3
SISTEMA APORTICADO
DOCENTE:
• ING. ANGUS ASCOY MONZON
INTEGRANTES:
• DAVILA GUZMAN, SUSAN
• LOPEZ GUTTY, CARLOS
• SALDAÑA MEZA, GLENDA
UBICACION
DISTRITO TRUJILLO
URBANIZACION CALIFORNIA
MANZANA _
LOTE _
ZONIFICACION R4(R.D.M)
N° DE PISOS 10
SEMISOTANO 2° AL 7° PISO
1° PISO
PLANTAS DE DISTRIBUCION
1 2 3 4 5 6 7 8
SEMISOTANO
• DIRECCION DE LAS LOSAS
1 2 3 4 5 6 7 8
26.5O m
A
5.85
m
B
13.65
2.50
m
m
C
5.30
m
SEMISOTANO
PREDIMENSIONAMIENTO DE LOSAS
L 5.85
h losa = =
A 25 25
B A B C
C 3
3.4O m
2
D
6.OO m
SEMISOTANO
5.85 m 2.50 m
H. LOSA=0.25M
PREDIMENSIONAMIENTO DE VIGAS
A B C
A B C Vigas principales:
Vigas secundarias
3.4O m
1.7O m
3.4O m
1.7O m
L 6.00 L 5.85
h viga = = = 0.55 m h vs = =
2 V.S
2 A.t 11 11 14 14
3.OO m
4.70 m
h viga ~ 0.60 m
3.OO m
= h vs = 0.42 m ~ 0.45 m
=
6.OO m
6.OO m
1
2.93.m 1.25 m 2.93.m 1.25 m 1 3
b= (Ancho tributario)
20 h < b < h.
1 V.S 4 4
1 1
b= (4.70)= 0.24
20 5.85 m 2.50 m
V.P V.P V.P 1 3
0.45 < b < 0.45
b ~ 0.25 m
= 4 4
0.30 m
0.25 m 0.11 < b < 0.34
h 0.45 m
0.60 m V.P=(0.25 x 0.60)m b vs = 0.30 m
h
b
b V.S=(0.30 x 0.45)m
PREDIMENSIONAMIENTO DE COLUMNAS
Columnas # 1 A B C
Predimensionamiento de columna C1
1.7O m
3.4O m
2º piso = 0.0012
Antep. Piso = 0.0011
C2
C1
2
3.OO m
ÁREA DE COLUMNA
6.OO m
Ag = K x At x 10^4 x Nº pisos
2.93.m 1.25 m
1
Área en antepenúltimo piso
5.85 m 2.50 m
Ag = 0.0011 x 19.65 x 10^4 x 2
Ag = 432.2 cm2 = 432.2 cm2
0.25.m Ag = 0.21m.
0.25m. x 0.25m.
0.50.m
PREDIMENSIONAMIENTO DE COLUMNAS
Columnas # 2 A B C
Predimensionamiento de columna C2
1.7O m
3.4O m
2º piso = 0.0014
Antep. Piso = 0.0025
C2
2 C1
3.OO m
ÁREA DE COLUMNA
6.OO m
Ag = K x At x 10^4 x Nº pisos
2.93.m 1.25 m
1
Área en antepenúltimo piso
0.45m.
PREDIMENSIONAMIENTO DE COLUMNAS
Columnas # 3 A B C
Predimensionamiento de columna C3
3 C3
AT = 1.70 X 4.18 = 7.10 m2 C4
1.7O m
3.4O m
Factor K :
2º piso = 0.0014
Antep. Piso = 0.0022
C2
2 C1
3.OO m
ÁREA DE COLUMNA
6.OO m
Ag = K x At x 10^4 x Nº pisos 2.93.m 1.25 m
1
Área en antepenúltimo piso
5.85 m 2.50 m
Ag = 0.0022 x 7.10 x 10^4 x 2
Ag = 312.4 cm2 = 312.4 cm2
0.25.m Ag = 0.18m.
0.25m. x 0.25m.
0.25m. Área en segundo piso
1.7O m
3.4O m
At = 1.70 X 2.93 = 4.98 m2
Factor K :
2º piso = 0.0025
C2
Antep. Piso = 0.0040 2 C1
3.OO m
ÁREA DE COLUMNA
6.OO m
Ag = K x At x 10^4 x Nº pisos 2.93.m 1.25 m
1
Área en antepenúltimo piso
5.85 m 2.50 m
Ag = 0.0040 x 4.98 x 10^4 x 2
Ag = 398.4 cm2 = 398.4 cm2
0.25m.
Ag = 0.20m.
0.25m. x 0.25m.
0.25m. Área en segundo piso
3.4O m
rc = 2400 kg/cm2
1.7O
Predimensionamiento de zapata en C1
m
Wlosa = 350 kg + 100pm=450kg/m2
Z1
a) Carga Muerta:
3.OO
m
w. Losa = 4.18 x 4.70 x 450 Kg/m2 x 10 = 88407
6.OO
w. V.P. = 0.25 x 0.60 x 4.70 x 2400 x 10 = 16920
m
w. V.S. = 0.45 x 0.30 x 4.70 x 2400 x 10 = 15228 2.93.m 1.25 m
w. Col. = Semisótano = 0.50 x 0.50 x 2.40 x 2400 x 1 = 1440
1°al 9 Piso. = 0.25 x 0.25 x 2.40 x 2400 x 9 = 3240
5.85 m 2.50 m
C.M. 125235
C. Vivienda = 200 kg/m2
C. Azotea= 150 Kg/m2
P= CM + VM
b) Carga Viva:
Semisótano al 9° Piso = 4.18 x 4.70 x 200 kg/m2 x 9 = 35362.8 P = 125235 + 38309.7
Azotea = 4.18 x 4.70 x 150 Kg/m2 x 1 = 2946.9
P = 163544.7 cm2.
C.V. 38309.7
Az = Pt % + Pt 3.70m
rt
H = (A/2)
Az = 0.15 % +163544.7 3
1.20 Kg/m2 3.70m
H = (3.70/2) H = 0.65m
Az = 136287.3 cm2 3
H = 0.62
Az = 136287.3cm2 = 369.17 cm
~ ~
H = 0.65
rt = resistencia del suelo
A = 3.69 m =~ 3.70 m
B = 3.69 m = 3.70 m
rt = 1.2 kg/cm2
PREDIMENSIONAMIENTO DE ZAPATAS
PREDIMENSIONAMIENTO DE ZAPATAS
3.4O m
rc = 2400 kg/cm2
1.7O
Predimensionamiento de zapata en C2
m
Wlosa = 350 kg + 100pm=450kg/m2
Z2
a) Carga Muerta:
3.OO
w. Losa = 2.93 x 4.70 x 450 Kg/m2 x 10 = 61969.5
m
w. V.P. = 0.25 x 0.60 x 4.70 x 2400 x 10 = 16920
6.OO
m
w. V.S. = 0.45 x 0.30 x 4.70 x 2400 x 10 = 15228
2.93.m 1.25 m
w. Col. = Semisótano = 0.45 x 0.45 x 2.40 x 2400 x 1 = 1166.4
1°al 9 Piso. = 0.30 x 0.30 x 2.40 x 2400 x 9 = 4665.6
5.85 m 2.50 m
C.M. 99949.5
C. Vivienda = 200 kg/m2
b) Carga Viva: C. Azotea= 150 Kg/m2
P= CM + VM
Semisótano al 9° Piso = 2.93 x 4.70 x 200 kg/m2 x 9 = 24787.8
Azotea = 2.93 x 4.70 x 150 Kg/m2 x 1 = 2065.7 P = 99949.5 + 26853.5
P = 126802.5 cm2.
C.V. 26853.5
Az = Pt % + Pt 6.65m
rt
H = (A/2)
Az = 0.15 % +126802.5 3
1.20 Kg/m2 3.30m
H = (3.30/2) H = 0.60m
Az = 105668.8 cm2 3
Az = 105668.8 cm2 = 325cm2 H = 0.55
~ ~
A = 3.25 m2 = 3.30 m H = 0.60
B = 2 x A (2 x 3.30)
rt = resistencia del suelo
rt = 1.2 kg/cm2 B = 6.60 ~
= 6.65 m
PREDIMENSIONAMIENTO DE ZAPATAS
3.4O m
rc = 2400 kg/cm2
1.7O
Predimensionamiento de zapata en C3
m
Wlosa = 350 kg + 100pm=450kg/m2
a) Carga Muerta:
3.OO
m
w. Losa = 1.70 x 4.18 x 450 Kg/m2 x 10 = 31977
6.OO
w. V.P. = 0.25 x 0.60 x 4.70 x 2400 x 10 = 16920
m
w. V.S. = 0.45 x 0.30 x 4.70 x 2400 x 10 = 15228 2.93.m 1.25 m
w. Col. = Semisótano = 0.35 x 0.35 x 2.40 x 2400 x 1 = 705.6
1°al 9 Piso. = 0.25 x 0.25 x 2.40 x 2400 x 9 = 3240
5.85 m 2.50 m
C.M. 68070.6
C. Vivienda = 200 kg/m2
C. Azotea= 150 Kg/m2
P= CM + VM
b) Carga Viva:
Semisótano al 9° Piso = 1.70 x 4.18 x 200 kg/m2 x 9 = 12790.8 P = 68070.6 + 13856.7
Azotea = 1.70 x 4.18 x 150 Kg/m2 x 1 = 1065.9
P = 81927.3cm2.
C.V. 13856.7
Az = Pt % + Pt 5.35m
rt
H = (A/2)
Az = 0.15 % + 81927.3 3
2.65m
1.20 Kg/m2
H = (2.65/2) H = 0.45m
Az = 68272.8 cm2 3
Az = 68272.8 cm2 = 261 cm2 H = 0.44
A = 2.61m2 = ~ ~
2.65 m H = 0.45
rt = resistencia del suelo B = 2 x A (2 x 2.65)
rt = 1.2 kg/cm2 B = 5.30 ~
= 5.35 m
PREDIMENSIONAMIENTO DE ZAPATAS
Zapata # 4 rc= concreto de armadura
Z4
3.4O m
rc = 2400 kg/cm2
1.7O
Predimensionamiento de zapata en C4
m
Wlosa = 350 kg + 100pm=450kg/m2
a) Carga Muerta:
3.OO
m
w. Losa = 1.70 x 2.93 x 450 Kg/m2 x 10 = 22414.5
6.OO
w. V.P. = 0.25 x 0.60 x 4.70 x 2400 x 10 = 16920
m
w. V.S. = 0.45 x 0.30 x 4.70 x 2400 x 10 = 15228 2.93.m 1.25 m
w. Col. = Semisótano = 0.35 x 0.35 x 2.40 x 2400 x 1 = 705.6
1°al 9 Piso. = 0.25 x 0.25 x 2.40 x 2400 x 9 = 3240
5.85 m 2.50 m
C.M. 58508.1
C. Vivienda = 200 kg/m2
P= CM + VM
b) Carga Viva: C. Azotea= 150 Kg/m2
Semisótano al 9° Piso = 1.70 x 2.93 x 200 kg/m2 x 9 = 8965.8 P = 58508.1 + 10211.1
Azotea = 1.70 x 2.93 x 150 Kg/m2 x 1 = 1245.3
P = 68719.2 cm2.
C.V. 10211.1
Az = Pt % + Pt 2.40m
rt
H = (A/2) H = 0.45m
Az = 0.15 % + 68719.2 3
1.20 Kg/m2 2.40m
H = (2.40/2)
Az = 57266 cm2 3
H = 0.40
Az = 57266 cm2 = 239cm2
~ ~
A = 2.39 m2 = 2.40m H = 0.45
rt = resistencia del suelo ~
B = 2.39 m2
rt = 1.2 kg/cm2 = 2.40m
PREDIMENSIONAMIENTO DE VIGAS DE CIMENTACION
h = 1…….1.L A B C
8 10
( 0.30 x 0.60)
Zp.
( 0.30 x 0.60) Zp. Zp.
VP 3
L = 6.00m.
3.4O m
Hv = 6 = 0.60m. ( 0.30 x 0.60) ( 0.30 x 0.60)
10 Zp. Zp. Zp.
b = h = 0.60= 0.30m. 2
2 2
Vc = ( 0.30 x 0.60)m.
6.OO m
( 0.30 x 0.60)
( 0.30 x 0.60)
( 0.30 x 0.60)
Zp. Zp. Zp.
VS L = 5.80m.
1
Hv = 5.80 = 0.58m. 0.60 ~
10 = ( 0.30 x 0.60) ( 0.30 x 0.60)
5.85 m 2.50 m
b = h = 0.58= 0.29m. 0.30
2 2 =~
( 0.30 x 0.60) ( 0.30 x 0.60)
Vc = ( 0.30 x 0.60)m.