DATOS GENERALES
COMPONENTES:
INFRAESTRUCTURA S/. 12,172,642.87 (C/IGV) 10,315,799.04 (S/IGV)
MOBILIARIO S/. 359,935.60 (C/IGV) 305,030.17 (S/IGV)
EQUIPAMIENTO S/. 758,795.15 (C/IGV) 643,046.74 (S/IGV)
PLAN DE CONTINGENCIA S/. 252,573.37 (C/IGV) 214,045.23 (S/IGV)
CAPACITACIÓN S/. 64,750.00 (C/IGV) 54,872.88 (S/IGV)
PLAN COVID - OBRA S/. 84,206.24 (C/IGV) 71,361.22 (S/IGV)
MONTO DE ADICIONAL NETO (SIN IGV) S/. 0.00 CON IGV S/. 0.00
MONTO DEL ADICIONAL (SIN IGV) S/. 214,045.23 CON IGV S/. 252,573.37
MONTO DEL DEDUCTIVO VINCULADO (SIN IGV) S/. 214,045.23 CON IGV S/. 252,573.37
MONTO DE ADICIONAL NETO (SIN IGV) S/. 1,102,829.96 CON IGV S/. 1,301,339.35
MONTO DEL ADICIONAL (SIN IGV) S/. 1,766,717.81 CON IGV S/. 2,084,727.02
MONTO DEL DEDUCTIVO VINCULADO (SIN IGV) S/. 663,887.86 CON IGV S/. 783,387.67
D
A “MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I. E. Nº81034 JOSE
T DENOMINACION DE LA OBRA MARIA ARGUEDAS, DISTRITO DE TAYABAMBA – PROVINCIA DE PATAZ – REGION LA LIBERTAD." CUI:
O 2276750
S
D NOMBRE DEL RESIDENTE DE OBRA JAVIER JESUS VILLARREAL GONZALES CIP N° 55440
E
MONTO CONTRATADO S/. 13,692,903.23 CON I.G.V.
O
B
PLAZO CONTRACTUAL DE EJECUCIÓN 365 DIAS CALENDARIO
R
A
PLAZO DE LIQUIDACIÓN DE OBRA 15 DIAS CALENDARIO
D
E MONTO CONTRATADO S/. 627,452.19 CON I.G.V.
MONTO ADELANTO PARA MATERIALES E INSUMOS S/. 1,369,290.33 CON IGV % : 10%
MONTO DE ADICIONAL NETO (SIN IGV) S/. 0.00 CON IGV S/. 0.00
D
MONTO DEL ADICIONAL (SIN IGV) S/. 214,045.23 CON IGV S/. 252,573.37
E
L MONTO DEL DEDUCTIVO VINCULADO (SIN IGV) S/. 214,045.23 CON IGV S/. 252,573.37
A
PORCENTAJE DE INCIDENCIA 0.00%
A
D ADICIONAL Y DEDUCTIVO VINCULADO N°02 RESOLUCIÓN GERENCIAL REGIONAL N°000010-2023-GRLL-GOB.
M
I MONTO DE ADICIONAL NETO (SIN IGV) S/. 1,102,829.96 CON IGV S/. 1,301,339.35
N
I
S MONTO DEL ADICIONAL (SIN IGV) S/. 1,766,717.81 CON IGV S/. 2,084,727.02
T
R MONTO DEL DEDUCTIVO VINCULADO (SIN IGV) S/. 663,887.86 CON IGV S/. 783,387.67
A
C PORCENTAJE DE INCIDENCIA 9.50%
I
O SUSPENSIONES DE PLAZO DE EJECUCIÓN
N
C TERMINO 11/30/2022
O
N DIAS DE SUSPENSIÓN 47.00 DIAS CALENDARIO
T
R
A AMPLIACIONES DE PLAZO
T
O AMPLIACION DE PLAZO N° 01 RESOLUCIÓN GERENCIAL REGIONAL N°000366-2022-GRLI-GGR-GRCO.
OBRA "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
ACUMULADO VAL. N° 01 VAL. N° 02 VAL. N° 03 VAL. N° 04 VAL. N° 05 VAL. N° 06 VAL. N° 07 VAL. N° 08 VAL. N° 09 VAL. N° 10 VAL. N° 11
CONCEPTO
(S/) August-22 September-22 October-22 December-22 January-23 February-23 March-23 April-23 May-23 June-23 July-23
MONTOS VALORIZADOS (V) S/. 3,826,608.11 S/. 25,456.52 S/. 35,044.30 S/. 14,049.05 S/. 320,485.39 S/. 480,474.12 S/. 455,917.47 S/. 689,372.06 S/. 560,823.68 S/. 530,063.30 S/. 594,412.84 S/. 120,509.38
Valorización
01. Obras Provisionales, Preliminares y Estructuras 3,737,890.43 23,117.20 28,507.01 11,044.44 314,270.16 474,774.68 450,224.43 683,687.02 551,309.76 508,957.98 574,173.81 117,823.94
02. Arquitectura - - - - - - - - - - - -
03. Instalaciones Sanitarias 3,828.88 - - - - - - - 3,828.88 - - -
04. Instalaciones Electricas 29,773.87 - - - S - - - - - 15,419.88 14,353.99 -
05. Señalizacion, Seguridad Y Salud - - - - U - - - - - - - -
06. Plan de Vigilancia, Prevención Contra la Exposicion Covid-19. 55,114.93 2,339.32 6,537.29 3,004.61 6,215.23 5,699.44 5,693.04 5,685.04 5,685.04 5,685.44 5,885.04 2,685.44
07. Plan de Contingencia. - - - -
S - - - - - - - -
08. Mobiliario - - - - P - - - - - - - -
09. Equipamiento - - - - - - - - - - - -
10. Capacitación de RR.HH. - - - -
E - - - - - - - -
N
REAJUSTES (R) S/. 327,444.85 S/. 1,525.74 S/. 2,907.72 S/. 1,281.16 S S/. 37,083.88 S/. 36,082.88 S/. 37,818.85 S/. 60,848.14 S/. 49,219.07 S/. 44,356.44 S/. 47,484.18 S/. 8,836.80
01. Obras Provisionales, Preliminares y Estructuras 327,387.50 1,525.74 2,907.72 1,281.16 I 37,083.88 36,082.88 37,818.85 60,848.14 49,066.57 44,279.34 47,656.43 8,836.80
02. Arquitectura - - - - Ó - - - - - - - -
03. Instalaciones Sanitarias 152.51 - - - - - - - 152.51 - - -
04. Instalaciones Electricas -95.15 - - - N - - - - - 77.10 -172.25 -
05. Señalizacion, Seguridad Y Salud - - - - - - - - - - - -
06. Plan de Vigilancia, Prevención Contra la Exposicion Covid-19. - - - - - - - - - - - -
07. Plan de Contingencia. - - - -
D - - - - - - - -
08. Mobiliario - - - - E - - - - - - - -
09. Equipamiento - - - - - - - - - - - -
10. Capacitación de RR.HH. - - - - - - - - - - - -
P
DEDUCCIONES (D) S/. (10,366.46) S/. - S/. (114.48) S/. (62.94) L S/. (2,162.96) S/. (460.90) S/. (770.68) S/. (2,501.72) S/. (1,945.03) S/. (1,289.41) S/. (1,046.47) S/. (11.87)
. Deducción que No corresponde Adelanto Directo -7,395.03 - -114.48 -62.94 A -1,435.87 -446.54 -757.06 -1,455.97 -1,166.57 -983.27 -873.69 -98.64
. Deducción que No corresponde Adelanto de Materiales -2,971.43 - - - Z -727.09 -14.36 -13.62 -1,045.75 -778.46 -306.14 -172.78 86.77
VALORIZACIÓN BRUTA (VB) = (V)+(R)+(D) S/. 4,143,686.50 S/. 26,982.26 S/. 37,837.54 S/. 15,267.27
O S/. 355,406.31 516,096.10 492,965.64 747,718.49 608,097.72 573,130.33 640,850.55 129,334.30
AMORTIZACIONES (A) S/. -833,402.89 S/. -2,545.65 S/. -3,504.43 S/. -7,212.42 S/. -197,301.49 S/. -97,977.65 S/. -92,940.14 S/. -112,077.65 S/. -99,796.54 S/. -94,539.25 S/. -106,022.08 S/. -19,485.59
Amortización Por adelanto directo 10% -382,660.82 -2,545.65 -3,504.43 -1,404.91
N -32,048.54 -48,047.41 -45,591.75 -68,937.21 -56,082.37 -53,006.33 -59,441.28 -12,050.94
Amortización Por adelanto de Materiales -450,742.07 - - -5,807.51 ° -165,252.95 -49,930.24 -47,348.39 -43,140.44 -43,714.17 -41,532.92 -46,580.80 -7,434.65
0
VALORIZACIÓN NETA (VN) = (VB) - (A) 3,310,283.61 24,436.61 34,333.11 8,054.85 158,104.82 418,118.45 400,025.50 635,640.84 508,301.18 478,591.08 534,828.47 109,848.71
1
1. MONTO (SIN IGV) 3,310,283.61 24,436.61 34,333.11 8,054.85 158,104.82 418,118.45 400,025.50 635,640.84 508,301.18 478,591.08 534,828.47 109,848.71
2. I.G.V (18%) 595,851.05 4,398.59 6,179.96 1,449.87 28,458.87 75,261.32 72,004.59 114,415.35 91,494.21 86,146.40 96,269.12 19,772.77
3. MONTO A FACTURAR (1+2) 3,906,134.66 S/. 28,835.20 S/. 40,513.07 S/. 9,504.72 S/. 186,563.69 S/. 493,379.77 S/. 472,030.09 S/. 750,056.19 S/. 599,795.39 S/. 564,737.48 S/. 631,097.59 S/. 129,621.48
4. ESTADO DE PAGO (TRAMITE O PAGADO) - PAGADO PAGADO PAGADO PAGADO PAGADO PAGADO PAGADO PAGADO PAGADO PAGADO EN TRAMITE
RESUMEN DE VALORIZACION MENSUAL
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
CERTIFICADO DE PAGO
JULIO DEL 2023
"MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE
OBRA
TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
MONTO
CONCEPTO
S/.
01 INFRAESTRUCTURA
01. Obras Provisionales, Preliminares y Estructuras 6,927,921.97 3,617,347.23 52.21% 117,823.94 1.70% 3,735,171.17 53.91% 3,192,750.80 46.09%
02. Arquitectura 2,264,491.66 0.00 0.00% 0.00 0.00% 0.00 0.00% 2,264,491.66 100.00%
03. Instalaciones Sanitarias 308,714.04 3,244.81 1.05% 0.00 0.00% 3,244.81 1.05% 305,469.23 98.95%
04. Instalaciones Electricas 795,889.42 31,480.47 3.96% 0.00 0.00% 31,480.47 3.96% 764,408.95 96.04%
05. Señalizacion, Seguridad Y Salud 18,781.95 0.00 0.00% 0.00 0.00% 0.00 0.00% 18,781.95 100.00%
02 PLAN COVID 19 71,361.22 46,730.04 65.48% 2,685.44 3.76% 49,415.48 69.25% 21,945.74 30.75%
03 MOBILIARIO 305,030.17 0.00 0.00% 0.00 0.00% 0.00 0.00% 305,030.17 100.00%
04 EQUIPAMIENTO 643,046.74 0.00 0.00% 0.00 0.00% 0.00 0.00% 643,046.74 100.00%
05 PLAN DE CONTINGENCIA 214,045.23 0.00 0.00% 0.00 0.00% 0.00 0.00% 214,045.23 100.00%
06 CAPACITACIÓN 54,872.88 0.00 0.00% 0.00 0.00% 0.00 0.00% 54,872.88 100.00%
SUB-TOTAL SIN I.G.V 11,604,155.28 3,698,802.55 31.87% 120,509.38 1.04% 3,819,311.93 32.913% 7,784,843.35 67.09%
RESUMEN DE VALORIZACION Y REAJUSTES POR COMPONENTES
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
"MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA
OBRA:
LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
CONTRATISTA: CLASILL CONTRATISTAS GENERALES S.A.C
RESIDENTE: ING. JAVIER JESUS VILLARREAL GONZALES
SUPERVISOR: ING. DIONISIO ROJAS MAMANI
PLAZO EJECUCIÓN: 415 DIAS CALENDARIOS
PRESUPUESTO: S/. 13,692,903.23
01 INFRAESTRUCTURA
01. Obras Provisionales, Preliminares y Estructuras S/. 8,174,947.92 S/. 4,268,469.73 S/. 139,032.25 S/. 4,407,501.98 S/. 3,767,445.94 S/. 319,655.24 S/. 52,249.63 S/. 371,904.86
02. Arquitectura S/. 2,672,100.16 S/. - S/. - S/. - S/. 2,672,100.16 S/. - S/. - S/. -
03. Instalaciones Sanitarias S/. 364,282.57 S/. 3,828.88 S/. - S/. 3,828.88 S/. 360,453.69 S/. 179.96 S/. - S/. 179.96
04. Instalaciones Electricas S/. 939,149.52 S/. 37,146.95 S/. - S/. 37,146.95 S/. 902,002.57 S/. (112.28) S/. 90.98 S/. (21.30)
05. Señalizacion, Seguridad Y Salud S/. 22,162.70 S/. - S/. - S/. - S/. 22,162.70 S/. - S/. -
02 PLAN COVID 19 S/. 84,206.24 S/. 55,141.45 S/. 3,168.82 S/. 58,310.27 S/. 25,895.97 S/. - S/. - S/. -
03 MOBILIARIO S/. 359,935.60 S/. - S/. - S/. - S/. 359,935.60 S/. - S/. - S/. -
04 EQUIPAMIENTO S/. 758,795.15 S/. - S/. - S/. - S/. 758,795.15 S/. - S/. - S/. -
05 PLAN DE CONTINGENCIA S/. 252,573.37 S/. - S/. - S/. - S/. 252,573.37 S/. - S/. - S/. -
06 CAPACITACIÓN S/. 64,750.00 S/. - S/. - S/. - S/. 64,750.00 S/. - S/. - S/. -
TOTAL INCLUIDO I.G.V S/. 13,692,903.23 S/. 4,364,587.01 S/. 142,201.07 S/. 4,506,788.08 S/. 9,186,115.15 S/. 319,722.92 S/. 52,340.60 S/. 372,063.53
"MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE
OBRA :
TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
Imo Ima
COEFICIENTE PORCENTAJE TOTAL REAJUSTE
AMORTIZACION MONTO SOLICITADO
F.P. CODIGO DESCRIPCIÓN DE INCIDENCIA PRESUPUESTO/MON 12/1/2021 9/28/2022 ADELANTO UTILIZADO AMORTIZACION DEDUCCIÓN SALDO
ACUMULADA ACUMULADO
DE MONOMIO (%) TO VALORIZADO Fecha de Presupuesto Fecha de Solicitud Adelanto
Mes Ir
Base de Materiales
(1) (2) (5)=(3)-(4) (8) (9) (11)
FORMULA N°01: OBRAS PROVISIONALES, TRABAJOS PRELIMINARES Y ESTRUCTURAS S/ 451,061.25 S/ 670,628.47
03 ACERO DE CONSTRUCCION CORRUGA 0.184 100.00 % S/ 6,939,991.53 810.49 894.62 S/ 248,596.82
Dic-2022 S/ 314,270.16 Set-22 894.62 S/ 6,939.09 S/ 7,659.37 S/ 7,659.37 S/ - S/ 240,937.45
Feb-23 S/ 450,224.43 Dic-2022 879.48 S/ 9,940.96 S/ 10,972.84 S/ 18,632.21 -S/ 204.97 S/ 229,964.61
Mar-23 S/ 683,687.02 Feb-23 918.29 S/ 15,095.81 S/ 16,662.78 S/ 35,294.99 S/ 486.63 S/ 213,301.83
Apr-23 S/ 551,309.76 Mar-23 903.90 S/ 15,216.15 S/ 16,795.61 S/ 52,090.60 S/ 192.31 S/ 196,506.22
May-23 S/ 508,957.98 Apr-23 903.90 S/ 14,047.24 S/ 15,505.36 S/ 67,595.96 S/ 177.53 S/ 181,000.86
Jun-23 S/ 574,173.81 May-23 878.71 S/ 15,847.20 S/ 17,492.16 S/ 69,582.76 -S/ 343.37 S/ 179,014.06
Jul-23 S/ 117,823.94 Jun-23 842.28 S/ 2,601.55 S/ 2,871.59 S/ 70,467.55 -S/ 185.44 -S/ 70,467.55
21 CEMENTO PORTLAND TIPO I 0.133 100.00 % S/ 6,939,991.53 496.5 539.21 S/ 199,819.18
Dic-2022 S/ 314,270.16 Set-22 539.21 S/ 5,015.75 S/ 5,447.22 S/ 5,447.22 S/ - S/ 194,371.96
Feb-23 S/ 450,224.43 Dic-2022 551.55 S/ 7,185.58 S/ 7,803.70 S/ 13,250.92 S/ 193.95 S/ 192,015.48
Mar-23 S/ 683,687.02 Feb-23 554.45 S/ 10,911.64 S/ 11,850.29 S/ 25,101.21 S/ 363.74 S/ 174,717.97
Apr-23 S/ 551,309.76 Mar-23 551.55 S/ 10,998.63 S/ 11,944.76 S/ 37,045.96 S/ 296.87 S/ 162,773.22
May-23 S/ 508,957.98 Apr-23 529.35 S/ 10,153.71 S/ 11,027.15 S/ 48,073.12 -S/ 218.99 S/ 151,746.06
Jun-23 S/ 574,173.81 May-23 551.55 S/ 11,454.77 S/ 12,440.13 S/ 49,486.10 S/ 309.19 S/ 150,333.08
Jul-23 S/ 117,823.94 Jun-23 551.55 S/ 1,880.47 S/ 2,042.23 S/ 50,115.35 S/ 50.76 -S/ 50,115.35
1.00 44 MADERA TERCIADA PARA CARPINTERI 0.090 100.00 % S/ 6,939,991.53 482.1 518.92 S/ 124,718.46
Dic-2022 S/ 314,270.16 Set-22 518.92 S/ 3,394.12 S/ 3,653.34 S/ - S/ 121,065.12
Feb-23 S/ 450,224.43 Dic-2022 521.07 S/ 4,862.42 S/ 5,233.79 S/ 5,233.79 S/ 23.34 S/ 119,484.67
Mar-23 S/ 683,687.02 Feb-23 526.68 S/ 7,383.82 S/ 7,947.75 S/ 13,181.54 S/ 127.93 S/ 111,536.92
Apr-23 S/ 551,309.76 Mar-23 529.35 S/ 7,442.68 S/ 8,011.11 S/ 21,192.65 S/ 173.32 S/ 103,525.81
May-23 S/ 508,957.98 Apr-23 522.41 S/ 6,870.93 S/ 7,395.69 S/ 28,588.34 S/ 53.54 S/ 96,130.12
Jun-23 S/ 574,173.81 May-23 528.75 S/ 7,751.35 S/ 8,343.35 S/ 29,536.00 S/ 170.12 S/ 95,182.46
Jul-23 S/ 117,823.94 Jun-23 526.92 S/ 1,272.50 S/ 1,369.69 S/ 29,958.03 S/ 22.73 -S/ 29,958.03
05 AGREGADO GRUESO 0.079 100.00 % S/ 6,939,991.53 498.16 513.4 S/ 97,494.01
Dic-2022 S/ 314,270.16 Set-22 513.40 S/ 2,979.28 S/ 3,070.43 S/ - S/ 94,423.58
Feb-23 S/ 450,224.43 Dic-2022 512.93 S/ 4,268.13 S/ 4,398.70 S/ 4,398.70 -S/ 4.15 S/ 93,095.31
Mar-23 S/ 683,687.02 Feb-23 518.43 S/ 6,481.35 S/ 6,679.63 S/ 11,078.33 S/ 67.45 S/ 86,415.68
Apr-23 S/ 551,309.76 Mar-23 522.41 S/ 6,533.02 S/ 6,732.88 S/ 17,811.22 S/ 121.77 S/ 79,682.79
May-23 S/ 508,957.98 Apr-23 539.86 S/ 6,031.15 S/ 6,215.66 S/ 24,026.88 S/ 330.15 S/ 73,467.13
Jun-23 S/ 574,173.81 May-23 520.52 S/ 6,803.96 S/ 7,012.11 S/ 24,823.33 S/ 100.22 S/ 72,670.68
Jul-23 S/ 117,823.94 Jun-23 524.30 S/ 1,116.97 S/ 1,151.14 S/ 25,178.02 S/ 25.19 -S/ 25,178.02
FORMULA N°02: ARQUITECTURA S/ 354,618.09 S/ 354,618.09
21 CEMENTO PORTLAND TIPO I 0.099 100.00 % S/ 2,268,436.77 496.5 539.21 S/ 89,891.15
Dic-2022 S/ - Set-22 S/ - S/ - S/ 89,891.15
Feb-23 S/ - Nov.22 S/ - S/ - S/ -
Mar-23 S/ - Feb.23 S/ - S/ - S/ -
Apr-23 S/ - Mar-23 S/ - S/ - S/ -
May-23 S/ - Apr-23 S/ - S/ - S/ -
Jun-23 S/ - May-23 S/ - S/ - S/ -
Jul-23 S/ - Jun-23 S/ - S/ - S/ -
17 BLOQUE Y LADRILLO 0.069 100.00 % S/ 2,268,436.77 812.25 787.94 S/ 62,398.63
Dic-2022 S/ - Set-22 S/ - S/ - S/ 62,398.63
Feb-23 S/ - Nov.22 S/ - S/ - S/ -
Mar-23 S/ - Feb.23 S/ - S/ - S/ -
Apr-23 S/ - Mar-23 S/ - S/ - S/ -
May-23 S/ - Apr-23 S/ - S/ - S/ -
Jun-23 S/ - May-23 S/ - S/ - S/ -
Jul-23 S/ - Jun-23 S/ - S/ - S/ -
59 PLANCHA DE ASBESTO-CEMENTO 0.067 100.00 % S/ 2,268,436.77 234.5 270.05 S/ 56,667.46
Dic-2022 S/ - Set-22 S/ - S/ - S/ 56,667.46
Feb-23 S/ - Nov.22 S/ - S/ - S/ -
Mar-23 S/ - Feb.23 S/ - S/ - S/ -
Apr-23 S/ - Mar-23 S/ - S/ - S/ -
May-23 S/ - Apr-23 S/ - S/ - S/ -
Jun-23 S/ - May-23 S/ - S/ - S/ -
Jul-23 S/ - Jun-23 S/ - S/ - S/ -
2.00
05 AGREGADO GRUESO 0.057 100.00 % S/ 2,268,436.77 498.16 513.4 S/ 37,586.91
Dic-2022 S/ - Set-22 S/ - S/ - S/ 37,586.91
Feb-23 S/ - Nov.22 S/ - S/ - S/ -
Mar-23 S/ - Feb.23 S/ - S/ - S/ -
Apr-23 S/ - Mar-23 S/ - S/ - S/ -
May-23 S/ - Apr-23 S/ - S/ - S/ -
Jun-23 S/ - May-23 S/ - S/ - S/ -
Jul-23 S/ - Jun-23 S/ - S/ - S/ -
30 DOLAR MAS INFLACION DEL MERCADO 0.186 84.16 % S/ 2,268,436.77 654.51 673.09 S/ 90,989.36
Dic-2022 S/ - Set-22 S/ - S/ - S/ 90,989.36
Feb-23 S/ - Nov.22 S/ - S/ - S/ -
Mar-23 S/ - Feb.23 S/ - S/ - S/ -
Apr-23 S/ - Mar-23 S/ - S/ - S/ -
May-23 S/ - Apr-23 S/ - S/ - S/ -
Jun-23 S/ - May-23 S/ - S/ - S/ -
Jul-23 S/ - Jun-23 S/ - S/ - S/ -
43 MADERA NECIONAL PARA ENCOFRADO 0.035 15.84 % S/ 2,268,436.77 910.1 921.33 S/ 17,084.58
Dic-2022 S/ - Set-22 S/ - S/ - S/ 17,084.58
Feb-23 S/ - Nov.22 S/ - S/ - S/ -
Mar-23 S/ - Feb.23 S/ - S/ - S/ -
Apr-23 S/ - Mar-23 S/ - S/ - S/ -
May-23 S/ - Apr-23 S/ - S/ - S/ -
Jun-23 S/ - May-23 S/ - S/ - S/ -
Jul-23 S/ - Jun-23 S/ - S/ - S/ -
AMORTIZACIÓN Y DEDUCCIÓN DEL ADELANTO DE MATERIALES
Imo Ima
COEFICIENTE PORCENTAJE TOTAL REAJUSTE
AMORTIZACION MONTO SOLICITADO
F.P. CODIGO DESCRIPCIÓN DE INCIDENCIA PRESUPUESTO/MON 12/1/2021 9/28/2022 ADELANTO UTILIZADO AMORTIZACION DEDUCCIÓN SALDO
ACUMULADA ACUMULADO
DE MONOMIO (%) TO VALORIZADO Fecha de Presupuesto Fecha de Solicitud Adelanto
Mes Ir
Base de Materiales
(1) (2) (5)=(3)-(4) (8) (9) (11)
FORMULA N°01: OBRAS PROVISIONALES, TRABAJOS PRELIMINARES Y ESTRUCTURAS S/ 451,061.25 S/ 670,628.47
Imo Ima
COEFICIENTE PORCENTAJE TOTAL REAJUSTE
AMORTIZACION MONTO SOLICITADO
F.P. CODIGO DESCRIPCIÓN DE INCIDENCIA PRESUPUESTO/MON 12/1/2021 9/28/2022 ADELANTO UTILIZADO AMORTIZACION DEDUCCIÓN SALDO
ACUMULADA ACUMULADO
DE MONOMIO (%) TO VALORIZADO Fecha de Presupuesto Fecha de Solicitud Adelanto
Mes Ir
Base de Materiales
(1) (2) (5)=(3)-(4) (8) (9) (11)
FORMULA N°01: OBRAS PROVISIONALES, TRABAJOS PRELIMINARES Y ESTRUCTURAS S/ 451,061.25 S/ 670,628.47
AMORT. SIN IGV DE ADELANTO DE MATERIALES DEL MES S/ 7,434.65
DEDUCCIÓN DE ADELANTO DE MATERIALES DEL MES S/ 86.77
AMORTIZACION POR ADELANTO DE MATERIALES
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I. E. Nº81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA – PROVINCIA DE PATAZ – REGION LA LIBERTAD." CUI:
O B R A :
2276750
MONTO CONTRATO (C/IGV) : S/. 13,692,903.23 ADEL. MATER.. (C/IGV) 01 : S/. 1,369,290.33
MONTO CONTRATO (S/IGV) = C : S/. 11,604,155.28 ADEL. MATER.. (S/IGV) 01 = A : S/. 1,160,415.53
FECHA ADEL. MATERIALES 01 : 28-Sep-22
ESTRUCTURAS
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO ADELANTO MONTO SALDO POR
AMORTIZACION
MONTO MONTO COEF.INCID. % INCID. Dic-21 Set-22 DEFLACTADO UTILIZADO A AMORTIZABLE AMORTIZAR
No. MES
V FECHA A C % Io Ia F=adxIo/Ia AU=C*%*V MA=A*Ia/Io Am= S=A-Am
ACERO DE CONSTRUCCIÓN CO FORMULA 01 IU 3
Val. N° 01 31-Aug-22 23,117.20 248,596.82
Val. N° 02 30-Sep-22 28,507.01 248,596.82
Val. N° 03 14-Oct-22 11,044.44 2,032.18 2,032.18 2,243.12 2,243.12 246,353.70
Val. N° 04 31-Dec-22 314,270.16
Val. N° 05 31-Jan-23 474,774.68
Val. N° 06 28-Feb-23 450,224.43 16,568.26 16,568.26 18,288.07 18,288.07 228,065.63
225,218.79
Val. N° 07 31-Mar-23 683,687.02 28/09/2022 248,596.82 0.184 100.00% 810.49 894.62 15,095.81 15,095.81 16,662.78 16,662.78 211,402.85
Val. N° 08 30-Apr-23 551,309.76 15,216.15 15,216.15 16,795.61 16,795.61 194,607.24
Val. N° 09 31-May-23 508,957.98 14,047.24 14,047.24 15,505.36 15,505.36 179,101.88
Val. N° 10 30-Jun-23 574,173.81 15,847.20 15,847.20 17,492.16 17,492.16 177,115.08
Val. N° 11 31-Jul-23 117,823.94 2,601.55 2,601.55 2,871.59 2,871.59 176,230.29
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I. E. Nº81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA – PROVINCIA DE PATAZ – REGION LA LIBERTAD." CUI:
O B R A :
2276750
MONTO CONTRATO (C/IGV) : S/. 13,692,903.23 ADEL. MATER.. (C/IGV) 01 : S/. 1,369,290.33
MONTO CONTRATO (S/IGV) = C : S/. 11,604,155.28 ADEL. MATER.. (S/IGV) 01 = A : S/. 1,160,415.53
FECHA ADEL. MATERIALES 01 : 28-Sep-22
INSTALACIONES SANITARIAS
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO ADELANTO MONTO SALDO POR
AMORTIZACION
MONTO MONTO COEF.INCID. % INCID. Dic-21 Set-22 DEFLACTADO UTILIZADO A AMORTIZABLE AMORTIZAR
No. MES
V FECHA A C % Io Ia F=adxIo/Ia AU=C*%*V MA=A*Ia/Io Am= S=A-Am
APARATO SANITARIO CON GRIFE FORMULA 03 IU 10
Val. N° 01 31-Aug-22 0.00 8,190.10
Val. N° 02 30-Sep-22 0.00 8,190.10
Val. N° 03 14-Oct-22 0.00 0.00 0.00 0.00 0.00 8,190.10
Val. N° 04 31-Dec-22 0.00 0.00 0.00 0.00 0.00 8,190.10
Val. N° 05 31-Jan-23 0.00 0.00 0.00 0.00 0.00 8,190.10
Val. N° 06 28-Feb-23 0.00 0.00 0.00 0.00 0.00 8,190.10
7,701.90
Val. N° 07 31-Mar-23 0.00 28/09/2022 8,190.10 0.093 100.00% 575.36 611.83 0.00 0.00 0.00 0.00 8,190.10
Val. N° 08 30-Apr-23 3,244.81 45.27 45.27 48.14 48.14 8,141.96
Val. N° 09 31-May-23 0.00 0.00 0.00 0.00 0.00 8,141.96
Val. N° 10 30-Jun-23 0.00 0.00 0.00 0.00 0.00 8,141.96
Val. N° 11 31-Jul-23 0.00 0.00 0.00 0.00 0.00 8,141.96
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I. E. Nº81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA – PROVINCIA DE PATAZ – REGION LA LIBERTAD." CUI:
O B R A :
2276750
MONTO CONTRATO (C/IGV) : S/. 13,692,903.23 ADEL. MATER.. (C/IGV) 01 : S/. 1,369,290.33
MONTO CONTRATO (S/IGV) = C : S/. 11,604,155.28 ADEL. MATER.. (S/IGV) 01 = A : S/. 1,160,415.53
FECHA ADEL. MATERIALES 01 : 28-Sep-22
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I. E. Nº81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA – PROVINCIA DE PATAZ – REGION LA LIBERTAD." CUI:
O B R A :
2276750
MONTO CONTRATO (C/IGV) : 28/09/2022 S/. 13,692,903.23 ADEL. MATER.. 3,832.95 : S/. 1,369,290.33
3,941.76 0.141 77.47% 654.51 (C/IGV) 01673.09
MONTO CONTRATO (S/IGV) = C : S/. 11,604,155.28 ADEL. MATER.. (S/IGV) 01 = A : S/. 1,160,415.53
FECHA ADEL. MATERIALES 01 : 28-Sep-22
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I. E. Nº81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA – PROVINCIA DE PATAZ – REGION LA LIBERTAD." CUI:
O B R A :
2276750
MONTO CONTRATO (C/IGV) : S/. 13,692,903.23 ADEL. MATER.. (C/IGV) 01 : S/. 1,369,290.33
MONTO CONTRATO (S/IGV) = C : S/. 11,604,155.28 ADEL. MATER.. (S/IGV) 01 = A : S/. 1,160,415.53
FECHA ADEL. MATERIALES 01 : 28-Sep-22
INSTALACIONES ELECTRICAS
VALORIZACION ADELANTO PAGADO COEFICIENTE INDICES ADELANTO ADELANTO MONTO SALDO POR
AMORTIZACION
MONTO MONTO COEF.INCID. % INCID. Dic-21 Set-22 DEFLACTADO UTILIZADO A AMORTIZABLE AMORTIZAR
No. MES
V FECHA A C % Io Ia F=adxIo/Ia AU=C*%*V MA=A*Ia/Io Am= S=A-Am
CABLE NYY Y NKY FORMULA 04 IU 19
Val. N° 01 31-Aug-22 0.00 21,499.04
Val. N° 02 30-Sep-22 0.00 21,499.04
Val. N° 03 14-Oct-22 0.00 0.00 0.00 0.00 0.00 21,499.04
Val. N° 04 31-Dec-22 0.00 0.00 0.00 0.00 0.00 21,499.04
Val. N° 05 31-Jan-23 0.00 0.00 0.00 0.00 0.00 21,499.04
Val. N° 06 28-Feb-23 0.00 0.00 0.00 0.00 0.00 21,499.04
24,251.79
Val. N° 07 31-Mar-23 0.00 28/09/2022 21,499.04 0.095 100.00% 1254.46 1112.07 0.00 0.00 0.00 0.00 21,499.04
Val. N° 08 30-Apr-23 0.00 0.00 0.00 0.00 0.00 21,499.04
Val. N° 09 31-May-23 15,419.88 219.73 219.73 194.79 194.79 21,304.25
Val. N° 10 30-Jun-23 14,353.99 204.54 204.54 181.32 181.32 21,317.72
Val. N° 11 31-Jul-23 0.00 0.00 0.00 0.00 0.00 21,304.25
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I. E. Nº81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA – PROVINCIA DE PATAZ – REGION LA LIBERTAD." CUI:
O B R A :
2276750
MONTO CONTRATO (C/IGV) : S/. 13,692,903.23 ADEL. MATER.. (C/IGV) 01 : S/. 1,369,290.33
MONTO CONTRATO (S/IGV) = C : S/. 11,604,155.28 ADEL. MATER.. (S/IGV) 01 = A : S/. 1,160,415.53
FECHA ADEL. MATERIALES 01 : 28-Sep-22
“MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA I. E. Nº81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA – PROVINCIA DE PATAZ – REGION LA LIBERTAD." CUI:
O B R A :
2276750
MONTO CONTRATO (C/IGV) : S/. 13,692,903.23 ADEL. MATER.. (C/IGV) 01 : S/. 1,369,290.33
MONTO CONTRATO (S/IGV) = C : S/. 11,604,155.28 ADEL. MATER.. (S/IGV) 01 = A : S/. 1,160,415.53
FECHA ADEL. MATERIALES 01 : 28-Sep-22
MONTO OTORGADO DE
S/. 1,369,290.33
ADELANTO DE MATERIALES N°01
MONTO DE SALDO POR MONTO DE SALDO POR MONTO MINIMO QUE DEBERIA
MONTO TOTAL DE MONTO QUE CUBRE LAS
AMORTIZAR ADELANTO DE AMORTIZAR ADELANTO DE CUBRIR LAS CARTAS FIANZAS
AMORTIZACIÓNES CARTAS FIANZAS
MATERIALES N°01 MATERIALES N°02 N°01+N°02.
S/. 531,875.64 S/. 837,414.68 S/. 1,369,290.33 S/. 2,738,580.66 S/. 2,206,705.02
DEDUCTIVOS QUE NO CORRESPONDE ADELANTO DIRECTO
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
1.00 ESTRUCTURAS
ESTRUCTURAS Y OBRAS PROVISIONALES FÓRMULA POLINÓMICA K = 0.241*(Mr / Mo) + 0.184*(Ar / Ao) + 0.133*(Cr / Co) + 0.090*(Mr / Mo) + 0.079*(Ar / Ao) + 0.078*(Fr / Fo) +
0.065*(MDr / MDo) + 0.130*(Ir / Io)
1 M 47 MANO DE OBRA INC. LEYES SOCIALES 100.000% 0.241 653.54 650.44 0.240 704.78 0.260 704.78 0.260
2 A 03 ACERO DE CONSTRUCCION CORRUGADO 100.000% 0.184 810.49 985.34 0.224 878.71 0.199 842.28 0.191
3 C 21 CEMENTO PORLAND TIPO I 100.000% 0.133 496.50 530.26 0.142 551.55 0.148 551.55 0.148
4 M 44 MADERA TERCIADA PARA CARPINTERIA 100.000% 0.090 482.10 504.96 0.094 528.75 0.099 526.92 0.098
5 A 05 AGREGADO GRUESO 100.000% 0.079 498.16 504.96 0.080 520.52 0.083 524.30 0.083
6 F 32 FLETE TERRESTRE 100.000% 0.078 509.80 526.28 0.081 539.86 0.083 547.75 0.084
MD 49 MAQUINARIA Y EQUIPO IMPORTADO 67.692% 407.98 422.26 0.046 419.05 0.045 415.54 0.045
7 0.065
30 DOLAR MAS INFLACION DEL MERCASO USA 32.308% 654.51 674.44 0.022 652.49 0.021 647.59 0.021
8 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 100.000% 0.130 499.88 526.99 0.137 556.66 0.145 555.81 0.145
COEFICIENTE DE REAJUSTE MENSUAL 1.000 Ka = 1.066 K10 = 1.083 K11 = 1.075
CÁLCULO DE LOS COEFICIENTES DE REAJUSTE MENSUAL "K"
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
"MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA,
OBRA:
PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
CONTRATISTA: CLASILL CONTRATISTAS GENERALES S.A.C
RESIDENTE: ING. JAVIER JESUS VILLARREAL GONZALES
SUPERVISOR: ING. DIONISIO ROJAS MAMANI
PLAZO EJECUCIÓN: 415 DIAS CALENDARIOS
PRESUPUESTO: S/ 13,692,903.23
1.00 ESTRUCTURAS
2.00 ARQUITECTURA
ARQUITECTURA FÓRMULA POLINÓMICA K = 0.357*(Mr / Mo) + 0.099*(Cr / Co) + 0.069*(Br / Bo) + 0.067*(Pr / Po) + 0.057*(Ar / Ao) + 0.221*(DMr / DMo) +
0.130*(Ir / Io)
1 M 47 MANO DE OBRA INC. LEYES SOCIALES 100.000% 0.357 633.53 650.44 0.367 0.000 0.000
2 C 21 CEMENTO PORTLAND TIPO I 100.000% 0.099 612.32 530.26 0.086 0.000 0.000
3 B 17 BLOQUE Y LADRILLO 100.000% 0.069 221.13 791.22 0.247 0.000 0.000
4 P 59 PLANCHA DE ASBESTO-CEMENTO 100.000% 0.067 814.34 270.05 0.022 0.000 0.000
5 A 05 AGREGADO GRUESO 100.000% 0.057 433.52 504.96 0.066 0.000 0.000
AM 30 DOLAR MAS INFLACION DEL MERCASO USA 84.163% 389.28 674.44 0.322 0.000 0.000
6 0.221
43 MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA 15.837% 471.50 922.11 0.068 0.000 0.000
7 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 100.000% 0.130 476.04 526.99 0.144 0.000 0.000
COEFICIENTE DE REAJUSTE MENSUAL 1.000 Ka = 1.322 K10 = 0.000 K11 = 0.000
CÁLCULO DE LOS COEFICIENTES DE REAJUSTE MENSUAL "K"
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
"MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA,
OBRA:
PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
CONTRATISTA: CLASILL CONTRATISTAS GENERALES S.A.C
RESIDENTE: ING. JAVIER JESUS VILLARREAL GONZALES
SUPERVISOR: ING. DIONISIO ROJAS MAMANI
PLAZO EJECUCIÓN: 415 DIAS CALENDARIOS
PRESUPUESTO: S/ 13,692,903.23
1.00 ESTRUCTURAS
3.00 INSTALACIONES SANITARIAS
SANITARIAS FÓRMULA POLINÓMICA K = 0.298*(Mr / Mo) + 0.093*(Ar / Ao) + 0.132*(Tr / To) + 0.060*(Tr / To) + 0.054*(Cr / Co) + 0.051*(Ar / Ao) +
0.182*(DPr / DPo) + 0.130*(Ir / Io)
1 M 47 MANO DE OBRA INC. LEYES SOCIALES 100.000% 0.298 653.54 650.44 0.297 704.78 0.321 704.78 0.321
2 A 10 APARATO SANITARIO CON GRIFERIA 100.000% 0.093 575.36 604.23 0.098 588.64 0.095 594.06 0.096
3 T 65 TUBERIA DE ACERO NEGRO 100.000% 0.132 322.97 329.58 0.135 297.20 0.121 293.77 0.120
4 T 72 TUBERIA DE PVC 100.000% 0.060 687.7 721.97 0.063 608.95 0.053 591.34 0.052
5 C 21 CEMENTO PORTLAND TIPO I 100.000% 0.054 496.50 530.26 0.058 551.55 0.060 551.55 0.060
6 A 03 ACERO DE CONSTRUCCION CORRUGADO 100.000% 0.051 810.49 985.34 0.062 878.71 0.055 842.28 0.053
DP 30 DOLAR MAS INFLACION DEL MERCASO USA 77.473% 654.51 674.44 0.145 652.49 0.141 647.59 0.140
7 0.182
51 PERFIL DE ACERO 22.527% 456.32 513.99 0.046 488.08 0.044 486.46 0.044
8 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 100.000% 0.130 499.88 526.99 0.137 556.66 0.145 555.81 0.145
COEFICIENTE DE REAJUSTE MENSUAL 1.000 Ka = 1.041 K10 = 1.035 K11 = 1.031
CÁLCULO DE LOS COEFICIENTES DE REAJUSTE MENSUAL "K"
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
"MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA,
OBRA:
PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
CONTRATISTA: CLASILL CONTRATISTAS GENERALES S.A.C
RESIDENTE: ING. JAVIER JESUS VILLARREAL GONZALES
SUPERVISOR: ING. DIONISIO ROJAS MAMANI
PLAZO EJECUCIÓN: 415 DIAS CALENDARIOS
PRESUPUESTO: S/ 13,692,903.23
1.00 ESTRUCTURAS
4.00 INSTALACIONES ELECTRICAS
ELECTRICAS FÓRMULA POLINÓMICA K = 0.151*(Mr / Mo) + 0.095*(Cr / Co) + 0.085*(Ar / Ao) + 0.080*(Tr / To) + 0.066*(Ar / Ao) + 0.055*(Cr / Co) +
0.338*(Dr / Do) + 0.130* (Ir / Io)
1 M 47 MANO DE OBRA INC. LEYES SOCIALES 100.000% 0.151 653.54 650.44 0.150 704.78 0.163 704.78 0.163
2 C 19 CABLE NYY Y NKY 100.000% 0.095 1254.46 1137.58 0.086 1,060.45 0.080 1,035.05 0.078
3 A 12 ARTEFACTO DE ALUMBRADO INTERIOR 100.000% 0.085 348.01 345.98 0.085 341.32 0.083 333.26 0.081
4 T 72 TUBERIA DE PVC 100.000% 0.080 687.7 721.97 0.084 608.95 0.071 591.34 0.069
5 A 11 ARTEFACTO DE ALUMBRADO EXTERIOR 100.000% 0.066 281.82 283.11 0.066 270.14 0.063 265.70 0.062
6 C 18 CABLE TELEFONICO 100.000% 0.055 535.58 494.65 0.051 447.33 0.046 440.48 0.045
7 D 30 DOLAR MAS INFLACION DEL MERCASO USA 100.000% 0.338 654.51 674.44 0.348 652.49 0.337 647.59 0.334
8 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 100.000% 0.130 499.88 526.99 0.137 556.66 0.145 555.81 0.145
COEFICIENTE DE REAJUSTE MENSUAL 1.000 Ka = 1.007 K10 = 0.988 K11 = 0.977
CÁLCULO DE LOS COEFICIENTES DE REAJUSTE MENSUAL "K"
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
"MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA,
OBRA:
PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
CONTRATISTA: CLASILL CONTRATISTAS GENERALES S.A.C
RESIDENTE: ING. JAVIER JESUS VILLARREAL GONZALES
SUPERVISOR: ING. DIONISIO ROJAS MAMANI
PLAZO EJECUCIÓN: 415 DIAS CALENDARIOS
PRESUPUESTO: S/ 13,692,903.23
1.00 ESTRUCTURAS
5.00 SEÑALIZACIÓN Y SEGURIDAD
SEGURIDAD FÓRMULA POLINÓMICA K = 0.151*(Mr / Mo) + 0.095*(Cr / Co) + 0.085*(Ar / Ao) + 0.080*(Tr / To) + 0.066*(Ar / Ao) + 0.055*(Cr / Co) +
0.338*(Dr / Do) + 0.130* (Ir / Io)
1 M 47 MANO DE OBRA INC. LEYES SOCIALES 100.000% 0.309 633.53 633.53 0.357 704.78 0.344 704.78 0.344
2 D 30 DOLAR MAS INFLACION DEL MERCASO USA 100.000% 0.561 612.32 612.32 0.099 652.49 0.598 647.59 0.593
3 I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 100.000% 0.130 476.04 479.79 0.131 556.66 0.152 555.81 0.152
COEFICIENTE DE REAJUSTE MENSUAL 1.000 Ka = 0.587 K10 = 1.094 K11 = 1.089
NOTA: EL "K" BASE SE USO LOS INDICES UNIFICADOS DEL MES DE DICIEMBRE DEL 2021, PUBLICADOS EL 20 DE ENERO DEL 2022 EN EL DIARIO OFICIAL EL PERUANO - RESOLUCIÓN JEFATURAL N° 065-2022-INEI
EL "K" DEL MES DE AGOSTO DEL 2022 HA SIDO CALCULADO CON LOS INDICES UNIFICADOS DEL MES DE JULIO DEL 2022, PUBLICADOS EL 15 DE AGOSTO DEL 2022 EN EL DIARIO OFICIAL EL PERUANO - RESOLUCION
JEFATURAL N° 161-2022-INEI
CÁLCULO DEL REINTEGRO AUTORIZADO
CÁLCULO DE LOS COEFICIENTES DE REAJUSTE MENSUAL "K"
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
"MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE
OBRA:
TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
PRESUPUESTO
3 INSTALACIONES SANITARIAS
PROGRAMADO EJECUTADO
REINTEGRO
VALORIZ. Nº FECHA
V K R=V*(K-1) V K R=V*(K-1) AUTORIZADO
1 Aug-22 0.00 - - - - - -
2 Sep-22 0.00 - - - - - -
3 Oct-22 0.00 - - - - - -
SUSPENSIÓN DE PLAZO DE EJECUCIÓN DE OBRA DESDE EL 15/10/2022 AL 30/11/2022
4 Dec-23 0.00 - - - - - -
5 Jan-23 0.00 - - - - - -
6 Feb-23 0.00 - - - - - -
7 Mar-23 0.00 - - - - - -
8 Apr-23 0.00 1.047 - 3,244.81 1.047 152.51 152.51
9 May-23 0.00 1.047 - - 1.047 - -
10 Jun-23 2,444.83 1.035 85.57 - 1.035 - -
11 Jul-23 156,924.45 1.031 4,864.66 - 1.031 - -
30 de 67
CÁLCULO DEL REINTEGRO AUTORIZADO
CÁLCULO DE LOS COEFICIENTES DE REAJUSTE MENSUAL "K"
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
"MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE
OBRA:
TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
4 INSTALACIONES ELECTRICAS
PROGRAMADO EJECUTADO
REINTEGRO
VALORIZ. Nº FECHA
V K R=V*(K-1) V K R=V*(K-1) AUTORIZADO
1 Aug-22 0.00 - - - - - -
2 Sep-22 0.00 - - - - - -
3 Oct-22 0.00 - - - - - -
SUSPENSIÓN DE PLAZO DE EJECUCIÓN DE OBRA DESDE EL 15/10/2022 AL 30/11/2022
4 Dec-23 0.00 - - - - - -
5 Jan-23 0.00 - - - - - -
6 Feb-23 0.00 - - - - - -
7 Mar-23 0.00 - - - - - -
8 Apr-23 0.00 - - - - - -
9 May-23 0.00 1.005 - 15,419.88 1.005 77.10 77.10
10 Jun-23 0.00 0.988 - 14,353.99 0.988 -172.25 -172.25
11 Jul-23 16,184.38 0.977 -372.24 - 0.977 - -
31 de 67
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
N° 0 2 N° 0
2
DEDUCTIVO
01.02.07.01.01 CORTE EN TERRENO NATURAL C/MAQUINARIA P/NIVELACION m3 1,106.80 26.97 29,850.40 741.92 20,009.58 -741.92 -20,009.58 -67.03% 0.00 0.00 0.00% 1,106.80 29,850.40 100.00%
01.02.07.01.02 EXCAVACION MANUAL PARA ZAPATAS Y CIMIENTOS m3 268.05 42.33 11,346.56 220.20 9,321.07 -137.71 -5,829.26 -51.37% 82.49 3,491.81 30.77% 185.56 7,854.75 69.23%
IVO
01.02.07.01.03 RELLENO Y COMPACTACION C/MAQ. C/MATERIAL PROPIO m3 992.94 16.24 16,125.35 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 992.94 16,125.35 100.00%
T
01.02.07.01.04 ELIMINACIÓN MATERIAL EXCEDENTE PROCEDENTE DE LAS EXCAVACIONES m3 684.04 22.88 15,650.84 464.44 10,626.39 -357.20 -8,172.74 -52.22% 107.24 2,453.65 15.68% 576.80 13,197.19 84.32%
01.02.07.01.05 PERFILADO Y NIVELACION m2 393.58 2.60 1,023.31 197.30 512.98 -197.30 -512.98 -50.13%
DE
01.02.07.02 OBRAS DE CONCRETO SIMPLE
01.02.07.02.01 CIMIENTO CORRIDO - CONCRETO F'C=175KG/CM2 + 30%PG m3 70.64 435.56 30,767.96 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 70.64 30,767.96 100.00%
01.02.07.02.02 SOBRECIMIENTO ARMADO:CONCRETO f'c=175 kg/cm2 m3 3.32 514.19 1,707.11 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 3.32 1,707.11 100.00%
01.02.07.02.03 SOBRECIMIENTO ARMADO : ENCOFRADO Y DESENCOFRADO m2 51.04 60.16 3,070.57 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 51.04 3,070.57 100.00%
01.02.07.02.04 SOLADO C:H 1:10 e=0.10m m2 315.09 35.49 11,182.54 137.44 4,877.75 0.00 0.00 0.00% 137.44 4,877.75 43.62% 177.65 6,304.79 56.38%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
N° 0 2
01.02.07.03.03 SOBRECIMIENTOS REFORZADO
O
01.02.07.03.03.01 CONCRETO f'c=175 kg/cm2 m3 6.77 514.19 3,481.07 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 6.77 3,481.07 100.00%
U C T I V
DED
01.02.07.03.03.02 ENCOFRADO Y DESENCOFRADO m2 90.33 60.16 5,434.25 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 90.33 5,434.25 100.00%
01.02.07.03.03.03 ACERO DE REFUERZO fy=4200 kg/cm2 kg 472.72 5.83 2,755.96 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 472.72 2,755.96 100.00%
01.02.07.03.04 MURO DE CONTENCION
01.02.07.03.04.01 MC :CONCRETO f'c= 210 Kg/cm2 m3 391.84 744.74 291,818.92 82.46 61,411.26 0.00 0.00 0.00% 82.46 61,411.26 21.04% 309.38 230,407.66 78.96%
01.02.07.03.04.02 MC : ENCOFRADO Y DESENCOFRADO m2 1,026.73 102.13 104,859.93 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 1,026.73 104,859.93 100.00%
01.02.07.03.04.03 ACERO DE REFUERZO fy=4200 kg/cm2 kg 32,839.12 5.83 191,452.07 6,239.97 36,379.03 187.19 1,091.32 0.57% 6,427.16 37,470.35 19.57% 26,411.96 153,981.72 80.43%
COSTO DIRECTO 6,034,775.24 3,150,999.33 102,634.09 1.70% 3,253,633.42 53.91% 2,781,141.82 46.09%
GASTOS GENERALES 10.00% 603,477.52 S/. 315,099.93 S/. 10,263.41 S/. 325,363.34 S/. 278,114.18
UTILIDAD 4.80% 289,669.21 S/. 151,247.97 S/. 4,926.44 S/. 156,174.40 S/. 133,494.81
SUB TOTAL 6,927,921.97 S/. 3,617,347.23 S/. 117,823.94 S/. 3,735,171.16 S/. 3,192,750.81
IGV 18.00% 1,247,025.95 S/. 651,122.50 S/. 21,208.31 S/. 672,330.81 S/. 574,695.15
PRESUPUESTO BASE 8,174,947.92 4,268,469.73 S/. 139,032.25 1.70% 4,407,501.97 32.19% 3,767,445.96 46.09%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
DEDUCTIVO N° 02
2.84X3.12m APROX.
02.04.07 RAMPA DE CONCRETO SIMPLE a=1.65 APROX.+ BRUÑA A @0.15 m2 87.68 108.12 9,479.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 87.68 9,479.96 100.00%
02.04.08 SARDINEL DE CONCRETO SIMPLE e=15CM, h=25CM PARA JARDINES m 214.60 17.21 3,693.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 214.60 3,693.27 100.00%
02.04.09 LOSA DE CEMENTO SEMI PULIDO e=15CM EN PATIOS m2 1,173.55 102.80 120,640.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,173.55 120,640.94 100.00%
02.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 CONTRAZOCALO DE PORCELANATO 15X60 CM m 292.83 17.21 5,039.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 292.83 5,039.60 100.00%
02.05.02 ZOCALO DE CERAMICA 30X30 H=1.80 m2 595.06 58.35 34,721.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 595.06 34,721.75 100.00%
02.05.03 CONTRAZOCALO DE CEMENTO PULIDO H=30 cm m 633.97 17.21 10,910.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 633.97 10,910.62 100.00%
02.06 COBERTURAS
02.06.01 COBERTURA TEJA ANDINA EN POLIPROPILENO PARA TECHO DE 1.15 X 0.76 X 9mm m2 1,698.45 53.98 91,682.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,698.45 91,682.33 100.00%
02.06.02 CUMBRERA DE TEJA ANDINA PARA TECHO DE 1.14 X 0.52 X 3.00MM m2 175.85 38.97 6,852.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 175.85 6,852.87 100.00%
02.07 CARPINTERIA DE MADERA
02.07.01 PUERTA TABLERO DE MADERA TORNILLO INCL MARCO, BASTIDORES, PINTURA Y ACCESORIOS m2 195.95 374.66 73,414.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 195.95 73,414.63 100.00%
PUERTAS CONTRAPLACADASDE MADERA TORNILLO. INCL. MARCO, BASTIDORES, PINTURA Y
02.07.02
ACCESORIOS m2 11.34 263.34 2,986.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.34 2,986.28 100.00%
PUERTAS CONTRAPLACADASPARA SS.HH. DE MADERA TORNILLO. INCL.MARCO, BASTIDORES,
02.07.03
PINTURA Y ACCESORIOS m2 58.32 263.34 15,357.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 58.32 15,357.99 100.00%
02.08 CARPINTERIA METALICA
02.08.01 PUERTAS METALICAS DE TUBO CUADRADO 2"X2"X2MM Y 1"X1!X1MM INCL. ACCESORIOS m2 17.32 749.23 12,976.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.32 12,976.66 100.00%
02.08.02 ESCALERA DE GATO METALICO a=0.60CMh=12.6M + PROTECTOR METÁLICO und 1.00 2,531.72 2,531.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,531.72 100.00%
02.08.03 CERCOS DE MALLA Y POSTES METALICOS INCLUYE PUERTASH=2.70 /3.00/ 4.00 mts m 49.01 234.91 11,512.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.01 11,512.94 100.00%
02.08.04 BARANDA DE ACERO INOXIDABLE EN RAMPA DE Ø2", h=1.00/0.90m. INCLUY. ACCESORIOS m 90.64 76.58 6,941.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 90.64 6,941.21 100.00%
PASAMANO DE ACERO EN GRADERIAS EXTERIORESINOXIDABLE DE Ø2", h=1.00m. INCLUY.
02.08.05
ACCESORIOS DE SUJESIÓN m 47.00 356.38 16,749.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 47.00 16,749.86 100.00%
PASAMANO DE ACERO INOXIDABLE EN ESCALERAS DE Ø2", h=1.00m. INCLUY. ACCESORIOS DE
02.08.06
SUJESIÓN m 29.75 404.55 12,035.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.75 12,035.36 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
04.13.04 SUMINISTRO E INSTALACION DE SISTEMA DE UTILIZACION EN MEDIA TENSION glb 1.00 160,000.00 160,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 160,000.00 100.00%
04.13.05 PARARRAYOS IONICO PDC E60 glb 1.00 4,458.53 4,458.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 4,458.53 100.00%
COSTO DIRECTO 693,283.46 27,422.01 3.96% 0.00 0.00% 27,422.01 3.96% 665,861.45 96.04%
GASTOS GENERALES 10.00% 69,328.35 S/. 2,742.20 S/. - S/. 2,742.20 S/. 66,586.15
UTILIDAD 4.80% 33,277.61 S/. 1,316.26 S/. - S/. 1,316.26 S/. 31,961.35
SUB TOTAL 795,889.42 S/. 31,480.47 S/. - S/. 31,480.47 S/. 764,408.95
IGV 18.00% 143,260.10 S/. 5,666.48 S/. - S/. 5,666.48 S/. 137,593.61
PRESUPUESTO BASE 939,149.52 37,146.95 3.96% 0.00 0.00% 37,146.95 3.96% 902,002.56 96.04%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
01.01.04.01 SUMINISTRO DE TERMOMETRO DIGITAL INFRARROJO und 1.00 83.90 83.90 1.00 83.90 100.00% 0.00 0.00 0.00% 1.00 83.90 100.00% 0.00 0.00 0.00%
01.01.04.02 SUMINISTRO DE PULSIMETRO und 1.00 42.29 42.29 1.00 42.29 100.00% 0.00 0.00 0.00% 1.00 42.29 100.00% 0.00 0.00 0.00%
01.01.04.03 FORMATO DE FICHA DE SINTOMATOLOGIA Y DECLARACION JURADA und 365.00 0.20 73.00 237.00 47.40 64.93% 31.00 6.20 8.49% 268.00 53.60 73.42% 97.00 19.40 26.58%
01.01.04.04 FORMATO DE TOMA DE TEMPERATURA Y PULSO und 365.00 0.20 73.00 253.00 50.60 69.32% 31.00 6.20 8.49% 284.00 56.80 77.81% 81.00 16.20 22.19%
01.01.05 LINEAMIENTO 03: LAVADO Y DESINFECCION DE MANOS OBLIGATORIO
01.01.05.01 SUMINISTRO E INSTALACION DE TANQUE DE AGUA Y LAVADERO PORTATIL und 2.00 250.00 500.00 2.00 500.00 100.00% 0.00 0.00 0.00% 2.00 500.00 100.00% 0.00 0.00 0.00%
01.01.05.02 SUMINISTRO E INSTALACION DE DISPENSADOR DE PAPEL TOALLA und 2.00 82.12 164.24 2.00 164.24 100.00% 0.00 0.00 0.00% 2.00 164.24 100.00% 0.00 0.00 0.00%
01.01.05.03 SUMINISTRO DE INSUMOS PARA LAVADO Y DESINFECCION mes 12.00 946.14 11,353.68 7.67 7,253.74 63.89% 1.00 946.14 8.33% 8.67 8,199.88 72.22% 3.33 3,153.80 27.78%
01.01.06.01 CAPACITACION EN PREVENCION DE LA COVID-19 mes 12.00 100.00 1,200.00 7.67 766.67 63.89% 1.00 100.00 8.33% 8.67 866.67 72.22% 3.33 333.33 27.78%
01.01.07 LINEAMIENTO 05: MEDIDAS PREVENTIVAS DE APLICACIÓN COLECTIVAS
01.01.07.01 TOPICO
01.01.07.01.01 SUMINISTRO E INSTALACIÓN DE MÓDULOS DE TÓPICO und 1.00 800.00 800.00 1.00 800.00 100.00% 0.00 0.00 0.00% 1.00 800.00 100.00% 0.00 0.00 0.00%
01.01.07.01.02 MOBILIARIOS PARA MÓDULO DE TOPICO und 1.00 645.34 645.34 1.00 645.34 100.00% 0.00 0.00 0.00% 1.00 645.34 100.00% 0.00 0.00 0.00%
01.01.08 LINEAMIENTO 06: MEDIDAS DE PROTECCION PERSONAL
01.01.08.01 ABASTECIMIENTO DE INSUMOS PARA LA ZONA DE TRABAJO mes 12.00 676.45 8,117.40 7.67 5,186.12 63.89% 1.00 676.45 8.33% 8.67 5,862.57 72.22% 3.33 2,254.83 27.78%
01.01.09 LINEAMIENTO 07: VIGILANCIA DE LA SALUD DEL TRABAJADOR EN EL CONTEXTO DEL COVID 19
01.01.09.01 VIGILANCIA, PREVENCION Y CONTROL DE LA SALUD DE LOS TRABAJADORES EN EL CONTECTO COVID 19 mes 12.00 3,000.00 36,000.00 7.67 23,000.00 63.89% 0.00 0.00 0.00% 7.67 23,000.00 63.89% 4.33 13,000.00 36.11%
COSTO DIRECTO 71,361.22 46,730.04 65.48% 2,685.44 3.76% 49,415.48 69.25% 21,945.74 30.75%
IGV 18.00% 12,845.02 S/. 8,411.41 S/. 483.38 S/. 8,894.79 S/. 3,950.23
PRESUPUESTO BASE 84,206.24 55,141.45 65.48% 3,168.82 3.76% 58,310.27 69.25% 25,895.97 30.75%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ACUMULADA ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
1 PLAN DE CONTINGENCIA :ESTRUCTURAS
01.01.01 OFICINA, COMEDOR, VESTUARIOS Y ALMACEN DE OBRA m2 12.00 154.97 1,859.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 1,859.64 100.00%
1.02 OBRAS PRELIMINARES
01.02.01 TRAZO, NIVELACION Y REPLANTEO m2 2,498.00 1.34 3,347.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,498.00 3,347.32 100.00%
1.03 SEGURIDAD Y SALUD
01.03.01 PLAN DE SEGURIDAD glb 1.00 500.00 500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 500.00 100.00%
01.03.02 EQUIPOS DE PROTECCION INDIVIDUAL und 10.00 96.29 962.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 962.90 100.00%
01.03.03 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 620.00 620.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 620.00 100.00%
01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 762.85 762.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 762.85 100.00%
1.04 FLETE TERRESTRE DE MATERIALES
01.04.01 FLETE TERRESTRE glb 1.00 17,096.21 17,096.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 17,096.21 100.00%
1.05 OBRAS DE CONCRETO SIMPLE
01.05.01 CONCRETO CICLOPEO PARA CIMIENTOS CORRIDOS C:H 1:10 + 30%P.G. m3 6.00 435.56 2,613.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 2,613.36 100.00%
01.05.02 SOBRECIMIENTO ARMADO:CONCRETO f'c=175 kg/cm2 m3 3.00 514.19 1,542.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 1,542.57 100.00%
01.05.03 SOBRECIMIENTO ARMADO : ENCOFRADO Y DESENCOFRADO m2 30.00 49.33 1,479.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 1,479.90 100.00%
2 ARQUITECTURA
02.01.01 CERCO PERIMETRICO TIPO PLACA PREFABRICADO DE CONCRETO m 155.00 155.38 24,083.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 155.00 24,083.90 100.00%
02.01.02 PORTON METALICO DIMENSIONES 3.00x3.50m und 1.00 1,487.43 1,487.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,487.43 100.00%
2.02 PISOS, VEREDAS
LOSA DE CONCRETO f'c=175 Kg/cm2, e=0.10m., AULAS PRE-FABRICADAS (semi
02.02.01 pulido) m2 471.00 59.92 28,222.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 471.00 28,222.32 100.00%
02.02.02 VEREDA DE CONCRETO SIMPLE FC° 175KG/CM2, e=15CM + ACABADO CEMENTO SEMI PULIDO m2 205.19 67.24 13,796.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 205.19 13,796.98 100.00%
2.03 AULAS PRE-FABRICADAS
02.03.01 AULAS PRE-FABRICADAS SISTEMA EN SECO Y COBERTURA DE POLIPROPILENO und 6.00 11,616.32 69,697.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 69,697.92 100.00%
02.03.02 MODULO PRE-FABRICADO SISTEMA EN SECO Y COBERTURA DE POLIPROPILENO PARA SS.HH. und 1.00 12,297.52 12,297.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 12,297.52 100.00%
02.03.03 REINSTALACION Y ACONDICIONAMIENTO DE AULAS PRE-FABRICADAS EXISTENTES und 2.00 445.51 891.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 891.02 100.00%
2.04 PINTURA
02.04.01 PINTURA LATEX EN VIGAS Y COLUMNAS EN PÓRTICO DE INGRESO PRINCIPAL m2 5.98 22.25 133.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.98 133.06 100.00%
02.04.02 PINTURA LATEX EN MUROS INTERIORES m2 552.00 21.08 11,636.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 552.00 11,636.16 100.00%
02.04.03 PINTURA LATEX EN MURO EXTERIOR E INTERIOR DE SS.HH m2 675.00 14.94 10,084.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 675.00 10,084.50 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ACUMULADA ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
3 INSTALACIONES SANITARIAS
3.01 VEREDA DE CONCRETO SIMPLE FC° 175KG/CM2, e=15CM + ACABADO CEMENTO SEMI PULIDO
03.01.01 SUMINISTRO E INSTALACIÓN DE INODONO, TAZA Y TANQUE COLOR BLANCO und 8.00 420.68 3,365.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 3,365.44 100.00%
03.01.02 SUMINISTRO E INSTALACIÓN DE LAVATORIO DE PARED COLOR BLANCO und 8.00 322.98 2,583.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 2,583.84 100.00%
3.02 SISTEMA DE AGUA FRÍA
03.02.01 SALIDAS DE AGUA FRIA TUBERIA PVC C-10 *1/2 " pto 16.00 42.90 686.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.00 686.40 100.00%
03.02.02 EMPALME A LA RED EXISTENTE P/AGUA FRÍA glb 1.00 61.10 61.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 61.10 100.00%
3.03 SISTEMA DE DESAGUE
03.03.01 SALIDA DE DESAGUE DE PVC SAL 4" pto 8.00 82.96 663.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 663.68 100.00%
03.03.02 SALIDA DE DESAGUE DE PVC SAL 2" pto 8.00 56.44 451.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 451.52 100.00%
03.03.03 EMPALME A LA RED EXISTENTE P/DESAGUE glb 1.00 65.27 65.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 65.27 100.00%
4 INSTALACIONES ELÉCTRICAS ( AULAS Y ALMACÉN PREFABRICADAS )
04.01.01 SALIDA PARA CENTRO DE LUZ pto 6.00 71.04 426.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 426.24 100.00%
04.01.02 SALIDA PARA TOMACORRIENTES pto 6.00 27.03 162.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 162.18 100.00%
04.01.03 SALIDA PARA INTERRUPTORES pto 6.00 34.34 206.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 206.04 100.00%
04.01.04 TABLERO ELÉCTRICO METÁLICO DE 06 POLOS und 1.00 347.87 347.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 347.87 100.00%
04.01.05 SUB TABLERO ELÉCTRICO METÁLICO DE 04 POLOS und 1.00 339.21 339.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 339.21 100.00%
04.01.06 ALIMENTADOR PRINCIPAL m 60.00 16.02 961.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 60.00 961.20 100.00%
04.01.07 LUMINARIAS EQUIPO HERMÉTICO pto 8.00 76.21 609.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 609.68 100.00%
COSTO DIRECTO 214,045.23 0.00 0.00% 0.00 0.00% 0.00 0.00% 214,045.23 100.00%
IGV 18.00% 38,528.14 S/. - S/. - S/. - S/. 38,528.14
PRESUPUESTO BASE 252,573.37 0.00 0.00% 0.00 0.00% 0.00 0.00% 252,573.37 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
MOBILIARIO
AULAS PRIMARIA
MP/1-2 Modulo Escolar para 1° - 2° grado primaria (30 x aula) UND 120 160.00 19,200.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 120.00 19,200.00 100.00%
MP/3-6 Carpeta unipersonal para 3° - 6° (30 x aula) UND 240 120.00 28,800.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 240.00 28,800.00 100.00%
ES/D Escritorio + silla para docente UND 12 590.00 7,080.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 7,080.00 100.00%
PZ-A1 Pizarra acrílica de 3.00 x 1.10 m. UND 12 354.24 4,250.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 4,250.85 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 24 590.00 14,160.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.00 14,160.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 24 850.00 20,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.00 20,400.00 100.00%
AULA DE INNOVACION PEDAGOGICA (PRIMARIA)
ES/D Escritorio + silla para docente UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
MS/PC1 Mueble y silla de computo UND 30 550.00 16,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 16,500.00 100.00%
PZ-A1 Pizarra acrílica de 3.00 x 1.10 m. UND 1 354.24 354.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 354.24 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 1 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 2 590.00 1,180.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,180.00 100.00%
CENTRO DE RECURSOS EDUCATIVOS (PRIMARIA)
ES/1 Escritorio + silla para asistente UND 1 550.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 100.00%
SM/1 Sillas de madera UND 30 70.00 2,100.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 2,100.00 100.00%
MT/8P Mesas de trabajo para 8 personas UND 6 296.61 1,779.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 1,779.66 100.00%
MT/4P Mesas de trabajo para 4 personas UND 2 186.44 372.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 372.88 100.00%
AF-01 Anaqueles de fierro. Cada cuerpo de: 4 soportes y 7 planchas = 11 UND 10 135.59 1,355.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 1,355.93 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 4 850.00 3,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 3,400.00 100.00%
PZ-A1 Pizarra acrílica de 3.00 x 1.10 m. UND 1 354.24 354.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 354.24 100.00%
MMA-1 Mostrador de madera para atención de 0.80 x 4.80 m. UND 1 1,525.42 1,525.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,525.42 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 4 590.00 2,360.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2,360.00 100.00%
TOPICO / PSICOLOGIA (PRIMARIA)
ES/1 Escritorio + silla UND 2 550.00 1,100.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,100.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 2 850.00 1,700.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,700.00 100.00%
AM/02 Archivador de melamine de 1.50 x 2.00 m UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
CM/1 Camilla de metal UND 1 355.93 355.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 355.93 100.00%
BQ-PA Botiquín con primeros auxilios basicos UND 1 88.90 88.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 88.90 100.00%
E/2P Escalera dos peldaños de metal UND 1 93.14 93.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 93.14 100.00%
B-3C Biombo de 3 cuerpos uso clínico UND 1 148.31 148.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 148.31 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
AULAS SECUNDARIA
MS/1-5 Carpeta unipersonal de madera para aula (30 x aula) UND 90 120.00 10,800.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 90.00 10,800.00 100.00%
ES/D Escritorio + silla para docente UND 3 550.00 1,650.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 1,650.00 100.00%
PZ-A1 Pizarra acrílica de 3.00 x 1.10 m. UND 3 354.24 1,062.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 1,062.71 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 12 590.00 7,080.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 7,080.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 6 850.00 5,100.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 5,100.00 100.00%
AULAS FUNCIONALES SECUNDARIA
MS/1-5 Carpeta unipersonal de madera para aula UND 120 120.00 14,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 120.00 14,400.00 100.00%
ES/D Escritorio + silla para docente UND 4 550.00 2,200.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2,200.00 100.00%
PZ-A1 Pizarra acrílica de 3.00 x 1.10 m. UND 4 354.24 1,416.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,416.95 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 20 590.00 11,800.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 11,800.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 11 850.00 9,350.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.00 9,350.00 100.00%
AULAS DE REFORZAMIENTO
MS/1-5 Carpeta unipersonal de madera para aula UND 14 120.00 1,680.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.00 1,680.00 100.00%
ES/D Escritorio + silla para docente UND 1 550.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 100.00%
PZ-A1 Pizarra acrílica de 3.00 x 1.10 m. UND 1 354.24 354.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 354.24 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 1 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
INNOVACION PEDAGOGICA
M/PC2 Mueble de computo UND 30 450.00 13,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 13,500.00 100.00%
SM/2 Sillas de madera para estudiantes UND 30 70.00 2,100.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 2,100.00 100.00%
ES/D Escritorio + silla para docente UND 1 550.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 1 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
PZ-A1 Pizarra acrílica de 3.00 x 1.10 m. UND 1 354.24 354.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 354.24 100.00%
CUARTO DE CARGA
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 2 590.00 1,180.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,180.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 2 850.00 1,700.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,700.00 100.00%
LABORATORIO
PZ-A1 Pizarra acrílica de 3.00 x 1.10 m. UND 1 354.24 354.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 354.24 100.00%
BL-1 Butacas de trabajos para labortorio UND 42 135.59 5,694.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 42.00 5,694.92 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 4 850.00 3,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 3,400.00 100.00%
ES/D Escritorio de melamine y silla UND 1 900.00 900.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 900.00 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
SALA DE PREPARADO Y GUARDADO
EM/02 Estante de melamine de 1.80 m. x 2.00 m. 0.40 m. UND 1 690.00 690.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 690.00 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
DIRECCION
ES-D1 Escritorio + sillon para dirección UND 1 900.00 900.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 900.00 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 1 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
SM/3 Sillas de madera para atención UND 2 65.00 130.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 130.00 100.00%
M/PC2 Mueble de computo UND 1 450.00 450.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 450.00 100.00%
NORMAS EDUCATIVAS
ES/1 Escritorio + silla UND 1 550.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 1 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
M/PC2 Mueble de computo UND 1 450.00 450.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 450.00 100.00%
ESPERA/SECRETARIA
ES/1 Escritorio + silla UND 1 550.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 100.00%
SM/3 Sillas de madera para atención UND 4 65.00 260.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 260.00 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 1 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
ILM-1 Impresora láser Multifuncional UND 1 1,083.90 1,083.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,083.90 100.00%
PC-I7 Computadora de escritorio I7 Ultima Generacion UND 1 3,009.58 3,009.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,009.58 100.00%
ARCHIVO
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 2 850.00 1,700.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,700.00 100.00%
AM/02 Archivador de melamine de 1.50 x 2.00 m UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
ES/1 Escritorio + silla UND 1 550.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 100.00%
COORDINACION PEDAGOGICA
ES/1 Escritorio + silla UND 1 550.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 2 850.00 1,700.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,700.00 100.00%
COORDINACION DE TUTORIA
ES/1 Escritorio + silla UND 1 550.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 2 850.00 1,700.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,700.00 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
COORDINACION ADMINISTRATIVA
ES/1 Escritorio + silla UND 1 550.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 2 850.00 1,700.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,700.00 100.00%
SALA DE REUNIONES
MS/10P Mesa de reuniones + silla 10 pesonas UND 1 2,203.39 2,203.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,203.39 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 2 590.00 1,180.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,180.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 1 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
PZ-A1 Pizarra acrílica de 3.00 x 1.10 m. UND 1 354.24 354.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 354.24 100.00%
SALA DE PROFESORES
M/T1 Mesas de trabajo de madera de 3.00 x 1.20 m. UND 1 1,271.19 1,271.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,271.19 100.00%
SM/T1 Silla de metal + asiento y espaldar tapizado. UND 32 84.75 2,711.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 32.00 2,711.86 100.00%
SM/3 Sillas de madera para atención UND 4 65.00 260.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 260.00 100.00%
ES/1 Escritorio + silla UND 1 550.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 100.00%
PZ-A1 Pizarra acrílica de 3.00 x 1.10 m. UND 1 354.24 354.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 354.24 100.00%
EM/01 Estante de melamine de 1.50 x 2.00 m. UND 2 590.00 1,180.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,180.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 2 850.00 1,700.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,700.00 100.00%
MOBILIARIO PARA AREAS COMPLEMENTARIAS
COCINA
RMA-1 Repostero de melamine altos de 2.00 x 0.60 cm. UND 2 750.00 1,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,500.00 100.00%
EM-V1 Estante de melamine para víveres UND 3 590.00 1,770.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 1,770.00 100.00%
AF-01 Anaqueles de fierro. Cada cuerpo de: 4 soportes y 7 planchas = 11 UND 2 135.59 271.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 271.19 100.00%
DEPOSITO
AF-01 Anaqueles de fierro. Cada cuerpo de: 4 soportes y 7 planchas = 11 UND 4 135.59 542.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 542.37 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 2 850.00 1,700.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,700.00 100.00%
EM/V1 Estantes de melamine para material didáctico UND 2 550.00 1,100.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,100.00 100.00%
VIGILANCIA
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 1 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
ES/1 Escritorio + silla UND 1 550.00 550.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 550.00 100.00%
TOPICO/PSICOLOGIA (PRIMARIA)
ES/1 Escritorio + silla UND 2 550.00 1,100.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,100.00 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 1 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
AM/02 Archivador de melamine de 1.50 x 2.00 m UND 1 590.00 590.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 590.00 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
E/2P Escalera dos peldaños de metal UND 1 93.14 93.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 93.14 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
APAFA
MR-T1 Mesa de melamine para reuniones y de trabajo 2.4 x 1.8 mts. UND 2 700.00 1,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,400.00 100.00%
PZ-A1 Pizarra acrílica de 3.00 x 1.10 m. UND 1 354.24 354.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 354.24 100.00%
SR-D Sillas rodantes para docentes UND 12 150.00 1,800.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 1,800.00 100.00%
SALA DE USOS MULTIPLES
SM/T1 Silla de metal + asiento y espaldar tapizado. UND 112 84.75 9,491.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 112.00 9,491.53 100.00%
M/E1 Mesa de madera para expositor UND 2 250.00 500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 500.00 100.00%
S/E1 Sillas de madera para expositores UND 2 180.00 360.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 360.00 100.00%
AF-01 Anaqueles de fierro. Cada cuerpo de: 4 soportes y 7 planchas = 11 UND 4 135.59 542.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 542.37 100.00%
EM/03 Estantes de melamine 1.5 x 2.00 m. UND 2 590.00 1,180.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,180.00 100.00%
DEPOSITO / CUARTO DE LIMPIEZA
AF-01 Anaqueles de fierro. Cada cuerpo de: 4 soportes y 7 planchas = 11 UND 5 135.59 677.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 677.97 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 1 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
ARCHIVO DE LIBROS
AF-01 Anaqueles de fierro. Cada cuerpo de: 4 soportes y 7 planchas = 11 UND 10 135.59 1,355.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 1,355.93 100.00%
AM/01 Armario de melamine c/puerta de 1.50 x 2.00 m. UND 1 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
MMA-1 Mostrador de madera para atención de 0.80 x 4.80 m. UND 1 1,525.42 1,525.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,525.42 100.00%
SM/1 Sillas de madera UND 4 70.00 280.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 280.00 100.00%
FLETE DE EQUIPOS GLB 1.00 4,690.86 4,690.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 4,690.86 100.00%
COSTO DIRECTO 305,030.17 0.00% 0.00 0.00% 0.00 0.00% 305,030.17 100.00%
IGV 18.00% 54,905.43 S/. - S/. - S/. - S/. 54,905.43
PRESUPUESTO BASE 359,935.60 0.00 0.00% 0.00 0.00% 0.00 0.00% 359,935.60 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
EQUIPAMIENTO
AULAS PRIMARIA
L-I7 Equipo Laptop por aula I7 ult gener. UND 12.00 3,389.83 40,677.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 40,677.97 100.00%
Pizarra Digital Interactiva 2343 x 1365 mm (marco aluminio) UND 12.00 4,152.54 49,830.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 49,830.51 100.00%
PM-1 Proyector multimedia tiro corto WXGA, 1280x800(450 type),Blu-ray Full HD 3D support UND 12.00 3,559.32 42,711.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 42,711.86 100.00%
RCK-1 Rack para proyector multimedia UND 12.00 59.24 710.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 710.85 100.00%
AULA DE INNOVACION PEDAGOGICA (PRIMARIA)
PC-I7 Computadora de escritorio I7 Ultima Generacion UND 30.00 3,009.58 90,287.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 30.00 90,287.29 100.00%
PM-1 Proyector multimedia tiro corto WXGA, 1280x800(450 type),Blu-ray Full HD 3D support UND 1.00 3,559.32 3,559.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,559.32 100.00%
RCK-1 Rack para proyector multimedia UND 1.00 59.24 59.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 59.24 100.00%
Pizarra Digital Interactiva 2343 x 1365 mm (marco aluminio) UND 1.00 4,152.54 4,152.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 4,152.54 100.00%
ILM-1 Impresora láser Multifuncional UND 1.00 1,083.90 1,083.90 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,083.90 100.00%
CENTRO DE RECURSOS EDUCATIVOS (PRIMARIA)
PC-I7 Computadora de escritorio I7 Ultima Generacion UND 4.00 3,009.58 12,038.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 12,038.31 100.00%
ILM-1 Impresora láser Multifuncional UND 1.00 1,083.90 1,083.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,083.90 100.00%
TOPICO / PSICOLOGIA (PRIMARIA)
PC-I7 Computadora de escritorio I7 Ultima Generacion UND 1.00 3,009.58 3,009.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,009.58 100.00%
ILM-1 Impresora láser Multifuncional UND 1.00 1,083.90 1,083.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,083.90 100.00%
AULAS SECUNDARIA
L-I7 Equipo Laptop por aula I7 ult gener. UND 3.00 3,389.83 10,169.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 10,169.49 100.00%
Pizarra Digital Interactiva 2343 x 1365 mm (marco aluminio) UND 3.00 4,152.54 12,457.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 12,457.63 100.00%
PM-1 Proyector multimedia tiro corto WXGA, 1280x800(450 type),Blu-ray Full HD 3D support UND 3.00 3,559.32 10,677.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 10,677.97 100.00%
RCK-1 Rack para proyector multimedia UND 3.00 59.24 177.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 177.71 100.00%
AULAS FUNCIONALES SECUNDARIA
L-I7 Equipo Laptop por aula I7 ult gener. UND 62.00 3,389.83 210,169.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 62.00 210,169.49 100.00%
Pizarra Digital Interactiva 2343 x 1365 mm (marco aluminio) UND 4.00 4,152.54 16,610.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 16,610.17 100.00%
PM-1 Proyector multimedia tiro corto WXGA, 1280x800(450 type),Blu-ray Full HD 3D support UND 4.00 3,559.32 14,237.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 14,237.29 100.00%
RCK-1 Rack para proyector multimedia UND 4.00 59.24 236.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 236.95 100.00%
EQS-01 Equipo de sonido UND 4.00 1,355.08 5,420.34 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 5,420.34 100.00%
INNOVACION PEDAGOGICA
Pizarra Digital Interactiva 2343 x 1365 mm (marco aluminio) UND 1.00 4,152.54 4,152.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 4,152.54 100.00%
PM-1 Proyector multimedia tiro corto WXGA, 1280x800(450 type),Blu-ray Full HD 3D support UND 1.00 3,559.32 3,559.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,559.32 100.00%
RCK-1 Rack para proyector multimedia UND 1.00 59.24 59.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 59.24 100.00%
L-I7 Equipo Laptop por aula I7 ult gener. UND 1.00 3,389.83 3,389.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,389.83 100.00%
ILM-1 Impresora láser Multifuncional UND 1.00 1,083.90 1,083.90 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,083.90 100.00%
LABORATORIO
ILM-1 Impresora láser Multifuncional UND 1.00 1,083.90 1,024.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,024.18 100.00%
Pizarra Digital Interactiva 2343 x 1365 mm (marco aluminio) UND 1.00 4,152.54 4,152.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 4,152.54 100.00%
PM-1 Proyector multimedia tiro corto WXGA, 1280x800(450 type),Blu-ray Full HD 3D support UND 1.00 3,559.32 3,559.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,559.32 100.00%
RCK-1 Rack para proyector multimedia UND 1.00 59.24 67.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 67.80 100.00%
SALA DE PREPARADO Y GUARDADO
BP Balanza de presicion UND 6.00 559.32 3,355.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 3,355.93 100.00%
ALC Alcoholímetros UND 1.00 1,500.00 1,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,500.00 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
KPE Kit probetas educativas UND 1.00 1,500.00 1,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,500.00 100.00%
MD Microscopios de laboratorio UND 6.00 759.31 4,555.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 4,555.88 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
DIRECCION
PC-I7 Computadora de escritorio I7 Ultima Generacion UND 1.00 3,009.58 3,009.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,009.58 100.00%
FG-SM1 Fotocopiadora A3/A4 grande con soporte multifuncional UND 1.00 6,778.81 6,778.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 6,778.81 100.00%
NORMAS EDUCATIVAS
PC-I7 Computadora de escritorio I7 Ultima Generacion UND 1.00 3,009.58 3,009.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,009.58 100.00%
ILM-1 Impresora láser Multifuncional UND 1.00 1,083.90 1,083.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,083.90 100.00%
ESPERA/SECRETARIA
ILM-1 Impresora láser Multifuncional UND 1.00 1,083.90 1,083.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,083.90 100.00%
PC-I7 Computadora de escritorio I7 Ultima Generacion UND 1.00 3,009.58 3,009.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,009.58 100.00%
COORDINACION PEDAGOGICA
PC-I7 Computadora de escritorio I7 Ultima Generacion UND 1.00 3,009.58 3,009.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,009.58 100.00%
ILM-1 Impresora láser Multifuncional UND 1.00 1,083.90 1,083.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,083.90 100.00%
COORDINACION DE TUTORIA
PC-I7 Computadora de escritorio I7 Ultima Generacion UND 1.00 3,009.58 3,009.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,009.58 100.00%
ILM-1 Impresora láser Multifuncional UND 1.00 1,083.90 1,083.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,083.90 100.00%
COORDINACION ADMINISTRATIVA
PC-I7 Computadora de escritorio I7 Ultima Generacion UND 1.00 3,009.58 3,009.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,009.58 100.00%
ILM-1 Impresora láser Multifuncional UND 1.00 1,083.90 1,083.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,083.90 100.00%
SALA DE REUNIONES
PC-I7 Computadora de escritorio I7 Ultima Generacion UND 1.00 3,009.58 3,009.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,009.58 100.00%
PM-1 Proyector multimedia UND 1.00 3,559.32 3,559.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,559.32 100.00%
EE-01 Ecran estándar (1.8 x 1.8 m por aula) UND 1.00 338.97 338.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 338.97 100.00%
RCK-1 Rack para proyector multimedia UND 1.00 59.24 59.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 59.24 100.00%
SALA DE PROFESORES
EE-01 Ecran estándar (1.8 x 1.8 m por aula) UND 1.00 338.97 338.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 338.97 100.00%
PM-1 Proyector multimedia UND 1.00 2,542.37 2,542.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,542.37 100.00%
RCK-1 Rack para proyector multimedia UND 1.00 59.24 59.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 59.24 100.00%
L-I7 Equipo Laptop por aula I7 ult gener. UND 1.00 3,389.83 3,389.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,389.83 100.00%
EQUIPOS PARA AREAS COMPLEMENTARIAS
COCINA
CSI-1 Cocina a gas semi industrial UND 1.00 295.76 295.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 295.76 100.00%
BG-1 Balón de gas sin carga UND 2.00 84.75 169.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 169.49 100.00%
RM-1 Refrigeradora mediana UND 1.00 1,100.85 1,100.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,100.85 100.00%
HM-1 Horno microondas UND 1.00 338.14 338.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 338.14 100.00%
O-AI Ollas de acero inoxidable varias UND 4.00 317.80 1,271.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,271.19 100.00%
LSI-1 Licuadora semi industrial UND 2.00 525.42 1,050.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,050.85 100.00%
BS1-1 Batidora semi industrial UND 2.00 330.51 661.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 661.02 100.00%
UT-1 Cucharones, espumaderas, tenedor grande. 5 juegos UND 5.00 50.85 254.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 254.24 100.00%
UT-2 Cubiertos para comensales juego x 4 pzas. (doc.) UND 5.00 12.71 63.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 63.56 100.00%
UT-3 Platos de loza tendido y para sopa juego x 2 pzas. (doc) UND 5.00 88.98 444.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 444.92 100.00%
UT-4 Menajes varios: posillos, jarras, coladores (jgo) UND 4.00 125.59 502.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 502.37 100.00%
UT-5 Vasos refractarios para servir el desayuno (doc.) UND 8.00 18.81 150.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 150.51 100.00%
E-12K Extintor de 12 kilos UND 2.00 181.27 362.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 362.54 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
TOPICO/PSICOLOGIA (PRIMARIA)
CM/1 Camilla de metal UND 1.00 355.93 355.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 355.93 100.00%
BQ-PA Botiquín con primeros auxilios basicos UND 1.00 88.90 88.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 88.90 100.00%
B-3C Biombo de 3 cuerpos uso clínico UND 1.00 148.31 148.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 148.31 100.00%
SALA DE USOS MULTIPLES
L-I7 Equipo Laptop por aula I7 ult gener. UND 1.00 3,389.83 3,389.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,389.83 100.00%
EQS-01 Equipo de sonido UND 1.00 1,355.08 1,355.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,355.08 100.00%
PM-E1 Proyector multimedia INTERACTIVO UND 1.00 3,050.85 3,050.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,050.85 100.00%
C-BO Cortinas black out de 1.50 mx 1.50m UND 8.00 186.44 1,491.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 1,491.53 100.00%
DEPOSITO / CUARTO DE LIMPIEZA
UT-6 Implementos y herramientas de jardineria UND 1.00 185.15 185.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 185.15 100.00%
UT-7 Implementos y herramientas de limpieza UND 3.00 584.32 1,752.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 1,752.96 100.00%
UT-8 Implementos y herramientas de limpieza para ss.h.h. UND 6.00 594.23 3,565.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 3,565.38 100.00%
UT-D1 Colchonetas c/forro de lona de 1 x 2 m. UND 35.00 149.00 5,215.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.00 5,215.00 100.00%
UT-D2 Balones de futbol UND 6.00 31.00 186.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 186.00 100.00%
UT-D3 Balones de Vóley UND 6.00 36.00 216.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 216.00 100.00%
UT-D4 Balones de básquet UND 6.00 21.00 126.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 126.00 100.00%
UT-D5 Taburete de madera flexible de 6 niveles UND 3.00 790.00 2,370.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 2,370.00 100.00%
UT-D6 Net de vóley profesional UND 3.00 135.00 405.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 405.00 100.00%
UT-D7 Juego de Ajedrez. UND 20.00 37.00 740.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 740.00 100.00%
UT-D8 Balanza electrónica. UND 1.00 507.63 507.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 507.63 100.00%
UT-D9 Cintas de gimnasia rítmica. UND 35.00 9.90 346.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.00 346.50 100.00%
UT-D10 Sogas para juegos diametro mediano de 5 metros c/u. UND 35.00 33.90 1,186.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.00 1,186.45 100.00%
UT-D11 Cronómetros UND 6.00 59.00 354.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 354.00 100.00%
UT-D12 Wincha de 30 m. UND 6.00 37.00 222.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 222.00 100.00%
UT-D13 Talimetros UND 6.00 260.00 1,560.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 1,560.00 100.00%
UT-D14 Balanza de piso digital UND 6.00 49.00 294.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 294.00 100.00%
UT-D15 Señalizadores de 6 piezas UND 6.00 29.66 177.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 177.97 100.00%
UT-D16 Banderín arbitro UND 12.00 19.00 228.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 228.00 100.00%
FLETE DE EQUIPOS GLB 1.00 902.89 902.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 902.89 100.00%
COSTO DIRECTO 643,046.74 0.00% 0.00 0.00% 0.00 0.00% 643,046.74 100.00%
IGV 18.00% 115,748.41 S/. - S/. - S/. - S/. 115,748.41
PRESUPUESTO BASE 758,795.15 0.00 0.00% 0.00 0.00% 0.00 0.00% 758,795.15 100.00%
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
VALORIZACIÓN N° 11, del 01 al 31 de Julio del 2023
OBRA: "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
UBICACIÓN: DISTRITO TAYABAMBA, PROVINCIA DE PATAZ, DEPARTAMENTO LA LIBERTAD
CONTRATO: N°038 - 2022 - GRLL - GRCO
AVANCES
PRESUPUESTO SALDO POR VALORIZAR
PARTIDA DESCRIPCION VAL. ANTERIOR VAL. ACTUAL VAL. ACUMULADO
UND. METRADO P. UNIT. MONTO METRADO S/ % METRADO S/ % METRADO S/ % METRADO S/ %
1.00 CAPACITACION A DOCENTES
1.01 GASTOS ADMINISTRATIVOS Y DE MONITOREO GLB 1.00 1,750.00 1,750.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,750.00 100.00%
1.02.01 EL CONOCIMIENTO TECNOLOGICO GLB 1.00 22,400.00 22,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 22,400.00 100.00%
1.02.02 APLICACIÓN PEDAGOGICA DE LAS TIC EN EL AULA GLB 1.00 22,400.00 22,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 22,400.00 100.00%
1.02.03 ACTITUD DEL MAESTRO RESPECTO A LAS TIC GLB 1.00 18,200.00 18,200.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 18,200.00 100.00%
COSTO DIRECTO 54,872.88 0.00% 0.00 0.00% 0.00 0.00% 54,872.88 100.00%
IGV 18.00% 9,877.12 S/. - S/. - S/. - S/. 9,877.12
PRESUPUESTO BASE 64,750.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 64,750.00 100.00%
CURVA "S"
OBRA : "MEJORAMIENTO DEL SERVICIO DE EDUCACION PRIMARIA Y SECUNDARIA DE LA IE 81034 JOSE MARIA ARGUEDAS, DISTRITO DE TAYABAMBA, PROVINCIA DE PATAZ, REGION LA LIBERTAD"
CONTRATO : N°038 - 2022 - GRLL - GRCO
CONTRATISTA : CLASILL CONTRATISTAS GENERALES S.A.C
RESIDENTE: ING. JAVIER JESUS VILLARREAL GONZALES
JEFE DE SUPERVISION : ING. DIONISIO ROJAS MAMANI
PLAZO EJECUCIÓN: 415 DIAS CALENDARIOS
Presupuesto Ofertado : S/. 13,692,903.23
4506788.07
370,252.43 368,231.80
378,172.76
diciembre 368231.803799999
CURVA "S"
% DE AVANCE ACUMULADO
120.00%
100.00%
100.00%
92.26%
81.87%
80.00%
69.88%
60.00% 57.64%
42.34%
40.00%
34.03% 32.91%
31.87%
26.75%
24.07%
22.18%
20.00% 17.36%
16.44%
11.42%
9.66%
7.49%
5.86%
3.42%
3.35%
0.22%
0.22% 0.67%
0.52% 0.87%
0.64%
0.00%
VAL 01: 24 - 31 VAL 02: 01 - 30 VAL 03: 01 -14 SUSPENSIÓN DE VAL 04: 01 - 31 DI- VAL 05: 01 - 31 VAL 06: 01 - 28 VAL 07: 01 - 31 VAL 08: 01 - 30 ABRIL VAL 09: 01 - 31 MAYO VAL 10: 01 - 30 JUNIO VAL 11: 01 - 31 JULIO VAL 12: 01 - 31 VAL 13: 01 - 30 VAL 14: 01 - 31 VAL 14: 01 - 28
AGOSTO DEL 2022 SEPTIEMBRE DEL OCTUBRE DEL PLAZO DE EJECUCIÓN CIEMBRE DEL 2022 ENERO DEL 2023 FEBRERO DEL 2023 MARZO DEL 2023 DEL 2023 DEL 2023 DEL 2023 DEL 2023 AGOSTO DEL 2023 SETIEMBRE DEL 2023 OCTUBRE DEL NOVIEMBRE DEL
2022 2022 N°01 2023 2023
VAL 01 Aug-22 S/. 30,511.80 S/. 30,511.80 0.22% 0.22% S/. 30,038.70 S/. 30,038.70 0.22% 0.22% 0.00%
VAL 02 Sep-22 S/. 60,711.79 S/. 91,223.59 0.44% 0.67% S/. 41,352.27 S/. 71,390.97 0.30% 0.52% -0.14%
VAL 03 Oct-22 S/. 28,500.76 S/. 119,724.35 0.21% 0.87% S/. 16,577.88 S/. 87,968.85 0.12% 0.64% -0.23%
SUSPENSIÓN DE PLAZO DE EJECUCIÓN N°01
VAL 04 Dec-22 S/. 349,183.32 S/. 468,907.67 2.55% 3.42% S/. 442,854.39 S/. 530,823.24 3.23% 3.88% -0.96%
VAL 05 Jan-23 S/. 333,599.76 S/. 802,507.43 2.44% 5.86% S/. 657,924.01 S/. 745,892.86 4.80% 8.68% 2.82%
VAL 06 Feb-23 S/. 520,253.73 S/. 1,322,761.16 3.80% 9.66% S/. 537,982.61 S/. 1,283,875.47 3.93% 12.61% 2.95%
VAL 07 Mar-23 S/. 928,260.65 S/. 2,251,021.81 6.78% 16.44% S/. 813,459.03 S/. 2,097,334.50 5.94% 18.55% 2.11%
VAL 08 Apr-23 S/. 1,044,518.20 S/. 3,295,540.01 7.63% 24.07% S/. 661,082.75 S/. 2,758,417.25 4.83% 23.38% -0.69%
VAL 09 May-23 S/. 1,364,447.55 S/. 4,659,987.56 9.96% 34.03% S/. 625,474.70 S/. 3,383,891.95 4.57% 27.95% -6.09%
VAL 10 Jun-23 S/. 1,137,303.59 S/. 5,797,291.15 8.31% 42.34% S/. 701,407.16 S/. 4,085,299.11 5.12% 33.07% -9.27%
VAL 11 Jul-23 S/. 2,094,812.32 S/. 7,892,103.47 15.30% 57.64% S/. 142,201.07 S/. 4,227,500.18 1.04% 34.11% -23.53%
VAL 12 Aug-23 S/. 1,676,320.22 S/. 9,568,423.69 12.24% 69.88% S/. -
VAL 13 Sep-23 S/. 1,641,465.54 S/. 11,209,889.23 11.99% 81.87% S/. -
VAL 14 Oct-23 S/. 1,423,294.55 S/. 12,633,183.78 10.39% 92.26%
VAL 15 Nov-23 S/. 1,059,719.46 S/. 13,692,903.23 7.74% 100.00%
% DE AVANCE MENSUAL
16.00%
CUADRO COMPARATIVO: PROGRAMADO VS. EJECUTADO
14.00%
12.00%
10.00%
8.00%
6.00%
4.00%
2.00%
TIEMPO DE EJECUCIÓN DE LA OBRA
0.00%
VAL 01 VAL 02 VAL 03 SUSPENSIÓN DE VAL 04 VAL 05 VAL 06 VAL 07 VAL 08 VAL 09 VAL 10 VAL 11 VAL 12 VAL 13 VAL 14 VAL 15
PLAZO DE EJE-
CUCIÓN N°01
INFRAESTRUCTURA
01. Obras Provisionales, Preliminares y Estructuras 8174947.92
02. Arquitectura 2672100.16
03. Instalaciones Sanitarias 364282.57
04. Instalaciones Electricas 939149.52
05. Señalizacion, Seguridad Y Salud 22162.7
2.0%
273858.065
programado ejecutado acumulado
% incidencia monto acumulado ejec. Junio ejec. Julio
59.702% 4,407,501.97 32.188% 3617341.4 31.17% 117823.94
19.514% 0.0 0.000% 0 0.00% 0
2.660% 3,828.88 0.028% 3828.88 0.03% 0
6.859% 37,146.95 0.271% 29773.87 0.26% 0
0.162% 0.0 0.000% 0 0.00% 0
0.00%
0.615% 58,310.27 0.426% 46730.0407 0.40% 2685.44
2.629% 0.0 0.000% 0 0.00% 0
5.542% 0.0 0.000% 0 0.00% 0
1.845% 0.0 0.000% 0 0.00% 0
0.473% 0.0 0.000% 0 0.00% 0
32.909%
4752898.28 248,130.84
4504767.44
1.02% 32.188%
0.00% 0.000%
0.00% 0.033%
0.00% 0.257%
0.00% 0.000%
0.00% 0.000%
0.02% 0.426%
0.00% 0.000%
0.00% 0.000%
0.00% 0.000%
0.00% 0.000%
1.04% 32.904%