Está en la página 1de 1

25 a 35 a

b b
2-2 c
d 2" L=1,05 2' L=0,80 1-1 c
d
1
e e
2" f 2' f
-0.05

10 6 15

10 6 15
C12/15;Bc15;(B200) 1 C12/15;Bc15;(B200)
Dop bitum a
b
4 Trotuar beton c
5
d
5 2 4 e
L=105 OB37
3 f

79
OB37

79
3

1.60

1.60
MATERIALE:
-Beton : C12/15 (C4/5-beton egalizare)
8 -1.15
50 6
6
Bc15

37.5
37.5

37.5
37.5
Bc15 (B200)

45

45
(B200) C12/15
7
C12/15
7
50 -1.60 - Clasa de importan
9 Bc5 (B75) C4/5

5
-1.65 - Categoria de importan D (HG 766/97)

5
15 30 15 - Grad de rezisten la foc: III (P118/99)
15 30 15 20
3
60 5
60 L=35 OB37

11
0.25 10
+0.85 a

b
25
100
100

10 a

90
25 b
c d
c
1 d
-0.05
-0.05
30

20
20

10
20

5 5 LONGITUDUNALE DIN CENTURI


11
20
.
4 4

30
1.60

> 1,00m
80

. .
-1.15
6 VERIFICATOR/ NUME SEMNATURA CERINTA REFERAT / EXPERTIZA NR./ DATA

Bc15 Bc15 EXPERT


45

(B200) (B200) Proiect nr.


C12/15 C12/15

18
7 -1.60 58 /2023
-1.60 FAZA:
Bc5 (B75) C4/5 -1.65
5

SPECIFICATIE NUME SEMNATURA SCARA:


1:20
15 30 15 SEF PROIECT ing. POPA EMANUEL TITLU PLANSA: PL. NR.
DATA
60 PROIECTAT ing. POPA EMANUEL
R2
DESENAT ing. POPA EMANUEL 2023

También podría gustarte