2.07 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO PARARAMPA DE ACCESO, M3 35.00 55.68 1948.89
E=0.20M (AFIRMADO O GRANULAR)
7.00 OTROS
7.01 TRASLADO DE PERSONAL A OBRA MES
1.00 1.00
1.00
1.00 1.00 1.00
3.00
1.00 1.00 3.00
3.00
1.00 1.00 3.00
3.00
1.00 1.00 3.00
1.00
1.00 1.00 1.00
3.00
1.00 1.00 3.00
2.00
1.00 1.00 2.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
3.00
1.00 1.00 3.00
1.00
1.00 1.00 1.00
187.36
4.80 1.20 2.10 1.00 1.00 12.10
4.80 1.40 2.60 1.00 1.00 17.47
6.20 1.70 3.50 1.00 1.00 36.89
6.20 2.20 3.95 1.00 1.00 53.88
6.20 2.30 4.70 1.00 1.00 67.02
187.36
4.80 1.20 2.10 1.00 1.00 12.10
4.80 1.40 2.60 1.00 1.00 17.47
6.20 1.70 3.50 1.00 1.00 36.89
6.20 2.20 3.95 1.00 1.00 53.88
6.20 2.30 4.70 1.00 1.00 67.02
187.36
4.80 1.20 2.10 1.00 1.00 12.10
4.80 1.40 2.60 1.00 1.00 17.47
6.20 1.70 3.50 1.00 1.00 36.89
6.20 2.20 3.95 1.00 1.00 53.88
6.20 2.30 4.70 1.00 1.00 67.02
187.36
4.80 1.20 2.10 1.00 1.00 12.10
4.80 1.40 2.60 1.00 1.00 17.47
6.20 1.70 3.50 1.00 1.00 36.89
6.20 2.20 3.95 1.00 1.00 53.88
6.20 2.30 4.70 1.00 1.00 67.02
187.36
187.36
4.80 1.20 2.10 1.00 1.00 12.10
4.80 1.40 2.60 1.00 1.00 17.47
6.20 1.70 3.50 1.00 1.00 36.89
6.20 2.20 3.95 1.00 1.00 53.88
6.20 2.30 4.70 1.00 1.00 67.02
187.36
86.84
4.80 2.05 1.00 1.00 9.84
4.80 2.35 1.00 1.00 11.28
6.20 2.85 1.00 1.00 17.67
6.20 3.65 1.00 1.00 22.63
6.20 4.10 1.00 1.00 25.42
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
64.18
4.80 2.05 0.30 1.00 1.00 2.95
4.80 0.25 2.10 1.00 1.00 2.52
4.80 2.35 0.30 1.00 1.00 3.38
4.80 0.25 2.60 1.00 1.00 3.12
6.20 2.85 0.40 1.00 1.00 7.07
6.20 0.25 3.50 1.00 1.00 5.43
6.20 3.65 0.45 1.00 1.00 10.18
6.20 0.30 3.95 1.00 1.00 7.35
6.20 4.10 0.50 1.00 1.00 12.71
6.20 0.33 4.70 1.00 1.00 9.47
240.11
13.70 0.30 1.00 1.00 4.11
4.80 2.10 1.00 1.00 20.16
0.25 2.10 1.00 1.00 1.05
14.30 0.30 1.00 1.00 4.29
4.80 2.60 1.00 1.00 24.96
0.25 2.60 1.00 1.00 1.30
18.10 0.40 1.00 1.00 7.24
6.20 3.50 1.00 1.00 43.40
0.25 3.50 1.00 1.00 1.75
19.70 0.45 1.00 1.00 8.87
6.20 3.95 1.00 1.00 48.98
0.30 3.95 1.00 1.00 2.37
20.60 0.50 1.00 1.00 10.30
6.20 4.70 1.00 1.00 58.28
0.33 4.70 1.00 1.00 3.06
5583.31
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
2.00
1.00 1.00 1.00
1.00
1.00 1.00 1.00
Análisis de precios unitarios
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Rendimiento mes/DIA 2.0000 EQ. 2.0000 Costo unitario directo por : mes
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301010007 NIVEL DE INGENIERO HM 15.0000 60.0000
Rendimiento GLB/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Rendimiento glb/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301010007 Excavadora Komatsu PC-200 LC-8MO hm 1.0000 0.0444
MATERIALES
0301010006 DINAMITA UND 0.0000
0301010007 GUIA RAPIDA M 0.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301010007 Excavadora Komatsu PC-200 LC-8MO hm 1.0000 0.1143
COMPRENSORA DE AIRE hm 1.0000 0.1143
MAQUINA JACKLE hm 1.0000 0.1143
Partida #NAME? #NAME?
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301010007 Excavadora Komatsu PC-200 LC-8MO hm 1.0000 0.0727
MATERIALES
0301010006 DINAMITA UND 0.0000
0301010007 GUIA RAPIDA M 0.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301010007 Excavadora Komatsu PC-200 LC-8MO hm 1.0000 0.1600
COMPRENSORA DE AIRE hm 1.0000 0.1600
MAQUINA JACKLE hm 1.0000 0.1600
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 6.5000
0301010007 Excavadora Komatsu PC-200 LC-8MO hm 0.0000 0.0000
VOLQUETES DE 15M3 hm 0.0000 0.0000
Partida 2.04 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO PARA CANALETA DE MT (AFIRMADO O GRANULAR)
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301010007 VIBRAPISON hm 1.0000 0.5333
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301010007 Excavadora Komatsu PC-200 LC-8MO hm 1.0000 0.0100
VOLQUETES DE 15M3 hm 4.0000 0.0400
Materiales
GASOLINA gal 0.1000
CEMENTO PORTLAND TIPO MS (42.5 kg) bol 0.6500
Equipos
HERRAMIENTAS MANUALES %mo 5.0000
VIBRADOR DE CONCRETO 4 HP 1.25" hm 0.0000 0.0000
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 1.0000 0.0571
Materiales
GASOLINA gal 3.0000
CEMENTO PORTLAND TIPO MS (42.5 kg) bol 11.0000
HORMIGON m3 1.0500
Equipos
HERRAMIENTAS MANUALES %mo 5.0000
VIBRADOR DE CONCRETO 4 HP 1.25" hm 1.0000 0.2667
MIXER PARA CONCRETO hm 1.0000 0.2667
Materiales
ALAMBRE NEGRO RECOCIDO N° 8 kg 0.2500
CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.3000
TUBERIA PVC-SAP C-10 C/R DE 3/4" X 5 m m 0.1300
MADERA TORNILLO p2 4.2500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Materiales
ALAMBRE NEGRO N° 16 kg 0.1000
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0700
Equipos
HERRAMIENTAS MANUALES %mo 5.0000
Materiales
ADITIVO ANTISOL cilindro 0.0020
BOMBA DE FUMIGAR und 0.0050
Equipos
HERRAMIENTAS MANUALES %mo 5.0000
Materiales
TECKNOPOR DE 1" und 0.1000
SIKAFLEX 1A de 600 ML cart 0.5500
Equipos
HERRAMIENTAS MANUALES %mo 5.0000
Materiales
CEMENTO PORTLAND TIPO MS (42.5 kg) BLS 0.1000
Equipos
HERRAMIENTAS MANUALES %mo 5.0000
Materiales
CEMENTO PORTLAND TIPO MS (42.5 kg) BLS 0.1500
Equipos
HERRAMIENTAS MANUALES %mo 5.0000
Equipos
HERRAMIENTAS MANUALES %mo 5.0000
Partida 5.01 REJILLAS DE PLATINA DE FIERRO PARA DRENAJE PLUVIAL ANCHO 0.30 REJILLA DE 1/16" X1"
Materiales
0204260002 ESCUBILLAS CONICAS DE 4" und 0.0500
0222140008 DESENGRASANTE gal 0.0700
02550800030001 SOLDADURA ELECTRICA SUPERCITO DE 1/8" kg 2.5000
0276020025 DISCO DE CORTE und 0.0500
0276020050 DISCO DE DESBASTE und 0.0100
02901300090004 PLATINA DE 1"X1/16" m 12.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301270005 MAQUINAS DE SOLDAR hm 1.0000 2.0000
0301330008 AMOLADORA hm 1.0000 2.0000
Materiales
0204260002 ESCUBILLAS CONICAS DE 4" und 0.0500
0222140008 DESENGRASANTE gal 0.0700
02550800030001 SOLDADURA ELECTRICA SUPERCITO DE 1/8" kg 0.3500
0276020025 DISCO DE CORTE und 0.0500
0276020050 DISCO DE DESBASTE und 0.0100
02901300090004 TUBO DE 1 1/2" X 2MM m 1.5000
MALLA GALVANIZADA TIPO COCO DE 2"X10 m 2.0500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301270005 MAQUINAS DE SOLDAR hm 1.0000 1.3333
0301330008 AMOLADORA hm 1.0000 1.3333
Materiales
0204260002 ESCUBILLAS CONICAS DE 4" und 0.0500
0222140008 DESENGRASANTE gal 0.0700
02550800030001 SOLDADURA ELECTRICA SUPERCITO DE 1/8" kg 0.3500
0276020025 DISCO DE CORTE und 0.0500
0276020050 DISCO DE DESBASTE und 0.0100
02901300090004 TUBO DE 1 1/2" X 2MM m 1.5000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
0301270005 MAQUINAS DE SOLDAR hm 1.0000 2.0000
0301330008 AMOLADORA hm 1.0000 2.0000
3,500.00
3,500.00 3,500.00
3,500.00
1,200.00
1,200.00 1,200.00
1,200.00
1,500.00
1,500.00 1,500.00
1,500.00
930.00
85.00 170.00
75.00 150.00
75.00 150.00
120.00 120.00
45.00 90.00
250.00 250.00
930.00
5,717.25
18.15 5,445.00
5,445.00
5,445.00 272.25
272.25
4,379.40
21.50 1,290.00
18.15 2,178.00
3,468.00
3,468.00 173.40
12.30 738.00
911.40
1,524.60
21.50 0.00
18.15 1,452.00
1,452.00
1,452.00 72.60
72.60
1,644.50
1.20 1,200.00
25.00 0.00
0.00 0.00
4.50 13.50
30.00 30.00
7.50 90.00
29.52 295.20
15.80 15.80
0.00 0.00
0.00 0.00
22.50 0.00
22.50 0.00
0.00 0.00
175.00 0.00
175.00 0.00
15.00 0.00
1,644.50
18.12
30.00 1.33
18.15 3.23
4.56
4.56 0.23
300.00 13.33
13.56
58.77
30.00 3.43
18.15 8.30
35.00 8.00
19.73
0.00 0.00
0.00 0.00
0.00
19.73 0.99
300.00 34.29
18.00 2.06
15.00 1.71
39.04
29.65
30.00 2.18
18.15 5.28
7.46
7.46 0.37
300.00 21.82
22.19
81.46
30.00 4.80
18.15 11.62
35.00 11.20
27.62
0.00 0.00
0.00 0.00
0.00
11.20 0.56
300.00 48.00
18.00 2.88
15.00 2.40
53.84
4.93
30.00 1.00
18.15 3.63
4.63
4.63 0.30
300.00 0.00
0.00 0.00
0.30
A DE MT (AFIRMADO O GRANULAR)
55.68
21.50 11.47
18.15 38.72
50.19
50.19 2.51
5.60 2.99
5.50
5.29
30.00 0.30
18.15 0.54
0.84
0.84 0.04
0.00 0.00
110.00 4.40
4.44
33.41
24.50 0.14
21.50 2.46
20.00 1.14
18.15 8.30
12.04
17.00 1.70
28.00 18.20
19.90
12.04 0.60
12.50 0.00
15.30 0.87
1.48
652.19
24.50 0.65
21.50 22.93
20.00 5.33
18.15 29.04
57.96
17.00 51.00
28.00 308.00
180.00 189.00
548.00
57.96 2.90
12.50 3.33
150.00 40.00
46.23
55.04
24.50 1.40
21.50 12.29
18.15 10.37
24.06
3.55 0.89
4.50 1.35
7.50 0.98
6.25 26.56
29.78
24.06 1.20
1.20
7.49
24.50 0.08
21.50 0.69
20.00 0.64
1.41
4.50 0.45
5.20 5.56
6.01
1.41 0.07
0.07
4.88
24.50 0.08
20.00 0.64
0.72
1,500.00 3.00
225.00 1.13
4.13
0.72 0.04
0.04
41.39
24.50 0.33
21.50 2.87
18.15 2.42
5.61
25.00 2.50
60.00 33.00
35.50
5.61 0.28
0.28
20.48
24.50 0.98
21.50 8.60
18.15 7.26
16.84
28.00 2.80
2.80
16.84 0.84
0.84
26.30
24.50 1.23
21.50 10.75
18.15 9.08
21.05
28.00 4.20
4.20
21.05 1.05
1.05
26.30
24.50 1.23
21.50 10.75
18.15 9.08
21.05
28.00 4.20
4.20
21.05 1.05
1.05
253.68
24.50 9.80
18.15 36.30
27.80 55.60
101.70
15.00 0.75
15.50 1.09
17.50 43.75
18.50 0.93
18.50 0.19
6.85 82.20
128.90
101.70 5.09
6.00 12.00
3.00 6.00
23.09
204.19
24.50 6.53
18.15 24.20
27.80 37.07
67.80
15.00 0.75
15.50 1.09
17.50 6.13
18.50 0.93
18.50 0.19
12.30 18.45
45.60 93.48
121.00
67.80 3.39
6.00 8.00
3.00 4.00
15.39
152.31
24.50 9.80
18.15 36.30
27.80 55.60
101.70
15.00 0.75
15.50 1.09
17.50 6.13
18.50 0.93
18.50 0.19
12.30 18.45
27.52
101.70 5.09
6.00 12.00
3.00 6.00
23.09
FLETE TERRESTRE
TOTAL Kg
BATERIAS
O. LLEGADA HUALANGA
108,164.80 S/ 36,776.03
TOTAL 36,776.03
PROYECTO DE BATERIAS LPC I S/ 447,253.59
Inicio de actividades S/ 0.00
1 OBRAS PROVISIONALES S/ 48,909.65
1.1 INSTALACIONES PROVISIONALES DE OBRA (OFICINAS, ALMACEN) S/ 6,000.00
1.2 SUMINISTRO Y ALMACENAMIENTO DE AGUA PARA PERSONAL DE OBRA S/ 3,600.00
1.3 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS, MAQUINARIAS Y HERRAMIENTAS S/ 1,500.00
1.4 MOVILIZACION Y DESMOVILIZACION DE PERSONAL TRUJILLO - UNIDAD Y VICEVERSA S/ 4,800.00
1.5 IMPLEMENTOS DE SEGURIDAD S/ 930.00
1.6 GUARDIANIA DE OBRA S/ 17,151.75
1.7 TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE OBRA S/ 8,758.80
1.8 LIMPIEZA GENERAL DURANTE LA EJECUCION DE OBRA S/ 1,524.60
1.9 IMPLEMENTACIÓN PLAN COVID 19 S/ 1,644.50
1.1 SSHH Y DUCHAS PROVISIONALES S/ 2,250.00
1.11 PUNTO ECOLÓGICO S/ 750.00
2 MOVIMIENTO DE TIERRAS S/ 36,188.99
2.1 EXCAVACIÓN LOCALIZADA DE ROCA FIJA(ZANJAS SISTEMA PUESTA A TIERRA) S/ 6,992.18
2.2 EXACAVACIÓN LOCALIZADA CANALETA DE MT S/ 5,773.60
2.3 CORTE Y NIVELACION DE PLATAFORMA S/ 5,917.14
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO PARA CANALETA DE MT (AFIRMADO O
2.4 GRANULAR) S/ 3,946.79
5.1 REJILLAS DE PLATINA DE FIERRO PARA DRENAJE PLUVIAL ANCHO 0.30 REJILLA DE 1/16" X1" S/ 7,114.96
S/ 500,000.00
S/ 450,000.00
S/ 400,000.00
S/ 350,000.00
S/ 300,000.00
S/ 250,000.00
S/ 200,000.00
S/ 150,000.00
S/ 100,000.00
S/ 200,000.00
S/ 150,000.00
S/ 100,000.00
S/ 50,000.00
S/ 5,79
S/ 0.00
S/ 0.00
11/3/2022
11/3/2022 11/5/2022 11/12/2022 11/19/2022 11/26/2022 12/3/2022 12/10/2022
S/ 0.00 S/ 5,797.37 S/ 21,911.70 S/ 54,201.69 S/ 97,630.58 S/ 137,924.36 S/ 200,769.61
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 0.00 S/ 4,566.81 S/ 10,186.45 S/ 13,592.45 S/ 16,998.46 S/ 20,404.47 S/ 23,810.47
S/ 0.00 S/ 3,750.00 S/ 6,000.00 S/ 6,000.00 S/ 6,000.00 S/ 6,000.00 S/ 6,000.00
S/ 0.00 S/ 75.00 S/ 355.00 S/ 635.00 S/ 915.00 S/ 1,195.00 S/ 1,475.00
S/ 0.00 S/ 31.25 S/ 147.92 S/ 264.58 S/ 381.25 S/ 497.92 S/ 614.58
S/ 0.00 S/ 100.00 S/ 473.33 S/ 846.67 S/ 1,220.00 S/ 1,593.33 S/ 1,966.67
S/ 0.00 S/ 0.00 S/ 75.22 S/ 151.81 S/ 228.40 S/ 304.99 S/ 381.57
S/ 0.00 S/ 357.33 S/ 1,691.35 S/ 3,025.38 S/ 4,359.40 S/ 5,693.43 S/ 7,027.45
S/ 0.00 S/ 218.97 S/ 1,036.46 S/ 1,853.95 S/ 2,671.43 S/ 3,488.92 S/ 4,306.41
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 0.00 S/ 34.26 S/ 162.17 S/ 290.07 S/ 417.98 S/ 545.88 S/ 673.79
S/ 0.00 S/ 0.00 S/ 206.25 S/ 416.25 S/ 626.25 S/ 836.25 S/ 1,046.25
S/ 0.00 S/ 0.00 S/ 38.75 S/ 108.75 S/ 178.75 S/ 248.75 S/ 318.75
S/ 0.00 S/ 0.00 S/ 5,030.88 S/ 18,682.92 S/ 18,682.92 S/ 18,682.92 S/ 18,682.92
S/ 0.00 S/ 0.00 S/ 4,020.50 S/ 6,992.18 S/ 6,992.18 S/ 6,992.18 S/ 6,992.18
S/ 0.00 S/ 0.00 S/ 1,010.38 S/ 5,773.60 S/ 5,773.60 S/ 5,773.60 S/ 5,773.60
S/ 0.00 S/ 0.00 S/ 0.00 S/ 5,917.14 S/ 5,917.14 S/ 5,917.14 S/ 5,917.14
S/ 450,000.00
S/ 400,000.00
S/ 350,000.00
S/ 300,000.00
S/ 250,000.00 S/ 235,511.00
S/ 200,769.61
S/ 200,000.00
S/ 150,000.00 S/ 137,924.36
S/ 97,630.58
S/ 100,000.00
S/ 54,201.69
S/ 200,000.00
S/ 150,000.00 S/ 137,924.36
S/ 97,630.58
S/ 100,000.00
S/ 54,201.69
S/ 50,000.00
S/ 21,911.70
S/ 5,797.37
S/ 0.00
S/ 0.00
11/3/2022 11/10/2022 11/17/2022 11/24/2022 12/1/2022 12/8/2022 12/15/2022 1
12/17/2022 12/24/2022 12/31/2022 1/7/2023 1/14/2023 1/21/2023
S/ 235,511.00 S/ 262,793.03 S/ 294,840.72 S/ 316,890.37 S/ 379,108.29 S/ 424,927.73
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 27,216.48 S/ 30,622.49 S/ 34,028.50 S/ 37,434.50 S/ 40,840.51 S/ 43,737.73
S/ 6,000.00 S/ 6,000.00 S/ 6,000.00 S/ 6,000.00 S/ 6,000.00 S/ 6,000.00
S/ 1,755.00 S/ 2,035.00 S/ 2,315.00 S/ 2,595.00 S/ 2,875.00 S/ 3,155.00
S/ 731.25 S/ 847.92 S/ 964.58 S/ 1,081.25 S/ 1,197.92 S/ 1,314.58
S/ 2,340.00 S/ 2,713.33 S/ 3,086.67 S/ 3,460.00 S/ 3,833.33 S/ 4,206.67
S/ 458.16 S/ 534.75 S/ 611.34 S/ 687.93 S/ 764.51 S/ 841.10
S/ 8,361.48 S/ 9,695.50 S/ 11,029.53 S/ 12,363.55 S/ 13,697.58 S/ 15,031.60
S/ 5,123.90 S/ 5,941.39 S/ 6,758.87 S/ 7,576.36 S/ 8,393.85 S/ 8,758.80
S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 0.00
S/ 801.69 S/ 929.60 S/ 1,057.50 S/ 1,185.41 S/ 1,313.32 S/ 1,441.22
S/ 1,256.25 S/ 1,466.25 S/ 1,676.25 S/ 1,886.25 S/ 2,096.25 S/ 2,250.00
S/ 388.75 S/ 458.75 S/ 528.75 S/ 598.75 S/ 668.75 S/ 738.75
S/ 23,005.29 S/ 33,105.56 S/ 36,188.99 S/ 36,188.99 S/ 36,188.99 S/ 36,188.99
S/ 6,992.18 S/ 6,992.18 S/ 6,992.18 S/ 6,992.18 S/ 6,992.18 S/ 6,992.18
S/ 5,773.60 S/ 5,773.60 S/ 5,773.60 S/ 5,773.60 S/ 5,773.60 S/ 5,773.60
S/ 5,917.14 S/ 5,917.14 S/ 5,917.14 S/ 5,917.14 S/ 5,917.14 S/ 5,917.14
S/ 447,03
S/ 440,334.71
S/ 424,927.73
S/ 379,108.29
S/ 316,890.37
S/ 294,840.72
S/ 262,793.03
S/ 235,511.00
0,769.61
2 12/15/2022 12/22/2022 12/29/2022 1/5/2023 1/12/2023 1/19/2023 1/26/2023
1/28/2023 2/1/2023
S/ 440,334.71 S/ 447,036.41
S/ 0.00 S/ 0.00
S/ 46,057.50 S/ 48,774.51
S/ 6,000.00 S/ 6,000.00
S/ 3,435.00 S/ 3,595.00
S/ 1,431.25 S/ 1,497.92
S/ 4,580.00 S/ 4,793.33
S/ 917.69 S/ 930.00
S/ 16,365.63 S/ 17,127.93
S/ 8,758.80 S/ 8,758.80
S/ 0.00 S/ 1,429.31
S/ 1,569.13 S/ 1,642.22
S/ 2,250.00 S/ 2,250.00
S/ 750.00 S/ 750.00
S/ 36,188.99 S/ 36,188.99
S/ 6,992.18 S/ 6,992.18
S/ 5,773.60 S/ 5,773.60
S/ 5,917.14 S/ 5,917.14
S/ 3,946.79 S/ 3,946.79
S/ 4,093.23 S/ 4,093.23
S/ 7,517.16 S/ 7,517.16
S/ 1,948.89 S/ 1,948.89
S/ 230,301.58 S/ 230,301.58
S/ 14,261.79 S/ 14,261.79
S/ 72,363.98 S/ 72,363.98
S/ 46,736.03 S/ 46,736.03
S/ 8,075.84 S/ 8,075.84
S/ 14,055.59 S/ 14,055.59
S/ 3,496.52 S/ 3,496.52
S/ 103,356.99 S/ 103,356.99
S/ 57,634.15 S/ 57,634.15
S/ 11,064.24 S/ 11,064.24
S/ 29,573.14 S/ 29,573.14
S/ 3,719.25 S/ 3,719.25
S/ 1,366.21 S/ 1,366.21
S/ 29,254.58 S/ 29,254.58
S/ 14,211.25 S/ 14,211.25
S/ 10,387.86 S/ 10,387.86
S/ 4,274.88 S/ 4,274.88
S/ 380.59 S/ 380.59
S/ 11,064.24 S/ 11,064.24
S/ 11,064.24 S/ 11,064.24
S/ 7,091.12 S/ 7,091.12
S/ 6,444.87 S/ 6,444.87
S/ 295.11 S/ 295.11
S/ 351.14 S/ 351.14
S/ 20,123.03 S/ 21,482.52
S/ 7,114.96 S/ 7,114.96
S/ 6,813.82 S/ 6,813.82
S/ 1,250.00 S/ 1,250.00
S/ 4,944.25 S/ 5,103.74
S/ 0.00 S/ 1,200.00
S/ 506.70 S/ 506.70
S/ 67.50 S/ 67.50
S/ 439.20 S/ 439.20
S/ 100,065.79 S/ 102,690.99
S/ 24,045.00 S/ 25,165.00
S/ 36,776.03 S/ 36,776.03
S/ 17,175.00 S/ 17,975.00
S/ 3,117.26 S/ 3,262.46
S/ 1,750.00 S/ 1,750.00
S/ 12,022.50 S/ 12,582.50 S/ 92,435.00
S/ 5,180.00 S/ 5,180.00
S/ 0.00 S/ 0.00
S/ 447,036.41
S/ 440,334.71
S/ 424,927.73
9/2023 1/26/2023