01.00 ESTRUCTURAS

01.01 OBRAS PROVISIONALES

01.01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA m2 48.00 48.00 48.00

01.01.02 CARTEL DE OBRA DE 2.40M X 3.60 M CON GIGANTOGRAFIA und 1.00 1.00 1.00

01.02 TRABAJOS PRELIMINARES


01.02.01 DESMONTAJE DE COBERTURAS LIVIANAS m2 697.32
PABELLON AULAS IZQ. 1.00 28.50 7.50 213.75
PABELLON AULAS FRONTAL 1.00 38.50 8.00 308.00
PABELLON AULAS DERECHA 1.00 19.50 7.60 148.20
SS.HH. 1.00 5.50 1.00 5.50
SS.HH.02 1.00 8.10 2.70 21.87

01.02.02 DEMOLICION DE ESTRUCTURAS DE ADOBE C/MAQUINARIA m2 697.32


PABELLON AULAS IZQ. 1.00 28.50 7.50 213.75
PABELLON AULAS FRONTAL 1.00 38.50 8.00 308.00
PABELLON AULAS DERECHA 1.00 19.50 7.60 148.20
SS.HH. 1.00 5.50 1.00 5.50
SS.HH.02 1.00 8.10 2.70 21.87

01.02.03 DEMOLICION DE ESTRUCTURAS DE MATERIAL NOBLE - LADRILLO m2 302.21


PABELLON AULAS DERECHA 2.00 19.50 7.60 296.40
KIOSKO 1.00 2.15 2.70 5.81

01.02.04 DEMOLICION DE PISO DE CONCRETO INC. FALSO PISO m2 1,493.82


PABELLON AULAS IZQ. 1.00 28.50 7.50 213.75
PABELLON AULAS FRONTAL 1.00 38.50 8.00 308.00
PABELLON AULAS DERECHA 1.00 19.50 7.60 148.20
SS.HH. 1.00 5.50 1.00 5.50
SS.HH.02 1.00 8.10 2.70 21.87
LOSA DEPORTIVA 1.00 35.50 20.00 710.00
VEREDA AULAS IZQ. 1.00 28.50 1.00 28.50
VEREDA AULAS FRONTAL 1.00 38.50 1.00 38.50
VEREDA AULAS DERECHA 1.00 19.50 1.00 19.50

01.02.05 DEMOLICION DE CIMIENTOS Y SOBRECIMIENTOS DE CONCRETO. m3 147.20


PABELLON AULAS IZQ. 4.00 7.50 0.35 0.50 5.25
2.00 28.50 0.35 0.50 9.98
PABELLON AULAS FRONTAL 5.00 8.00 0.35 0.50 7.00
2.00 38.50 0.35 0.50 13.48
PABELLON AULAS DERECHA 4.00 7.60 0.60 1.00 18.24
2.00 19.50 0.60 1.00 23.40
SS.HH. 2.00 5.50 0.35 0.50 1.93
2.00 1.00 0.35 0.50 0.35
SS.HH.02 3.00 2.10 0.35 0.50 1.10
2.00 8.10 0.35 0.50 2.84
GRADERIAS DE CONCRETO 1.00 23.50 2.95 0.85 58.93
ESTRADO 1.00 3.50 2.70 0.50 4.73

01.02.06 TRASPORTE DE EQUIPO Y MAQUINARIA glb. 1.00

01.02.07 TRANSPORTE DE MATERIALES A LA OBRA glb. 1.00

01.02.08 LIMPIEZA DE TERRENO MANUAL M2 2,043.83

01.02.09 TRAZO Y REPLANTEO PRELIMINAR m2 2,043.86


SS.HH. COLISEO 1.00 8.30 9.85 81.76
COLISEO 1.00 39.40 25.50 1,004.70
SS.HH.-UTILERIA-SS.DOC 1.00 AREA 51.61 51.61
PABELLON C 1.00 23.70 7.90 187.23
ESCALERA 04 1.00 4.35 7.90 34.37
PABELLON B 1.00 AREA 143.95 143.95
PABELLON A 1.00 15.85 7.90 125.22
ESCALERA 02 1.00 4.65 3.90 18.14
VEREDA FRONTAL COLISEO 1.00 AREA 73.26 73.26
VEREDA -ESCALERA 05 1.00 4.30 4.90 21.07
VEREDA FRONTAL PABELLON B-C 1.00 4.00 38.45 153.80
1.00 9.20 1.00 9.20
VEREDA PABELLON A 1.00 16.80 6.95 116.76
VEREDA PERIMETRAL PABELLON A 1.00 3.90 0.50 1.95
1.00 3.25 0.50 1.63
1.00 15.85 0.50 7.93
CERCO PERIMETRICO POSTERIOR PAB A 1.00 19.65 0.25 4.91
CERCO FRONTAL COLISEO 1.00 11.00 0.25 2.75
1.00 14.60 0.25 3.65

01.03 MOVIMIENTO DE TIERRAS


01.03.01 CORTE MASIVO DE TERRENO A MAQUINA m3 LARGO ANCHO ALTURA PARCIAL 599.95
PLATAFORMAS
MODULO A(VEREDA FRONTAL) 19.00 5.00 1.40 133.00
MODULO A 19.00 10.30 0.65 127.21
SS.HH. ALUMNOS-DOC AREA 71.27 0.90 64.14
MODULO C 23.67 10.20 0.20 48.29
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
VEREDA FRONTAL MODULO C 23.67 1.70 1.62 65.19
MODULO A 14.75 10.20 0.50 75.23
VEREDA FRONTAL MODULO C 14.75 1.70 1.62 40.62
MODULO A COMEDOR-COCINA AREA 92.56 0.50 46.28

01.03.02 EXCAVACION DE ZANJAS PARA ZAPATAS Y CIMIENTOS H=1.5m (RT<2kg/cm2 ) m3 1,779.60


SS.HH. COLISEO veces largo ancho altura parcial
EJE 2-2 CORTE 2-2 1.00 3.80 0.60 1.50 3.42
EJE 3 CORTE 3-3 1.00 3.30 0.60 1.50 2.97
EJE 4 CORTE 4-4 1.00 1.72 0.50 1.50 1.29
1.00 0.75 0.50 1.50 0.56
EJE 5-5 CORTE 2-2 1.00 2.60 0.60 1.50 2.34
EJE A-A CORTE 1-1 1.00 9.85 0.70 1.50 10.34
EJE A-B CORTE 4-4 1.00 2.80 0.50 1.50 2.10
EJE B-B CORTE 1-1 1.00 11.00 0.70 1.50 11.55
ENSANCHE DIVISIONES INTERIORES 7.00 1.20 0.45 0.15 0.57

MODULO COLISEO
ZAPATAS
EJE B
ZC-05 1.00 4.00 1.60 1.90 12.16

ZC-01 6.00 2.95 1.10 1.90 36.99


ZC-02 1.00 1.30 2.95 1.90 7.29

Z-06 1.00 1.10 1.40 1.90 2.93


Z-04 1.00 1.60 1.80 3.22 9.27

EJE 12
Z-03 5.00 1.10 1.20 1.90 12.54
Z-04 5.00 1.60 1.80 3.22 46.37

EJE H
Z-06 1.00 1.10 1.40 1.90 2.93
Z-05 1.00 1.60 2.00 3.22 10.30

Z-03 6.00 1.10 1.20 1.90 15.05


Z-05 6.00 1.60 2.00 3.22 61.82

Z-06 1.00 1.10 1.40 1.90 2.93


Z-07 1.00 1.60 2.20 3.22 11.33

ZC-06 1.00 4.00 1.60 3.22 20.61

EJE 2
ZC-04 3.00 1.60 1.80 1.90 16.42
3.00 3.62 1.00 1.90 20.63
Z-04 2.00 1.60 1.80 1.90 10.94
ZC-03 1.00 2.95 1.00 1.90 5.61

VIGAS DE CIMENTACION
EJE B
VC-01 1.00 2.00 0.25 1.00 0.50
4.00 3.50 0.25 1.00 3.50
2.00 3.54 0.25 1.00 1.77
1.00 2.82 0.25 1.00 0.71
EJE 2
VC-02 1.00 4.10 0.25 1.00 1.03
1.00 1.00 0.25 1.00 0.25
2.00 2.60 0.25 1.00 1.30
1.00 2.10 0.25 1.00 0.53
1.00 2.40 0.25 1.00 0.60
MUROS ARMADOS
EJE 12
MA-01 1.00 1.65 1.20 3.22 6.38
1.00 2.10 1.20 3.22 8.11
1.00 2.70 1.20 3.22 10.43
1.00 2.78 1.20 3.22 10.74
1.00 1.95 1.20 3.22 7.53
1.00 2.50 1.20 3.22 9.66

EJE H
MA-01 1.00 1.56 1.20 3.22 6.03
4.00 2.60 1.20 3.22 40.19
2.00 2.64 1.20 3.22 20.40
1.00 2.74 1.20 3.22 10.59

CIMIENTOS CORRIDOS
ENTRE EJE C-D CORTE 4-4 2.00 2.73 0.50 1.50 4.10
2.00 0.35 0.50 1.50 0.53
EJE E CORTE 3-3 1.00 2.73 0.60 1.50 2.46
EJE 3-3 CORTE 5-5 1.00 8.35 0.60 1.50 7.52
ENSANCHE DIVISIONES INTERIORES 8.00 1.20 0.45 0.15 0.65

MODULO A
EJE 14 CORTE 3-3 1.00 15.84 1.80 2.20 62.73
EJE 13 CORTE 4-4 1.00 15.84 2.10 2.20 73.18
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
EJE R-K CORTE 1-1 2.00 5.50 1.50 2.20 36.30
VC-1 EJE L,,M,N 3.00 5.50 0.25 0.60 2.48
CORTE XX-YY 1.00 5.50 0.50 0.65 1.79

MODULO B
ZAPATAS
EJE J CORTE 3-3 1.00 8.90 1.80 4.50 72.09
1.00 11.60 1.80 4.50 93.96
EJE I CORTE 4-4 1.00 20.28 2.10 2.40 102.21

CC-3 1.00 4.85 0.95 2.20 10.14


CC-2 1.00 4.85 0.90 2.20 9.60
CC-1 1.00 3.10 0.90 2.20 6.14

VC-1 EJE 26 1.00 4.85 0.25 0.60 0.73


VC-1 EJE 28 1.00 4.35 0.25 0.60 0.65
VC-1 EJE 29 1.00 3.67 0.25 0.60 0.55
ENTRE EJE I-J CORTE 5-5 1.00 3.03 0.60 1.50 2.73

MODULO C
EJE J CORTE 3-3 1.00 24.06 1.80 4.20 181.89
EJE I CORTE 4-4 1.00 24.06 2.10 2.20 111.16

CC-3 1.00 4.85 0.95 2.00 9.22


CC-2 2.00 4.85 0.90 2.00 17.46
CC-1 1.00 4.85 0.90 2.00 8.73

VC-1 EJE 17-19-21 3.00 4.85 0.25 0.60 2.18

SS.HH. ALUMNOS - DOC


CIMIENTOS CORRIDOS
EJE H CORTE 4-4 1.00 5.90 0.60 1.50 5.31
EJE 2 CORTE 3-3 1.00 1.68 0.60 3.02 3.04
EJE 3 CORTE 4-4 1.00 4.10 0.60 1.50 3.69
EJE J CORTE 5-5 1.00 5.50 0.50 1.50 4.13
1.00 1.70 0.50 1.50 1.28
1.00 1.35 0.50 1.50 1.01
1.00 2.63 0.50 1.50 1.97
1.00 0.87 0.50 1.50 0.65
EJE 15 CORTE 4-4 1.00 5.73 0.60 1.50 5.16
EJE 1 MA-04 1.00 6.50 1.50 4.20 40.95
EJE 1 MA-05 1.00 10.50 1.35 3.70 52.45
ENSANCHE DIVISIONES INTERIORES 7.00 1.35 0.45 0.15 0.64

ESCALERA 01
ARRANQUE 1.00 2.30 0.30 0.75 0.52
LLEGADA 1.00 2.30 0.30 0.70 0.48

ESCALERA 03
ARRANQUE 1.00 3.50 0.30 0.75 0.79

ESCALERA 05
ARRANQUE 1.00 2.87 0.30 0.75 0.65

ESCALERA 06
ARRANQUE 2.00 0.90 0.50 1.00 0.90

ESCALERA 02
EJE 13 CORTE 4 1.00 3.90 2.10 2.20 18.02
EJE 13* CPRTE 3 1.00 3.90 1.80 2.20 15.44

EJE P-O CC-1 2.00 2.25 0.90 2.20 8.91

ESCALERA 04
EJE J CORTE 3-3 1.00 4.35 1.80 4.50 35.24
EJE I CORTE 4-4 1.00 4.35 2.10 2.40 21.92

SA-1 1.00 3.35 0.25 0.65 0.54


1.00 3.20 0.25 0.65 0.52

PORTICO DE INGRESO
Z-1 1.00 0.90 1.70 1.10 1.68
Z-2 1.00 2.00 1.70 1.10 3.74
VC 1.00 2.15 0.25 0.60 0.32

VEREDAS
VEREDA ENTRE INGRESO PORTON Y COLISEO 1.00 AREA 63.85 0.10 6.39
VEREDA FRONTAL INGRESO A SS.HH. COLISEO 1.00 27.06 0.10 2.71
VEREDA INGRESO ESCALERA 03 -COLISEO 1.00 2.65 3.50 0.10 0.93
VEREDA INGRESO ESCALERA 05 -COLISEO 1.00 6.40 4.00 0.10 2.56
VEREDA PERIMETRAL LOSA 2.00 30.30 1.10 0.10 6.67
2.00 18.00 1.15 0.10 4.14
VEREDA FRONTAL SS.HH. DOC 1.00 3.98 2.85 0.10 1.13
VEREDA FRONTAL PABELLON A-B-C 1.00 38.50 1.95 0.10 7.51
1.00 18.85 1.95 0.10 3.68
1.00 33.00 1.70 0.10 5.61
1.00 18.50 4.65 0.10 8.60
VEREDA FRONTAL COMEDOR - COCINA 1.00 9.30 1.00 0.10 0.93
VEREDA POSTERIOR ESCALERA 02-PAB A 1.00 3.95 0.50 0.10 0.20
1.00 2.75 0.50 0.10 0.14
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
1.00 16.35 0.50 0.10 0.82

SARDINEL PARA VEREDAS


VEREDA ENTRE INGRESO PORTON Y COLISEO perimetro 50.74 0.20 0.20 2.03
VEREDA FRONTAL INGRESO A SS.HH. COLISEO 20.90 0.20 0.20 0.84
VEREDA PERIMETRAL LOSA 125.50 0.20 0.20 5.02
SS.HH. ALUMNOS - DOC 13.59 0.20 0.20 0.54
FRONTAL PABELLON A-ESCALERA 02 2.00 38.00 0.20 0.20 3.04
FRONTAL PABELLON B-C-ESCALERA 04

LOSA DEPOR
1.00 30.00 18.00 0.10 54.00

SARDINEL LOSA 2.00 30.00 0.20 0.20 2.40


2.00 18.00 0.20 0.20 1.44

CERCO PERIMETRICO
POSTERIOR PABELLON A 1.00 19.65 0.70 1.35 18.57
FRONTAL I.E. 1.00 6.25 0.70 1.35 5.91
1.00 14.60 0.70 1.35 13.80

CUNETAS
INGRESO I.E. 1.00 4.10 0.55 0.55 1.24
1.00 23.20 0.55 0.55 7.02
FRONTAL PABELLON B-C 1.00 2.85 0.55 0.55 0.86
1.00 38.00 0.55 0.55 11.50
FRONTAL PABELLON A 1.00 18.50 0.55 0.55 5.60

ASTA DE BANDERA 1.00 3.00 2.00 0.40 2.40

EXCAVACION PARA CAMA DE AFIRMADO-FALSO PISO

MODULO A 1.00 15.35 7.55 0.10 11.59


MODULO B 1.00 7.55 7.55 0.10 5.70
COMEDOR AREA 50.61 0.10 5.06
COCINA AREA 21.68 0.10 2.17
MODULO C 3.00 7.55 7.55 0.10 17.10
SS.HH. ALUMNOS-DOC. AREA 52.61 0.10 5.26
VESTIDORES-COLISEO 2.00 AREA 17.05 0.10 3.41
SS.HH. COLISEO AREA 41.66 0.10 4.17
ESCALERA 02 1.00 4.35 3.35 0.10 1.46
ESCALERA 04 1.00 7.55 3.85 0.10 2.91

01.03.03 RELLENO COMPACTADO C/EQUIPO MAT./PROPIO m3 625.91


SS.HH. COLISEO veces largo ancho altura parcial
EJE 2-2 CORTE 2-2 1.00 3.80 0.45 0.35 0.60
EJE 3 CORTE 3-3 1.00 3.30 0.45 0.35 0.52
EJE 4 CORTE 4-4 1.00 1.72 0.35 0.35 0.21
1.00 0.75 0.35 0.35 0.09
EJE 5-5 CORTE 2-2 1.00 2.60 0.45 0.35 0.41
EJE A-A CORTE 1-1 1.00 9.85 0.55 0.35 1.90
EJE A-B CORTE 4-4 1.00 2.80 0.35 0.35 0.34
EJE B-B CORTE 1-1 1.00 11.00 0.55 0.35 2.12

MODULO COLISEO
ZAPATAS
EJE B
ZC-05 1.00 4.00 1.60 0.50 3.20

ZC-01 6.00 2.95 1.10 0.50 9.74


ZC-02 1.00 1.30 2.95 0.50 1.92

Z-06 1.00 1.10 1.40 0.50 0.77


Z-04 1.00 1.60 1.80 0.80 2.30

EJE 12
Z-03 5.00 1.10 1.20 0.50 3.30
Z-04 5.00 1.60 1.80 0.80 11.52

EJE H
Z-06 1.00 1.10 1.40 0.50 0.77
Z-05 1.00 1.60 2.00 0.80 2.56

Z-03 6.00 1.10 1.20 0.50 3.96


Z-05 6.00 1.60 2.00 0.80 15.36

Z-06 1.00 1.10 1.40 0.50 0.77


Z-07 1.00 1.60 2.20 0.80 2.82

ZC-06 1.00 4.00 1.60 0.80 5.12

EJE 2
ZC-04 3.00 1.60 1.80 0.50 4.32
3.00 3.62 1.00 0.50 5.43
Z-04 2.00 1.60 1.80 0.50 2.88
ZC-03 1.00 2.95 1.00 0.50 1.48
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

MUROS ARMADOS
EJE 12
MA-01 1.00 13.68 0.95 2.42 31.45
EJE H
MA-01 1.00 19.98 0.95 2.42 45.93

CIMIENTOS CORRIDOS
ENTRE EJE C-D CORTE 4-4 2.00 2.73 0.35 0.35 0.67
2.00 0.35 0.35 0.35 0.09
EJE E CORTE 3-3 1.00 2.73 0.45 0.35 0.43
EJE 3-3 CORTE 5-5 1.00 8.35 0.45 0.35 1.32

DESCONTAMOS
VIGAS DE CIMENTACION
EJE B
VC-01 -1.00 13.22 0.25 1.00 -3.31
EJE 2
VC-02 -1.00 12.40 0.25 1.00 -3.10

COLUMNAS
C-1 -9.00 0.25 0.50 0.50 -0.56
-9.00 0.25 0.50 0.80 -0.90
C-2 -4.00 0.45 0.25 0.80 -0.36
-4.00 0.20 0.25 0.80 -0.16
C-3 -5.00 0.40 0.25 0.50 -0.25
-4.00 0.40 0.25 0.80 -0.32
C-4 -31.00 0.40 0.25 0.50 -1.55

MODULO A
EJE 14 CORTE 3-3 1.00 15.84 1.35 0.90 19.25
EJE 13 CORTE 4-4 1.00 15.84 1.65 0.90 23.52
EJE R-K CORTE 1-1 2.00 5.50 1.26 0.90 12.47

MODULO B
EJE J CORTE 3-3 1.00 8.90 1.35 3.20 38.45
1.00 11.60 1.35 3.20 50.11
EJE I CORTE 4-4 1.00 20.28 1.65 0.90 30.12

CC-3 1.00 4.85 0.45 0.60 1.31


CC-2 1.00 4.85 0.66 0.60 1.92
CC-1 1.00 3.10 0.66 0.60 1.23

MODULO C
EJE J CORTE 3-3 1.00 24.06 1.80 2.90 125.59
EJE I CORTE 4-4 1.00 24.06 2.10 0.90 45.47

CC-3 1.00 4.85 0.45 0.60 1.31


CC-2 2.00 4.85 0.66 0.60 3.84
CC-1 1.00 4.85 0.66 0.60 1.92

SS.HH. ALUMNOS - DOC


CIMIENTOS CORRIDOS
EJE H CORTE 4-4 1.00 5.90 0.47 0.35 0.97
EJE 2 CORTE 3-3 1.00 1.68 0.47 1.92 1.52
EJE 3 CORTE 4-4 1.00 4.10 0.47 0.35 0.67
EJE J CORTE 5-5 1.00 5.50 0.37 0.35 0.71
1.00 1.70 0.37 0.35 0.22
1.00 1.35 0.37 0.35 0.17
1.00 2.63 0.37 0.35 0.34
1.00 0.87 0.37 0.35 0.11
EJE 15 CORTE 4-4 1.00 5.73 0.47 0.35 0.94
EJE 1 MA-04 1.00 6.50 1.25 3.20 26.00
EJE 1 MA-05 1.00 10.50 1.10 2.70 31.19

ESCALERA 02
EJE 13 CORTE 4 1.00 3.90 1.65 0.90 5.79
EJE 13* CPRTE 3 1.00 3.90 1.35 0.90 4.74

EJE P-O CC-1 2.00 2.25 0.66 0.60 1.78

ESCALERA 04
EJE J CORTE 3-3 1.00 4.35 1.35 3.20 18.79
EJE I CORTE 4-4 1.00 4.35 1.65 0.90 6.46

PORTICO DE INGRESO
Z-1 1 1.00 0.90 1.70 0.60 0.92
Z-2 1 1.00 2.00 1.70 0.60 2.04

CERCO PERIMETRICO
POSTERIOR PABELLON A 1.00 19.65 0.55 0.55 5.94
FRONTAL I.E. 1.00 6.25 0.55 0.55 1.89
1.00 14.60 0.55 0.55 4.42

01.03.04 NIVELACION Y COMPACTACION MANUAL DE TERRENO m2 1,654.17


HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
VEREDAS
VEREDA ENTRE INGRESO PORTON Y COLISEO 1.00 AREA 63.85 63.85
VEREDA FRONTAL INGRESO A SS.HH. COLISEO 1.00 27.06 27.06
VEREDA INGRESO ESCALERA 03 -COLISEO 1.00 2.65 3.50 9.28
VEREDA INGRESO ESCALERA 05 -COLISEO 1.00 6.40 4.00 25.60
VEREDA PERIMETRAL LOSA 2.00 30.30 1.10 66.66
2.00 18.00 1.15 41.40
VEREDA FRONTAL SS.HH. DOC 1.00 3.98 2.85 11.34
VEREDA FRONTAL PABELLON A-B-C 1.00 38.50 1.95 75.08
1.00 18.85 1.95 36.76
1.00 33.00 1.70 56.10
1.00 18.50 4.65 86.03
VEREDA FRONTAL COMEDOR - COCINA 1.00 9.30 1.00 9.30
VEREDA POSTERIOR ESCALERA 02-PAB A 1.00 3.95 0.50 1.98
1.00 2.75 0.50 1.38
1.00 16.35 0.50 8.18

LOSA DEPOR
1.00 30.00 18.00 540.00

ASTA DE BANDERA 1.00 3.00 2.00 6.00

CAMA DE AFIRMADO-FALSO PISO

MODULO A 1.00 15.35 7.55 115.89


MODULO B 1.00 7.55 7.55 57.00
COMEDOR AREA 50.61 50.61
COCINA AREA 21.68 21.68
MODULO C 3.00 7.55 7.55 171.01
SS.HH. ALUMNOS-DOC. AREA 52.61 52.61
VESTIDORES-COLISEO 2.00 AREA 17.05 34.10
SS.HH. COLISEO AREA 41.66 41.66
ESCALERA 02 1.00 4.35 3.35 14.57
ESCALERA 04 1.00 7.55 3.85 29.07

01.03.05 RELLENO COMPACTADO C/EQUIPO MAT/PRESTAMO DE AFRIMADO m3 165.42


VEREDAS
VEREDA ENTRE INGRESO PORTON Y COLISEO 1.00 AREA 63.85 0.10 6.39
VEREDA FRONTAL INGRESO A SS.HH. COLISEO 1.00 27.06 0.10 2.71
VEREDA INGRESO ESCALERA 03 -COLISEO 1.00 2.65 3.50 0.10 0.93
VEREDA INGRESO ESCALERA 05 -COLISEO 1.00 6.40 4.00 0.10 2.56
VEREDA PERIMETRAL LOSA 2.00 30.30 1.10 0.10 6.67
2.00 18.00 1.15 0.10 4.14
VEREDA FRONTAL SS.HH. DOC 1.00 3.98 2.85 0.10 1.13
VEREDA FRONTAL PABELLON A-B-C 1.00 38.50 1.95 0.10 7.51
1.00 18.85 1.95 0.10 3.68
1.00 33.00 1.70 0.10 5.61
1.00 18.50 4.65 0.10 8.60
VEREDA FRONTAL COMEDOR - COCINA 1.00 9.30 1.00 0.10 0.93
VEREDA POSTERIOR ESCALERA 02-PAB A 1.00 3.95 0.50 0.10 0.20
1.00 2.75 0.50 0.10 0.14
1.00 16.35 0.50 0.10 0.82

LOSA DEPOR
1.00 30.00 18.00 0.10 54.00

ASTA DE BANDERA 1.00 3.00 2.00 0.10 0.60

EXCAVACION PARA CAMA DE AFIRMADO-FALSO PISO

MODULO A 1.00 15.35 7.55 0.10 11.59


MODULO B 1.00 7.55 7.55 0.10 5.70
COMEDOR AREA 50.61 0.10 5.06
COCINA AREA 21.68 0.10 2.17
MODULO C 3.00 7.55 7.55 0.10 17.10
SS.HH. ALUMNOS-DOC. AREA 52.61 0.10 5.26
VESTIDORES-COLISEO 2.00 AREA 17.05 0.10 3.41
SS.HH. COLISEO AREA 41.66 0.10 4.17
ESCALERA 02 1.00 4.35 3.35 0.10 1.46
ESCALERA 04 1.00 7.55 3.85 0.10 2.91

01.03.06 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES m3 1,442.12


VC FACTOR
CORTE MANUAL 1,779.60 1.25 2,224.50
RELLENO MAT. PROPIO 625.91 -1.25 -782.38

01.03.07 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA m3 3,097.66

DEMOLICIONES 670.82 1.35 905.61


CORTE MASIVO 599.95 1.25 749.94
CORTE MANUAL 1,779.60 1.25 2,224.50
RELLENO MAT. PROPIO 625.91 -1.25 -782.38
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
01.04 OBRAS DE CONCRETO SIMPLE
01.04.01 SOLADO PARA ZAPATAS E=4", MEZCLA 1:12 C:H m2 54.53
PORTICO DE INGRESO
Z-1 1.00 0.90 1.70 1.53
Z-2 1.00 2.00 1.70 3.40
MODULO COLISEO
ZAPATAS
EJE B
Z-04 1.00 1.60 1.80 2.88

EJE 12
Z-04 5.00 1.60 1.80 14.40

EJE H
Z-05 1.00 1.60 2.00 3.20

Z-05 6.00 1.60 2.00 19.20

Z-07 1.00 1.60 2.20 3.52

ZC-06 1.00 4.00 1.60 6.40

01.04.02 SUBCIMIENTOS MEZCLA 1:12 + 30% P.G. m3 352.95


veces largo ancho altura parcial
SS.HH. COLISEO
EJE 2-2 CORTE 2-2 1.00 3.80 0.60 0.35 0.80
EJE 3 CORTE 3-3 1.00 3.30 0.60 0.35 0.69
EJE 4 CORTE 4-4 1.00 1.72 0.50 0.35 0.30
1.00 0.75 0.50 0.35 0.13
EJE 5-5 CORTE 2-2 1.00 2.60 0.60 0.35 0.55
EJE A-A CORTE 1-1 1.00 9.85 0.70 0.35 2.41
EJE A-B CORTE 4-4 1.00 2.80 0.50 0.35 0.49
EJE B-B CORTE 1-1 1.00 11.00 0.70 0.35 2.70

MODULO COLISEO
ZAPATAS
EJE B
ZC-05 1.00 4.00 1.60 0.60 3.84

ZC-01 6.00 2.95 1.10 0.60 11.68


ZC-02 1.00 1.30 2.95 0.60 2.30

Z-06 1.00 1.10 1.40 0.60 0.92

EJE 12
Z-03 5.00 1.10 1.20 0.60 3.96

EJE H
Z-06 1.00 1.10 1.40 0.60 0.92

Z-03 6.00 1.10 1.20 0.60 4.75

Z-06 1.00 1.10 1.40 0.60 0.92

EJE 2
ZC-04 3.00 1.60 1.80 0.60 5.18
3.00 3.62 1.00 0.60 6.52
Z-04 2.00 1.60 1.80 0.60 3.46
ZC-03 1.00 2.95 1.00 0.60 1.77

CIMIENTOS CORRIDOS
ENTRE EJE C-D CORTE 4-4 2.00 2.73 0.50 0.35 0.96
2.00 0.35 0.50 0.35 0.12
EJE E CORTE 3-3 1.00 2.73 0.60 0.35 0.57
EJE 3-3 CORTE 5-5 1.00 8.35 0.60 0.35 1.75

MUROS ARMADOS
EJE 12
MA-01 1.00 13.68 1.20 0.20 3.28
EJE H
MA-01 1.00 19.98 1.20 0.20 4.80

MODULO A
EJE 14 CORTE 3-3 1.00 15.84 1.80 0.80 22.81
EJE 13 CORTE 4-4 1.00 15.84 2.10 0.80 26.61
EJE R-K CORTE 1-1 2.00 5.50 1.50 0.80 13.20

MODULO B
ZAPATAS
EJE J CORTE 3-3 1.00 8.90 1.80 0.80 12.82
1.00 11.60 1.80 0.80 16.70
EJE I CORTE 4-4 1.00 20.28 2.10 1.00 42.59

CC-3 1.00 6.37 0.95 0.80 4.84


CC-2 1.00 6.37 0.90 0.80 4.59
CC-1 1.00 4.50 0.90 0.80 3.24
ENTRE EJE I-J CORTE 5-5 1.00 3.03 0.60 0.40 0.73
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
MODULO C
EJE J CORTE 3-3 1.00 24.06 1.80 0.80 34.65
EJE I CORTE 4-4 1.00 24.06 2.10 0.80 40.42

CC-3 1.00 6.37 0.95 0.60 3.63


CC-2 2.00 6.37 0.90 0.60 6.88
CC-1 1.00 6.37 0.90 0.60 3.44

SS.HH. ALUMNOS - DOC


CIMIENTOS CORRIDOS
EJE H CORTE 4-4 1.00 7.45 0.60 0.35 1.56
EJE 2 CORTE 3-3 1.00 3.55 0.60 0.50 1.07
EJE 3 CORTE 4-4 1.00 4.10 0.60 0.35 0.86
EJE J CORTE 5-5 1.00 5.50 0.50 0.35 0.96
1.00 1.70 0.50 0.35 0.30
1.00 1.35 0.50 0.35 0.24
1.00 2.63 0.50 0.35 0.46
1.00 2.20 0.50 0.35 0.39
EJE 15 CORTE 4-4 1.00 6.76 0.60 0.35 1.42
MUROS ARMADOS
EJE 1 MA-04 1.00 6.50 1.50 0.50 4.88
EJE 1 MA-05 1.00 10.50 1.35 0.50 7.09

ESCALERA 02
EJE 13 CORTE 4 1.00 3.90 2.10 0.80 6.55
EJE 13* CPRTE 3 1.00 3.90 1.80 0.80 5.62

EJE P-O CC-1 2.00 2.25 0.90 0.80 3.24

ESCALERA 04
EJE J CORTE 3-3 1.00 4.35 1.80 0.80 6.26
EJE I CORTE 4-4 1.00 4.35 2.10 1.00 9.14

01.04.03 CIMIENTOS CORRIDOS 1:10 + 30% P.G. m3 96.24


SS.HH. COLISEO veces largo ancho altura parcial
EJE 2-2 CORTE 2-2 1.00 3.80 0.60 0.70 1.60
EJE 3 CORTE 3-3 1.00 3.30 0.60 0.70 1.39
EJE 4 CORTE 4-4 1.00 1.72 0.50 0.70 0.60
1.00 0.75 0.50 0.70 0.26
EJE 5-5 CORTE 2-2 1.00 2.60 0.60 0.70 1.09
EJE A-A CORTE 1-1 1.00 9.85 0.70 0.70 4.83
EJE A-B CORTE 4-4 1.00 2.80 0.50 0.70 0.98
EJE B-B CORTE 1-1 1.00 11.00 0.70 0.70 5.39

MODULO COLISEO
CIMIENTOS CORRIDOS
ENTRE EJE C-D CORTE 4-4 2.00 2.73 0.50 0.70 1.91
2.00 0.35 0.50 0.70 0.25
EJE E CORTE 3-3 1.00 2.73 0.60 0.70 1.15
EJE 3-3 CORTE 5-5 1.00 8.35 0.60 0.70 3.51

MODULO A
CORTE X-Y 1.00 7.00 0.50 0.65 2.28

MODULO B
CC-3 1.00 6.37 0.95 0.80 4.84
CC-2 1.00 6.37 0.90 0.80 4.59
CC-1 1.00 4.50 0.90 0.80 3.24
ENTRE EJE I-J CORTE 5-5 1.00 3.03 0.60 0.80 1.45

MODULO C
CC-3 1.00 6.37 0.95 0.80 4.84
CC-2 2.00 6.37 0.90 0.80 9.17
CC-1 1.00 6.37 0.90 0.80 4.59

SS.HH. ALUMNOS - DOC


CIMIENTOS CORRIDOS
EJE H CORTE 4-4 1.00 7.45 0.60 0.70 3.13
EJE 3 CORTE 4-4 1.00 4.10 0.60 0.70 1.72
EJE J CORTE 5-5 1.00 5.50 0.50 0.70 1.93
1.00 1.70 0.50 0.70 0.60
1.00 1.35 0.50 0.70 0.47
1.00 2.63 0.50 0.70 0.92
1.00 2.20 0.50 0.70 0.77
EJE 15 CORTE 4-4 1.00 6.76 0.60 0.70 2.84

ESCALERA 02
EJE P-O CC-1 2.00 2.25 0.90 0.80 3.24

CERCO PERIMETRICO
POSTERIOR PABELLON A 1.00 19.65 0.70 0.80 11.00
FRONTAL I.E. 1.00 6.25 0.70 0.80 3.50
1.00 14.60 0.70 0.80 8.18

01.04.04 SOBRECIMIENTO DE CONCRETO 175 KG/CM m3 VECES LARGO ANCHO ALTURA 12.83
SS.HH. COLISEO
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
EJE 2-2 CORTE 2-2 1.00 4.80 0.13 0.40 0.25
EJE 3 CORTE 3-3 1.00 3.14 0.13 0.35 0.14
EJE 4 CORTE 4-4 1.00 4.60 0.13 0.35 0.21
EJE 5-5 CORTE 2-2 1.00 3.44 0.13 0.40 0.18
EJE A-A CORTE 1-1 1.00 8.55 0.13 0.35 0.39
EJE B-B CORTE 1-1 1.00 4.28 0.13 0.35 0.19
1.00 3.95 0.13 0.35 0.18
MODULO COLISEO
ENTRE EJE C-D CORTE 4-4 2.00 2.80 0.13 0.35 0.25
2.00 3.65 0.13 0.35 0.33
EJE E CORTE 3-3 1.00 3.85 0.13 0.35 0.18
EJE 3-3 CORTE 5-5 2.00 4.43 0.13 0.35 0.40

MODULO A
EJE 14 4.00 2.98 0.13 0.20 0.31
EJE 13 2.00 2.98 0.13 0.20 0.15
2.00 1.40 0.13 0.20 0.07
EJE R-K 2.00 7.40 0.24 0.20 0.71

MODULO B
EJE I 1.00 1.53 0.13 0.20 0.04
1.00 2.93 0.13 0.20 0.08
1.00 1.87 0.13 0.20 0.05
1.00 2.93 0.13 0.20 0.08
1.00 2.62 0.13 0.20 0.07

EJE J 1.00 2.61 0.13 0.20 0.07


1.00 2.91 0.13 0.20 0.08
2.00 2.97 0.13 0.20 0.15
1.00 2.67 0.13 0.20 0.07
EJE 25-27 2.00 7.40 0.24 0.20 0.71
EJE 29 1.00 2.29 0.13 0.30 0.09
1.00 2.07 0.13 0.30 0.08
EJE 30 1.00 5.38 0.24 0.20 0.26
CC-5 1.00 2.88 0.13 0.40 0.15

MODULO C
EJE J 4.00 2.98 0.13 0.20 0.31
2.00 2.68 0.13 0.20 0.14
EJE I 3.00 2.98 0.13 0.20 0.23
3.00 1.78 0.13 0.20 0.14
EJE 16-18-20-22 4.00 7.40 0.24 0.30 2.13

SS.HH. ALUMNOS - DOC


EJE H CORTE 4-4 1.00 3.08 0.13 0.35 0.14
1.00 3.32 0.13 0.35 0.15

EJE 3 CORTE 4-4 1.00 3.32 0.13 0.35 0.15


ENTRE EJE I-J CORTE 5-5 1.00 1.58 0.13 0.35 0.07
1.00 2.30 0.13 0.35 0.10
1.00 2.03 0.13 0.35 0.09
1.00 1.10 0.13 0.35 0.05
1.00 0.50 0.13 0.35 0.02
1.00 2.28 0.13 0.35 0.10
1.00 1.50 0.13 0.35 0.07
EJE 15 CORTE 4-4 1.00 2.23 0.13 0.35 0.10
1.00 3.70 0.13 0.35 0.17
EJE 1 MA-04 1.00 5.70 0.13 0.35 0.26
EJE 1 MA-05 1.00 8.75 0.13 0.35 0.40
1.00 1.82 0.13 0.35 0.08

ESCALERA 02
EJE P-O CC-1 2.00 3.60 0.24 0.30 0.52
EJE 13 1.00 1.95 0.13 0.20 0.05
EJE 13* 1.00 0.60 0.13 0.45 0.04
ENTRE P-O 1.00 2.50 0.13 0.45 0.15

ESCALERA 04
EJE 24 1.00 6.80 0.24 0.30 0.49
EJE 23 1.00 6.80 0.24 0.30 0.49
EJE J 1.00 2.40 0.13 0.20 0.06
SCA-1 1.00 0.80 0.13 0.45 0.05
SCA-1 1.00 2.50 0.13 0.45 0.15

01.04.05 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 159.88


VECES LARGO CARAS ALTO PARCIAL
SS.HH. COLISEO
EJE 2-2 CORTE 2-2 1.00 4.80 2.00 0.40 3.84
EJE 3 CORTE 3-3 1.00 3.14 2.00 0.35 2.20
EJE 4 CORTE 4-4 1.00 4.60 2.00 0.35 3.22
EJE 5-5 CORTE 2-2 1.00 3.44 2.00 0.40 2.75
EJE A-A CORTE 1-1 1.00 8.55 2.00 0.35 5.99
EJE B-B CORTE 1-1 1.00 4.28 2.00 0.35 3.00
1.00 3.95 2.00 0.35 2.77
MODULO COLISEO
ENTRE EJE C-D CORTE 4-4 2.00 2.80 2.00 0.35 3.92
2.00 3.65 2.00 0.35 5.11
EJE E CORTE 3-3 1.00 3.85 2.00 0.35 2.70
EJE 3-3 CORTE 5-5 2.00 4.43 2.00 0.35 6.20
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

MODULO A
EJE 14 4.00 2.98 2.00 0.20 4.77
EJE 13 2.00 2.98 2.00 0.20 2.38
2.00 1.40 2.00 0.20 1.12
EJE R-K 2.00 7.40 2.00 0.20 5.92

MODULO B
EJE I 1.00 1.53 2.00 0.20 0.61
1.00 2.93 2.00 0.20 1.17
1.00 1.87 2.00 0.20 0.75
1.00 2.93 2.00 0.20 1.17
1.00 2.62 2.00 0.20 1.05

EJE J 1.00 2.61 2.00 0.20 1.04


1.00 2.91 2.00 0.20 1.16
2.00 2.97 2.00 0.20 2.38
1.00 2.67 2.00 0.20 1.07
EJE 25-27 2.00 7.40 2.00 0.20 5.92
EJE 29 1.00 2.29 2.00 0.30 1.37
1.00 2.07 2.00 0.30 1.24
EJE 30 1.00 5.38 2.00 0.20 2.15
CC-5 1.00 2.88 2.00 0.40 2.30

MODULO C
EJE J 4.00 2.98 2.00 0.20 4.77
2.00 2.68 2.00 0.20 2.14
EJE I 3.00 2.98 2.00 0.20 3.58
3.00 1.78 2.00 0.20 2.14
EJE 16-18-20-22 4.00 7.40 2.00 0.30 17.76

SS.HH. ALUMNOS - DOC


EJE H CORTE 4-4 1.00 3.08 2.00 0.35 2.16
1.00 3.32 2.00 0.35 2.32

EJE 3 CORTE 4-4 1.00 3.32 2.00 0.35 2.32


ENTRE EJE I-J CORTE 5-5 1.00 1.58 2.00 0.35 1.11
1.00 2.30 2.00 0.35 1.61
1.00 2.03 2.00 0.35 1.42
1.00 1.10 2.00 0.35 0.77
1.00 0.50 2.00 0.35 0.35
1.00 2.28 2.00 0.35 1.60
1.00 1.50 2.00 0.35 1.05
EJE 15 CORTE 4-4 1.00 2.23 2.00 0.35 1.56
1.00 3.70 2.00 0.35 2.59
EJE 1 MA-04 1.00 5.70 2.00 0.35 3.99
EJE 1 MA-05 1.00 8.75 2.00 0.35 6.13
1.00 1.82 2.00 0.35 1.27

ESCALERA 02
EJE P-O CC-1 2.00 3.60 2.00 0.30 4.32
EJE 13 1.00 1.95 2.00 0.20 0.78
EJE 13* 1.00 0.60 2.00 0.45 0.54
ENTRE P-O 1.00 2.50 2.00 0.45 2.25

ESCALERA 04
EJE 24 1.00 6.80 2.00 0.30 4.08
EJE 23 1.00 6.80 2.00 0.30 4.08
EJE J 1.00 2.40 2.00 0.20 0.96
SCA-1 1.00 0.80 2.00 0.45 0.72
SCA-1 1.00 2.50 2.00 0.45 2.25

01.04.06 LOSA DE CONCRETO F´C=175 KG/CM2 m3 81.00


LOSA DEPORTIVA 1.00 30.00 18.00 0.150 81.00

01.04.07 SARDINEL, CONCRETO F´c=175 kg/cm2 m3 15.31

SARDINEL PARA VEREDAS


VEREDA ENTRE INGRESO PORTON Y COLISEO perimetro 50.74 0.20 0.20 2.03
VEREDA FRONTAL INGRESO A SS.HH. COLISEO 20.90 0.20 0.20 0.84
VEREDA PERIMETRAL LOSA 125.50 0.20 0.20 5.02
SS.HH. ALUMNOS - DOC 13.59 0.20 0.20 0.54
FRONTAL PABELLON A-ESCALERA 02 2.00 38.00 0.20 0.20 3.04
FRONTAL PABELLON B-C-ESCALERA 04

SARDINEL LOSA 2.00 30.00 0.20 0.20 2.40


2.00 18.00 0.20 0.20 1.44

01.04.08 SARDINEL, ENCOFRADO Y DESENCOFRADO m2 76.55


PERIMETRO CARAS ALT
SARDINEL PARA VEREDAS
VEREDA ENTRE INGRESO PORTON Y COLISEO perimetro 50.74 1.00 0.20 10.15
VEREDA FRONTAL INGRESO A SS.HH. COLISEO 20.90 1.00 0.20 4.18
VEREDA PERIMETRAL LOSA 125.50 1.00 0.20 25.10
SS.HH. ALUMNOS - DOC 13.59 1.00 0.20 2.72
FRONTAL PABELLON A-ESCALERA 02 2.00 38.00 1.00 0.20 15.20
FRONTAL PABELLON B-C-ESCALERA 04
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
SARDINEL LOSA 2.00 30.00 1.00 0.20 12.00
2.00 18.00 1.00 0.20 7.20

01.04.09 FALSO PISO MEZCLA 1:8 E=4" m2 588.20


MODULO A 1.00 15.35 7.55 115.89
MODULO B 1.00 7.55 7.55 57.00
COMEDOR AREA 50.61 50.61
COCINA AREA 21.68 21.68
MODULO C 3.00 7.55 7.55 171.01
SS.HH. ALUMNOS-DOC. AREA 52.61 52.61
VESTIDORES-COLISEO 2.00 AREA 17.05 34.10
SS.HH. COLISEO AREA 41.66 41.66
ESCALERA 02 1.00 4.35 3.35 14.57
ESCALERA 04 1.00 7.55 3.85 29.07

01.04.10 GRADAS CONCRETO CONCRETO CICLOPEO m3 0.50


INGRESO A CAMERINOS AREA
2.00 1.00 0.25 0.50

01.04.11 GRADAS, ENCOFRADO Y DESENCOFRADO CARAVISTA m2 1.99


INGRESO A CAMERINOS VECES AREA CARAS
LATERALES 2 0.25 2.00 1.00
CONTRAPASOS 3 1.95 0.17 1.00 0.99

01.05 OBRAS DE CONCRETO ARMADO

01.05.01 ZAPATAS
01.05.01.01 ZAPATAS, CONCRETO F´c=210 kg/cm2 m3 272.53
MODULO COLISEO
ZAPATAS
EJE B
ZC-05 1.00 4.00 1.60 0.80 5.12

ZC-01 6.00 2.95 1.10 0.80 15.58


ZC-02 1.00 1.30 2.95 0.80 3.07

Z-06 1.00 1.10 1.40 0.70 1.08


Z-04 1.00 1.60 1.80 0.70 2.02

EJE 12
Z-03 5.00 1.10 1.20 0.70 4.62
Z-04 5.00 1.60 1.80 0.70 10.08

EJE H
Z-06 1.00 1.10 1.40 0.70 1.08
Z-05 1.00 1.60 2.00 0.70 2.24

Z-03 6.00 1.10 1.20 0.70 5.54


Z-05 6.00 1.60 2.00 0.70 13.44

Z-06 1.00 1.10 1.40 0.70 1.08


Z-07 1.00 1.60 2.20 0.70 2.46

ZC-06 1.00 4.00 1.60 0.70 4.48

EJE 2
ZC-04 3.00 1.60 1.80 0.80 6.91
3.00 3.62 1.00 0.80 8.69
Z-04 2.00 1.60 1.80 0.80 4.61
ZC-03 1.00 2.95 1.00 0.80 2.36

MUROS ARMADOS
EJE 12
MA-01 1.00 1.65 1.20 0.60 1.19
1.00 2.10 1.20 0.60 1.51
1.00 2.70 1.20 0.60 1.94
1.00 2.78 1.20 0.60 2.00
1.00 1.95 1.20 0.60 1.40
1.00 2.50 1.20 0.60 1.80

EJE H
MA-01 1.00 1.56 1.20 0.60 1.12
4.00 2.60 1.20 0.60 7.49
2.00 2.64 1.20 0.60 3.80
1.00 2.74 1.20 0.60 1.97

MODULO A
EJE 14 CORTE 3-3 1.00 15.84 1.80 0.50 14.26
EJE 13 CORTE 4-4 1.00 15.84 2.10 0.50 16.63
EJE Ñ-K CORTE 1-1 2.00 5.50 1.50 0.50 8.25

MODULO B
ZAPATAS
EJE J CORTE 3-3 1.00 8.90 1.80 0.50 8.01
1.00 11.60 1.80 0.50 10.44
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
EJE I CORTE 4-4 1.00 20.28 2.10 0.50 21.29

MODULO C
EJE J CORTE 3-3 1.00 24.06 1.80 0.50 21.65
EJE I CORTE 4-4 1.00 24.06 2.10 0.50 25.26

SS.HH. ALUMNOS - DOC


EJE 1 MA-04 1.00 6.50 1.50 0.50 4.88
EJE 1 MA-05 1.00 10.50 1.35 0.50 7.09

ESCALERA 02
EJE 13 CORTE 4 1.00 3.90 2.10 0.50 4.10
EJE 13* CPRTE 3 1.00 3.90 1.80 0.50 3.51

ESCALERA 04
EJE J CORTE 3-3 1.00 4.35 1.80 0.50 3.92
EJE I CORTE 4-4 1.00 4.35 2.10 0.50 4.57

01.05.01.02 ZAPATAS- CONCRETO F´C=175 KG/CM2 m3 2.47


PORTICO DE INGRESO
Z-1 1 1.00 0.90 1.70 0.50 0.77
Z-2 1 1.00 2.00 1.70 0.50 1.70

01.05.01.03 ZAPATAS, ACERO F'y=4200 kg/cm2 kg. 5,422.18

01.05.02 VIGAS DE CIMENTACION


01.05.02.01 VIGAS DE CIMENTACION,CONCRETO F'C=210 KG/CM2 m3 79.02
VECES LARGO ANCHO ALTO PARCIAL
MODULO COLISEO
EJE B VC-01 1.00 36.25 0.25 0.50 4.53

EJE 2 VC-02 1.00 14.55 0.25 0.50 1.82

MODULO A
EJE J CORTE 3-3 1.00 15.35 0.45 1.00 6.91
EJE 13 CORTE 4-4 1.00 15.35 0.45 1.00 6.91
EJE Ñ-K CORTE 1-1 2.00 7.40 0.24 1.00 3.55
EJE L,M,N VC-01 3.00 7.00 0.25 0.60 3.15

MODULO B
EJE I CORTE 4-4 1.00 19.25 0.45 1.00 8.66
EJE J CORTE 3-3 1.00 20.52 0.45 1.00 9.23

EJE 26-27 VC-01 2.00 7.00 0.25 0.60 2.10


EJE 28 VC-01 1.00 6.30 0.25 0.60 0.95
EJE 29 VC-01 1.00 5.60 0.25 0.60 0.84

MODULO C
EJE I CORTE 4-4 1.00 23.00 0.45 1.00 10.35
EJE J CORTE 3-3 1.00 23.00 0.45 1.00 10.35

EJE 17-19-21 VC-01 3.00 7.00 0.25 0.60 3.15

ESCALERA 02
EJE 13 CORTE 4 1.00 3.40 0.45 1.00 1.53
EJE 13* CPRTE 3 1.00 3.40 0.45 1.00 1.53

ESCALERA 04
EJE J CORTE 3-3 1.00 3.85 0.45 1.00 1.73
EJE I CORTE 4-4 1.00 3.85 0.45 1.00 1.73

01.05.02.02 VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO m2 423.82


VECES LARGO CARAS ALTO PARCIAL
MODULO COLISEO
EJE B VC-01 1.00 36.25 2.00 0.50 36.25

EJE 2 VC-02 1.00 14.55 2.00 0.50 14.55

MODULO A
EJE J CORTE 3-3 1.00 15.35 2.00 1.00 30.70
EJE 13 CORTE 4-4 1.00 15.35 2.00 1.00 30.70
EJE Ñ-K CORTE 1-1 2.00 7.40 2.00 1.00 29.60
EJE L,M,N VC-01 3.00 7.00 2.00 0.60 25.20

MODULO B
EJE I CORTE 4-4 1.00 19.25 2.00 1.00 38.50
EJE J CORTE 3-3 1.00 20.52 2.00 1.00 41.04

EJE 26-27 VC-01 2.00 7.00 2.00 0.60 16.80


EJE 28 VC-01 1.00 6.30 2.00 0.60 7.56
EJE 29 VC-01 1.00 5.60 2.00 0.60 6.72

MODULO C
EJE I CORTE 4-4 1.00 23.00 2.00 1.00 46.00
EJE J CORTE 3-3 1.00 23.00 2.00 1.00 46.00
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
EJE 17-19-21 VC-01 3.00 7.00 2.00 0.60 25.20

ESCALERA 02
EJE 13 CORTE 4 1.00 3.40 2.00 1.00 6.80
EJE 13* CPRTE 3 1.00 3.40 2.00 1.00 6.80

ESCALERA 04
EJE J CORTE 3-3 1.00 3.85 2.00 1.00 7.70
EJE I CORTE 4-4 1.00 3.85 2.00 1.00 7.70

01.05.02.03 VIGAS DE CIMENTACION, ACERO F'y=4200 kg/cm2 kg. 7,925.87

01.05.03 SOBRECIMIENTOS ARMADOS


01.05.03.01 SOBRECIMIENTO, CONCRETO F´c=175 kg/cm2 m3 26.57
VECES LARGO ANCHO ALTO PARCIAL
SS.HH. COLISEO
EJE 2-2 CORTE 2-2 1.00 4.80 0.13 0.60 0.37
EJE 3 CORTE 3-3 1.00 3.14 0.13 0.45 0.18
EJE 4 CORTE 4-4 1.00 4.60 0.13 0.45 0.27
EJE 5-5 CORTE 2-2 1.00 3.44 0.13 0.60 0.27
EJE A-A CORTE 1-1 1.00 8.55 0.13 0.45 0.50
EJE B-B CORTE 1-1 1.00 4.28 0.13 0.45 0.25
1.00 3.95 0.13 0.45 0.23
MODULO COLISEO
ENTRE EJE C-D CORTE 4-4 2.00 2.80 0.13 0.45 0.33
2.00 3.65 0.13 0.45 0.43
EJE E CORTE 3-3 1.00 3.85 0.13 0.45 0.23
EJE 3-3 CORTE 5-5 2.00 4.43 0.13 0.45 0.52

MODULO A
CORTE Y-Y 2.00 2.08 0.20 0.75 0.62

MODULO B
EJE 25-27 2.00 7.40 0.24 0.60 2.13
EJE 30 1.00 5.40 0.24 0.60 0.78

MODULO C
EJE 16,18,20,22 4.00 7.40 0.24 0.60 4.26

SS.HH. ALUMNOS - DOC


EJE H CORTE 4-4 1.00 7.20 0.13 0.45 0.42
EJEJ 2-2 CORTE 3-3 1.00 4.40 0.60 0.60 1.58
1.00 4.40 0.13 4.34 2.48
EJE 3 CORTE 4-4 1.00 4.65 0.13 0.45 0.27
ENTRE EJE I-J CORTE 5-5 1.00 1.58 0.13 0.45 0.09
1.00 2.30 0.13 0.45 0.13
1.00 2.03 0.13 0.45 0.12
1.00 1.10 0.13 0.45 0.06
1.00 0.50 0.13 0.45 0.03
1.00 2.28 0.13 0.45 0.13
1.00 1.50 0.13 0.45 0.09
EJE 15 CORTE 4-4 1.00 2.23 0.13 0.45 0.13
1.00 3.70 0.13 0.45 0.22

ESCALERA 02
EJE P-O CC-1 2.00 3.60 0.24 0.60 1.04
ENTRE P-O 1.00 5.00 0.13 0.50 0.33

ESCALERA 04
EJE 23 1.00 6.80 0.24 0.60 0.98
EJE 24 1.00 6.80 0.24 0.60 0.98
SCA-1 ENTRE EJE 23-24 1.00 5.80 0.24 0.50 0.70

PORTICO DE INGRESO
VC 1.00 4.05 0.25 0.50 0.51

CERCO PERIMETRICO
POSTERIOR PABELLON A 1.00 19.65 0.13 1.05 2.68
DESCONTAMOS COLUMNAS -8.00 0.25 0.13 1.05 -0.27
FRONTAL I.E. 1.00 6.25 0.13 1.05 0.85
DESCONTAMOS COLUMNAS -3.00 0.25 0.13 1.05 -0.10
FRONTAL I.E. 1.00 14.60 0.13 1.05 1.99
DESCONTAMOS COLUMNAS -7.00 0.25 0.13 1.05 -0.24

01.05.03.02 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO M2 194.80


VECES LARGO CARAS ALTO PARCIAL
SS.HH. COLISEO
EJE 2-2 CORTE 2-2 1.00 4.80 2.00 0.60 5.76
EJE 3 CORTE 3-3 1.00 3.14 2.00 0.45 2.83
EJE 4 CORTE 4-4 1.00 4.60 2.00 0.45 4.14
EJE 5-5 CORTE 2-2 1.00 3.44 2.00 0.60 4.13
EJE A-A CORTE 1-1 1.00 8.55 2.00 0.45 7.70
EJE B-B CORTE 1-1 1.00 4.28 2.00 0.45 3.85
1.00 3.95 2.00 0.45 3.56
MODULO COLISEO
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
ENTRE EJE C-D CORTE 4-4 2.00 2.80 2.00 0.45 5.04
2.00 3.65 2.00 0.45 6.57
EJE E CORTE 3-3 1.00 3.85 2.00 0.45 3.47
EJE 3-3 CORTE 5-5 2.00 4.43 2.00 0.45 7.97

MODULO A
CORTE Y-Y 2.00 2.08 2.00 0.75 6.24

MODULO B
EJE 25-27 2.00 7.40 2.00 0.60 17.76
EJE 30 1.00 5.40 2.00 0.60 6.48

MODULO C
EJE 16,18,20,22 4.00 7.40 2.00 0.60 35.52

SS.HH. ALUMNOS - DOC


EJE H CORTE 4-4 1.00 7.20 2.00 0.45 6.48
EJEJ 2-2 CORTE 3-3
1.00 4.40 2.00 4.34 38.19
EJE 3 CORTE 4-4 1.00 4.65 2.00 0.45 4.19
ENTRE EJE I-J CORTE 5-5 1.00 1.58 2.00 0.45 1.42
1.00 2.30 2.00 0.45 2.07
1.00 2.03 2.00 0.45 1.83
1.00 1.10 2.00 0.45 0.99
1.00 0.50 2.00 0.45 0.45
1.00 2.28 2.00 0.45 2.05
1.00 1.50 2.00 0.45 1.35
EJE 15 CORTE 4-4 1.00 2.23 2.00 0.45 2.01
1.00 3.70 2.00 0.45 3.33

ESCALERA 02
EJE P-O CC-1 2.00 3.60 0.24 0.60 1.04
ENTRE P-O 1.00 5.00 0.13 0.50 0.33

ESCALERA 04
EJE 23 1.00 6.80 0.24 0.60 0.98
EJE 24 1.00 6.80 0.24 0.60 0.98
SCA-1 ENTRE EJE 23-24 1.00 5.80 0.24 0.50 0.70

PORTICO DE INGRESO
VC 1.00 4.05 0.25 0.50 0.51

CERCO PERIMETRICO
POSTERIOR PABELLON A 1.00 19.65 0.13 1.05 2.68
DESCONTAMOS COLUMNAS -8.00 0.25 0.13 1.05 -0.27
FRONTAL I.E. 1.00 6.25 0.13 1.05 0.85
DESCONTAMOS COLUMNAS -3.00 0.25 0.13 1.05 -0.10
FRONTAL I.E. 1.00 14.60 0.13 1.05 1.99
DESCONTAMOS COLUMNAS -7.00 0.25 0.13 1.05 -0.24

01.05.03.03 SOBRECIMIENTO, ACERO F'y=4200 kg/cm2 KG 3,429.60

01.05.04 COLUMNAS
01.05.04.01 COLUMNAS , CONCRETO F´c=175 kg/cm2 M3 22.33
MODULO VECES LARGO ANCHO ALTURA
MODULO COLISEO
EJE B CA-2 1 14.00 0.25 0.15 3.05 1.60
1 4.00 0.25 0.15 2.40 0.36
EJE 18 CA-2 1 10.00 0.25 0.15 2.05 0.77
1 2.00 0.25 0.15 1.00 0.08
EJE H CA-2 1 14.00 0.25 0.15 2.05 1.08
1 2.00 0.25 0.15 1.00 0.08
1 2.00 0.25 0.15 3.85 0.29
EJE 2 CA-2 1 8.00 0.25 0.15 2.05 0.62
1 4.00 0.25 0.15 1.00 0.15

PARAPETO ESTRADO 1 4.00 0.25 0.15 1.00 0.15

SS.HH. COLISEO
CA-03 1 15.00 0.20 0.09 1.80 0.49

MODULO A
PRIMER PISO CA-01
EJE 14 1 8.00 0.25 0.13 1.63 0.42
EJE 13 1 8.00 0.25 0.13 1.63 0.42
SEGUNDO PISO
EJE 14 1 8.00 0.25 0.13 1.25 0.33
EJE 13 1 8.00 0.25 0.13 1.63 0.42
VOLADIZO CA-2 1 10.00 0.25 0.13 1.00 0.33
TERCER PISO
EJE 14 1 8.00 0.25 0.13 1.25 0.33
EJE 13 1 8.00 0.25 0.13 1.63 0.42
MURO ALMACEN BIBLI. CA-3 1 4.00 0.25 0.13 2.60 0.34
VOLADIZO CA-2 1 10.00 0.25 0.13 1.00 0.33

MODULO B
PRIMER PISO
EJE I 1 2.00 0.25 0.13 1.63 0.11
1 8.00 0.25 0.13 1.25 0.33
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
EJE J 1 10.00 0.25 0.13 1.63 0.53
CA-3 (COCINA) 1 4.00 0.25 0.13 2.75 0.36
SEGUNDO PISO
EJE I 1 2.00 0.25 0.13 1.63 0.11
1 8.00 0.25 0.13 1.25 0.33
EJE J 1 10.00 0.25 0.13 1.63 0.53
CA-3 1 4.00 0.25 0.13 2.10 0.27
VOLADIZO CA-2 1 6.00 0.25 0.13 1.00 0.20
TERCER PISO
EJE I 1 2.00 0.25 0.13 1.63 0.11
1 8.00 0.25 0.13 1.25 0.33
EJE J 1 10.00 0.25 0.13 1.63 0.53
CA-3 1 4.00 0.25 0.13 2.10 0.27
VOLADIZO CA-2 1 6.00 0.25 0.13 1.00 0.20

MODULO C
PRIMER PISO
EJE I 1 12.00 0.25 0.13 1.25 0.49
EJE J 1 12.00 0.25 0.13 1.63 0.64
SEGUNDO PISO
EJE I 1 12.00 0.25 0.13 1.25 0.49
EJE J 1 12.00 0.25 0.13 1.63 0.64
VOLADIZO AULAS 1 16.00 0.25 0.13 1.00 0.52

SS.HH. ALUMNOS - DOC


CA-02 1 7.00 0.20 0.09 1.80 0.23

ESCALERA 02
VOLADIZO ESCALERA CA-1(3 pisos) 6.00 0.25 0.13 1.00 0.20
CA-02 EJE 13 4.00 0.25 0.13 0.85 0.11
4.00 0.25 0.13 1.00 0.13
CA-02 DEPSITO 3.00 0.25 0.13 2.80 0.27

ESCALERA 04
VOLADIZO ESCALERA CA-1 6.00 0.25 0.13 1.00 0.20
CA-02 EJE A-A 4.00 0.25 0.13 0.85 0.11
4.00 0.25 0.13 1.00 0.13
CA-02 DEPSITO 3.00 0.25 0.13 2.80 0.27

CERCO PERIMETRICO
POSTERIOR PABELLON A
8.00 0.25 0.25 3.60 1.80
FRONTAL I.E.
3.00 0.25 0.25 3.60 0.68
FRONTAL I.E.
7.00 0.25 0.25 3.60 1.58

PORTICO DE INGRESO
C-1 2.00 0.25 0.35 3.35 0.59
C-2 1.00 0.15 0.25 3.35 0.13

01.05.04.02 COLUMNAS, CONCRETO F´c=210 kg/cm2 M3 165.46


SS.HH. COLISEO
C-5 1.00 AREA 0.05 3.80 0.20
C-6 1.00 0.07 4.80 0.33
C-7 1.00 0.25 0.25 4.80 0.30
C-8 1.00 0.06 3.80 0.25
C-9 4.00 0.40 0.15 4.80 1.15
CA-1 7.00 0.25 0.15 4.30 1.13

COLISEO
EJE B
C-2 1.00 0.45 0.25 7.10 0.80
1.00 0.20 0.25 7.10 0.36
C-1 9.00 0.50 0.25 7.10 7.99
C-4 8.00 0.40 0.25 0.65 0.52
EJE 12
C-2 2.00 0.45 0.25 8.90 2.00
2.00 0.20 0.25 8.90 0.89
C-3 5.00 0.50 0.25 8.90 5.56
C-4 7.00 0.40 0.25 0.75 0.53
EJE H
C-2 1.00 0.45 0.25 9.05 1.02
1.00 0.20 0.25 9.05 0.45
C-1 9.00 0.50 0.25 9.05 10.18
C-4 8.00 0.40 0.25 0.75 0.60
EJE 2
C-3 5.00 0.50 0.25 6.95 4.34
C-4 4.00 0.40 0.25 2.45 0.98
4.00 0.40 0.25 0.65 0.26
C-10 1.00 0.25 0.25 2.75 0.17
CA-1 4.00 0.25 0.15 2.75 0.41

MODULO A
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
1 PISO
C-1 4.00 0.60 0.25 4.30 2.58
C-2 6.00 0.90 0.25 4.30 5.81
6.00 0.30 0.20 4.30 1.55
C-4 2.00 0.25 0.25 4.30 0.54
2 PISO
C-1 4.00 0.60 0.25 3.40 2.04
C-2 6.00 0.90 0.25 3.40 4.59
6.00 0.30 0.20 3.40 1.22
C-4 2.00 0.25 0.25 3.40 0.43
3 PISO
C-1 4.00 0.60 0.25 3.40 2.04
C-2 6.00 0.90 0.25 3.40 4.59
6.00 0.30 0.20 3.40 1.22
C-4 2.00 0.25 0.25 4.45 0.56

MODULO B
1 PISO
EJE I
C-3-6-7 3.00 0.90 0.250 4.30 2.90
C-2-5 3.00 0.90 0.25 4.30 2.90
3.00 0.30 0.20 4.30 0.77
C-4 3.00 0.25 0.25 4.00 0.75
EJE J 0.55
C-3-6-7 3.00 0.90 0.250 6.60 4.46
C-2-5 3.00 0.90 0.25 6.60 4.46
3.00 0.30 0.20 6.60 1.19
2 PISO
EJE I-J
C-3-6-7 6.00 0.90 0.250 3.40 4.59
C-2-5 6.00 0.90 0.25 3.40 4.59
6.00 0.30 0.20 3.40 1.22
C-4 3.00 0.25 0.25 3.40 0.64

3 PISO
EJE I-J
C-3-6-7 6.00 0.90 0.250 3.40 4.59
C-2-5 6.00 0.90 0.25 3.40 4.59
6.00 0.30 0.20 3.40 1.22
C-4 3.00 0.25 0.25 4.45 0.83

MODULO C
1 PISO
EJE I
C-3 4.00 0.90 0.250 4.30 3.87
C-2 3.00 0.90 0.25 4.30 2.90
3.00 0.30 0.20 4.30 0.77
C-4 4.00 0.25 0.25 4.00 1.00
EJE J
C-3 4.00 0.90 0.250 6.30 5.67
C-2 3.00 0.90 0.25 6.30 4.25
3.00 0.30 0.20 6.30 1.13

2 PISO
C-3 8.00 0.90 0.25 3.30 5.94
C-2 6.00 0.90 0.25 3.30 4.46
6.00 0.30 0.20 3.30 1.19
C-4 4.00 0.25 0.25 3.30 0.83
COL -4 TIMPANOS 7.00 0.25 0.25 1.20 0.53

SS.HH. ALUMNOS - DOC


C-11 1.00 0.14 2.75 0.37
C-9 5.00 0.40 0.15 2.75 0.83
C-5 2.00 0.25 0.25 2.75 0.34
C-10 1.00 0.05 2.75 0.14
CA-1 11.00 0.25 0.15 2.75 1.13

ESCALERA 02
C-01 2.00 0.60 0.25 12.00 3.60
C-02 2.00 0.70 0.25 11.50 4.03
2.00 0.25 0.25 11.50 1.44

ESCALERA 04
C-01 4.00 0.60 0.25 12.00 7.20
C-02 2.00 0.70 0.25 13.80 4.83
2.00 0.25 0.25 13.80 1.73

01.05.04.03 COLUMNAS, ENCOFRADO Y DESENCOFRADO M2 1,978.34


CONFINAMIENTO
MODULO VECES ANCHO CARAS ALTURA
MODULO COLISEO
EJE B CA-2 1 14.00 0.25 2.00 3.05 21.35
1 4.00 0.25 2.00 2.40 4.80
EJE 18 CA-2 1 10.00 0.25 2.00 2.05 10.25
1 2.00 0.25 2.00 1.00 1.00
EJE H CA-2 1 14.00 0.25 2.00 2.05 14.35
1 2.00 0.25 2.00 1.00 1.00
1 2.00 0.25 2.00 3.85 3.85
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
EJE 2 CA-2 1 8.00 0.25 2.00 2.05 8.20
1 4.00 0.25 2.00 1.00 2.00

PARAPETO ESTRADO 1 4.00 0.25 2.00 1.00 2.00

SS.HH. COLISEO
CA-03 1 15.00 0.20 2.00 1.80 10.80

MODULO A
PRIMER PISO CA-01
EJE 14 1 8.00 0.25 2.00 1.63 6.52
EJE 13 1 8.00 0.25 2.00 1.63 6.52
SEGUNDO PISO
EJE 14 1 8.00 0.25 2.00 1.25 5.00
EJE 13 1 8.00 0.25 2.00 1.63 6.52
VOLADIZO CA-2 1 10.00 0.25 2.00 1.00 5.00
TERCER PISO
EJE 14 1 8.00 0.25 2.00 1.25 5.00
EJE 13 1 8.00 0.25 2.00 1.63 6.52
MURO ALMACEN BIBLI. CA-3 1 4.00 0.25 2.00 2.60 5.20
VOLADIZO CA-2 1 10.00 0.25 2.00 1.00 5.00

MODULO B
PRIMER PISO
EJE I 1 2.00 0.25 2.00 1.63 1.63
1 8.00 0.25 2.00 1.25 5.00
EJE J 1 10.00 0.25 2.00 1.63 8.15
CA-3 (COCINA) 1 4.00 0.25 2.00 2.75 5.50
SEGUNDO PISO
EJE I 1 2.00 0.25 2.00 1.63 1.63
1 8.00 0.25 2.00 1.25 5.00
EJE J 1 10.00 0.25 2.00 1.63 8.15
CA-3 1 4.00 0.25 2.00 2.10 4.20
VOLADIZO CA-2 1 6.00 0.25 2.00 1.00 3.00
TERCER PISO
EJE I 1 2.00 0.25 2.00 1.63 1.63
1 8.00 0.25 2.00 1.25 5.00
EJE J 1 10.00 0.25 2.00 1.63 8.15
CA-3 1 4.00 0.25 2.00 2.10 4.20
VOLADIZO CA-2 1 6.00 0.25 2.00 1.00 3.00

MODULO C
PRIMER PISO
EJE I 1 12.00 0.25 2.00 1.25 7.50
EJE J 1 12.00 0.25 2.00 1.63 9.78
SEGUNDO PISO
EJE I 1 12.00 0.25 2.00 1.25 7.50
EJE J 1 12.00 0.25 2.00 1.63 9.78
VOLADIZO AULAS 1 16.00 0.25 2.00 1.00 8.00

SS.HH. ALUMNOS - DOC


CA-02 1 7.00 0.20 2.00 1.80 5.04

ESCALERA 02
VOLADIZO ESCALERA CA-1(3 pisos) 6.00 0.25 2.00 1.00 3.00
CA-02 EJE 13 4.00 0.25 2.00 0.85 1.70
4.00 0.25 2.00 1.00 2.00
CA-02 DEPSITO 3.00 0.25 2.00 2.80 4.20

ESCALERA 04
VOLADIZO ESCALERA CA-1 6.00 0.25 2.00 1.00 3.00
CA-02 EJE A-A 4.00 0.25 2.00 0.85 1.70
4.00 0.25 2.00 1.00 2.00
CA-02 DEPSITO 3.00 0.25 2.00 2.80 4.20

CERCO PERIMETRICO
POSTERIOR PABELLON A perimetro
8.00 0.75 3.60 21.60
FRONTAL I.E.
3.00 0.75 3.60 8.10
FRONTAL I.E.
7.00 0.75 3.60 18.90

PORTICO DE INGRESO
C-1 2.00 1.20 3.35 8.04
C-2 1.00 0.80 3.35 2.68

COLUMNAS PRINCIPALES

SS.HH. COLISEO perimetro


C-5 1.00 0.63 3.80 2.39
C-6 1.00 0.75 4.80 3.60
C-7 1.00 0.70 4.80 3.36
C-8 1.00 0.72 3.80 2.74
C-9 4.00 0.95 4.80 18.24
CA-1 7.00 0.25 2.00 4.30 15.05
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

COLISEO
EJE B veces perimetro altura
C-2 1.00 1.80 7.10 12.78
C-1 9.00 1.50 7.10 95.85
C-4 8.00 1.30 0.65 6.76
EJE 12
C-2 2.00 1.80 8.90 32.04
C-3 5.00 1.30 8.90 57.85
C-4 7.00 1.30 0.75 6.83
EJE H
C-2 1.00 1.80 9.05 16.29
C-1 9.00 1.50 9.05 122.18
C-4 8.00 1.30 0.75 7.80
EJE 2
C-3 5.00 1.30 6.95 45.18
C-4 4.00 1.30 2.45 12.74
4.00 1.30 0.65 3.38
C-10 1.00 0.55 2.75 1.51
CA-1 4.00 0.65 2.75 7.15

MODULO A veces
1 PISO
C-1 4.00 1.41 4.30 24.25
C-2 6.00 2.70 4.30 69.66
C-4 2.00 0.50 4.30 4.30
2 PISO
C-1 4.00 1.41 3.40 19.18
C-2 6.00 2.70 3.40 55.08
C-4 2.00 0.50 3.40 3.40
3 PISO
C-1 4.00 1.41 3.40 19.18
C-2 6.00 2.70 3.40 55.08
C-4 2.00 0.50 4.45 4.45

MODULO B
1 PISO
EJE I
C-3-6-7 3.00 2.05 4.30 26.45
C-2-5 3.00 2.70 4.30 34.83
C-4 3.00 0.50 4.00 6.00
EJE J
C-3-6-7 3.00 2.05 6.60 40.59
C-2-5 3.00 2.70 6.60 53.46
2 PISO
EJE I-J
C-3-6-7 6.00 2.05 3.40 41.82
C-2-5 6.00 2.70 3.40 55.08
C-4 3.00 0.50 3.40 5.10

3 PISO
EJE I-J
C-3-6-7 6.00 2.05 3.40 41.82
C-2-5 6.00 2.70 3.40 55.08
C-4 3.00 0.50 4.45 6.68

MODULO C
1 PISO
EJE I
C-3 4.00 2.05 4.30 35.26
C-2 3.00 2.70 4.30 34.83
C-4 4.00 0.50 4.00 8.00
EJE J
C-3 4.00 2.05 6.30 51.66
C-2 3.00 2.70 6.30 51.03

2 PISO
C-3 8.00 2.05 3.30 54.12
C-2 6.00 2.70 3.30 53.46
C-4 4.00 0.50 3.30 6.60
COL -4 TIMPANOS 7.00 0.50 1.20 4.20

SS.HH. ALUMNOS - DOC


C-11 1.00 1.78 2.75 4.90
C-9 5.00 0.65 2.75 8.94
C-5 2.00 0.70 2.75 3.85
C-10 1.00 0.55 2.75 1.51
CA-1 11.00 0.50 2.75 15.13

ESCALERA 02
C-01 2.00 1.45 12.00 34.80
C-02 2.00 2.40 11.50 55.20

ESCALERA 04
C-01 4.00 1.45 12.00 69.60
C-02 2.00 2.40 13.80 66.24
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
01.05.04.04 COLUMNAS, ACERO F'y=4200 kg/cm2 KG 39,254.73
MODULOS HOJA DE ACERO 01 39,254.73

01.05.05 VIGAS
01.05.05.01 VIGAS, CONCRETO F´c=175 kg/cm2 m3 9.50
MODULO COLISEO
EJE B VS-3 2.00 2.87 0.13 0.15 0.11
6.00 4.35 0.13 0.15 0.51
1.00 4.39 0.13 0.15 0.09
EJE 12 VS-3 1.00 3.77 0.13 0.15 0.07
1.00 3.65 0.13 0.15 0.07
1.00 4.25 0.13 0.15 0.08
1.00 4.33 0.13 0.15 0.08
1.00 3.50 0.13 0.15 0.07
1.00 3.85 0.13 0.15 0.08
EJE H VS-3 3.00 2.87 0.13 0.15 0.17
6.00 4.35 0.13 0.15 0.51
1.00 4.39 0.13 0.15 0.09
EJE 2 VS-3 1.00 4.88 0.13 0.15 0.10
1.00 2.47 0.13 0.15 0.05
2.00 4.10 0.13 0.15 0.16
1.00 3.50 0.13 0.15 0.07
1.00 3.70 0.13 0.15 0.07

MODULO A
1 PISO
EJE 14 4.00 2.98 0.13 0.10 0.15
EJE 13 2.00 2.98 0.13 0.10 0.08
2.00 1.40 0.13 0.10 0.04
2 PISO
EJE 14 4.00 2.98 0.13 0.10 0.15
EJE 13 2.00 2.98 0.13 0.10 0.08
2.00 1.87 0.13 0.10 0.05
VOLADIZO (confimaniento de parapeto) 1.00 15.78 0.13 0.10 0.21
3 PISO
EJE 14 4.00 2.98 0.13 0.10 0.15
EJE 13 2.00 2.98 0.13 0.10 0.08
2.00 1.87 0.13 0.10 0.05
VOLADIZO (confimaniento de parapeto) 1.00 15.78 0.13 0.10 0.21
EJE N-L 2.00 3.48 0.13 0.10 0.09

MODULO B
1 PISO
EJE J 1.00 2.68 0.13 0.10 0.03
1.00 2.98 0.13 0.10 0.04
2.00 3.05 0.13 0.10 0.08
1.00 2.75 0.13 0.10 0.04
EJE I 2.00 2.98 0.13 0.10 0.08
1.00 2.68 0.13 0.10 0.03
2.00 1.87 0.13 0.10 0.05
EJE 29 1.00 2.07 0.13 0.10 0.03
1.00 2.30 0.13 0.10 0.03
1.00 2.88 0.13 0.10 0.04
2 PISO
EJE J 1.00 2.68 0.13 0.10 0.03
1.00 2.98 0.13 0.10 0.04
2.00 3.05 0.13 0.10 0.08
1.00 2.75 0.13 0.10 0.04
EJE I 2.00 2.98 0.13 0.10 0.08
1.00 2.68 0.13 0.10 0.03
2.00 1.87 0.13 0.10 0.05
EJE 29 1.00 1.68 0.13 0.10 0.02
1.00 3.35 0.13 0.10 0.04
VOLADIZO (confimaniento de parapeto) 1.00 8.55 0.13 0.10 0.11
1.00 2.50 0.13 0.10 0.03

3 PISO
EJE J 1.00 2.68 0.13 0.10 0.03
1.00 2.98 0.13 0.10 0.04
2.00 3.05 0.13 0.10 0.08
1.00 2.75 0.13 0.10 0.04
EJE I 2.00 2.98 0.13 0.10 0.08
1.00 2.68 0.13 0.10 0.03
2.00 1.87 0.13 0.10 0.05
EJE 29 1.00 1.68 0.13 0.10 0.02
1.00 3.35 0.13 0.10 0.04
VOLADIZO (confimaniento de parapeto) 1.00 8.55 0.13 0.10 0.11
1.00 2.50 0.13 0.10 0.03

MODULO C
VIGAS DE CONFINAMIENTO, CONCRETO F´c=175 kg/cm2 - 1 PISO
EJE I 2.00 2.70 0.13 0.10 0.07
4.00 3.00 0.13 0.10 0.16
EJE J
3.00 1.75 0.13 0.10 0.07
3.00 3.00 0.13 0.10 0.12

VIGAS DE CONFINAMIENTO, CONCRETO F´c=175 kg/cm2 - 2 PISOS


HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
EJE I 2.00 2.70 0.13 0.10 0.07
4.00 3.00 0.13 0.10 0.16
EJE J
3.00 1.75 0.13 0.10 0.07
3.00 3.00 0.13 0.10 0.12
VOLADIZO (confimaniento de parapeto) 1.00 1.95 0.13 0.10 0.03
1.00 23.64 0.13 0.10 0.31

ESCALERA 02
DEPOSITO 1.00 4.00 0.13 0.10 0.05
ENTRE EJE P-O 2.00 3.85 0.13 0.20 0.20
EJE P-O 2.00 4.75 0.13 0.20 0.25
3.00 2.50 0.13 0.20 0.20
2.00 1.80 0.13 0.20 0.09
VIGA DEL PARAPETO (borde) 2.00 3.90 0.13 0.10 0.10

ESCALERA 04
DEPOSITO 1.00 4.00 0.13 0.10 0.05
EJE J VAM-1 3.00 2.95 0.13 0.10 0.12
ENTRE EJE I-J 2.00 3.85 0.13 0.20 0.20
2.00 2.00 0.13 0.20 0.10
VIGA DEL PARAPETO (borde) 2.00 4.35 0.13 0.10 0.11

PORTICO DE INGRESO
VIGA 1.00 4.75 0.25 0.45 0.53
CORTE 1-1 1.00 3.35 0.15 0.45 0.23
CORTE 2-2 1.00 2.15 0.15 0.45 0.15

CERCO PERIMETRICO
POSTERIOR PABELLON A 1.00 19.65 0.13 0.15 0.38
DESCONTAMOS COLUMNAS -8.00 0.25 0.13 0.15 -0.04
FRONTAL I.E. 1.00 6.25 0.13 0.15 0.12
DESCONTAMOS COLUMNAS -3.00 0.25 0.13 0.15 -0.01
FRONTAL I.E. 1.00 14.60 0.13 0.15 0.28
DESCONTAMOS COLUMNAS -7.00 0.25 0.13 0.15 -0.03

01.05.05.02 VIGAS, CONCRETO F´c=210 kg/cm2 M3 203.58


n.veces largo ancho altura parcial
SS.HH. COLISEO
EJE A VS-01(15X35) 1.00 9.35 0.15 0.35 0.49
EJE B VS-01(15X35) 1.00 10.53 0.15 0.35 0.55
EJE 2 VA-01(15X30) 1.00 4.80 0.15 0.30 0.22
EJE 3 VA-01(15X30) 1.00 4.38 0.15 0.30 0.20
EJE 4 VA-01(15X30) 1.00 4.05 0.15 0.30 0.18
EJE 4 VA-01(15X30) 1.00 3.45 0.15 0.30 0.16
VA-02 TIMPANOS 4.00 4.00 0.15 0.20 0.48
VB(20X20) 1.00 6.50 0.20 0.20 0.26

COLISEO
ESTRADO
VCH-01 2.00 4.10 0.25 0.20 0.41
VB 20X20 2.00 3.85 0.20 0.20 0.31
2.00 2.90 0.20 0.20 0.23
VA-01 15X30 1.00 3.85 0.15 0.30 0.17
VS-02 (25X40) 1.00 9.60 0.25 0.40 0.96

VIGAS PERIMETRICAS INTERMEDIAS


EJE B-H (VP-01) 2.00 36.25 0.25 0.45 8.16
EJE 2-12 (VP-01) 2.00 23.35 0.25 0.45 5.25

VIGAS PERIMETRICAS FINALES


EJE B-H (VIGA CANALON) 2.00 36.25 AREA 0.36 26.10
EJE 2-12 (VP-02) 2.00 23.35 0.25 0.40 4.67

VIGAS DE TRIBUNA
EJE B-H (VP-02) 16.00 2.35 0.25 0.40 3.76
2.00 3.75 0.25 0.40 0.75
EJE 2-12 (VP-02) 9.00 2.35 0.25 0.40 2.12

MODULO A
VIGAS, CONCRETO F´c=210 kg/cm2 - 1 PISO modulo n.veces largo ancho altura
PRIMER NIVEL
EJE 14 VA-1 1.00 4.00 3.00 0.25 0.55 1.65
EJE 13 VA-1 1.00 4.00 3.00 0.25 0.55 1.65
EJE K-Ñ VS-1 1.00 2.00 7.40 0.25 0.55 2.04
V-101 1.00 2.00 1.95 0.25 0.55 0.54
V-102 1.00 3.00 1.95 0.30 0.55 0.97
V-103 1.00 3.00 7.00 0.30 0.70 4.41
VIGA BORDE 1.00 1.00 15.27 0.20 0.20 0.61
SEGUNDO NIVEL
EJE 14 VA-1 1.00 4.00 3.00 0.25 0.55 1.65
EJE 13 VA-1 1.00 4.00 3.00 0.25 0.55 1.65
EJE K-Ñ VS-1 1.00 2.00 7.40 0.25 0.55 2.04
V-101 1.00 2.00 1.95 0.25 0.55 0.54
V-102 1.00 3.00 1.95 0.30 0.55 0.97
V-103 1.00 3.00 7.00 0.30 0.70 4.41
VIGA BORDE 1.00 1.00 15.27 0.20 0.20 0.61
TERCER NIVEL
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
EJE 14 VA-2 1.00 4.00 3.00 AREA 0.17 2.07
EJE 13 VA-2 1.00 4.00 3.00 AREA 0.17 2.07
V.CUMBRERA 1.00 1.00 14.37 0.60 0.20 1.72
VIGA BORDE 1.00 2.00 15.27 0.20 0.20 1.22
EJE K-Ñ VS-2 1.00 2.00 7.65 0.25 0.55 2.10
V-201 1.00 2.00 2.00 0.25 0.40 0.40
V-204 1.00 3.00 2.00 0.30 0.40 0.72
V-203 1.00 3.00 7.65 0.30 0.70 4.82
V-202 1.00 5.00 1.00 0.25 0.20 0.25

MODULO B
VIGAS, CONCRETO F´c=210 kg/cm2 - 1 PISO modulo n.veces largo ancho altura
PRIMER NIVEL
EJE I VA-1 1.00 1.00 14.35 0.25 0.55 1.97
EJE J VA-1 1.00 1.00 14.53 0.25 0.55 2.00
EJE 25-27 VS-1 1.00 2.00 7.40 0.25 0.55 2.04
EJE 30 VS-1 1.00 1.00 5.40 0.25 0.55 0.74
V-101 1.00 2.00 1.95 0.25 0.55 0.54
1.00 1.00 1.00 0.25 0.55 0.14
V-102 1.00 1.00 1.95 0.30 0.55 0.32
1.00 2.00 1.00 0.30 0.55 0.33
V-103 1.00 1.00 7.00 0.30 0.70 1.47
1.00 1.00 6.30 0.30 0.70 1.32
1.00 1.00 5.65 0.30 0.70 1.19
VIGA BORDE 1.00 1.00 19.75 0.20 0.20 0.79
SEGUNDO NIVEL
EJE I VA-1 1.00 1.00 14.35 0.25 0.55 1.97
EJE J VA-1 1.00 1.00 14.53 0.25 0.55 2.00
EJE 25-27 VS-1 1.00 2.00 7.40 0.25 0.55 2.04
EJE 30 VS-1 1.00 1.00 5.40 0.25 0.55 0.74
V-101 1.00 2.00 1.95 0.25 0.55 0.54
1.00 1.00 1.00 0.25 0.55 0.14
V-102 1.00 1.00 1.95 0.30 0.55 0.32
1.00 2.00 1.00 0.30 0.55 0.33
V-103 1.00 1.00 7.00 0.30 0.70 1.47
1.00 1.00 6.30 0.30 0.70 1.32
1.00 1.00 5.65 0.30 0.70 1.19
VIGA BORDE 1.00 1.00 19.75 0.20 0.20 0.79
TERCER NIVEL
EJE I VA-2 1.00 1.00 14.35 AREA 0.17 2.48
EJE J VA-2 1.00 1.00 5.68 AREA 0.17 0.98
EJE J VA-2 ENTRE 27-28 1.00 1.00 3.00 AREA 0.20 0.60
EJE J VA-2 ENTRE 28-29 1.00 1.00 3.00 AREA 0.23 0.69
EJE J VA-2 ENTRE 29-30 1.00 1.00 2.74 AREA 0.28 0.77
V.CUMBRERA 1.00 1.00 18.40 0.60 0.20 2.21
VIGA BORDE 1.00 1.00 19.75 0.20 0.20 0.79
1.00 1.00 9.00 0.20 0.20 0.36
EJE 25-27 VS-1 1.00 2.00 7.65 0.25 0.55 2.10
EJE 30 VS-1 1.00 1.00 5.55 0.25 0.55 0.76
V-201 1.00 2.00 2.00 0.25 0.40 0.40
1.00 1.00 1.00 0.25 0.40 0.10
V-204 1.00 1.00 2.00 0.30 0.40 0.24
1.00 2.00 1.00 0.30 0.40 0.24
V-203 1.00 1.00 7.65 0.30 0.70 1.61
1.00 1.00 6.97 0.30 0.70 1.46
1.00 1.00 6.20 0.30 0.70 1.30
V-202 1.00 6.00 1.00 0.25 0.20 0.30

MODULO C
VIGAS, CONCRETO F´c=210 kg/cm2 - 1 PISO modulo n.veces largo ancho altura
PRIMER NIVEL
EJE I VA-1 1.00 2.00 2.67 0.25 0.55 0.73
1.00 4.00 3.00 0.25 0.55 1.65
EJE J VA-1 1.00 2.00 2.67 0.25 0.55 0.73
1.00 4.00 3.00 0.25 0.55 1.65
EJE 16-18-20-22 VS-1 1.00 4.00 7.40 0.25 0.55 4.07
V-101 1.00 4.00 1.95 0.25 0.55 1.07
EJE 17-19-21 V-103 1.00 3.00 7.40 0.30 0.70 4.66
V-102 1.00 3.00 1.95 0.30 0.55 0.97
VIGA BORDE 1.00 1.00 23.64 0.20 0.20 0.95

VIGAS, CONCRETO F´c=210 kg/cm2 - 2 PISO


SEGUNDO NIVEL
EJE I VA-2 1.00 2.00 2.67 0.25 0.55 0.73
1.00 4.00 3.00 0.25 0.55 1.65
EJE J VA-2 1.00 2.00 2.67 0.25 0.55 0.73
1.00 4.00 3.00 0.25 0.55 1.65
EJE 16-18-20-22 VS-2 1.00 4.00 7.40 0.25 0.55 4.07
V-201 1.00 4.00 1.95 0.25 0.55 1.07
V-204 1.00 4.00 1.00 0.25 0.55 0.55
EJE 17-19-21V-203 1.00 3.00 7.40 0.30 0.70 4.66
V-202 1.00 3.00 1.95 0.30 0.55 0.97
V-205 1.00 3.00 1.00 0.25 0.55 0.41
VIGA BORDE 1.00 2.00 23.64 0.20 0.20 1.89
TIMPANOS 1.00 7.00 11.20 0.25 0.35 6.86

SS.HH. ALUMNOS - DOC


EJE H -VA-01(15X30) 1.00 1.00 7.20 0.15 0.30 0.32
EJE I - VB 20X20 1.00 1.00 4.28 0.20 0.20 0.17
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
EJE I - VA-01(15X30) 1.00 1.00 4.28 0.15 0.30 0.19
EJE 1-VS -02(15X35) 1.00 1.00 16.25 0.15 0.35 0.85
EJE 1-VB 20X20 1.00 1.00 16.75 0.20 0.20 0.67
EJE 2-VS -01(15X35) 1.00 1.00 5.30 0.15 0.35 0.28
EJE 3-VS -01(15X35) 1.00 1.00 9.15 0.15 0.35 0.48
EJE 15-VS -01(15X35) 1.00 1.00 8.52 0.15 0.35 0.45

ESCALERA 02
VIGAS, CONCRETO F´c=210 kg/cm2 - 1 PISO
EJE 13* VE 1.00 1.00 2.50 0.15 0.45 0.17
EJE 13 VA-1 1.00 1.00 3.40 0.25 0.55 0.47
VB 1.00 1.00 3.40 0.20 0.20 0.14
EJE P-O VS-01 1.00 2.00 3.56 0.25 0.55 0.98
V-101 1.00 2.00 1.95 0.25 0.55 0.54

VIGAS, CONCRETO F´c=210 kg/cm2 - 2 PISO


EJE 13*VE 1.00 1.00 2.50 0.15 0.45 0.17
EJE 13 VA-1 1.00 1.00 3.40 0.25 0.55 0.47
VB 1.00 1.00 3.40 0.20 0.20 0.14
EJE P-O VS-01 1.00 2.00 3.56 0.25 0.55 0.98
V-101 1.00 2.00 1.95 0.25 0.55 0.54

VIGAS, CONCRETO F´c=210 kg/cm2 - 3 PISO


EJE 13*VA-2 1.00 1.00 2.50 0.17 0.43
EJE 13 VA-2 1.00 1.00 3.40 0.17 0.59
VB 1.00 2.00 3.95 0.20 0.20 0.32
V.CUMBRERA 1.00 1.00 3.95 0.60 0.20 0.47
EJE P-O VS-02 1.00 2.00 4.30 0.25 0.55 1.18
VB 1.00 1.00 7.60 0.20 0.20 0.30
V-202 1.00 2.00 1.00 0.25 0.20 0.10
V-201 1.00 2.00 2.00 0.25 0.40 0.40

ESCALERA 04
VIGAS, CONCRETO F´c=210 kg/cm2 - 1 PISO
EJE J VE 1.00 1.00 2.95 0.15 0.45 0.20
ENTRE EJE I-J VA-1 1.00 1.00 3.85 0.25 0.55 0.53
EJE I VA-1 1.00 1.00 3.85 0.25 0.55 0.53
VB 1.00 1.00 3.85 0.20 0.20 0.15
EJE 23-24 VS-01 1.00 2.00 6.20 0.25 0.55 1.71
V-101 1.00 2.00 1.95 0.25 0.55 0.54

VIGAS, CONCRETO F´c=210 kg/cm2 - 2 PISO


EJE JVA-1 1.00 1.00 2.95 0.15 0.45 0.20
ENTRE EJE I-J VA-1 1.00 1.00 3.85 0.25 0.55 0.53
EJE I VA-1 1.00 1.00 3.85 0.25 0.55 0.53
VB 1.00 1.00 3.85 0.20 0.20 0.15
EJE 23-24 VS-01 1.00 2.00 6.20 0.25 0.55 1.71
V-101 1.00 2.00 1.95 0.25 0.55 0.54

VIGAS, CONCRETO F´c=210 kg/cm2 - 3 PISO


EJE J VA-2 1.00 1.00 2.95 0.17 0.51
EJE I VA-2 1.00 1.00 3.85 0.17 0.67
VB 1.00 2.00 4.85 0.20 0.20 0.39
V.CUMBRERA 1.00 1.00 4.60 0.60 0.20 0.55
EJE 23-24 VS-02 1.00 2.00 7.65 0.25 0.55 2.10
VB 1.00 1.00 10.85 0.20 0.20 0.43
V-202 1.00 2.00 1.00 0.25 0.20 0.10
V-201 1.00 2.00 2.00 0.25 0.40 0.40

01.05.05.03 VIGAS, ENCOFRADO Y DESENCOFRADO M2 1,702.85


VIGAS DE CONFINAMIENTO veces largo caras alto

MODULO COLISEO
EJE B VS-3 2.00 2.87 2.00 0.15 1.72
6.00 4.35 2.00 0.15 7.83
1.00 4.39 2.00 0.15 1.32
EJE 12 VS-3 1.00 3.77 2.00 0.15 1.13
1.00 3.65 2.00 0.15 1.10
1.00 4.25 2.00 0.15 1.28
1.00 4.33 2.00 0.15 1.30
1.00 3.50 2.00 0.15 1.05
1.00 3.85 2.00 0.15 1.16
EJE H VS-3 3.00 2.87 2.00 0.15 2.58
6.00 4.35 2.00 0.15 7.83
1.00 4.39 2.00 0.15 1.32
EJE 2 VS-3 1.00 4.88 2.00 0.15 1.46
1.00 2.47 2.00 0.15 0.74
2.00 4.10 2.00 0.15 2.46
1.00 3.50 2.00 0.15 1.05
1.00 3.70 2.00 0.15 1.11

MODULO A
1 PISO
EJE 14 4.00 2.98 2.00 0.10 2.38
EJE 13 2.00 2.98 2.00 0.10 1.19
2.00 1.40 2.00 0.10 0.56
2 PISO
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
EJE 14 4.00 2.98 2.00 0.10 2.38
EJE 13 2.00 2.98 2.00 0.10 1.19
2.00 1.87 2.00 0.10 0.75
VOLADIZO (confimaniento de parapeto) 1.00 15.78 2.00 0.10 3.16
3 PISO
EJE 14 4.00 2.98 2.00 0.10 2.38
EJE 13 2.00 2.98 2.00 0.10 1.19
2.00 1.87 2.00 0.10 0.75
VOLADIZO (confimaniento de parapeto) 1.00 15.78 2.00 0.10 3.16
EJE N-L 2.00 3.48 2.00 0.10 1.39

MODULO B
1 PISO
EJE J 1.00 2.68 2.00 0.10 0.54
1.00 2.98 2.00 0.10 0.60
2.00 3.05 2.00 0.10 1.22
1.00 2.75 2.00 0.10 0.55
EJE I 2.00 2.98 2.00 0.10 1.19
1.00 2.68 2.00 0.10 0.54
2.00 1.87 2.00 0.10 0.75
EJE 29 1.00 2.07 2.00 0.10 0.41
1.00 2.30 2.00 0.10 0.46
1.00 2.88 2.00 0.10 0.58
2 PISO
EJE J 1.00 2.68 2.00 0.10 0.54
1.00 2.98 2.00 0.10 0.60
2.00 3.05 2.00 0.10 1.22
1.00 2.75 2.00 0.10 0.55
EJE I 2.00 2.98 2.00 0.10 1.19
1.00 2.68 2.00 0.10 0.54
2.00 1.87 2.00 0.10 0.75
EJE 29 1.00 1.68 2.00 0.10 0.34
1.00 3.35 2.00 0.10 0.67
VOLADIZO (confimaniento de parapeto) 1.00 8.55 2.00 0.10 1.71
1.00 2.50 2.00 0.10 0.50

3 PISO
EJE J 1.00 2.68 2.00 0.10 0.54
1.00 2.98 2.00 0.10 0.60
2.00 3.05 2.00 0.10 1.22
1.00 2.75 2.00 0.10 0.55
EJE I 2.00 2.98 2.00 0.10 1.19
1.00 2.68 2.00 0.10 0.54
2.00 1.87 2.00 0.10 0.75
EJE 29 1.00 1.68 2.00 0.10 0.34
1.00 3.35 2.00 0.10 0.67
VOLADIZO (confimaniento de parapeto) 1.00 8.55 2.00 0.10 1.71
1.00 2.50 2.00 0.10 0.50

MODULO C
VIGAS DE CONFINAMIENTO, CONCRETO F´c=175 kg/cm2 - 1 PISO
EJE I 2.00 2.70 2.00 0.10 1.08
4.00 3.00 2.00 0.10 2.40
EJE J
3.00 1.75 2.00 0.10 1.05
3.00 3.00 2.00 0.10 1.80

VIGAS DE CONFINAMIENTO, CONCRETO F´c=175 kg/cm2 - 2 PISOS


EJE I 2.00 2.70 2.00 0.10 1.08
4.00 3.00 2.00 0.10 2.40
EJE J
3.00 1.75 2.00 0.10 1.05
3.00 3.00 2.00 0.10 1.80
VOLADIZO (confimaniento de parapeto) 1.00 1.95 2.00 0.10 0.39
1.00 23.64 2.00 0.10 4.73

ESCALERA 02
DEPOSITO 1.00 4.00 2.00 0.10 0.80
ENTRE EJE P-O 2.00 3.85 2.00 0.20 3.08
EJE P-O 2.00 4.75 2.00 0.20 3.80
3.00 2.50 2.00 0.20 3.00
2.00 1.80 2.00 0.20 1.44
VIGA DEL PARAPETO (borde) 2.00 3.90 2.00 0.10 1.56

ESCALERA 04
DEPOSITO 1.00 4.00 2.00 0.10 0.80
EJE J VAM-1 3.00 2.95 2.00 0.10 1.77
ENTRE EJE I-J 2.00 3.85 2.00 0.20 3.08
2.00 2.00 2.00 0.20 1.60
VIGA DEL PARAPETO (borde) 2.00 4.35 2.00 0.10 1.74

PORTICO DE INGRESO
VIGA 1.00 4.75 2.00 0.45 4.28
1.00 4.75 1.00 0.25 1.19
CORTE 1-1 1.00 3.35 2.00 0.45 3.02
CORTE 2-2 1.00 2.15 2.00 0.45 1.94

CERCO PERIMETRICO
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
POSTERIOR PABELLON A 1.00 19.65 2.00 0.15 5.90
DESCONTAMOS COLUMNAS -8.00 0.25 2.00 0.15 -0.60
FRONTAL I.E. 1.00 6.25 2.00 0.15 1.88
DESCONTAMOS COLUMNAS -3.00 0.25 2.00 0.15 -0.23
FRONTAL I.E. 1.00 14.60 2.00 0.15 4.38
DESCONTAMOS COLUMNAS -7.00 0.25 2.00 0.15 -0.53

VIGAS PRINCIPALES n.veces largo perimetro parcial

SS.HH. COLISEO
EJE A VS-01(15X35) 1.00 9.35 0.50 4.68
EJE B VS-01(15X35) 1.00 10.53 0.50 5.27
EJE 2 VA-01(15X30) 1.00 4.80 0.20 0.96
EJE 3 VA-01(15X30) 1.00 4.38 0.20 0.88
EJE 4 VA-01(15X30) 1.00 4.05 0.20 0.81
EJE 4 VA-01(15X30) 1.00 3.45 0.20 0.69
VA-02 TIMPANOS 4.00 4.00 0.40 6.40
VB(20X20) 1.00 6.50 0.40 2.60

COLISEO
ESTRADO
VCH-01 2.00 4.10 0.25 2.05
VB 20X20 2.00 3.85 0.40 3.08
2.00 2.90 0.40 2.32
VA-01 15X30 1.00 3.85 0.20 0.77
VS-02 (25X40) 1.00 9.60 0.70 6.72

VIGAS PERIMETRICAS INTERMEDIAS


EJE B-H (VP-01) 2.00 36.25 1.15 83.38
EJE 2-12 (VP-01) 2.00 23.35 1.15 53.71

VIGAS PERIMETRICAS FINALES


EJE B-H (VIGA CANALON) 2.00 36.25 2.95 213.88
EJE 2-12 (VP-02) 2.00 23.35 1.05 49.04

VIGAS DE TRIBUNA
EJE B-H (VP-02) 16.00 2.35 1.05 39.48
2.00 3.75 1.05 7.88
EJE 2-12 (VP-02) 9.00 2.35 1.05 22.21

MODULO A
VIGAS, CONCRETO F´c=210 kg/cm2 - 1 PISO
PRIMER NIVEL
EJE 14 VA-1 4.00 3.00 1.15 13.80
EJE 13 VA-1 4.00 3.00 0.95 11.40
EJE K-Ñ VS-1 2.00 7.40 0.90 13.32
V-101 2.00 1.95 1.15 4.49
V-102 3.00 1.95 1.00 5.85
V-103 3.00 7.00 1.30 27.30
VIGA BORDE 1.00 15.27 0.40 6.11
SEGUNDO NIVEL
EJE 14 VA-1 4.00 3.00 1.15 13.80
EJE 13 VA-1 4.00 3.00 0.95 11.40
EJE K-Ñ VS-1 2.00 7.40 0.90 13.32
V-101 2.00 1.95 1.15 4.49
V-102 3.00 1.95 1.00 5.85
V-103 3.00 7.00 1.30 27.30
VIGA BORDE 1.00 15.27 0.40 6.11
TERCER NIVEL
EJE 14 VA-2 4.00 3.00 1.22 14.64
EJE 13 VA-2 4.00 3.00 1.22 14.64
V.CUMBRERA 1.00 14.37 0.50 7.19
VIGA BORDE 2.00 15.27 0.40 12.22
EJE K-Ñ VS-2 2.00 7.65 0.90 13.77
V-201 2.00 2.00 0.85 3.40
V-204 3.00 2.00 0.70 4.20
V-203 3.00 7.65 1.30 29.84
V-202 5.00 1.00 0.25 1.25

MODULO B
VIGAS, CONCRETO F´c=210 kg/cm2
PRIMER NIVEL
EJE I VA-1 1.00 14.35 0.95 13.63
EJE J VA-1 1.00 14.53 1.15 16.71
EJE 25-27 VS-1 2.00 7.40 0.90 13.32
EJE 30 VS-1 1.00 5.40 0.90 4.86
V-101 2.00 1.95 1.15 4.49
1.00 1.00 1.15 1.15
V-102 1.00 1.95 1.00 1.95
2.00 1.00 1.00 2.00
V-103 1.00 7.00 1.30 9.10
1.00 6.30 1.30 8.19
1.00 5.65 1.30 7.35
VIGA BORDE 1.00 19.75 0.40 7.90
SEGUNDO NIVEL
EJE I VA-1 1.00 14.35 0.95 13.63
EJE J VA-1 1.00 14.53 1.15 16.71
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
EJE 25-27 VS-1 2.00 7.40 0.90 13.32
EJE 30 VS-1 1.00 5.40 0.90 4.86
V-101 2.00 1.95 1.15 4.49
1.00 1.00 1.15 1.15
V-102 1.00 1.95 1.00 1.95
2.00 1.00 1.00 2.00
V-103 1.00 7.00 1.30 9.10
1.00 6.30 1.30 8.19
1.00 5.65 1.30 7.35
VIGA BORDE 1.00 19.75 0.40 7.90
TERCER NIVEL
EJE I VA-2 1.00 14.35 1.22 17.51
EJE J VA-2 1.00 5.68 1.22 6.93
EJE J VA-2 ENTRE 27-28 1.00 3.00 1.55 4.65
EJE J VA-2 ENTRE 28-29 1.00 3.00 1.95 5.85
EJE J VA-2 ENTRE 29-30 1.00 2.74 2.29 6.27
V.CUMBRERA 1.00 18.40 0.50 9.20
VIGA BORDE 1.00 19.75 0.40 7.90
1.00 9.00 0.40 3.60
EJE 25-27 VS-1 1.00 7.65 0.90 6.89
1.00 7.65 0.70 5.36
EJE 30 VS-1 1.00 5.55 0.90 5.00
V-201 2.00 2.00 0.85 3.40
1.00 1.00 0.85 0.85
V-204 1.00 2.00 0.70 1.40
2.00 1.00 0.70 1.40
V-203 1.00 7.65 1.30 9.95
1.00 6.97 1.30 9.06
1.00 6.20 1.30 8.06
V-202 6.00 1.00 0.25 1.50

MODULO C
n.veces largo perimetro
PRIMER NIVEL
EJE I VA-1 2.00 2.67 1.15 6.14
4.00 3.00 1.15 13.80
EJE J VA-1 2.00 2.67 0.95 5.07
4.00 3.00 0.95 11.40
EJE 16-18-20-22 VS-1 2.00 7.40 0.95 14.06
2.00 7.40 1.15 17.02
V-101 2.00 1.95 1.15 4.49
2.00 1.95 0.95 3.71
EJE 17-19-21 V-103 3.00 7.40 1.30 28.86
V-102 3.00 1.95 1.00 5.85
VIGA BORDE 1.00 23.64 0.40 9.46

VIGAS, CONCRETO F´c=210 kg/cm2 - 2 PISO


SEGUNDO NIVEL
EJE I VA-1 2.00 2.67 0.95 5.07
4.00 3.00 0.95 11.40
EJE J VA-1 2.00 2.67 0.95 5.07
4.00 3.00 0.95 11.40
EJE 16-18-20-22 VS-1 2.00 7.40 1.15 17.02
2.00 7.40 0.95 14.06
V-201 2.00 1.95 1.15 4.49
2.00 1.95 0.95 3.71
V-204 2.00 1.00 1.15 2.30
2.00 1.00 0.95 1.90
EJE 17-19-21 V-103 3.00 7.40 1.30 28.86
V-202 3.00 1.95 1.00 5.85
V-205 3.00 1.00 0.95 2.85
VIGA BORDE 2.00 23.64 0.40 18.91
TIMPANOS 7.00 11.20 0.70 54.88

SS.HH. ALUMNOS - DOC


EJE H -VA-01(15X30) 1.00 7.20 0.40 2.88
EJE I - VB 20X20 1.00 4.28 0.40 1.71
EJE I - VA-01(15X30) 1.00 4.28 0.20 0.86
EJE 1-VS -02(15X35) 1.00 16.25 0.30 4.88
EJE 1-VB 20X20 1.00 16.75 0.40 6.70
EJE 2-VS -01(15X35) 1.00 5.30 0.30 1.59
EJE 3-VS -01(15X35) 1.00 9.15 0.30 2.75
EJE 15-VS -01(15X35) 1.00 8.52 0.50 4.26

ESCALERA 02
VIGAS, CONCRETO F´c=210 kg/cm2 - 1 PISO
EJE 13* VE 1.00 2.50 1.05 2.63
EJE 13 VA-1 1.00 3.40 1.15 3.91
VB 1.00 3.40 0.40 1.36
EJE P-O VS-01 2.00 3.56 0.90 6.41
V-101 2.00 1.95 1.15 4.49

VIGAS, CONCRETO F´c=210 kg/cm2 - 2 PISO


EJE 13*VA-1 1.00 2.50 1.05 2.63
EJE 13 VA-1 1.00 3.40 1.15 3.91
VB 1.00 3.40 0.40 1.36
EJE P-O VS-01 2.00 3.56 0.90 6.41
V-101 2.00 1.95 1.15 4.49
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
VIGAS, CONCRETO F´c=210 kg/cm2 - 3 PISO
EJE 13*VA-2 1.00 2.50 1.22 3.05
EJE 13 VA-2 1.00 3.40 1.22 4.15
VB 2.00 3.95 0.40 3.16
V.CUMBRERA 1.00 3.95 0.50 1.98
EJE P-O VS-02 2.00 4.30 0.90 7.74
VB 1.00 7.60 0.40 3.04
V-202 2.00 1.00 0.45 0.90
V-201 2.00 2.00 0.65 2.60

ESCALERA 04
VIGAS, CONCRETO F´c=210 kg/cm2 - 1 PISO
EJE J VE 1.00 2.95 1.05 3.10
ENTRE EJE I-J VA-1 1.00 3.85 1.15 4.43
EJE I VA-1 1.00 3.85 1.15 4.43
VB 1.00 3.85 0.40 1.54
EJE 23-24 VS-01 2.00 6.20 0.90 11.16
V-101 2.00 1.95 1.15 4.49

VIGAS, CONCRETO F´c=210 kg/cm2 - 2 PISO


EJE J VE 1.00 2.95 1.05 3.10
ENTRE EJE I-J VA-1 1.00 3.85 1.15 4.43
EJE I VA-1 1.00 3.85 1.15 4.43
VB 1.00 3.85 0.40 1.54
EJE 23-24 VS-01 2.00 6.20 0.90 11.16
V-101 2.00 1.95 1.15 4.49

VIGAS, CONCRETO F´c=210 kg/cm2 - 3 PISO


EJE J VA-2 1.00 2.95 1.22 3.60
EJE I VA-2 1.00 3.85 1.22 4.70
VB 2.00 4.85 0.40 3.88
V.CUMBRERA 1.00 4.60 0.50 2.30
EJE 23-24 VS-02 2.00 7.65 0.90 13.77
VB 1.00 10.85 0.40 4.34
V-202 2.00 1.00 0.45 0.90
V-201 2.00 2.00 0.65 2.60

01.05.05.04 VIGAS, ACERO F'y=4200 kg/cm2 KG 28,528.56


MODULOS HOJA DE ACERO 01 28,528.56

01.05.06 LOSAS ALIGERADAS


01.05.06.01 LOSA ALIGERADA, CONCRETO F´c=210 kg/cm2 M3 139.98
modulos Nº Veces Largo Ancho AREA(m2) FACTOR
SS.HH. COLISEO
ENTRE EJE A-B 1.00 1.00 10.30 8.90 91.67
ENTRE EJE D-F 1.00 1.00 3.85 9.10 35.04
-1.00 2.00 2.15 0.80 -3.44
-1.00 2.00 0.75 0.90 -1.35

PABELLON A
PRIMER PISO modulos Nº Veces Largo Ancho
EJE K-Ñ INTER. 13-14 1.00 4 7.40 3.63 107.45
VOLADO FRONTAL 1.00 4 1.75 3.63 25.41
SEGUNDO PISO
EJE K-Ñ INTER. 13-14 1.00 4 7.40 3.63 107.45
VOLADO FRONTAL 1.00 4 1.75 3.63 25.41
TERCER PISO
EJE K-Ñ INTER. 13-14 1.00 4 7.10 3.63 103.09
VOLADO FRONTAL 1.00 4 1.80 3.63 26.14
VOLADO POSTERIOR 1.00 4 0.85 3.63 12.34

PABELLON B
PRIMER PISO modulos Nº Veces Largo Ancho
ENTRE EJE 25-27
PAÑO CENTRAL 1.00 2 7.40 3.63 53.72
VOLADO FRONTAL 1.00 2 1.75 3.63 12.71
ENTRE EJE 27-28
PAÑO CENTRAL 1.00 1 AREA 25.70 25.70
VOLADO FRONTAL 1.00 1 5.70 5.70
ENTRE EJE 28-29
PAÑO CENTRAL 1.00 1 AREA 22.99 22.99
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90
ENTRE EJE 29-20
PAÑO CENTRAL 1.00 1 AREA 20.65 20.65
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90

SEGUNDO PISO modulos Nº Veces Largo Ancho


ENTRE EJE 25-27
PAÑO CENTRAL 1.00 2 7.40 3.63 53.72
VOLADO FRONTAL 1.00 2 1.75 3.63 12.71
ENTRE EJE 27-28
PAÑO CENTRAL 1.00 1 AREA 25.70 25.70
VOLADO FRONTAL 1.00 1 5.70 5.70
ENTRE EJE 28-29
PAÑO CENTRAL 1.00 1 AREA 22.99 22.99
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
ENTRE EJE 29-20
PAÑO CENTRAL 1.00 1 AREA 20.65 20.65
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90

TERCER PISO modulos Nº Veces Largo Ancho


ENTRE EJE 25-27
PAÑO CENTRAL 1.00 2 7.40 3.63 53.72
VOLADO FRONTAL 1.00 2 1.75 3.63 12.71
ENTRE EJE 27-28
PAÑO CENTRAL 1.00 1 AREA 25.70 25.70
VOLADO FRONTAL 1.00 1 5.70 5.70
ENTRE EJE 28-29
PAÑO CENTRAL 1.00 1 AREA 22.99 22.99
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90
ENTRE EJE 29-20
PAÑO CENTRAL 1.00 1 AREA 20.65 20.65
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90
VOLADO POSTEROR 1.00 5 0.85 3.63 15.43

PABELLON C
PRIMER PISO modulos Nº Veces Largo Ancho
INTER. I-J 1.00 6.00 7.40 3.63 161.17
VOLADO FRONTAL 1.00 6.00 1.75 3.63 38.12
SEGUNDO PISO
INTER. I-J 1.00 6.00 7.40 3.63 161.17
VOLADO FRONTAL 1.00 6.00 1.75 3.63 38.12
VOLADO POSTERIOR 1.00 6.00 0.80 3.63 17.42

SS.HH. DOCENTES -ALUMNOS


ENTRE EJE 1-15 Y H-J 1.00 1.00 AREA 72.82 72.82

ESCALERA 02
PRIMER Y SEGUNDO PISO
01 NIVEL EJE 15-16 1.00 2.00 1.75 3.50 12.25

TERCER PRISO
EJEO-P INTER. 13-14 1.00 1 7.10 3.50 24.85
1.00 1 0.80 3.50 2.80
VOLADO FRONTAL 1.00 1 1.80 3.50 6.30
VOLADO POSTERIOR 1.00 1 0.85 3.50 2.98
VOLADO LATERAL 1.00 1 6.75 0.30 2.03

ESCALERA 04
PRIMER Y SEGUNDO PISO
EJE I-J 1.00 2.00 2.40 3.85 18.48
1.00 2.00 1.75 3.85 13.48
TERCER PRISO
EJE I-J 1.00 1 3.55 3.85 13.67
1.00 1 3.55 3.85 13.67
VOLADO FRONTAL 1.00 1 1.80 3.85 6.93
VOLADO POSTERIOR 1.00 1 0.85 3.85 3.27
VOLADO LATERAL 1.00 1 9.80 0.30 2.94

TOTAL AREA m2 1598.91 0.0875


139.98

01.05.06.02 LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO M2 1,598.91


SS.HH. COLISEO
ENTRE EJE A-B 1.00 1.00 10.30 8.90 91.67
ENTRE EJE D-F 1.00 1.00 3.85 9.10 35.04
-1.00 2.00 2.15 0.80 -3.44
-1.00 2.00 0.75 0.90 -1.35

PABELLON A
PRIMER PISO modulos Nº Veces Largo Ancho
EJE K-Ñ INTER. 13-14 1.00 4 7.40 3.63 107.45
VOLADO FRONTAL 1.00 4 1.75 3.63 25.41
SEGUNDO PISO
EJE K-Ñ INTER. 13-14 1.00 4 7.40 3.63 107.45
VOLADO FRONTAL 1.00 4 1.75 3.63 25.41
TERCER PISO
EJE K-Ñ INTER. 13-14 1.00 4 7.10 3.63 103.09
VOLADO FRONTAL 1.00 4 1.80 3.63 26.14
VOLADO POSTERIOR 1.00 4 0.85 3.63 12.34

PABELLON B
PRIMER PISO modulos Nº Veces Largo Ancho
ENTRE EJE 25-27
PAÑO CENTRAL 1.00 2 7.40 3.63 53.72
VOLADO FRONTAL 1.00 2 1.75 3.63 12.71
ENTRE EJE 27-28
PAÑO CENTRAL 1.00 1 AREA 25.70 25.70
VOLADO FRONTAL 1.00 1 5.70 5.70
ENTRE EJE 28-29
PAÑO CENTRAL 1.00 1 AREA 22.99 22.99
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90
ENTRE EJE 29-20
PAÑO CENTRAL 1.00 1 AREA 20.65 20.65
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

SEGUNDO PISO modulos Nº Veces Largo Ancho


ENTRE EJE 25-27
PAÑO CENTRAL 1.00 2 7.40 3.63 53.72
VOLADO FRONTAL 1.00 2 1.75 3.63 12.71
ENTRE EJE 27-28
PAÑO CENTRAL 1.00 1 AREA 25.70 25.70
VOLADO FRONTAL 1.00 1 5.70 5.70
ENTRE EJE 28-29
PAÑO CENTRAL 1.00 1 AREA 22.99 22.99
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90
ENTRE EJE 29-20
PAÑO CENTRAL 1.00 1 AREA 20.65 20.65
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90

TERCER PISO modulos Nº Veces Largo Ancho


ENTRE EJE 25-27
PAÑO CENTRAL 1.00 2 7.40 3.63 53.72
VOLADO FRONTAL 1.00 2 1.75 3.63 12.71
ENTRE EJE 27-28
PAÑO CENTRAL 1.00 1 AREA 25.70 25.70
VOLADO FRONTAL 1.00 1 5.70 5.70
ENTRE EJE 28-29
PAÑO CENTRAL 1.00 1 AREA 22.99 22.99
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90
ENTRE EJE 29-20
PAÑO CENTRAL 1.00 1 AREA 20.65 20.65
VOLADO FRONTAL 1.00 1 0.80 3.63 2.90
VOLADO POSTEROR 1.00 5 0.85 3.63 15.43

PABELLON C
PRIMER PISO modulos Nº Veces Largo Ancho
INTER. I-J 1.00 6.00 7.40 3.63 161.17
VOLADO FRONTAL 1.00 6.00 1.75 3.63 38.12
SEGUNDO PISO
INTER. I-J 1.00 6.00 7.40 3.63 161.17
VOLADO FRONTAL 1.00 6.00 1.75 3.63 38.12
VOLADO POSTERIOR 1.00 6.00 0.80 3.63 17.42

SS.HH. DOCENTES -ALUMNOS


ENTRE EJE 1-15 Y H-J 1.00 1.00 AREA 72.82 72.82

ESCALERA 02
PRIMER Y SEGUNDO PISO
01 NIVEL EJE 15-16 1.00 2.00 1.75 3.50 12.25

TERCER PRISO
EJEO-P INTER. 13-14 1.00 1 7.10 3.50 24.85
1.00 1 0.80 3.50 2.80
VOLADO FRONTAL 1.00 1 1.80 3.50 6.30
VOLADO POSTERIOR 1.00 1 0.85 3.50 2.98
VOLADO LATERAL 1.00 1 6.75 0.30 2.03

ESCALERA 04
PRIMER Y SEGUNDO PISO
EJE I-J 1.00 2.00 2.40 3.85 18.48
1.00 2.00 1.75 3.85 13.48
TERCER PRISO
EJE I-J 1.00 1 3.55 3.85 13.67
1.00 1 3.55 3.85 13.67
VOLADO FRONTAL 1.00 1 1.80 3.85 6.93
VOLADO POSTERIOR 1.00 1 0.85 3.85 3.27
VOLADO LATERAL 1.00 1 9.80 0.30 2.94

01.05.06.03 LOSA ALIGERADA, ACERO F'y=4200 kg/cm2 KG 8,032.87

01.05.06.04 LOSA ALIGERADA, LADRILLO HUECO 15X30X30 UND 13,319.00


Area Fac Cantidad F redon.
1,598.91 8.33 13318.92 13,319.00

01.05.07 MUROS DE CONTENCION


01.05.07.01 MUROS DE CONTENCION ARMADOS,CONCRETO F'C=210 KG/CM2 M3 67.63
COLISEO VECES LARGO ANCHO ESPESOR
MA-01
EJE 12
PANTALLA 1.00 23.35 2.42 0.25 14.13
EJE H
PANTALLA 1.00 36.25 2.42 0.25 21.93
MODULO B
MA-03
EJE J
PANTALLA 1.00 14.55 2.30 0.25 8.37

MODULO C
MA-02
EJE J
PANTALLA 1.00 17.25 2.00 0.25 8.63
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA

SS.HH. ALUMNOS-DOC
EJE 1
MA-04
PANTALLA 1.00 6.50 3.30 0.25 5.36
MA-05 1.00 10.75 2.80 0.25 7.53

ESCALERA 04
MA-03
EJE J
PANTALLA 1.00 2.95 2.30 0.25 1.70

01.05.07.02 MUROS DE CONTENCION ARMADOS, ENCOFRADO Y DESENCOFRADO CARAVISTA M2 541.06


VECES LARGO ALTO CARAS
COLISEO
MA-01
EJE 12
PANTALLA 1.00 23.35 2.42 2.00 113.01
EJE H
PANTALLA 1.00 36.25 2.42 2.00 175.45
MODULO B
MA-03
EJE J
PANTALLA 1.00 14.55 2.30 2.00 66.93

MODULO C
MA-02
EJE J
PANTALLA 1.00 17.25 2.00 2.00 69.00

SS.HH. ALUMNOS-DOC
EJE 1
MA-04
PANTALLA 1.00 6.50 3.30 2.00 42.90
MA-05 1.00 10.75 2.80 2.00 60.20

ESCALERA 04
MA-03
EJE J
PANTALLA 1.00 2.95 2.30 2.00 13.57

01.05.07.03 MUROS DE CONTENCION ARMADOS, ACERO F'y=4200 kg/cm2 KG 4,074.44

01.05.08 GRADERIAS
01.05.08.01 GRADERIAS, CONCRETO F´c=210 kg/cm2 M3 VECES LARGO ALTURA ESPESOR 68.79
COLISEO
EJE B
CONTRAPASO 5.00 32.80 0.45 0.15 11.07
PASOS 5.00 32.80 0.50 0.15 12.30
EJE 12
CONTRAPASO 5.00 20.20 0.45 0.15 6.82
PASOS 5.00 20.20 0.50 0.15 7.58
EJE H
CONTRAPASO 5.00 32.80 0.45 0.15 11.07
PASOS 5.00 32.80 0.50 0.15 12.30
EJE 2
CONTRAPASO 5.00 8.10 0.45 0.15 2.73
PASOS 5.00 8.10 0.50 0.15 3.04

GRADAS PARA ACCESO 7 4.00 1.20 0.23 0.25 1.89

01.05.08.02 GRADERIAS, ENCOFRADO Y DESENCOFRADO M2 664.86


EJE B
CONTRAPASO 5.00 32.80 0.45 2.00 147.60
PASOS 5.00 32.80 0.50 1.00 82.00
EJE 12
CONTRAPASO 5.00 20.20 0.45 2.00 90.90
PASOS 5.00 20.20 0.50 1.00 50.50
EJE H
CONTRAPASO 5.00 32.80 0.45 2.00 147.60
PASOS 5.00 32.80 0.50 1.00 82.00
EJE 2
CONTRAPASO 5.00 8.10 0.45 2.00 36.45
PASOS 5.00 8.10 0.50 1.00 20.25
GRADAS PARA ACCESO 7 4.00 1.20 0.23 1.00 7.56

01.05.08.03 GRADERIAS, ACERO F'y=4200 kg/cm2 KG 7,553.32

01.05.09 ESCALERA
01.05.09.01 ESCALERA, CONCRETO F´c=210 kg/cm2 M3 AREA CORTE ANCHO 30.82
ESCALERA 01 1.10 2.30 2.53
ESCALERA 02
TRAMO 01 1.40 1.70 2.38
TRAMO 02 1.150 1.70 1.96
HOJA DE METRADOS ESTRUCTURAS
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO
PROVINCIA : SANCHEZ CARRION
DISTRITO: MARCABAL

MEDIDAS
PARTIDA DESCRIPCION UND Nº VECES PARCIAL TOTAL
LARGO ANCHO ALTURA
TRAMO 03 1.15 1.70 1.96
TRAMO 04 1.150 1.70 1.96
ESCALERA 03 1.10 3.50 3.85
ESCALERA 04
TRAMO 01 1.51 1.90 2.87
TRAMO 02 1.264 1.90 2.40
TRAMO 03 1.30 1.90 2.47
TRAMO 04 1.264 1.90 2.40
ESCALERA 05 1.10 2.87 3.16
ESCALERA 06
TRAMO 01 2.00 1.21 0.90 2.18
TRAMO 02 2.00 0.400 0.90 0.72

01.05.09.02 ESCALERA, ENCOFRADO Y DESENCOFRADO M2 136.71


ESCALERA 01 VECES CARAS LARGO ANCHO PARCIAL
BASE 1.00 1.000 2.45 2.30 5.64
CONTRAPASOS 9.00 1.000 0.180 2.30 3.73
ESCALERA 02
TRAMO 01 1.00 1.00 4.70 1.70 7.99
TRAMO 02 1.00 1.00 4.70 1.70 7.99
TRAMO 03 1.00 1.00 4.70 1.70 7.99
TRAMO 04 1.00 1.00 4.70 1.70 7.99
CONTRAPASOS 40.00 1.00 0.16 1.70 10.88
ESCALERA 03
BASE 1.00 1.000 2.45 3.50 8.58
CONTRAPASOS 9.00 1.000 0.180 3.50 5.67
ESCALERA 04
TRAMO 01 1.00 1.00 5.20 1.90 9.88
TRAMO 02 1.00 1.00 5.20 1.90 9.88
TRAMO 03 1.00 1.00 5.20 1.90 9.88
TRAMO 04 1.00 1.00 5.20 1.90 9.88
CONTRAPASOS 40.00 1.00 0.16 1.90 12.16
ESCALERA 05
BASE 1.00 1.000 2.45 2.87 7.03
CONTRAPASOS 9.00 1.000 0.180 2.87 4.65
ESCALERA 06
BASE 1.00 1.000 5.15 0.90 4.64
CONTRAPASOS 14.00 1.000 0.180 0.90 2.27

01.05.09.03 ESCALERA, ACERO F`y=4200 kg/cm2 KG 2,406.06

01.05.10 VARIOS
01.05.0.01 GARGOLA DE CONCRETO, TERMINADO SEGUN DISEÑO UND parcial 12.00
MODULO A 2.00 1.00 2.00
MODULO B 2.00 2.00 4.00
MODULO C 1.00 2.00 2.00
ESCALERA 02 2.00 1.00 2.00
ESCALERA 04 2.00 1.00 2.00
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

01.05.01.03 ZAPATAS, ACERO F'y=4200 kg/cm2


LONGITUD TOTAL

DESCRIPCIÓN
ELEM
Ø CANT. LONG. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
f = .25kg/m f = .58kg/m f =1.02kg/m f =1.60kg/m f =2.26kg/m f =4.04kg/m
MODULO COLISEO
EJE B
ZC-05
3.85

1 5/8" 7 3.85 43.12

1.45 1 5/8" 16 1.45 37.12

ZC-01
0.95

6 5/8" 12 0.95 109.44

2.80 6 5/8" 5 2.80 134.40

ZC-02
1.15

1 5/8" 12 1.15 22.08

2.80 1 5/8" 5 2.80 22.40

Z-06
0.95

1 5/8" 5 0.95 7.60

1.25 1 5/8" 4 1.25 8.00

Z-04
1.45

1 5/8" 7 1.45 16.24

1.65 1 5/8" 7 1.65 18.48

EJE 12
Z-03
0.95

5 5/8" 4 0.95 30.40

1.05 5 5/8" 4 1.05 33.60

Z-04
1.45

5 5/8" 7 1.45 81.20

1.65 5 5/8" 7 1.65 92.40

EJE H
Z-06
0.95

1 5/8" 5 0.95 7.60

1.25 1 5/8" 4 1.25 8.00

Z-05
1.85

1 5/8" 7 1.85 20.72

1.45 1 5/8" 8 1.45 18.56

Z-03
0.95

6 5/8" 4 0.95 36.48

1.05 6 5/8" 4 1.05 40.32

Z-05
1.85

6 5/8" 7 1.85 124.32


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
1.45 6 5/8" 8 1.45 111.36

Z-06
0.95

1 5/8" 5 0.95 7.60

1.25 1 5/8" 4 1.25 8.00

Z-07
2.05

1 5/8" 7 2.05 22.96

1.45 1 5/8" 9 1.45 20.88

ZC-06
3.85

1 5/8" 7 3.85 43.12

1.45 1 5/8" 16 1.45 37.12

EJE 2
ZC-04
3.47

3 5/8" 4 3.47 66.62

0.85 3 5/8" 24 0.85 97.92

1.45

3 5/8" 7 1.45 48.72

1.65 3 5/8" 7 1.65 55.44

Z-04
1.45

2 5/8" 7 1.45 32.48

1.65 2 5/8" 7 1.65 36.96

ZC-03
2.80

1 5/8" 4 2.80 17.92

0.85 1 5/8" 12 0.85 16.32

MUROS ARMADOS
EJE 12
MA-01
13.68

1 1/2" 6 13.68 83.72

1.05 1 1/2" 68 1.05 72.83

EJE H
MA-01
19.98

1 1/2" 6 19.98 122.28

1.05 1 1/2" 100 1.05 107.10

MODULO A
EJE 14 CORTE 31/2"@0.15M
15.80

1 1/2" 8 15.80 128.93

1.65 1 1/2" 105 1.65 176.72

EJE 13 CORTE 41/2"@0.15M


15.80

1 1/2" 10 15.80 161.16


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

1.95 1 1/2" 105 1.95 208.85

EJE R-K CORTE 1-1 1/2"@0.15M


5.50

2 1/2" 8 5.50 89.76

1.35 2 1/2" 36 1.35 99.14

MODULO B
EJE I 20.00 ENPALME

1.20 1 1/2" 10 21.20 216.24

1.65 1 1/2" 133 1.65 223.84

EJE I CORTE 4- 20.50 ENPALME

1.20 1 1/2" 8 21.70 177.07

1.95 1 1/2" 136 1.95 270.50

MODULO C
EJE I 24.00 ENPALME

1.20 1 1/2" 10 25.20 257.04

1.65 1 1/2" 160 1.65 269.28

EJE I CORTE 4- 24.00 ENPALME

1.20 1 1/2" 8 25.20 205.63

1.95 1 1/2" 160 1.95 318.24

SS.HH. ALUMNOS - DOC

EJE 1 MA-04
6.50

1 1/2" 10 6.50 66.30

1.35 1 1/2" 43 1.35 59.21

EJE 1 MA-05
10.50

1 1/2" 9 10.50 96.39

1.20 1 1/2" 70 1.20 85.68

ESCALERA 02
EJE 13 CORTE 4
3.90

1 1/2" 10 3.90 39.78

1.95 1 1/2" 26 1.95 51.71

EJE 13* CPRTE 3


3.90

1 1/2" 8 3.90 31.82

1.65 1 1/2" 26 1.65 43.76

ESCALERA 04
EJE 13 CORTE 4
4.35

1 1/2" 10 4.35 44.37

1.95 1 1/2" 29 1.95 57.68

EJE 13* CPRTE 3


4.35

1 1/2" 8 4.35 35.50

1.65 1 1/2" 29 1.65 48.81


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

PORTICO ENTRADA
Z-1 0.80
1 3/8" 9 0.80 4.18

1.60 1 1/2" 4 1.60 6.53


|

Z-2 1.90
1 3/8" 9 1.90 9.92

1.60 1 1/2" 10 1.60 16.32

14.09 3,872.19 1,535.90 0.00 0.00


Total 5,422.18 KG

01.05.02.03 VIGAS DE CIMENTACION, ACERO F'y=4200 kg/cm kg.


LONGITUD TOTAL

DESCRIPCIÓN
ELEM
Ø CANT. LONG. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
f = .25kg/m f = .58kg/m f =1.02kg/m f =1.60kg/m f =2.26kg/m f =4.04kg/m
MODULO COLISEO
EJE B VC-01
6Ø3/4"

39.40

0.30 0.30 1 3/4" 6 40.00 542.40

0.19 0.30

0.44 0.44 1 3/8" 323 1.56 292.25


0.19

EJE 2 VC-02
6Ø5/8"

16.50

0.30 0.30 1 5/8" 6 17.10 164.16

0.19 0.30

0.44 0.44 1 3/8" 115 1.56 104.05


0.19

MODULO A
EJE J-I

8Ø3/4" + 4Ø1/2"
EST Ø 3/8" @ 0.20M
16.50

0.80 0.80 2 3/4" 8 18.10 654.50


2 1/2" 4 18.10 147.70

0.40 0.30

1.40 1.40 2 3/8" 82 3.90 370.97


0.40

EJE Ñ-K CORTE 1-1


4Ø3/4" + 2Ø1/2"
EST Ø 3/8" @ 0.20M
7.90

0.80 0.80 2 3/4" 4 9.50 171.76


2 1/2" 2 9.50 38.76

0.20 0.30

1.40 1.40 2 3/8" 38 3.50 154.28


0.20

EJE L,M,N VC-01


6Ø3/4" + 2Ø1/2"

7.90

0.30 0.30 3 3/4" 6 8.50 345.78


3 1/2" 2 8.50 52.02

0.19 0.40

0.54 0.54 3 3/8" 29 1.86 93.86


0.19
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
MODULO B
EJE I CORTE 4-4

8Ø3/4" + 4Ø1/2"
EST Ø 3/8" @ 0.20M
20.50

0.80 0.80 1 3/4" 8 22.10 399.57


1 1/2" 4 22.10 90.17

0.40 0.30

1.40 1.40 1 3/8" 102 3.90 230.72


0.40

EJE J CORTE 3-3

8Ø3/4" + 4Ø1/2"
EST Ø 3/8" @ 0.20M
21.30

0.80 0.80 1 3/4" 8 22.90 414.03


1 1/2" 4 22.90 93.43

0.40 0.30

1.40 1.40 1 3/8" 107 3.90 242.03


0.40

EJE 26-27 VC-01


6Ø3/4" + 2Ø1/2"

7.90

0.30 0.30 2 3/4" 6 8.50 230.52


2 1/2" 2 8.50 34.68

0.19 0.40

0.54 0.54 2 3/8" 29 1.86 62.57


0.19

EJE 28 VC-01
6Ø3/4" + 2Ø1/2"

7.20

0.30 0.30 1 3/4" 6 7.80 105.77


1 1/2" 2 7.80 15.91

0.19 0.40

0.54 0.54 1 3/8" 27 1.86 29.13


0.19

EJE 29 VC-01
6Ø3/4" + 2Ø1/2"

6.55

0.30 0.30 1 3/4" 6 7.15 96.95


1 1/2" 2 7.15 14.59

0.19 0.40

0.54 0.54 1 3/8" 24 1.86 25.89


0.19

MODULO C
EJE I , J
23.70

0.80 0.80 2 3/4" 5 25.30 571.78

23.70 2 1/2" 4 25.30 206.45

0.80 0.80 2 3/4" 3 25.30 343.07


23.70

0.40 0.30

1.40 1.40 2 3/8" 120 3.90 542.88


0.40

EJE 17-19-21 VC-01


6Ø3/4" + 2Ø1/2"

7.90

0.30 0.30 3 3/4" 6 8.50 345.78


1/2" 2 8.50 0.00

0.19 0.40
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.54 0.54 0 3/8" 29 1.86 0.00
0.19

ESCALERA 02
EJE 13-13*
3.90

0.80 0.80 2 3/4" 5 5.50 124.30

3.90 2 1/2" 4 5.50 44.88

0.80 0.80 2 3/4" 3 5.50 74.58


3.90

0.40 0.30

1.40 1.40 2 3/8" 20 3.90 90.48


0.40

ESCALERA 04
EJE I , J
4.35

0.80 0.80 2 3/4" 5 5.95 134.47

4.35 2 1/2" 4 5.95 48.55

0.80 0.80 2 3/4" 3 5.95 80.68


4.35

0.40 0.30

1.40 1.40 2 3/8" 22 3.90 99.53


0.40

0.00 2,338.64 787.13 164.16 4,635.94 0.00


Total 7,925.87 kg

01.05.03.03 SOBRECIMIENTO, ACERO F'y=4200 kg/cm2 KG


LONGITUD TOTAL

DESCRIPCIÓN
ELEM
Ø CANT. LONG. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
f = .25kg/m f = .58kg/m f =1.02kg/m f =1.60kg/m f =2.26kg/m f =4.04kg/m

SS.HH. COLISEO
EJE 2-2 CORTE 2-2
5.50

0.20 0.20 1 5/8" 4 5.90 37.76


1 3/8" 2 5.90 6.84

0.08 0.40

0.55 0.55 1 3/8" 34 1.66 32.74


0.08

EJE 3 CORTE 3-3


3.50

0.20 0.20 1 5/8" 4 3.90 24.96

0.08 0.40

0.40 0.40 1 3/8" 25 1.36 19.72


0.08

EJE 4 CORTE 4-4


5.60

0.20 0.20 1 1/2" 4 6.00 24.48

0.08 0.40

0.40 0.40 1 3/8" 30 1.36 23.66


0.08

EJE 5-5 CORTE 2-2


4.00

0.20 0.20 1 5/8" 4 4.40 28.16


1 3/8" 2 4.40 5.10

0.08 0.40

0.55 0.55 1 3/8" 27 1.66 26.00


0.08

EJE A-A CORTE 1-1


8.95

0.20 0.20 1 5/8" 4 9.35 59.84

0.08 0.40
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.40 0.40 1 3/8" 54 1.36 42.60
0.08

EJE B-B CORTE 1-1


4.50

0.20 0.20 1 5/8" 4 4.90 31.36

0.08 0.40

0.40 0.40 1 3/8" 31 1.36 24.45


0.08

4.30

0.20 0.20 1 5/8" 4 4.70 30.08

0.08 0.40

0.40 0.40 1 3/8" 29 1.36 22.88


0.08

MODULO COLISEO
ENTRE EJE C-D CORTE 4-4
3.30

0.20 0.20 2 1/2" 4 3.70 30.19

0.08 0.40

0.40 0.40 2 3/8" 23 1.36 36.28


0.08

4.10

0.20 0.20 2 1/2" 4 4.50 36.72

0.08 0.40

0.40 0.40 2 3/8" 27 1.36 42.60


0.08

EJE E CORTE 3-3


4.30

0.20 0.20 1 5/8" 4 4.70 30.08

0.08 0.40

0.40 0.40 1 3/8" 30 1.36 23.66


0.08

EJE 3-3 CORTE 5-5


4.90

0.20 0.20 2 5/8" 4 5.30 67.84

0.08 0.40

0.40 0.40 2 3/8" 32 1.36 50.48


0.08

MODULO A
CORTE Y-Y
7.90

0.15 0.15 1 3/8" 4 8.20 19.02

1.40 1 3/8" 37 1.60 34.34

0.20

MODULO B
EJE 25-27
7.90

0.30 0.30 2 5/8" 6 8.50 163.20


2 1/2" 2 8.50 34.68

0.19 0.40

0.54 0.54 2 3/8" 36 1.86 77.67


0.19

EJE 30
5.90

0.30 0.30 1 5/8" 6 6.50 62.40


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
1 1/2" 2 6.50 13.26

0.19 0.40

0.54 0.54 1 3/8" 27 1.86 29.13


0.19

MODULO C
EJE 16,18,20,22
7.90

0.30 0.30 4 5/8" 6 8.50 326.40


4 1/2" 2 8.50 69.36

0.19 0.40

0.54 0.54 4 3/8" 36 1.86 155.35


0.19

SS.HH. ALUMNOS - DOC


EJE H CORTE 4-4
7.70

0.20 0.20 1 5/8" 4 8.10 51.84

0.08 0.40

0.40 0.40 1 3/8" 46 1.36 36.28


0.08

EJEJ 2-2 CORTE 3-3


4.80

0.15 0.15 2 3/8" 13 5.10 76.91

5.35 0.10 2 3/8" 22 5.65 144.19

0.20

EJE 3 CORTE 4-4


4.85

0.20 0.20 1 5/8" 4 5.25 33.60

0.08 0.40

0.40 0.40 1 3/8" 31 1.36 24.45


0.08

ENTRE EJE I-J CORTE 5-5


9.50

0.20 0.20 1 1/2" 4 9.90 40.39

0.08 0.40

0.40 0.40 1 3/8" 68 1.36 53.64


0.08

EJE 15 CORTE 4-4


2.75

0.20 0.20 1 5/8" 4 3.15 20.16

0.08 0.40

0.40 0.40 1 3/8" 20 1.36 15.78


0.08

4.20

0.20 0.20 1 5/8" 4 4.60 29.44

0.08 0.40

0.40 0.40 1 3/8" 28 1.36 22.09


0.08

ESCALERA 02
EJE P-O CC-1
4.10

0.30 0.30 2 5/8" 6 4.70 90.24


2 1/2" 2 4.70 19.18

0.19 0.40

0.54 0.54 2 3/8" 16 1.86 34.52


0.19

SCA-1 -- ENTRE EJE P-O


5.50
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.20 0.20 1 5/8" 4 5.90 37.76
1 3/8" 2 5.90 6.84
0.20 0.20 1 5/8" 3 5.90 28.32
5.50

0.19 0.30
0.44 0.44 1 3/8" 29 1.56 26.24
0.19

ESCALERA PRINCIPAL
EJE 23-24
7.90

0.30 0.30 2 5/8" 6 8.50 163.20


2 1/2" 2 8.50 34.68

0.19 0.40

0.54 0.54 2 3/8" 36 1.86 77.67


0.19

SCA-1 --
6.20
0.20 0.20 2 5/8" 4 6.60 84.48
1 3/8" 2 6.60 7.66
0.20 0.20 2 5/8" 3 6.60 63.36
6.20

0.19 0.30
0.44 0.44 2 3/8" 35 1.56 63.34
0.19

CERCO PERIMETRICO

POSTERIOR PABELLON A
19.65
0.50 0.50 1 3/8" 8 20.65 95.82
0.09 0.40

0.99 0.99 1 1/4" 131 2.56 83.84


0.09

FRONTAL I.E.
20.85
0.50 0.50 1 3/8" 8 21.85 101.38
0.09 0.40

0.99 0.99 1 1/4" 140 2.56 89.60


0.09

PORTICO
VC
4.35
0.35 0.35 1 1/2" 4 5.05 20.60
0.19 0.15

0.44 0.44 1 1/4" 25 1.41 8.81


0.19

182.25 1,459.33 323.54 1,464.48 0.00 0.00


Total 3,429.60 kg

01.05.04.04 COLUMNAS, ACERO F'y=4200 kg/cm2 KG


LONGITUD TOTAL

DESCRIPCIÓN
ELEM
Ø CANT. LONG. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
f = .25kg/m f = .58kg/m f =1.02kg/m f =1.60kg/m f =2.26kg/m f =4.04kg/m

SS.HH. COLISEO
C-5,8
Acero principal 0.30

5.30 2 5/8" 4 5.90 75.52

0.30

Estribos 0.19 0.30

0.19 0.19 2 3/8" 27 1.06 33.20


0.19

C-6,7
Acero principal 0.30

6.30 2 5/8" 4 6.90 88.32

0.30
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

Estribos 0.19 0.30

0.19 0.19 2 3/8" 30 1.06 36.89


0.19

C-9
Acero principal 0.30

4 5/8" 4 6.90 176.64


6.30 4 1/2" 2 6.90 56.30

0.30

Estribos 0.09 0.30

0.36 0.36 4 3/8" 30 1.20 83.52


0.09

CA-1
Acero principal 0.30

5.80

7 1/2" 4 6.40 182.78


0.30

Estribos 0.19 0.30

0.09 0.09 7 3/8" 26 0.86 90.78


0.19

COLISEO
EJE B
C-2
Acero principal 0.30

7.80 1 5/8" 4 8.40 53.76


1 3/4" 8 8.40 151.87
0.30

Estribos 0.39 0.30

0.19 0.19 1 3/8" 45 1.46 38.11


0.39

Estribos 0.39 0.30

0.19 0.19 1 3/8" 45 1.46 38.11


0.39

C-1
Acero principal 0.30

7.80

9 3/4" 8 8.40 1,366.85


0.30

Estribos 0.44 0.30

0.19 0.19 9 3/8" 45 1.56 366.44


0.44

C-4
Acero principal 0.30

1.80 8 5/8" 6 2.40 184.32

0.30

Estribos 0.39 0.30

0.19 0.19 8 3/8" 6 1.46 40.65


0.39

EJE B
C-2
Acero principal 0.30

9.50 2 5/8" 4 10.10 129.28


2 3/4" 8 10.10 365.22
0.30

Estribos 0.39 0.30

0.19 0.19 2 3/8" 55 1.46 93.15


0.39

Estribos 0.39 0.30

0.19 0.19 2 3/8" 55 1.46 93.15


0.39

C-3
Acero principal 0.30

9.50
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
5 3/4" 6 10.10 684.78
0.30

Estribos 0.39 0.30

0.19 0.19 5 3/8" 55 1.46 232.87


0.39

C-4
Acero principal 0.30

1.80 7 5/8" 6 2.40 161.28

0.30

Estribos 0.39 0.30

0.19 0.19 7 3/8" 6 1.46 35.57


0.39

EJE H
C-2
Acero principal 0.30

9.65 1 5/8" 4 10.25 65.60


1 3/4" 8 10.25 185.32
0.30

Estribos 0.39 0.30

0.19 0.19 1 3/8" 55 1.46 46.57


0.39

Estribos 0.39 0.30

0.19 0.19 1 3/8" 55 1.46 46.57


0.39

C-1
Acero principal 0.30

9.65

9 3/4" 8 10.25 1,667.88


0.30

Estribos 0.44 0.30

0.19 0.19 9 3/8" 55 1.56 447.88


0.44

C-4
Acero principal 0.30

1.80 8 5/8" 6 2.40 184.32

0.30

Estribos 0.39 0.30

0.19 0.19 8 3/8" 6 1.46 40.65


0.39

EJE 2
C-3
Acero principal 0.30

7.75

5 3/4" 6 8.35 566.13


0.30

Estribos 0.39 0.30

0.19 0.19 5 3/8" 45 1.46 190.53


0.39

C-4
Acero principal 0.30

1.80 4 5/8" 6 2.40 92.16

0.30

Estribos 0.39 0.30

0.19 0.19 4 3/8" 6 1.46 20.32


0.39

C-4
Acero principal 0.30

3.60 4 5/8" 6 4.20 161.28

0.30

Estribos 0.39 0.30

0.19 0.19 4 3/8" 19 1.46 64.36


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.39

C-10
Acero principal 0.30

3.50 1 5/8" 4 4.10 26.24

0.30

Estribos 0.19 0.30

0.19 0.19 1 3/8" 25 1.06 15.37


0.19

CA-1
Acero principal 0.30

3.50

4 1/2" 4 4.10 66.91


0.30

Estribos 0.19 0.30

0.09 0.09 4 3/8" 25 0.86 49.88


0.19

COLUMNAS DE CONFINAMIENTO
EJE B CA-2

Acero principal

0.25

3.35 14 3/8" 4 3.60 116.93

Estribos 0.20 0.10

0.10 0.10 14 1/4" 17 0.70 41.65


0.20 .

EJE B CA-2

Acero principal

0.25

2.70 2 3/8" 4 2.95 13.69

Estribos 0.20 0.10

0.10 0.10 2 1/4" 15 0.70 5.25


0.20 .

EJE 18 CA-2

Acero principal

0.25

2.35 10 3/8" 4 2.60 60.32

Estribos 0.20 0.10

0.10 0.10 10 1/4" 13 0.70 22.75


0.20 .

Acero principal

0.25

1.30 2 3/8" 4 1.55 7.19

Estribos 0.20 0.10

0.10 0.10 2 1/4" 9 0.70 3.15


0.20 .

EJE H CA-2

Acero principal

0.25

2.35 14 3/8" 4 2.60 84.45

Estribos 0.20 0.10

0.10 0.10 14 1/4" 13 0.70 31.85


0.20 .

Acero principal

0.25

1.30 2 3/8" 4 1.55 7.19

Estribos 0.20 0.10

0.10 0.10 2 1/4" 9 0.70 3.15


0.20 .
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
Acero principal

0.25

4.10 2 3/8" 4 4.35 20.18

Estribos 0.20 0.10

0.10 0.10 2 1/4" 20 0.70 7.00


0.20 .

EJE 2 CA-2

Acero principal

0.25

2.35 8 3/8" 4 2.60 48.26

Estribos 0.20 0.10

0.10 0.10 8 1/4" 13 0.70 18.20


0.20 .

Acero principal

0.25

1.30 4 3/8" 4 1.55 14.38

Estribos 0.20 0.10

0.10 0.10 4 1/4" 9 0.70 6.30


0.20 .

PARAPETO ESTRADO

Acero principal

0.25

1.30 4 3/8" 4 1.55 14.38

Estribos 0.20 0.10

0.10 0.10 4 1/4" 9 0.70 6.30


0.20 .

CA-03

Acero principal

0.25

2.00 15 3/8" 2 2.25 39.15

Estribos 0.20 0.00

0.03 0.03 15 1/4" 13 0.46 22.43


0.20 .

MODULO A

C-1
Acero principal 0.30

11.50 4 5/8" 4 12.10 309.76


4 3/4" 6 12.10 656.30
0.30

Estribos 0.38 0.30

0.19 0.19 4 3/8" 88 1.44 293.99


0.38

Estribos 0.38 0.30

0.19 0.19 4 3/8" 88 1.44 293.99


0.38

C-2
Acero principal 0.30

6 5/8" 12 12.10 1,393.92


11.50 6 3/4" 6 12.10 984.46

0.30

Estribos 0.84 0.30

0.17 0.17 6 3/8" 88 2.32 710.48


0.84

0.22 0.30

0.37 0.37 6 3/8" 88 1.48 453.24


0.22

0.20 0.30

0.17 0.17 6 3/8" 88 1.04 318.49


0.20
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.20 0.30

0.17 0.17 6 3/8" 88 1.04 318.49


0.20

C-4
Acero principal 0.30

12.60 2 1/2" 4 13.20 107.71

0.30

Estribos 0.18 0.30

0.19 0.19 2 3/8" 96 1.04 115.81


0.18

columnas de confimaniento-columnetas
1 NIVEL
Acero principal eje 13

0.25

1.93 8 3/8" 4 2.18 40.46

Acero principal eje 14

0.25

1.93 8 3/8" 4 2.18 40.46

Estribos eje 14 0.20 0.10

0.10 0.10 8 1/4" 10 0.70 14.00


0.20 .
Estribos eje 13 0.20 0.10

0.10 0.10 8 1/4" 10 0.70 14.00


0.20

2 NIVEL
Acero principal eje 13

0.25

1.93 8 3/8" 4 2.18 40.46

Acero principal eje 14

0.25

1.55 8 3/8" 4 1.80 33.41

Estribos eje 14 0.20 0.10

0.10 0.10 8 1/4" 8 0.70 11.20


0.20 .
Estribos eje 13 0.20 0.10

0.10 0.10 8 1/4" 10 0.70 14.00


0.20

PARAPETO

0.25

1.15 E XTERIORES 10 3/8" 2 1.65 19.14

0.25

ESTRIBOS PARA PARAPETO

0.13

0.03 0.03 10 1/4" 8 0.32 6.40


0.13

3 NIVEL
Acero principal eje 13

0.25

1.93 8 3/8" 4 2.18 40.46

Acero principal eje 14

0.25

1.55 8 3/8" 4 1.80 33.41


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

Estribos eje 14 0.20 0.10

0.10 0.10 8 1/4" 8 0.70 11.20


0.20 .
Estribos eje 13 0.20 0.10

0.10 0.10 8 1/4" 10 0.70 14.00


0.20

PARAPETO

0.25

1.15 E XTERIORES 10 3/8" 2 1.65 19.14

0.25

ESTRIBOS PARA PARAPETO

0.13

0.03 0.03 10 1/4" 8 0.32 6.40


0.13

MURO ALMACEN BIBLI. CA-3

Acero principal

0.25

2.90 4 1/2" 4 3.15 51.41

Estribos 0.20 0.10

0.10 0.10 4 1/4" 17 0.70 11.90


0.20 .

MODULO B
EJE I
C-3-6-7
Acero principal 0.30

11.50 3 5/8" 8 12.10 464.64


3 3/4" 6 12.10 492.23
0.30

Estribos 0.58 0.30

0.19 0.19 3 3/8" 88 1.84 281.74


0.58

Estribos 0.58 0.30

0.19 0.19 3 3/8" 88 1.84 281.74


0.58

Estribos 0.84 0.30

0.19 0.19 3 3/8" 88 2.36 361.36


0.84

C-2-5
Acero principal 0.30

3 5/8" 12 12.10 696.96


11.50 3 3/4" 6 12.10 492.23

0.30

Estribos 0.84 0.30

0.17 0.17 3 3/8" 88 2.32 355.24


0.84

0.22 0.30

0.37 0.37 3 3/8" 88 1.48 226.62


0.22

0.20 0.30

0.17 0.17 3 3/8" 88 1.04 159.24


0.20

0.20 0.30

0.17 0.17 3 3/8" 88 1.04 159.24


0.20

C-4
Acero principal 0.30

12.60 3 1/2" 4 13.20 161.57

0.30

Estribos 0.18 0.30


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.19 0.19 3 3/8" 96 1.04 173.72
0.18

EJE J
C-3-6-7
Acero principal 0.30

13.80 3 5/8" 8 14.40 552.96


3 3/4" 6 14.40 585.79
0.30

Estribos 0.58 0.30

0.19 0.19 3 3/8" 94 1.84 300.95


0.58

Estribos 0.58 0.30

0.19 0.19 3 3/8" 94 1.84 300.95


0.58

Estribos 0.84 0.30

0.19 0.19 3 3/8" 94 2.36 386.00


0.84

C-2-5
Acero principal 0.30

3 5/8" 12 14.40 829.44


13.80 3 3/4" 6 14.40 585.79

0.30

Estribos 0.84 0.30

0.17 0.17 3 3/8" 94 2.32 379.46


0.84

0.22 0.30

0.37 0.37 3 3/8" 94 1.48 242.07


0.22

0.20 0.30

0.17 0.17 3 3/8" 94 1.04 170.10


0.20

0.20 0.30

0.17 0.17 3 3/8" 94 1.04 170.10


0.20

columnas de confimaniento-columnetas
primer piso
eje I-J
Acero principal

0.25

1.93 12 3/8" 4 2.18 60.69

Acero principal

0.25

1.55 8 3/8" 4 1.80 33.41

Estribos 0.20 0.10

0.10 0.10 8 1/4" 8 0.70 11.20


0.20 .
Estribos 0.20 0.10

0.10 0.10 12 1/4" 10 0.70 21.00


0.20

CA-3 0.25

3.15 4 1/2" 4 3.65 59.57


0.25

Estribos 0.20 0.10

0.10 0.10 4 1/4" 19 0.70 13.30


0.20 .

SEGUNDO piso
eje I-J
Acero principal

0.25

1.93 12 3/8" 4 2.18 60.69


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

Acero principal

0.25

1.55 8 3/8" 4 1.80 33.41

Estribos 0.20 0.10

0.10 0.10 8 1/4" 8 0.70 11.20


0.20 .
Estribos 0.20 0.10

0.10 0.10 12 1/4" 10 0.70 21.00


0.20

CA-3 0.25

2.40 4 1/2" 4 2.90 47.33


0.25

Estribos 0.20 0.10

0.10 0.10 4 1/4" 16 0.70 11.20


0.20 .

PARAPETO

0.25

1.15 E XTERIORES 6 3/8" 2 1.65 11.48

0.25

ESTRIBOS PARA PARAPETO

0.13

0.03 0.03 6 1/4" 8 0.32 3.84


0.13

TERCER piso
eje I-J
Acero principal

0.25

1.93 12 3/8" 4 2.18 60.69

Acero principal

0.25

1.55 8 3/8" 4 1.80 33.41

Estribos 0.20 0.10

0.10 0.10 8 1/4" 8 0.70 11.20


0.20 .
Estribos 0.20 0.10

0.10 0.10 12 1/4" 10 0.70 21.00


0.20

CA-3 0.25

2.40 4 1/2" 4 2.90 47.33


0.25

Estribos 0.20 0.10

0.10 0.10 4 1/4" 16 0.70 11.20


0.20 .

PARAPETO

0.25

1.15 E XTERIORES 6 3/8" 2 1.65 11.48

0.25

ESTRIBOS PARA PARAPETO

0.13

0.03 0.03 6 1/4" 8 0.32 3.84


0.13

MODULO C
EJE I
C-3
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
Acero principal 0.30

8.00 4 5/8" 8 8.60 440.32


4 3/4" 6 8.60 466.46
0.30

Estribos 0.58 0.30

0.19 0.19 4 3/8" 61 1.84 260.40


0.58

Estribos 0.58 0.30

0.19 0.19 4 3/8" 61 1.84 260.40


0.58

Estribos 0.84 0.30

0.19 0.19 4 3/8" 61 2.36 333.99


0.84

C-2
Acero principal 0.30

3 5/8" 12 8.60 495.36


8.00 3 3/4" 6 8.60 349.85

0.30

Estribos 0.84 0.30

0.17 0.17 3 3/8" 61 2.32 246.24


0.84

0.22 0.30

0.37 0.37 3 3/8" 61 1.48 157.09


0.22

0.20 0.30

0.17 0.17 3 3/8" 61 1.04 110.39


0.20

0.20 0.30

0.17 0.17 3 3/8" 61 1.04 110.39


0.20

C-4
Acero principal 0.30

8.00 4 1/2" 4 8.60 140.35

0.30

Estribos 0.18 0.30

0.19 0.19 4 3/8" 61 1.04 147.18


0.18

C-4-TIMPANO
Acero principal 0.30

2.00

7 1/2" 4 2.60 74.26


0.30

Estribos 0.19 0.30

0.19 0.19 7 3/8" 6 1.06 25.82


0.19

EJE J
C-3
Acero principal 0.30

10.00 4 5/8" 8 10.60 542.72


4 3/4" 6 10.60 574.94
0.30

Estribos 0.58 0.30

0.19 0.19 4 3/8" 74 1.84 315.89


0.58

Estribos 0.58 0.30

0.19 0.19 4 3/8" 74 1.84 315.89


0.58

Estribos 0.84 0.30

0.19 0.19 4 3/8" 74 2.36 405.16


0.84

C-2
Acero principal 0.30

3 5/8" 12 10.60 610.56


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
10.00 3 3/4" 6 10.60 431.21

0.30

Estribos 0.84 0.30

0.17 0.17 3 3/8" 74 2.32 298.72


0.84

0.22 0.30

0.37 0.37 3 3/8" 74 1.48 190.56


0.22

0.20 0.30

0.17 0.17 3 3/8" 74 1.04 133.91


0.20

0.20 0.30

0.17 0.17 3 3/8" 74 1.04 133.91


0.20

columnas de confimaniento-columnetas
primer piso
eje I-J
Acero principal

0.25

1.93 12 3/8" 4 2.18 60.69

Acero principal

0.25

1.55 12 3/8" 4 1.80 50.11

Estribos 0.20 0.10

0.10 0.10 12 1/4" 8 0.70 16.80


0.20 .
Estribos 0.20 0.10

0.10 0.10 12 1/4" 10 0.70 21.00


0.20

SEGUNDO piso
eje I-J
Acero principal

0.25

1.93 12 3/8" 4 2.18 60.69

Acero principal

0.25

1.55 12 3/8" 4 1.80 50.11

Estribos 0.20 0.10

0.10 0.10 12 1/4" 8 0.70 16.80


0.20 .
Estribos 0.20 0.10

0.10 0.10 12 1/4" 10 0.70 21.00


0.20

PARAPETO

0.25

1.15 E XTERIORES 16 3/8" 2 1.65 30.62

0.25

ESTRIBOS PARA PARAPETO

0.13

0.03 0.03 16 1/4" 8 0.32 10.24


0.13

SS.HH. ALUMNOS-DOC
C-11
Acero principal 0.30

2.80 1 5/8" 3 3.40 16.32


1 1/2" 3 3.40 10.40
0.30
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

Estribos 0.35 0.30

0.43 0.19 1 3/8" 17 1.62 15.97


0.35

C-09
Acero principal 0.30

3.75 5 5/8" 4 4.35 139.20


5 1/2" 2 4.35 44.37
0.30

Estribos 0.35 0.30

0.10 0.10 5 3/8" 20 1.20 69.60


0.35

C-05
Acero principal 0.30

3.75 2 5/8" 4 4.35 55.68

0.30

Estribos 0.35 0.30

0.10 0.10 2 3/8" 20 1.20 27.84


0.35

C-10
Acero principal 0.30

2.80 1 5/8" 6 3.40 32.64

0.30

Estribos 0.33 0.30

0.10 0.10 1 3/8" 17 1.16 11.44


0.33

CA-1
Acero principal 0.30

2.80 11 1/2" 4 3.40 152.59

0.30

Estribos 0.20 0.30

0.10 0.10 11 3/8" 17 0.90 97.61


0.20

CA-02
Acero principal

0.25

2.00 7 3/8" 2 2.25 18.27

Estribos 0.20 0.00

0.03 0.03 7 1/4" 13 0.46 10.47


0.20 .

ESCALERA 02
C-01
Acero principal 0.50

11.50 2 5/8" 10 12.30 393.60

0.30

Estribos 0.54 0.30

0.19 0.19 2 3/8" 88 1.76 179.66


0.54 2 3/8" 88 0.19 19.40

C-02
Acero principal 0.50

11.50 2 5/8" 14 12.30 551.04

0.30

Estribos 0.64 0.30

0.19 0.19 2 3/8" 88 1.96 200.08


0.64

Estribos 0.44 0.30

0.19 0.19 2 3/8" 88 1.56 159.24


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.44

columnas de confinamiento

CA-02
Acero principal

1.20 8 1/2" 4 1.50 48.96

0.30

Estribos 0.19 0.20

0.09 0.09 8 1/4" 6 0.76 9.12


0.19

CA-02
Acero principal

2.80 3 1/2" 4 3.10 37.94

0.30

Estribos 0.19 0.20

0.09 0.09 3 1/4" 14 0.76 7.98


0.19

PARAPETO

0.25

1.15 6 1/2" 2 1.65 20.20

0.25

ESTRIBOS PARA PARAPETO

0.13

0.03 0.03 6 1/4" 8 0.32 3.84


0.13

ESCALERA 04
C-01
Acero principal 0.50

11.50 4 5/8" 10 12.30 787.20

0.30

Estribos 0.54 0.30

0.19 0.19 4 3/8" 88 1.76 359.32


0.54 4 3/8" 88 0.19 38.79

C-02
Acero principal 0.50

11.50 2 5/8" 14 12.30 551.04

0.30

Estribos 0.64 0.30

0.19 0.19 2 3/8" 88 1.96 200.08


0.64

Estribos 0.44 0.30

0.19 0.19 2 3/8" 88 1.56 159.24


0.44

C-02
Acero principal 0.50

13.80 2 5/8" 14 14.60 654.08

0.30

Estribos 0.64 0.30

0.19 0.19 2 3/8" 94 1.96 213.72


0.64

Estribos 0.44 0.30

0.19 0.19 2 3/8" 94 1.56 170.10


0.44

columnas de confinamiento

CA-02
Acero principal

1.20 8 1/2" 4 1.50 48.96

0.30

Estribos 0.19 0.20

0.09 0.09 8 1/4" 6 0.76 9.12


0.19
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
CA-02
Acero principal

2.80 3 1/2" 4 3.10 37.94

0.30

Estribos 0.19 0.20

0.09 0.09 3 1/4" 14 0.76 7.98


0.19

PARAPETO

0.25

1.15 6 1/2" 2 1.65 20.20

0.25

ESTRIBOS PARA PARAPETO

0.13

0.03 0.03 6 1/4" 8 0.32 3.84


0.13

PORTICO DE INGRESO
C-1
Acero principal 0.25

3.85 2 5/8" 4 4.35 55.68

0.25

Estribos 0.29 0.15

0.19 0.19 2 3/8" 21 1.11 27.04


0.29

C-2
Acero principal 0.25

3.85 1 5/8" 4 4.35 27.84

0.25

Estribos 0.09 0.15

0.19 0.19 1 3/8" 21 0.71 8.65


0.09

CERCO PERIMETRICO
CA-1
Acero principal 0.25

4.35 18 1/2" 4 4.85 356.18

0.25

Estribos 0.19 0.20

0.19 0.19 18 1/4" 22 0.96 95.04


0.19

644.33 15,230.14 1,773.27 10,999.68 10,607.31 -


Total 39,254.73 kg

01.05.05.04 VIGAS, ACERO F'y=4200 kg/cm2 KG


LONGITUD TOTAL

DESCRIPCIÓN
ELEM
Ø CANT. LONG. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
f = .25kg/m f = .58kg/m f =1.02kg/m f =1.60kg/m f =2.26kg/m f =4.04kg/m

SS.HH. COLISEO
VIGAS PRINCIPALES
EJE A VS-01(15X35)
9.85 1 5/8" 2 10.25 32.80
0.20 0.20

9.85
0.20 0.20
1 5/8" 2 10.25 32.80

0.29 0.30

0.09 0.09 1 3/8" 50 1.06 30.74


0.29

EJE B VS-01(15X35)
11.00 1 5/8" 2 11.40 36.48
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.20 0.20

11.00
0.20 0.20
1 5/8" 2 11.40 36.48

0.29 0.30

0.09 0.09 1 3/8" 61 1.06 37.50


0.29

EJE 2 VA-01(15X30)
5.30 1 5/8" 2 5.70 18.24
0.20 0.20

5.30
0.20 0.20
1 5/8" 2 5.70 18.24

0.24 0.30

0.09 0.09 1 3/8" 27 0.96 15.03


0.24

EJE 3 VA-01(15X30)
4.85 1 5/8" 2 5.25 16.80
0.20 0.20

4.85
0.20 0.20
1 5/8" 2 5.25 16.80

0.24 0.30

0.09 0.09 1 3/8" 25 0.96 13.92


0.24

EJE 4 VA-01(15X30)
4.50 1 5/8" 2 4.90 15.68
0.20 0.20

4.50
0.20 0.20
1 5/8" 2 4.90 15.68

0.24 0.30

0.09 0.09 1 3/8" 23 0.96 12.81


0.24

EJE 4 VA-01(15X30)
3.90 1 5/8" 2 4.30 13.76
0.20 0.20

3.90
0.20 0.20
1 5/8" 2 4.30 13.76

0.24 0.30

0.09 0.09 1 3/8" 20 0.96 11.14


0.24

VA-02 TIMPANOS
4.50 4 3/8" 2 4.90 22.74
0.20 0.20

4.50
0.20 0.20
4 3/8" 2 4.90 22.74

0.14 0.20

0.09 0.09 4 1/4" 24 0.66 15.84


0.14

VIGA DE BORDE
6.50
0.15 1 3/8" 3 6.80 11.83
0.15

0.15 6.50 1 3/8" 3 6.80 11.83


0.15

0.16 0.15

0.16 0.16 1 1/4" 34 0.79 6.72


0.16

COLISEO
ESTRADO
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
VCH-01
4.60 2 5/8" 2 4.90 31.36
0.15 0.15

4.60
0.15 0.15
2 5/8" 2 4.90 31.36

0.19 0.20

0.14 0.14 2 3/8" 25 0.86 24.94


0.19

VIGA DE BORDE
4.30
0.15 2 3/8" 3 4.60 16.01
0.15

0.15 4.30 2 3/8" 3 4.60 16.01


0.15

0.16 0.15

0.16 0.16 2 1/4" 22 0.79 8.69


0.16

3.40
0.15 2 3/8" 3 3.70 12.88
0.15

0.15 3.40 2 3/8" 3 3.70 12.88


0.15

0.16 0.15

0.16 0.16 2 1/4" 15 0.79 5.93


0.16

VA-01 15X30
4.35 1 5/8" 2 4.75 15.20
0.20 0.20

4.35
0.20 0.20
1 5/8" 2 4.75 15.20

0.24 0.30

0.09 0.09 1 3/8" 24 0.96 13.36


0.24

VS-02 (25X40)
10.20 1 5/8" 2 10.70 34.24
0.25 0.25

1 1/2" 2 10.70 21.83


10.20
0.25 0.25
1 5/8" 2 10.70 34.24

0.34 0.30

0.19 0.19 1 3/8" 62 1.36 48.91


0.34

VIGAS PERIMETRICAS INTERMEDIAS


EJE B-H (VP-01)
39.40 2 5/8" 3 39.90 383.04
0.25 0.25

39.40
0.25 0.25
2 5/8" 3 39.90 383.04

0.39 0.30

0.19 0.19 2 3/8" 324 1.46 548.73


0.39

EJE 2-12 (VP-01)


25.50 2 5/8" 3 26.00 249.60
0.25 0.25

25.50
0.25 0.25
2 5/8" 3 26.00 249.60

0.39 0.30

0.19 0.19 2 3/8" 200 1.46 338.72


0.39
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

VIGAS PERIMETRICAS FINALES


EJE B-H (VIGA CANALON)
39.40

0.30 0.30 1.00 2 5/8" 3 40.00 384.00


39.40 1.00 2 1/2" 2 39.40 160.75

0.30 0.30 1.00 2 5/8" 3 40.00 384.00


39.40

39.40 1.00 2 3/8" 7 39.40 319.93

0.70 1.00 2 3/8" 195 0.85 192.27

0.15

Estribos 0.32 0.30

0.54 0.54 1.00 2 3/8" 260 2.02 609.23


0.32

0.09 0.20

0.80 0.80 1.00 2 3/8" 195 1.98 447.88


0.09

EJE 2-12 (VP-02)


25.50 2 5/8" 3 26.00 249.60
0.25 0.25

25.50
0.25 0.25
2 5/8" 3 26.00 249.60

0.34 0.30

0.19 0.19 2 3/8" 204 1.36 321.83


0.34

VIGAS DE TRIBUNA(inclinada)
EJE B-H (VP-02)
3.00 16 5/8" 3 3.50 268.80
0.25 0.25

3.00
0.25 0.25
16 5/8" 3 3.50 268.80

0.34 0.30

0.19 0.19 16 3/8" 21 1.36 265.04


0.34

EJE B-H (VP-02)


4.25 2 5/8" 3 4.75 45.60
0.25 0.25

4.25
0.25 0.25
2 5/8" 3 4.75 45.60

0.34 0.30

0.19 0.19 2 3/8" 31 1.36 48.91


0.34

EJE 2-12 (VP-02)


3.00 9 5/8" 3 3.50 151.20
0.25 0.25

3.00
0.25 0.25
9 5/8" 3 3.50 151.20

0.34 0.30

0.19 0.19 9 3/8" 21 1.36 149.08


0.34

VIGAS DE CONFINAMIENTO
EJE B VS-3
36.50 1 3/8" 1 36.90 21.40
0.20 0.20 1 3/8" 1 36.90 21.40

ESTRIBOS
0.10
0.07 1 1/4" 182 0.30 13.65
0.05 0.05

0.10

EJE 12 VS-3
23.50 1 3/8" 1 23.90 13.86
0.20 0.20 1 3/8" 1 23.90 13.86
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

ESTRIBOS
0.10
0.07 1 1/4" 118 0.30 8.85
0.05 0.05

0.10

EJE H VS-3
39.20 1 3/8" 1 39.60 22.97
0.20 0.20 1 3/8" 1 39.60 22.97

ESTRIBOS
0.10
0.07 1 1/4" 196 0.30 14.70
0.05 0.05

0.10

EJE 2 VS-3
22.80 1 3/8" 1 23.20 13.46
0.20 0.20 1 3/8" 1 23.20 13.46

ESTRIBOS
0.10
0.07 1 1/4" 114 0.30 8.55
0.05 0.05

0.10

MODULO A
PRIMER NIVEL
VA-1 EJE 13-14

15.77 2 5/8" 2 16.12 103.17


0.35 0.35

15.77
0.35 2 5/8" 2 16.12 103.17
0.35

ANCLAJES

CON LA C-1 1.80 4 5/8" 1 2.15 13.76


0.35

0.35 4 5/8" 1 2.15 13.76


1.80

INTERSCC. CON LA C-2 3.33 6 5/8" 1 3.33 31.97


ABAJO 6 5/8" 1 3.33 31.97

0.19 0.30

0.49 0.49 8 3/8" 24 1.66 184.86


0.19

VS-1 V-101 EJE K--Ñ

9.80

0.35 0.35 2 5/8" 2 10.50 67.20


0.35 0.35 2 5/8" 2 10.50 67.20
9.80

VS-1 0.19 0.30 .


0.49 0.49 4 3/8" 25 1.66 96.28
0.19

V-101

0.19 0.30

0.49 0.49 2 3/8" 14 1.66 26.96


0.19

INTERSECC. EJE 13

2.55 2 3/4" 2 2.55 23.05

INTERSECC. EJE 13

2.55 2 5/8" 1 2.55 8.16

V-103 ,V-102
9.80

0.35 0.35 3 5/8" 3 10.50 151.20


2.37 0.35 3 3/4" 2 4.35 58.99
4.35 3 3/4" 1 2.72 18.44
0.25 7.90 0.25 3 1/2" 2 8.40 51.41

0.35 3.10 3 5/8" 3 3.45 49.68

3.60 0.35 3 5/8" 1 3.60 17.28


0.35 7.90 3 5/8" 3 8.60 123.84
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
ESTRIBOS V 102

0.24 0.30

0.49 0.49 3 3/8" 14 1.76 42.87


0.24

ESTRIBOS V 103

0.24 0.30

0.64 0.64 3 3/8" 44 2.06 157.71


0.24

VIGA DE BORDE DEL VOLADIZO

6.50 8.65

0.20 1 3/8" 3 15.55 27.06


0.20

0.20 6.50 8.65 1 3/8" 3 15.55 27.06


0.20

0.16 0.15

0.16 0.16 4 1/4" 25 0.79 19.75


0.16

SEGUNDO NIVEL
VA-1 EJE 13-14

15.77 2 5/8" 2 16.12 103.17


0.35 0.35

15.77
0.35 2 5/8" 2 16.12 103.17
0.35

ANCLAJES

CON LA C-1 1.80 4 5/8" 1 2.15 13.76


0.35

0.35 4 5/8" 1 2.15 13.76


1.80

INTERSCC. CON LA C-2 3.33 6 5/8" 1 3.33 31.97


ABAJO 6 5/8" 1 3.33 31.97

0.19 0.30

0.49 0.49 8 3/8" 24 1.66 184.86


0.19

VS-1 V-101 EJE K--Ñ

9.80

0.35 0.35 2 5/8" 2 10.50 67.20


0.35 0.35 2 5/8" 2 10.50 67.20
9.80

VS-1 0.19 0.30 .


0.49 0.49 4 3/8" 25 1.66 96.28
0.19

V-101

0.19 0.30

0.49 0.49 2 3/8" 14 1.66 26.96


0.19

INTERSECC. EJE 13

2.55 2 3/4" 2 2.55 23.05

INTERSECC. EJE 13

2.55 2 5/8" 1 2.55 8.16

V-103 ,V-102
9.80

0.35 0.35 3 5/8" 3 10.50 151.20


2.37 0.35 3 3/4" 2 4.35 58.99
4.35 3 3/4" 1 2.72 18.44
0.25 7.90 0.25 3 1/2" 2 8.40 51.41

0.35 3.10 3 5/8" 3 3.45 49.68

3.60 0.35 3 5/8" 1 3.60 17.28


0.35 7.90 3 5/8" 3 8.60 123.84

ESTRIBOS V 102

0.24 0.30

0.49 0.49 3 3/8" 14 1.76 42.87


0.24
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
ESTRIBOS V 103

0.24 0.30

0.64 0.64 3 3/8" 44 2.06 157.71


0.24

VIGA DE BORDE DEL VOLADIZO

6.50 8.65

0.20 1 3/8" 3 15.55 27.06


0.20

0.20 6.50 8.65 1 3/8" 3 15.55 27.06


0.20

0.16 0.15

0.16 0.16 4 1/4" 25 0.79 19.75


0.16

TERCER NIVEL
VA-2 EJE 13-14

15.77 2 5/8" 2 16.12 103.17


0.35 0.35

15.77
0.35 2 5/8" 2 16.12 103.17
0.35

ANCLAJES

CON LA C-1 1.80 4 5/8" 1 2.15 13.76


0.35

0.35 4 5/8" 1 2.15 13.76


1.80

INTERSCC. CON LA C-2 3.33 6 5/8" 1 3.33 31.97


ABAJO 6 5/8" 1 3.33 31.97

0.21 0.30

0.66 0.60 8 3/8" 24 1.96 218.27


0.19

VIGA DE BORDE DEL VOLADIZO

6.50 8.65

0.20 2 3/8" 3 15.55 54.11


0.20

0.20 6.50 8.65 2 3/8" 3 15.55 54.11


0.20

0.16 0.15

0.16 0.16 8 1/4" 25 0.79 39.50


0.16

VIGA CUMBRERA

15.77 1 5/8" 3 15.92 76.42


0.15 0.15

15.77
0.15 1 5/8" 3 15.92 76.42
0.15

0.24 0.20

0.14 0.14 4 3/8" 28 0.91 59.11


0.19

0.24 0.20

0.14 0.14 4 3/8" 28 0.91 59.11


0.19

VS-2 V-201,202

11.20

0.35 0.35 2 5/8" 2 11.90 76.16


0.35 0.35 2 5/8" 2 12.90 82.56
12.20

VS-2 0.19 0.30 .


0.49 0.49 4 3/8" 28 1.66 107.83
0.19

V-201

0.19 0.30
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.40 0.40 2 3/8" 14 1.48 24.04
0.19

V-202

0.19 0.20

0.14 0.14 2 3/8" 8 0.86 7.98


0.19

INTERSECC. EJE 13

2.40 2 3/4" 2 2.40 21.70

INTERSECC. EJE 13

2.55 2 5/8" 1 2.55 8.16

INTERSECC. EJE 14

2.25 2 5/8" 2 2.25 14.40

V-203-204-202

V-203-204
10.50

0.35 0.35 3 5/8" 3 11.20 161.28

entre eje 13-14 sin volado V-203

10.00

0.50 0.50 3 1/2" 2 11.00 67.32

0.35 0.35 3 5/8" 4 12.20 234.24


11.50

INTERSECC. EJE 13

2.40 3 3/4" 2 2.40 32.54

INTERSECC. EJE 13

2.55 3 5/8" 3 2.55 36.72

INTERSECC. EJE 14 V-202

2.25 3 5/8" 2 2.25 21.60


1.50 3 5/8" 2 1.50 14.40

V-203 0.24 0.30 .


0.64 0.64 3 3/8" 62 2.06 222.23
0.24

V-204

0.24 0.30

0.40 0.40 3 3/8" 14 1.58 38.49


0.24

V-202

0.19 0.20

0.14 0.14 3 3/8" 8 0.86 11.97


0.19

VIGAS DE CONFINAMIENTO
PRMER PISO

VIGETAS DE CONFIMANIENTO EN EL EJE 14

2.90 4 3/8" 1 3.30 7.66


0.20 2.90 0.20 4 3/8" 1 3.30 7.66
ESTRIBOS 0.20 0.20
0.10
0.07 4 1/4" 14 0.30 4.20
0.05 0.05

0.10

VIGAS DE CONFIMANIENTO EN EL EJE 13

2.90 2 3/8" 1 3.30 3.83


0.20 2.90 0.20 2 3/8" 1 3.30 3.83
0.20 0.20
1.40
0.20 0.20 2 3/8" 1 1.80 2.09
1.40 2 3/8" 1 1.80 2.09
0.20 0.20
0.10
ESTRIBOS 0.07 2 1/4" 14 0.30 2.10
0.05 0.05 2 1/4" 8 0.30 1.20
0.10

SEGUNDO PISO

VIGETAS DE CONFIMANIENTO EN EL EJE 14

2.90 4 3/8" 1 3.30 7.66


0.20 2.90 0.20 4 3/8" 1 3.30 7.66
ESTRIBOS 0.20 0.20
0.10
0.07 4 1/4" 14 0.30 4.20
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.05 0.05

0.10

VIGAS DE CONFIMANIENTO EN EL EJE 13

2.90 2 3/8" 1 3.30 3.83


0.20 2.90 0.20 2 3/8" 1 3.30 3.83
0.20 0.20
1.85
0.20 0.20 2 3/8" 1 2.25 2.61
1.85 2 3/8" 1 2.25 2.61
0.20 0.20
0.10
ESTRIBOS 0.07 2 1/4" 14 0.30 2.10
0.05 0.05 2 1/4" 10 0.30 1.50
0.10

VIGAS DE CONFIMANIENTO DEL PARAPETO VOL.

15.70 1 3/8" 1 15.90 9.22


0.10 15.70 0.10 1 3/8" 1 15.90 9.22
0.10 0.10

ESTRIBOS

0.10 cada 15 1 1/4" 104 0.30 7.80


0.05 0.05

0.10

EJE N-L

3.50 2 3/8" 1 3.70 4.29


0.10 3.50 0.10 2 3/8" 1 3.70 4.29
0.10 0.10

ESTRIBOS

0.10 cada 20 2 1/4" 18 0.40 3.60


0.10 0.10

0.10

TERCER PISO

VIGETAS DE CONFIMANIENTO EN EL EJE 14

2.90 4 3/8" 1 3.30 7.66


0.20 2.90 0.20 4 3/8" 1 3.30 7.66
ESTRIBOS 0.20 0.20
0.10
0.07 4 1/4" 14 0.30 4.20
0.05 0.05

0.10

VIGAS DE CONFIMANIENTO EN EL EJE 13

2.90 2 3/8" 1 3.30 3.83


0.20 2.90 0.20 2 3/8" 1 3.30 3.83
0.20 0.20
1.85
0.20 0.20 2 3/8" 1 2.25 2.61
1.85 2 3/8" 1 2.25 2.61
0.20 0.20
0.10
ESTRIBOS 0.07 2 1/4" 14 0.30 2.10
0.05 0.05 2 1/4" 10 0.30 1.50
0.10

VIGAS DE CONFIMANIENTO DEL PARAPETO VOL.

15.70 1 3/8" 1 15.90 9.22


0.10 15.70 0.10 1 3/8" 1 15.90 9.22
0.10 0.10

ESTRIBOS

0.10 cada 15 1 1/4" 104 0.30 7.80


0.05 0.05

0.10

MODULO B
PRIMER NIVEL
VA-1 EJE I

19.80 1 5/8" 2 20.15 64.48


0.35 0.35

19.80
0.35 1 5/8" 2 20.15 64.48
0.35

ANCLAJES

CON LA C-3(ESQ) 2.10 2 5/8" 1 2.45 7.84


0.35

0.35 2 5/8" 1 2.45 7.84


2.10

INTERSCC. CON LA C-2-3 3.30 4 5/8" 1 3.30 21.12


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
ABAJO 4 5/8" 1 3.30 21.12

0.19 0.30

0.49 0.49 5 3/8" 25 1.66 120.35


0.19

VA-1 EJE J

20.30 1 5/8" 2 20.65 66.08


0.35 0.35

20.30
0.35 1 5/8" 2 20.65 66.08
0.35

ANCLAJES

CON LA C-3(ESQ) 2.10 2 5/8" 1 2.45 7.84


0.35

0.35 2 5/8" 1 2.45 7.84


2.10

INTERSCC. CON LA C-2-3 3.30 4 5/8" 1 3.30 21.12


ABAJO 4 5/8" 1 3.30 21.12

0.19 0.30

0.49 0.49 5 3/8" 25 1.66 120.35


0.19

VS-1 V-101 EJE 25-27

9.80

0.35 0.35 2 5/8" 2 10.50 67.20


0.35 0.35 2 5/8" 2 10.50 67.20
9.80

VS-1 0.19 0.30 .


0.49 0.49 4 3/8" 25 1.66 96.28
0.19

V-101

0.19 0.30

0.49 0.49 2 3/8" 14 1.66 26.96


0.19

INTERSECC. EJE I

2.55 2 3/4" 2 2.55 23.05

INTERSECC. EJE I

2.55 2 5/8" 1 2.55 8.16

VS-1 V-101 EJE 30

6.85

0.35 0.35 1 5/8" 2 7.55 24.16


0.35 0.35 1 5/8" 2 7.55 24.16
6.85

VS-1 0.19 0.30 .


0.49 0.49 1.4 3/8" 25 1.66 33.70
0.19

V-101

0.19 0.30

0.49 0.49 1 3/8" 10 1.66 9.63


0.19

INTERSECC. EJE I

2.05 1 3/4" 2 2.05 9.27

INTERSECC. EJE I

2.05 1 5/8" 1 2.05 3.28

V-103 ,V-102 EJE 26

9.80

0.35 0.35 1 5/8" 3 10.50 50.40


2.37 0.35 1 3/4" 2 4.35 19.66
4.35 1 3/4" 1 2.72 6.15
0.25 7.90 0.25 1 1/2" 2 8.40 17.14

0.35 3.10 1 5/8" 3 3.45 16.56

3.60 0.35 1 5/8" 1 3.60 5.76


0.35 7.90 1 5/8" 3 8.60 41.28
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
ESTRIBOS V 102

0.24 0.30

0.49 0.49 1 3/8" 14 1.76 14.29


0.24

ESTRIBOS V 103

0.24 0.30

0.64 0.64 1 3/8" 44 2.06 52.57


0.24

V-103 ,V-102 EJE 28

8.20

0.35 0.35 1 5/8" 3 8.90 42.72


2.37 0.35 1 3/4" 2 3.85 17.40
3.85 1 3/4" 1 2.72 6.15
0.25 6.30 0.25 1 1/2" 2 6.80 13.87

0.35 2.45 1 5/8" 3 2.80 13.44

3.60 0.35 1 5/8" 1 3.60 5.76


0.35 6.30 1 5/8" 3 7.00 33.60

ESTRIBOS V 102

0.24 0.30

0.49 0.49 1 3/8" 10 1.76 10.21


0.24

ESTRIBOS V 103

0.24 0.30

0.64 0.64 1 3/8" 42 2.06 50.18


0.24

V-103 ,V-102 EJE 29

7.55

0.35 0.35 1 5/8" 3 8.25 39.60


2.37 0.35 1 3/4" 2 3.85 17.40
3.85 1 3/4" 1 2.72 6.15
0.25 5.60 0.25 1 1/2" 2 6.10 12.44

0.35 2.45 1 5/8" 3 2.80 13.44

3.60 0.35 1 5/8" 1 3.60 5.76


0.35 5.60 1 5/8" 3 6.30 30.24

ESTRIBOS V 102

0.24 0.30

0.49 0.49 1 3/8" 10 1.76 10.21


0.24

ESTRIBOS V 103

0.24 0.30

0.64 0.64 1 3/8" 40 2.06 47.79


0.24

VIGA DE BORDE DEL VOLADIZO

19.75

0.20 1 3/8" 3 20.15 35.06


0.20

0.20 19.75 8.65 1 3/8" 3 28.80 50.11


0.20

0.16 0.15

0.16 0.16 5 1/4" 25 0.79 24.69


0.16

SEGUNDO NIVEL
VA-1 EJE I

19.80 1 5/8" 2 20.15 64.48


0.35 0.35

19.80
0.35 1 5/8" 2 20.15 64.48
0.35

ANCLAJES

CON LA C-3(ESQ) 2.10 2 5/8" 1 2.45 7.84


0.35

0.35 2 5/8" 1 2.45 7.84


2.10

INTERSCC. CON LA C-2-3 3.30 4 5/8" 1 3.30 21.12


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
ABAJO 4 5/8" 1 3.30 21.12

0.19 0.30

0.49 0.49 5 3/8" 25 1.66 120.35


0.19

VA-1 EJE J

20.30 1 5/8" 2 20.65 66.08


0.35 0.35

20.30
0.35 1 5/8" 2 20.65 66.08
0.35

ANCLAJES

CON LA C-3(ESQ) 2.10 2 5/8" 1 2.45 7.84


0.35

0.35 2 5/8" 1 2.45 7.84


2.10

INTERSCC. CON LA C-2-3 3.30 4 5/8" 1 3.30 21.12


ABAJO 4 5/8" 1 3.30 21.12

0.19 0.30

0.49 0.49 5 3/8" 25 1.66 120.35


0.19

VS-1 V-101 EJE 25-27

9.80

0.35 0.35 2 5/8" 2 10.50 67.20


0.35 0.35 2 5/8" 2 10.50 67.20
9.80

VS-1 0.19 0.30 .


0.49 0.49 4 3/8" 25 1.66 96.28
0.19

V-101

0.19 0.30

0.49 0.49 2 3/8" 14 1.66 26.96


0.19

INTERSECC. EJE I

2.55 2 3/4" 2 2.55 23.05

INTERSECC. EJE I

2.55 2 5/8" 1 2.55 8.16

VS-1 V-101 EJE 30

6.85

0.35 0.35 1 5/8" 2 7.55 24.16


0.35 0.35 1 5/8" 2 7.55 24.16
6.85

VS-1 0.19 0.30 .


0.49 0.49 1.4 3/8" 25 1.66 33.70
0.19

V-101

0.19 0.30

0.49 0.49 1 3/8" 10 1.66 9.63


0.19

INTERSECC. EJE I

2.05 1 3/4" 2 2.05 9.27

INTERSECC. EJE I

2.05 1 5/8" 1 2.05 3.28

V-103 ,V-102 EJE 26

9.80

0.35 0.35 1 5/8" 3 10.50 50.40


2.37 0.35 1 3/4" 2 4.35 19.66
4.35 1 3/4" 1 2.72 6.15
0.25 7.90 0.25 1 1/2" 2 8.40 17.14

0.35 3.10 1 5/8" 3 3.45 16.56

3.60 0.35 1 5/8" 1 3.60 5.76


0.35 7.90 1 5/8" 3 8.60 41.28
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
ESTRIBOS V 102

0.24 0.30

0.49 0.49 1 3/8" 14 1.76 14.29


0.24

ESTRIBOS V 103

0.24 0.30

0.64 0.64 1 3/8" 44 2.06 52.57


0.24

V-103 ,V-102 EJE 28

8.20

0.35 0.35 1 5/8" 3 8.90 42.72


2.37 0.35 1 3/4" 2 3.85 17.40
3.85 1 3/4" 1 2.72 6.15
0.25 6.30 0.25 1 1/2" 2 6.80 13.87

0.35 2.45 1 5/8" 3 2.80 13.44

3.60 0.35 1 5/8" 1 3.60 5.76


0.35 6.30 1 5/8" 3 7.00 33.60

ESTRIBOS V 102

0.24 0.30

0.49 0.49 1 3/8" 10 1.76 10.21


0.24

ESTRIBOS V 103

0.24 0.30

0.64 0.64 1 3/8" 42 2.06 50.18


0.24

V-103 ,V-102 EJE 29

7.55

0.35 0.35 1 5/8" 3 8.25 39.60


2.37 0.35 1 3/4" 2 3.85 17.40
3.85 1 3/4" 1 2.72 6.15
0.25 5.60 0.25 1 1/2" 2 6.10 12.44

0.35 2.45 1 5/8" 3 2.80 13.44

3.60 0.35 1 5/8" 1 3.60 5.76


0.35 5.60 1 5/8" 3 6.30 30.24

ESTRIBOS V 102

0.24 0.30

0.49 0.49 1 3/8" 10 1.76 10.21


0.24

ESTRIBOS V 103

0.24 0.30

0.64 0.64 1 3/8" 40 2.06 47.79


0.24

VIGA DE BORDE DEL VOLADIZO

19.75

0.20 1 3/8" 3 20.15 35.06


0.20

0.20 19.75 8.65 1 3/8" 3 28.80 50.11


0.20

0.16 0.15

0.16 0.16 5 1/4" 25 0.79 24.69


0.16

TERCER NIVEL
VA-2 EJE I

19.80 1 5/8" 2 20.15 64.48


0.35 0.35

19.80
0.35 1 5/8" 2 20.15 64.48
0.35

ANCLAJES

CON LA C-3(ESQ) 2.10 2 5/8" 1 2.45 7.84


0.35

0.35 2 5/8" 1 2.45 7.84


2.10

INTERSCC. CON LA C-2-3 3.30 4 5/8" 1 3.30 21.12


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
ABAJO 4 5/8" 1 3.30 21.12

0.21 0.30

0.66 0.60 5 3/8" 25 1.96 142.10


0.19

VA-2 EJE J

20.30 1 5/8" 2 20.65 66.08


0.35 0.35

20.30
0.35 1 5/8" 2 20.65 66.08
0.35

ANCLAJES

CON LA C-3(ESQ) 2.10 2 5/8" 1 2.45 7.84


0.35

0.35 2 5/8" 1 2.45 7.84


2.10

INTERSCC. CON LA C-2-3 3.30 4 5/8" 1 3.30 21.12


ABAJO 4 5/8" 1 3.30 21.12

0.21 0.30

0.66 0.60 5 3/8" 25 1.96 142.10


0.19

VIGA CUMBRERA

20.25 1 5/8" 3 20.40 97.92


0.15 0.15

0.15 20.25 1 5/8" 3 20.40 97.92


0.15

0.24 0.20

0.14 0.14 5 3/8" 28 0.91 73.89


0.19

0.24 0.20

0.14 0.14 5 3/8" 28 0.91 73.89


0.19

VIGA DE BORDE DEL VOLADIZO

20.30

0.20 2 3/8" 3 20.70 72.04


0.20

0.20 20.30 8.65 2 3/8" 3 29.35 102.14


0.20

0.16 0.15

0.16 0.16 10 1/4" 25 0.79 49.38


0.16

VS-2 V-201,202 EJE 25-27

11.20

0.35 0.35 2 5/8" 2 11.90 76.16


0.35 0.35 2 5/8" 2 12.90 82.56
12.20

VS-2 0.19 0.30 .


0.49 0.49 4 3/8" 28 1.66 107.83
0.19

V-201

0.19 0.30

0.40 0.40 2 3/8" 14 1.48 24.04


0.19

V-202

0.19 0.20

0.14 0.14 2 3/8" 8 0.86 7.98


0.19

INTERSECC. EJE I

2.40 2 3/4" 2 2.40 21.70

INTERSECC. EJE I

2.55 2 5/8" 1 2.55 8.16


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

INTERSECC. EJE J

2.25 2 5/8" 2 2.25 14.40

VS-2 V-201,202 EJE 30

8.55

0.35 0.35 1 5/8" 2 9.25 29.60


0.35 0.35 1 5/8" 2 7.20 23.04
6.50

VS-2 0.19 0.30 .


0.49 0.49 1.4 3/8" 28 1.66 37.74
0.19

V-201

0.19 0.30

0.40 0.40 1 3/8" 10 1.48 8.58


0.19

V-202

0.19 0.20

0.14 0.14 1 3/8" 8 0.86 3.99


0.19

INTERSECC. EJE I

2.05 1 3/4" 2 2.05 9.27

INTERSECC. EJE I

2.30 1 5/8" 1 2.30 3.68

INTERSECC. EJE J

2.25 1 5/8" 2 2.25 7.20

V-203-204-202
V-203-204 EJE 26

10.50

0.35 0.35 1 5/8" 3 11.20 53.76

entre eje I-J sin volado V-203

10.00

0.50 0.50 1 1/2" 2 11.00 22.44

0.35 0.35 1 5/8" 4 12.20 78.08


11.50

INTERSECC. EJE I

2.40 1 3/4" 2 2.40 10.85

INTERSECC. EJE I

2.55 1 5/8" 3 2.55 12.24

INTERSECC. EJE J V-202

2.25 1 5/8" 2 2.25 7.20


1.50 1 5/8" 2 1.50 4.80

V-203 0.24 0.30 .


0.64 0.64 1 3/8" 62 2.06 74.08
0.24

V-204

0.24 0.30

0.40 0.40 1 3/8" 14 1.58 12.83


0.24

V-202

0.19 0.20

0.14 0.14 1 3/8" 8 0.86 3.99


0.19

V-203-204-202
V-203-204 EJE 28

8.30

0.35 0.35 1 5/8" 3 9.00 43.20

entre eje I-J sin volado V-203

8.00

0.50 0.50 1 1/2" 2 9.00 18.36

0.35 0.35 1 5/8" 4 10.20 65.28


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
9.50

INTERSECC. EJE I

2.05 1 3/4" 2 2.05 9.27

INTERSECC. EJE I

2.35 1 5/8" 3 2.35 11.28

INTERSECC. EJE J V-202

2.25 1 5/8" 2 2.25 7.20


1.50 1 5/8" 2 1.50 4.80

V-203 0.24 0.30 .


0.64 0.64 1 3/8" 52 2.06 62.13
0.24

V-204

0.24 0.30

0.40 0.40 1 3/8" 8 1.58 7.33


0.24

V-202

0.19 0.20

0.14 0.14 1 3/8" 8 0.86 3.99


0.19

V-203-204-202
V-203-204 EJE 29

7.90

0.35 0.35 1 5/8" 3 8.60 41.28

entre eje I-J sin volado V-203

7.50

0.50 0.50 1 1/2" 2 8.50 17.34

0.35 0.35 1 5/8" 4 9.70 62.08


9.00

INTERSECC. EJE I

2.05 1 3/4" 2 2.05 9.27

INTERSECC. EJE I

2.35 1 5/8" 3 2.35 11.28

INTERSECC. EJE J V-202

2.25 1 5/8" 2 2.25 7.20


1.50 1 5/8" 2 1.50 4.80

V-203 0.24 0.30 .


0.64 0.64 1 3/8" 49 2.06 58.55
0.24

V-204

0.24 0.30

0.40 0.40 1 3/8" 8 1.58 7.33


0.24

V-202

0.19 0.20

0.14 0.14 1 3/8" 8 0.86 3.99


0.19

PRIMER PISO

VIGETAS DE CONFIMANIENTO EN EL EJE I

2.90 2 3/8" 1 3.30 3.83


0.20 2.90 0.20 2 3/8" 1 3.30 3.83
0.20 0.20
1.50
0.20 0.20 1 3/8" 1 1.90 1.10
1.50 1 3/8" 1 1.90 1.10
0.20 0.20
1.85
0.20 0.20 1 3/8" 1 2.25 1.31
1.85 1 3/8" 1 2.25 1.31
0.20 0.20

2.60 1 3/8" 1 3.00 1.74


0.20 2.60 0.20 1 3/8" 1 3.00 1.74
0.20 0.20
0.10
ESTRIBOS 0.07 2 1/4" 14 0.30 2.10
0.05 0.05 1 1/4" 8 0.30 0.60
0.10 1 1/4" 9 0.30 0.68
1 1/4" 13 0.30 0.98
VIGETAS DE CONFIMANIENTO EN EL EJE J

2.90 3 3/8" 1 3.30 5.74


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.20 2.90 0.20 3 3/8" 1 3.30 5.74
0.20 0.20
2.60
0.20 0.20 2 3/8" 1 3.00 3.48
2.60 2 3/8" 1 3.00 3.48
0.20 0.20
0.10
ESTRIBOS 0.07 3 1/4" 14 0.30 3.15
0.05 0.05 2 1/4" 13 0.30 1.95
0.10

EJE 29
2.00
0.20 0.20 1 3/8" 1 2.40 1.39
2.00 1 3/8" 1 2.40 1.39
0.20 0.20
0.10
ESTRIBOS 0.07

0.05 0.05 1 1/4" 10 0.37 0.93


0.10

2.30
0.20 0.20 1 3/8" 1 2.70 1.57
2.30 1 3/8" 1 2.70 1.57
0.20 0.20
0.10
ESTRIBOS 0.07

0.05 0.05 1 1/4" 12 0.37 1.11


0.10

2.85
0.20 0.20 1 3/8" 1 3.25 1.89
2.85 1 3/8" 1 3.25 1.89
0.20 0.20
0.10
ESTRIBOS 0.07

0.05 0.05 1 1/4" 14 0.37 1.30


0.10

SEGUNDO PISO

2.90 2 3/8" 1 3.30 3.83


0.20 2.90 0.20 2 3/8" 1 3.30 3.83
0.20 0.20
1.50
0.20 0.20 1 3/8" 1 1.90 1.10
1.50 1 3/8" 1 1.90 1.10
0.20 0.20
1.85
0.20 0.20 1 3/8" 1 2.25 1.31
1.85 1 3/8" 1 2.25 1.31
0.20 0.20

2.60 1 3/8" 1 3.00 1.74


0.20 2.60 0.20 1 3/8" 1 3.00 1.74
0.20 0.20
0.10
ESTRIBOS 0.07 2 1/4" 14 0.30 2.10
0.05 0.05 1 1/4" 8 0.30 0.60
0.10 1 1/4" 9 0.30 0.68
1 1/4" 13 0.30 0.98
VIGETAS DE CONFIMANIENTO EN EL EJE J

2.90 3 3/8" 1 3.30 5.74


0.20 2.90 0.20 3 3/8" 1 3.30 5.74
0.20 0.20
2.60
0.20 0.20 2 3/8" 1 3.00 3.48
2.60 2 3/8" 1 3.00 3.48
0.20 0.20
0.10
ESTRIBOS 0.07 3 1/4" 14 0.30 3.15
0.05 0.05 2 1/4" 13 0.30 1.95
0.10

EJE 29
3.35
0.20 0.20 1 3/8" 1 3.75 2.18
3.35 1 3/8" 1 3.75 2.18
0.20 0.20
0.10
ESTRIBOS 0.07

0.05 0.05 1 1/4" 17 0.37 1.57


0.10

1.70
0.20 0.20 1 3/8" 1 2.10 1.22
1.70 1 3/8" 1 2.10 1.22
0.20 0.20
0.10
ESTRIBOS 0.07

0.05 0.05 1 1/4" 9 0.37 0.83


0.10

VIGAS DE CONFIMANIENTO DEL PARAPETO VOL.

11.05 1 3/8" 1 11.25 6.53


0.10 11.05 0.10 1 3/8" 1 11.25 6.53
0.10 0.10

ESTRIBOS

0.10 cada 15 1 1/4" 74 0.30 5.55


0.05 0.05
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.10

TERCER PISO

2.90 2 3/8" 1 3.30 3.83


0.20 2.90 0.20 2 3/8" 1 3.30 3.83
0.20 0.20
1.50
0.20 0.20 1 3/8" 1 1.90 1.10
1.50 1 3/8" 1 1.90 1.10
0.20 0.20
1.85
0.20 0.20 1 3/8" 1 2.25 1.31
1.85 1 3/8" 1 2.25 1.31
0.20 0.20

2.60 1 3/8" 1 3.00 1.74


0.20 2.60 0.20 1 3/8" 1 3.00 1.74
0.20 0.20
0.10
ESTRIBOS 0.07 2 1/4" 14 0.30 2.10
0.05 0.05 1 1/4" 8 0.30 0.60
0.10 1 1/4" 9 0.30 0.68
1 1/4" 13 0.30 0.98
VIGETAS DE CONFIMANIENTO EN EL EJE J

2.90 3 3/8" 1 3.30 5.74


0.20 2.90 0.20 3 3/8" 1 3.30 5.74
0.20 0.20
2.60
0.20 0.20 2 3/8" 1 3.00 3.48
2.60 2 3/8" 1 3.00 3.48
0.20 0.20
0.10
ESTRIBOS 0.07 3 1/4" 14 0.30 3.15
0.05 0.05 2 1/4" 13 0.30 1.95
0.10

EJE 29
3.35
0.20 0.20 1 3/8" 1 3.75 2.18
3.35 1 3/8" 1 3.75 2.18
0.20 0.20
0.10
ESTRIBOS 0.07

0.05 0.05 1 1/4" 17 0.37 1.57


0.10

1.70
0.20 0.20 1 3/8" 1 2.10 1.22
1.70 1 3/8" 1 2.10 1.22
0.20 0.20
0.10
ESTRIBOS 0.07

0.05 0.05 1 1/4" 9 0.37 0.83


0.10

VIGAS DE CONFIMANIENTO DEL PARAPETO VOL.

11.05 1 3/8" 1 11.25 6.53


0.10 11.05 0.10 1 3/8" 1 11.25 6.53
0.10 0.10

ESTRIBOS

0.10 cada 15 1 1/4" 74 0.30 5.55


0.05 0.05

0.10

MODULO C
PRIMER NIVEL
VA-1 EJE I Y J

8.65 7.00 2 5/8" 2 9.00 57.60


0.35 0.35 2 5/8" 2 7.35 47.04
9.00
2 5/8" 2 9.00 57.60
7.00
0.35 8.65 2 5/8" 2 9.00 57.60
9.00 0.35 2 5/8" 2 7.35 47.04
2 5/8" 2 9.00 57.60
ANCLAJES

CON LA C-3 2.10 4 5/8" 1 2.45 15.68


0.35

0.35 4 5/8" 1 2.45 15.68


2.10

INTERSCC. CON LA C-2 3.33 6 5/8" 1 3.33 31.97


ABAJO 6 5/8" 1 3.33 31.97
C-3EJE 3 Y 5 3.33 4 5/8" 1 3.33 21.31
ABAJO 4 5/8" 1 3.33 21.31

0.19 0.30

0.49 0.49 12 3/8" 24 1.66 277.29


0.19
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

VS-1 V-101
10.50

0.35 0.35 4 5/8" 2 11.20 143.36


0.35 0.35 4 5/8" 2 11.20 143.36
10.50

VS-1 0.19 0.30

0.49 0.49 8 3/8" 28 1.66 215.67


0.19

V-101

0.19 0.30

0.49 0.49 4 3/8" 15 1.66 57.77


0.19

INTERSECC. EJE I

2.55 4 3/4" 2 2.55 46.10

INTERSECC. EJE I

2.55 4 5/8" 1 2.55 16.32

V-103 ,V-102
10.50

0.35 3 5/8" 3 11.20 161.28


0.35 2.37 0.35 3 3/4" 1 2.72 18.44
4.35 3 3/4" 2 4.35 58.99
0.25 7.68 0.25 3 1/2" 2 8.18 50.06

0.35 3.50 3 5/8" 3 3.85 55.44


5.00 0.35 3 5/8" 1 5.00 24.00
0.35 8.65 3 5/8" 3 9.35 134.64

ESTRIBOS V 102

0.24 0.30

0.49 0.49 3 3/8" 14 1.76 42.87


0.24

ESTRIBOS V 103

0.24 0.30

0.64 0.64 3 3/8" 44 2.06 157.71


0.24

VIGA DE BORDE DEL VOLADIZO

6.50 8.65

0.35 1 3/8" 3 24.85 43.24


9.00 0.35

0.35 6.50 8.65 1 3/8" 3 24.85 43.24


0.35

9.00

0.16 0.15

0.16 0.16 6 1/4" 25 0.79 29.63


0.16

SEGUNDO NIVEL
VA-2 EJE I-J

8.65 7.00 2 5/8" 2 9.00 57.60


0.35 0.35 2 5/8" 2 7.35 47.04
9.00
2 5/8" 2 9.00 57.60
8.65 7.00
0.35 2 5/8" 2 9.00 57.60
9.00 0.35 2 5/8" 2 7.35 47.04
2 5/8" 2 9.00 57.60
ANCLAJES

CON LA C-3 2.10 4 5/8" 1 2.45 15.68


0.35

0.35 4 5/8" 1 2.45 15.68


2.10

INTERSCC. CON LA C-2 3.33 6 5/8" 1 3.33 31.97


ABAJO 6 5/8" 1 3.33 31.97
C-3EJE 3 Y 5 3.33 4 5/8" 1 3.33 21.31
ABAJO 4 5/8" 1 3.33 21.31

0.19 0.30

0.49 0.49 12 3/8" 24 1.66 277.29


0.19

VS-2 V-201-204
11.00
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.35 0.35 4 5/8" 2 11.70 149.76
0.35 0.35 4 5/8" 2 11.70 149.76
11.00

VS-2 V-201-204 0.19 0.30

0.49 0.49 8 3/8" 28 1.66 215.67


0.19

V-201

0.19 0.30

0.49 0.49 4 3/8" 15 1.66 57.77


0.19

V-204

0.19 0.30

0.49 0.49 4 3/8" 10 1.66 38.51


0.19

INTERSECC. EJE I

2.55 4 3/4" 2 2.55 46.10

INTERSECC. EJE I

2.55 4 5/8" 1 2.55 16.32

INTERSECC. EJE J

2.00 4 5/8" 1 2.00 12.80

V-203 ,V-202-205
11.00

0.35 3 5/8" 3 11.70 168.48


0.35 2.37 0.35 3 3/4" 1 2.72 18.44
4.35
3 3/4" 2 4.35 58.99
0.25 7.68 0.25 3 1/2" 2 8.18 50.06

0.35
3.50 3 5/8" 3 3.85 55.44
5.00 0.35 3 5/8" 1 5.00 24.00
0.35 8.65 3 5/8" 3 9.35 134.64
2.25
0.35 3 5/8" 2 2.60 24.96

ESTRIBOS V 202

0.24 0.30

0.49 0.49 3 3/8" 14 1.76 42.87


0.24

ESTRIBOS V 203

0.24 0.30

0.64 0.64 3 3/8" 44 2.06 157.71


0.24

ESTRIBOS V 205

0.19 0.30

0.49 0.49 3 3/8" 10 1.66 28.88


0.19

VIGA DE BORDE DEL VOLADIZO

6.50 8.65

0.35 2 3/8" 3 24.85 86.48


9.00 0.35

0.35 6.50 8.65 2 3/8" 3 24.85 86.48


0.35

9.00

0.16 0.15

0.16 0.16 12 1/4" 25 0.79 59.25


0.16

VIGAS DE TIMPANO
VT-02

10.30

0.20 7 1/2" 3 10.70 229.19


0.20

0.20 10.30 7 1/2" 2 10.70 152.80


0.20

0.19 0.30

0.29 0.29 7 1/4" 38 1.26 194.39


0.19

VIGAS DE CONFINAMIENTO
VIGAS DE CONFIMANIENTO EN EL EJE J 1 Y 2 PISO

2.90 12 3/8" 1 3.30 22.97


0.20 2.90 0.20 12 3/8" 1 3.30 22.97
ESTRIBOS 0.20 0.20
0.10
0.07 12 1/4" 14 0.37 15.54
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.05 0.05

0.10

VIGAS DE CONFIMANIENTO EN EL EJE I 1 Y 2 PISO

2.90 6 3/8" 1 3.30 11.48


0.20 2.90 0.20 6 3/8" 1 3.30 11.48
0.20 0.20
1.75
0.20 0.20 6 3/8" 1 2.15 7.48
1.75 6 3/8" 1 2.15 7.48
ESTRIBOS 0.20 0.20
0.10
0.07 6 1/4" 14 0.37 7.77
0.05 0.05 6 1/4" 10 0.37 5.55
0.10

VIGAS DEL PARAPETO

23.50 1 3/8" 1 23.70 13.75


0.10 23.50 0.10 1 3/8" 1 23.70 13.75
0.10 0.10

CERRAMIENTO 1 3/8" 1 1.90 1.10


ESTRIBOS

0.10 cada 15 1 1/4" 160 0.30 12.00


0.05 0.05

0.10

SS.HH. ALUM - DOC


EJE H -VA-01(15X30)

7.80 1 5/8" 2 8.20 26.24


0.20 0.20

7.80
0.20 0.20
1 5/8" 2 8.20 26.24

0.24 0.30

0.09 0.09 1 3/8" 42 0.96 23.39


0.24

EJE I - VB 20X20

4.28
0.15 1 3/8" 3 4.58 7.97
0.15

0.15 4.28 1 3/8" 3 4.58 7.97


0.15

0.16 0.15

0.16 0.16 1 1/4" 24 0.79 4.74


0.16

EJE I - VA-01(15X30)

4.28 1 5/8" 2 4.68 14.98


0.20 0.20

4.28
0.20 0.20
1 5/8" 2 4.68 14.98

0.24 0.30

0.09 0.09 1 3/8" 25 0.96 13.92


0.24

EJE 1-VS -02(15X35)

16.25 1 5/8" 2 16.65 53.28


0.20 0.20

16.25
0.20 0.20
1 5/8" 2 16.65 53.28

0.29 0.30

0.09 0.09 1 3/8" 102 1.06 62.71


0.29

EJE 1-VB 20X20

16.75
0.15 1 3/8" 3 17.05 29.67
0.15

0.15 16.75 1 3/8" 3 17.05 29.67


0.15

0.16 0.15

0.16 0.16 1 1/4" 85 0.79 16.79


0.16
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

EJE 2-VS -01(15X35)

5.30 1 5/8" 2 5.70 18.24


0.20 0.20

5.30
0.20 0.20
1 5/8" 2 5.70 18.24

0.29 0.30

0.09 0.09 1 3/8" 33 1.06 20.29


0.29

EJE 3-VS -01(15X35)

9.15 1 5/8" 2 9.55 30.56


0.20 0.20

9.15
0.20 0.20
1 5/8" 2 9.55 30.56

0.29 0.30

0.09 0.09 1 3/8" 58 1.06 35.66


0.29

EJE 15-VS -01(15X35)

8.50 1 5/8" 2 8.90 28.48


0.20 0.20

8.50
0.20 0.20
1 5/8" 2 8.90 28.48

0.29 0.30

0.09 0.09 1 3/8" 54 1.06 33.20


0.29

ESCALERA 02
PRIMER NIVEL

EJE 13* VE

3.90

0.35 0.35 1 5/8" 2 4.60 14.72


1 3/8" 2 4.60 5.34
0.35 0.35 1 5/8" 2 5.05 16.16
4.35

0.19 0.30

0.47 0.47 1 3/8" 18 1.62 16.91


0.19

EJE 13 VA-1

3.90

0.35 0.35 1 5/8" 3 4.60 22.08

0.35 0.35 1 5/8" 3 4.60 22.08


3.90

0.19 0.30

0.47 0.47 1 3/8" 29 1.62 27.25


0.19

VB

3.90

0.35 0.35 1 3/8" 3 4.60 8.00

0.35 0.35 1 3/8" 3 4.60 8.00


3.90

0.16 0.15

0.16 0.16 1 1/4" 24 0.79 4.74


0.16

EJE P-O VS-01, V-101

6.50

0.35 0.35 2 5/8" 2 7.20 46.08


0.35 0.35 2 5/8" 2 7.20 46.08
6.50

VS-1 0.19 0.30

0.49 0.49 2 3/8" 28 1.66 53.92


0.19

V-101

0.19 0.30

0.49 0.49 2 3/8" 15 1.66 28.88


0.19

INTERSECC. EJE 13

2.55 2 3/4" 2 2.55 23.052


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

INTERSECC. EJE 13

2.55 2 5/8" 1 2.55 8.16

SEGUNDO NIVEL

EJE 13* VE

3.90

0.35 0.35 1 5/8" 2 4.60 14.72


1 3/8" 2 4.60 5.34
0.35 0.35 1 5/8" 2 5.05 16.16
4.35

0.19 0.30

0.47 0.47 1 3/8" 18 1.62 16.91


0.19

EJE 13 VA-1

3.90

0.35 0.35 1 5/8" 3 4.60 22.08

0.35 0.35 1 5/8" 3 4.60 22.08


3.90

0.19 0.30

0.47 0.47 1 3/8" 29 1.62 27.25


0.19

VB

3.90

0.35 0.35 1 3/8" 3 4.60 8.00

0.35 0.35 1 3/8" 3 4.60 8.00


3.90

0.16 0.15

0.16 0.16 1 1/4" 24 0.79 4.74


0.16

EJE P-O VS-01, V-101

6.50

0.35 0.35 2 5/8" 2 7.20 46.08


0.35 0.35 2 5/8" 2 7.20 46.08
6.50

VS-1 0.19 0.30

0.49 0.49 2 3/8" 28 1.66 53.92


0.19

V-101

0.19 0.30

0.49 0.49 2 3/8" 15 1.66 28.88


0.19

INTERSECC. EJE 13

2.55 2 3/4" 2 2.55 23.052

INTERSECC. EJE 13

2.55 2 5/8" 1 2.55 8.16

TERCER NIVEL

EJE 13* VA-2

3.90

0.35 0.35 1 5/8" 3 4.60 22.08

0.35 0.35 1 5/8" 3 4.60 22.08


3.90

0.21 0.30

0.66 0.60 1 3/8" 25 1.96 28.42


0.19

EJE 13 VA-2

3.90

0.35 0.35 1 5/8" 3 4.60 22.08

0.35 0.35 1 5/8" 3 4.60 22.08


3.90

0.19 0.30

0.47 0.47 1 3/8" 29 1.62 27.25


0.19

VB

3.90

0.35 0.35 2 3/8" 3 4.60 16.01

0.35 0.35 2 3/8" 3 4.60 16.01


3.90
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.16 0.15

0.16 0.16 2 1/4" 24 0.79 9.48


0.16

VIGA CUMBRERA

3.95 1 5/8" 3 4.10 19.68


0.15 0.15

0.15 3.95 1 5/8" 3 4.10 19.68


0.15

0.24 0.20

0.14 0.14 1 3/8" 29 0.91 15.31


0.19

0.24 0.20

0.14 0.14 1 3/8" 29 0.91 15.31


0.19

VS-2 V-201,202 EJE O-P

8.80

0.35 0.35 2 5/8" 2 9.50 60.80


0.35 0.35 2 5/8" 2 11.00 70.40
10.30

VS-2 0.19 0.30 .


0.49 0.49 2 3/8" 22 1.66 42.36
0.19

VS-2 0.19 0.30 .


0.49 0.49 2 3/8" 10 1.66 19.26
0.19

V-201

0.19 0.30

0.40 0.40 2 3/8" 14 1.48 24.04


0.19

V-202

0.19 0.20

0.14 0.14 2 3/8" 8 0.86 7.98


0.19

INTERSECC. EJE I

2.40 2 3/4" 2 2.40 21.70

INTERSECC. EJE I

2.55 2 5/8" 1 2.55 8.16

INTERSECC. EJE J

2.25 2 5/8" 2 2.25 14.40

VIGA DE BORDE DEL VOLADIZO

7.60

0.20 1 3/8" 3 8.00 13.92


0.20

0.20 7.60 1 3/8" 3 8.00 13.92


0.20

0.16 0.15

0.16 0.16 1 1/4" 38 0.79 7.51


0.16

VIGAS DE CONFINAMIENTO
EJE 13* VAM-1

3.50 3 3/8" 1 3.90 6.79


0.20 3.50 0.20 3 3/8" 1 3.90 6.79
ESTRIBOS 0.20 0.20

0.10 0.07 3 1/4" 18 0.37 5.00


0.05 0.05

0.10

ENTRE EJE P-O

3.85 2 3/8" 1 4.25 4.93


0.20 3.85 0.20 2 3/8" 1 4.25 4.93
ESTRIBOS 0.20 0.20

0.10 0.07 2 1/4" 22 0.37 4.07


0.05 0.05

0.10

4.75 2 3/8" 1 5.15 5.97


0.20 4.75 0.20 2 3/8" 1 5.15 5.97
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
ESTRIBOS 0.20 0.20

0.10 0.07 2 1/4" 25 0.37 4.63


0.05 0.05

0.10

VIGA DEL PARAPETO (borde)

3.65 2 3/8" 1 4.05 4.70


0.20 3.65 0.20 2 3/8" 1 4.05 4.70
ESTRIBOS 0.20 0.20

0.10 0.07 2 1/4" 18 0.37 3.33


0.05 0.05

0.10

ESCALERA 04
PRIMER NIVEL

EJE J VE

4.10

0.35 0.35 1 5/8" 2 4.80 15.36


1 3/8" 2 4.80 5.57
0.35 0.35 1 5/8" 2 4.80 15.36
4.10

0.19 0.30

0.47 0.47 1 3/8" 20 1.62 18.79


0.19

EJE 13 VA-1

4.35

0.35 0.35 2 5/8" 3 5.05 48.48

0.35 0.35 2 5/8" 3 5.05 48.48


4.35

0.19 0.30

0.47 0.47 2 3/8" 32 1.62 60.13


0.19

VB

4.35

0.35 0.35 1 3/8" 3 5.05 8.79

0.35 0.35 1 3/8" 3 5.05 8.79


4.35

0.16 0.15

0.16 0.16 1 1/4" 24 0.79 4.74


0.16

EJE 23-24 VS-01, V-101

9.85

0.35 0.35 2 5/8" 2 10.55 67.52


0.35 0.35 2 5/8" 2 10.55 67.52
9.85

VS-1 0.19 0.30

0.49 0.49 2 3/8" 42 1.66 80.88


0.19

V-101

0.19 0.30

0.49 0.49 2 3/8" 15 1.66 28.88


0.19

INTERSECC. EJE I

2.55 2 3/4" 2 2.55 23.052

INTERSECC. EJE I

2.55 2 5/8" 1 2.55 8.16

SEGUNDO NIVEL

EJE J VE

4.10

0.35 0.35 1 5/8" 2 4.80 15.36


1 3/8" 2 4.80 5.57
0.35 0.35 1 5/8" 2 4.80 15.36
4.10

0.19 0.30

0.47 0.47 1 3/8" 20 1.62 18.79


0.19

EJE 13 VA-1

4.35

0.35 0.35 2 5/8" 3 5.05 48.48

0.35 0.35 2 5/8" 3 5.05 48.48


4.35
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.19 0.30

0.47 0.47 2 3/8" 32 1.62 60.13


0.19

VB

4.35

0.35 0.35 1 3/8" 3 5.05 8.79

0.35 0.35 1 3/8" 3 5.05 8.79


4.35

0.16 0.15

0.16 0.16 1 1/4" 24 0.79 4.74


0.16

EJE 23-24 VS-01, V-101

9.85

0.35 0.35 2 5/8" 2 10.55 67.52


0.35 0.35 2 5/8" 2 10.55 67.52
9.85

VS-1 0.19 0.30

0.49 0.49 2 3/8" 42 1.66 80.88


0.19

V-101

0.19 0.30

0.49 0.49 2 3/8" 15 1.66 28.88


0.19

INTERSECC. EJE I

2.55 2 3/4" 2 2.55 23.052

INTERSECC. EJE I

2.55 2 5/8" 1 2.55 8.16

TERCER NIVEL

EJE J VA-2

4.35

0.35 0.35 1 5/8" 3 5.05 24.24

0.35 0.35 1 5/8" 3 5.05 24.24


4.35

0.21 0.30

0.66 0.60 1 3/8" 30 1.96 34.10


0.19

EJE I-J VA-2

4.35

0.35 0.35 2 5/8" 3 5.05 48.48

0.35 0.35 2 5/8" 3 5.05 48.48


4.35

0.19 0.30

0.47 0.47 2 3/8" 35 1.62 65.77


0.19

VB

4.35

0.35 0.35 2 3/8" 3 5.05 17.57

0.35 0.35 2 3/8" 3 5.05 17.57


4.35

0.16 0.15

0.16 0.16 2 1/4" 26 0.79 10.27


0.16

VIGA CUMBRERA

4.85 1 5/8" 3 5.00 24.00


0.15 0.15

0.15 4.85 1 5/8" 3 5.00 24.00


0.15

0.24 0.20

0.14 0.14 1 3/8" 33 0.91 17.42


0.19

0.24 0.20

0.14 0.14 1 3/8" 33 0.91 17.42


0.19

VS-2 V-201,202 EJE I-J


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
11.20

0.35 0.35 2 5/8" 2 11.90 76.16


0.35 0.35 2 5/8" 2 12.90 82.56
12.20

VS-2 0.19 0.30 .


0.49 0.49 4 3/8" 28 1.66 107.83
0.19

V-201

0.19 0.30

0.40 0.40 2 3/8" 14 1.48 24.04


0.19

V-202

0.19 0.20

0.14 0.14 2 3/8" 8 0.86 7.98


0.19

INTERSECC. EJE I

2.40 2 3/4" 2 2.40 21.70

INTERSECC. EJE I

2.55 2 5/8" 1 2.55 8.16

INTERSECC. EJE J

2.25 2 5/8" 2 2.25 14.40

VIGA DE BORDE DEL VOLADIZO

10.85

0.20 1 3/8" 3 11.25 19.58


0.20

0.20 10.85 1 3/8" 3 11.25 19.58


0.20

0.16 0.15

0.16 0.16 1 1/4" 54 0.79 10.67


0.16

VIGAS DE CONFINAMIENTO
EJE I VAM-1

2.95 3 3/8" 1 3.35 5.83


0.20 2.95 0.20 3 3/8" 1 3.35 5.83
ESTRIBOS 0.20 0.20

0.10 0.07 3 1/4" 18 0.37 5.00


0.05 0.05

0.10

ENTRE EJE I-J

3.85 2 3/8" 1 4.25 4.93


0.20 3.85 0.20 2 3/8" 1 4.25 4.93
ESTRIBOS 0.20 0.20

0.10 0.07 2 1/4" 22 0.37 4.07


0.05 0.05

0.10

4.75 2 3/8" 1 5.15 5.97


0.20 4.75 0.20 2 3/8" 1 5.15 5.97
ESTRIBOS 0.20 0.20

0.10 0.07 2 1/4" 25 0.37 4.63


0.05 0.05

0.10

VIGA DEL PARAPETO (borde)

4.35 2 3/8" 1 4.75 5.51


0.20 4.35 0.20 2 3/8" 1 4.75 5.51
ESTRIBOS 0.20 0.20

0.10 0.07 2 1/4" 24 0.37 4.44


0.05 0.05

0.10

CERCO PERIMETRICO
POSTERIOR PABELLON A

19.65

0.15 0.15 1 3/8" 1 19.95 11.57

0.15 0.15 1 3/8" 1 19.95 11.57


19.65

0.07 0.05

0.11 0.11 1 1/4" 98 0.41 10.05


0.07

FRONTAL I.E.
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
6.25

0.15 0.15 1 3/8" 1 6.55 3.80

0.15 0.15 1 3/8" 1 6.55 3.80


6.25

0.07 0.05

0.11 0.11 1 1/4" 31 0.41 3.18


0.07

FRONTAL I.E.

14.60

0.15 0.15 1 3/8" 1 14.90 8.64

0.15 0.15 1 3/8" 1 14.90 8.64


14.60

0.07 0.05

0.11 0.11 1 1/4" 73 0.41 7.48


0.07

PORTICO DE INGRESO
VIGA P.
4.75

0.25 0.25 1 1/2" 2 5.25 10.71

0.25 0.25 1 1/2" 2 5.25 10.71


4.75

VS-1 0.20 0.20

0.40 0.40 1 1/4" 28 1.40 9.80


0.20

CORTE 1-1
0.80

1 3/8" 4 0.95 2.20

0.15

3.35 1 3/8" 2 3.35 3.89

CORTE 2-2
1.30

1 3/8" 9 1.45 7.57

0.15

2.15 1 3/8" 2 2.15 2.49

624.36 12,233.62 1,001.29 13,760.64 908.66 0.00


Total 28,528.56 kg

01.05.06.03 LOSA ALIGERADA, ACERO F'y=4200 kg/cm2 KG


LONGITUD TOTAL

DESCRIPCIÓN
ELEM.
Ø CANT. LONG. 6mm 3/8" 1/2" 5/8" 3/4" 1"
f = .18kg/m f = .58kg/m f =1.02kg/m f =1.60kg/m f =2.26kg/m f =4.04kg/m
SS.HH. COLISEO
01 PISO
PAÑO ENTRE EJE 2-3
1.10

0.15 9 1/2" 1 1.25 11.48


2.45

9 3/8" 1 2.45 12.79


1.10

0.15 9 1/2" 1 1.25 11.48

4.80

9 1/2" 1 4.80 44.06

Acero de Temperatura
3.90

1 1/4" 20 3.90 14.04


4.80

1 1/4" 1 4.80 0.86

PAÑO ENTRE EJE 3-4


1.00

0.15 6 1/2" 1 1.15 7.04


2.05

6 3/8" 1 2.05 7.13


1.00

0.15 6 1/2" 1 1.15 7.04

4.40

6 1/2" 1 4.40 26.93


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

Acero de Temperatura
2.70

1 1/4" 18 2.70 8.75


4.40

1 1/4" 1 4.40 0.79

PAÑO ENTRE EJE 4-5


0.90

0.15 6 1/2" 1 1.05 6.43


1.70

6 3/8" 1 1.70 5.92


0.90

0.15 6 1/2" 1 1.05 6.43

3.95

6 1/2" 1 3.95 24.17

Acero de Temperatura
3.30

1 1/4" 16 3.30 9.50


3.95

1 1/4" 1 3.95 0.71

SS.HH. CAMERINOS
PAÑO ENTRE EJE D-H
1.15

0.15 10 1/2" 1 1.30 13.26


2.45

10 3/8" 1 2.45 14.21


1.15

0.15 10 1/2" 1 1.30 13.26

4.15

10 1/2" 1 4.15 42.33

Acero de Temperatura
4.40

1 1/4" 17 4.40 13.46


4.15

1 1/4" 1 4.15 0.75

PAÑO SENTIDO INGRESO ESCALERA


2.40

0.15 0.15 13 3/8" 1 2.70 20.36

2.40

13 1/2" 1 2.40 31.82

Acero de Temperatura
2.85

1 1/4" 10 2.85 5.13


2.40

1 1/4" 1 2.40 0.43

MODULO A
01 PISO
PAÑO CENTRAL
0.95

0.15 18 3/8" 1 1.10 11.48


2.30

18 1/2" 3 2.30 126.68


15.60

18 1/2" 1 15.60 286.42

0.95

0.15 18 3/8" 1 1.10 11.48

Acero de Temperatura
7.95

4 1/4" 14 7.95 111.30


3.60 4 1/4" 1 3.60 3.60

VOLADIZO FRONTAL
0.95

0.15 4 3/8" 1 1.10 2.55


2.30

4 1/2" 3 2.30 28.15


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
15.60

4 1/2" 1 15.60 63.65

0.95

0.15 4 3/8" 1 1.10 2.55

Acero de Temperatura
1.95

4 1/4" 14 1.95 27.30


3.60 4 1/4" 1 3.60 3.60

02 PISO
PAÑO CENTRAL
0.95

0.15 18 3/8" 1 1.10 11.48


2.30

18 1/2" 3 2.30 126.68


15.60

18 1/2" 1 15.60 286.42

0.95

0.15 18 3/8" 1 1.10 11.48

Acero de Temperatura
7.95

4 1/4" 14 7.95 111.30


3.60 4 1/4" 1 3.60 3.60

VOLADIZO FRONTAL
0.95

0.15 4 3/8" 1 1.10 2.55


2.30

4 1/2" 3 2.30 28.15


15.60

4 1/2" 1 15.60 63.65

0.95

0.15 4 3/8" 1 1.10 2.55

Acero de Temperatura
1.95

4 1/4" 14 1.95 27.30


3.60 4 1/4" 1 3.60 3.60

03 PISO
VOL. POSTERIOR
0.95

0.15 2 3/8" 1 1.10 1.28


2.30

2 1/2" 3 2.30 14.08


15.60

2 1/2" 1 15.60 31.82

0.95

0.15 2 3/8" 1 1.10 1.28

Acero de Temperatura
1.00

4 1/4" 14 1.00 14.00


3.60 4 1/4" 1 3.60 3.60

PAÑO CENTRAL
0.95

0.15 18 3/8" 1 1.10 11.48


2.30

18 1/2" 3 2.30 126.68


15.60

18 1/2" 1 15.60 286.42

0.95

0.15 18 3/8" 1 1.10 11.48

Acero de Temperatura
7.95

4 1/4" 14 7.95 111.30


3.60 4 1/4" 1 3.60 3.60

VOLADIZO FRONTAL
0.95
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.15 4 3/8" 1 1.10 2.55
2.30

4 1/2" 3 2.30 28.15


15.60

4 1/2" 1 15.60 63.65

0.95

0.15 4 3/8" 1 1.10 2.55

Acero de Temperatura
1.95

4 1/4" 14 1.95 27.30


3.60 4 1/4" 1 3.60 3.60

MODULO B
01 PISO
PAÑO CENTRAL
0.95

0.15 16 3/8" 1 1.10 10.21


2.30

16 1/2" 4 2.30 150.14


19.70

16 1/2" 1 19.70 321.50

0.95

0.15 16 3/8" 1 1.10 10.21

Acero de Temperatura
7.25

4.5 1/4" 14 7.25 114.19


3.60 4.5 1/4" 1 3.60 4.05

VOLADIZO FRONTAL
0.95

0.15 4 3/8" 1 1.10 2.55


2.30

4 1/2" 4 2.30 37.54


19.70

4 1/2" 1 19.70 80.38

0.95

0.15 3.5 3/8" 1 1.10 2.23

Acero de Temperatura
1.95

3.5 1/4" 14 1.95 23.89


3.60 3.5 1/4" 1 3.60 3.15

02 PISO
PAÑO CENTRAL
0.95

0.15 16 3/8" 1 1.10 10.21


2.30

16 1/2" 4 2.30 150.14


19.70

16 1/2" 1 19.70 321.50

0.95

0.15 16 3/8" 1 1.10 10.21

Acero de Temperatura
7.25

4.5 1/4" 14 7.25 114.19


3.60 4.5 1/4" 1 3.60 4.05

VOLADIZO FRONTAL
0.95

0.15 4 3/8" 1 1.10 2.55


2.30

4 1/2" 4 2.30 37.54


19.70

4 1/2" 1 19.70 80.38

0.95

0.15 3.5 3/8" 1 1.10 2.23

Acero de Temperatura
1.95

3.5 1/4" 14 1.95 23.89


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
3.60 3.5 1/4" 1 3.60 3.15

03 PISO
VOL. POSTERIOR
0.95

0.15 2 3/8" 1 1.10 1.28


2.30

2 1/2" 3 2.30 14.08


19.70

2 1/2" 1 19.70 40.19

0.95

0.15 2 3/8" 1 1.10 1.28

Acero de Temperatura
1.00

4 1/4" 14 1.00 14.00


3.60 4 1/4" 1 3.60 3.60

PAÑO CENTRAL
0.95

0.15 16 3/8" 1 1.10 10.21


2.30

16 1/2" 4 2.30 150.14


19.70

16 1/2" 1 19.70 321.50

0.95

0.15 16 3/8" 1 1.10 10.21

Acero de Temperatura
7.25

4.5 1/4" 14 7.25 114.19


3.60 4.5 1/4" 1 3.60 4.05

VOLADIZO FRONTAL
0.95

0.15 4 3/8" 1 1.10 2.55


2.30

4 1/2" 4 2.30 37.54


19.70

4 1/2" 1 19.70 80.38

0.95

0.15 3.5 3/8" 1 1.10 2.23

Acero de Temperatura
1.95

3.5 1/4" 14 1.95 23.89


3.60 3.5 1/4" 1 3.60 3.15

MODULO C
VIGUETAS PISO 1
PAÑO CENTRAL
0.95

0.15 18 3/8" 1 1.10 11.48


2.30

18 1/2" 5 2.30 211.14


24.70

18 1/2" 1 24.70 453.49

0.95

0.15 18 3/8" 1 1.10 11.48

Acero de Temperatura
7.95

6 1/4" 14 7.95 166.95


3.60 6 1/4" 1 3.60 5.40

VOLADIZO FRONTAL
0.95

0.15 5 3/8" 1 1.10 3.19


2.30

5 1/2" 5 2.30 58.65


24.70

5 1/2" 1 24.70 125.97

0.95
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.15 5 3/8" 1 1.10 3.19

Acero de Temperatura
1.95

6 1/4" 14 1.95 40.95


3.60

6 1/4" 1 3.60 5.40

VIGUETAS PISO 2
VOLADIZO POSTERIOR
0.95

0.15 2 3/8" 1 1.10 1.28


2.30

2 1/2" 5 2.30 23.46


24.70

2 1/2" 1 24.70 50.39

0.95

0.15 2 3/8" 1 1.10 1.28

Acero de Temperatura
1.00

6 1/4" 14 1.00 21.00


3.60

6 1/4" 1 3.60 5.40

PAÑO CENTRAL
0.95

0.15 18 3/8" 1 1.10 11.48


2.30

18 1/2" 5 2.30 211.14


24.70

18 1/2" 1 24.70 453.49

0.95

0.15 18 3/8" 1 1.10 11.48

Acero de Temperatura
7.95

6 1/4" 14 7.95 166.95


3.60 6 1/4" 1 3.60 5.40

VOLADIZO FRONTAL
0.95

0.15 5 3/8" 1 1.10 3.19


2.30

5 1/2" 5 2.30 58.65


24.70

5 1/2" 1 24.70 125.97

0.95

0.15 5 3/8" 1 1.10 3.19

Acero de Temperatura
1.95

6 1/4" 14 1.95 40.95


3.60

6 1/4" 1 3.60 5.40

SS.HH. ALUMNOS-DOC.

PAÑO ENTRE EJE 1-3


1.10

0.15 6 1/2" 1 1.25 7.65


1.55

6 1/2" 1 1.55 9.49


1.10

0.15 6 1/2" 1 1.25 7.65

4.60

6 1/2" 1 4.60 28.15

Acero de Temperatura
4.10

1 1/4" 18 4.10 13.28


4.60

1 1/4" 1 4.60 0.83

PAÑO ENTRE EJE 3-4


1.00

0.15 12 1/2" 1 1.15 14.08


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D

1.00

0.15 12 1/2" 1 1.15 14.08

4.30

12 1/2" 1 4.30 52.63

Acero de Temperatura
6.20

1 1/4" 17 6.20 18.97


4.30

1 1/4" 1 4.30 0.77

ESCALERA 02
1-2 PISO
VOLADIZO FRONTAL
3.90

0.10 0.10 8 1/2" 1 4.10 33.46


3.90

8 1/2" 1 4.10 33.46

Acero de Temperatura
1.95

2 1/4" 15 1.95 14.63


3.90 2 1/4" 1 3.90 1.95

3 PISO
PAÑO CENTRAL
4.40

0.10 0.10 9 1/2" 1 4.60 42.23


4.40

9 1/2" 1 4.60 42.23

Acero de Temperatura
4.65

1 1/4" 18 4.65 20.93


4.40 1 1/4" 1 4.40 1.10

VOLADIZO FRONTAL
4.40

0.10 0.10 4 1/2" 1 4.60 18.77


4.40

4 1/2" 1 4.60 18.77

Acero de Temperatura
1.95

1 1/4" 18 1.95 8.78


4.40 1 1/4" 1 4.40 1.10

VOL. POSTERIOR
4.40

0.10 0.10 2 1/2" 1 4.60 9.38


4.40

2 1/2" 1 4.60 9.38

Acero de Temperatura
1.00

1 1/4" 18 1.00 4.50


4.40 1 1/4" 1 4.40 1.10

ESCALERA 04
1-2 PISO
PAÑO CENTRAL
4.35

0.10 0.10 12 1/2" 1 4.55 55.69


4.35

12 1/2" 1 4.55 55.69

Acero de Temperatura
2.90

2 1/4" 18 2.90 26.10


4.35 2 1/4" 1 4.35 2.18

VOLADIZO FRONTAL
4.35

0.10 0.10 8 1/2" 1 4.55 37.13


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
4.35

8 1/2" 1 4.55 37.13

Acero de Temperatura
1.95

2 1/4" 15 1.95 14.63


4.35 2 1/4" 1 4.35 2.18

3 PISO
PAÑO CENTRAL
4.85

0.10 0.10 15 1/2" 1 5.05 77.27


4.85

15 1/2" 1 5.05 77.27

Acero de Temperatura
4.65

1 1/4" 20 4.65 23.25


4.85 1 1/4" 1 4.85 1.21

VOLADIZO FRONTAL
4.85

0.10 0.10 4 1/2" 1 5.05 20.60


4.85

4 1/2" 1 5.05 20.60

Acero de Temperatura
1.95

1 1/4" 20 1.95 9.75


4.85 1 1/4" 1 4.85 1.21

VOL. POSTERIOR
4.85

0.10 0.10 2 1/2" 1 5.05 10.30


4.85

2 1/2" 1 5.05 10.30

Acero de Temperatura
1.00

1 1/4" 20 1.00 5.00


4.85 1 1/4" 1 4.85 1.21

1,601.30 286.58 6,144.99 0.00 0.00 0.00

Total 8,032.87 kg

01.05.07.03 MUROS DE CONTENCION ARMADOS, ACERO F'y=4200 kg/cm2 KG


LONGITUD TOTAL

DESCRIPCIÓN
ELEM
Ø CANT. LONG. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
f = .25kg/m f = .58kg/m f =1.02kg/m f =1.60kg/m f =2.26kg/m f =4.04kg/m

COLISEO
MA-01 EJE 12

PANTALLA VERTICAL

0.20 0.20

1 3/8" 128 3.40 252.42


2.90 2.90 1 3/8" 128 3.40 252.42
0.30 0.30

PANTALLA LONG

25.50

0.20 0.20 1 3/8" 11 25.90 165.24


0.20 0.20 1 3/8" 11 25.90 165.24
25.50

MA-01 EJE H

PANTALLA VERTICAL

0.20 0.20

1 3/8" 198 3.40 390.46


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
2.90 2.90 1 3/8" 198 3.40 390.46
0.30 0.30

PANTALLA LONG

39.50

0.20 0.20 1 3/8" 11 39.90 254.56


0.20 0.20 1 3/8" 11 39.90 254.56
39.50

MODULO B
MA-03 EJE J

PANTALLA VERTICAL

0.20 0.20

1 3/8" 108 3.00 187.92


2.80 2.80 1 3/8" 108 3.00 187.92

PANTALLA LONG

21.50

0.20 0.20 1 3/8" 9 21.90 114.32


0.20 0.20 1 3/8" 9 21.90 114.32
21.50

MODULO C
MA-02 EJE J

PANTALLA VERTICAL

0.20 0.20

1 3/8" 120 2.70 187.92


2.50 2.50 1 3/8" 120 2.70 187.92

PANTALLA LONG

23.50

0.20 0.20 1 3/8" 8 23.90 110.90


0.20 0.20 1 3/8" 8 23.90 110.90
23.50

SS.HH. ALUMNOS
MA-04 EJE1

PANTALLA VERTICAL

0.20 0.20

1 3/8" 33 4.20 80.39


3.70 3.70 1 3/8" 33 4.20 80.39
0.30 0.30

PANTALLA LONG

6.50

0.20 0.20 1 3/8" 14 6.90 56.03


0.20 0.20 1 3/8" 14 6.90 56.03
6.50

MA-05 EJE1

PANTALLA VERTICAL

0.20 0.20

1 3/8" 54 3.70 115.88


3.20 3.20 1 3/8" 54 3.70 115.88
0.30 0.30

PANTALLA LONG

10.75

0.20 0.20 1 3/8" 12 11.15 77.60


0.20 0.20 1 3/8" 12 11.15 77.60
10.75

ESCALERA 04
MA-03 EJE J

PANTALLA VERTICAL

0.20 0.20
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
1 3/8" 15 3.00 26.10
2.80 2.80 1 3/8" 15 3.00 26.10

PANTALLA LONG

2.95

0.20 0.20 1 3/8" 9 3.35 17.49


0.20 0.20 1 3/8" 9 3.35 17.49
2.95

0.00 4,074.44 0.00 0.00 0.00 0.00

Total 4,074.44 KG

01.05.08.03 GRADERIAS, ACERO F'y=4200 kg/cm2


LONGITUD TOTAL

DESCRIPCIÓN
ELEM
Ø CANT. LONG. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
f = .25kg/m f = .58kg/m f =1.02kg/m f =1.60kg/m f =2.26kg/m f =4.04kg/m

COLISEO
EJE B-H
CONTRAPASO

32.80

0.20 0.20 2.00 5 1/2" 2 33.20 677.28


2.00 5 3/8" 2 32.80 380.48
0.20
0.20 2.00 5 1/2" 2 33.20 677.28
32.80

0.10 0.30

0.55 0.55 2.00 5 3/8" 265 1.60 2,459.20


0.10

DESCANZO

0.60

0.15 0.15 2.00 5 3/8" 164 0.90 856.08

32.80

2.00 5 3/8" 2 32.80 380.48

EJE 12
CONTRAPASO

20.20

0.20 0.20 1.00 5 1/2" 2 20.60 210.12


1.00 5 3/8" 2 20.20 117.16
0.20
0.20 1.00 5 1/2" 2 20.60 210.12
20.20

0.10 0.30

0.55 0.55 1.00 5 3/8" 124 1.60 575.36


0.10

DESCANZO

0.60

0.15 0.15 1.00 5 3/8" 100 0.90 261.00

20.20

1.00 5 3/8" 2 20.20 117.16

EJE 12
CONTRAPASO

8.10

0.20 0.20 1.00 5 1/2" 2 8.50 86.70


1.00 5 3/8" 2 8.10 46.98
0.20
0.20 1.00 5 1/2" 2 8.50 86.70
8.10

0.10 0.30

0.55 0.55 1.00 5 3/8" 56 1.60 259.84


0.10

DESCANZO

0.60

0.15 0.15 1.00 5 3/8" 40 0.90 104.40

8.10

1.00 5 3/8" 2 8.10 46.98

0.00 5,605.12 1,948.20 0.00 0.00 0.00


Total 7,553.32 KG

01.05.09.03 ESCALERA, ACERO F`y=4200 kg/cm2 KG


METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
LONGITUD TOTAL

DESCRIPCIÓN
ELEM
Ø CANT. LONG. 1/4" 3/8" 1/2" 5/8" 3/4" 1"
f = .25kg/m f = .58kg/m f =1.02kg/m f =1.60kg/m f =2.26kg/m f =4.04kg/m

ESCALERA 01

1 TRAMO 2.35

1 3/8" 15 2.35 20.45

VERTICAL

0.20

1 3/8" 12 3.50 24.36


2.80

0.50

ESCALERA 02

1-3 TRAMO 1.70

2 3/8" 21 1.70 41.41


2 3/8" 22 1.70 43.38
1.70

VERTICAL

0.50 0.50

2 1/2" 11 4.70 105.47


4.00 3.75 2 1/2" 11 4.45 99.86
0.20

0.20

REFUERZO BASE 1.00

0.20 2 1/2" 11 1.20 26.93

DESCANZO
HORIZ 3.40

2 3/8" 12 3.40 47.33


2 3/8" 12 3.40 47.33
3.40

LLEGADA

0.50 0.50

2 1/2" 26 2.90 153.82


2.20 2.20 2 1/2" 26 2.90 153.82
0.20

0.20

2-4 TRAMO 1.70

2 3/8" 18 1.70 35.50


2 3/8" 18 1.70 35.50
1.70

VERTICAL

0.50 0.50

2 1/2" 11 4.35 97.61


3.65 3.65 2 1/2" 11 4.35 97.61
0.20

0.20

ESCALERA 03

1 TRAMO 3.50

1 3/8" 15 3.50 30.45

VERTICAL

0.20

1 3/8" 18 3.50 36.54


2.80

0.50

ESCALERA 04

1-3 TRAMO 1.80

2 3/8" 21 1.80 43.85


2 3/8" 22 1.80 45.94
1.80

VERTICAL

0.50 0.50

2 1/2" 11 4.70 105.47


4.00 3.75 2 1/2" 11 4.45 99.86
0.20
METRADO DE ACERO ESTRUCTURAS-HOJA 01
PROYECTO: MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO EN LOS NIVELES SECUNDARIA Y PRIMARIA DE LA I.E. 80143 TORIBIO RODRIGUEZ DE MENDOZA COLLANTES DE MARCABALITO, DISTRITO D
0.20

REFUERZO BASE 1.00

0.20 2 1/2" 11 1.20 26.93

DESCANZO
HORIZ 4.30

2 3/8" 12 4.30 59.86


2 3/8" 12 4.30 59.86
4.30

LLEGADA

0.50 0.50

2 1/2" 26 2.90 153.82


2.20 2.20 2 1/2" 26 2.90 153.82
0.20

0.20

2 - 4 TRAMO 1.80

2 3/8" 18 1.80 37.58


2 3/8" 18 1.80 37.58
1.80

VERTICAL

0.50 0.50

2 1/2" 11 4.35 97.61


3.65 3.65 2 1/2" 11 4.35 97.61
0.20

0.20

ESCALERA 05

1 TRAMO 2.87

1 3/8" 15 2.87 24.97

VERTICAL

0.20

1 3/8" 14 3.50 28.42


2.80

0.50

ESCALERA 06

1 TRAMO 0.90 unidades


2 3/8" 10 0.90 10.44
2 3/8" 13 0.90 13.57
0.90

VERTICAL

0.50 0.50

2 1/2" 5 4.60 46.92


3.90 3.40 2 1/2" 5 4.10 41.82
0.20

0.20

REFUERZO DESCAZ 1.50

0.20 2 1/2" 5 1.70 17.34

2 TRAMO

DESCANZO
HORIZ 0.90

2 3/8" 3 0.90 3.13


2 3/8" 4 0.90 4.18
0.90

LLEGADA

0.50 0.50

2 1/2" 5 2.90 29.58


2.20 2.20 2 1/2" 5 2.90 29.58
0.20 2 1/2" 5 2.90 29.58
0.20

0.90

2 3/8" 5 0.90 5.22


2 3/8" 4 0.90 4.18
0.90

0.00 741.01 1,665.05 0.00 0.00 0.00


Total 2,406.06 KG