Está en la página 1de 1

3A 3 3B 4A 4 4B

N
C:\Users\DELL\Documents\PROYECTOS LUIS MONTILLA 2021\22-Proyecto Villa CERMAKOVA\LOGO VEGA LOPEZ.png

DB

PT2-C02
CCI#2
PROYECTO:

EDIFICIO CDL
D COMERCIAL SAMANA
PT2-C03
CCI#2

COMITENTE:
SRA SOLANYI DE LEON

DA FIRMA
PT2-C04
CCI#2

RESPONSABLE DEL PROYECTO:


ING. CAROLIN VEGA

FIRMA

PT2-C05
CCI#2
CODIA: 28637

CCI #2
3AAAC#2/0(E) 3AAAC#2/0(E)
Centro Control Iluminacion #2

4AAAC#2/0(P)
DOWN

PT2-C06
CCI#2
12

13

14

15

19
11

2 20
9

6
10

PT2-C06
UP

ASCENSOR 1 PARARRAYOS
10kv
1 CUT-OUT DE 100 AMP.
CB PT2-C07 15 KV, CON FUSIBLE
CCI#2
DE 7 AMP. Tipo D DISENO ARQUITECTONICO:

ARQ. LUIS MONTILLA


TRANSF. TIPO POSTE
SUMERGIDO EN ACEITE FIRMA

DE 50 KVA,60 HZ, 7.2KV/120-240V


PT2-C10
CODIA: 31534
CCI#2
PT2-C08
CCI#2
DOBLE ALTURA
FIRMA

C DISE O PAISA E:

PT2-C09 FIRMA
CCI#2 MODULO DE MEDICION Y DISTRIBUCION (MC-1)
DISENO SISTEMA HIDROSANITARIO:

FIRMA

CA DISENO SISTEMA ELECTRICO:

ING. ROBERTO GIL LI


CODIA: 23117

FIRMA

DISENO SISTEMA MECANICO:

FIRMA

DISE O ESTRUCTURAL:

FIRMA

RESERVADO

PT-C02
BB CCI#1

1-) TODA LA TUBERIA ELECTRICA ES DE PVC DE 1/2", PERO LA DE TELEFONO, TELEVISION SON DE 3/4.

2-) LOS CONDUCTORES SON DEL TIPO TRENZADO, CON AISLAMIENTO THHN, DEL CALIBRE SEÑALADO EN EL PANEL.
PT-C03 #1 #2
CCI#1
3-) TODOS LOS CIRCUITOS, SALVO LAS LUCES TIENEN UN TERCER CONDUCTOR COLOR VERDE, CALIBRE # 14

PARA SER UTILIZADO COMO ELEMENTO DE TIERRA.


DIAGRAMA DE PANELES
B HACIA TRANSFORMADOR
4-) TODOS LOS PANELES Y EL MODULO DE CONTADOR DEBEN SER ATERRIZADOS CON VARRILLA 5/8 x 6'.

2DO NIVEL
5-) EL CODIGO DE COLORES SERA: BLANCO= NEUTRO, VERDE= TIERRA, POTENCIAL DIFERENTE AL NEUTRO
PT-C04 2 THHN, AWG NO. 4/0 2THHN #8(F)
CCI#1 1 THHN, AWG NO. 3/0 1THHN #10 (N)
Ø3" 1THHN #12(T)
Ø1"
Y TIERRA.
MODULO DE CONTADORES

1ER NIVEL
2THHN #10(F) 2THHN #10(F) 2THHN #10(F)
2THHN #2/0(F) 2THHN #6(F) 2THHN #4(F) 1THHN #10 (N) 1THHN #10 (N) 1THHN #10 (N)
1THHN #1/0 (N) 1THHN #8 (N) 1THHN #6 (N) 1THHN #12(T) 1THHN #12(T) 1THHN #12(T)
PT-C15 1THHN #2(T) 1THHN #12(T) 1THHN #8(T)
CCI#1 Ø3/4" Ø3/4" Ø3/4"

BA Ø2" Ø3/4" Ø1"

Detalle Conexion A/A


NOTA:
C
o
Ø ½"
DOWN

m
PT-C06 p
CCI#1 r
12

13

14

15

16

17

18

19
11

20

e
s
4
9

2
10

o ETAPA:
20R x 175 r
PROYECTO EJECUTIVO
UP

19G x 30
ASCENSOR
TECHO
EMISIONES

No. FECHA DESCRIPCION POR


Ø2" 0.65 MTS
CCI #1
Centro Control Iluminacion #2 PT-C07
CCI#1
DIAGRAMA TELEFONICO/DATA
DEL TECHO
Consola

ACCESO SERVICIO

AB (8x8x4)

Ø3/4" Ø3/4"
TUBERIA PVC 1/2" TUBERIA PVC 2"
AREA CONSERJE
PT-C09
SALIDA ELECTRICA DESAGUE SUBE AL TECHO
220 V A/A
PL1-C01 PL2-C01 PL3-C01 RTPL1
(8x8x4)
RTPL2
(8x8x4)
RTPL3
(8x8x4)
REVISIONES
RTELP RTEL1
(14"x14"x6") (8x8x4) No. FECHA DESCRIPCION POR
PT-C11 Ø1" Ø3/4" Ø3/4" Ø3/4" Ø3/4" Ø3/4" Ø3/4" Ø3/4" Ø3/4"
ENCENDIDO CON
FOTOCELDA Ø1"
Ø1"
Ø1"
VESTIBULO PT-C08 A CIA.
TELEFONO
POSTE MAS CERCANO

A BAÑO DAMAS BAÑO CABALLEROS

PT-C10
ENCENDIDO CON
FOTOCELDA
ACCESO PRINCIPAL
Piso
Hacia Panel ؽ" CONTENIDO:

Drenaje Ø1" PLANTA ILUMINACION Y


DIAGRAMAS

AA
FECHA: NOVIEMBRE 2021
ESCALA: 0:00 REVISION:

A01 PLANTA ILUMINACION Y DIAGRAMAS


ESC 0:00
DIBU O:

LAMINA NUM:
APROBACION:

A01
3A
3 3B 4A
4 4B

También podría gustarte