Plantilla Lookahead Planning
Plantilla Lookahead Planning
FECHA : 29/09/23 .
PRESUPUESTO DE SUB CONTRATA LLD ACEROS INOXISABLES S.A.C AVANCE SEMANA ACTUAL
SEMANA 55 - AGOSTO
ACUMULADO ANTERIOR AVANCE SEMANA ACTUAL ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION UND METRADO PREC. UNIT. S/. PREC. PARC. S/. L M M J V S D
25 26 27 28 29 30 1 METRADO P.PARCIAL (S/) % METRADO P.PARCIAL (S/) % METRADO P.PARCIAL (S/) % METRADO P.PARCIAL (S/) %
02.01.01 ESTRUCTURAS -
02.01.01.01 MOVIMIENTO DE TIERRAS -
02.01.01.01.01 EXCAVACION MANUAL PARA CIMENTACIONES m3 650.85 S/ 44.61 S/ 29,034.42 650.85 29,034.42 100.00% - 0.00 0.00% 650.85 29,034.42 100.00% - 0.00 0.00%
02.01.01.01.02 RELLENO CON MATERIAL PROPIO m3 226.76 S/ 38.14 S/ 8,648.63 226.76 8,648.63 100.00% - 0.00 0.00% 226.76 8,648.63 100.00% - 0.00 0.00%
02.01.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE m3 221.92 S/ 29.62 S/ 6,573.27 221.92 6,573.27 100.00% - 0.00 0.00% 221.92 6,573.27 100.00% - 0.00 0.00%
02.01.01.02 CONCRETO SIMPLE S/ - S/ - -
02.01.01.02.01 SUBCIMIENTOS m3 94.18 S/ 263.14 S/ 24,782.53 94.18 24,782.53 100.00% - 0.00 0.00% 94.18 24,782.53 100.00% - 0.00 0.00%
02.01.01.02.02 ESCALERAS Y GRADERIAS m3 15.61 S/ 412.81 S/ 6,443.96 15.61 6,443.96 100.00% - 0.00 0.00% 15.61 6,443.96 100.00% - 0.00 0.00%
ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERA Y
02.01.01.02.03 m2 67.71 S/ 51.12 S/ 3,461.34 67.71 3,461.34 100.00% - 0.00 0.00% 67.71 3,461.34 100.00% - 0.00 0.00%
GRADERIA
02.01.01.03 CONCRETO ARMADO S/ - S/ - -
02.01.01.03.01 CONCRETO f'c=210 kg/cm2 m3 121.64 S/ 507.15 S/ 61,689.73 121.64 61,689.73 100.00% - 0.00 0.00% 121.64 61,689.73 100.00% - 0.00 0.00%
02.01.01.03.02 ACERO DE REFUERZO Fy=4200 kg/cm2 kg 6,115.68 S/ 6.21 S/ 37,978.37 6,115.68 37,978.37 100.00% - 0.00 0.00% 6,115.68 37,978.37 100.00% - 0.00 0.00%
ENCOFRADO Y DESENCOFRADO NORMAL EN
02.01.01.03.03 m2 760.55 S/ 51.12 S/ 38,879.32 760.55 38,879.32 100.00% - 0.00 0.00% 760.55 38,879.32 100.00% - 0.00 0.00%
CIMENTACIONES
02.01.01.04 ESTRUCTURA MÉTALICA S/ - S/ - -
02.01.01.04.01 ESTRUCTURA MÉTALICA EN MODULOS (S/. 654,674.88) kg 30,563.72 S/ 21.42 -
SUMINISTRO (30%) kg 9,169.12 S/ 21.42 S/ 196,402.46 9,169.12 196,402.46 100.00% - 0.00 0.00% 9,169.12 196,402.46 100.00% - 0.00 0.00%
FABRICACION (40%) - (S/. 261,869.95) kg 12,225.49 S/ 21.42 -
Habilitado (20%) kg 2,445.10 S/ 21.42 S/ 52,373.99 2,445.10 52,373.99 100.00% - 0.00 0.00% 2,445.10 52,373.99 100.00% - 0.00 0.00%
Armado (30%) kg 3,667.65 S/ 21.42 S/ 78,560.99 3,667.65 78,560.99 100.00% - 0.00 0.00% 3,667.65 78,560.99 100.00% - 0.00 0.00%
Soldeo (30%) kg 3,667.65 S/ 21.42 S/ 78,560.99 3,667.65 78,560.99 100.00% - 0.00 0.00% 3,667.65 78,560.99 100.00% - 0.00 0.00%
Limpieza Mecánica (05%) kg 611.27 S/ 21.42 S/ 13,093.50 611.27 13,093.50 100.00% - 0.00 0.00% 611.27 13,093.50 100.00% - 0.00 0.00%
Galvanizado (15%) kg 1,833.82 S/ 21.42 S/ 39,280.49 1,833.82 39,280.49 100.00% - 0.00 0.00% 1,833.82 39,280.49 100.00% - 0.00 0.00%
MONTAJE E INSTALACION (30%) kg 9,169.12 S/ 21.42 S/ 196,402.46 9,169.12 196,402.46 100.00% - 0.00 0.00% 9,169.12 196,402.46 100.00% - 0.00 0.00%
ESTRUCTURA MÉTALICA EN RAMPA Y
02.01.01.04.02 CIRCULACION( INCLUYE ACABADO CON PLANCHA kg 8,756.18 S/ 19.06 S/ 166,892.79 8,756.18 166,892.79 100.00% - 0.00 0.00% 8,756.18 166,892.79 100.00% - 0.00 0.00%
ESTRIADA)
02.01.02 ARQUITECTURA - S/ - S/ - -
02.01.02.01 MUROS S/ - S/ - -
02.01.02.01.01 CERRAMIENTO DE TERMOPANEL PUR 50mm m2 284.82 S/ 206.55 S/ 58,829.57 284.82 58,829.57 100.00% - 0.00 0.00% 284.82 58,829.57 100.00% - 0.00 0.00%
02.01.03.01.05 SUMINISTRO E INSTALACION DE LAVATORIO DE EMPOTRAR und 18.00 S/ 247.21 S/ 4,449.78 18.00 4,449.78 100.00% - 0.00 0.00% 18.00 4,449.78 100.00% - 0.00 0.00%
01 ESTRUCTURAS -
OBRAS PROVISIONALES, TRABAJOS
01.01 -
PRELIMINARES, SEGURIDAD Y SALUD
01.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES -
01.01.01.01 MOVILIZACION Y DESMOVILIZACION glb 1.00 S/ 5,000.00 S/ 5,000.00 1.00 5,000.00 100.00% - 0.00 0.00% 1.00 5,000.00 100.00% - 0.00 0.00%
MOVILIZACION Y DESMOVILIZACION DE MOBILIARIO
01.01.01.02 glb 1.00 S/ 5,000.00 S/ 5,000.00 1.00 - 0.00 0.00% 1.00 5,000.00 100.00% 1.00 5,000.00 100.00% - 0.00 0.00%
EXISTENTE
01.01.01.03 CARTEL DE IDENTIFICACIÓN DE OBRA 3.60m x 4.80m und 1.00 S/ 2,252.30 S/ 2,252.30 1.00 2,252.30 100.00% - 0.00 0.00% 1.00 2,252.30 100.00% - 0.00 0.00%
OFICINA EB CONSORCIO Y PEIPE 02 OFICINAS (INC.
01.01.01.04 MES 2.00 S/ 2,000.00 S/ 4,000.00 2.00 4,000.00 100.00% - 0.00 0.00% 2.00 4,000.00 100.00% - 0.00 0.00%
ENERGIA ELECTRICA, AGUA Y BAÑO)
01.01.01.05 MOBILIARIO Y EQUIPO DE OFICINA ( 8 PROFESIONALES ) glb 1.00 S/ 10,140.00 S/ 10,140.00 1.00 10,140.00 100.00% - 0.00 0.00% 1.00 10,140.00 100.00% - 0.00 0.00%
01.01.01.06 INSTALACION PROVISIONAL DE AGUA glb 1.00 S/ 4,500.00 S/ 4,500.00 1.00 4,500.00 100.00% - 0.00 0.00% 1.00 4,500.00 100.00% - 0.00 0.00%
01.01.01.07 INSTALACION PROVICIONAL DE ENERGIA ELECTRICA glb 1.00 S/ 9,000.00 S/ 9,000.00 1.00 9,000.00 100.00% - 0.00 0.00% 1.00 9,000.00 100.00% - 0.00 0.00%
01.01.01.08 INSTALACION PROVICIONAL DE COMUNICACIONES glb 1.00 S/ 1,000.00 S/ 1,000.00 1.00 1,000.00 100.00% - 0.00 0.00% 1.00 1,000.00 100.00% - 0.00 0.00%
01.01.01.09 SERVICIOS HIGIENICOS DE OBRA (PORTATIL) MES 2.00 S/ 4,800.00 S/ 9,600.00 2.00 9,600.00 100.00% - 0.00 0.00% 2.00 9,600.00 100.00% - 0.00 0.00%
01.01.02 OBRAS PRELIMINARES -
01.01.02.01 DESBROSE Y ELIMINACION DE MATERIAL ORGANICO glb 1.00 S/ 5,000.00 S/ 5,000.00 1.00 5,000.00 100.00% - 0.00 0.00% 1.00 5,000.00 100.00% - 0.00 0.00%
01.01.02.02 TRAZO Y REPLANTEO DURANTE LA OBRA MES 2.00 S/ 5,000.00 S/ 10,000.00 2.00 10,000.00 100.00% - 0.00 0.00% 2.00 10,000.00 100.00% - 0.00 0.00%
01.01.03 INSTALACIONES PROVISIONALES -
SUMINISTRO DE ENERGIA ELECTRICA - PARA LA
01.01.03.01 glb 1.00 S/ 2,500.00 S/ 2,500.00 1.00 2,500.00 100.00% - 0.00 0.00% 1.00 2,500.00 100.00% - 0.00 0.00%
INSTALACIÓN DE MEDIDOR
01.01.03.02 CONSUMO SERVICIO DE AGUA MES 2.00 S/ 1,598.52 S/ 3,197.04 2.00 3,197.04 100.00% - 0.00 0.00% 2.00 3,197.04 100.00% - 0.00 0.00%
01.01.03.03 CONSUMO SERVICIO DE ENERGIA ELECTRICA MES 2.00 S/ 2,598.52 S/ 5,197.04 2.00 5,197.04 100.00% - 0.00 0.00% 2.00 5,197.04 100.00% - 0.00 0.00%
01.01.04 SEGURIDAD, SALUD Y MEDIO AMBIENTE -
01.01.04.01 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 S/ 9,107.50 S/ 9,107.50 1.00 9,107.50 100.00% - 0.00 0.00% 1.00 9,107.50 100.00% - 0.00 0.00%
01.01.04.02 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 S/ 1,500.00 S/ 1,500.00 1.00 1,500.00 100.00% - 0.00 0.00% 1.00 1,500.00 100.00% - 0.00 0.00%
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN
01.01.04.03 glb 1.00 S/ 1,000.00 S/ 1,000.00 1.00 1,000.00 100.00% - 0.00 0.00% 1.00 1,000.00 100.00% - 0.00 0.00%
SEGURIDAD Y SALUD DURANTE EL TRABAJO
01.01.04.04 MITIGACION AMBIENTAL glb 1.00 S/ 5,000.00 S/ 5,000.00 1.00 5,000.00 100.00% - 0.00 0.00% 1.00 5,000.00 100.00% - 0.00 0.00%
MANEJO Y GESTIÓN DE RESIDUOS SEGREGADOS Y
01.01.04.05 glb 1.00 S/ 3,000.00 S/ 3,000.00 1.00 3,000.00 100.00% - 0.00 0.00% 1.00 3,000.00 100.00% - 0.00 0.00%
PELIGROSOS
01.02 MOVIMIENTO DE TIERRAS -
01.02.01 EXCAVACION MASIVA CON MAQUINARIA m3 316.97 S/ 22.90 S/ 7,258.61 316.97 7,258.61 100.00% - 0.00 0.00% 316.97 7,258.61 100.00% - 0.00 0.00%
01.02.02 EXCAVACION MANUAL m3 10.63 S/ 47.95 S/ 509.71 10.63 509.71 100.00% - 0.00 0.00% 10.63 509.71 100.00% - 0.00 0.00%
01.02.03 RELLENO CON MATERIAL PROPIO CON EQUIPO m3 367.40 S/ 34.03 S/ 12,502.62 367.40 12,502.62 100.00% - 0.00 0.00% 367.40 12,502.62 100.00% - 0.00 0.00%
01.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 36.81 S/ 37.10 S/ 1,365.65 36.81 1,365.65 100.00% - 0.00 0.00% 36.81 1,365.65 100.00% - 0.00 0.00%
01.03 OBRAS DE CONCRETO SIMPLE -
SOLADO DE CONCRETO E=2" MEZCLA 1:12 CEMENTO-
01.03.01 m2 53.14 S/ 31.19 S/ 1,657.44 53.14 1,657.44 100.00% - 0.00 0.00% 53.14 1,657.44 100.00% - 0.00 0.00%
HORMIGON PARA MURO
01.04 OBRAS DE CONCRETO ARMADO -
01.04.01 CIMIENTOS -
01.04.01.01 CONCRETO DE CIMIENTOS f'c=210 kg/cm2 m3 34.78 S/ 540.98 S/ 18,815.28 34.78 18,815.28 100.00% - 0.00 0.00% 34.78 18,815.28 100.00% - 0.00 0.00%
01.04.01.02 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS m2 54.96 S/ 50.98 S/ 2,801.86 54.96 2,801.86 100.00% - 0.00 0.00% 54.96 2,801.86 100.00% - 0.00 0.00%
01.04.01.03 ACERO CORRUGADO FY=4200 KG/CM2. kg 1,724.91 S/ 7.19 S/ 12,402.10 1,724.91 12,402.10 100.00% - 0.00 0.00% 1,724.91 12,402.10 100.00% - 0.00 0.00%
01.04.02 MUROS Y PLACAS -
01.04.02.01 CONCRETO DE MUROS Y PLACAS f'c=210 kg/cm2 m3 20.67 S/ 568.38 S/ 11,748.41 20.67 11,748.41 100.00% - 0.00 0.00% 20.67 11,748.41 100.00% - 0.00 0.00%
01.04.02.02 ENCOFRADO Y DESENCOFRADO DE MUROS Y PLACAS m2 164.85 S/ 59.38 S/ 9,788.79 164.85 9,788.79 100.00% - 0.00 0.00% 164.85 9,788.79 100.00% - 0.00 0.00%
01.04.02.03 ACERO CORRUGADO FY=4200 KG/CM2. kg 1,944.27 S/ 7.19 S/ 13,979.30 1,944.27 13,979.30 100.00% - 0.00 0.00% 1,944.27 13,979.30 100.00% - 0.00 0.00%
01.04.03 LOSA DE PISO -
01.04.03.01 CONCRETO DE LOSA DE PISO f'c=210 kg/cm2 m3 11.05 S/ 568.38 S/ 6,280.60 11.05 6,280.60 100.00% - 0.00 0.00% 11.05 6,280.60 100.00% - 0.00 0.00%
01.04.03.02 ACERO CORRUGADO FY=4200 KG/CM2. kg 837.18 S/ 7.19 S/ 6,019.32 837.18 6,019.32 100.00% - 0.00 0.00% 837.18 6,019.32 100.00% - 0.00 0.00%
01.04.04 ESCALERAS -
01.04.04.01 CONCRETO DE ESCALERAS f'c=210 kg/cm2 m3 5.35 S/ 568.38 S/ 3,040.83 5.35 3,040.83 100.00% - 0.00 0.00% 5.35 3,040.83 100.00% - 0.00 0.00%
01.04.04.02 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 5.04 S/ 67.80 S/ 341.71 5.04 341.71 100.00% - 0.00 0.00% 5.04 341.71 100.00% - 0.00 0.00%
01.04.04.03 ACERO CORRUGADO FY=4200 KG/CM2. kg 97.17 S/ 7.19 S/ 698.65 97.17 698.65 100.00% - 0.00 0.00% 97.17 698.65 100.00% - 0.00 0.00%
01.05 ESTRUCTURA METALICA -
01.05.01 ZONA DE TANQUES DE AGUA -
PRESUPUESTO DE SUB CONTRATA LLD ACEROS INOXISABLES S.A.C AVANCE SEMANA ACTUAL
SEMANA 55 - AGOSTO
ACUMULADO ANTERIOR AVANCE SEMANA ACTUAL ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION UND METRADO PREC. UNIT. S/. PREC. PARC. S/. L M M J V S D
25 26 27 28 29 30 1 METRADO P.PARCIAL (S/) % METRADO P.PARCIAL (S/) % METRADO P.PARCIAL (S/) % METRADO P.PARCIAL (S/) %
02.01.01 ESTRUCTURAS -
02.02 PISOS Y PAVIMENTOS -
PISO DE CEMENTO FROTACHADO BRUÑADO(CONCRETO
02.02.01 m2 70.72 S/ 58.91 S/ 4,166.12 70.72 4,166.12 100.00% - 0.00 0.00% 70.72 4,166.12 100.00% - 0.00 0.00%
Fc=210 kg/cm2,Esp=0.20m)
02.02.02 ACABADO DE PISO SEMIPULIDO m2 44.00 S/ 26.92 S/ 1,184.48 44.00 1,184.48 100.00% - 0.00 0.00% 44.00 1,184.48 100.00% - 0.00 0.00%
02.02.03 PISO DE CONFITILLO E=5cm m2 2,553.45 S/ 9.10 S/ 23,236.39 2,553.45 23,236.39 100.00% - 0.00 0.00% 2,553.45 23,236.39 100.00% - 0.00 0.00%
NIVELACION Y COMPACTACION DE TERRENO NATURAL
02.02.04 m2 2,553.45 S/ 5.00 S/ 12,767.25 2,553.45 12,767.25 100.00% - 0.00 0.00% 2,553.45 12,767.25 100.00% - 0.00 0.00%
PARA RECIBIR CONFITILLO
02.02.05 NIVELACION DE TERRENO DE AREAS EXTERIORES m2 1,182.06 S/ 4.00 S/ 4,728.24 1,182.06 4,728.24 100.00% - 0.00 0.00% 1,182.06 4,728.24 100.00% - 0.00 0.00%
02.02.06 ACABADO EN CANALETA DE RECOLECCION 0.40m m 8.00 S/ 37.92 S/ 303.36 8.00 303.36 100.00% - 0.00 0.00% 8.00 303.36 100.00% - 0.00 0.00%
02.02.07 MANTENIMIENTO DE AREAS VERDES EXISTENTES m2 155.51 S/ 17.45 S/ 2,713.65 155.51 2,713.65 100.00% - 0.00 0.00% 155.51 2,713.65 100.00% - 0.00 0.00%
02.03 CARPINTERIA METALICA Y HERRERIA -
02.03.01 ZONA DE TANQUES DE AGUA -
02.03.01.01 BARANDA DE MALLA METALICA H=1.50M m 19.55 S/ 398.92 S/ 7,798.89 19.55 7,798.89 100.00% - 0.00 0.00% 19.55 7,798.89 100.00% - 0.00 0.00%
ESTRUCTURA DE PLANCHA METALICA PERFORADA CON 5
02.03.01.02 GRADAS (A=0.85m) con DESCANSO DE 3.60mx0.60m con und 1.00 S/ 3,345.45 S/ 3,345.45 0.15 0.85 2,843.63 85.00% 0.15 501.82 15.00% 1.00 3,345.45 100.00% - 0.00 0.00%
Escalera de gato L=2.80m
03.01.04.03 TANQUE HIDRONEUMATICO A PRESION CAPACIDAD 62 GAL und 1.00 S/ 3,672.72 S/ 3,672.72 1.00 3,672.72 100.00% - 0.00 0.00% 1.00 3,672.72 100.00% - 0.00 0.00%
COSTO DIRECTO LLD ACERO S/ 1,904,886.69 1,902,154.67 ### 1,267.16 0.07% 1,903,421.83 99.92% 1,464.86 0.08%
GASTOS
8.75% S/ 166,615.74 166,376.78 110.83 166,487.61 128.13
GENERALES
UTILIDAD 7.00% S/ 133,342.07 133,150.83 88.70 133,239.53 102.54
TOTAL LLD ### 2,201,682.28 ### 1,466.69 0.07% 2,203,148.97 99.92% 1,695.52 0.08%
O TOTAL (LLD + JK(LD EXTER) ### 3,074,105.54 ### 15,062.24 0.49% 3,089,167.77 99.79% 6,519.41 0.21%
PROYECTO
COLEGIO
CLIENTE
ETAPA
SECTOR B
02.01.01 ESTRUCTURAS
02.01.01.02 CONCRETO SIMPLE
02.01.01.02.02 ESCALERAS Y GRADERIAS
02.01.01.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERA Y GRADERIA
RAMPAS
ENCOFRADO Y DESENCOFRADO DE RAMPAS
02.01.02 ARQUITECTURA
02.01.02.01 MUROS
02.01.02.01.01 CERRAMIENTO
REJILLA DE TERMOPANEL
DE ILUMINACIÓN PUR 50mm
Y VENTILACIÓN (LAMAS DE MADERA SECCIÓN 20MMX35MM CON
02.01.02.01.02 SEPARACIÓN VERTICAL DE 35MM + MALLA MOSQUITERO IGNÍFUGA PORO 1.8MMX1.8MM COLOR
02.01.02.02 NEGRO)
ACABADOS INTERNOS
02.01.02.02.01 CONTRAZOCALO DE ALUMINIO H=7CM
02.01.02.02.02 CONTRAZOCALO DE PVC
02.01.02.02.03 PISO VINIL EN ROLLO e=2mm
CONTRAPISO OSB FENÓLICO
PISO VINIL EN ROLLO e=2mm
02.01.02.02.04 PISO CERAMICO 0.60x0.60m
02.01.02.02.05 BARANDA DE ACERO GALVANIZADO H=0.90m(RAMPA Y CIRCULACION)
02.01.02.03 PUERTAS Y VENTANAS
PUERTA (LAMAS DE MADERA SECCIÓN 20MMX35MM CON SEPARACIÓN VERTICAL DE 35MM + MALLA
02.01.02.03.01
MOSQUITERO
PUERTA IGNÍFUGA PORO
DE TERMOPANEL 1.8MMX1.8MM
PUR 50mm COLOR NEGRO)
P-1 0.90X2.10M 1.00X2.40M
COM SOBRE LUZ DE MALLA ELECTRICA Y
02.01.02.03.02
MOSQUITERO
VENTANAS 0.90X0.40M
ALTAS PROYECTANTES DE MALLA MOSQUITERO Y MALLA ELECTROSOLDADA. VA-
02.01.02.03.03
01(0.40X1.80M)
VENTANAS ALTAS PROYECTANTES DE MALLA MOSQUITERO Y MALLA ELECTROSOLDADA. VA-
02.01.02.03.04
01(0.40X3.80M)
02.01.02.04 COBERTURA
02.01.02.04.01 COBERTURA DE TERMOPANEL PUR 50mm
02.01.02.04.02 CANALETA DE ALUZINC
02.03 DIVISIONES PARA SERVICIOS HIGIÉNICOS
02.03.01 DIVISION DE MELAMINA ANTIMICROBIANO e=18MM C/ MARCO DE ALUMNIO DE 1 1/2" EN INODOROS
DIVISION DE MELAMINA ANTIMICROBIANO e=18MM C/ MARCO DE ALUMNIO DE 1 1/2" EN URINARIOS
02.03.02
0.20X0.65m
02.03.03 TABLERO POSTFORMADO e=30MM INCLUYE SOPORTES METALICOS ANCHO=55CM
02.01.03 INSTALACIONES SANITARIAS
02.01.03.01 SUMINISTRO E INSTALACIÓN DE APARATOS SANITARIOS
02.01.03.01.01 SUMINISTRO E INSTALACION DE INODORO BLANCO EN SSHH
02.01.03.01.02 SUMINISTRO E INSTALACION DE INODORO SSHH DISCAPACITADOS
02.01.03.01.03 SUMINISTRO E INSTALACION DE URINARIO BLANCO EN SSHH
02.01.03.01.04 SUMINISTRO E INSTALACION DE URINARIO SSHH DISCAPACITADOS
02.01.03.01.05 SUMINISTRO E INSTALACION DE LAVATORIO DE EMPOTRAR
02.01.03.01.06 SUMINISTRO E INSTALACION DE LAVATORIO DE DISCAPACITADOS
02.01.03.01.07 SUMINISTRO E INSTALACION DE GRIFERIA PARA LAVATORIO
02.01.04 INSTALACIONES ELECTRICAS
02.01.04.02 INTERRUPTORES
02.01.04.02.01 INTERRUPTOR UNIPOLAR SIMPLE
02.01.04.02.02 INTERRUPTOR UNIPOLAR TRIPLE
02.01.04.02.03 INTERRUPTOR DE CONMUTACION SIMPLE
02.01.04.03 TOMACORRIENTES
02.01.04.03.01 TOMACORRIENTE BIPOLAR DOBLE TRES EN LINEA , CON PUESTA A TIERRA (2F+T), 16A, 250V
TOMACORRIENTE BIPOLAR DEL TRES EN LINEA, CON PUESTA A TIERRA(2F+T), 16A, 250V,A PRUEBA
02.01.04.03.02
DE AGUA DE MONTAJE ADOSADO EN MURO DE TERMOPANEL
02.01.04.04 CANALIZACIONES, CONDUCTOS O TUBERÍAS
02.01.04.04.01 TUBERIA EMT DE 20mm
02.01.04.05 CONDUCTORES Y CABLES DE ENERGIA
02.01.04.05.01 CABLE - 1X4mm2 LSOH - 90 + 1X4mm2 LSOH(T) - 90
02.01.04.06 TABLEROS ELECTRICOS
FABRICACION , SUMINISTRO E INSTALACION DE TABLERO ME-03
FABRICACION , SUMINISTRO E INSTALACION DE TABLERO ME-04
02.01.04.07 ARTEFACTOS, SUMINISTRO E INSTALACION
02.01.04.07.01 SUMINISTRO E INSTALACION DE LUMINARIA HERMÉTICA, PARA SUSPENDER
02.01.04.07.02 SUMINISTRO E INSTALACION DE EQUIPO DE ALUMBRADO DE EMERGENCIA ADOSABLE
02.01.04.08 VARIOS
02.01.04.08.01 PRECOMISIONAMIENTO
MES DE ABRIL
MES DE MAYO
SM 31 10/04 AL 16/04) SM 32 17/04 AL 23/04) SM 33 24/04 AL 30/04) SM 34 01/05 AL 07/05) SM 35 08/05 AL 14/05) SM 36 15/05 AL 21/05)
M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
ME-01 ME-01 ME-02 ME-02 AD-01 / AU-01 AD-01 / AU-01 AD-01 / AU-01
ME-01 ME-01
ME-01 ME-01
ME-01 ME-01
ME-03 / ME-04 ME-03 / ME-04 ME-03 / ME-04 ME-03 / ME-04 ME-03 ME-03 ME-04 ME-04
ME-03 / ME-04 ME-03 / ME-04 ME-03 / ME-04 ME-03 ME-03 ME-04 ME-04
MES DE MAYO MES DE JUNIO
SM 36 15/05 AL 21/05) SM 37 22/05 AL 28/05) SM 38( 29/05 AL 04/06) SM 39 (05/06 AL 11/06) SM 40 (12/06 AL 18/06) SM 41 (19/06 AL 25/06)
V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D
19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
AU-02 AU-02 AU-02 AU-02 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01
AU-02 AU-02 AU-02 AU-02 AU-02 SS.HH SS.HH SS.HH SS.HH SS.HH SS.HH SS.HH SS.HH SS.HH SS.HH SS.HH SS.HH
MES DE JULIO MES DE AGOSTO
SM 42 (26/06 AL 02/07) SM 43 (03/07 AL 09/07) SM 44 (10/07 AL 16/07) SM 45 (17/07 AL 23/07) SM 46 (24/07 AL 30/07) SM 47 (31/07 AL 06/08)
L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
AU-01 AU-01
AU-01 AU-01 AU-01 AD-01 AD-01 AD-01
AU-01 AU-01 AU-01 AD-01 AD-01 AD-01 AD-01 ME-01 ME-01 ME-02 ME-02 AD-01
AD-01 AD-01
ME-01
ME-02
SS.HH-01 AU-02
SS.HH-01 SS.HH-01 SS.HH-01 AU-02 AU-02 AU-02
SS.HH-01 SS.HH-01
AU-02 AU-02 AU-02 SS.HH-01 SS.HH-01 SS.HH-01 ME-03 ME-03 ME-04 ME-04
SM 47 (31/07 AL 06/08) SM 48 (07/08 AL 13/08) SM 49 (14/08 AL 20/08) SM 50 (21/08 AL 27/08) SM 51 (28/08 AL 03/09) SM 52 (28/08 AL 03/09) SM 53 (28/08 AL 03/09) SM 54 (18/09 AL 24/09)
V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ME-01 ME-02
ME-01 ME-02
ME-01 ME-02
ME-01 ME-02
ME-01 ME-02
ME-01 ME-02 AD-01 AD-01 ME-01 ME-01 ME-02 ME-02 AD-01 AD-01 ME-01 ME-01 ME-02 ME-02
AD-01 AU-01 AU-01 ME-01 ME-02 ME-01 ME-02 ME-01 ME-01 ME-02 ME-02
AD-01 AD-01 AU-01 AU-01 ME-01 ME-02 AD-01 AD-01 AU-01 AU-01 ME-01 ME-01
AD-01 AD-01 AU-01 AU-01 ME-01 ME-02 AD-01 AD-01 AU-01 AU-01 ME-02 ME-02 ME-01 ME-01
ME-02 ME-02
S1 PRECOM.
ME-03 ME-04
ME-03 ME-04
ME-03 ME-04
ME-03 ME-04
AU-02 AU-02 SS.HH-01 SS.HH-01 SS.HH-01 ME-03 ME-04 ME-03 ME-03 ME-04 ME-04 ME-03 ME-03 ME-04 ME-04
ME-03 ME-03
ME-04 ME-04
AU-02 AU-02 SS.HH-01 SS.HH-01 ME-03 ME-04 AU-02 AU-02 AU-02 SS.HH-01 SS.HH-01 SS.HH-01 ME-03 ME-03 ME-04 ME-04
AU-02 AU-02 SS.HH-01 SS.HH-01 ME-03 ME-04 AU-02 AU-02 AU-02 SS.HH-01 SS.HH-01 SS.HH-01 ME-03 ME-03 ME-04 ME-04
ME-03 ME-03 ME-04 ME-04
S2 ME-03 ME-03 ME-04 ME-04
LOOKAHEAD DE OBRA - 4 SEMANAS
PROYECTO
COLEGIO
CLIENTE
ETAPA
PROGRAMACIÓN SEMANA 24 (20/02 AL 26/02) SM 25 (27/02 AL 05/03) SM 26 (06/03 AL 13/03) SM 27 13/03 AL 19/03) SM 28 20/03 AL 26/03) SM 29 20/03 AL 02/04) SM 30 03/04 AL 09/04) SM 31 10/04 AL 16/04) SM 32 17/04 AL 23/04)
ITEM DESCRIPCION DURACIÓN (Días) L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V
INICIO FIN
20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
SECTOR A
02.01.01 ESTRUCTURAS
02.01.01.02 CONCRETO SIMPLE
02.01.01.02.02 ESCALERAS Y GRADERIAS
02.01.01.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERA Y GRADERIA
RAMPAS
ENCOFRADO Y DESENCOFRADO DE RAMPAS
02.01.02 ARQUITECTURA
02.01.02.01 MUROS
02.01.02.01.01 CERRAMIENTO
REJILLA DE TERMOPANEL
DE ILUMINACIÓN PUR 50mm
Y VENTILACIÓN (LAMAS DE MADERA SECCIÓN 20MMX35MM CON 5 5 5 5 5 5 5 2 5
02.01.02.01.02 SEPARACIÓN VERTICAL DE 35MM + MALLA MOSQUITERO IGNÍFUGA PORO 1.8MMX1.8MM COLOR
02.01.02.02 NEGRO)
ACABADOS INTERNOS
02.01.02.02.01 CONTRAZOCALO DE ALUMINIO H=7CM
02.01.02.02.03 PISO VINIL EN ROLLO e=2mm
DESMONTAJE DE CONTRAPISO OSB FENÓLICO
CONTRAPISO OSB FENÓLICO
PISO VINIL EN ROLLO e=2mm
02.01.02.02.05 BARANDA DE ACERO GALVANIZADO H=0.90m(RAMPA Y CIRCULACION)
02.01.04 INSTALACIONES ELECTRICAS
02.01.04.02 INTERRUPTORES
02.01.04.02.01 INTERRUPTOR UNIPOLAR SIMPLE
02.01.04.02.02 INTERRUPTOR UNIPOLAR TRIPLE
02.01.04.02.03 INTERRUPTOR DE CONMUTACION SIMPLE
02.01.04.03 TOMACORRIENTES
02.01.04.03.01 TOMACORRIENTE BIPOLAR DOBLE TRES EN LINEA , CON PUESTA A TIERRA (2F+T), 16A, 250V
TOMACORRIENTE BIPOLAR DEL TRES EN LINEA, CON PUESTA A TIERRA(2F+T), 16A, 250V,A PRUEBA
02.01.04.03.02
DE AGUA DE MONTAJE ADOSADO EN MURO DE TERMOPANEL
02.01.04.04 CANALIZACIONES, CONDUCTOS O TUBERÍAS
02.01.04.04.01 TUBERIA EMT DE 20mm
02.01.04.05 CONDUCTORES Y CABLES DE ENERGIA
02.01.04.05.01 CABLE - 1X4mm2 LSOH - 90 + 1X4mm2 LSOH(T) - 90
02.01.04.06 TABLEROS ELECTRICOS
02.01.04.06.03 FABRICACION , SUMINISTRO E INSTALACION DE TABLERO ME-01
02.01.04.06.04 FABRICACION , SUMINISTRO E INSTALACION DE TABLERO ME-02
02.01.04.07 ARTEFACTOS, SUMINISTRO E INSTALACION
02.01.04.07.01 SUMINISTRO E INSTALACION DE LUMINARIA HERMÉTICA, PARA SUSPENDER
02.01.04.07.02 SUMINISTRO E INSTALACION DE EQUIPO DE ALUMBRADO DE EMERGENCIA ADOSABLE
02.01.04.08 VARIOS
02.01.04.08.01 PRECOMISIONAMIENTO
SECTOR B
02.01.01 ESTRUCTURAS
02.01.01.02 CONCRETO SIMPLE
02.01.01.02.02 ESCALERAS Y GRADERIAS
02.01.01.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERA Y GRADERIA
RAMPAS
ENCOFRADO Y DESENCOFRADO DE RAMPAS
02.01.02 ARQUITECTURA
02.01.02.01 MUROS
02.01.02.01.01 CERRAMIENTO
REJILLA DE TERMOPANEL
DE ILUMINACIÓN PUR 50mm
Y VENTILACIÓN (LAMAS DE MADERA SECCIÓN 20MMX35MM CON ME-03 / ME-04 ME-03 / ME-04
02.01.02.01.02 SEPARACIÓN VERTICAL DE 35MM + MALLA MOSQUITERO IGNÍFUGA PORO 1.8MMX1.8MM COLOR
02.01.02.02 NEGRO)
ACABADOS INTERNOS
02.01.02.02.01 CONTRAZOCALO DE ALUMINIO H=7CM
02.01.02.02.02 CONTRAZOCALO DE PVC
02.01.02.02.03 PISO VINIL EN ROLLO e=2mm
DESMONTAJE DE CONTRAPISO OSB FENÓLICO
CONTRAPISO OSB FENÓLICO
PISO VINIL EN ROLLO e=2mm
02.01.02.02.04 PISO CERAMICO 0.60x0.60m
02.01.02.02.05 BARANDA DE ACERO GALVANIZADO H=0.90m(RAMPA Y CIRCULACION)
02.01.02.03 PUERTAS Y VENTANAS
PUERTA (LAMAS DE MADERA SECCIÓN 20MMX35MM CON SEPARACIÓN VERTICAL DE 35MM + MALLA
02.01.02.03.01
MOSQUITERO
PUERTA IGNÍFUGA PORO
DE TERMOPANEL 1.8MMX1.8MM
PUR 50mm COLOR NEGRO)
P-1 0.90X2.10M 1.00X2.40M
COM SOBRE LUZ DE MALLA ELECTRICA Y
02.01.02.03.02
MOSQUITERO
VENTANAS 0.90X0.40M
ALTAS PROYECTANTES DE MALLA MOSQUITERO Y MALLA ELECTROSOLDADA. VA-
02.01.02.03.03
01(0.40X1.80M)
VENTANAS ALTAS PROYECTANTES DE MALLA MOSQUITERO Y MALLA ELECTROSOLDADA. VA-
02.01.02.03.04
01(0.40X3.80M)
02.01.02.04 COBERTURA
02.01.02.04.01 COBERTURA DE TERMOPANEL PUR 50mm ME-03 / ME-04 ME-03 / ME-04 ME-03 / ME-04
02.01.02.04.02 CANALETA DE ALUZINC
02.03 DIVISIONES PARA SERVICIOS HIGIÉNICOS
02.03.01 DIVISION DE MELAMINA ANTIMICROBIANO e=18MM C/ MARCO DE ALUMNIO DE 1 1/2" EN INODOROS
DIVISION DE MELAMINA ANTIMICROBIANO e=18MM C/ MARCO DE ALUMNIO DE 1 1/2" EN URINARIOS
02.03.02
0.20X0.65m
02.03.03 TABLERO POSTFORMADO e=30MM INCLUYE SOPORTES METALICOS ANCHO=55CM
02.01.03 INSTALACIONES SANITARIAS
02.01.03.01 SUMINISTRO E INSTALACIÓN DE APARATOS SANITARIOS
02.01.03.01.01 SUMINISTRO E INSTALACION DE INODORO BLANCO EN SSHH
02.01.03.01.02 SUMINISTRO E INSTALACION DE INODORO SSHH DISCAPACITADOS
02.01.03.01.03 SUMINISTRO E INSTALACION DE URINARIO BLANCO EN SSHH
02.01.03.01.04 SUMINISTRO E INSTALACION DE URINARIO SSHH DISCAPACITADOS
02.01.03.01.05 SUMINISTRO E INSTALACION DE LAVATORIO DE EMPOTRAR
02.01.03.01.06 SUMINISTRO E INSTALACION DE LAVATORIO DE DISCAPACITADOS
02.01.03.01.07 SUMINISTRO E INSTALACION DE GRIFERIA PARA LAVATORIO
02.01.04 INSTALACIONES ELECTRICAS
02.01.04.02 INTERRUPTORES
02.01.04.02.01 INTERRUPTOR UNIPOLAR SIMPLE
02.01.04.02.02 INTERRUPTOR UNIPOLAR TRIPLE
02.01.04.02.03 INTERRUPTOR DE CONMUTACION SIMPLE
02.01.04.03 TOMACORRIENTES
02.01.04.03.01 TOMACORRIENTE BIPOLAR DOBLE TRES EN LINEA , CON PUESTA A TIERRA (2F+T), 16A, 250V
TOMACORRIENTE BIPOLAR DEL TRES EN LINEA, CON PUESTA A TIERRA(2F+T), 16A, 250V,A PRUEBA
02.01.04.03.02
DE AGUA DE MONTAJE ADOSADO EN MURO DE TERMOPANEL
02.01.04.04 CANALIZACIONES, CONDUCTOS O TUBERÍAS
02.01.04.04.01 TUBERIA EMT DE 20mm
02.01.04.05 CONDUCTORES Y CABLES DE ENERGIA
02.01.04.05.01 CABLE - 1X4mm2 LSOH - 90 + 1X4mm2 LSOH(T) - 90
02.01.04.06 TABLEROS ELECTRICOS
FABRICACION , SUMINISTRO E INSTALACION DE TABLERO ME-03
FABRICACION , SUMINISTRO E INSTALACION DE TABLERO ME-04
02.01.04.07 ARTEFACTOS, SUMINISTRO E INSTALACION
02.01.04.07.01 SUMINISTRO E INSTALACION DE LUMINARIA HERMÉTICA, PARA SUSPENDER
02.01.04.07.02 SUMINISTRO E INSTALACION DE EQUIPO DE ALUMBRADO DE EMERGENCIA ADOSABLE
02.01.04.08 VARIOS
02.01.04.08.01 PRECOMISIONAMIENTO
MES DE ABRIL
SM 33 24/04 AL 30/04) SM 34 01/05 AL 07/05) SM 35 08/05 AL 14/05) SM 36 15/05 AL 21/05) SM 37 22/05 AL 28/05) SM 38( 29/05 AL 04/06) SM 39 (05/06 AL 11/06) SM 40 (12/06 AL 18/06)
D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M
30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13
ME-01 ME-01 ME-02 ME-02 AD-01 / AU-01 AD-01 / AU-01 AD-01 / AU-01 AU-01 AU-01 AU-01 AD-01 AD-01 AD-01 AD-01
ME-01 ME-01
ME-01 ME-01
ME-01 ME-01
ME-03 ME-03 ME-04 ME-04 AU-02 AU-02 AU-02 AU-02 SS.HH SS.HH SS.HH SS.HH
ME-03 ME-03 ME-04 ME-04 AU-02 AU-02 AU-02 AU-02 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01
SM 40 (12/06 AL 18/06) SM 41 (19/06 AL 25/06) SM 42 (26/06 AL 02/07) SM 43 (03/07 AL 09/07) SM 44 (10/07 AL 16/07) SM 45 (17/07 AL 23/07) SM 46 (24/07 AL 30/07)
M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
AU-01 AU-01
AU-01 AU-01 AU-01 AD-01 AD-01 AD-01
AU-01 AU-01 AU-01 AD-01 AD-01 AD-01 AD-01 ME-01 ME-01 ME-02 ME-02
AD-01 AD-01
ME-01
ME-02
SS.HH-01
SS.HH-01 SS.HH-01 SS.HH-01 AU-02 AU-02
SS.HH-01 SS.HH-01
AU-02 AU-02 AU-02 AU-02 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01 SS.HH-01
SS.HH SS.HH SS.HH SS.HH SS.HH SS.HH SS.HH SS.HH SS.HH-01 SS.HH-01 SS.HH-01
AU-02 AU-02 AU-02 SS.HH-01 SS.HH-01 SS.HH-01 ME-03 ME-03 ME-04 ME-04
SM 46 (24/07 AL 30/07) SM 47 (31/07 AL 06/08) SM 48 (07/08 AL 13/08) SM 49 (14/08 AL 20/08) SM 50 (21/08 AL 27/08) SM 51 (28/08 AL 03/09) SM 52 (04/09 AL 10/09) SM 53 (11/09 AL 17/09) SM 54 (18/09 AL 24/09) SM 55 (25/09 AL 24/09) SM 55 (25/09 AL 24/09)
S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8
ME-01 ME-02
AD-01 AD-01 AU-01 AU-01 ME-01 ME-02 ME-01 ME-02 ME-01 ME-01 ME-02 ME-02
AD-01 AD-01 AU-01 AU-01 ME-01 ME-02 AD-01 AD-01 AU-01 AU-01 ME-01 ME-01
AD-01 AD-01 AU-01 AU-01 ME-01 ME-02 AD-01 AD-01 AU-01 AU-01 ME-02 ME-02
S1
AU-02 AU-02 SS.HH-01 SS.HH-01 SS.HH-01 ME-03 ME-04 ME-03 ME-03 ME-04 ME-04
ME-03 ME-03
ME-04 ME-04
AU-02 AU-02 SS.HH-01 SS.HH-01 ME-03 ME-04 AU-02 AU-02 AU-02 SS.HH-01 SS.HH-01 SS.HH-01 ME-03 ME-03 ME-04 ME-04
AU-02 AU-02 SS.HH-01 SS.HH-01 ME-03 ME-04 AU-02 AU-02 AU-02 SS.HH-01 SS.HH-01 SS.HH-01 ME-03 ME-03 ME-04 ME-04
S2
PORCENTAJE DE PLANIFICACIÓN CUMPLIDA (PPC) Y CAUSAS DE INCUMPLIENTO
PROYECTO :
COLEGIO :
CLIENTE :
ETAPA :
FECHA :
SSSSSSSSS
E
6E
7E
1A E
2E6E
1E
1E
2E
4 % HISTÓRICO DE CUMPLIMIENTO
M
3MM
2AC M
0M8M
7M
2M
4M
4
T
C
NNNPI NN
N NNN
°°°OT °°°°°°
V
I445555
444IR
567DV
C 890123
I
E
A
D
N
D
A
T
E
D
A
S
JE
S
E
P
L
N
R
A
O
E
N 25
A
I 15
C
L
F
U 5
I
M
C
P
U
A
L
M
ID
P ACTIVIDADES PLANIFICADAS ACTIVIDADES NO CUMPLIDAS PORCENTAJE REAL CUMPLIDO (%)
A
D
L
S
A
I
S
D
O
(
%
)
COD DESCRIPCION
IF INFORMACION DE PLANOS
ET ESPACIO TERRENO
MO MANO DE OBRA
MT MATERIALES
EQ EQUIPOS
CE CONDICIONES EXTERNAS
PE PERMISOS
OS OTROS
PROYECTO : MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL SECUNDARIA DE LA I.E FERNANDO CARBAJAL, EN EL DISTRITO DE PADRE ABAB - PROVINCIA DE PADRE ABAD -DE PARTAMENTO UCAYALI
AVANCE PLANIFICADO BASE REPROGRAMADO ACTIVIDADES (30/06/23) REPROGRAMADO ACTIVIDADES (23/07/23) REPROGRAMADO ACTIVIDADES (17/09/23) AVANCE REAL
SEMANA FECHA ACTIVIDADES ACT. PLANIFICADAS %ACUMULADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO SEMANA FECHA
PLANIFICADAS ACUMULADAS ACTIVIDADES ACUMULADO ACUMULADO ACTIVIDADES ACUMULADO ACUMULADO ACTIVIDADES ACUMULADO ACUMULADO
98
110%
Curva "S" de control de Avance Físico
100.00% 100.00% 9 5 .3 8 %
93.85% 9 1 .1 5 %
89.23% 8 5 .3 8 %
87.73% 83.85%
90%
79.23% 8 1 .5 4 %
7 6 .9 2 %
7 2 .6 9 %
Avance
71.15%
6 8 .0 8 %
70%
60.77%
61.54%
56.15%
46.54%
33.15%
36.15%
39.23%
40.38%
46.54%
50.77%
54.23%
1/23/2023 1/29/2023
1/30/2023 2/5/2023 22.71%
27.29% 30.59% 36.15%
39.23% 40.38% 1/30/2023 2/5/2023
2/6/2023 2/12/2023 2/6/2023 2/12/2023
30%
17.22%
14.47%
3/13/2023 3/19/2023 PL
A
NI
FI
3/13/2023 3/19/2023
3/20/2023 3/26/2023 3/20/2023 3/26/2023
C
A
D
O
B
3/27/2023 4/2/2023 A
SE 3/27/2023 4/2/2023
4/3/2023 ### 4/9/2023 4/3/2023 4/9/2023
R 0% 1.10% 2.20% 4.03% 6.41% 7.69% 10.44% 12.82% 14.47% 16.12% 36.15% 39.23% 40.38% 46.54% 50.77% 54.23% 64.62% 68.08% 72.69% 76.92% 81.54% 85.38% 91.15% 95.38%
E
P
R
O
4/10/2023 4/16/2023 G
R
A
M
4/10/2023 4/16/2023
4/17/2023 4/23/2023 4/17/2023 4/23/2023
A
D
O
A
C
4/24/2023 4/30/2023 TI
VI
D
A
4/24/2023 4/30/2023
5/1/2023 5/7/2023 5/1/2023 5/7/2023
D
ES
(2
3/
5/8/2023 5/14/2023 0
7/
2
3)
5/8/2023 5/14/2023
5/15/2023 5/21/2023 R
E
P
0% 1.10% 2.20% 4.03% 6.41% 7.69% 10.44% 12.82% 14.47% 16.12% 36.15% 39.23% 40.38% 46.54% 56.15% 60.77% 71.15% 79.23% 5/15/2023
83.85% 5/21/2023
89.23% 93.85% 100.00%
5/29/2023 6/4/2023
A
M
A
D
O
5/29/2023 6/4/2023
6/5/2023 6/11/2023 6/5/2023 6/11/2023
A
C
TI
VI
6/19/2023 6/25/2023 (3
0/
0
6/
6/19/2023 6/25/2023
6/26/2023 7/2/2023 6/26/2023 7/2/2023
2
3)
R 0% 1.10% 2.20% 4.03% 6.41% 7.69% 10.44% 12.82% 14.47% 16.12% 36.15% 39.23% 40.38% 46.54% 50.77% 54.23% 64.62% 68.08% 72.69% 75.38% 78.46% 81.54% 88.08% 90.00%
E
7/10/2023 7/16/2023 A
M
A
D
7/10/2023 7/16/2023
7/17/2023 7/23/2023 7/17/2023 7/23/2023
O
A
C
TI
7/24/2023 7/30/2023
VI
D
A
D
ES
7/24/2023 7/30/2023
7/31/2023 8/6/2023 (2
3/
0
7/31/2023 8/6/2023
8/7/2023 ### 8/13/2023 8/7/2023 8/13/2023
6/
2
3)
R 0% 1.10% 2.20% 4.03% 6.41% 7.69% 10.44% 12.82% 14.47% 16.12% 36.15% 39.23% 40.38% 46.54% 50.77% 54.23% 64.62% 68.08% 72.69% 75.38% 78.46% 81.54% 88.08% 90.00%
E
P
R
O
28/08/2023 9/3/2023 R
E
P
0% 1.10% 2.20% 4.03% 6.41% 7.69% 10.44% 12.82% 14.47% 16.12% 36.15% 39.23% 40.38% 46.54% 50.77% 54.23% 64.62% 68.08%
28/08/2023
72.69%
03/09/2023
75.38% 78.46% 81.54% 88.08% 90.00%
R
O
G
9/4/2023 9/10/2023 R
A
M
A
9/4/2023 9/10/2023
D
O
A
C
9/18/2023 9/24/2023 (1
7/
0
9/
9/18/2023 9/24/2023
2
3)
AVANCE REAL
0 0 0%
0 0 0%
6 6 1.10%
6 12 2.20%
10 22 4.03%
13 35 6.41%
7 42 7.69%
15 57 10.44%
13 70 12.82%
9 79 14.47%
9 88 16.12%
88
9 8 .4 6 % 1 0 0 .0 0 %
va "S" de control de Avance Físico 99.61% 100%
100.00% 9 5 .3 8 % 97.31% 97.47% 97.49% 98.45% 99.03%
96.15%
93.85% 9 1 .1 5 %
89.23% 8 5 .3 8 %
99.87%
8 1 .5 4 % 99.10%
98.47%
7 6 .9 2 % 97.97%
7 2 .6 9 % 97.49%
97.47%
8%
SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA
N°39 N°40 N°41 N°42 N°43 N°44 N°45 N°46 N°47 N°48 N°49 N°50 N°51 N°52 N°53 N°54
(05/06/23 - (12/06/23 - (19/06/23 - (26/06/23 - (03/07/23 - (10/07/23 - (17/07/23 - (24/07/23 - (31/07/23 - (07/08/23 - (14/08/23 - (21/08/23 - (28/08/23 - (04/09/23 - (11/09/23 - (18/09/23 -
11/06/23) 18/06/23) 25/06/23) 02/07/23) 09/07/23) 16/07/23) 23/07/23) 30/07/23) 06/08/23) 13/08/23) 20/08/23) 27/08/23) 03/09/23) 10/09/23) 17/09/23) 24/09/23)
72.69% 75.38% 78.46% 81.54% 88.08% 90.00% 93.85% 94.62% 96.15% 97.31% 97.47% 97.49% 97.97% 98.47% 99.10% 99.87%
72.69% 75.38% 78.46% 81.54% 88.08% 90.00% 93.85% 94.62% 96.15% 97.31% 97.47% 97.49% 98.45% 99.03% 99.61% 100%
REPROGRAMADO ACTIVIDADES (30/06/23) REPROGRAMADO ACTIVIDADES (23/06/23) REPROGRAMADO ACTIVIDADES (17/09/23)
0 0 0% 0 0 0% 0 0 0%
6 6 1.10% 6 6 1.10% 6 6 1.10%
6 12 2.20% 6 12 2.20% 6 12 2.20%
10 22 4.03% 10 22 4.03% 10 22 4.03%
13 35 6.41% 13 35 6.41% 13 35 6.41%
7 42 7.69% 7 42 7.69% 7 42 7.69%
15 57 10.44% 15 57 10.44% 15 57 10.44%
13 70 12.82% 13 70 12.82% 13 70 12.82%
9 79 14.47% 9 79 14.47% 9 79 14.47%
9 88 16.12% 9 88 16.12% 9 88 16.12%
6 94 36.15% 6 94 36.15% 6 94 36.15%
8 102 39.23% 8 102 39.23% 8 102 39.23%
3 105 40.38% 3 105 40.38% 3 105 40.38%
16 121 46.54% 16 121 46.54% 16 121 46.54%
#REF! #REF! #REF! 11 132 50.77% 11 132 50.77%
9.00 #REF! #REF! 9 141 54.23% 9 141 54.23%
27.00 #REF! #REF! 27 168 64.62% 27 168 64.62%
9.00 #REF! #REF! 9 177 68.08% 9 177 68.08%
12.00 189 72.69% 12 189 72.69%
7.00 196 75.38% 7 196 75.38%
8.00 204 78.46% 8 204 78.46%
8.00 212 81.54% 8 212 81.54%
17.00 229 88.08% 17 229 88.08%
5.00 234 90.00% 5 234 90.00%
10.00 244 93.85% 10 244 93.85%
2.00 246 94.62%
4.00 250 96.15%
3.00 253 97.31%
0.43 253 97.47%
0.05 253 97.49%
1.25 255 97.97%
1.30 256 98.47%
1.62 258 99.10%
2.00 260 99.87%
9 8 .4 6 % 1 0 0 .0 0 %
9 5 .3 8 % 97.47% 97.49% 98.45% 99.03% 99.61% 100%
96.15% 97.31%
5%
99.10%
99.87% CUADRO RESUMEN
98.47%
97.49%
97.97% AVANCE PLANIFICADO ACU. 100.0%
97.47%
AVANCE REAL ACUMULADO 99.87%
VARIACIÓN 0.13%
SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA SEMANA
N°44 N°45 N°46 N°47 N°48 N°49 N°50 N°51 N°52 N°53 N°54
- (10/07/23 - (17/07/23 - (24/07/23 - (31/07/23 - (07/08/23 - (14/08/23 - (21/08/23 - (28/08/23 - (04/09/23 - (11/09/23 - (18/09/23 -
) 16/07/23) 23/07/23) 30/07/23) 06/08/23) 13/08/23) 20/08/23) 27/08/23) 03/09/23) 10/09/23) 17/09/23) 24/09/23)
90.00% 93.85% 94.62% 96.15% 97.31% 97.47% 97.49% 97.97% 98.47% 99.10% 99.87%
90.00% 93.85% 94.62% 96.15% 97.31% 97.47% 97.49% 98.45% 99.03% 99.61% 100%
CURVA "S" DE AVANCE PLANIFICADO VS AVANCE REAL
PROYECTO : MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL SECUNDARIA DE LA I.E FERNANDO CARBAJAL, EN EL DISTRITO DE PADRE ABAB - PROVINCIA DE PADRE ABAD -DE PARTAMENTO UCAYALI
AVANCE PLANIFICADO BASE REPROGRAMADO ACTIVIDADES (30/06/23) REPROGRAMADO ACTIVIDADES (23/07/23) REPROGRAMADO ACTIVIDADES (17/09/23) AVANCE REAL
SEMANA FECHA ACTIVIDADES ACT. PLANIFICADAS %ACUMULADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO SEMANA FECHA
PLANIFICADAS ACUMULADAS ACTIVIDADES ACUMULADO ACUMULADO CUMPLIDAS ACUMULADO ACUMULADO ACTIVIDADES ACUMULADO ACUMULADO
SEMANA N°21 (30/01/23 - 05/02/23) 0 0 #REF! 0 0 0% 0 0 0.0% 0 0 0.0% SEMANA N°21 (30/01/23 - 05/02/23)
SEMANA N°22 (06/02/23 - 12/02/23) #REF! #REF! #REF! 3 3 1% 3 3 1.0% 3 3 1.0% SEMANA N°22 (06/02/23 - 12/02/23)
SEMANA N°23 (13/02/23 - 19/02/23) #REF! #REF! #REF! 4 7 2.41% 4 7 2.4% 4 7 2.4% SEMANA N°23 (13/02/23 - 19/02/23)
SEMANA N°24 (20/02/23 - 26/02/23) #REF! #REF! #REF! 6 13 4% 6 13 4.5% 6 13 4.5% SEMANA N°24 (20/02/23 - 26/02/23)
SEMANA N°25 (27/02/23 - 05/03/23) #REF! #REF! #REF! 3 16 6% 3 16 5.5% 3 16 5.5% SEMANA N°25 (27/02/23 - 05/03/23)
SEMANA N°26 (06/03/23 - 12/03/23) #REF! #REF! #REF! 6 22 8% 6 22 7.6% 6 22 7.6% SEMANA N°26 (06/03/23 - 12/03/23)
SEMANA N°27 (13/03/23 - 19/03/23) #REF! #REF! #REF! 2 24 8% 2 24 8.3% 2 24 8.3% SEMANA N°27 (13/03/23 - 19/03/23)
SEMANA N°28 (20/03/23 - 26/03/23) #REF! #REF! #REF! 6 30 10% 6 30 10.0% 6 30 10.0% SEMANA N°28 (20/03/23 - 26/03/23)
SEMANA N°29 (27/03/23 - 02/04/23) #REF! #REF! #REF! 4 34 11% 4 34 11.4% 4 34 11.4% SEMANA N°29 (27/03/23 - 02/04/23)
SEMANA N°30 (03/04/23 - 09/04/23) #REF! #REF! #REF! 6 40 15% 6 40 14.8% 6 40 14.8% SEMANA N°30 (03/04/23 - 09/04/23)
SEMANA N°31 (10/04/23 - 16/04/23) #REF! #REF! #REF! 6 46 28.22% 6 46 31.5% 6 46 31.7% SEMANA N°31 (10/04/23 - 16/04/23)
SEMANA N°32 (17/04/23 - 23/04/23) 6 52 31.90% 5 51 34.9% 5 51 35.2% SEMANA N°32 (17/04/23 - 23/04/23)
SEMANA N°33 (24/04/23 - 30/04/23) 12 64 39.26% 7 58 35.6% 7 58 35.6% SEMANA N°33 (24/04/23 - 30/04/23)
SEMANA N°34 (01/05/23 - 07/05/23) 10 74 45.40% 4 62 38.0% 4 62 38.0% SEMANA N°34 (01/05/23 - 07/05/23)
SEMANA N°35 (08/05/23 - 14/05/23) 2 76 46.63% 1 63 38.7% 1 63 38.7% SEMANA N°35 (08/05/23 - 14/05/23)
SEMANA N°36 (15/05/23 - 21/05/23) 9 85 52.15% 1 64 39.3% 1 64 39.3% SEMANA N°36 (15/05/23 - 21/05/23)
SEMANA N°37 (22/05/23 - 28/05/23) 9 94 57.67% 7 71 43.6% 7 71 43.6% SEMANA N°37 (22/05/23 - 28/05/23)
SEMANA N°38 (29/05/23 - 04/06/23) 16 110 67% 6 77 47.2% 6 77 47.2% SEMANA N°38 (29/05/23 - 04/06/23)
SEMANA N°39 (05/06/23 - 11/06/23) 10 120 74% 0 77 47.2% 0 77 47.2% SEMANA N°39 (05/06/23 - 11/06/23)
SEMANA N°40 (12/06/23 - 18/06/23) 12 132 81% 0 77 47.2% 0 77 47.2% SEMANA N°40 (12/06/23 - 18/06/23)
SEMANA N°41 (19/06/23 - 25/06/23) 15 147 90% 10 87 60.0% 6 83 50.9% SEMANA N°41 (19/06/23 - 25/06/23)
SEMANA N°42 (26/06/23 - 02/07/23) 16 163 100% 12 99 68.3% 5 88 54.0% SEMANA N°42 (26/06/23 - 02/07/23)
SEMANA N°43 (03/07/23 - 09/07/23) 15 114 78.6% 25 113 69.3% SEMANA N°43 (03/07/23 - 09/07/23)
SEMANA N°44 (10/07/23 - 16/07/23) 2 116 80.0% 7 120 73.6% SEMANA N°44 (10/07/23 - 16/07/23)
SEMANA N°45 (17/07/23 - 23/07/23) 14 130 89.7% 10 130 80.0% SEMANA N°45 (17/07/23 - 23/07/23)
SEMANA N°46 (24/07/23 - 30/07/23) 15 145 100.0% 4 134 82.5% SEMANA N°46 (24/07/23 - 30/07/23)
SEMANA N°47 (31/07/23 - 06/08/23) 6 140 86.1% SEMANA N°47 (31/07/23 - 06/08/23)
SEMANA N°48 (07/08/23 - 13/08/23) 4 144 88.6% SEMANA N°48 (07/08/23 - 13/08/23)
SEMANA N°49 (14/08/23 - 20/08/23) 5 149 91.5% SEMANA N°49 (14/08/23 - 20/08/23)
SEMANA N°50 (21/08/23 - 27/08/23) 4 153 93.87% SEMANA N°50 (21/08/23 - 27/08/23)
SEMANA N°51 (28/08/23 - 03/09/23) 4 157 96.20% SEMANA N°51 (28/08/23 - 03/09/23)
SEMANA N°52 (04/09/23 - 10/09/23) 3 160 98.04% SEMANA N°52 (04/09/23 - 10/09/23)
SEMANA N°53 (11/09/23 - 17/09/23) 2 161 98.96% SEMANA N°53 (11/09/23 - 17/09/23)
SEMANA N°54 (18/09/23 - 24/09/23) 1 162 100% SEMANA N°54 (18/09/23 - 24/09/23)
TOTAL DE ACTIVIDADES PLANIFICADAS #REF! 163 145 162.3 TOTAL DE ACTIVIDADES EJECUTADAS
90%
90%
81% 78.6% 80
74% 68.3%
67% 60.0%
70%
47.2%
(%)
46.63% 57.67%
52.15%
45.40% 47.2% 47.2%
50% 39.26%
31.90%
28.22%
30%
0.0% 1.0%
SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A
N ° 21 N ° 22 N ° 23 N ° 24 N ° 25 N ° 26 N ° 27 N ° 28 N ° 29 N ° 30 N ° 31 N ° 32 N ° 33 N ° 34 N ° 35 N ° 36 N ° 37 N ° 38 N ° 39 N ° 40 N ° 41 N ° 42 N ° 43
2/20/2023 2/26/2023 N
C
E
P
2/20/2023 2/26/2023
2/27/2023 3/5/2023 L
A
N
I
F
2/27/2023 3/5/2023
3/6/2023 3/12/2023 I
C
A
D
O
3/6/2023 3/12/2023
3/13/2023 3/19/2023 B
A
S
E
3/13/2023 3/19/2023
3/20/2023 3/26/2023 A
V
0. 0% 1. 0% 2. 4% 4. 5% 5. 5% 7. 6% 8. 3% 10. 0% 11. 4% 14. 8% 31. 5% 34. 9% 35. 6% 38. 0% 38. 7% 39. 3%
3/20/2023
43. 6% 47. 2%
3/26/2023
47. 2% 47. 2% 60. 0% 68. 3% 78. 6%
4/10/2023 4/16/2023 %
R
E
0% 1% 2. 41% 4% 6% 8% 8% 10% 11% 15% 28. 22% 31. 90% 39. 26% 45. 40% 46. 63% 52. 15%
4/10/2023
57. 67% 67%
4/16/2023
74% 81% 90% 100%
4/17/2023 4/23/2023
P
P
R
O
G
4/17/2023 4/23/2023
R
4/24/2023 4/30/2023 M
A
D
O
4/24/2023 4/30/2023
5/1/2023 5/7/2023 A
C
U
M
5/1/2023 5/7/2023
U
5/8/2023 5/14/2023 L
A
D
O
5/8/2023 5/14/2023
5/15/2023 5/21/2023 5/15/2023 5/21/2023
R 0. 0% 1. 0% 2. 4% 4. 5% 5. 5% 7. 6% 8. 3% 10. 0% 11. 4% 14. 8% 31. 7% 35. 2% 35. 6% 38. 0% 38. 7% 39. 3% 43. 6% 47. 2% 47. 2% 47. 2% 50. 9% 54. 0% 69. 3%
E
P
R
O
A
C
(
1
7
R 0. 0% 1. 0% 2. 4% 4. 5% 5. 5% 7. 6% 8. 3% 10. 0% 11. 4% 14. 8% 28. 3% 31. 4% 35. 6% 38. 0% 38. 7% 39. 3% 43. 6% 47. 2% 47. 2% 47. 2% 50. 9% 54. 0% 69. 3%
E
9/11/2023 9/17/2023 A
C
T
I
9/11/2023 9/17/2023
9/18/2023 9/24/2023 9/18/2023 9/24/2023
V
I
D
A
D
E
S
(
1
7
/
0
9
/
2
3
)
AVANCE REAL REPROGRAMADO ACTIVIDADES (30/06/23) REPROGRAMADO ACTIVIDADES (23/07/23) REPROGRAMADO ACTIVIDADES (17/09/23)
89.7%
100.0%
86.1%
88.6% 91.5%
93.87%
CUADRO RESUMEN
90%
82.5%
74%
81%
68.3%
78.6% 80.0%
94.48% 94.85%
96.81% 96.99%
AVANCE PLANIFICADO 100%
93.87%
47.2%
47.2%
VARIACIÓN 2.58%
47.2%
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A SE M AN A
0 0
SE M AN A
0
SE M AN A
0
SE M AN A
0
SE M AN A SE M AN A
0 0
SE M AN A
0
SE M AN A
N ° 37 N ° 38 N ° 39 N ° 40 N ° 41 N ° 42 N ° 43 N ° 44 N ° 45 N ° 46 N ° 47 N ° 48 N ° 49 N ° 50 N ° 51 N ° 52 N ° 53 N ° 54
22/05/23 - (29/05/23 - (05/06/23 - (12/06/23 - (19/06/23 - (26/06/23 - (03/07/23 - (10/07/23 - (17/07/23 - (24/07/23 - (31/07/23 - (07/08/23 - (14/08/23 - (21/08/23 - (28/08/23 - (04/09/23 - (11/09/23 - (18/09/23 -
8/05/23) 04/06/23) 11/06/23) 18/06/23) 25/06/23) 02/07/23) 09/07/23) 16/07/23) 23/07/23) 30/07/23) 06/08/23) 13/08/23) 20/08/23) 27/08/23) 03/09/23) 10/09/23) 17/09/23) 24/09/23)
43. 6% 47. 2% 47. 2% 47. 2% 60. 0% 68. 3% 78. 6% 80. 0% 89. 7% 100. 0%
43. 6% 47. 2% 47. 2% 47. 2% 50. 9% 54. 0% 69. 3% 73. 6% 80. 0% 82. 5% 86. 1% 88. 6% 91. 5% 93. 87% 96. 20% 98. 04% 98. 96% 100%
43. 6% 47. 2% 47. 2% 47. 2% 50. 9% 54. 0% 69. 3% 73. 6% 80. 0% 82. 5% 86. 1% 88. 6% 91. 5% 93. 87% 94. 48% 94. 85% 96. 81% 96. 99%
CURVA "S" GENERAL DE AVANCE PLANIFICADO VS AVANCE REAL
PROYECTO : MEJORAMIENTO DEL SERVICIO EDUCATIVO DEL NIVEL SECUNDARIA DE LA I.E FERNANDO CARBAJAL, EN EL DISTRITO DE PADRE ABAB - PROVINCIA DE PADRE ABAD -DE PARTAMENTO UCAYALI
AVANCE PLANIFICADO BASE REPROGRAMADO ACTIVIDADES (30/06/23) REPROGRAMADO ACTIVIDADES (23/07/23) REPROGRAMADO ACTIVIDADES (17/09/23) AVANCE REAL REPROGRAMADO ACTIVIDADES (30/06/23) AVANCE DE REPROGRAMADO ACTIVIDADES (23/07/23) REPROGRAMADO ACTIVIDADES (17/09/23)
SEMANA FECHA ACTIVIDADES ACT. PLANIFICADAS %ACUMULADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO SEMANA FECHA ACTIVIDADES ACT. EJECUTADAS %ACUMULADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO REPROGRAMADO R. PLANFICADO % REPPROGRMADO
PLANIFICADAS ACUMULADAS ACTIVIDADES ACUMULADO ACUMULADO CUMPLIDAS ACUMULADO ACUMULADO ACTIVIDADES ACUMULADO ACUMULADO EJECUTADAS ACUMULADAS CUMPLIDAS ACUMULADO ACUMULADO CUMPLIDAS ACUMULADO ACUMULADO ACTIVIDADES ACUMULADO ACUMULADO
SEMANA N°21 (30/01/23 - 05/02/23) 0 0 0% 0 0 0% 0 0 0% 0 0 0% SEMANA N°21 (30/01/23 - 05/02/23) 0 0 0% 0 0 0% 0 0 0% 0 0 0%
SEMANA N°22 (06/02/23 - 12/02/23) #REF! #REF! #REF! 9 9 2.1% 9 9 2% 9 9 2% SEMANA N°22 (06/02/23 - 12/02/23) #REF! #REF! #REF! 9 9 2% 9 9 2% 9 9 2%
SEMANA N°23 (13/02/23 - 19/02/23) #REF! #REF! #REF! 10 19 4.5% 10 19 4% 10 19 4% SEMANA N°23 (13/02/23 - 19/02/23) #REF! #REF! #REF! 10 19 4% 10 19 4% 10 19 4%
SEMANA N°24 (20/02/23 - 26/02/23) #REF! #REF! #REF! 16 35 8.3% 16 35 8% 16 35 8% SEMANA N°24 (20/02/23 - 26/02/23) #REF! #REF! #REF! 16 35 8% 16 35 8% 16 35 8%
SEMANA N°25 (27/02/23 - 05/03/23) #REF! #REF! #REF! 16 51 12.1% 16 51 12% 16 51 12% SEMANA N°25 (27/02/23 - 05/03/23) #REF! #REF! #REF! 16 51 12% 16 51 12% 16 51 12%
SEMANA N°26 (06/03/23 - 12/03/23) #REF! #REF! #REF! 13 64 15.1% 13 64 15% 13 64 15% SEMANA N°26 (06/03/23 - 12/03/23) #REF! #REF! #REF! 13 64 15% 13 64 15% 13 64 15%
SEMANA N°27 (13/03/23 - 19/03/23) #REF! #REF! #REF! 17 81 19.1% 17 81 19% 17 81 19% SEMANA N°27 (13/03/23 - 19/03/23) #REF! #REF! #REF! 17 81 19% 17 81 19% 17 81 19%
SEMANA N°28 (20/03/23 - 26/03/23) #REF! #REF! #REF! 19 100 23.6% 19 100 24% 19 100 24% SEMANA N°28 (20/03/23 - 26/03/23) #REF! #REF! #REF! 19 100 24% 19 100 24% 19 100 24%
SEMANA N°29 (27/03/23 - 02/04/23) #REF! #REF! #REF! 13 113 26.7% 13 113 27% 13 113 27% SEMANA N°29 (27/03/23 - 02/04/23) #REF! #REF! #REF! 13 113 27% 13 113 27% 13 113 27%
SEMANA N°30 (03/04/23 - 09/04/23) #REF! #REF! #REF! 15 128 30.3% 15 128 30% 15 128 30% SEMANA N°30 (03/04/23 - 09/04/23) #REF! #REF! #REF! 15 128 30% 15 128 30% 15 128 30%
SEMANA N°31 (10/04/23 - 16/04/23) #REF! #REF! #REF! 12 140 33.1% 12 140 33% 12 140 33% SEMANA N°31 (10/04/23 - 16/04/23) 12 140 33% 12 140 33% 12 140 33%
SEMANA N°32 (17/04/23 - 23/04/23) #REF! #REF! #REF! 14 154 36.4% 13 153 36.17% 13 153 36.17% SEMANA N°32 (17/04/23 - 23/04/23) 13 153 36.17% 13 153 36.17% 13 153 36.17%
SEMANA N°33 (24/04/23 - 30/04/23) #REF! #REF! #REF! 15 169 40.0% 10 163 38.53% 10 163 38.53% SEMANA N°33 (24/04/23 - 30/04/23) 10 163 38.53% 10 163 38.53% 10 163 38.53%
SEMANA N°34 (01/05/23 - 07/05/23) 26 195 46.1% 20 183 43.26% 20 183 43.26% SEMANA N°34 (01/05/23 - 07/05/23) 20 183 43.26% 20 183 43.26% 20 183 43.26%
SEMANA N°35 (08/05/23 - 14/05/23) 27 222 52.5% 18 201 47.52% 18 201 47.52% SEMANA N°35 (08/05/23 - 14/05/23) #REF! #REF! #REF! 18 201 47.52% 18 201 47.52%
SEMANA N°36 (15/05/23 - 21/05/23) 21 243 57.4% 10 211 49.88% 10 211 49.88% SEMANA N°36 (15/05/23 - 21/05/23) 10 #REF! #REF! 10 211 49.88% 10 211 49.88%
SEMANA N°37 (22/05/23 - 28/05/23) 36 279 66.0% 34 245 57.92% 34 245 57.92% SEMANA N°37 (22/05/23 - 28/05/23) 34 #REF! #REF! 34 245 57.92% 34 245 57.92%
SEMANA N°38 (29/05/23 - 04/06/23) 37 316 75% 15 260 61.47% 15 260 61.47% SEMANA N°38 (29/05/23 - 04/06/23) 15 #REF! #REF! 15 260 61.47% 15 260 61.47%
SEMANA N°39 (05/06/23 - 11/06/23) 22 338 80% 12 272 68.51% 12 272 68.51% SEMANA N°39 (05/06/23 - 11/06/23) 12 272 68.51% 12 272 68.51%
SEMANA N°40 (12/06/23 - 18/06/23) 26 364 86% 11 283 71.28% 11 283 71.28% SEMANA N°40 (12/06/23 - 18/06/23) 11 283 71.28% 11 283 71.28%
SEMANA N°41 (19/06/23 - 25/06/23) 27 391 92% 30 313 78.84% 30 313 78.84% SEMANA N°41 (19/06/23 - 25/06/23) 30 313 78.84% 30 313 78.84%
SEMANA N°42 (26/06/23 - 02/07/23) 32 423 100% 25 338 85.14% 11 328 82.64% SEMANA N°42 (26/06/23 - 02/07/23) 11 328 82.64% 11 328 82.64%
SEMANA N°43 (03/07/23 - 09/07/23) 12 350 88.16% 14 342 86.17% SEMANA N°43 (03/07/23 - 09/07/23) 14 342 86.17% 14 342 86.17%
SEMANA N°44 (10/07/23 - 16/07/23) 23 373 93.95% 15 357 89.95% SEMANA N°44 (10/07/23 - 16/07/23) 15 357 89.95% 15 357 89.95%
SEMANA N°45 (17/07/23 - 02/07/23) 15 388 97.73% 4 361 90.96% SEMANA N°45 (17/07/23 - 02/07/23) 14 371 93.48% 4 361 90.96%
SEMANA N°46 (24/07/23 - 30/07/23) 9 397 100.00% 3 364 91.71% SEMANA N°46 (24/07/23 - 30/07/23) 3 364 91.71%
SEMANA N°47 (31/07/23 - 06/08/23) 6 370 93.22% SEMANA N°47 (31/07/23 - 06/08/23) 6 370 93.22%
SEMANA N°48 (07/08/23 - 13/08/23) 6 376 94.82% SEMANA N°48 (07/08/23 - 13/08/23) 6 376 94.82%
SEMANA N°49 (14/08/23 - 20/08/23) 4 380 95.70% SEMANA N°49 (14/08/23 - 20/08/23) 4 380 95.70%
SEMANA N°50 (21/08/23 - 27/08/23) 3 383 96.46% SEMANA N°50 (21/08/23 - 27/08/23) 3 383 96.46%
SEMANA N°51 (28/08/23 - 03/09/23) 6 389 97.87% SEMANA N°51 (28/08/23 - 03/09/23) 2 385 96.91%
SEMANA N°52 (04/09/23 - 10/09/23) 3 392 98.62% SEMANA N°52 (04/09/23 - 10/09/23) 2 387 97.42%
SEMANA N°53 (11/09/23 - 17/09/23) 2 394 99.13% SEMANA N°53 (11/09/23 - 17/09/23) 4 391 98.45%
SEMANA N°54 (18/09/23 - 24/09/23) 2 396 100% SEMANA N°54 (18/09/23 - 24/09/23) 2 393 99.03%
TOTAL DE ACTIVIDADES PLANIFICADAS #REF! 423.00 397 391.44 TOTAL DE ACTIVIDADES EJECUTADAS #REF! #REF! 211 211
90%
VARIACIÓN #VALUE! VARIACIÓN -61% 86% 85.14%
88.16%
98.45%
99.03%
VARIACIÓN 0.6%
80% 96.91% 97.42%
75%
78.84% 96.46%
95.70%
1/23/2023 1/29/2023 70% 6 6 .0 %
68.51%
1/23/2023 71.28%
1/29/2023 94.82%
Avance
61.47%
1/30/2023 2/5/2023 5 2 .5 %
5 7 .4 % 57.92% 1/30/2023 2/5/2023
2/6/2023 2/12/2023 50% 4 0 .0 %
4 6 .1 %
2/6/2023 2/12/2023
2/13/2023 2/19/2023 3 0 .3 %
3 3 .1 %
3 6 .4 %
2/13/2023 2/19/2023
2/20/2023 2/26/2023 2/20/2023 2/26/2023
30%
4/24/2023 4/30/2023 R
EP
0% 2% 4% 8% 12% 15% 19% 24% 27% 30% 33% 36. 17% 38. 53% 43. 26% 47. 52% 49. 88% 57. 92% 61. 47% 4/24/2023
68. 51% 4/30/2023
71. 28% 78. 84% 85. 14% 88. 16% 93. 95%
ver pestaña PPC el
97. 73% 100. 00%
5/1/2023 5/7/2023
R
O
G
R
5/1/2023 5/7/2023 porcentaje
A
5/8/2023 5/14/2023 M
A
D
5/8/2023 5/14/2023 ver pestaña PPC el
porcentaje
O
5/15/2023 5/21/2023 A
CT
IV
5/15/2023 5/21/2023
ID
5/22/2023 5/28/2023 A
D
ES
5/22/2023 5/28/2023 ver pestaña PPC el
5/29/2023 6/4/2023 (2
3/
07
5/29/2023 6/4/2023 porcentaje
/2
6/5/2023 6/11/2023 3)
% 0% 2. 1% 4. 5% 8. 3% 12. 1% 15. 1% 19. 1% 23. 6% 26. 7% 30. 3% 33. 1% 36. 4% 40. 0% 46. 1% 52. 5% 57. 4% 66. 0% 75% 6/5/2023
80% 86% 6/11/2023 92% 100% #FM T #FM T ver pestaña PPC el
porcentaje
R
(2
3/
07
8/14/2023 8/20/2023 /2
3)
R 0% 2% 4% 8% 12% 15% 19% 24% 27% 30% 33% 36. 17% 38. 53% 43. 26% 47. 52% 49. 88% 57. 92% 61. 47%
8/14/2023
68. 51%
8/20/2023
71. 28% 78. 84% 82. 64% 86. 17% 89. 95% 90. 96% 91. 71% 93. 22% 94. 82% 95. 70% 96. 46% 97. 87% 98. 62% 99. 13% 100%
EP
R
O
G
R
A
M
A
8/21/2023 8/27/2023 D
O
A
8/21/2023 8/27/2023
CT
IV
ID
A
D
ES
(1
(1
7/
Imagen 01: SELLADO CON SIKAFLEX LA PARTE INFERIOR DEL Imagen 02: INSTALACIÓN DE GRIFERÍA DEL LAVADERO DE Imagen 03: COLOCACIÓN DE CAJAS OCTOGONALES METÁLICAS, Imagen 04: HABILITADO DE LUMINARIAS SUSPENDIDAS PARA
CONTRAZOCALO DE ALUMINIO, UBICADO EN MÓDULO AU-04. DISCAPACITADO, UBICADO EN MÓDULO SS.HH. UBICADO EN MÓDULOS EXISTENTE ME-05 Y ME-06. COLOCACIÓN EN MÓDULOS EXISTENTES.
Tuesday, September 26, 2023
Imgagen 05: INSTALACIÓN DE MONTANTE PLUVIAL DEL Imgagen 06: COLOCACIÓN DE LUMINARIAS SUSPENDIDAS DEL Imagen 07: REVISIÓN Y MEGADO DE CABLES ELÉCTRICOS DEL Imagen 08: CULMINACIÓN DE LUMINARIAS SUSPENDIDAS EN
MÓDULO AU-04. MÓDULO EXISTENTE ME-01. MÓDULO AD-01. EL INTERIOR DEL MÓDULO EXISTENTE ME-07.
Wednesday, September 27, 2023
Imgagen 09: COLOCACIÓN DE LUMINARIAS SUSPENDIDAS, Imgagen 10: INSTALACIÓN DE PERFILES DE ALUMINIO DE Imgagen 11: COLOCACIÓN DE LA TUBERÍA MONTANTE PLUVIAL, Imgagen 12: FABRICACIÓN DE BARANDAS METÁLICAS PARA
UBICADO EN MÓDULO EXISTENTE ME-01. VENTANAS EN MÓDULO EXISTENTE ME-07. UBICADO EN MÓDULO EXISTENTE ME-07. RAMPAS DE LOS MÓDULOS EXISTENTES.
Thursday, September 28, 2023
Imgagen 13: CULMINACIÓN DE INSTALACIÓN DE LUMINARIAS Imgagen 14: INSTALACIÓN DE LUMINARIAS SUSPENDIDAS, Imgagen 15: MEGADO DE CABLES ELÉCTRICOS DE LOS Imgagen 16: CAMBIO DE DPS POR DPS DE MARCA SCHNEIDER
SUSPENDIDAS EN MÓDULO EXISTENTE ME-01. UBICADO EN VEREDA DEL MÓDULO EXISTENTE ME-01. MÓDULOS NUEVOS; AD-01, AU-01 y SS.HH. DE LOS TABLEROS ELÉCTRICOS DE LOS MÓDULOS NUEVOS.
Friday, September 29, 2023
Imgagen 17: COLOCACIÓN DE TRAMPAS "P" DE LAVATORIOS Imgagen 18: INSTALACIÓN DE PUR EN LA PARTE SUPERIOR Imgagen 19: INSTALACIÓN DE LUMINARIAS SUSPENDIDAS, Imgagen 20: COLOCACIÓN DE CERRADURA DE PUERTA EN
TIPO OVALÍN, UBICADO EN MÓDULO SS.HH. DEL MURO DIVISORIO DE MÓDULOS NUEVOS UBICADO EN VEREDA DEL MÓDULO EXISTENTE ME-05 Y ME-06. MÓDULO EXISTENTE ME-03.
Saturday, September 30, 2023
Imgagen 05: CULMINACIÓN DE INSTALACIÓN DE COBERTURA Imgagen 06: COLOCACIÓN DE PIEDRA DE FORMA CIRCULAR Imagen 07: INSTALACIÓN DE CAJA DE PASE METÁLICA DEL Imagen 08: FABRICACIÓN DE TAPA METÁLICA DEL BUZÓN
METÁLICA DE LA ESTRUCTURA BAJO SOMBRA. PARA LA ZONA EVACUACIÓN. TABLERO DE CONTROL DE BOMBAS DE AGUA. ELÉCTRICO.
Wednesday, September 27, 2023
Imgagen 09: COLOCACIÓN DE CAJAS DE PASE Y TUBERÍA Imgagen 12: VERTIDO DE CONCRETO DEL MURO DE
Imgagen 10: COLOCACIÓN DE COBERTURA METÁLICA, Imgagen 11: COLOCACIÓN DE PIEDRAS DE FORMA CIRCULAR
CONDUIT EN PISO, UBICADO EN ZONA DE CUARTO DE CANALETA, UBICADO EN EL CONTORNO DEL BUZÓN
UBICADO EN CUARTO DE MÁQUINAS. PARA LA ZONA DE EVACUACIÓN DEL I.E FERNANDO CARBAJAL.
MÁQUINAS. ELÉCTRICO.
Thursday, September 28, 2023
Imgagen 13: COLOCACIÓN DE SOPORTE METÁLICO PARA LA Imgagen 14: INSTALACIÓN DE PASAMANOS METÁLICO, Imgagen 15: COLOCACIÓN DE TAPA METÁLICA DEL BUZÓN Imgagen 16: COLOCACIÓN DE PIEDRA EN FORMA DE CÍRCULO
TUBERÍA DE IMPULSIÓN DE AGUA. UBICADO EN ESCALERA DEL CUARTO DE MÁQUINAS. ELÉCTRICO, UBICADO EN RAMPA DE INGRESO A OBRA. PARA ZONA DE EVACUACIÓN.
Friday, September 29, 2023
Imgagen 17: CONTINÚA EL PINTADO DE PIEDRA DE COLOR Imgagen 18: INSTALACIÓN DE BARANDA METÁLICA, UBICADO Imgagen 19: CULMINACIÓN DE TAPA METÁLICA DEL BUZÓN Imgagen 20: COLOCACIÓN DE CERRAMIENTO DE MURO PUR,
AMARILLO PARA LA ZONA DE EVACUACIÓN. EN EL INGRESO DE PUERTA DEL CUARTO DE MÁQUINAS. ELÉCTRICO, UBICADO EN RAMPA DE INGRESO A OBRA. UBICADO ADYACENTE A MÓDULO EXISTENTE ME-07.
Saturday, September 30, 2023