DISEO DE RED DE POMABAMBA CON LA

APLICACIN DE:
1. METODO WATERCAD
2. METODO HARDY CROSS
3. METODO DE CORNISH

1.- METODO WATERCAD

RED DE DISTRIBUCION DE LA LOCALIDAD DE POMABAMBA


TRAMO

Link
Label

Length
(m)

Diameter
(mm)

P-1
P-2
P-3
P-4
P-5
P-6
P-7
P-8
P-9
P-10
P-11
P-12
P-13
P-14
P-15
P-16
P-17
P-18
P-19
P-20
P-21

P-1
P-2
P-3
P-4
P-5
P-6
P-7
P-8
P-9
P-10
P-11
P-12
P-13
P-14
P-15
P-16
P-17
P-18
P-19
P-20
P-21

800
400
300
400
300
400
300
400
400
300
400
500
300
400
300
400
300
300
400
300
450

300
250
200
150
150
250
150
150
150
150
150
150
100
100
100
150
150
150
100
150
150

Material Rough
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC

140
140
140
140
140
140
140
140
140
140
140
140
140
140
140
140
140
140
140
140
140

Initial
Status
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Start Calculated End Calculated


Discharge
Headloss
Hydraulic Grade Hydraulic Grade
(l/s)
(m)
(m)
(m)
95.2
36.71
28.31
4.11
-18.67
39.82
16.3
-7.17
15.12
8.87
-9.44
12.06
-6.83
-1.66
-7.21
-10.75
-17
9.1
2.85
-12.15
10

422
417.88
417.03
415.85
415.67
417.88
416.89
415.16
416.89
414.89
414.33
414.33
412.68
412.68
412.92
412.92
413.98
412.92
412.33
411.68
411.68

417.88
417.03
415.85
415.67
417.88
416.89
415.16
415.67
414.89
414.33
415.16
412.68
415.16
412.92
415.67
413.98
415.85
412.33
411.68
412.68
410.63

4.12
0.86
1.18
0.18
2.22
1
1.72
0.5
2
0.56
0.84
1.65
2.48
0.24
2.75
1.06
1.86
0.59
0.66
1
1.05

Friction
End
Slope Pressure
(m/km) (m H2O)
5.14
2.14
3.93
0.45
7.39
2.49
5.75
1.26
5
1.87
2.09
3.29
8.28
0.6
9.16
2.66
6.21
1.95
1.64
3.34
2.33

RED DE DISTRIBUCION DE LA LOCALIDAD DE POMABAMBA

12.852
16.983
17.802
19.618
12.852
26.819
23.105
19.618
24.823
34.24
23.105
29.604
23.105
24.858
19.618
27.914
17.802
24.273
30.6
29.604
30.553

Start
Pressure
(m H2O)
12.852
16.983
17.802
19.618
12.852
26.819
23.105
26.819
24.823
34.24
34.24
29.604
29.604
24.858
24.858
27.914
24.858
24.273
30.6
30.6

Velocity
(m/s)
1.35
0.75
0.9
0.23
1.06
0.81
0.92
0.41
0.86
0.5
0.53
0.68
0.87
0.21
0.92
0.61
0.96
0.51
0.36
0.69
0.57

NUDO
J-1
J-2
J-3
J-4
J-5
J-6
J-7
J-8
J-9
J-10
J-11
J-12
J-13
J-14
T-1

Node Elevation
Label
(m)
J-1
J-2
J-3
J-4
J-5
J-6
J-7
J-8
J-9
J-10
J-11
J-12
J-13
J-14
T-1

405
400
398
396
390
392
390
380
383
388
386
388
381
380
420

Demand

Demand
(l/s)

Demand
Demand
Demand
Demand
Demand
Demand
Demand
Demand
Demand
Demand
Demand
Demand
Demand
Demand

0
8.4
7.2
8.4
8.4
7.2
6.25
6.25
8.4
7.2
6.25
6.25
5
10

Demand Calculated
Pattern Demand (l/s)
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed

0
8.4
7.2
8.4
8.4
7.2
6.25
6.25
8.4
7.2
6.25
6.25
5
10

Calculated
Hydraulic
Grade (m)
417.88
417.03
415.85
415.67
416.89
415.16
414.89
414.33
412.68
412.92
413.98
412.33
411.68
410.63
422

Calculated Minimum
Pressure
System Pressure (m
(m H2O)
H2O)
12.852
16.983
17.802
19.618
26.819
23.105
24.823
34.24
29.604
24.858
27.914
24.273
30.6
30.553

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

Minimum
System
Junction

Total Upper
Limit Flow (l/s)

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

0
8.4
7.2
8.4
8.4
7.2
6.25
6.25
8.4
7.2
6.25
6.25
5
10

2. METODO HARDY CROSS


PRIMERA ITERACION
RED DE POMABAMBA
1
MALLA

II

TRAMO

V (m/s)

D pulg

L (Km)

Q asumido
(lps)

hf (m)

hf/Q asum.

VARIACION

Q calculado (lps)

-0.431

10

0.4

140

-21.85

-0.299

0.014

-0.8331

-22.683

1.777

0.3

140

32.4

5.588

0.172

-1.8072

30.593

0.439

0.4

140

0.560

0.070

-0.9926

7.007

-0.415

0.3

140

-13.45

-0.271

0.020

-0.8331

-14.283

5.578

0.276
29.924

0.571

10

0.4

140

28.95

0.503

0.017

0.9741

0.411

0.3

140

7.5

0.373

0.050

1.1695

8.670

-0.548

0.4

140

-10

-0.847

0.085

0.9621

-9.038

-1.777

0.3

140

-32.4

-5.588

0.172

1.8072

-30.593

-5.559

0.324

1.630

0.114

-0.1955

14.055

9
III

IV

0.781

0.4

140

14.25

10

0.439

0.3

140

0.420

0.053

-0.1955

7.805

11

-0.343

0.4

140

-6.25

-0.355

0.057

-0.1484

-6.398

-0.411

0.3

140

-7.5

-0.373

0.050

-1.1695

-8.670

1.323

0.273
-7.007

-0.439

0.4

140

-8

-0.560

0.070

0.9926

15

0.740

0.3

140

1.778

0.296

0.1476

6.148

16

-0.439

0.4

140

-8

-0.560

0.070

0.1596

-7.840

17

-0.781

0.3

140

-14.25

-1.223

0.086

0.1596

-14.090

-0.565

0.522

-0.8331

0.9741

-0.1955

0.1596

VI

VII

0.548

0.4

140

10

0.847

0.085

-0.9621

9.038

13

0.352

0.3

140

2.85

0.448

0.157

0.0590

2.909

14

0.302

0.4

140

2.45

0.452

0.185

-0.2115

2.238

15

-0.740

0.3

140

-6

-1.778

0.296

-0.1476

-6.148

-0.031

0.723

11

0.343

0.4

140

6.25

0.355

0.057

0.1484

6.398

12

0.439

0.3

140

0.420

0.053

-0.0471

7.953

1.097

140

20

0.000

0.000

-0.0471

19.953

13

-0.352

0.3

140

-2.85

-0.448

0.157

-0.0590

-2.909

0.327

0.267

14

-0.302

0.4

140

-2.45

-0.452

0.185

0.2115

-2.238

20

0.658

0.3

140

12

0.890

0.074

0.2235

12.223

19

-0.370

0.4

140

-3

-0.657

0.219

0.2235

-2.777

18

-0.507

0.3

140

-9.25

-0.550

0.059

0.2235

-9.027

-0.770

0.537

hf (m)

hf/Q asum.

VARIACION

Q calculado (lps)

0.0120

-0.0471

0.2235

ITERACION NUMERO 60
60
MALLA

TRAMO

V (m/s)

D pulg

L (Km)

Q asumido
(lps)

II

III

IV

VI

-0.604

10

0.4

140

-30.578

-0.556

0.018

-0.0416

-30.620

0.942

0.3

140

17.174

1.727

0.101

-0.0261

17.148

-0.085

0.4

140

-1.544

-0.027

0.017

-0.0402

-1.585

-0.684

0.3

140

-22.178

-0.683

0.031

-0.0416

-22.220

0.461

0.167

0.700

10

0.4

140

35.448

0.731

0.021

-0.0154

35.433

0.816

0.3

140

14.872

1.323

0.089

-0.0135

14.859

-0.262

0.4

140

-4.777

-0.216

0.045

-0.0146

-4.792

-0.942

0.3

140

-17.174

-1.727

0.101

0.0261

-17.148

0.112

0.255
13.374

0.733

0.4

140

13.376

1.450

0.108

-0.0020

10

0.391

0.3

140

7.126

0.339

0.048

-0.0020

7.124

11

-0.392

0.4

140

-7.141

-0.454

0.064

-0.0031

-7.144

-0.816

0.3

140

-14.872

-1.323

0.089

0.0135

-14.859

0.012

0.309

0.085

0.4

140

1.544

0.027

0.017

0.0402

1.585

15

0.684

0.3

140

5.541

1.534

0.277

-0.0006

5.541

16

-0.394

0.4

140

-7.184

-0.459

0.064

-0.0014

-7.185

17

-0.737

0.3

140

-13.434

-1.096

0.082

-0.0014

-13.435

0.006

0.440

0.262

0.4

140

4.777

0.216

0.045

0.0146

4.792

13

0.507

0.3

140

4.108

0.882

0.215

-0.0019

4.106

14

0.297

0.4

140

2.410

0.439

0.182

-0.0009

2.409

15

-0.684

0.3

140

-5.541

-1.534

0.277

0.0006

-5.541

0.002

0.719

11

0.392

0.4

140

7.141

0.454

0.064

0.0031

7.144

12
A

0.440
1.098

6
6

0.3
0

140
140

8.017
20.017

0.422
0.000

0.053
0.000

0.0011
0.0011

8.018
20.018

-0.0416

-0.0154

-0.0020

-0.0014

-0.0008

0.0011

13

14
VII

-0.507

0.3

140

-4.108

-0.882

0.215

-0.006

0.331

0.0019

-4.106

-0.439

0.182

0.0009

-2.409

-0.297

0.4

140

-2.410

20

0.730

0.3

140

13.315

1.078

0.081

0.0001

13.315

19

-0.208

0.4

140

-1.685

-0.226

0.134

0.0001

-1.685

18

-0.435

0.3

140

-7.935

-0.414

0.052

0.0001

-7.935

3.METODO DE CORNISH
PRIMERA ITERACION
CALCULO HIDRAULICO DE LA RED DE DISTRIBUCION DE LA LOCALIDAD POMABAMBA

0.0001

(CORNISH)
1
NUDO
I

NUDO
II

NUDO
III

NUDO
IV

NUDO
V

TRAMO
1
2
5
6

L(Km)
0.8
0.4
0.3
0.4

D(pulg)
12
10
6
10

C
140
140
140
140

S
0.0028
-0.0040
-0.0045
-0.0045

hfi asumida
2.2400
-1.6000
-1.3500
-1.8000

Qj calculada
55.83
-19.82
-4.04
-21.12
10.84

Qi/hfi
24.9250
12.3894
2.9927
11.7360
52.0431

h*fj
1.8545
-0.0278
-1.7418
-0.2187

VARIACION hfi

qi

-0.3855

TRAMO
2
3

L(Km)
0.4
0.3

D(pulg)
10
8

C
140
140

S
0.0040
-0.0025

hfi
1.6000
-0.7500

Qj
19.82
-6.27
13.55

Qi/hfi
12.3894
8.3575
20.7469

h*fj
0.0278
-0.9152

VARIACION hfi

qi

-1.9577

8.4

TRAMO
3
17
4

L(Km)
0.3
0.3
0.4

D(pulg)
8
6
6

C
140
140
140

S
0.0025
-0.0040
0.0035

hfi
0.7500
-1.2000
1.4000

Qj
6.27
-3.79
4.81
7.29

Qi/hfi
8.3575
3.1593
3.4377
14.9545

h*fj
0.9152
-1.4765
-0.3988

VARIACION hfi

qi

-1.7925

7.2

TRAMO
5
4
15
8

L(Km)
0.3
0.4
0.3
0.4

D(pulg)
6
6
6
6

C
140
140
140
140

S
0.0045
-0.0035
-0.0030
-0.0030

hfi
1.3500
-1.4000
-0.9000
-1.2000

Qj
4.04
-4.81
-3.25
-4.43
-8.45

Qi/hfi
2.9927
3.4377
3.6063
3.6903
13.7270

h*fj
1.7418
0.3988
1.0059
0.3955

VARIACION hfi

qi

0.0063

8.4

TRAMO
7
8
13
11

L(Km)
0.3
0.4
0.3
0.4

D(pulg)
6
6
4
6

C
140
140
140
140

S
0.0030
0.0030
-0.0035
-0.0030

hfi
0.9000
1.2000
-1.0500
-1.2000

Qj
3.25
4.43
-1.21
-4.43
2.03

Qi/hfi
3.6063
3.6903
1.1565
3.6903
12.1434

h*fj
1.2776
-0.3955
-0.2651
-1.6503

VARIACION hfi

qi

-1.5892

8.4

NUDO
VI

NUDO
VII

NUDO
VIII

NUDO
IX

NUDO
X

NUDO

TRAMO
6
7
9

L(Km)
0.4
0.3
0.4

D(pulg)
10
6
6

C
140
140
140

S
0.0045
-0.0030
-0.0045

hfi
1.8000
-0.9000
-1.8000

Qj
21.12
-3.25
-5.51
12.37

Qi/hfi
11.7360
3.6063
3.0624
18.4047

h*fj
0.2187
-1.2776
-1.4303

VARIACION hfi

qi

-1.9668

7.2

TRAMO
9
10

L(Km)
0.4
0.3

D(pulg)
6
6

C
140
140

S
0.0045
-0.0025

hfi
1.8000
-0.7500

Qj
5.51
-2.94
2.57

Qi/hfi
3.0624
3.9218
6.9842

h*fj
1.4303
-1.9476

VARIACION hfi

qi

-2.3365

6.25

TRAMO
10
11
12

L(Km)
0.3
0.4
0.5

D(pulg)
6
6
6

C
140
140
140

S
0.0025
0.0030
-0.0045

hfi
0.7500
1.2000
-2.2500

Qj
2.94
4.43
-7.01
0.36

Qi/hfi
3.9218
3.6903
3.1175
10.7296

h*fj
1.9476
1.6503
-1.0148

VARIACION hfi

qi

-1.1389

6.25

TRAMO
13
14
20
12

L(Km)
0.3
0.4
0.3
0.5

D(pulg)
4
4
6
6

C
140
140
140
140

S
0.0035
-0.0022
-0.0025
0.0045

hfi
1.0500
-0.8800
-0.7500
2.2500

Qj
1.21
-1.29
-2.94
7.01
4.00

Qi/hfi
1.1565
1.4652
3.9218
3.1175
9.6611

h*fj
0.2651
-1.3545
-8.7957
1.0148

VARIACION hfi

qi

-2.3741

8.4

TRAMO
15
16
18
14

L(Km)
0.3
0.4
0.3
0.4

D(pulg)
6
6
6
4

C
140
140
140
140

S
0.0030
0.0030
-0.0048
0.0022

hfi
0.9000
1.2000
-1.4400
0.8800

Qj
3.25
4.43
-4.18
1.29
4.78

Qi/hfi
3.6063
3.6903
2.9052
1.4652
11.6670

h*fj
-1.0059
0.8163
0.5008
1.3545

VARIACION hfi

qi

-1.8996

7.2

TRAMO

L(Km)

D(pulg)

hfi

Qj

Qi/hfi

h*fj

VARIACION hfi

qi

XI

NUDO
XII

NUDO
XIII

17
16

0.3
0.4

6
6

140
140

0.0040
-0.0030

1.2000
-1.2000

3.79
-4.43
-0.64

3.1593
3.6903
6.8496

1.4765
-0.8163

TRAMO
18
19

L(Km)
0.3
0.4

D(pulg)
6
4

C
140
140

S
0.0048
-0.0020

hfi
1.4400
-0.8000

Qj
4.18
-1.22
2.96

Qi/hfi
2.9052
1.5309
4.4360

TRAMO
20
19

L(Km)
0.3
0.4

D(pulg)
6
4

C
140
140

S
0.0025
-0.0020

hfi
0.7500
-0.8000

Qj
2.94
-1.22
1.72

Qi/hfi
3.9218
1.5309
5.4527

-1.5160

6.25

h*fj
-0.5008
1.0313

VARIACION hfi

qi

-3.8404

6.25

h*fj
-2.5475
-2.6313

VARIACION hfi

qi

-5.6716

15

ITERACION N65
65
NUDO TRAMO
1
2
I
5
6

L(Km)
0.8
0.4
0.3
0.4

D(pulg)
12
10
6
10

C
140
140
140
140

S
0.0021
-0.0021
-0.0026
-0.0030

NUDO TRAMO

L(Km)

D(pulg)

hfi asumida Qj calculada


-2.8296
-63.34
3.3279
29.44
10.7029
12.36
2.4807
25.12
3.58
h*fj

Qj

Qi/hfi
22.3850
8.8460
1.1546
10.1261
42.5117

h*fj
-2.9852
3.0370
10.4511
1.8931

VARIACION hfi

qi

-0.1556

Qi/hfi

h*fj

VARIACION hfi

qi

0.4
0.3

10
8

140
140

0.0021
-0.0025

-3.3279
6.5289

-29.44
20.17
-9.27

8.8460
3.0887
11.9347

-3.0370
6.7719

NUDO TRAMO
3
III
17
4

L(Km)
0.3
0.3
0.4

D(pulg)
8
6
6

C
140
140
140

S
0.0025
-0.0025
0.0025

h*fj
-6.5289
5.8597
1.2461

Qj
-20.17
8.93
4.52
-6.72

Qi/hfi
3.0887
1.5233
3.6268
8.2389

NUDO TRAMO
5
4
IV
15
8

L(Km)
0.3
0.4
0.3
0.4

D(pulg)
6
6
6
4

C
140
140
140
140

S
0.0026
-0.0025
-0.0026
-0.0030

h*fj
-10.7029
-1.2461
8.0466
-2.9480

Qj
-12.36
-4.52
10.59
-2.48
-8.76

NUDO TRAMO
7
8
V
13
11

L(Km)
0.3
0.4
0.3
0.4

D(pulg)
6
6
4
6

C
140
140
140
140

S
0.0021
0.0030
-0.0026
-0.0030

h*fj
-5.1242
2.9480
-3.2012
-0.2939

NUDO TRAMO
6
VI
7
9

L(Km)
0.4
0.3
0.4

D(pulg)
10
6
6

C
140
140
140

S
0.0030
-0.0021
-0.0026

NUDO TRAMO
9
VII
10

L(Km)
0.4
0.3

D(pulg)
6
6

C
140
140

S
0.0026
-0.0025

II

2
3

0.1353

8.4

h*fj
-6.7719
5.8005
1.0422

VARIACION hfi

qi

-0.1077

7.2

Qi/hfi
1.1546
3.6268
1.3165
0.8402
6.9382

h*fj
-10.4511
-1.0422
8.1017
-2.3810

VARIACION hfi

qi

0.0961

8.4

Qj
-8.30
7.19
-2.22
-2.07
-5.40

Qi/hfi
1.6203
2.4406
0.6926
7.0489
11.8024

h*fj
-6.0270
2.3810
-3.1621
-2.0404

VARIACION hfi

qi

-0.4708

8.4

h*fj
-2.4807
5.1242
2.2583

Qj
-25.12
8.30
6.23
-10.59

Qi/hfi
10.1261
1.6203
2.7589
14.5053

h*fj
-1.8931
6.0270
4.5358

VARIACION hfi

qi

0.4319

7.2

h*fj
-2.2583
2.1220

Qj
-6.23
5.16

Qi/hfi
2.7589
2.4306

h*fj
-4.5358
-0.9993

VARIACION hfi

qi

-1.8456

6.25

-1.07

5.1896

NUDO TRAMO
10
VIII
11
12

L(Km)
0.3
0.4
0.5

D(pulg)
6
6
6

C
140
140
140

S
0.0025
0.0030
-0.0026

h*fj
-2.1220
0.2939
-5.3073

Qj
-5.16
2.07
-11.15
-14.24

Qi/hfi
2.4306
7.0489
2.1007
11.5802

h*fj
0.9993
2.0404
-3.5217

VARIACION hfi

qi

1.2757

6.25

NUDO TRAMO
13
14
IX
20
12

L(Km)
0.3
0.4
0.3
0.5

D(pulg)
4
4
6
6

C
140
140
140
140

S
0.0026
-0.0032
-0.0035
0.0026

h*fj
3.2012
11.9657
-42.3830
5.3073

Qj
2.22
5.28
-25.98
11.15
-7.34

Qi/hfi
0.6926
0.4411
0.6131
2.1007
3.8474

h*fj
3.1621
11.4148
-42.8977
3.5217

VARIACION hfi

qi

-0.5099

8.4

NUDO TRAMO
15
16
X
18
14

L(Km)
0.3
0.4
0.3
0.4

D(pulg)
4
6
6
4

C
140
140
140
140

S
0.0026
0.0040
-0.0026
0.0032

h*fj
-8.0466
-0.5330
1.5686
-11.9657

Qj
-3.65
-2.86
4.38
-5.28
-7.40

Qi/hfi
0.4532
5.3603
2.7931
0.4411
9.0477

h*fj
-8.1017
-0.4434
1.6888
-11.4148

VARIACION hfi

qi

0.0410

7.2

NUDO TRAMO
17
XI
16

L(Km)
0.3
0.4

D(pulg)
6
6

C
140
140

S
0.0025
-0.0040

h*fj
-5.8597
0.5330

Qj
-8.93
2.86
-6.07

Qi/hfi
1.5233
5.3603
6.8836

h*fj
-5.8005
0.4434

VARIACION hfi

qi

-0.0486

6.25

NUDO TRAMO
18
XII
19

L(Km)
0.3
0.4

D(pulg)
6
4

C
140
140

S
0.0026
-0.0025

h*fj
-1.5686
-1.4680

Qj
-4.38
-1.70
-6.08

Qi/hfi
2.7931
1.1579
3.9510

h*fj
-1.6888
-1.5423

VARIACION hfi

qi

-0.0792

6.25

NUDO TRAMO
20
XIII
19

L(Km)
0.3
0.4

D(pulg)
6
4

C
140
140

S
0.0035
0.0025

h*fj
-14.4363
-0.1320

Qj
-14.53
-0.46
-14.99

Qi/hfi
1.0062
3.5063
4.5124

h*fj
-13.9313
-0.0577

VARIACION hfi

qi

-0.0048

15

OBSERVACIONES DE LOS TRES METODOS:


-

SE ENCONTRO PROBLEMAS EN LA ITERACION LA VARIACION NO TIENE A CERO SOLO SE


APROXIMA.
HAY UNA DIFERENCIA ENTRE LOS TRES METODOS COMO SE PUEDE OBSERVAR.
LA SOLUCION PUEDE SER QUE SE AH TOMADO MAL LOS CAUDALES,
SE REVISO
REITERADAMENTE PERO NO SE ENCONTRO.

PRACTICA DEJADO EN CLASES PARA LA SOLUCION DEL


SIGUIENTE PROBLEMA CON LOS METODOS DE :
1.- METODO WATERCAD
2.- METODO LINEALIZACION

1.- METODO WATERCAD

CALCULO DE CAUDALES QUE CIRCULA EN LOS TRAMOS

TRAM

Link
Label

Length
(m)

Diame
(mm)

Material

Rough

P-1
P-2
P-3
P-4
P-5

P-1
P-2
P-3
P-4
P-5

400
700
650
500
600

300
500
450
400
350

PVC
PVC
PVC
PVC
PVC

100
140
110
140
120

Start
End
Discharge Calculated Calculated
Headloss (m)
(l/s)
Hydraulic Hydraulic
Grade (m) Grade (m)
41.62
62
61.17
0.83
-901.9
42
61.17
19.17
-860.28
61.17
103.74
42.57
-651.82
103.74
126
22.26
-208.46
103.74
112
8.26

Friction
End
Start
Slope Pressure (m Pressure (m
(m/km)
H2O)
H2O)
2.07
27.39
65.49
44.52
13.77

61.016
61.016
103.477

CALCULO DE CAUDAL QUE CIRCULA EN LOS NUDOS (WATER CAD)

TANQUE

Node
Label

Elevation
Demand
(m)

Demand
(l/s)

Demand Calculated
Pattern Demand (l/s)

Calculated
Hydraulic
Grade (m)

Minimum
Calculated
Pressure
System
(m H2O) Minimum System
Pressure (m H2O) Junction

Total Upper
Limit Flow (l/s)

61.016
103.477
103.477

Velocity
(m/s)
0.59
4.59
5.41
5.19
2.17

T-1
T-2
T-3
T-4
J-1
J-2

T-1
T-2
T-3
T-4
J-1
J-2

60
40
125
110
0
0

Demand
Demand

0
0

Fixed
Fixed

PRACTICA DOMICILIARIA
SISTEMA:

0
0

62
42
126
112
61.17
103.74

61.016
103.477

N/A
N/A

N/A
N/A

0
0

ENVIADO POR EMAIL DISEO DE UN

1. EN QUE CONSISTE LA CALIBRACIN DE MODELOS MATEMTICOS DE REDES DE DISTRIBUCIN DE AGUA?


QU PROGRAMA DE COMPUTO TE PERMITE REALIZAR ESTE PROCESO?

2. SOLUCION DEL PROBLEMA


DATO:
LABEL
1
2
3
4
5

L Km
0.5
0.75
1
0.5
0.25

D mm
400
300
450
300
150

MATE
HD
HD
HD
HD
HD

Hw
150
120
130
120
140

a)- METODO LINEALIZACION

PRACTICA DE REDES POR EMAIL


1
tramo
1
2
3
4
5

Lm
500
750
1000
500
250

D pulg
16
12
18
12
6

C
150
120
130
120
140

qi
100.0000
100.0000
100.0000
100.0000
100.0000

ki
0.0057
0.0523
0.0083
0.0349
0.3832

Qi
293.1806
-63.6495
229.5311
184.0620
45.4691

2
1
2
3
4
5

500
750
1000
500
250

16
12
18
12
6

150
120
130
120
140

196.5903
18.1752
164.7655
142.0310
72.7346

0.0101
0.0123
0.0128
0.0470
0.2924

309.7165
-152.1839
157.5325
103.3073
54.2251

4
1
2
3
4

500
750
1000
500

16
12
18
12

150
120
130
120

253.1534
-67.0043
161.1490
122.6691

0.0125
0.0372
0.0125
0.0415

233.7388
-55.8673
177.8714
116.9848

250

140

63.4798

0.2604

60.8866

5
1
2
3
4
5

500
750
1000
500
250

16
12
18
12
6

150
120
130
120
140

243.4461
-61.4358
169.5102
119.8270
62.1832

0.0121
0.0346
0.0131
0.0407
0.2559

239.4117
-60.7837
178.6279
117.0292
61.5986

6
1
2
3
4
5

500
750
1000
500
250

16
12
18
12
6

150
120
130
120
140

241.4289
-61.1098
174.0691
118.4281
61.8909

0.0120
0.0344
0.0134
0.0402
0.2549

240.4490
-61.4712
178.9778
117.3210
61.6567

7
1
2
3
4
5

500
750
1000
500
250

16
12
18
12
6

150
120
130
120
140

240.9390
-61.2905
176.5234
117.8745
61.7738

0.0120
0.0345
0.0135
0.0401
0.2545

240.2802
-61.3518
178.9284
117.2345
61.6939

500
750
1000
500
250

16
12
18
12
6

150
120
130
120
140

240.6096
-61.3211
177.7259
117.5545
61.7339

0.0120
0.0345
0.0136
0.0400
0.2543

240.2011
-61.3793
178.8217
117.1402
61.6815

8
1
2
3
4
5

POR LO TANTO POR EL TRAMO DE C=150 PASA =


TRAMO DE C= 120 =
TRAMO DE C= 130 =

240.2011
-61.3793
178.8217

SENTIDO CONTRARIO

TRAMO DE C = 120 =
TRAMO DE C=140 =

b)- METODO WATERCAD

117.1402
61.6815

CALCULO DE CAUDALES WC

Link
TRAMO
Label
P-2
P-1
P-3
P-4
P-5

P-2
P-1
P-3
P-4
P-5

Length Diameter
Material Rough
(m)
(mm)
750
500
1,000
500
250

300
400
450
300
150

HD
HD
HD
HD
HD

120
150
130
120
140

Start
End
Current Discharge Calculated Calculated Headloss
Status
(l/s)
Hydraulic Hydraulic
(m)
Grade (m) Grade (m)
Open
95.6
25
19.83
5.17
Open
49.7
20
19.83
0.17
Open
145.2
19.83
18.04
1.79
Open
89.4
18.04
15
3.04
Open
55.9
18.04
4
14.04

Calculated Calculated
Node Elevation
Demand Demand
PUNTO
Demand
Demand Hydraulic
Label
(m)
(l/s)
Pattern
(l/s)
Grade (m)
J-1
J-2
R-1
R-2
R-4
R-5

J-1
J-2
R-1
R-2
R-4
R-5

0
0
20
25
15
4

Demand
Demand

0
0

Fixed
Fixed

0
0

19.83
18.04
20
25
15
4

Friction
Slope
(m/km)
6.89
0.34
1.79
6.09
56.17

End
Start
Pressure Pressure (m
(m H2O)
H2O)
19.782
19.782
17.997

Calculated
Minimum Minimum Total Upper
Pressure
System
System Limit Flow
(m H2O)
Pressure Junction
(l/s)
(m H2O)
19.782
N/A
N/A
0
17.997
N/A
N/A
0

19.782
17.997
17.997

Velocity
(m/s)
1.35
0.4
0.91
1.26
3.16