Varillas
Numero Pulgadas Diametro [m] Area [m^2] Peso
2 1/4 0.00635 0.0000317 0.249
3 3/8 0.0095 0.0000709 0.556
4 1/2 0.0127 0.0001267 0.994
5 5/8 0.0159 0.0001986 1.559
6 3/4 0.0191 0.0002865 2.249
7 7/8 0.0222 0.0003871 3.039
8 1 0.0254 0.0005067 3.978
Densidad 7850
Adicionales
Diametro Diametro min Diametro Uso Largo (m) Largo T (m)
3/8 a 1 6db 1/2 0.0762 2.7432
Numero Diametro Diametro (m) Area Peso (kg/m)
6 Baston 3/4 0.0191 0.0002865 2.249
Longitud [m] Cantidad [Uni] Largo total [m] Peso
116.915851
II - MATERIALES
Cemento Saco
Arena m^3
Agua Lts
Grava m^3
SUBTOTAL : $ 1,357.14
SUBTOTAL : $ 250,601.26
SUBTOTAL : 7,722.28
A 18% 46,743
I 3% 7,790
U 5% 12,984
26% 67,517
327,197.66
IVA 19% 2,467
TOTAL 329,664.62
28 38000
1 0.0357143 1357.1429
18 88376
1 0.0555556 4909.7778
16 45000
1 0.0625 2812.5
ANALISIS : C3500PSI
COSTOS DIRECTOS
I - EQUIPOS
CODIGO DESCRIPCION UNIDAD
Mezcladora (1 gasolina incluida) Dia
II - MATERIALES
Cemento Saco
Arena m^3
Agua Lts
Grava m^3
SUBTOTAL : 1,357.14
SUBTOTAL : 368,853.49
SUBTOTAL : 7,722.28
A 18% 68,028
I 3% 11,338
U 5% 18,897
26% 98,263
476,195.46
IVA 19% 3,590
TOTAL 479,785.82
28 38000
1 0.0357143 1357.1429
18 88376
1 0.0555556 4909.7778
16 45000
1 0.0625 2812.5
ANALISIS : Acero
COSTOS DIRECTOS
I - EQUIPOS
CODIGO DESCRIPCION UNIDAD
II - MATERIALES
Acero figurado Kg
SUBTOTAL : -
SUBTOTAL : 5,100.00
SUBTOTAL :
A 18% 918
I 3% 153
U 5% 255
26% 1,326
6,426.00
IVA 19% 48
TOTAL 6,474.45
ANALISIS : Zapata
COSTOS DIRECTOS
I - EQUIPOS
CODIGO DESCRIPCION UNIDAD
Vibrador a gasolina Dia
II - MATERIALES
Concreto 200PSI m^3
Concreto 3500PSI m^3
Aceros Kg
SUBTOTAL : 975.66
SUBTOTAL : 1,194,309.07
A 18% 218,880
I 3% 36,480
U 5% 60,800
26% 316,161
1,532,162.87
IVA 19% 11,552
TOTAL 1,543,714.89
40 24200
1.61 0.0403167 975.66333
1200 45000
116.92 0.0974333 4384.5
1200 88376
116.92 0.0974333 8610.7683
18 88376
1 0.0555556 4909.7778
16 45000
1 0.0625 2812.5
VALOR
DESCRIPCION UND UNITARIO RENDIMIENTO
II - MATERIALES
AGUA LT 20.42
ARENA M3 38,000.00
SAC
CEMENTO GRIS 42,5 KG ESTRUCTURAL 28,049.00
O
SAC
CEMENTO GRIS 50 KG UG 23,550.00
O
GRAVA M3 36,750.00
BLOQUE 0.33x0.23x0.10 UND 912.00
BLOQUE ,10x,23x,16 MEDIO UND 450.00
BLOQUE 0.33x0.23x0.09 UND 854.00
BLOQUE 0.33x0.23x0.09 MEDIO UND 512.00
LADRILLO PRENSADO 0.25x0.12x0.06 UND 713.00
LADRILLO PRENSADO ,0125x.12x.06 MEDIO UND 425.00
TABLA BURRA 0,25*3MT UND 563.00
REPISA 0,50 X 0,50*3MT UND 240.00
ICOPOR M3 32,000.00
CASETON EN GUADUA M3 28,000.00
ACERO KG 2,450.00
ANCLAJE UND 2,500.00
ESCALERILLA 1MT UND 1,200.00
PUNTILLA LB 400.00
ALAMBRE N 18 KG 800.00
SIKANOL KG 3,489.00
SIKATAR KG 5,428.00
SIKA 1 KG 2,450.00
AYUDANTE MORTERO DIA 49,500.00 4 M3/ DIA
OFICIAL MORTERO DIA 72,589.00 4 M3/ DIA
OFICIAL MAMPOSTERIA DIA 83,376.00 20 M2 /DIA
AYUDANTE MAMPOSTERIA DIA 46,300.00 20 M2 /DIA
OFICIAL ESTRUCTURAY MORTEROS DIA 88,376.00 16 M3/DIA
AYUDANTE ESTRUCTURA Y MORTEROS DIA 45,000.00 16 M3 /DIA
OFICIAL HERRERO DIA 89,376.00 600KG/DIA
AYUDANTE HERRERO DIA 47,500.00 600KG/DIA
OFICIAL ZAPATAS DIA 85,343.00 20M3 /DIA
AYUDANTE ZAPATAS DIA 46,250.00 20M3 /DIA
VIBRADOR A GASOLINA DIA 24,200.00 40M3 /DIA
MEZCLADORA 1 SACO A GASOLINA DIA 31,500.00 20M3 /DIA
MEZCLADORA 1 SACO GASOLINA INCLUIDA DIA 38,000.00 30M3 /DIA
CORTADORA DE LADRILLO DIA 32,000.00 40M2 /DIA
GASOLINA GAL 1,300.00 1GAL/DIA
TABLA DE CONCRETOS PARA 1 M3 ADITIVO
CEMENTO ESTRUC ARENA TRITURADO AGUA SIKATAR
PSI KG M3 M3 LT LT
4,000 455 0.47 0.76 22.00 0.77
3,500 415 0.49 0.77 25.00 0.66
3,000 380 0.52 0.78 29.00 0.68
2,500 300 0.48 0.95 39 1
TABLA DE ACEROS
Numero Pulgadas Kg/mt
2 1/4 0.2490
3 3/8 0.5600
4 1/2 0.0994
5 5/8 1.5520
4 3/4 2.2350
7 7/8 3.0420
8 1 3.9730
9 1 1/8 5.0500
10 1 1/$ 6.4040
11 1 3/8 7.9070
CUADRO DE ZAPATAS
REFUERZO INFERIOR
ZAPATA DIMENSIONES LONGITUDINAL TRANSVERSAL
Z-1 120 X 120 X 35 7 - 4 - 110 R a 20 7 - 4 - 110 R a 20
Z -2 160 X 160 X 35 9 - 5- 150 R a 20 9 - 5 - 150 R a 20
Z-3 170 X 170 X 35 9 - 6 - 160 R a 20 9 - 6 - 160 R a 20
Z-4 120 X 280 X 35 15 - 5 - 110 R a 20 7 - 5 - 270 R a 20
COSTOS DIRECTOS
I - EQUIPOS
II - MATERIALES
SUBTOTAL :
SUBTOTAL :
SUBTOTAL :
A 18% #VALUE!
I 3% #VALUE!
U 5% #VALUE!
26% #VALUE!
#VALUE!
IVA 19% #VALUE!
TOTAL #VALUE!