Está en la página 1de 1

PL-3/4" 924.

60
D-1 720.60
OR-3" 102.00 102.00
PL-3/4" OR 3"Ø 134.60
PL-1/2" IPR 4"X6"
354.02
PL-1/2" PL-1/2"

DETALLE 1 605.92

PL-1/2" PL-1/2"

600.98
IPR 4"X6" PL-1/2" 2686.39
PL-1/2" 2958.75

592.85

PL-1/2" PL-1/2"
IPR 4"X6"
D-2 IPR 4"X6"
804.98
ISOMETRICO
DETALLE 2
RACK PARA TUBERÍA DE PERFORACIÓN PL-1/2" IPR 4"X6" 187.40

127.40

2000.00
ALZADO FRONTAL
Ø120.00
PL-3/4"
Ø38.10
134.60
RACK PARA TUBERÍA DE
500.00 PERFORACIÓN
IPR 4"X6"
IPR 4"X6"

95°0'0" 2006.35
800.00 1929.89
1585.36
1730.65
IPR 4"X6"
1531.41
1232.56
95°0'0" OR 3"Ø
1000.00 102.00
3093.35
IPR 4"X6" IPR 4"X6" 152.40 575.71
IPR 4"X6"

IPR 4"X6" 720.60 924.60


95°0'0" OR 3"Ø
1200.00
OR 3"Ø
IPR 4"X6" 1347.22 102.00
1220.99
IPR 4"X6" IPR 4"X6"
95°0'0" 25°0'0"
65°0'0"

IPR 4"X6" 152.40 VISTA EN PLANTA


RACK PARA TUBERÍA DE PERFORACIÓN
ALZADO LATERAL
RACK PARA TUBERÍA DE PLANOS ARQUITECTONICOS PARA LA FABRICACIÓN DE UN RACK
PARA TUBERÍA DE PERFORACIÓN PARA DRILL PIPE DE 1.29MTS Y
PERFORACIÓN 1.08MTS

También podría gustarte