Está en la página 1de 1

3

0
A
P

6.0
M
A
R
E
B
U
S
LOSA DE CONCRETO
NPT=+/- 0.00

5.8
8 3.40

0
1.5
CISTERNA
PROYECTADA
.50

13

L
B CAP. = 10.00m3

2.40
0. T A
TE
rect.100x55x50mm y tapa

/- RE R
.50

A
0
(4"x2 1/4"x2")

3.0

= + NC T
00 O
ER
ES
omba

PT O N
1 ElectrobHP.
de 0.5

O
D

N EC E
IN
A
L

C
H

D
C
A caja cuad. 100x100x40mm y

JE
tapa (4"x4"x1 1/2")

R
N

15 T
0. RO

JA

D
TO
sube a tanque alto

SA
2X2.5mm2TW+1X2.5mm2TW

SA
=+ F
20mm PVC-L

PT TO
2 VA A RED EXTERIOR 3-1X6

LO
1 mm.2 NYY.+1X6 mm.2 NYY

PA
0
A

N RE
PE
P

1.5
M

C
A

N
R

O
E
B

C
ED
U
S

A
ED
R

R
VE

VE

12
A
ER
IN
0
4.5

D
R
JA
1
1

M
P
A .30 .30 4.88
A
R
E
B
U
S

11
0
3.0

A
ER
5.8
IN
R
D 8
.99
JA

38
PISO TERRAZO LAVADO
1
0 PRE MEZCLADO E= 0.01
COLOR NARANJA / GRIS
A
P
M
A
R
E
B
U
S

29.94
10

TUB. VIENE DE RED PÚBLICA


A
ER

TDG
IN
D
R
JA

PASAJE CENTRAL
NPT=+/- 0.00

GLORIETA
PISO CERAMICO
0.50X0.50 COLOR
A DEFINIR
NPT=+0.80

PISO CONCRETO
FROTACHADO
NPT=+0.45

R2.00

GRUTA PROYECTADA
(Ver Plano de Detalle)

29.45 4.73

PASAJE CENTRAL

También podría gustarte