.40 3.50 .

30
4.10

3.90
e) Volumn concreto vigas
b) EL numero de ladrillos 4.10x0.30x0.30=0.369m3
66 l x 12.55 m2 = 808.5 l Fc230 = 1k+1k+2k=0.369m3
4k=0.369 k= 0.09225 m3
c)Volumen de mortero 1k=(C)1x 0.09225
1mx0.24m=0.24m3 2k=(ag)1x 0.09225
Vm=0.24m3-66(0.24x0.13x0.09) 3k=(Pch1/2”)2x 0.09225
Vm=0.054672m2/m2x12.25m2
= 0.6697m2 f)Volumen concreto sobrecimiento
3.50x0.40x0.24=0.336m3
d)Volumen de concreto para columnas 1.8+25%Pm
3.90x0.30x0.30=0.351m3 0.336m3 -100%x0.336 =25% Pm
Vc=0.351 25 100% 0.084m2
1k+2h+3h=0.351 1k+8k= 75%
6k=0.351 K=0.0585 k=0,028 m3
1k=(c)1x0.0585 0.336m3
2k=(a.g)2x0.0585 0.084m3
3k=(Pch 1/2”)3x0.0585 75%=0,252m3=75%(C,H)
C=1k=0.028m3
H=8k=0.024m3
=0.252m3
Pm = 0.084m3
g)A reov para muro i) A rev
24.5m2x0.005m (3.50mx0.40m)2
1.5 = 6k=0.1225m3 =280m3x0.005m0.014m3
K=0.020416m3 6k=0.014m3k=0.0023m3
C1x0.204m3 6k=0.014m3=0.023m3
F5x0.204m3 C=1x0.0023
Af=5x0.0023
h)A revoque para columnas
4.10mx0.30)+2(0.30x0.30)+(0.30-0.243.50m2) j) Vcv
4.08m2x0.005m=0.0204 (3.90mx0.30)3+3.50m(0.30-0.24)
1.5 = 6k=0.351 K=0.0034 =3744m2x005=0.01872m2
C1x0.0034m2 6k=0.0374m3 K=0.0624m3
F5x0.0034m2 C=1x 0.00624
0.0204m2 F=5x0.00624=0.0312

K) CARAVISTA NO TIENE BRUÑAS


m