50,272.30
50,936.51
370,184.51
38,387.58
102,772.48
192,593.51
3,097,500.00
1,760,330.40
1,924,397.47
177,650.56
1,704,099.93
6,656,266.76
5,162,812.78
5,030,763.46
4,580,432.22
8,885,126.35
9,002,518.28
2,480,236.22
3,994,995.03
15,354,516.62
5,345.64
9,334.32
3,541.73
2,656.29
8,887.37
11,990.61
533,241.93
479,624.54
21,572.10
17,713.83
9,990.68
9,186.56
10,240.66
19,470.98
9,582.68
5,707.15
6,231.68
2,853.58
1,082.71
3,541.73
2,656.29
5,312.59
27,279.26
23,945.52
12,844.25
10,269.27
13,782.39
22,127.28
14,895.27
400,186.74
388,396.26
292,977.45
90,164.19
81,729.54
77,666.74
208,533.74
9,175.94
15,086.98
24,143.04
7,589.41
10,625.18
13,281.47
16,765.35
25,712.15
37,424.51
100,592.10
154,272.92
224,547.07
und
und
und
6.00
6.00
1.00
127,063.10
108,381.00
14,790.00
10,827.14
10,827.14
10,827.14
137,890.24
119,208.14
25,617.14
827,341.47
715,248.87
25,617.14
und
und
ml
m2
21.00
20.00
216.38
66.09
27,896.20
14,241.00
57,359.11
5,808.25
8,854.32
10,625.18
10,625.18
5,312.59
36,750.52
24,866.18
67,984.28
11,120.84
771,760.82
497,323.57
14,710,751.97
734,976.05
m2
m2
m2
105.32
17.30
176.74
57,200.00
153,000.00
31,444.50
13,281.47
4,330.86
10,625.18
70,481.47
157,330.86
42,069.68
7,423,108.72
2,721,823.84
7,435,395.56
LOCALIZACION Y REPLANTEO
ACERO 60,000 PSI Y 30.000 PSI
EXCAVACION
RELLENO COMPACTADO
CAJAS DE INSPECCION
CONCRETO DE LIMPIEZA
ZAPATAS Z2 (0,80*0,80)
VG CM2 (0,25*0,30)
COLUMNAS (0,25*0,25)
PLACA CONTRAPISO
VIGAS CORONAMIENTO
CUBIERTA (TEJA ZINC + CORREA MET. + FLACHIN + CANAL)
RED HIDRAULICA
PVC-P 1/2"
RED SANITARIA
PVC-S 4"
m2
kg
m3
m3
und
m3
und
ml
ml
m2
ml
m2
19.77
300.00
11.86
4.94
1.00
15.00
10.00
30.63
24.00
19.77
30.63
31.46
794.56
2,030.00
16,600.00
30,000.00
148,136.14
11,237.39
191,763.21
39,332.21
45,765.81
41,213.46
35,411.52
83,798.34
295.14
35.00
6,294.32
29,514.42
934.75
13,690.53
13,690.53
13,690.53
9,058.84
2,976.06
18,974.14
1,089.70
2,065.00
16,600.00
36,294.32
177,650.56
12,172.14
205,453.74
53,022.74
59,456.34
50,272.30
38,387.58
102,772.48
21,543.36
619,500.00
196,909.20
179,384.68
177,650.56
182,582.14
2,054,537.38
1,624,086.42
1,426,952.09
993,883.38
1,175,811.45
3,233,222.18
ml
40.00
5,345.64
3,541.73
8,887.37
355,494.62
ml
16.12
21,802.80
6,640.74
28,443.54
458,509.81
$ 22,812,386.15
17de52
OBRA
CIUDAD
CAP
11.3
11.4
ALTOS DE PAYANDA
NOCAIMA-CUNDINAMARCA
TIPO
FECHA
CONSTRUCCION DE TORRES
JULIO DE 2010
VALOR UNITARIO
ITEM
No
OBRAS DE URBANISMO
Und.
CANT
MATERIAL Y
EQUIPO
VALOR
MANO OBRA
TOTAL
UNITARIO
valor parcial
PRELIMINARES
11.2-15 PVC-S 3"
11.2-16 PVC-S 2"
11.2-19 PUNTOS HIDRAULICOS 1/2"
PUNTOS SANITARIOS
11.2-20 PUNTO SANITARIO 2"
11.2-21 PUNTO SANITARIO 3"
11.2-22 PUNTO SANITARIO 4"
APARATOS SANITARIOS
11.2-23 lavamanos
11.2-24 sanitario
11.2-25 duchas
PUNTOS ELECTRICOS
11.2-26 punto de iluminacion
11.2-27 MAMPOSTERIA CONFINADA
11.2-28 PAETES
CARPINTERIA METALICA
11.2-29 VENTANAS
11.2-30 PUERTAS METALICAS
11.2-31 ENCHAPES
CUARTO DE BASURAS 1
ml
ml
und
7.95
5.58
9.00
9,990.68
9,186.56
9,582.68
2,853.58
1,082.71
5,312.59
12,844.25
10,269.27
14,895.27
102,111.83
57,302.53
134,057.40
und
und
und
2.00
5.00
2.00
9,175.94
15,086.98
24,143.04
7,589.41
10,625.18
13,281.47
16,765.35
25,712.15
37,424.51
33,530.70
128,560.77
74,849.02
und
und
und
2.00
2.00
4.00
127,063.10
108,381.00
14,790.00
10,827.14
10,827.14
10,827.14
137,890.24
119,208.14
25,617.14
275,780.49
238,416.29
102,468.58
und
ml
m2
7.00
40.89
38.63
27,189.20
57,359.11
5,808.25
6,640.74
10,625.18
5,312.59
33,829.94
67,984.28
11,120.84
236,809.55
2,780,149.29
429,597.89
m2
m2
m2
12.00
11.20
69.19
57,200.00
153,000.00
31,444.50
13,281.47
4,330.86
10,625.18
70,481.47
157,330.86
42,069.68
845,777.67
1,762,105.61
2,910,801.28
11.3-1
11.3-2
11.3-3
11.3-4
11.3-5
m2
kg
M2
M3
m2
9.37
9.37
9.37
1.00
13.48
794.56
2,030.00
11,237.39
41,213.46
83,798.34
295.14
35.00
934.75
9,058.84
18,974.14
1,089.70
2,065.00
12,172.14
50,272.30
102,772.48
10,210.49
19,349.05
114,052.97
50,272.30
1,385,373.01
ml
1.80
5,345.64
3,541.73
8,887.37
15,997.26
ml
und
2.30
1.00
9,990.68
9,582.68
2,853.58
5,312.59
12,844.25
14,895.27
29,541.79
14,895.27
und
m2
ml
ml
6.00
7.79
12.66
8.66
15,086.98
57,359.11
13,249.65
5,734.42
10,625.18
10,625.18
3,271.05
2,708.75
25,712.15
67,984.28
16,520.69
8,443.17
154,272.92
529,597.57
209,151.99
73,117.85
m2
m2
10.89
5.60
56,708.75
153,000.00
7,830.40
4,330.86
64,539.15
157,330.86
702,831.34
881,052.80
m2
kg
M2
M3
m2
794.56
2,030.00
11,237.39
41,213.46
83,798.34
295.14
35.00
934.75
9,058.84
18,974.14
1,089.70
2,065.00
12,172.14
50,272.30
102,772.48
10,210.49
516,250.00
114,052.97
50,272.30
1,385,373.01
5,345.64
3,541.73
8,887.37
15,997.26
9,990.68
9,582.68
2,853.58
5,312.59
12,844.25
14,895.27
29,541.79
14,895.27
15,086.98
57,359.11
13,249.65
5,734.42
10,625.18
10,625.18
3,271.05
2,708.75
25,712.15
67,984.28
16,520.69
8,443.17
154,272.92
529,597.57
209,151.99
73,117.85
m2
m2
9.37
250.00
9.37
1.00
13.48
1.80
2.30
1.00
6.00
7.79
12.66
8.66
10.89
5.60
56,708.75
153,000.00
7,830.40
4,330.86
64,539.15
157,330.86
702,831.34
881,052.80
gl
1.00
4,134,730.34
328,572.00
4,463,302.34
4,463,302.34
2,500.00
80.00
80.00
1,229.71
63,106.25
39,070.83
885.43
5,312.59
3,541.73
2,115.14
68,418.84
42,612.56
5,287,850.38
5,473,507.27
3,409,004.85
59,104,007.61
22,044,574.69
81,148,582.30
81,148,582.30
11.4-6
11.4-7
11.4-8
11.4-9
11.4-10
11.4-11
11.4-12
$ 4,686,617.56
LOCALIZACION Y REPLANTEO
ACERO 60,000 PSI Y 30.000 PSI
CONCRETO DE LIMPIEZA
PLACA CONTRAPISO
CUBIERTA (TEJA ZINC + CORREA MET. + FLACHIN + CANAL)
RED HIDRAULICA
PVC-P 1/2"
RED SANITARIA
PVC-S 3"
PUNTOS HIDRAULICOS 1/2"
PUNTOS SANITARIOS
PUNTO SANITARIO 3"
MAMPOSTERIA CONFINADA
COLUMNAS (0,12*0,12)
VIGUETA CONFINAMIENTO
CARPINTERIA METALICA
CERRAMIENTO EN MALLA
PUERTAS METALICAS
11.5
11.4-13
11.4-14
KIOSKO
12
11.5-1
KIOSKO
Zonas Verdes Y Arborizacion
13
12.1
EMPRADIZACION
12.2
PALMAS
12.3
ARBUSTIVOS
ZONA DE PISCINA
13.1 PISCINA
$ 4,189,716.61
LOCALIZACION Y REPLANTEO
ACERO 60,000 PSI Y 30.000 PSI
CONCRETO DE LIMPIEZA
PLACA CONTRAPISO
CUBIERTA (TEJA ZINC + CORREA MET. + FLACHIN + CANAL)
RED HIDRAULICA
11.3-6
PVC-P 1/2"
RED SANITARIA
11.3-7
PVC-S 3"
11.3-8
PUNTOS HIDRAULICOS 1/2"
PUNTOS SANITARIOS
11.3-9
PUNTO SANITARIO 3"
11.3-10 MAMPOSTERIA CONFINADA
11.3-11 COLUMNAS (0,12*0,12)
11.3-12 VIGUETA CONFINAMIENTO
CARPINTERIA METALICA
11.3-13 CERRAMIENTO EN MALLA
11.3-14 PUERTAS METALICAS
CUARTO DE BASURAS 2
11.4-1
11.4-2
11.4-3
11.4-4
11.4-5
valor capitulo
ml
ml
und
und
m2
ml
ml
$ 4,463,302.34
m2
und
und
gl
VALOR COSTOS DIRECTOS PRESUPUESTO
TOTAL
$ 14,170,362.50
1.18
81,148,582.30
6.73
$ 1,205,614,062.12
100.00
REPUBLICA DE COLOMBIA
DEPARTAMENTO DE CUNDINAMARCA
MUNICIPIO DE NOCAIMA
UNION TEMPORAL PARA EL DESARROLLO DEL PROGRAMA DE VIVIENDA DE INTERES SOCIAL PROYECTO ALTOS DE PAYANDA MUNICIPIO DE NOCAIMA
PROYECTO
ALTOS DE PAYANDA
PROMOTOR
INTERVENTOR
SUPERVISOR
DURACION DE LA OBRA
ACTA No.:
FECHA DE ACTA
TOTAL EJECUTADO
DESCRIPCCION
ITEM
1
PRELIMINARES
1.1
LOCALIZACION Y REPLANTEO
1.3
CAMPAMENTO
1.4
DESCAPOTE TRANSPORTE
1.6
PROVISIONAL ACUEDUCTO
PROVISIONAL ENERGIA
UNIDAD
CANTIDAD
VALOR UNITARIO
V.TOTAL
CANT.
V.TOTAL
VALOR TOTAL
37,313,935.35
M
UND
2,563.00
1,089.70
2,792,900.06
1,281.50
1,396,450.03
1,281.50
1,396,450.03
11.00
2,733,959.48
30,073,554.28
9.00
24,605,635.32
9.00
24,605,635.32
1,143.45
16,600.00
18,981,270.00
519.75
8,627,850.00
519.75
8,627,850.00
UND
11.00
17,000.00
187,000.00
11.00
187,000.00
11.00
187,000.00
UND
11.00
227,000.00
2,497,000.00
11.00
2,497,000.00
11.00
2,497,000.00
M3
CIMENTACION
2.1
EXCAVACION
M3
4,900.50
16,600.00
81,348,300.00
2,227.50
36,976,500.00
2,227.50
36,976,500.00
2.2
RELLENO COMPACTADO
M3
8,167.50
45,500.00
371,621,250.00
742.50
33,783,750.00
742.50
33,783,750.00
70,760,250.00
REPUBLICA DE COLOMBIA
DEPARTAMENTO DE CUNDINAMARCA
MUNICIPIO DE NOCAIMA
UNION TEMPORAL PARA EL DESARROLLO DEL PROGRAMA DE VIVIENDA DE INTERES SOCIAL PROYECTO ALTOS DE PAYANDA MUNICIPIO DE NOCAIMA
PROYECTO
ALTOS DE PAYANDA
PROMOTOR
INTERVENTOR
SUPERVISOR
DURACION DE LA OBRA
ACTA No.:
FECHA DE ACTA
TOTAL EJECUTADO
ITEM
DESCRIPCCION
UNIDAD
CANTIDAD
VALOR UNITARIO
VALOR TOTAL
V.TOTAL
CANT.
V.TOTAL
REPUBLICA DE COLOMBIA
DEPARTAMENTO DE CUNDINAMARCA
MUNICIPIO DE NOCAIMA
UNION TEMPORAL PARA EL DESARROLLO DEL PROGRAMA DE VIVIENDA DE INTERES SOCIAL PROYECTO ALTOS DE PAYANDA MUNICIPIO DE NOCAIMA
PROYECTO
PROMOTOR
INTERVENTOR
SUPERVISOR
ALTOS DE PAYANDA
DURACION DE LA OBRA
ACTA No.:
FECHA DE ACTA
TOTAL EJECUTADO
DESCRIPCCION
ITEM
UNIDAD
CANTIDAD
VALOR UNITARIO
V.TOTAL
CANT.
V.TOTAL
VALOR TOTAL
PRELIMINARES
252,143,699.72
1.1
LOCALIZACION Y REPLANTEO
8,880.00
1,089.70
9,676,532.39
2,664.00
2,902,959.72
2,664.00
2,902,959.72
1.2
M3
5,328.00
16,600.00
88,444,800.00
2,664.00
44,222,400.00
2,664.00
44,222,400.00
1.3
CERRAMIENTO LOTE
ML
414.04
8,500.00
3,519,340.00
414.04
3,519,340.00
414.04
3,519,340.00
1.4
MUROS DE CONTENCION
M3
277.57
518,510.00
143,922,820.70
160.00
82,961,600.00
160.00
82,961,600.00
1.5
KG
13,320.00
2,065.00
27,505,800.00
13,320.00
27,505,800.00
13,320.00
27,505,800.00
1.6
EXCAVACION
M3
5,126.00
16,600.00
85,091,600.00
5,126.00
85,091,600.00
5,126.00
85,091,600.00
1.7
ML
240.00
49,500.00
11,880,000.00
120.00
5,940,000.00
120.00
5,940,000.00
REPUBLICA DE COLOMBIA
DEPARTAMENTO DE CUNDINAMARCA
MUNICIPIO DE NOCAIMA
UNION TEMPORAL PARA EL DESARROLLO DEL PROGRAMA DE VIVIENDA DE INTERES SOCIAL PROYECTO ALTOS DE PAYANDA MUNICIPIO DE NOCAIMA
PROYECTO
ALTOS DE PAYANDA
PROMOTOR
INTERVENTOR
SUPERVISOR
DURACION DE LA OBRA
ACTA No.:
FECHA DE ACTA
TOTAL EJECUTADO
ITEM
DESCRIPCCION
UNIDAD
CANTIDAD
VALOR UNITARIO
VALOR TOTAL
V.TOTAL
CANT.
V.TOTAL
REPUBLICA DE COLOMBIA
DEPARTAMENTO DE CUNDINAMARCA
MUNICIPIO DE NOCAIMA
UNION TEMPORAL PARA EL DESARROLLO DEL PROGRAMA DE VIVIENDA DE INTERES SOCIAL PROYECTO ALTOS DE PAYANDA MUNICIPIO DE NOCAIMA
PROYECTO
ALTOS DE PAYANDA
PROMOTOR
INTERVENTOR
SUPERVISOR
DURACION DE LA OBRA
ACTA No.:
FECHA DE ACTA
TOTAL EJECUTADO
ITEM
DESCRIPCCION
UNIDAD
CANTIDAD
VALOR UNITARIO
VALOR TOTAL
V.TOTAL
CANT.
V.TOTAL
REPUBLICA DE COLOMBIA
DEPARTAMENTO DE CUNDINAMARCA
MUNICIPIO DE NOCAIMA
UNION TEMPORAL PARA EL DESARROLLO DEL PROGRAMA DE VIVIENDA DE INTERES SOCIAL PROYECTO ALTOS DE PAYANDA MUNICIPIO DE NOCAIMA
PROYECTO
ALTOS DE PAYANDA
PROMOTOR
INTERVENTOR
SUPERVISOR
DURACION DE LA OBRA
ACTA No.:
FECHA DE ACTA
TOTAL EJECUTADO
ITEM
DESCRIPCCION
UNIDAD
CANTIDAD
VALOR UNITARIO
VALOR TOTAL
V.TOTAL
CANT.
V.TOTAL
REPUBLICA DE COLOMBIA
DEPARTAMENTO DE CUNDINAMARCA
MUNICIPIO DE NOCAIMA
UNION TEMPORAL PARA EL DESARROLLO DEL PROGRAMA DE VIVIENDA DE INTERES SOCIAL PROYECTO ALTOS DE PAYANDA MUNICIPIO DE NOCAIMA
PROYECTO
ALTOS DE PAYANDA
PROMOTOR
INTERVENTOR
SUPERVISOR
DURACION DE LA OBRA
ACTA No.:
FECHA DE ACTA
TOTAL EJECUTADO
ITEM
DESCRIPCCION
UNIDAD
CANTIDAD
VALOR UNITARIO
VALOR TOTAL
V.TOTAL
CANT.
V.TOTAL
REPUBLICA DE COLOMBIA
DEPARTAMENTO DE CUNDINAMARCA
MUNICIPIO DE NOCAIMA
UNION TEMPORAL PARA EL DESARROLLO DEL PROGRAMA DE VIVIENDA DE INTERES SOCIAL PROYECTO ALTOS DE PAYANDA MUNICIPIO DE NOCAIMA
PROYECTO
ALTOS DE PAYANDA
PROMOTOR
INTERVENTOR
SUPERVISOR
DURACION DE LA OBRA
ACTA No.:
FECHA DE ACTA
TOTAL EJECUTADO
DESCRIPCCION
ITEM
UNIDAD
CANTIDAD
VALOR UNITARIO
V.TOTAL
CANT.
V.TOTAL
VALOR TOTAL
TOTAL EJECUTADO
360,217,885.07
Imprevistos
0.030
Administracin de obra
0.050
10,806,536.55
18,010,894.25
389,035,315.87
SON TRESCIENTOS SETENTA Y NUEVE MILLONES OCHOSCIENTOS CUARENTA Y NUEVE MIL VEINTIOCHO
371,024,421.62
Ejecutado
Mano de obra
1,857,500.00
07 febrero al 20 febrer
4,314,050.00
21 febrero al 06 marzo
6,494,400.00
07 marzo al 03 abril
rodrigo romero
materiales varios
rodrigo romero
materiales de cantera
12,500,000.00
rodrigo romero
materiales varios
21,590,000.00
rodrigo romero
materiales de cantera
52,600,000.00
rodrigo romero
transporte y materiales
39,960,000.00
jeison laverde
alquiler de equipos
alquiler de equipos
argos
cemento
alquiler equipos
comecializadora marald
acero
materiales varios
alquiler de equipos
2,213,000.00
280,000.00
5,000,000.00
13,000,000.00
5,802,000.00
16,213,740.00
4,499,300.00
70,000.00
1,800,000.00
combustible
pagos a don luis y trabajadores excavacion
arriendos y alimentacion
compra de formaletas 200 unidades
entrega de cemento a gonzalo
78 bultos x 18328
1,429,584.00
189,623,574.00
360,217,885.07
CANT.
V.TOTAL
1,281.50
1,396,450.03
2.00
5,467,918.96
623.70
10,353,420.00
2,673.00
44,371,800.00
7,425.00
337,837,500.00
CANT.
V.TOTAL
CANT.
V.TOTAL
6,216.00
6,773,572.68
2,664.00
44,222,400.00
117.57
120.00
60,961,220.70
5,940,000.00
CANT.
V.TOTAL
CANT.
V.TOTAL
CANT.
V.TOTAL
CANT.
V.TOTAL
CANT.
V.TOTAL
ITEM
GASTOS DE VENTAS
Montaje sala de ventas muebles y equipos
Publicidad del proyecto
Papeleria y gastos de oficina
Salario vendedora
Gastos gerencia de ventas
Arriendos y servicios
Gastos de viaje y operativos sala de ventas
ESTUDIOS Y DISENOS
COMISIONES DE VENTAS
HONORARIOS DE CONSTRUCCION
GERENCIA DEL PLAN DE VIVIENDA
NOTARIALES Y REGISTRO
RPH elaboracion
Registro FINDETER
Administracion
Oct-09
Oct-10
VR. PRESUPUESTO
158,500,000.00
141,773,826.00
198,125,000.00
158,500,000.00
198,125,000.00
277,375,000.00
272,641,973.07
Tiempo de ventas
Tiempo de obra
AVANCE
5,000,000.00
6,500,000.00
4,200,000.00
936,000.00
1,200,000.00
300,000.00
1,285,000.00
100% a la fecha
100% del valor total
26% del valor total
26% del valor total
cancelado a la fecha
cancelado a la fecha
cancelado a la fecha
cancelado a la fecha
6 meses
VR
5,000,000.00
6,500,000.00
4,200,000.00
19,656,000.00
25,200,000.00
6,300,000.00
26,985,000.00
141,773,826.00
13,500,000.00
16,500,000.00
6,350,000.00
EJECUTADO
93,841,000.00
141,773,826.00
198,125,000.00
52,833,333.33
66,041,666.67
13,500,000.00
16,500,000.00
6,350,000.00
27,264,197.31
EJECUTADO
522,388,023.30
389,035,315.87
18,000,000.00
18 meses
929,423,339.18
830,000,000.00
CONSTRUCTOR
PROYECTO
BARRIO
DIRECCION
VECINDARIO
FECHA DE INICIO
FIN OBRA
CAP.
ITEM
INFORMACION GENERAL
A&A INGENIEROS LTDA
ALTOS DE PAYANDA 11 BLOQUES
NOCAIMA - CUNDINAMARCA
Calle 5 No. 9-110 Nocaima (C/marca)
Sector Cementerio
JULIO DE 2010
MARZO DE 2012
TIPO
APARTAMENTOS
ESTRATO
No. APTOS
ETAPAS
VALOR LOTE
ALTURA
SOTANOS
PLAZO EN MESES
220
EN PROCESO
GARAJES
66
GARAJES VISIT
16
158,500,000.00
AREA LOTE M2
11443.00
14,312.00
12,681.24
% INCIDENC EN
PPTO
CONDICIONES DE CREDITO
AVANCE DE OBRA A
POR CAPITULO
FECHA DE APROBACIN
VR APROB X APTOS
5 PISOS
TASA
Licencia de Construccin
Nmero
PRESUPUESTO
INCIO DE OBRA
Fecha expedicin
Fecha Vencimiento
24 DE JUNIO DE 2012
Curadura
OFICINA DE PLANEACION
25 DE MARZO DE 2011
EN PESOS
6
7
8
9
10
11
12
13
14
PRELIMINARES
CIMENTACIN
ESTRUCTURA
MAMPOSTERIA
PISOS
INST. SANITARIAS
INST. HIDRULICAS
INST ELCTRICAS
INST TELEFONICAS
CUBIERTA Y CIELO RASO
PAETES
CARPINTERA METLICA
CARPINTIERA MADERA
PINTURA Y LAVADO DE FACHADAS
ENCHAPES Y ACCESORIOS
VIDRIOS, ESPEJOS Y CERR.
MUEBLES
APARATOS SANIT. Y DE COCINA
ASEO GENERAL
URBANISMO
VIAS, ANDENES Y PARQUEADEROS
SALON COMUNAL Y PORTERIA
PISCINA
ZONAS VERDES
EN PORCENTAJE
15
16
17
18
19
20
21
22
23
24
TOTAL COSTOS DIRECTOS
(+) ANTICIPOS EN COSTO DIRECTO
(+) COSTOS INDIRECTOS
TOTAL DIRECTOS + INDIRECTOS
$
$
$
$
$
424,572,617.43
804,201,388.30
1,676,227,341.58
7,225,633.61
117,421,060.78
7.79%
14.75%
30.74%
0.13%
2.15%
68.18%
8.80%
0.00%
0.00%
0.00%
$
$
$
$
$
208,313,317.46
3.82%
0.00% $
141,828,787.44
2.60%
0.00% $
$
$
$
359,120,675.06
31,017,689.19
213,217,228.83
11,718,211.65
6.59%
0.57%
3.91%
0.21%
0.00%
0.00%
0.00%
0.00%
$
$
$
$
361,452,366.53
6.63%
0.00% $
19,165,760.99
0.35%
0.00% $
65,001,949.97
1.19%
0.00% $
$
$
$
$
$
93,342,451.59
141,969,240.57
33,925,963.57
92,226,980.82
92,816,440.46
1.71%
2.60%
0.62%
1.69%
1.70%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
$
$
$
$
$
316,365,408.05
146,390,002.72
81,148,582.30
14,170,362.50
5,452,839,461.40
5.80%
2.68%
1.49%
0.26%
100.00%
$
$
$
1,634,060,056.45
7,086,899,517.85
-
$
$
$
$
$
$
$
$
$
$
$
289,457,635.07
70,760,250.00
-
% ACUMULADO
5.31%
1.30%
PREVENTAS
VR PROMEDIO UNIDAD
% DE VENTAS
No.UND
5.31% VENDIDOS
1.30% RADICACOS
220
VALOR TOTAL
100.00%
No. VENDIDOS
CONTADO
OTROS CRED
PREAPROBADOS
OTRAS OBSERVACIONES
EN ESTUDIO
APROBADAS
NEGADAS
DESEMBOLSOS
RELACIN
360,217,885.07
ACUM %
VALOR DESEMBOLSO
ACUMULADO
$
$
$
$
$
$
$
$
$
$
No. 1
No. 2
No. 3
No. 4
No. 5
No. 6
No. 7
No. 8
DESEMBOLSOS
#REF!
#REF!
Observaciones
COMENTARIOS Y OBSERVACIONES
PLANILLAS #1 LEGALIZADAS POR $
0.00%
DESEMBOLSOS BCO $
VALOR A DESEMBOLSAR
Aspectos de Seguridad Industrial
EXP MAXIMA
$
RESUMEN DE VENTAS
FECHA
1
2
3
4
5
24 DE JUNIO DE 2010
SI
NO
MM
Aspectos Ambientales
Sealizacin preventiva
Existe Botiquin
Existe Camilla
Existe Emfermera
Alto
Medio
Bajo
22.50
300.00
300.00
28.00
11,736.00
21,000.00
1,750.00
250.00
20.00
20.00
1.00
20.00
1.00
2,042,000.00
85,000.00
38,000.00
60,000.00
1,450.00
800.00
15,600.00
45,000.00
800,000.00
900,000.00
32,000,000.00
75,000.00
13,500,000.00
ETAPA 1
ETAPA 2
ETAPA 3
45,945,000.00
25,500,000.00
11,400,000.00
1,680,000.00
17,017,200.00
16,800,000.00
27,300,000.00
11,250,000.00
16,000,000.00
18,000,000.00
32,000,000.00
1,500,000.00
13,500,000.00
237,892,200.00
82,000,000.00
56,000,000.00
375,892,200.00
1,127,676,600.00
TORRES 1,2 y 3,
TORRES 4,5,6 y 7
TORRES 8,9,10 y 11
PROGRAMACION
TORRE 1
TORRE 2
TORRE 3
PROGRAMACION DE OBRA
INICIO
ENTREGA
ABRIL 25
SEPTIEMBRE 15
MAYO 05
SEPTIEMBRE 30
MAYO 20
OCTUBRE 15
JUNIO 05
OCTUBRE 30
JUNIO 20
NOVIEMBRE 15
JULIO 05
NOVIEMBRE 30
JULIO 20
DICIEMBRE 15
AGOSTO 05
DICIEMBRE 30
AGOSTO 20
ENERO 15
SEPTIEMBRE 05
ENERO 30
SEPTIEMBRE 25
FEBRERO 20
FLUJO DE RECURSOS POR CREDITO Y SUBSIDIOS
DESEMBOLSO DE
CREDITOS
436,176,900.00
425,782,100.00
414,817,000.00
FECHA
DESEMBOLSO
DE SUBSIDIO
FECHA
30 Sept.
15 Oct.
30 Oct.
140,622,500.00
161,697,900.00
139,933,000.00
30 Oct.
30 Oct.
30 Nov.
1,276,776,000.00
TORRE 4
TORRE 5
TORRE 6
426,482,000.00
405,480,000.00
403,257,150.00
TIEMPO
4,5 MESES
4,5 MESES
4,5 MESES
4,5 MESES
4,5 MESES
4,5 MESES
4,5 MESES
4,5 MESES
4,5 MESES
4,5 MESES
4,5 MESES
442,253,400.00
15 Nov.
30 Nov.
15 Dic
183,723,000.00
178,190,000.00
173,671,800.00
30 Nov.
30 Dic.
30 Dic.
TORRE 7
440,071,935.00
30 Dic.
1,675,291,085.00
TORRE
TORRE
TORRE
TORRE
8
9
10
11
449,735,700.00
455,270,000.00
457,542,351.00
410,368,750.00
141,710,000.00
30 Ener
677,294,800.00
15 Ene
30 Ene
15 Feb
15 Marz
1,772,916,801.00
95,734,300.00
97,335,000.00
10,652,200.00
75,494,900.00
30 Enero
15 Marzo
15 Marzo
30 Marzo
279,216,400.00
750,000,000.00
2,000,000,000.00
2,750,000,000.00
1,398,764,600.00
4,724,983,886.00
CONSTRUCTOR
PROYECTO
BARRIO
DIRECCION
VECINDARIO
FECHA DE INICIO
FIN OBRA
CAP.
ITEM
INFORMACION GENERAL
A&A INGENIEROS LTDA
ALTOS DE PAYANDA 11 BLOQUES
NOCAIMA - CUNDINAMARCA
Calle 5 No. 9-110 Nocaima (C/marca)
Sector Cementerio
JULIO DE 2010
MARZO DE 2012
TIPO
APARTAMENTOS
ESTRATO
No. APTOS
ETAPAS
SOTANOS
220
GARAJES
VALOR LOTE
ALTURA
GARAJES VISIT
158,500,000.00
AREA LOTE M2
14,312.00
INCIO DE OBRA
12,681.24
TERMINACION DE OBRA
% INCIDENC EN
PPTO
PRELIMINARES
424,572,617.43
CIMENTACIN
804,201,388.30
14.75%
ESTRUCTURA
1,676,227,341.58
30.74%
MAMPOSTERIA
7,225,633.61
0.13%
PISOS
117,421,060.78
2.15%
INST. SANITARIAS
208,313,317.46
3.82%
INST. HIDRULICAS
141,828,787.44
2.60%
INST ELCTRICAS
359,120,675.06
6.59%
INST TELEFONICAS
31,017,689.19
0.57%
10
213,217,228.83
3.91%
11
PAETES
11,718,211.65
0.21%
12
CARPINTERA METLICA
361,452,366.53
6.63%
13
CARPINTIERA MADERA
19,165,760.99
0.35%
14
65,001,949.97
1.19%
15
ENCHAPES Y ACCESORIOS
93,342,451.59
1.71%
16
141,969,240.57
2.60%
7.79% $
Feb-11
30,326,615.53 $
Mar-11
30,326,615.53 $
30,326,615.53
17
MUEBLES
33,925,963.57
0.62%
18
92,226,980.82
1.69%
19
ASEO GENERAL
92,816,440.46
1.70%
20
21
URBANISMO
VIAS, ANDENES Y PARQUEADEROS
316,365,408.05
5.80%
22
146,390,002.72
2.68%
23
PISCINA
81,148,582.30
1.49%
24
ZONAS VERDES
14,170,362.50
0.26%
5,452,839,461.40
100.00%
$
$
1,634,060,056.45
7,086,899,517.85
1,500,000,000.00
60,000,000.00 $
60,000,000.00 $
60,000,000.00
90,326,615.53
90,326,615.53
90,326,615.53
136,363,636.36
136,363,636.36
136,363,636.36
1,700,000,000.00
1,398,764,600.00
4,724,983,886.00
TOTAL COSTOS
90,326,615.53
90,326,615.53
90,326,615.53
TOTAL RECUADOS
136,363,636.36
136,363,636.36
136,363,636.36
Dficit/Supervit
46,037,020.83
92,074,041.67
138,111,062.50
7,086,899,517.85
89.42%
VALOR LOTE
158,500,000.00
2.00%
163,336,000.00
2.06%
UTILIDADES PROYECTADAS
516,264,482.15
6.51%
7,925,000,000.00
100%
ABRIL 2011
SIT
16
M2
11443.00
INCIO DE OBRA
TERMINACION DE OBRA
Mar-11
Apr-11
30,326,615.53
57,442,956.31
May-11
Jun-11
$
57,442,956.31
57,442,956.31
57,442,956.31
88,222,491.66
88,222,491.66
88,222,491.66
30,326,615.53
88,222,491.66
30,326,615.53
57,442,956.31
88,222,491.66
555,817.97
8,387,218.63
13,019,582.34
13,019,582.34
13,019,582.34
13,019,582.34
13,019,582.34
8,864,299.22
8,864,299.22
8,864,299.22
8,864,299.22
8,864,299.22
22,445,042.19
22,445,042.19
22,445,042.19
22,445,042.19
22,445,042.19
1,938,605.57
1,938,605.57
1,938,605.57
1,938,605.57
1,938,605.57
837,015.12
25,818,026.18
1,368,982.93
6,667,317.97
10,140,660.04
60,000,000.00 $
60,000,000.00 $
2,423,283.11
6,587,641.49
60,000,000.00
147,769,571.84
117,442,956.31
251,932,977.29
191,932,977.29
134,490,020.98
164,816,636.52
285,045,556.26
136,363,636.36
136,363,636.36
136,363,636.36
136,363,636.36
136,363,636.36
136,363,636.36
136,363,636.36
300,000,000.00
300,000,000.00
300,000,000.00
147,769,571.84
117,442,956.31
251,932,977.29
191,932,977.29
134,490,020.98
164,816,636.52
285,045,556.26
136,363,636.36
136,363,636.36
436,363,636.36
436,363,636.36
436,363,636.36
136,363,636.36
136,363,636.36
126,705,127.02
145,625,807.08
330,056,466.15
574,487,125.23
876,360,740.60
847,907,740.45
699,225,820.56
Jul-11
Aug-11
Sep-11
Oct-11
30,326,615.53
30,326,615.53
30,326,615.53
30,326,615.53
30,326,615.53
30,326,615.53
30,326,615.53
57,442,956.31
57,442,956.31
57,442,956.31
57,442,956.31
57,442,956.31
57,442,956.31
57,442,956.31
88,222,491.66
88,222,491.66
88,222,491.66
88,222,491.66
88,222,491.66
88,222,491.66
88,222,491.66
555,817.97
555,817.97
555,817.97
555,817.97
555,817.97
555,817.97
555,817.97
8,387,218.63
8,387,218.63
8,387,218.63
8,387,218.63
8,387,218.63
8,387,218.63
8,387,218.63
13,019,582.34
13,019,582.34
13,019,582.34
13,019,582.34
13,019,582.34
13,019,582.34
13,019,582.34
8,864,299.22
8,864,299.22
8,864,299.22
8,864,299.22
8,864,299.22
8,864,299.22
8,864,299.22
22,445,042.19
22,445,042.19
22,445,042.19
22,445,042.19
22,445,042.19
22,445,042.19
22,445,042.19
1,938,605.57
1,938,605.57
1,938,605.57
1,938,605.57
1,938,605.57
1,938,605.57
1,938,605.57
16,401,325.29
16,401,325.29
16,401,325.29
16,401,325.29
16,401,325.29
16,401,325.29
837,015.12
837,015.12
837,015.12
837,015.12
837,015.12
837,015.12
837,015.12
25,818,026.18
25,818,026.18
25,818,026.18
25,818,026.18
25,818,026.18
25,818,026.18
25,818,026.18
1,368,982.93
1,368,982.93
1,368,982.93
1,368,982.93
1,368,982.93
1,368,982.93
1,368,982.93
6,500,195.00
6,667,317.97
6,667,317.97
6,667,317.97
6,667,317.97
6,667,317.97
6,667,317.97
6,667,317.97
10,140,660.04
10,140,660.04
10,140,660.04
10,140,660.04
10,140,660.04
10,140,660.04
10,140,660.04
2,423,283.11
2,423,283.11
2,423,283.11
2,423,283.11
2,423,283.11
2,423,283.11
2,423,283.11
6,587,641.49
6,587,641.49
6,587,641.49
6,587,641.49
6,587,641.49
6,587,641.49
6,587,641.49
6,629,745.75
6,629,745.75
6,629,745.75
6,629,745.75
6,629,745.75
22,597,529.15
22,597,529.15
22,597,529.15
22,597,529.15
22,597,529.15
10,456,428.77
10,456,428.77
10,456,428.77
10,456,428.77
10,456,428.77
5,796,327.31
5,796,327.31
5,796,327.31
5,796,327.31
5,796,327.31
1,012,168.75
1,012,168.75
1,012,168.75
1,012,168.75
1,012,168.75
115,823,641.50 $
115,823,641.50
$
$
285,045,556.26
136,363,636.36
285,045,556.26
136,363,636.36
550,543,900.67
301,446,881.55
301,446,881.55
249,097,019.11
347,939,081.27
347,939,081.27
347,939,081.27
200,000,000.00
300,000,000.00
300,000,000.00
463,762,722.76
436,176,900.00
470,262,917.76
151,160,200.00
425,782,100.00
347,939,081.27
347,939,081.27
347,939,081.27
463,762,722.76
470,262,917.76
200,000,000.00
300,000,000.00
300,000,000.00
436,176,900.00
576,942,300.00
101,157,937.85
53,218,856.58
5,279,775.31
(22,306,047.45) $
84,373,334.79
Oct-11
Nov-11
Dec-11
Jan-12
30,326,615.53
57,442,956.31
57,442,956.31
88,222,491.66
88,222,491.66
88,222,491.66
88,222,491.66
88,222,491.66
555,817.97
555,817.97
555,817.97
555,817.97
555,817.97
8,387,218.63
8,387,218.63
8,387,218.63
8,387,218.63
13,019,582.34
13,019,582.34
13,019,582.34
13,019,582.34
8,864,299.22
8,864,299.22
8,864,299.22
8,864,299.22
22,445,042.19
22,445,042.19
22,445,042.19
22,445,042.19
1,938,605.57
1,938,605.57
1,938,605.57
1,938,605.57
16,401,325.29
16,401,325.29
16,401,325.29
16,401,325.29
837,015.12
837,015.12
837,015.12
25,818,026.18
25,818,026.18
25,818,026.18
1,368,982.93
1,368,982.93
6,500,195.00
6,500,195.00
6,667,317.97
10,140,660.04
88,222,491.66
8,387,218.63
8,387,218.63
16,401,325.29
16,401,325.29
837,015.12
837,015.12
837,015.12
25,818,026.18
25,818,026.18
25,818,026.18
1,368,982.93
1,368,982.93
1,368,982.93
1,368,982.93
6,500,195.00
6,500,195.00
6,500,195.00
6,500,195.00
6,667,317.97
6,667,317.97
6,667,317.97
6,667,317.97
6,667,317.97
10,140,660.04
10,140,660.04
10,140,660.04
10,140,660.04
10,140,660.04
16,401,325.29
6,500,195.00
2,423,283.11
2,423,283.11
2,423,283.11
2,423,283.11
2,423,283.11
2,423,283.11
6,587,641.49
6,587,641.49
6,587,641.49
6,587,641.49
6,587,641.49
6,587,641.49
6,629,745.75
6,629,745.75
6,629,745.75
6,629,745.75
6,629,745.75
6,629,745.75
6,629,745.75
22,597,529.15
22,597,529.15
22,597,529.15
22,597,529.15
22,597,529.15
22,597,529.15
22,597,529.15
10,456,428.77
10,456,428.77
10,456,428.77
10,456,428.77
10,456,428.77
10,456,428.77
10,456,428.77
5,796,327.31
5,796,327.31
5,796,327.31
5,796,327.31
5,796,327.31
5,796,327.31
5,796,327.31
1,012,168.75
1,012,168.75
1,012,168.75
1,012,168.75
1,012,168.75
1,012,168.75
1,012,168.75
115,823,641.50 $
115,823,641.50
115,823,641.50 $
115,823,641.50 $
115,823,641.50 $
115,823,641.50 $
115,823,641.50 $
470,262,917.76
439,936,302.23
382,493,345.92
382,493,345.92
336,225,816.60
335,669,998.63
185,217,361.50
151,160,200.00
161,828,000.00
161,828,000.00
175,930,900.00
175,930,900.00
118,722,150.00
118,722,150.00
414,817,000.00
426,482,000.00
405,480,000.00
403,257,150.00
440,071,935.00
449,735,700.00
455,270,000.00
470,262,917.76
439,936,302.23
382,493,345.92
382,493,345.92
336,225,816.60
335,669,998.63
185,217,361.50
565,977,200.00
588,310,000.00
567,308,000.00
579,188,050.00
616,002,835.00
568,457,850.00
573,992,150.00
180,087,617.03
328,461,314.80
513,275,968.88
709,970,672.96
989,747,691.36
1,222,535,542.73
1,611,310,331.23
Feb-12
6,500,195.00
6,500,195.00
6,629,745.75
6,629,745.75
22,597,529.15
22,597,529.15
10,456,428.77
10,456,428.77
5,796,327.31
5,796,327.31
1,012,168.75
1,012,168.75
115,823,641.50 $
115,823,641.50
$
$
168,816,036.21
168,816,036.21
91,741,050.00
91,741,050.00
457,542,351.00
410,368,750.00
168,816,036.21
168,816,036.21
549,283,401.00
502,109,800.00
1,991,777,696.02
2,325,071,459.81