OBRA: MOVIMIENTO DE TIERRAS, MEJORAMIENTO DE TERRENO, RELLENO, COMPACTACIÓN, PLATAFORMADO Y CONSTRUCCIÓN DE LA OBRA CIVIL PARA PABELLONES DE LA I.E.

14858

FECHA 6/15/2022
ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
04 INSTALACIONES SANITARIAS
04.03 SISTEMA DE AGUA FRIA
04.03.03 REDES DE ALIMENTACION
TUBERIA PVC CLASE 10 - 1/2" S/P P/EXTERIORES
04.03.03.01 41.89 41.89 m 41.89 41.89
TUBERIA PVC CLASE 10 - 3/4" S/P P/EXTERIORES
04.03.03.02 29.59 29.59 m 29.59 29.59
TUBERIA PVC CLASE 10 - 1" S/P P/EXTERIORES
04.03.03.03 59.91 59.91 m 59.91 59.91
TUBERIA PVC CLASE 10 - 1 1/4" S/P P/EXTERIORES
04.03.03.04 0.00 - m 0.00 0.00
TUBERIA PVC CLASE 10 - 1 1/2" S/P P/EXTERIORES
04.03.03.05 18.89 18.89 m 18.89 18.89
TUBERIA PVC CLASE 10 - 2" S/P P/EXTERIORES
04.03.03.06 95.12 95.12 m 95.12 95.12
TUBERIA PVC CLASE 10 - 2 1/2" S/P P/EXTERIORES
04.03.03.07 13.69 13.69 m 13.69 13.69
04.03.03.08 PRUEBA HIDRÁULICA Y DESINFECCIÓN 259.09 259.09 m 259.09 259.09
TUBERIA PVC CLASE 10 - 1/2" 41.89 41.89 m 41.89
TUBERIA PVC CLASE 10 - 3/4" 29.59 29.59 m 29.59
TUBERIA PVC CLASE 10 - 1" 59.91 59.91 m 59.91
TUBERIA PVC CLASE 10 - 1 1/4" 0.00 - m 0.00
TUBERIA PVC CLASE 10 - 1 1/2" 18.89 18.89 m 18.89
TUBERIA PVC CLASE 10 - 2" 95.12 95.12 m 95.12
TUBERIA PVC CLASE 10 - 2 1/2" 13.69 13.69 m 13.69

04.03.04 MOVIMIENTO DE TIERRAS


04.03.04.01 EXCAVACION DE ZANJA PARA REDES EXT. SANITARIAS m3 77.73 77.73
TUBERIA PVC CLASE 10 - 1/2" 41.89 0.5 0.6 12.57 m3 12.57
TUBERIA PVC CLASE 10 - 3/4" 29.59 0.5 0.6 8.88 m3 8.88
TUBERIA PVC CLASE 10 - 1" 59.91 0.5 0.6 17.97 m3 17.97
TUBERIA PVC CLASE 10 - 1 1/2" 18.89 0.5 0.6 5.67 m3 5.67
TUBERIA PVC CLASE 10 - 2" 95.12 0.5 0.6 28.54 m3 28.54
TUBERIA PVC CLASE 10 - 2 1/2" 13.69 0.5 0.6 4.11 m3 4.11
04.03.04.02 REFINE Y NIVELACION DE ZANJA PARA TUBERIA m2 129.55 129.55
TUBERIA PVC CLASE 10 - 1/2" 41.89 0.5 20.95 m2 20.95
TUBERIA PVC CLASE 10 - 3/4" 29.59 0.5 14.80 m2 14.80
TUBERIA PVC CLASE 10 - 1" 59.91 0.5 29.96 m2 29.96
TUBERIA PVC CLASE 10 - 1 1/2" 18.89 0.5 9.45 m2 9.45
TUBERIA PVC CLASE 10 - 2" 95.12 0.5 47.56 m2 47.56
TUBERIA PVC CLASE 10 - 2 1/2" 13.69 0.5 6.85 m2 6.85
04.03.04.03 CAMA DE APOYO (e= 0.10m) - ARENA GRUESA m3 12.95 12.95
TUBERIA PVC CLASE 10 - 1/2" 41.89 0.5 0.1 2.09 m3 2.09
TUBERIA PVC CLASE 10 - 3/4" 29.59 0.5 0.1 1.48 m3 1.48
TUBERIA PVC CLASE 10 - 1" 59.91 0.5 0.1 3.00 m3 3.00
TUBERIA PVC CLASE 10 - 1 1/2" 18.89 0.5 0.1 0.94 m3 0.94
TUBERIA PVC CLASE 10 - 2" 95.12 0.5 0.1 4.76 m3 4.76
TUBERIA PVC CLASE 10 - 2 1/2" 13.69 0.5 0.1 0.68 m3 0.68
04.03.04.04 RELLENO COMPACTADO C/EQUIPO MATERIAL PROPIO m3 64.77 64.77
TUBERIA PVC CLASE 10 - 1/2" 41.89 0.5 0.5 10.47 m3 10.47
TUBERIA PVC CLASE 10 - 3/4" 29.59 0.5 0.5 7.40 m3 7.40
TUBERIA PVC CLASE 10 - 1" 59.91 0.5 0.5 14.98 m3 14.98
TUBERIA PVC CLASE 10 - 1 1/2" 18.89 0.5 0.5 4.72 m3 4.72
TUBERIA PVC CLASE 10 - 2" 95.12 0.5 0.5 23.78 m3 23.78
TUBERIA PVC CLASE 10 - 2 1/2" 13.69 0.5 0.5 3.42 m3 3.42
ELIMINACION DE MATERIAL EXCEDENTE
04.03.04.05 m3 15.55 15.55
EXCAVACION 77.73 1.2 93.27 93.27
RELLENO COMPACTADO C/EQUIPO MATERIAL PROPIO 64.77 1.2 77.727 -77.73

04.03.05 VALVULAS Y LLAVES


04.03.05.01 VALVULA ESFERICA DE BRONCE PESADA Ø 3/4" 1 1.000 und 1.00
04.03.05.02 VALVULA ESFERICA DE BRONCE PESADA Ø 1/2" 3 3.000 und 3.00
04.03.05.03 VALVULA COMPUERTA DE BRONCE PESADA Ø 2" 1 1.000 und 1.00
04.03.05.05 VALVULA CHECK Ø 1" 2 2.000 und 2.00
04.03.05.06 VALVULA COMPUERTA DE BRONCE PESADA Ø 1" 2 2.000 und 2.00
04.03.05.07 VALVULA COMPUERTA DE BRONCE PESADA Ø 1 1/2" 1 1.000 und 1.00
ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
04.03.06 ACCESORIOS
CODO 90° PVC Ø 1/2"
04.03.06.01 12 12.000 und 12.00
CODO 90° PVC Ø 3/4"
04.03.06.02 10 10.000 und 10.00
CODO 90° PVC Ø 1"
04.03.06.03 11 11.000 und 11.00
CODO 90° PVC Ø 2"
04.03.06.05 7 7.000 und 7.00
CODO 90° PVC Ø 2 1/2"
04.03.06.06 2 2.000 und 2.00
TEE PVC Ø 1/2"
04.03.06.07 1 1.000 und 1.00
TEE PVC Ø 3/4"
04.03.06.08 5 5.000 und 5.00
TEE PVC Ø 1"
04.03.06.09 2 2.000 und 2.00
TEE PVC Ø 1 1/2"
04.03.06.11 1 1.000 und 1.00
TEE PVC Ø 2"
04.03.06.12 3 3.000 und 3.00
TEE PVC Ø 2 1/2"
04.03.06.13 3 3.000 und 3.00
04.03.06.14 REDUCCION PVC Ø 3/4" - 1/2" 5 5.000 und 5.00
04.03.06.15 REDUCCION PVC Ø 1" - 3/4" 4 4.000 und 4.00
04.03.06.18 REDUCCION PVC Ø 1 1/2" - 3/4" 1 1.000 und 1.00
04.03.06.23 REDUCCION PVC Ø 2 1/2" - 1 1/2" 1 1.000 und 1.00
04.03.06.24 REDUCCION PVC Ø 2 1/2" - 1/2" 1 1.000 und 1.00
04.03.06.26 REDUCCION PVC Ø 2 1/2" - 2" 2 2.000 und 2.00
04.03.06.29 REDUCCION PVC Ø 1" - 1/2" 1 1.000 und 1.00
04.03.06.30 REDUCCION PVC Ø 1 1/2" - 1" 1 1.000 und 1.00
04.03.06.31 REDUCCION PVC Ø 2" - 1" 2 2.000 und 2.00

04.03.07 VARIOS
04.03.07.04 CAJA DE CONCRETO PARA VALVULA EN PISO DE 0.60x0.45m 4 4.000 und 4.00
04.03.07.05 CAJA DE CONCRETO PARA VALVULA EN PISO DE 0.70x0.70m 1 1.000 und 1.00

04.04 SISTEMA DE DESAGUE Y VENTILACION


04.04.04 REDES COLECTORAS
TUBERIA PVC-CP 4" RED EXTERIOR DESAGUE
04.04.04.01 35.89 35.89 m 35.89 35.89 35.89
TUBERIA PVC-CP 6" RED EXTERIOR DESAGUE
04.04.04.02 132.40 132.40 m 132.40 132.40 132.40
04.04.04.03 PRUEBA HIDRAULICA DE ESTANQUEIDAD Y ESCORRENTIA DE TUB. DESAGUE. 179.32 179.32 m 179.32 179.32 179.32
04.04.04.04 TUBERIA PVC-CP 2" RED EXTERIOR DESAGUE 11.03 11.03 m 11.03 11.03 11.03
04.04.05 MOVIMIENTO DE TIERRAS
04.04.05.01 EXCAVACION DE ZANJA PARA REDES EXT. SANITARIAS m3 126.22 126.22
TUBERIA PVC-CP 4" RED EXTERIOR DESAGUE
1 35.89 0.6 1.25 26.92 m3 26.92
TUBERIA PVC-CP 6" RED EXTERIOR DESAGUE
1 132.4 0.6 1.25 99.30 m3 99.30

04.04.05.02 REFINE Y NIVELACION DE ZANJA PARA TUBERIA m2 100.97 100.97


TUBERIA PVC-CP 4" RED EXTERIOR DESAGUE
1 35.89 0.6 21.53 m2 21.53
TUBERIA PVC-CP 6" RED EXTERIOR DESAGUE
1 132.4 0.6 79.44 m2 79.44

04.04.05.03 CAMA DE APOYO (e= 0.10m) - ARENA GRUESA m3 10.10 10.10


TUBERIA PVC-CP 4" RED EXTERIOR DESAGUE
1 35.89 0.6 0.1 2.15 m3 2.15
TUBERIA PVC-CP 6" RED EXTERIOR DESAGUE
1 132.4 0.6 0.1 7.94 m3 7.94

04.04.05.04 RELLENO COMPACTADO C/EQUIPO MATERIAL PROPIO m3 116.12 116.12


TUBERIA PVC-CP 4" RED EXTERIOR DESAGUE
1 35.89 0.6 1.15 24.76 m3 24.76
TUBERIA PVC-CP 6" RED EXTERIOR DESAGUE
1 132.4 0.6 1.15 91.36 m3 91.36

ELIMINACION DE MATERIAL EXCEDENTE


04.04.05.05 m3 12.12 12.12
EXCAVACION DE ZANJA PARA REDES EXT. SANITARIAS 1 126.22 1.2 151.46 m3 151.46
RELLENO COMPACTADO C/EQUIPO MATERIAL PROPIO 1 116.12 1.2 139.344 m3 -139.34

04.04.07 ACCESORIO DE DERIVACION


CODO 90° PVC PESADO Ø 2"
04.04.07.01 und 6.00 6.00
6 6.00 und 6.00
TEE PVC PESADO Ø 2"
04.04.07.06 und 1.00 1.00
1 1.00 und 1.00
YEE PVC PESADO Ø 2"
04.04.07.07 und 2.00 2.00
2 2.00 und 2.00
04.04.08 CAMARA DE INSPECCION
CAJA DE REG. CONCRETO. 12" x 24" (0.30x0.60) C/ TAPA CONCRETO REFORZADO
04.04.08.01 und 9.00 9.00
9 9.00 und 9.00
CAJA DE REG. CONCRETO. 18" x 24" (0.45x0.60) C/ TAPA CONCRETO REFORZADO
04.04.08.02 und 3.00 3.00
3 3.00 und 3.00
ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
TRAMPA DE GRASA (SOLO ACCESORIOS SANITARIOS)
04.04.08.04 und 1.00 1.00
1 1.00 und 1.00
CAJA DE REBOSE 0.60x0.30x0.30m
04.04.08.05 und 4.00 4.00
1 1.00 und 1.00
04.04.08.06 BUZON CIRCULAR DE CONCRETO D=1.20M HASTA 2.00 M und 3.00 3.00
3 3.00 und 3.00
04.05 DRENAJE PLUVIAL
04.05.01 REDES DE DERIVACIÓN
04.05.01.05 CODO PVC 45° Ø4" 9.00 und 9.00
1 9 9.00 und 9.00

04.05.01.06 CODO PVC 90° Ø2" 5.00 und 5.00


5 1 5.00 und 5.00

04.05.01.07 CODO PVC 90° Ø4" 16.00 und 16.00


1 16 16.00 und 16.00

04.05.01.09 CODO PVC 45° Ø2" 8.00 und 8.00


4 2 8.00 und 8.00

04.05.01.10 TEE PVC Ø4" 7.00 und 7.00


1 7 7.00 und 7.00

04.05.01.11 YEE PVC CON REDUCCION Ø6" A Ø4" 9.00 und 9.00
1 9 9.00 und 9.00

04.05.02 REDES COLECTORAS


04.05.02.01 TUBERIA PVC-CP 4" RED EXTERIOR PLUVIAL m 52.220
MBR 415 2.40 m 2.40
1 2.4 2.40 m 2.40

COM 438 2.35 m 2.35


1 2.35 2.35 m 2.35

MBR 416 4.65 m 4.65


1 2.45 2.45 m 2.45
1 2.2 2.20 m 2.20

MBR 417 1.92 m 1.92


1 1.92 1.92 m 1.92

MBR 418 9.15 m 9.15


1 2.5 2.50 m 2.50
1 2.7 2.70 m 2.70
1 3.95 3.95 m 3.95

MBR 419 2.25 m 2.25


1 2.25 2.25 m 2.25

COM 439 1.90 m 1.90


1 1.9 1.90 m 1.90

MR 420 3.70 m 3.70


1 1.85 1.85 m 1.85
1 1.85 1.85 m 1.85

COM 451 17.30 m 17.30


2 5 10.00 m 10.00
1 7.3 7.30 m 7.30

SITIO 6.60 m 6.60


4 1.65 6.60 m 6.60
TUBERIA PVC-CP 6" RED EXTERIOR PLUVIAL
04.05.02.02 m 191.480
SITIO 191.48 m 191.48
ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
1 191.48 191.48 m 191.48
TUBERIA PVC-CP 8" RED EXTERIOR PLUVIAL
04.05.02.03 m 12.600
SITIO 12.60 m 12.60
1 12.6 12.60 m 12.60

04.05.02.05 PRUEBA HIDRAULICA DE ESTANQUEIDAD Y ESCORRENTIA DE TUB. PLUVIAL. m 250.910


m 229.15

04.05.02.06 TUBERIA PVC CP 2" - PLUVIAL m 25.070


MBR 447 14.29 m 14.29
1 7.2 7.20 m 7.20
1 7.09 7.09 m 7.09

MBR 448 7.47 m 7.47


1 3.69 3.69 m 3.69
1 3.78 3.78 m 3.78

MBR 459 3.31 m 3.31


1 3.31 3.31 m 3.31

04.05.03 CANALETAS
04.05.03.01 CANALETA DE CONCRETO C/IMPERMEABILIZANTE, ANCHO=0.30m m 97.900
SITIO 97.90 m 97.90
1 97.9 97.90 m 97.90

04.05.03.02 REJILLA METÁLICA EN PISO, ANCHO=0.30 M PL 1.1/4"x1/4" m 97.900


SITIO 97.90 m 97.90
1 97.9 97.90 m 97.90

04.05.04 CAMARA DE INSPECCION


04.05.04.01 CAJA DE REG. CONCRETO. 12" x 24" (0.30x0.60) C/ TAPA CONCRETO REFORZADO und 12.000
12.00 und 12.00
1 12 12.00 und 12.00

04.05.04.02 CAJA DE REG. CONCRETO. 24" x 24" (0.60x0.60) C/ TAPA CONCRETO REFORZADO und 12.000
12.00 und 12.00
1 12 12.00 und 12.00

04.05.04.03 CAJA SUMIDERO (0.30x0.60) C/ TAPA REJILLA und 4.000


4.00 und 4.00
1 4 4.00 und 4.00

04.05.05 MOVIMIENTO DE TIERRAS


04.05.05.01 EXCAVACIÓN DE ZANJA PARA CANAL DE CONCRETO m3 26.14
26.14 m3 26.14
1 26.141 26.14

04.05.05.02 EXCAVACIÓN DE ZANJA PARA COLECTORAS PLUVIALES m3 57.98


57.98 m3 57.98
1 57.981 57.98

04.05.05.03 REFINE Y NIVELACION DE ZANJA PARA CUNETA m2 24.48


24.48 m2 24.48
1 24.475 24.48

04.05.05.04 REFINE Y NIVELACION DE ZANJA PARA TUBERIA m2 110.08


110.08 m2 110.08
1 110.08 110.08

04.05.05.05 CAMA DE APOYO (e= 0.10m) - ARENA GRUESA m3 11.01


11.01 m3 11.01
1 220.16 0.5 0.1 11.01

04.05.05.06 RELLENO COMPACTADO C/EQUIPO MATERIAL PROPIO m3 46.97


ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
46.97 m3 46.97
1 46.97 46.97

04.05.05.07 ELIMINACION DE MATERIAL EXCEDENTE m3 84.12


84.12 m3 84.12
1 84.122 84.12

04.05.05.08 EXCAVACIÓN DE ZANJA PARA CAJAS DE REGISTRO Y VALVULAS m3 4.53


4.53 m3 4.53
1 4.5306 4.53

04.05.06 SISTEMAS DRENANTES


04.05.06.01 ZANJAS DE INFILTRACION m 18.00
18.00 m 18.00
1 18 18.00

04.05.06.02 PAQUETE DE GRAVA und 5.00


5.00 und 5.00
1 5 5.00

04.05.07 OTROS
04.05.07.01 VALVULA ANTIRETORNO DE 4'' und 8.00
8.00 und 8.00
1 8 8.00

04.05.07.02 VALVULA ANTIRETORNO DE 6'' und 2.00


2.00 und 2.00
1 2 2.00

04.05.07.03 REJILLA FLEXIBLE PVC ATRAPA HOJAS und 4.00


4.00 und 4.00
1 4 4.00

04.05.07.04 SALIDA PLUVIAL EN VEREDA, ANCHO=0.50m und 4.00


4.00 und 4.00
1 4 4.00

04.05.07.05 SALIDA PLUVIAL EN VEREDA, ANCHO=0.80m und 1.00


1.00 und 1.00
1 1 1.00

05 INSTALACIONES ELECTRICAS
05.01 MOVIMIENTO DE TIERRA
05.01.01 EXCAVACION MANUAL PARA REDES DE ELECTRICAS m3 156.19 156.19
TGT9 6.50 0.5 0.85 2.76 m3 2.76
MTG 7.97 0.5 0.85 3.39 m3 3.39
1TG 2.00 0.5 0.85 0.85 m3 0.85
12 25.75 0.5 0.85 10.94 m3 10.94
1T8 14.95 0.5 0.85 6.35 m3 6.35
23 25.20 0.5 0.85 10.71 m3 10.71
2T1 4.55 0.5 0.85 1.93 m3 1.93
34 16.60 0.5 0.85 7.06 m3 7.06
35 18.90 0.5 0.85 8.03 m3 8.03
3T3 11.85 0.5 0.85 5.04 m3 5.04
3T2 5.45 0.5 0.85 2.32 m3 2.32
4T7 5.45 0.5 0.85 2.32 m3 2.32
4T6 11.95 0.5 0.85 5.08 m3 5.08
5T4 4.95 0.5 0.85 2.10 m3 2.10
5CX 14.75 0.5 0.85 6.27 m3 6.27
C-C 9.90 0.5 0.85 4.21 m3 4.21
T5T51 2.68 0.5 0.85 1.14 m3 1.14
13 9.5 0.5 0.65 3.09 m3 3.09
23 10.25 0.5 0.65 3.33 m3 3.33
34 5.2 0.5 0.65 1.69 m3 1.69
45 13.2 0.5 0.65 4.29 m3 4.29
ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
T1-5 10.5 0.5 0.65 3.41 m3 3.41
56 8.75 0.5 0.65 2.84 m3 2.84
T3-7 20.4 0.5 0.65 6.63 m3 6.63
78 6.7 0.5 0.65 2.18 m3 2.18
T9-9 6.2 0.5 0.65 2.02 m3 2.02
910 14.5 0.5 0.65 4.71 m3 4.71
1011 13.8 0.5 0.65 4.49 m3 4.49
T9-LETRAS 7.7 0.5 0.65 2.50 m3 2.50
T5 10.7 0.5 0.65 3.48 m3 3.48
1415 6.5 0.5 0.65 2.11 m3 2.11

POZO A TIERRA
TG-PZ1 15.8 0.5 0.8 6.32 m3 6.32
PZ1-PZ2 5 0.5 0.8 2.00 m3 2.00
PZ2-PZ3 5 0.5 0.8 2.00 m3 2.00
TD8-PZ1 28.84 0.5 0.8 11.54 m3 11.54
PZ4-PZ5 4.9 0.5 0.8 1.96 m3 1.96
PZ5-PZ6 4.7 0.5 0.8 1.88 m3 1.88
PZ6-CAJA 8.08 0.5 0.8 3.23 m3 3.23

05.01.02 EXCAVACION MANUAL PARA BUZONES DE ELECTRICAS m3 24.34 24.34


BUZONES DE ELECTRICAS 13 1.2 1.2 1.3 24.34 m3 24.34

05.01.03 EXCAVACION MANUAL PARA POSTES DE REDES ELECTRICAS m3 0.47 0.47


POSTES PARA ALUMBRADO EXTERIOR 13 0.3 0.3 0.4 0.47 m3 0.47

05.01.04 RELLENO MANUAL C/MATERIAL PROPIO EN REDES ELECTRICAS m3 97.22 97.22


TGT9 6.50 0.5 0.5 1.63 6.50 0.2 0.20 0.2600 m3 1.37
MTG 7.97 0.5 0.5 1.99 7.97 0.2 0.20 0.3188 m3 1.67
1TG 2.00 0.5 0.5 0.50 2.00 0.4 0.20 0.1600 m3 0.34
12 25.75 0.5 0.5 6.44 25.75 0.4 0.20 2.0600 m3 4.38
1T8 14.95 0.5 0.5 3.74 14.95 0.2 0.20 0.5980 m3 3.14
23 25.20 0.5 0.5 6.30 25.20 0.3 0.20 1.5120 m3 4.79
2T1 4.55 0.5 0.5 1.14 4.55 0.3 0.20 0.2730 m3 0.86
34 16.60 0.5 0.5 4.15 16.60 0.2 0.20 0.6640 m3 3.49
35 18.90 0.5 0.5 4.73 18.90 0.2 0.20 0.7560 m3 3.97
3T3 11.85 0.5 0.5 2.96 11.85 0.2 0.20 0.4740 m3 2.49
3T2 5.45 0.5 0.5 1.36 5.45 0.2 0.20 0.2180 m3 1.14
4T7 5.45 0.5 0.5 1.36 5.45 0.2 0.20 0.2180 m3 1.14
4T6 11.95 0.5 0.5 2.99 11.95 0.2 0.20 0.4780 m3 2.51
5T4 4.95 0.5 0.5 1.24 4.95 0.2 0.20 0.1980 m3 1.04
5CX 14.75 0.5 0.5 3.69 14.75 0.2 0.20 0.5900 m3 3.10
C-C 9.90 0.5 0.5 2.48 9.90 0.2 0.20 0.3960 m3 2.08
T5T51 2.68 0.5 0.5 0.67 2.68 0.2 0.20 0.1072 m3 0.56
13 9.5 0.5 0.5 2.38 9.50 0.2 0.20 0.3800 m3 2.00
23 10.25 0.5 0.5 2.56 10.25 0.2 0.20 0.4100 m3 2.15
34 5.2 0.5 0.5 1.30 5.20 0.2 0.20 0.2080 m3 1.09
45 13.2 0.5 0.5 3.30 13.20 0.2 0.20 0.5280 m3 2.77
T1-5 10.5 0.5 0.5 2.63 10.50 0.2 0.20 0.4200 m3 2.21
56 8.75 0.5 0.5 2.19 8.75 0.2 0.20 0.3500 m3 1.84
T3-7 20.4 0.5 0.5 5.10 20.40 0.2 0.20 0.8160 m3 4.28
78 6.7 0.5 0.5 1.68 6.70 0.2 0.20 0.2680 m3 1.41
T9-9 6.2 0.5 0.5 1.55 6.20 0.2 0.20 0.2480 m3 1.30
910 14.5 0.5 0.5 3.63 14.50 0.2 0.20 0.5800 m3 3.05
1011 13.8 0.5 0.5 3.45 13.80 0.2 0.20 0.5520 m3 2.90
T9-LETRAS 7.7 0.5 0.5 1.93 7.70 0.2 0.20 0.3080 m3 1.62
T5 10.7 0.5 0.5 2.68 10.70 0.2 0.20 0.4280 m3 2.25
1415 6.5 0.5 0.5 1.63 6.50 0.2 0.20 0.2600 m3 1.37

POZO A TIERRA
TG-PZ1 15.8 0.5 0.8 6.32 m3 6.32
PZ1-PZ2 5 0.5 0.8 2.00 m3 2.00
ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
PZ2-PZ3 5 0.5 0.8 2.00 m3 2.00
TD8-PZ1 28.84 0.5 0.8 11.54 m3 11.54
PZ4-PZ5 4.9 0.5 0.8 1.96 m3 1.96
PZ5-PZ6 4.7 0.5 0.8 1.88 m3 1.88
PZ6-CAJA 8.08 0.5 0.8 3.23 m3 3.23

05.01.05 ELIMINACION DE MATERIAL EXCEDENTE m3 100.53 100.53


EXCAVACION (F.Esponjamiento = 1.2) 1 180.99 1.2 217.19 m3 217.19
RELLENO F.E (1.2) 1 97.22 1.2 116.6592 m3 -116.66

05.01.06 RELLENO MANUAL C/MATERIAL DE PRESTAMO EN REDES ELECTRICAS m3 58.33 58.33


TGT9 6.50 0.5 0.35 1.14 m3 1.14
MTG 7.97 0.5 0.35 1.39 m3 1.39
1TG 2.00 0.5 0.35 0.35 m3 0.35
12 25.75 0.5 0.35 4.51 m3 4.51
1T8 14.95 0.5 0.35 2.62 m3 2.62
23 25.20 0.5 0.35 4.41 m3 4.41
2T1 4.55 0.5 0.35 0.80 m3 0.80
34 16.60 0.5 0.35 2.91 m3 2.91
35 18.90 0.5 0.35 3.31 m3 3.31
3T3 11.85 0.5 0.35 2.07 m3 2.07
3T2 5.45 0.5 0.35 0.95 m3 0.95
4T7 5.45 0.5 0.35 0.95 m3 0.95
4T6 11.95 0.5 0.35 2.09 m3 2.09
5T4 4.95 0.5 0.35 0.87 m3 0.87
5CX 14.75 0.5 0.35 2.58 m3 2.58
C-C 9.90 0.5 0.35 1.73 m3 1.73
T5T51 2.68 0.5 0.35 0.47 m3 0.47
13 9.5 0.5 0.35 1.66 m3 1.66
23 10.25 0.5 0.35 1.79 m3 1.79
34 5.2 0.5 0.35 0.91 m3 0.91
45 13.2 0.5 0.35 2.31 m3 2.31
T1-5 10.5 0.5 0.35 1.84 m3 1.84
56 8.75 0.5 0.35 1.53 m3 1.53
T3-7 20.4 0.5 0.35 3.57 m3 3.57
78 6.7 0.5 0.35 1.17 m3 1.17
T9-9 6.2 0.5 0.35 1.09 m3 1.09
910 14.5 0.5 0.35 2.54 m3 2.54
1011 13.8 0.5 0.35 2.42 m3 2.42
T9-LETRAS 7.7 0.5 0.35 1.35 m3 1.35
T5 10.7 0.5 0.35 1.87 m3 1.87
1415 6.5 0.5 0.35 1.14 m3 1.14

05.02 OBRAS DE CONCRETO SIMPLE


05.02.01 SOLADO DE CONCRETO, H=0.05m; ANCHO=0.20m m2 73.88 73.88
BUZONES
Buzones 13 1.2 1.2 18.72 m2 18.72
REDES
TGT9 6.5 0.2 1.30 m2 1.30
M-TG 7.97 0.2 1.59 m2 1.59
1-T8 14.95 0.2 2.99 m2 2.99
3-4 16.6 0.2 3.32 m2 3.32
3-5 18.9 0.2 3.78 m2 3.78
3-T3 11.85 0.2 2.37 m2 2.37
3-T2 5.45 0.2 1.09 m2 1.09
4-T7 5.45 0.2 1.09 m2 1.09
4-T6 11.95 0.2 2.39 m2 2.39
5-T4 4.95 0.2 0.99 m2 0.99
5-CX 14.75 0.2 2.95 m2 2.95
C-C 9.9 0.2 1.98 m2 1.98
T5-T51 2.68 0.2 0.54 m2 0.54
13 9.5 0.2 1.90 m2 1.90
23 10.25 0.2 2.05 m2 2.05
34 5.2 0.2 1.04 m2 1.04
45 13.2 0.2 2.64 m2 2.64
ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
T1-5 10.5 0.2 2.10 m2 2.10
56 8.75 0.2 1.75 m2 1.75
T3-7 20.4 0.2 4.08 m2 4.08
78 6.7 0.2 1.34 m2 1.34
T9-9 6.2 0.2 1.24 m2 1.24
910 14.5 0.2 2.90 m2 2.90
1011 13.8 0.2 2.76 m2 2.76
T9-LETRAS 7.7 0.2 1.54 m2 1.54
T5 10.7 0.2 2.14 m2 2.14
1415 6.5 0.2 1.30 m2 1.30

05.02.02 SOLADO DE CONCRETO H=0.05M, ANCHO=0.30m m2 8.93 8.93


23 25.2 0.3 7.56 m2 7.56
2T1 4.55 0.3 1.37 m2 1.37

05.02.03 SOLADO DE CONCRETO H=0.05M, ANCHO=0.40m m2 11.10 11.10


1TG 2 0.4 0.80 m2 0.80
12 25.75 0.4 10.30 m2 10.30

05.02.04 DADO DE CONCRETO, H=0.15m; ANCHO=0.20m m3 9.65 9.65


TGT9 6.5 0.2 0.15 0.20 m3 0.20
M-TG 7.97 0.2 0.15 0.24 m3 0.24
1-T8 14.95 0.2 0.15 0.45 m3 0.45
3-4 16.6 0.2 0.15 0.50 m3 0.50
3-5 18.9 0.2 0.15 0.57 m3 0.57
3-T3 11.85 0.2 0.15 0.36 m3 0.36
3-T2 5.45 0.2 0.15 0.16 m3 0.16
4-T7 5.45 0.2 0.15 0.16 m3 0.16
4-T6 11.95 0.2 0.15 0.36 m3 0.36
5-T4 4.95 0.2 0.15 0.15 m3 0.15
5-CX 14.75 0.2 0.15 0.44 m3 0.44
C-C 9.9 0.2 0.15 0.30 m3 0.30
T5-T51 2.68 0.2 0.15 0.08 m3 0.08
13 9.5 0.5 0.35 1.66 m3 1.66
23 10.25 0.2 0.15 0.31 m3 0.31
34 5.2 0.2 0.15 0.16 m3 0.16
45 13.2 0.2 0.15 0.40 m3 0.40
T1-5 10.5 0.2 0.15 0.32 m3 0.32
56 8.75 0.2 0.15 0.26 m3 0.26
T3-7 20.4 0.2 0.15 0.61 m3 0.61
78 6.7 0.2 0.15 0.20 m3 0.20
T9-9 6.2 0.2 0.15 0.19 m3 0.19
910 14.5 0.2 0.15 0.44 m3 0.44
1011 13.8 0.2 0.15 0.41 m3 0.41
T9-LETRAS 7.7 0.2 0.15 0.23 m3 0.23
T5 10.7 0.2 0.15 0.32 m3 0.32
1415 6.5 0.2 0.15 0.20 m3 0.20

05.02.05 DADO DE CONCRETO, H=0.15m; ANCHO=0.30m m3 1.34 1.34


23 25.2 0.3 0.15 1.13 m3 1.13
2T1 4.55 0.3 0.15 0.20 m3 0.20

05.02.06 DADO DE CONCRETO, H=0.15m; ANCHO=0.40m m3 1.67 1.67


1TG 2 0.4 0.15 0.12 m3 0.12
12 25.75 0.4 0.15 1.55 m3 1.55

05.04 SISTEMA DE CONDUCTOS


05.04.01 BUZONES DE CONCRETO
05.04.01.01 BUZÓN ELÉCTRICO, CONCRETO F´C=210 KG/CM2 und 13.00 13.00
BUZONES 13.00 13.00 und 13.00
05.04.04 REDES EXTERIORES
05.04.04.01 TUBERIA 40mm PVC-SAP m 187.93 187.93
TGT9 2 6.50 13.00 m 13.00
1TG 8 2.00 2.00 m 2.00
12 6 25.75 25.75 m 25.75
ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
1T8 2 14.95 14.95 m 14.95
23 6 25.20 25.20 m 25.20
2T1 1 4.55 4.55 m 4.55
34 3 16.60 16.60 m 16.60
35 2 18.90 18.90 m 18.90
3T3 2 11.85 11.85 m 11.85
3T2 1 5.45 5.45 m 5.45
4T7 2 5.45 5.45 m 5.45
4T6 2 11.95 11.95 m 11.95
5T4 1 4.95 4.95 m 4.95
5CX 2 14.75 14.75 m 14.75
C-C 2 9.90 9.90 m 9.90
T5T51 2 2.68 2.68 m 2.68

05.04.04.02 TUBERIA 3/4" CONDUIT IMC m 0.00 0.00


05.04.04.03 TUBERIA 25mm PVC-SAP m 143.90 143.90
13 1 9.5 9.50 m 9.50
23 1 10.25 10.25 m 10.25
34 1 5.2 5.20 m 5.20
45 1 13.2 13.20 m 13.20
T1-5 1 10.5 10.50 m 10.50
56 1 8.75 8.75 m 8.75
T3-7 1 20.4 20.40 m 20.40
78 1 6.7 6.70 m 6.70
T9-9 1 6.2 6.20 m 6.20
910 1 14.5 14.50 m 14.50
1011 1 13.8 13.80 m 13.80
T9-LETRAS 1 7.7 7.70 m 7.70
T5 1 10.7 10.70 m 10.70
1415 1 6.5 6.50 m 6.50

05.04.04.08 TUBERIA 50mm PVC-SAP m 84.77 84.77


MTG 1.00 7.97 7.97 m 7.97
1TG 1.00 2 2.00 m 2.00
12 1.00 25.75 25.75 m 25.75
23 1.00 25.2 25.20 m 25.20
35 1.00 18.9 18.90 m 18.90
5T4 1.00 4.95 4.95 m 4.95

05.04.04.09 TUBERIA 60mm PVC-SAP m 7.97 7.97


MTG 1.00 7.97 7.97 m 7.97

05.08 VARIOS
05.08.06 POZO DE PUESTA A TIERRA < 25 OHM und 6.00 6.00
6 6.00 und 6.00

05.08.07 CABLEADO DE POZO A TIERRA DESNUDO m 72.32


TG-PZ1 15.8 15.80 m 15.80
PZ1-PZ2 5 5.00 m 5.00
PZ2-PZ3 5 5.00 m 5.00
TD8-PZ1 28.84 28.84 m 28.84
PZ4-PZ5 4.9 4.90 m 4.90
PZ5-PZ6 4.7 4.70 m 4.70
PZ6-CAJA 8.08 8.08 m 8.08

06 INSTALACIONES DE COMUNICACIONES
06.01 MOVIMIENTO DE TIERRAS
06.01.01 EXCAVACIÓN MANUAL PARA REDES DE COMUNICACIONES PROF.=0.60 M, ANCHO=0.50 M m3 43.70 43.70
COM 447 a BC-1 1 10.93 0.5 0.6 3.28 3.28
BC-1 a BC-2 1 25.45 0.5 0.6 7.64 7.64
COM 438 a BC-2 1 7.41 0.5 0.6 2.22 2.22
BC-2 a BC-3 1 6.06 0.5 0.6 1.82 1.82
BC-3 a MBR 417 1 1.35 0.5 0.6 0.41 0.41
ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
BC-3 a BC-4 1 16.84 0.5 0.6 5.05 5.05
BC-4 a MBR 416 1 2.20 0.5 0.6 0.66 0.66
BC-4 a BC-5 1 18.06 0.5 0.6 5.42 5.42
BC-5 a MBR 415 1 2.30 0.5 0.6 0.69 0.69
BC-5 a BC-6 1 12.76 0.5 0.6 3.83 3.83
BC-6 a MBR 418 1 0.90 0.5 0.6 0.27 0.27
BC-6 a BC-7 1 6.48 0.5 0.6 1.94 1.94
BC-7 a MBR 419 1 6.75 0.5 0.6 2.03 2.03
BC-7 a BC-8 1 20.82 0.5 0.6 6.25 6.25
BC-7 a MBR 420 1 7.30 0.5 0.6 2.19 2.19

06.01.02 EXCAVACIÓN MANUAL PARA BUZONES DE COMUNICACIONES PROF.=0.60 M, ANCHO=0.50 M. m3 16.16 16.16
BC-1 1 1.2 1.2 1.4 2.02 2.02
BC-2 1 1.2 1.2 1.4 2.02 2.02
BC-3 1 1.2 1.2 1.4 2.02 2.02
BC-4 1 1.2 1.2 1.4 2.02 2.02
BC-5 1 1.2 1.2 1.4 2.02 2.02
BC-6 1 1.2 1.2 1.4 2.02 2.02
BC-7 1 1.2 1.2 1.4 2.02 2.02
BC-8 1 1.2 1.2 1.4 2.02 2.02

06.01.03 RELLENO MANUAL C/MATERIAL PROPIO EN REDES DE COMUNICACIONES m3 12.40 12.40


COM 447 a BC-1 1 10.93 0.5 0.25 1.37 10.93 0.2 0.2 0.44 0.93
BC-1 a BC-2 1 25.45 0.5 0.25 3.18 25.45 0.2 0.2 1.02 2.16
COM 438 a BC-2 1 7.41 0.5 0.25 0.93 7.41 0.2 0.2 0.30 0.63
BC-2 a BC-3 1 6.06 0.5 0.25 0.76 6.06 0.2 0.2 0.24 0.52
BC-3 a MBR 417 1 1.35 0.5 0.25 0.17 1.35 0.2 0.2 0.05 0.12
BC-3 a BC-4 1 16.84 0.5 0.25 2.11 16.84 0.2 0.2 0.67 1.44
BC-4 a MBR 416 1 2.20 0.5 0.25 0.28 2.2 0.2 0.2 0.09 0.19
BC-4 a BC-5 1 18.06 0.5 0.25 2.26 18.06 0.2 0.2 0.72 1.54
BC-5 a MBR 415 1 2.30 0.5 0.25 0.29 2.3 0.2 0.2 0.09 0.20
BC-5 a BC-6 1 12.76 0.5 0.25 1.60 12.76 0.2 0.2 0.51 1.09
BC-6 a MBR 418 1 0.90 0.5 0.25 0.11 0.9 0.2 0.2 0.04 0.07
BC-6 a BC-7 1 6.48 0.5 0.25 0.81 6.48 0.2 0.2 0.26 0.55
BC-7 a MBR 419 1 6.75 0.5 0.25 0.84 6.75 0.2 0.2 0.27 0.57
BC-7 a BC-8 1 20.82 0.5 0.25 2.60 20.82 0.2 0.2 0.83 1.77
BC-7 a MBR 420 1 7.30 0.5 0.25 0.91 7.3 0.2 0.2 0.29 0.62

06.01.04 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA m3 56.33 56.33


Volumen Excavado 1 Vol = 59.86 1.2 71.83 71.83
Volumen Rellenado 1 Vol = 12.40 1.25 15.50 -15.50

06.02 OBRAS DE CONCRETO SIMPLE


06.02.01 SOLADO DE CONCRETO H=0.05m, ANCHO=0.20m m2 40.64 40.64
Buzones
Buzones 8 1.2 1.2 11.52 11.52
Zanjas para tuberías 0.00
COM 447 a BC-1 1 10.93 0.2 2.19 2.19
BC-1 a BC-2 1 25.45 0.2 5.09 5.09
COM 438 a BC-2 1 7.41 0.2 1.48 1.48
BC-2 a BC-3 1 6.06 0.2 1.21 1.21
BC-3 a MBR 417 1 1.35 0.2 0.27 0.27
BC-3 a BC-4 1 16.84 0.2 3.37 3.37
BC-4 a MBR 416 1 2.20 0.2 0.44 0.44
BC-4 a BC-5 1 18.06 0.2 3.61 3.61
BC-5 a MBR 415 1 2.30 0.2 0.46 0.46
BC-5 a BC-6 1 12.76 0.2 2.55 2.55
BC-6 a MBR 418 1 0.90 0.2 0.18 0.18
BC-6 a BC-7 1 6.48 0.2 1.30 1.30
BC-7 a MBR 419 1 6.75 0.2 1.35 1.35
BC-7 a BC-8 1 20.82 0.2 4.16 4.16
BC-7 a MBR 420 1 7.30 0.2 1.46 1.46

06.02.02 DADO DE CONCRETO, H=0.15M, ANCHO=0.20m m3 5.82


COM 447 a BC-1 1 10.93 0.2 0.2 0.44 0.44
ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
BC-1 a BC-2 1 25.45 0.2 0.2 1.02 1.02
COM 438 a BC-2 1 7.41 0.2 0.2 0.30 0.30
BC-2 a BC-3 1 6.06 0.2 0.2 0.24 0.24
BC-3 a MBR 417 1 1.35 0.2 0.2 0.05 0.05
BC-3 a BC-4 1 16.84 0.2 0.2 0.67 0.67
BC-4 a MBR 416 1 2.20 0.2 0.2 0.09 0.09
BC-4 a BC-5 1 18.06 0.2 0.2 0.72 0.72
BC-5 a MBR 415 1 2.30 0.2 0.2 0.09 0.09
BC-5 a BC-6 1 12.76 0.2 0.2 0.51 0.51
BC-6 a MBR 418 1 0.90 0.2 0.2 0.04 0.04
BC-6 a BC-7 1 6.48 0.2 0.2 0.26 0.26
BC-7 a MBR 419 1 6.75 0.2 0.2 0.27 0.27
BC-7 a BC-8 1 20.82 0.2 0.2 0.83 0.83
BC-7 a MBR 420 1 7.30 0.2 0.2 0.29 0.29

06.04 SISTEMA DE CONDUCTOS


06.04.01 BUZONES
06.04.01.01 BUZON DE COMUNICACIONES, CONCRETO f´c=210 kg/cm2 und 8.00
BC-1 1 1.00 1.00
BC-2 1 1.00 1.00
BC-3 1 1.00 1.00
BC-4 1 1.00 1.00
BC-5 1 1.00 1.00
BC-6 1 1.00 1.00
BC-7 1 1.00 1.00
BC-8 1 1.00 1.00

06.06 ELECTRODUCTOS PVC -SAP


06.06.01 ELECTRODUCTOS PARA ALARMAS CONTRA INCENDIO
06.06.01.01 TUBERIA PVC-SAP 25MM m 17.40
BC-3 a MBR 417 2 1.35 2.70 2.70
BC-4 a MBR 416 2 2.2 4.40 4.40
BC-5 a MBR 415 2 2.3 4.60 4.60
BC-6 a MBR 418 2 0.9 1.80 1.80
BC-7 a MBR 419 1 1.3 1.30 1.30
BC-8 a MBR 420 2 1.3 2.60 2.60

06.06.01.03 TUBERIA PVC-SAP 50MM m 81.02


BC-2 a BC-3 1 6.06 6.06 6.06
BC-3 a BC-4 1 16.84 16.84 16.84
BC-4 a BC-5 1 18.06 18.06 18.06
BC-5 a BC-6 1 12.76 12.76 12.76
BC-6 a BC-7 1 6.48 6.48 6.48
BC-7 a BC-8 1 20.82 20.82 20.82

06.06.02 ELECTRODUCTOS PARA SISTEMA DE PERIFONEO


06.06.02.01 TUBERIA PVC-SAP 25MM m 20.94
COM 447 a BC-1 1 10.93 10.93 10.93
COM 438 a BC-2 1 7.41 7.41 7.41
BC-7 a MBR 419 2 1.3 2.60 2.60

06.06.02.02 TUBERIA PVC-SAP 35MM m 16.10


BC-3 a MBR 417 2 1.35 2.70 2.70
BC-4 a MBR 416 2 2.2 4.40 4.40
BC-5 a MBR 415 2 2.3 4.60 4.60
BC-6 a MBR 418 2 0.9 1.80 1.80
BC-8 a MBR 420 2 1.3 2.60 2.60

06.06.02.03 TUBERIA PVC-SAP 50MM m 106.47


BC-1 a BC-2 1 25.45 25.45 25.45
BC-2 a BC-3 1 6.06 6.06 6.06
BC-3 a BC-4 1 16.84 16.84 16.84
BC-4 a BC-5 1 18.06 18.06 18.06
ELEMENTOS ABERTURAS O DESCUENTOS PARCIAL
PARTIDA DESCRIPCION Unid. PARCIAL TOTAL
Cant. Long. Ancho. Alto. Sub Total Clase Cant. Long. Ancho. Alto. Sub Total MBR
BC-5 a BC-6 1 12.76 12.76 12.76
BC-6 a BC-7 1 6.48 6.48 6.48
BC-7 a BC-8 1 20.82 20.82 20.82

06.06.03 RED GENERAL DE INTERCONEXXION

06.06.03.01 TUBERIA PVC-SAP 35MM m 7.41


COM 438 a BC-2 1 7.41 7.41 7.41

06.06.03.02 TUBERIA PVC-SAP 50MM m 243.06


BC-2 a BC-3 3 6.06 18.18 18.18
BC-3 a BC-4 3 16.84 50.52 50.52
BC-4 a BC-5 3 18.06 54.18 54.18
BC-5 a BC-6 3 12.76 38.28 38.28
BC-6 a BC-7 3 6.48 19.44 19.44
BC-7 a BC-8 3 20.82 62.46 62.46
3-5 18.9 0.2 3.78 m2 3.78
3-T3 11.85 0.2 2.37 m2 2.37
3-T2 5.45 0.2 1.09 m2 1.09
4-T7 5.45 0.2 1.09 m2 1.09
4-T6 11.95 0.2 2.39 m2 2.39
5-T4 4.95 0.2 0.99 m2 0.99
5-CX 14.75 0.2 2.95 m2 2.95
C-C 9.9 0.2 1.98 m2 1.98
T5-T51 2.68 0.2 0.54 m2 0.54
TUBERIA PVC CLASE 10 - 1/2" S/P P/EXTERIORES TUBERIA PVC CLASE 10 - 1/2" S/P P/EXTE
TUBERIA PVC CLASE 10 - 3/4" S/P P/EXTERIORES TUBERIA PVC CLASE 10 - 3/4" S/P P/EXTE
TUBERIA PVC CLASE 10 - 1" S/P P/EXTERIORES TUBERIA PVC CLASE 10 - 1" S/P P/EXTER
TUBERIA PVC CLASE 10 - 1 1/4" S/P P/EXTERIORES TUBERIA PVC CLASE 10 - 1 1/4" S/P P/EXT
TUBERIA PVC CLASE 10 - 1 1/2" S/P P/EXTERIORES TUBERIA PVC CLASE 10 - 1 1/2" S/P P/EXT
TUBERIA PVC CLASE 10 - 2" S/P P/EXTERIORES TUBERIA PVC CLASE 10 - 2" S/P P/EXTER
TUBERIA PVC CLASE 10 - 2 1/2" S/P P/EXTERIORES TUBERIA PVC CLASE 10 - 2 1/2" S/P P/EXT
TUBERIA PVC CLASE 10 - 1/2" S/P P/EXTERIORES
41.89 15 15.75
TUBERIA PVC CLASE 10 - 3/4" S/P P/EXTERIORES
29.59 11 11
TUBERIA PVC CLASE 10 - 1" S/P P/EXTERIORES
59.91 21
TUBERIA PVC CLASE 10 - 1 1/4" S/P P/EXTERIORES
#REF! #REF!
TUBERIA PVC CLASE 10 - 1 1/2" S/P P/EXTERIORES
18.89 8
TUBERIA PVC CLASE 10 - 2" S/P P/EXTERIORES
95.12 34
TUBERIA PVC CLASE 10 - 2 1/2" S/P P/EXTERIORES
13.69 6
RESUMEN

Item
2 04
5 04.03
8 04.03.03
11 04.03.03.01
11 04.03.03.02
11 04.03.03.03
11 04.03.03.05
11 04.03.03.06
11 04.03.03.07
11 04.03.03.08
8 04.03.04
11 04.03.04.01
11 04.03.04.02
11 04.03.04.03
11 04.03.04.04
11 04.03.04.05
8 04.03.05
11 04.03.05.01
11 04.03.05.02
11 04.03.05.03
11 04.03.05.05
11 04.03.05.06
11 04.03.05.07
8 04.03.06
11 04.03.06.01
11 04.03.06.02
11 04.03.06.03
11 04.03.06.05
11 04.03.06.06
11 04.03.06.07
11 04.03.06.08
11 04.03.06.09
11 04.03.06.11
11 04.03.06.12
11 04.03.06.13
11 04.03.06.14
11 04.03.06.15
11 04.03.06.18
11 04.03.06.23
11 04.03.06.24
11 04.03.06.26
11 04.03.06.29
11 04.03.06.30
11 04.03.06.31
8 04.03.07
11 04.03.07.04
11 04.03.07.05
5 04.04
8 04.04.04
11 04.04.04.01
11 04.04.04.02
11 04.04.04.03
11 04.04.04.04
8 04.04.05
11 04.04.05.01
11 04.04.05.02
11 04.04.05.03
11 04.04.05.04
11 04.04.05.05
8 04.04.07
11 04.04.07.01
11 04.04.07.06
11 04.04.07.07
8 04.04.08
11 04.04.08.01
11 04.04.08.02
11 04.04.08.04
11 04.04.08.05
11 04.04.08.06
5 04.05
8 04.05.01
11 04.05.01.05
11 04.05.01.06
11 04.05.01.07
11 04.05.01.09
11 04.05.01.10
11 04.05.01.11
8 04.05.02
11 04.05.02.01
11 04.05.02.02
11 04.05.02.03
11 04.05.02.05
11 04.05.02.06
8 04.05.03
11 04.05.03.01
11 04.05.03.02
8 04.05.04
11 04.05.04.01
11 04.05.04.02
11 04.05.04.03
8 04.05.05
11 04.05.05.01
11 04.05.05.02
11 04.05.05.03
11 04.05.05.04
11 04.05.05.05
11 04.05.05.06
11 04.05.05.07
11 04.05.05.08
8 04.05.06
11 04.05.06.01
11 04.05.06.02
8 04.05.07
11 04.05.07.01
11 04.05.07.02
11 04.05.07.03
11 04.05.07.04
11 04.05.07.05
2 05
5 05.01
8 05.01.02
8 05.01.03
8 05.01.05
5 05.04
8 05.04.01
11 05.04.01.01
5 05.08
8 05.08.06
8 05.08.07
2 06
5 06.02
8 06.02.01
8 06.02.02
5 06.04
8 06.04.01
11 06.04.01.01
RESUMEN

Descripcion Und

INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
REDES DE ALIMENTACION
TUBERIA PVC CLASE 10 - 1/2" S/P P/EXTERIORES
TUBERIA PVC CLASE 10 - 3/4" S/P P/EXTERIORES m
TUBERIA PVC CLASE 10 - 1" S/P P/EXTERIORES m
TUBERIA PVC CLASE 10 - 1 1/2" S/P P/EXTERIORES m
TUBERIA PVC CLASE 10 - 2" S/P P/EXTERIORES m
TUBERIA PVC CLASE 10 - 2 1/2" S/P P/EXTERIORES m
m
PRUEBA HIDRÁULICA Y DESINFECCIÓN m
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA REDES EXT. SANITARIAS m3
REFINE Y NIVELACION DE ZANJA PARA TUBERIA m2
CAMA DE APOYO (e= 0.10m) - ARENA GRUESA m3
RELLENO COMPACTADO
ELIMINACION C/EQUIPO
DE MATERIAL MATERIAL PROPIO
EXCEDENTE m3
m3
VALVULAS Y LLAVES
VALVULA ESFERICA DE BRONCE PESADA Ø 3/4" und
VALVULA ESFERICA DE BRONCE PESADA Ø 1/2" und
VALVULA COMPUERTA DE BRONCE PESADA Ø 2" und
VALVULA CHECK Ø 1" und
VALVULA COMPUERTA DE BRONCE PESADA Ø 1" und
VALVULA COMPUERTA DE BRONCE PESADA Ø 1 1/2" und
ACCESORIOS
CODO 90° PVC Ø 1/2"
CODO 90° PVC Ø 3/4" und
CODO 90° PVC Ø 1" und
CODO 90° PVC Ø 2" und
CODO 90° PVC Ø 2 1/2" und
TEE PVC Ø 1/2" und
TEE PVC Ø 3/4" und
TEE PVC Ø 1" und
TEE PVC Ø 1 1/2" und
TEE PVC Ø 2" und
TEE PVC Ø 2 1/2" und
und
REDUCCION PVC Ø 3/4" - 1/2" und
REDUCCION PVC Ø 1" - 3/4" und
REDUCCION PVC Ø 1 1/2" - 3/4" und
REDUCCION PVC Ø 2 1/2" - 1 1/2" und
REDUCCION PVC Ø 2 1/2" - 1/2" und
REDUCCION PVC Ø 2 1/2" - 2" und
REDUCCION PVC Ø 1" - 1/2" und
REDUCCION PVC Ø 1 1/2" - 1" und
REDUCCION PVC Ø 2" - 1" und
VARIOS
CAJA DE CONCRETO PARA VALVULA EN PISO DE 0.60x0.45m und
CAJA DE CONCRETO PARA VALVULA EN PISO DE 0.70x0.70m und
SISTEMA DE DESAGUE Y VENTILACION
REDES COLECTORAS
TUBERIA PVC-CP 4" RED EXTERIOR DESAGUE
TUBERIA PVC-CP 6" RED EXTERIOR DESAGUE m
m
PRUEBA HIDRAULICA DE ESTANQUEIDAD Y ESCORRENTIA DE TUB. DESAGUE. m
TUBERIA PVC-CP 2" RED EXTERIOR DESAGUE m
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA REDES EXT. SANITARIAS m3
REFINE Y NIVELACION DE ZANJA PARA TUBERIA m2
CAMA DE APOYO (e= 0.10m) - ARENA GRUESA m3
RELLENO COMPACTADO
ELIMINACION C/EQUIPO
DE MATERIAL MATERIAL PROPIO
EXCEDENTE m3
m3
ACCESORIO DE DERIVACION
CODO 90° PVC PESADO Ø 2"
TEE PVC PESADO Ø 2" und
YEE PVC PESADO Ø 2" und
und
CAMARA DE
CAJA DE INSPECCION
REG. CONCRETO. 12" x 24" (0.30x0.60) C/ TAPA CONCRETO REFORZADO
CAJA DE REG. CONCRETO. 18" x 24" (0.45x0.60) C/ TAPA CONCRETO REFORZADO und
TRAMPA DE GRASA (SOLO ACCESORIOS SANITARIOS) und
CAJA DE REBOSE 0.60x0.30x0.30m und
und
BUZON CIRCULAR DE CONCRETO D=1.20M HASTA 2.00 M und
DRENAJE PLUVIAL
REDES DE DERIVACIÓN
CODO PVC 45° Ø4" und
CODO PVC 90° Ø2" und
CODO PVC 90° Ø4" und
CODO PVC 45° Ø2" und
TEE PVC Ø4" und
YEE PVC CON REDUCCION Ø6" A Ø4" und
REDES COLECTORAS
TUBERIA PVC-CP 4"
TUBERIA PVC-CP RED EXTERIOR
6" RED EXTERIOR PLUVIAL
PLUVIAL m
TUBERIA PVC-CP 8" RED EXTERIOR PLUVIAL m
m
PRUEBA HIDRAULICA DE ESTANQUEIDAD Y ESCORRENTIA DE TUB. PLUVIAL. m
TUBERIA PVC CP 2" - PLUVIAL m
CANALETAS
CANALETA DE CONCRETO C/IMPERMEABILIZANTE, ANCHO=0.30m m
REJILLA METÁLICA EN PISO, ANCHO=0.30 M PL 1.1/4"x1/4" m
CAMARA DE INSPECCION
CAJA DE REG. CONCRETO. 12" x 24" (0.30x0.60) C/ TAPA CONCRETO REFORZADO und
CAJA DE REG. CONCRETO. 24" x 24" (0.60x0.60) C/ TAPA CONCRETO REFORZADO und
CAJA SUMIDERO (0.30x0.60) C/ TAPA REJILLA und
MOVIMIENTO DE TIERRAS
EXCAVACIÓN DE ZANJA PARA CANAL DE CONCRETO m3
EXCAVACIÓN DE ZANJA PARA COLECTORAS PLUVIALES m3
REFINE Y NIVELACION DE ZANJA PARA CUNETA m2
REFINE Y NIVELACION DE ZANJA PARA TUBERIA m2
CAMA DE APOYO (e= 0.10m) - ARENA GRUESA m3
RELLENO COMPACTADO C/EQUIPO MATERIAL PROPIO m3
ELIMINACION DE MATERIAL EXCEDENTE m3
EXCAVACIÓN DE ZANJA PARA CAJAS DE REGISTRO Y VALVULAS m3
SISTEMAS DRENANTES
ZANJAS DE INFILTRACION m
PAQUETE DE GRAVA und
OTROS
VALVULA ANTIRETORNO DE 4'' und
VALVULA ANTIRETORNO DE 6'' und
REJILLA FLEXIBLE PVC ATRAPA HOJAS und
SALIDA PLUVIAL EN VEREDA, ANCHO=0.50m und
SALIDA PLUVIAL EN VEREDA, ANCHO=0.80m und
INSTALACIONES ELECTRICAS
MOVIMIENTO DE TIERRA
EXCAVACION MANUAL PARA BUZONES DE ELECTRICAS m3
EXCAVACION MANUAL PARA POSTES DE REDES ELECTRICAS m3
ELIMINACION DE MATERIAL EXCEDENTE m3
SISTEMA DE CONDUCTOS
BUZONES DE CONCRETO
BUZÓN ELÉCTRICO, CONCRETO F´C=210 KG/CM2 und
VARIOS
POZO DE PUESTA A TIERRA < 25 OHM und
CABLEADO DE POZO A TIERRA DESNUDO m
INSTALACIONES DE COMUNICACIONES
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO H=0.05m, ANCHO=0.20m m2
DADO DE CONCRETO, H=0.15M, ANCHO=0.20m m3
SISTEMA DE CONDUCTOS
BUZONES
BUZON DE COMUNICACIONES, CONCRETO f´c=210 kg/cm2 und
Metrado

26.49
29.59
27.28
2.65
89.90
13.69
189.60

44.00
95.82
9.58
47.91
15.55

1.00
3.00
1.00
2.00
2.00
1.00

12.00
10.00
11.00
7.00
2.00
1.00
5.00
2.00
1.00
3.00
3.00
5.00
4.00
1.00
1.00
1.00
2.00
1.00
1.00
2.00

4.00
1.00

35.89
80.10
127.02
11.03
126.22
100.97
10.10
116.12
12.12

6.00
1.00
2.00

9.00
3.00
1.00
4.00
3.00

9.00
5.00
16.00
8.00
7.00
9.00

52.22
191.48
12.60
250.91
25.07

97.90
97.90

12.00
12.00
4.00

26.14
57.98
24.48
110.08
11.01
46.97
84.12
4.53

18.00
5.00

8.00
2.00
4.00
4.00
1.00
1.44
0.47
1.91

1.00

5.00
72.32

2.00
0.30

1.00
INSTALACIONES SANITARIAS
SISTEMA DE AGUA FRIA
REDES DE ALIMENTACION
TUBERIA PVC CLASE 10 - 1/2" S/P P/EXTERIORES
TUBERIA PVC CLASE 10 - 3/4" S/P P/EXTERIORES
TUBERIA PVC CLASE 10 - 1" S/P P/EXTERIORES
TUBERIA PVC CLASE 10 - 1 1/4" S/P P/EXTERIORES
TUBERIA PVC CLASE 10 - 1 1/2" S/P P/EXTERIORES
TUBERIA PVC CLASE 10 - 2" S/P P/EXTERIORES
TUBERIA PVC CLASE 10 - 2 1/2" S/P P/EXTERIORES

CAMA DE APOYO (e= 0.10m) - ARENA GRUESA


VALVULAS Y LLAVES
VALVULA ESFERICA DE BRONCE PESADA Ø 3/4"
VALVULA ESFERICA DE BRONCE PESADA Ø 1/2"
VALVULA COMPUERTA DE BRONCE PESADA Ø 2"
VALVULA CHECK Ø 1"
VALVULA COMPUERTA DE BRONCE PESADA Ø 1"
VALVULA
CODO 90° COMPUERTA
PVC Ø 1/2" DE BRONCE PESADA Ø 1 1/2"
CODO 90° PVC Ø 3/4"
CODO 90° PVC Ø 1"
CODO 90° PVC Ø 2"
CODO 90° PVC Ø 2 1/2"
TEE PVC Ø 1/2"
TEE PVC Ø 3/4"
TEE PVC Ø 1"
TEE PVC Ø 1 1/2"
TEE PVC Ø 2"
TEE PVC Ø 2 1/2"

REDUCCION PVC Ø 3/4" - 1/2"


REDUCCION PVC Ø 1" - 3/4"
REDUCCION PVC Ø 1 1/2" - 3/4"
REDUCCION PVC Ø 2 1/2" - 1 1/2"
REDUCCION PVC Ø 2 1/2" - 1/2"
REDUCCION PVC Ø 2 1/2" - 2"
REDUCCION PVC Ø 1" - 1/2"
REDUCCION PVC Ø 1 1/2" - 1"
REDUCCION PVC Ø 2" - 1"
CAJA DE CONCRETO PARA VALVULA EN PISO DE 0.60x0.45m
CAJA DE CONCRETO PARA VALVULA EN PISO DE 0.70x0.70m

SISTEMA DE DESAGUE Y VENTILACION


REDES COLECTORAS
TUBERIA PVC-CP 4" RED EXTERIOR DESAGUE
TUBERIA PVC-CP 6" RED EXTERIOR DESAGUE

TUBERIA PVC-CP 2" RED EXTERIOR DESAGUE


CAMA DE APOYO (e= 0.10m) - ARENA GRUESA
ACCESORIO DE DERIVACION
CODO 90° PVC PESADO Ø 2"
TEE PVC PESADO Ø 2"
YEE PVC PESADO Ø 2"

CAMARA DE
CAJA DE INSPECCION
REG. CONCRETO. 12" x 24" (0.30x0.60) C/ TAPA CONCRETO REFORZADO
CAJA DE REG. CONCRETO. 18" x 24" (0.45x0.60) C/ TAPA CONCRETO REFORZADO
TRAMPA DE GRASA (SOLO ACCESORIOS SANITARIOS)
CAJA DE REBOSE 0.60x0.30x0.30m

BUZON CIRCULAR DE CONCRETO D=1.20M HASTA 2.00 M

DRENAJE PLUVIAL
REDES DE DERIVACIÓN
CODO PVC 45° Ø4"
CODO PVC 90° Ø2"
CODO PVC 90° Ø4"
CODO PVC 45° Ø2"
TEE PVC Ø4"
YEE PVC CON REDUCCION Ø6" A Ø4"
REDES COLECTORAS
TUBERIA PVC-CP 6" RED EXTERIOR PLUVIAL
TUBERIA PVC-CP 8" RED EXTERIOR PLUVIAL

TUBERIA PVC CP 2" - PLUVIAL

CANALETAS
CANALETA DE CONCRETO C/IMPERMEABILIZANTE, ANCHO=0.30m
REJILLA METÁLICA EN PISO, ANCHO=0.30 M PL 1.1/4"x1/4"

CAMARA DE INSPECCION
CAJA DE REG. CONCRETO. 12" x 24" (0.30x0.60) C/ TAPA CONCRETO REFORZADO
CAJA DE REG. CONCRETO. 24" x 24" (0.60x0.60) C/ TAPA CONCRETO REFORZADO
CAJA SUMIDERO (0.30x0.60) C/ TAPA REJILLA
MOVIMIENTO DE TIERRAS
CAMA DE APOYO (e= 0.10m) - ARENA GRUESA
SISTEMAS DRENANTES
ZANJAS DE INFILTRACION
PAQUETE DE GRAVA
OTROS
VALVULA ANTIRETORNO DE 4''
VALVULA ANTIRETORNO DE 6''
REJILLA FLEXIBLE PVC ATRAPA HOJAS
SALIDA PLUVIAL EN VEREDA, ANCHO=0.50m
SALIDA PLUVIAL EN VEREDA, ANCHO=0.80m
INSTALACIONES ELECTRICAS
MOVIMIENTO DE TIERRA
EXCAVACION MANUAL PARA REDES DE ELECTRICAS
EXCAVACION MANUAL PARA BUZONES DE ELECTRICAS
EXCAVACION MANUAL PARA POSTES DE REDES ELECTRICAS
RELLENO MANUAL C/MATERIAL PROPIO EN REDES ELECTRICAS
RELLENO MANUAL C/MATERIAL DE PRESTAMO EN REDES ELECTRICAS
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO, H=0.05m; ANCHO=0.20m
SOLADO DE CONCRETO H=0.05M, ANCHO=0.30m
SOLADO DE CONCRETO H=0.05M, ANCHO=0.40m
DADO DE CONCRETO, H=0.15m; ANCHO=0.20m
DADO DE CONCRETO, H=0.15m; ANCHO=0.30m
DADO DE CONCRETO, H=0.15m; ANCHO=0.40m
SISTEMA DE CONDUCTOS
BUZONES DE CONCRETO
BUZÓN ELÉCTRICO, CONCRETO F´C=210 KG/CM2
REDES EXTERIORES
TUBERIA 25mm PVC-SAP
TUBERIA 40mm PVC-SAP
TUBERIA 50mm PVC-SAP
TUBERIA 50mm PVC-SAP
INSTALACIONES DE COMUNICACIONES
MOVIMIENTO DE TIERRAS
EXCAVACIÓN MANUAL PARA REDES DE COMUNICACIONES PROF.=0.60 M, ANCHO=0.50 M
EXCAVACIÓN MANUAL PARA BUZONES DE COMUNICACIONES PROF.=0.60 M, ANCHO=0.50 M.
RELLENO MANUAL C/MATERIAL PROPIO EN REDES DE COMUNICACIONES
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO H=0.05m, ANCHO=0.20m
DADO DE CONCRETO, H=0.15M, ANCHO=0.20m
SISTEMA DE CONDUCTOS
BUZONES
BUZON DE COMUNICACIONES, CONCRETO f´c=210 kg/cm2
ELECTRODUCTOS PVC -SAP
ELECTRODUCTOS PARA ALARMAS CONTRA INCENDIO
TUBERIA PVC-SAP 25MM
TUBERIA PVC-SAP 50MM
ELECTRODUCTOS PARA SISTEMA DE PERIFONEO
TUBERIA PVC-SAP 25MM
TUBERIA PVC-SAP 35MM
TUBERIA PVC-SAP 50MM
RED GENERAL DE INTERCONEXXION
TUBERIA PVC-SAP 35MM
TUBERIA PVC-SAP 50MM
RIEGO AGUA
3/4 1.59 1 3.38 2
3/4 10.52 4.41 4
3/4 38.78 2 49.26 4
3/4 10.09 30.89 4
1 1/4 26.5 2.24 6
1/2 2.1 2.1/2 6.68 4
1 1/4 2.89 6
1 1/2 3.15 6
1 1/2 2.51 4
1 1/2 6.59 6
1 1/2 1.88 6
1 1/2 1.47 6
1 1/2 14.93 6
1/2 1.25 6
1 1/4 23.93 4
1 1/4 5.18 6
3/4 57.85
3/4 1.47
212.68
259.09
DESAGUE PLUVIAL
6.23 4 3.96
6.39 6 15.55
3 6 11.23
10.66 6 11.24
9.32 6 11.64
11.52 6 10
45.57 6 10.39
39.36 6 13.92
1 6 13.92
4.91 8 11.32
6.77 8 1.2
5.16 4 3.96
6.35 6 6.98
2.62 6 11.7
4.02 6 12.15
12.33 6 13.56
175.21 6 15.18
6 14.69
4 4
6 13.87
6 14.17
224.63

0.8
579.84
250 0.0032