21.33 21.33 20.67 2.

97
25.88 25.88 15.8 11.74
117.81 117.81 14.95
12.29 12.29 13.3
19.93 2 39.86 49.81
7.67 2 15.34 3
62.12 62.12 7.92
15.96 15.96 130.19
TUB 150 310.59 56.89
8.5
45
13.37
44.56
51.79
TUB 200 475.75

3599.45 0.3 1079.83 1724.22


3574.03 0.3 1072.21 1733.36
5126.69 0.3 1538.01 1807.33
5033.907 1724.22 0.15 258.63 5264.91
5016.096 1733.36 0.15 260.00 REVESTIMIENTO
6630.291 1807.33 0.15 271.10
ARCILLA 4479.79

53855 53855
31286 12514.4
ELIMINACION 41340.6
2.97 5.42
4.2 12.47 27.6
5.92 8
TUB 250 21.36 TUB 400 41.02

258.63 19964.134 328.384


260.00 5033.907
271.10 5016.096
6630.291
789.74 AFIRMADO 328.384
METRADOS

PROYECTO : CONSTRUCCION DE LAGUNAS DE ESTABILIZACION "SAN MARCOS" REVSADO :


UBICACIÓN : DPTO. CAJAMARCA, PROV. SAN MARCOS, DIST. PEDRO GALVEZ HECHO : F.T.N.
PROPIETARIO : GOBIERNO REGIONAL CAJAMARCA FECHA : AGO 2005

01.04.01 PRE TRATAMIENTO

DESCRIPCION UND CANTIDAD LARGO ANCHO ALTURA PARCIAL


EXCAVACION EN TERRENO NORMAL M3 1.00 14.92 1.15 0.57 9.78

CONCRETO F´C=210 KG/CM4 M3


LOSA FONDO 1.00 14.92 1.15 0.20 3.43
PAREDES 3.00 14.92 0.15 0.94 6.31
LOSA SUPERIOR 2.00 1.20 0.35 0.15 0.13

CONCRETO F´C=100 KG/CM2 M3


SOLADO 1.00 14.92 1.15 0.05 0.86
GRADAS 0.50 1.55 0.75 0.63 0.37

ENCOFRADO Y DESENCOFRADO M2 6.00 14.92 1.15 102.95

ACERO DE REFUERZO FY =4200 KG/CM2 KG


LOSA FONDO KG/M2 13.00 14.92 1.15 223.05
LOSA TAPA KG/M2 7.47 2.40 0.35 6.27
PAREDES KG/M2 4.48 3.00 14.92 0.94 188.49

STOP LOG DE MADERA TRATADA P2


VERTEDERO 1.00 2.48 1.75 4.36
CANAL 4.00 1.32 3.11 16.49

REJILLA METALICA M2
REJILLA DE DESBASTE 2.00 0.35 1.07 0.75
REJILLA DE PISO 2.00 0.40 0.50 0.40
REJILLA EN COMPUERTAS 1.00 1.15 0.48 0.55

COMPUERTA PLANA DESLIZANTE CIRCULAR DN 200 UND 2.00 2.00

RESUMEN
EXCAVACION EN TERRENO NORMAL M3 9.78
CONCRETO F´C=210 KG/CM4 M3 9.87
CONCRETO F´C=100 KG/CM2 M3 1.22
ENCOFRADO Y DESENCOFRADO M2 102.95
ACERO DE REFUERZO FY =4200 KG/CM2 KG 417.82
STOP LOG DE MADERA TRATADA P2 20.85
REJILLA METALICA M2 1.70
COMPUERTA PLANA DESLIZANTE CIRCULAR DN 200 UND 2.00
METRADOS

PROYECTO : CONSTRUCCION DE LAGUNAS DE ESTABILIZACION "SAN MARCOS" REVSADO :


UBICACIÓN : DPTO. CAJAMARCA, PROV. SAN MARCOS, DIST. PEDRO GALVEZ HECHO : F.T.N.
PROPIETARIO : GOBIERNO REGIONAL CAJAMARCA FECHA : AGO 2005
01.04.02 CAJA DE DISTRIBUCION PRINCIPAL
DESCRIPCION UND CANTIDAD LARGO ANCHO ALTURA PARCIAL
EXCAVACION EN TERRENO NORMAL M3 1.00 2.66 1.10 2.93

CONCRETO F´C=210 KG/CM4 M3


LOSA PISO 1 2.66 0.15 0.40
MUROS 2 1.93 0.15 0.75 0.43
2 1.35 0.15 0.75 0.30
2 0.65 0.1 0.6 0.08
1 0.4 0.15 0.28 0.02
LOSA TECHO 1 1.91 0.15 0.29
TAPAS 1 0.5 0.3 0.05 0.01
3 0.5 0.4 0.05 0.03

CONCRETO F´C=100 KG/CM2 M3 1 2.66 0.05 0.13

ENCOFRADO Y DESENCOFRADO M2
MUROS 4 1.93 0.75 5.79
4 1.35 0.75 4.05
4 0.65 0.6 1.56
2 0.4 0.28 0.22
LOSA TECHO 1 1.91 1.91

ACERO DE REFUERZO FY =4200 KG/CM2 KG


LOSA FONDO KG/M2 17.33 2.66 46.10
LOSA TECHO KG/M2 7.47 2.66 19.87
PAREDES KG/M2 4.48 11.62 52.08

STOP LOG DE MADERA TRATADA P2


VERTEDEROS 3 1.49 2.40 10.73
REBOSE 1 1.49 1.47 2.20

VERTEDERO TRIANGULAR METALICO E=3 mm. M2 3 0.12 0.36

RESUMEN
EXCAVACION EN TERRENO NORMAL M3 2.93
CONCRETO F´C=210 KG/CM4 M3 1.56
CONCRETO F´C=100 KG/CM2 M3 0.13
ENCOFRADO Y DESENCOFRADO M2 13.53
ACERO DE REFUERZO FY =4200 KG/CM2 KG 118.04
STOP LOG DE MADERA TRATADA P2 12.93
VERTEDERO TRIANGULAR METALICO E=3 mm. UND 0.36
METRADOS

PROYECTO : CONSTRUCCION DE LAGUNAS DE ESTABILIZACION "SAN MARCOS" REVSADO :


UBICACIÓN : DPTO. CAJAMARCA, PROV. SAN MARCOS, DIST. PEDRO GALVEZ HECHO : F.T.N.
PROPIETARIO : GOBIERNO REGIONAL CAJAMARCA FECHA : AGO 2005
01.04.08 CAJA DE RECOLECCION
DESCRIPCION UND CANTIDAD LARGO ANCHO ALTURA PARCIAL
EXCAVACION EN TERRENO NORMAL M3 1.00 2.66 1.10 2.93

CONCRETO F´C=210 KG/CM4 M3


LOSA PISO 1 2.66 0.15 0.40
MUROS 2 1.93 0.15 0.75 0.43
2 1.35 0.15 0.75 0.30
2 0.65 0.1 0.6 0.08
1 0.4 0.15 0.28 0.02
LOSA TECHO 1 1.91 0.15 0.29
TAPAS 1 0.5 0.3 0.05 0.01
3 0.5 0.4 0.05 0.03

CONCRETO F´C=100 KG/CM2 M3 1 2.66 0.05 0.13

ENCOFRADO Y DESENCOFRADO M2
MUROS 4 1.93 0.75 5.79
4 1.35 0.75 4.05
4 0.65 0.6 1.56
2 0.4 0.28 0.22
LOSA TECHO 1 1.91 1.91

ACERO DE REFUERZO FY =4200 KG/CM2 KG


LOSA FONDO KG/M2 17.33 2.66 46.10
LOSA TECHO KG/M2 7.47 2.66 19.87
PAREDES KG/M2 4.48 11.62 52.08

STOP LOG DE MADERA TRATADA P2


VERTEDEROS 3 1.49 2.40 10.73
REBOSE 1 1.49 1.47 2.20

VERTEDERO TRIANGULAR METALICO E=3 mm. M2 3 0.12 0.36

RESUMEN
EXCAVACION EN TERRENO NORMAL M3 2.93
CONCRETO F´C=210 KG/CM4 M3 1.56
CONCRETO F´C=100 KG/CM2 M3 0.13
ENCOFRADO Y DESENCOFRADO M2 13.53
ACERO DE REFUERZO FY =4200 KG/CM2 KG 118.04
STOP LOG DE MADERA TRATADA P2 12.93
VERTEDERO TRIANGULAR METALICO E=3 mm. UND 0.36
METRADOS

PROYECTO : CONSTRUCCION DE LAGUNAS DE ESTABILIZACION "SAN MARCOS" REVSADO :


UBICACIÓN : DPTO. CAJAMARCA, PROV. SAN MARCOS, DIST. PEDRO GALVEZ HECHO : F.T.N.
PROPIETARIO : GOBIERNO REGIONAL CAJAMARCA FECHA : AGO 2005
01.04.10 OBRA DE ENTREGA
DESCRIPCION UND CANTIDAD LARGO ANCHO ALTURA PARCIAL
RELLENO COMPACTADO M3 1.00 1.37 1.30 1.78

CONCRETO F´C=210 KG/CM4 M3


LOSA PISO 1.00 1.30 1.25 0.15 0.24
MUROS 2.00 1.13 0.15 0.34
1.00 0.08 1.00 0.08
1.00 1.3 0.15 1.30 0.25

CONCRETO F´C=100 KG/CM2 M3 1.00 1.00 1.30 0.05 0.07

ENCOFRADO Y DESENCOFRADO M2
MUROS 4.00 1.07 0.75 3.21
2.00 1.00 0.60 1.20
2.00 1.30 1.10 2.86

ACERO DE REFUERZO FY =4200 KG/CM2 KG


LOSA FONDO KG/M2 17.33 1.625 28.16
PAREDES KG/M2 4.48 7.27 32.57

RESUMEN
RELLENO COMPACTADO M3 1.78
CONCRETO F´C=210 KG/CM4 M3 0.92
CONCRETO F´C=100 KG/CM2 M3 0.07
ENCOFRADO Y DESENCOFRADO M2 7.27
ACERO DE REFUERZO FY =4200 KG/CM2 KG 60.73

01.06.01 CASETA DE VIGILANCIA


DESCRIPCION UND CANTIDAD LARGO ANCHO ALTURA PARCIAL
ESTRUCTURAS
EXCAVACION M3 3.42
A 1.00 2.29 0.40 0.30 0.27
B 1.00 3.82 0.40 0.30 0.46
C 1.00 3.82 0.40 0.30 0.46
D 1.00 3.82 0.40 0.30 0.46
1 1.00 4.73 0.40 0.30 0.57
2 1.00 3.90 0.40 0.30 0.47
3 1.00 6.08 0.40 0.30 0.73

CONCRETO 140 KG/CM2 M3 3.67


FALSO PISO 1.00 16.51 0.10 1.65
1.00 10.96 0.10 1.10
ESCALERAS 1.00 0.58 1.60 0.92

CONCRETO 210 KG/CM3 M3 1.42


A 1.00 2.29 0.20 0.25 0.11
B 1.00 3.82 0.20 0.25 0.19
C 1.00 3.82 0.20 0.25 0.19
D 1.00 3.82 0.20 0.25 0.19
1 1.00 4.73 0.20 0.25 0.24
2 1.00 3.90 0.20 0.25 0.20
3 1.00 6.08 0.20 0.25 0.30
METRADOS

PROYECTO : CONSTRUCCION DE LAGUNAS DE ESTABILIZACION "SAN MARCOS" REVSADO :


UBICACIÓN : DPTO. CAJAMARCA, PROV. SAN MARCOS, DIST. PEDRO GALVEZ HECHO : F.T.N.
PROPIETARIO : GOBIERNO REGIONAL CAJAMARCA FECHA : AGO 2005

01.06.01 CASETA DE VIGILANCIA


DESCRIPCION UND CANTIDAD LARGO ANCHO ALTURA PARCIAL
CONCRETO CICLOPEO 100 KG/CM2 + 30% P.G. M3 5.12
A 1.00 2.29 0.60 0.30 0.41
B 1.00 3.82 0.60 0.30 0.69
C 1.00 3.82 0.60 0.30 0.69
D 1.00 3.82 0.60 0.30 0.69
1 1.00 4.73 0.60 0.30 0.85
2 1.00 3.90 0.60 0.30 0.70
3 1.00 6.08 0.60 0.30 1.09

ACERO FY= 4200 KG/CM2 KG 72.57


A 1.00 2.29 2.55 KG/M 5.84
B 1.00 3.82 2.55 KG/M 9.74
C 1.00 3.82 2.55 KG/M 9.74
D 1.00 3.82 2.55 KG/M 9.74
1 1.00 4.73 2.55 KG/M 12.06
2 1.00 3.90 2.55 KG/M 9.94
3 1.00 6.08 2.55 KG/M 15.50

ENCOFRADO Y DESENCOFRADO M2 31.31


A 1.00 2.29 1.10 M2/M 2.52
B 1.00 3.82 1.10 M2/M 4.20
C 1.00 3.82 1.10 M2/M 4.20
D 1.00 3.82 1.10 M2/M 4.20
1 1.00 4.73 1.10 M2/M 5.20
2 1.00 3.90 1.10 M2/M 4.29
3 1.00 6.08 1.10 M2/M 6.69

MURO DE SOGA LADRILLO KK M2 47.99


A 1.00 1.29 2.10 2.71
B 1.00 2.04 2.10 4.28
C 1.00 3.82 2.10 8.02
D 1.00 2.22 2.10 4.66
1 1.00 4.73 2.10 9.93
2 1.00 2.67 2.10 5.61
3 1.00 6.08 2.10 12.77

ARQUITECTURA
PINTURA M2 88.14
A 2.00 1.29 2.60 6.71
B 2.00 1.39 2.60 7.23
C 2.00 2.37 2.60 12.32
D 2.00 2.22 2.60 11.54
1 2.00 4.73 2.60 24.60
2 2.00 0.68 2.60 3.54
3 2.00 4.27 2.60 22.20

TARRAJEO M2 88.14
A 2.00 1.29 2.60 6.71
B 2.00 1.39 2.60 7.23
C 2.00 2.37 2.60 12.32
D 2.00 2.22 2.60 11.54
1 2.00 4.73 2.60 24.60
2 2.00 0.68 2.60 3.54
3 2.00 4.27 2.60 22.20

PISO DE CEMENTO PULIDO M2 27.47


1.00 16.51 16.51
1.00 10.96 10.96
METRADOS

PROYECTO : CONSTRUCCION DE LAGUNAS DE ESTABILIZACION "SAN MARCOS" REVSADO :


UBICACIÓN : DPTO. CAJAMARCA, PROV. SAN MARCOS, DIST. PEDRO GALVEZ HECHO : F.T.N.
PROPIETARIO : GOBIERNO REGIONAL CAJAMARCA FECHA : AGO 2005

01.06.01 CASETA DE VIGILANCIA


DESCRIPCION UND CANTIDAD LARGO ANCHO ALTURA PARCIAL
PUERTAS DE MADERA M2 9.24
2.00 0.90 2.10 3.78
1.00 1.00 2.10 2.10
1.00 1.60 2.10 3.36

VENTANAS DE MADERA M2 5.24


1.00 2.67 1.10 2.94
1.00 1.00 1.10 1.10
1.00 1.00 0.40 0.40
1.00 2.00 0.40 0.80

LOSETA PARA BAÑO M2 10.62


1.00 1.81 1.80 3.26
1.00 1.99 1.80 3.58
1.00 0.65 1.80 1.17
1.00 1.45 1.80 2.61

APARATOS SANITARIOS UND 2.00


INODORO 1.00 1.00
LAVATORIO 1.00 1.00

TECHO DE CALAMINA M2 1.00 7.26 5.00 36.30

INSTALACIONES SANITARIAS
VALVULA COMPUERTA 1/2"
GRIFO DE RIEGO
SALIDA DE AGUA FRIA
SALIDA DE DESAGUE
CAJA DE REGISTRO

INSTALACIONES ELECTRICAS
GRIFO DE RIEGO
SALIDA DE AGUA FRIA
SALIDA DE DESAGUE
CAJA DE REGISTRO
VALVULA COMPUERTA 1/2"

RESUMEN
RELLENO COMPACTADO M3 0.00
CONCRETO F´C=210 KG/CM4 M3 189.54
CONCRETO F´C=100 KG/CM2 M3 0.00
ENCOFRADO Y DESENCOFRADO M2 0.00
ACERO DE REFUERZO FY =4200 KG/CM2 KG 0.00