Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Metrado
01 REUBICACION DE RED DE AGUA Y DESAGUE
01.06.01.07 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M TUB. Ø 4" m3 9.75
01.06.01.08 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20M TUB. Ø 2" m3 5.85
10,380.93
947.98 947.98
2,180.28 2,180.28
1,524.58 1,524.58
10.09 5,728.09
4,577.19
677.97 2,033.91
847.76 2,543.28
5,973.61
11.19 100.71
10.71 2,227.47
12.95 3,645.43
814.10
0.82 138.50
2.00 337.80
2.00 337.80
24,926.88
9,700.00 9,700.00
8,465.70 8,465.70
1,788.30 1,788.30
4,023.73 4,023.73
949.15 949.15
123,241.23
43,632.29
215.31 31,004.64
215.31 2,523.43
215.31 1,511.48
4.31 1,086.34
16.25 2,457.49
30.94 4,084.08
30.94 301.67
30.94 181.00
8.21 161.57
16.29 320.59
260.32
98.07 98.07
85.36 85.36
76.89 76.89
63,174.23
286.61 57,322.00
166.78 5,428.69
21.72 423.54
12,302.92
12,302.92 12,302.92
3,871.47
12.71 3,203.56
43.42 390.78
32.93 111.96
1.09 165.17
19,896.71
Item Descripción Und. Metrado
01.07.01 MOVIMIENTO DE TIERRAS
01.08.03.03 2do RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 1.50
0.20M
01.08.03.04 3ER RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 2.00
0.20M
01.08.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC 1" C-10 , ACOMETIDA RANGO 2 - 6 m 11.20
mt
215.31 9,512.40
4.31 126.93
16.25 287.14
30.94 1,312.17
8.21 18.88
16.29 37.47
110.78
110.78 110.78
7,558.34
256.65 7,558.34
539.03
539.03 539.03
393.57
12.71 374.31
1.09 19.26
2,814.06
18.42
1.09 6.50
2.00 11.92
298.27
46.03 298.27
271.59
16.25 96.85
30.94 30.94
30.94 46.41
30.94 61.88
16.29 35.51
1,955.60
11.39 127.57
21.49 85.96
61.90 247.60
28.72 114.88
16.06 179.87
41.84 167.36
41.84 167.36
41.84 334.72
132.57 530.28
270.18
16.75 48.24
32.93 94.84
12.71 127.10
819.11
10.88
1.09 3.84
2.00 7.04
42.95
10.71 42.95
169.50
16.25 55.90
Item Descripción Und. Metrado
Precio S/. Parcial S/.
01.09.03.02
1er RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 0.67
0.20M
01.09.03.03
2do RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 0.97
0.20M
01.09.03.04
3ER RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE m3 1.30
0.20M
01.09.03.05
ELIMINACION DE MATERIAL EXCEDENTE m3 1.39
01.09.04
SUMINISTRO E INSTALACIÓN DE TUBERIAS Y ACCESORIOS
01.09.04.01
SUMINISTRO E INSTALACION DE TUB. PVC Ø 6" m 5.40
01.09.04.02
SUMINISTRO E INSTALACION DE TEE PVC SAP Ø6" und 1.00
01.09.04.03
SUMINISTRO E INSTALACION DE CODO PVC SAP Ø6"X45ª und 2.00
01.09.04.04
CAJAS DE REGISTRO DE DESAGUE 24" x 24" und 1.00
01.09.05
VARIOS
01.09.05.01
DEMOLICION DE VEREDAS DE 0.10 m m2 1.32
01.09.05.02
REPOSICION DE VEREDA CONCRETO fc= 175 kg /cm2 m2 1.32
01.09.05.03
PRUEBA HIDRAULICA Y DE DESINFECCIÓN DE REDES DE DESAGUE m 5.40
01.10
PASE AEREO L= 20 metros
01.10.01
TRABAJOS PRELIMINARES
01.10.01.01
LIMPIEZA DEL TERRENO MANUAL m2 55.00
01.10.01.02
TRAZO, NIVELES Y REPLANTEO INICIAL m2 55.00
01.10.02
MOVIMIENTO DE TIERRAS
01.10.02.01
EXCAVACION MANUAL PARA ESTRUCTURAS m3 19.32
01.10.02.02
RELLENO CON MATERIAL PROPIO m3 0.84
01.10.02.03
ACARREO DE MATERIAL EXCEDENTE HASTA DIST. PROMEDIO 30 m. m3 24.02
01.10.02.04
ELIMINACION DE MATERIAL EXCEDENTE m3 24.02
01.10.03
OBRAS DE CONCRETO SIMPLE
01.10.03.01
SOLADOS
01.10.03.01.01
SOLADO E= 4" CONCRETO FC= 100 KG/CM2 + 30% P.G 8" MAX. m2 8.40
01.10.04
OBRAS DE CONCRETO ARMADO
01.10.04.01
ZAPATAS
01.10.04.01.01
CONCRETO ZAPATAS f'c=210 kg/cm2 m3 1.68
01.10.04.01.02
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60,EN ZAPATAS kg 49.28
01.10.04.02
COLUMNAS
01.10.04.02.01
CONCRETO COLUMNAS f'c=210 kg/cm2 m3 8.40
01.10.04.02.02
ENCOFRADO Y DESENCOFRADO m2 23.20
01.10.04.02.03
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60,EN COLUMNAS kg 555.39
01.10.05
ACCESORIOS
01.10.05.01
SUMINISTRO E INST. DE ACCESORIOS EN PASE AEREO glb 1.00
01.10.06
REVOQUES Y ENLUCIDOS
01.10.06.01
TARRAJEO C/ IMPERMEABILIZANTE MEZCLA 1:2; e=1.5 cm m2 31.60
01.10.07
PINTURAS
01.10.07.01
PINTURA BASE ZINCORMATO EN CARPINTERIA METALICA. m2 56.00
01.10.07.02
PINTURA ANTOCORROSIVA EN CARPINTERIA METALICA m2 56.00
01.10.07.03
LIMPIEZA FINAL DE OBRA m2 55.00
01.11
PASE AEREO L= 6.9 metros
01.11.01
TRABAJOS PRELIMINARES
01.11.01.01
TRAZO, NIVELES Y REPLANTEO INICIAL m2 12.00
01.11.01.02
LIMPIEZA DEL TERRENO MANUAL m2 12.00
01.11.02
MOVIMIENTO DE TIERRAS
01.11.02.01
EXCAVACION MANUAL PARA ESTRUCTURAS m3 0.86
01.11.02.02
RELLENO CON MATERIAL PROPIO m3 0.07
01.11.02.03
ELIMINACION DE MATERIAL EXCEDENTE m3 1.03
01.11.03
OBRAS DE CONCRETO SIMPLE
01.11.03.01
CONCRETO SIMPLE f´c = 100 kg/cm2 m3 0.07
01.11.03.02
CONCRETO EN DADO , f'c=175 kg/cm2 + 30% P.M m3 0.43
etrado
Precio S/. Parcial S/.
30.94 20.73
30.94 30.01
30.94 40.22
16.29 22.64
461.57
11.39 61.51
87.75 87.75
87.75 175.50
136.81 136.81
134.21
16.75 22.11
32.93 43.47
12.71 68.63
22,347.79
155.10
0.82 45.10
2.00 110.00
1,503.78
46.03 889.30
30.94 25.99
8.21 197.20
16.29 391.29
271.40
271.40
32.31 271.40
9,301.18
978.73
398.07 668.76
6.29 309.97
8,322.45
398.07 3,343.79
64.02 1,485.26
6.29 3,493.40
6,044.28
6,044.28 6,044.28
1,281.38
40.55 1,281.38
3,790.67
33.31 1,865.36
33.31 1,865.36
1.09 59.95
3,935.82
33.84
2.00 24.00
0.82 9.84
58.54
46.03 39.59
30.94 2.17
16.29 16.78
175.75
266.59 18.66
365.32 157.09
Item Descripción Und. Metrado
01.11.04 ACCESORIOS
COSTO DIRECTO
GASTOS GENERALES (15.00%)
UTILIDAD (10.00%)
Precio S/. Parcial S/.
2,975.67
2,975.67 2,975.67
145.98
40.55 145.98
546.04
33.31 266.48
33.31 266.48
1.09 13.08
219,727.43
32,959.11
21,972.74
========================
SUB TOTAL 274,659.28
IGV (18.00%) 49,438.67
=========================
PRESUPUESTO DE OBRA 324,097.95
SON : DOSCIENTOS DIECINUEVE MIL SETECIENTOS VEINTISIETE Y 43/100 NUEVOS SOLES