02 GASTOS GENERALES(9%) GG NDIRECTO*0.09 No 03 UTILIDAD(10%) UTI NDIRECTO*0.10 No 04 ------------------------------------ --------------------------------- No 05 SUB TOTAL ST NDIRECTO+GG+UTI No 06 IGV(18%) IGV ST*0.18 Si 07 ======================== ====================== No 08 TOTAL PRESUPUESTO P_T ST+IGV No