One-Line Diagram - W 4=>Circuito 3 (Load Flow Analysis) - tcucof(Project Editor)

RAMAL 3

905.9 kW
465.1 kvar
L_POR-L3N1
0.37 km
Penguin 4/0 0.117 % Vd
L3N1
13.8 kV
905 kW
464.4 kvar

L_L3N1-L3N2
0.8 km 0.253 % Vd
Penguin 4/0
L3N2
13.8 kV
903.1 kW
462.9 kvar

L_L3N2-PE-01
0.2 km 0.063 % Vd
Penguin 4/0

N_PE-01
13.8 kV

442 kW 236.4 kW 224.3 kW


217.7 kvar 125.6 kvar 119.3 kvar
F_AMI-5
53 A CCM-2021-3P-2
CCM-2021-3P-1 0.199 % Vd
TR_PE-01 0.21 % Vd 2500 m
2500 m
1000 kVA -2.5% TapP Penguin 4/0
Penguin 4/0
13.8/0.48 kV
SDT_CCM_PE1
50 m
12-1/C 500 CCM-2021-3.1
0.406 % Vd CCM-2021-3.

437.5 kW POZO 37 H-2


204.1 kvar
POZO 37 H -1

CCMPE1 CB_CCM_PE1
2500 A
0.48 kV

12.4 kW 12.4 kW 17.3 kW 20.9 kW 37.9 kW 60.2 kW 39.2 kW 65.7 kW 65.7 kW 105.8 kW
7.67 kvar 7.67 kvar 10.7 kvar 9.79 kvar 16.6 kvar 26.9 kvar CCMPE1_QT1 17.5 kvar CCMPE1_QT4 29.5 kvar CCMPE1_QT5 29.5 kvar CCMPE1_QT9 48.3 kvar
CCMPE1_QT2 CCMPE1_QT3 CCMPE1_QT6 630 A 630 A 630 A
630 A CCMPE1_QT10 Open
630 A 630 A 630 A 630 A
AMI-52/CB-QT7 AMI-52/CB-QSS3 AMI-52/CB-QT8
50 A 45 A 63 A Cable7
Cable4 Cable6 Cable9
Cable17 40 m 40 m 40 m 40 m Cable10
Cable2 Cable5 40 m 3-1/C 350 3-1/C 350 40 m
25 m 30 m 3-1/C 350 3-1/C 350
3-1/C 350 0.139 % Vd 0.233 % Vd 0.233 % Vd 0.377 % Vd 3-1/C 350
3-1/C 500 3-1/C 500 0.213 % Vd
N-05P11 DPSP11 TABLERO TESTINGP11 0.039 % Vd 0.082 % Vd
45 m 0.279 % Vd 45 m 45 m T1 T2 T3 T5
0.279 % Vd 0.391 % Vd T10 T12 T16 200 kVA
3-1/C 4 3-1/C 4 3-1/C 4 200 kVA 200 kVA 200 kVA T6
260 kVA 260 kVA 200 kVA 0.48/4.16 kV 200 kVA
0.48/4.16 kV 0.48/4.16 kV 0.48/4.16 kV
0.48/4.16 kV 0.48/4.16 kV 0.48/4.16 kV 0.48/4.16 kV
12.4 kW 12.4 kW 17.3 kW
7.66 kvar 7.66 kvar 10.7 kvar 39 kW 65 kW 65 kW 103.9 kW
20.9 kW 37.8 kW 59.6 kW 17.1 kvar 28.5 kvar 28.5 kvar 45.6 kvar
9.71 kvar 16.3 kvar 26 kvar

S. AUXILIARES9 DPS (AMI-52)5 TABLERO TESTING11 PE-3 PE-4


PE-52 PE-6
30 kVA 30 kVA 42 kVA PE-1 PE-15H PE-50H 148 HP 148 HP 148 HP PE-7
148 HP
56 HP 235 HP 170 HP 148 HP
POZOS P1 POZOS P1 POZOS P1 POZOS P1
POZOS POZOS POZOS P1 Infield POZOS P1
Infield Infield Infield
Perforados Perforados Infield Infield