TOPOGRAFIA MINERA

TEMA: “INFORME BRÚJULA SUSPENDIDA”

GRUPO 5

DOCENTE: Krover Willian Laza

INTEGRANTE:

Cachay Quiñones Ricardo Daryl

AREQUIPA -2022
Levantamiento con Brújula colgante.

Tramo Sube (-) Baja (+) Az Individual Sube Baja DI DH DH Acum DV Cot PN PE N E Pto
300 400 500 1
1-2 2 30 46 -2.5 0 8.1 8.09 8.09 -0.325 299.675 5.82 5.62 405.82 505.62 2
2-3 5 0 46 0 5 8.15 8.12 16.21 0.71 300.385 5.84 5.64 411.66 511.26 3
3-4 9 15 46 -9.25 0 4.37 4.37 20.58 -0.7 299.685 3.14 3.04 414.8 514.3 4
4-5 4 0 46 0 4 8.75 8.73 29.31 0.61 300.295 6.28 6.06 421.08 520.36 5
5-6 6 45 46 -6.75 0 8.17 8.11 37.42 -0.92 299.375 5.83 5.63 426.91 525.99 6
6-7 11 45 46 0 11.75 3.65 3.57 40.99 0.72 300.095 2.57 2.48 429.48 528.47 7
7-8 3 15 46 0 3.25 8.55 8.54 49.53 0.46 300.555 6.14 5.93 435.62 534.4 8
8-9 12 0 46 -12 0 6.2 6.05 55.58 -1.29 299.265 4.36 4.21 439.98 538.61 9
9 - 10 10 30 46 0 10.5 5.9 5.8 61.38 1.08 300.345 4.17 4.03 444.15 542.64 10
10 - 11 9 46 -9 0 3.3 3.26 64.64 -0.52 299.825 2.35 2.26 446.5 544.9 11
Buenas noches
Ingeniero

Como visualiza les escribí a mis compañeros a treves del foro y ala fecha no me respondieron.
Yo actualmente estoy laborando en mina. Estoy de turno día Por ello me vi en la necesidad de
realizar el trabajo solo. Así mismo , solicito si apoyo me puedo unir a otro grupo para los
siguientes trabajos.

También podría gustarte