ID Description Dur Start Finish J A S O N D J F M A M J J A S O N D J F PNPB NITRATE-PRILLING PLANT (TARGET) HI HITO HITO HITO
H1400 Project Startup 0 14JUL08*
H1170 Detailed Engineering Nitrate Plant Startup 0 01SEP08* H1180 Crystallization Engineering HPD Startup 0 01SEP08* H1000 Bertrams Chemical Contract Startup 0 03NOV08* H1100 Bertrams Heatec Contract Startup 0 03DEC08* H1190 Hazop Nitrate Plant 2 22DEC08 23DEC08 H1300 Basic Engineering Bertrams Heatec End 0 01APR09* H1200 Basic Engineering Bertrams Chemicals End 0 01APR09* H1210 Hazop Prilling Plant 2 04MAY09 05MAY09 H1500 Basic Engineering End 0 01JUN09* H1310 Detailed Engineering End 0 02OCT09* H1290 Management & Administration Paquerte of Requisit 0 15JAN10* CB INGENIERIA CONCEPTUAL-BASICA 2000 GENERAL FS Proceso FSPCB21001 Trade Off Localización Nitrato - Prilado (DW) 23 14JUL08 14AUG08 FSDCB21001 Trade Off Localización Nitrato - Prilado 23 14JUL08 14AUG08 SE Estructura SEDCB20001 PLANO BASICO MOV.DE TIERRAS PLANTA 9 20OCT08 30OCT08 SEDCB21005 CUBICACIONES 10 03NOV08 14NOV08 ME Mecánica MEDCB20002 Mechanical Design Criteria - Wet Harvest & Prill 10 26AUG08 08SEP08 MEDCB20004 Material Take Off - Wet Harvest & Prilling 5 02SEP08 08SEP08 MEDCB21001 Technical Report (Process Support) 10 09SEP08 24SEP08 MEDCB20003 Cost Report - Wet Harvest & Prilling 5 09SEP08 15SEP08 MEPCB21001 Contribution PL-SK-001 3 25SEP08 29SEP08 MEPCB21002 Contribution PL-SK-002 3 25SEP08 29SEP08 IN Instrumentación INDCB20001 DESIGN CRITERIA 42 15OCT08 15DEC08 INDCB20002 INSTRUMENT AND CONTROL COST REPORT 42 15OCT08 15DEC08 INDCB20003 SPEC - INSTRUMENTATION & CONTROL IN MAYOR EQUIP 42 15OCT08 15DEC08 INDCB20004 INSTRUMENTS LIST 42 15OCT08 15DEC08
H1600 Basic Engineering General Area End 0 15DEC08*
3000 WET HARVEST FS Proceso FSPCB30001 Process Flow Diagrams 29 14JUL08 25AUG08 FSDCB30001 Design Criteria Update 20 14JUL08 11AUG08 FSDCB30002 Process Data Sheet 29 01AUG08 10SEP08
Start Date 14JUL08 PNPB Sheet 1 of 8
Early Bar Finish Date 15JAN10 ATACAMA MINERALS Date Revision Checked Approved Progress Bar Data Date 14JUL08 Run Date 20NOV08 11:11 Critical Activity NITRATE-PRILLING PLANT (TARGET)
H1700 Basic Engineering Wet Harvest Area End 0 15DEC08*
4000 NITRATE PLANT FS Proceso FSDCB40001 Revisión Ingeniería Básica 74 14JUL08 30OCT08 SE Estructura SEDCB43001 MEMORIA CALCULO PREDISEÑO EDIF. CRISTALIZADORES 5 15OCT08 21OCT08 PD Piping PDDCB40004 DATA SHEET - TANK - BUFFER TANK N°1 66 22AUG08 27NOV08 PDDCB40005 DATA SHEET - TANK - BUFFER TANK N°2 66 22AUG08 27NOV08 PDDCB40006 DATA SHEET - TANK - BUFFER TANK N°3 66 22AUG08 27NOV08 PDDCB41013 DATA SHEET - TANK - MLK TANK 66 22AUG08 27NOV08 PDDCB41014 DATA SHEET - TANK - CENTRATE TANK N°1 66 22AUG08 27NOV08 PDDCB42024 DATA SHEET - TANK - CENTRATE TANK N°2 66 22AUG08 27NOV08
Start Date 14JUL08 PNPB Sheet 2 of 8
Early Bar Finish Date 15JAN10 ATACAMA MINERALS Date Revision Checked Approved Progress Bar Data Date 14JUL08 Run Date 20NOV08 11:11 Critical Activity NITRATE-PRILLING PLANT (TARGET)
H1800 Basic Engineering Nitrate Plant Area End 0 26FEB09*
5000 PRILLING PLANT FS Proceso FSDCB50004 Balance de Masa Global (3 Productos) 20 15SEP08 15OCT08 FSDCB50005 Balance de Energía Global (3 Productos) 20 15SEP08 15OCT08 FSPCB50001 Flow Diagrams General 20 15SEP08 15OCT08 FSDCB52001 Pruebas para diseño Sistema de Ducheo 40 03NOV08 30DEC08 FSDCB50006 Mass Balance, Prilling Plant KNO3-NaNO3-SPO 20 01DEC08 30DEC08 FSDCB52015 Process Data Sheet Prilling Area 20 01DEC08 30DEC08 FSDCB52016 Process Data Sheet Prilling Area 20 01DEC08 30DEC08 FSDCB52002 Resultados de Pruebas Piloto Sistema de Ducheo 18 03DEC08 30DEC08 FSDCB51013 Process Data Sheet Melting and Circulation Area 18 03DEC08 30DEC08 Start Date 14JUL08 PNPB Sheet 3 of 8 Early Bar Finish Date 15JAN10 ATACAMA MINERALS Date Revision Checked Approved Progress Bar Data Date 14JUL08 Run Date 20NOV08 11:11 Critical Activity NITRATE-PRILLING PLANT (TARGET)
Early Bar Finish Date 15JAN10 ATACAMA MINERALS Date Revision Checked Approved Progress Bar Data Date 14JUL08 Run Date 20NOV08 11:11 Critical Activity NITRATE-PRILLING PLANT (TARGET)
H1110 BC-Drying,Screening,Cooling and Storage Area End 0 15MAY09*
7000 S/E Y CONTROL EE Electricidad EEDCB70001 CALCULATION REPORT 10 04MAY09 15MAY09 EEDCB70002 POWER CIRCUIT LIST 10 04MAY09 15MAY09 EEDCB70003 MTO 10 04MAY09 15MAY09 EEDCB70004 LOAD FLOW STUDY REPORT (REVIEW) 10 04MAY09 15MAY09 EEPCB70001 DISTRIBUTION LINE 10 04MAY09 15MAY09 EEPCB70002 DISTRIBUTION LINE 10 04MAY09 15MAY09
H1120 Basic Engineering S/E y Control Area End 0 01JUN09*
8000 UTILITIES FS Proceso FSDCB80002 Mass Balance Prill Tower Utilities 15 05DEC08 29DEC08 FSDCB80001 Utilities Wet Harvest Mass Balance 15 05DEC08 29DEC08 FSDCB80003 Energy Balance Prill Tower Utilities 15 05DEC08 29DEC08 FSPCB80001 Process Flow Diagrams Prill Tower Utilities 15 05DEC08 29DEC08 EE Electricidad EEDCB80003 MTO 5 03DEC08 10DEC08 EEDCB80001 DATA SHEET 3 03DEC08 05DEC08 EEDCB80002 DATA SHEET 3 03DEC08 05DEC08 EEDCB80004 POWER CIRCUIT LIST 5 11DEC08 17DEC08 EEPCB80001 GENERAL ONE LINE DIAGRAM 5 11DEC08 17DEC08 EEPCB80002 ELECTRICALS EQUIPMENTS LAYOUT 5 11DEC08 17DEC08 EEPCB80003 ELECTRICALS EQUIPMENTS LAYOUT 5 11DEC08 17DEC08
H1130 Basic Engineering Utilities Area End 0 15APR09*
0080 REVISION INGENIERIA BASICA C-1276 FS Proceso FSDCB08001 Balance de Masa, KNO3 34 14JUL08 01SEP08 FSDCB08002 Balance de Energía, KNO3 34 14JUL08 01SEP08 FSDCB08005 Balance de Masa, SPO 34 21JUL08 05SEP08 FSDCB08007 Balance de Energía, SPO 34 21JUL08 05SEP08 FSPCB08001 Grinding Area, KNO3 34 21JUL08 05SEP08 FSDCB08004 Dimensonamiento de Equipos, KNO3 34 21JUL08 05SEP08
Start Date 14JUL08 PNPB Sheet 6 of 8
Early Bar Finish Date 15JAN10 ATACAMA MINERALS Date Revision Checked Approved Progress Bar Data Date 14JUL08 Run Date 20NOV08 11:11 Critical Activity NITRATE-PRILLING PLANT (TARGET)
H1140 C-1276 Basic Engineering Review 0080 Area End 0 26NOV08*
Start Date 14JUL08 PNPB Sheet 7 of 8
Early Bar Finish Date 15JAN10 ATACAMA MINERALS Date Revision Checked Approved Progress Bar Data Date 14JUL08 Run Date 20NOV08 11:11 Critical Activity NITRATE-PRILLING PLANT (TARGET)
H1150 C-1276 Basic Engineering Review 0090 Area End 0 15SEP08*
Start Date 14JUL08 PNPB Sheet 8 of 8
Early Bar Finish Date 15JAN10 ATACAMA MINERALS Date Revision Checked Approved Progress Bar Data Date 14JUL08 Run Date 20NOV08 11:11 Critical Activity NITRATE-PRILLING PLANT (TARGET)