RESUMEN DEL ESTADO FINANCIERO
1.0 COSTO DIRECTO 1,534,233.91 470,097.25 889,208.83 50.63% 25,568.00 1.67% 914,776.83 1,384,874.08 90.26% S/. 149,359.83
2.6.2.3.5.3 COSTO DE PERSONAL S/.422,367.54 94,705.00 216,500.00 12.33% 17,000.00 4.02% 233,500.00 328205.00 77.71% S/. 94,162.54
2.6.2.3.5.4 COSTO DE BIENES S/.981,626.47 373,292.25 672,708.83 38.30% 8,568.00 0.87% 681,276.83 1054569.08 107.43% S/. -72,942.61
2.6.2.3.5.5 COSTO DE SERVICIO S/.130,239.90 2,100.00 0.00 0.00% 0.00 0.00% - 2100.00 1.61% S/. 128,139.90
2.0 GASTOS GENERALES DE OBRA 156,889.51 30,556.00 141,065.84 8.03% 56,931.20 36.29% 197,997.04 228,553.04 145.68% S/. -71,663.53
2.6.2.3.5.3 PERSONAL S/.154,300.00 26,367.00 37,516.00 2.14% 1,680.00 1.09% 39,196.00 65563.00 42.49% S/. 88,737.00
2.6.2.3.5.4 BIENES S/.2,589.51 4,189.00 1,018.00 0.06% 0.00 0.00% 1,018.00 5207.00 201.08% S/. -2,617.49
2.6.2.3.5.5 SERVICIOS - 102,531.84 5.84% 55,251.20 #¡DIV/0! 157,783.04 157783.04 0.00% S/. -157,783.04
3.0 GASTOS DE SUPERVISION 30,750.00 - 243.60 0.01% - 0.00% 243.60 243.60 0.79% S/. 30,506.40
2.6.2.3.5.3 PERSONAL S/.29,750.00 - 0.00 0.00% 0.00 0.00% - 0.00 0.00% S/. 29,750.00
2.6.2.3.5.4 BIENES S/.1,000.00 - 243.60 0.01% 0.00 0.00% 243.60 243.60 0.00% S/. 756.40
2.6.2.3.5.5 SERVICIOS - 0.00 0.00% 0.00 0.00% - 0.00 0.00% S/. -
4.0 GASTOS EXPEDIENTE TECNICO 27,500.00 8,000.00 0.00 0.00% - 0.00% - 8,000.00 29.09% S/. 19,500.00
2.6.2.3.5.3 PERSONAL - 0.00 0.00% 0.00 0.00% - 0.00 0.00% S/. -
2.6.2.3.5.4 BIENES - 0.00% 0.00 0.00% - 0.00 0.00% S/. -
2.6.2.3.5.5 SERVICIOS S/.27,500.00 8,000.00 0.00% 0.00 0.00% 8000.00 29.09% S/. 19,500.00
5.0 GASTOS DE LIQUIDACION 7,000.00 - 0.00 0.00% - 0.00% - - 0.00% S/. 7,000.00
2.6.2.3.5.3 PERSONAL S/.6,700.00 - 0.00% 0.00 0.00% - 0.00 0.00% S/. 6,700.00
2.6.2.3.5.4 BIENES S/.146.17 - 0.00% 0.00 0.00% - 0.00 0.00% S/. 146.17
2.6.2.3.5.5 SERVICIOS S/.153.83 - 0.00% 0.00 0.00% - 0.00 0.00% S/. 153.83
TOTAL INVERSION 1,756,373.42 508,653.25 1,030,518.27 58.67% 82,499.20 37.95% 1,113,017.47 1,621,670.72 92.33% S/. 134,702.69
SALDO DE MATERIALES
INFORME FINAL DE LA OBRA: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE SANEAMIENTO BÁSICO EN LA
COMUNIDAD CAMPESINA DE QUIÑER DEL DISTRITO DE HUANCARANI, PROVINCIA DE PAUCARTAMBO, REGION
CUSCO”.
MUNICIPALIDAD DISTRITAL DE
HUANCARANI
“Año del Fortalecimiento de la Soberanía Nacional”
59 TUBERIA PVC SAP PRESION C-10 1"X5M 390 UND 435.00 18.90 136.00 2,570.40
60 CODO PVC SAP PRESION DE 2 1/2" X 45° 458 UND 15.00 14.65 12.00 175.80
61 CODO PVC SAP PRESION DE 1 1/2" X 45° 458 UND 8.00 8.50 8.00 68.00
62 TEE PVC SAP PRESION DE 1" 458 UND 10.00 9.10 8.00 72.80
63 TEE PVC SAP PRESION DE 1 1/2" 458 UND 12.00 15.10 8.00 120.80
64 CODO PVC SAP 90° DE 2 1/2" 458 UND 40.00 21.30 30.00 639.00
65 VALVULA ESFERICA PVC 2 1/2" 458 UND 11.00 224.75 9.00 2,022.75
66 CANASTILLA DE PVC DE 2 1/2" 458 UND 11.00 26.10 9.00 234.90
67 UNION UNIVERSAL PVC DE 2 1/2" 458 UND 22.00 65.25 18.00 1,174.50
68 NIPLE DE PVC DE 2 1/2 458 UND 22.00 16.40 22.00 360.80
69 ADAPTADOR PVC ROSCADO DE 2 1/2" 458 UND 33.00 19.40 29.00 562.60
70 CONO DE REBOSE PVC SAP DE 4" A 2" 458 UND 4.00 45.20 4.00 180.80
71 TAPON PVC SAP HEMBRA DE 2 1/2" 458 UND 8.00 18.10 8.00 144.80
72 VALVULA FLOTADOR DE 2 1/2" (INCLUYE ACCESORIOS) 458 UND 7.00 1,377.50 5.00 6,887.50
73 CONO DE REBOSE DE 2" 458 UND 7.00 22.04 7.00 154.28
74 CODO PVC SAP DE 90° DE 2" 458 UND 7.00 17.80 7.00 124.60
75 TAPON PVC SAP HEMBRA DE 2" 458 UND 7.00 16.80 7.00 117.60
76 NIPLE PVC 1" 458 UND 30.00 2.20 30.00 66.00
77 UNION UNIVERSAL PVC DE 1" 458 UND 30.00 7.30 30.00 219.00
78 ADAPTADOR UPR DE PVC SAP 1 1/2" 458 UND 28.00 5.80 28.00 162.40
79 NIPLE PVC 1 1/2" 458 UND 28.00 3.50 28.00 98.00
80 UNION UNIVERSAL PVC DE 1 1/2" 458 UND 32.00 23.00 32.00 736.00
81 VALVULA COMPUERTA DE BRONCE DE 1" 458 UND 3.00 92.00 2.00 184.00
82 CODO PVC SAP 90° DE 1 1/2" 458 UND 6.00 10.90 6.00 65.40
83 TAPON PVC SAP HEMBRA DE 1 " 458 UND 3.00 3.50 3.00 10.50
84 VALVULA COMPUERTA DE BRONCE DE 1 1/2" 458 UND 4.00 209.38 4.00 837.52
85 CODO PVC SAP 90° DE 1 1/2" 458 UND 2.00 10.90 2.00 21.80
86 TAPON PVC SAP HEMBRA DE 1 1/2 458 UND 1.00 12.60 1.00 12.60
87 VALVULA ESFERICA 1 1/2" 458 UND 12.00 222.30 12.00 2,667.60
88 VALVULA ESFERICA 1" 458 UND 12.00 106.10 12.00 1,273.20
89 TEE PVC SAP DE 1” 458 UND 3.00 11.60 3.00 34.80
90 VALVULA AUTOMATICO DE AIRE 1/2" 458 UND 3.00 55.10 3.00 165.30
91 TAPA METALICA ESTRIADA DE 0.60X0.60 1/8" 457 UND 7.00 135.00 4.00 540.00
92 TAPA METALICA ESTRIADA DE 0.40X0.40 1/8" 457 UND 33.00 91.50 32.00 2,928.00
93 TAPA METALICA ESTRIADA DE 0.50X0.50 1/8" 457 UND 5.00 126.00 3.00 378.00
CERAMICO DE PISO DE ANTIDESLIZANTE SEGÚN ESP. TEC. (DE
94 465 M2 543.00 46.00 14.18 652.28
BUENA CALIDAD)
CERAMICO DE PARED DE ANTIDESLIZANTE SEGÚN ESP. TEC. (DE
95 465 M2 1,368.00 42.00 84.72 3,558.24
BUENA CALIDAD)
96 CEMENTO PORTLAND TIPO IP (42.5KG) 454 BLS 130.00 29.50 56.00 1,652.00
97 CACHIMBA 4" 468 UND 15.00 54.00 11.00 594.00
98 CINTA TEFLON DE 1/2 468 PAQ 3.00 11.00 0.70 7.70
99 CINTA AISLANTE NEGRO 468 PAQ 4.00 94.00 1.00 94.00
100 CODO INSERTO MIXTO 1/2 468 UND 25.00 11.00 6.00 66.00
101 CAJAS DE CONCRETO PARA AGUA 486 UND 144.00 15.00 4.00 60.00
CAJAS DE CONCRETO PARA DESAGUE INCLUYE TAPA DE
102 486 UND 288.00 25.00 33.00 825.00
CONCRETO)
PLANCHA SUPER BOARD DE 6 MM ( INCLUYE INSTALACION Y
103 467 PLCH 153.00 334.65 4.00 1,338.60
ACCESORIOS)
104 RODOPLAS PVC PARA CERAMICO DE 10 MMDE 2.4M DE LONG. 625 UND 128.00 7.41 74.00 548.34
105 CACHIMBA DE 4- 6 656 UND 20.00 25.50 15.00 382.50
106 CACHIMBA DE 8 - 4 656 UND 3.00 42.00 3.00 126.00
107 UNION DE 1/2 MIXTO 656 UND 30.00 3.60 19.00 68.40
108 TUBERIA DE VENTILACION DE 2" 656 UND 25.00 95.00 25.00 2,375.00
109 VALVULA DE 2 1/2 656 UND 1.00 460.00 1.00 460.00
110 CODO DE 2" X 45° DE AGUA POTABLE 656 UND 1.00 12.00 1.00 12.00
111 CURVA DE 3/4" 737 UND 8.00 1.40 3.00 4.20
112 TAPON DE 2" 737 UND 3.00 4.20 1.00 4.20
113 CODO DE 4" X 90° 737 UND 17.00 12.80 8.00 102.40
114 TEE PVC A PRESION DE 2" 737 UND 3.00 23.00 1.00 23.00
115 CODO PVC DE 2" X 90° 737 UND 7.00 16.80 6.00 100.80
116 TUBOS PVC SAL 2" X 3M 781 UND 30.00 21.90 22.00 481.80
INFORME FINAL DE LA OBRA: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE SANEAMIENTO BÁSICO EN LA
COMUNIDAD CAMPESINA DE QUIÑER DEL DISTRITO DE HUANCARANI, PROVINCIA DE PAUCARTAMBO, REGION
CUSCO”.
MUNICIPALIDAD DISTRITAL DE
HUANCARANI
“Año del Fortalecimiento de la Soberanía Nacional”
Los saldos de materiales son internados al almacen central con una acta de internamiento.
Atentamente.
MEMORIA DESCRIPTIVA
INFORME FINAL DE LA OBRA: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE SANEAMIENTO BÁSICO EN LA
COMUNIDAD CAMPESINA DE QUIÑER DEL DISTRITO DE HUANCARANI, PROVINCIA DE PAUCARTAMBO, REGION
CUSCO”.
MUNICIPALIDAD DISTRITAL DE
HUANCARANI
“Año del Fortalecimiento de la Soberanía Nacional”
I. FICHA TECNICA
1. DATOS GENERALES
SECUENCIA FUNCIONAL
FUNCION : SANEAMIENTO
DIVISION FUNCIONAL : SANEAMIENTO
GRUPO FUNCIONAL : SANEAMIENTO RURAL
SECTOR RESPONSABLE :VIVIENDA, CONSTRUCCION Y SANEAMIENTO
TIPOLOGÍA DE PROYECTO : SISTEMA DE SANEAMIENTO RURAL
PROYECTO META 2019 : 0056
PROYECTO META 2020 : 0022
2. META EJECUTADA
MONTO DE INVERSIÓN : 1,198,160.64Soles
MONTO APROBADO EXP. TECN. : 1,198,160.64Soles
MONTO APROBADO REFORM. : 1,756,373.42Soles
NOMBRE DEL PROYECTO :“MEJORAMIENTO Y AMPLIACION DEL
SERVICIO DE SANEAMIENTO BÁSICO EN
LA COMUNIDAD CAMPESINA DE QUIÑER
INFORME FINAL DE LA OBRA: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE SANEAMIENTO BÁSICO EN LA
COMUNIDAD CAMPESINA DE QUIÑER DEL DISTRITO DE HUANCARANI, PROVINCIA DE PAUCARTAMBO, REGION
CUSCO”.
MUNICIPALIDAD DISTRITAL DE
HUANCARANI
“Año del Fortalecimiento de la Soberanía Nacional”
B.- COMPONENTE 2:
ADECUADAS CONDICIONES
DEL SISTEMA DE
Construccion de sistema de tratamiento de aguas
ELIMINACION DE
EXCRETAS POR UBS residuales
C.- COMPONENTE 3:
SUFICIENTE Talleres de educacion sanitaria, gestion social y
CONOCIMIENTO DE difusion
GESTIÓN Y
ORGANIZACIÓN Y
EDUCACIÓN SANITARIA DE
INFORME FINAL DE LA OBRA: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE SANEAMIENTO BÁSICO EN LA
COMUNIDAD CAMPESINA DE QUIÑER DEL DISTRITO DE HUANCARANI, PROVINCIA DE PAUCARTAMBO, REGION
CUSCO”.
MUNICIPALIDAD DISTRITAL DE
HUANCARANI
“Año del Fortalecimiento de la Soberanía Nacional”
LA POBLACIÓN
1.1.1.5 KIT - -
-
1.1.1.5.1 KIT DE HERRAMIENTAS gbl 1.00 100.00%
10,703.00
1.1.1.5.2 KIT DE IMPLEMENTOS DE SEGURIDAD MONC - MOC gbl 1.00 100.00%
29,232.50
1.1.1.5.3 KIT DE IMPLEMENTOS SANITARIOS gbl 1.00 100.00%
3,437.50
1.1.2 CAPTACION (04 UND) - -
-
1.1.2.1 DEMOLICIONES - -
-
1.1.2.1.1 DEMOLICION DE CONCRETO EXISTENTE E=0.20M m³ - -
-
1.1.2.2 TRABAJOS PRELIMINARES - -
-
1.1.2.2.1 LIMPIEZA MANUAL DE TERRENO NORMAL m² - -
-
1.1.2.2.2 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m² - -
-
1.1.2.3 MOVIMIENTO DE TIERRAS - -
-
1.1.2.3.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³ - -
-
1.1.2.3.2 ELIMINACION MATERIAL MANUAL D<30M m³ - -
-
1.1.2.4 TRANSPORTE DE MATERIALES Y AGREGADOS - -
-
1.1.2.4.1 ACARREO DE CEMENTO EN PENDIENTE PRONUNCIADA D > 100M und - -
-
1.1.2.4.2 ACARREO DE AGREGADOS D>100M m³ - -
-
1.1.2.5 ENCOFRADO Y DESENCOFRADO m² - -
-
1.1.2.6 CONCRETO F'C= 140 KG/CM2 SIN MEZCLADORA m³ - -
-
1.1.2.7 CONCRETO F'C= 175 KG/CM2 CON MEZCLADORA m³ - -
-
1.1.2.8 ACERO DE REFUERZO FY = 4200 KG/CM2 kg - -
-
1.1.2.9 TARRAJEO CON ADITIVO IMPERMEABILIZANTE MORTERO C:A 1:5 E=1.5CM m² - -
-
1.1.2.10 TARRAJEO EN MUROS MORTERO C:A 1:5 E=1.5CM m² - -
-
1.1.2.11 PINTURA ESMALTE DOS MANOS EN MUROS EXTERIORES m² - -
-
1.1.2.12 VALVULA DE BOLA DE DOBLE UNION DE TUBOS DE HDPE DE 1" und - -
-
1.1.2.13 INSTALACION DE ACCESORIOS PARA CAPTACION DE MANANTIAL DE Ø 1" und - -
-
1.1.2.14 FILTRO DE GRAVA ZARANDEADA Ø 1"-1 1/2" m³ - -
-
1.1.2.15 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.60X3/16" und - -
-
1.1.2.16 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.40X0.40X1/8" und - -
-
1.1.2.17 CERCO PERIMETRICO - -
-
1.1.2.17.1 EXCAVACIÓN DE HOYOS PARA CERCO 0.40X0.40X0.50M und - -
-
1.1.2.17.2 CONCRETO F'C= 140 KG/CM2 SIN MEZCLADORA m³ - -
-
CERCO DE ALAMBRE DE PUAS (SUMINISTRO Y COLOCACION ALAMBRE Y
1.1.2.17.3 m - -
POSTES MADERA, HILADAS DE ALAMBRE @ 0.30M C/U) -
1.1.3 LINEA DE CONDUCCION (L= 2732.72 m, PVC SAP) - -
-
1.1.3.1 TRABAJOS PRELIMINARES - -
-
1.1.3.1.1 LIMPIEZA MANUAL DE TERRENO NORMAL m² 1,639.66 100.00%
2,262.73
1.1.5.4.1 SUM. Y COLOC. DE ACCESORIOS VALVULA DE PURGA 2" und 9.00 100.00%
968.76
1.1.5.4.2 SUM. Y COLOC. DE ACCESORIOS VALVULA DE PURGA 3" und 3.00 100.00%
377.07
1.1.5.4.3 ESCALERA PARA TUBO GALVANIZADO 1-1/2" x 2mm PASO DE 3/4" x 2" mm und 2.00 100.00%
1,085.90
1.1.5.4.4 INSTALACION DE ACCESORIOS PARA RESERVORIO und 1.00 100.00%
454.17
1.1.5.5 PRUEBA HIDRAULICA Y DESINFECCIÓN m³ 180.00 100.00%
104.40
1.1.5.6 CERCO PERIMETRICO - -
-
1.1.5.6.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³ 111.00 100.00%
3,253.41
1.1.5.6.2 SOBRECIMIENTO - ENCOFRADO Y DESENCOFRADO m² 222.00 100.00%
4,604.28
SOBRECIMIENTO DE 0.25m DE ANCHO MEZCLA C:H 1:8+25% PM (MÁX.6")
1.1.5.6.3 m³ 19.43 100.00%
MANUAL 4,179.20
1.1.5.6.4 CERCO PERIMETRICO DE MALLA METALICA DE H= 2.00 M m 111.00 100.00%
23,988.21
1.1.5.6.5 PUERTA METALICA DE INGRESO CERCO und 3.00 100.00%
1,578.90
1.1.6 LINEA DE ADUCCION (L= 347.35 m, PVC SAP) - -
-
1.1.6.1 TRABAJOS PRELIMINARES - -
-
1.1.6.1.1 LIMPIEZA MANUAL DE TERRENO NORMAL m² 162.00 77.73%
223.56
1.1.6.1.2 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m² 162.00 77.73%
84.24
1.1.6.2 MOVIMIENTO DE TIERRAS - -
-
EXCAVACIÓN DE ZANJA PARA TUBERÍAS APROM=0.60 HMÁX<= 1.00M EN
1.1.6.2.1 m 120.00 71.97%
TERRENO NORMAL MANUAL 2,461.20
1.1.6.2.2 NIVELACION, REFINE Y COMPACTACION PISON MANUAL m² 90.00 25.91%
228.60
1.1.6.2.3 RELLENO CON MATERIAL PROPIO CON COMPACTACION CON PISON m³ 45.80 25.12%
793.26
1.1.6.2.4 ELIMINACION MATERIAL MANUAL D<30M m³ 2.00 25.58%
33.22
CAMA DE APOYO E= 0.10 M PARA TUBO CON MATERIAL PROPIO
1.1.6.2.5 m 90.00 25.91%
SARANDEADO 211.50
1.1.6.3 SUMINISTRO E INSTALACIÓN DE TUBERÍA DE PVC Ø 1" C-10 m 90.00 25.91%
479.70
1.1.6.4 PRUEBA HIDRAULICA Y DESINFECCIÓN DE TUBERÍA DE AGUA POTABLE m 90.00 25.91%
52.20
1.1.7 VALVULAS DE AIRE (03 UND), CONSTRUCCIÓN - -
-
1.1.7.1 TRABAJOS PRELIMINARES - -
-
1.1.7.1.1 LIMPIEZA MANUAL DE TERRENO NORMAL m² - -
-
1.1.7.1.2 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m² - -
-
1.1.7.2 MOVIMIENTO DE TIERRAS - -
-
1.1.7.2.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³ - -
-
1.1.7.2.2 ELIMINACION MATERIAL MANUAL D<30M m³ - -
-
1.1.7.3 TRANSPORTE DE MATERIALES Y AGREGADOS - -
-
1.1.7.3.1 ACARREO DE CEMENTO EN PENDIENTE PRONUNCIADA D > 100M und - -
-
1.1.7.3.2 ACARREO DE AGREGADOS D>100M m³ - -
-
1.1.7.4 ENCOFRADO Y DESENCOFRADO m² - -
-
1.1.7.5 CONCRETO F'C= 175 KG/CM2 CON MEZCLADORA m³ - -
-
1.1.7.6 FILTRO DE GRAVA ZARANDEADA Ø 1"-1 1/2" m³ - -
INFORME FINAL DE LA OBRA: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE SANEAMIENTO BÁSICO EN LA
COMUNIDAD CAMPESINA DE QUIÑER DEL DISTRITO DE HUANCARANI, PROVINCIA DE PAUCARTAMBO, REGION
CUSCO”.
MUNICIPALIDAD DISTRITAL DE
HUANCARANI
“Año del Fortalecimiento de la Soberanía Nacional”
-
1.1.7.7 TARRAJEO EN INTERIOR C:A 1:5 E=1.5CM m² - -
-
1.1.7.8 VÁLVULA DE AIRE DE 1" und - -
-
1.1.8 VALVULAS DE PURGA (5 UND), CONSTRUCCIÓN - -
-
1.1.8.1 TRABAJOS PRELIMINARES - -
-
1.1.8.1.1 LIMPIEZA MANUAL DE TERRENO NORMAL m² - -
-
1.1.8.1.2 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m² - -
-
1.1.8.2 MOVIMIENTO DE TIERRAS - -
-
1.1.8.2.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³ - -
-
1.1.8.2.2 ELIMINACION MATERIAL MANUAL D<30M m³ - -
-
1.1.8.3 TRANSPORTE DE MATERIALES Y AGREGADOS - -
-
1.1.8.3.1 ACARREO DE CEMENTO EN PENDIENTE PRONUNCIADA D > 100M und - -
-
1.1.8.3.2 ACARREO DE AGREGADOS D>100M m³ - -
-
1.1.8.4 ENCOFRADO Y DESENCOFRADO m² - -
-
1.1.8.5 CONCRETO F'C= 175 KG/CM2 CON MEZCLADORA m³ - -
-
1.1.8.6 ACERO DE REFUERZO FY = 4200 KG/CM2 kg - -
-
1.1.8.7 TARRAJEO EN INTERIOR - EXTERIOR C:A 1:5 E=1.5CM m² - -
-
1.1.8.8 SUM. Y COLOC. DE ACCESORIOS VALVULA DE PURGA 1" und - -
-
1.1.9 VALVULAS DE CONTROL (23 UND), CONSTRUCCIÓN - -
-
1.1.9.1 TRABAJOS PRELIMINARES - -
-
1.1.9.1.1 LIMPIEZA MANUAL DE TERRENO NORMAL m² 0.49 4.37%
0.68
1.1.9.1.2 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m² 0.49 4.27%
0.25
1.1.9.2 MOVIMIENTO DE TIERRAS - -
-
1.1.9.2.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³ 0.29 3.84%
8.62
1.1.9.2.2 ELIMINACION MATERIAL MANUAL D<30M m³ 0.34 3.61%
5.70
1.1.9.3 TRANSPORTE DE MATERIALES Y AGREGADOS - -
-
1.1.9.3.1 ACARREO DE CEMENTO EN PENDIENTE PRONUNCIADA D > 100M und 3.00 10.34%
5.85
1.1.9.3.2 ACARREO DE AGREGADOS D>100M m³ 0.40 9.30%
15.60
1.1.9.4 ENCOFRADO Y DESENCOFRADO m² 5.04 10.96%
108.96
1.1.9.5 CONCRETO F'C= 175 KG/CM2 CON MEZCLADORA m³ 0.22 7.24%
83.42
1.1.9.6 FILTRO DE GRAVA ZARANDEADA Ø 1"-1 1/2" m³ 0.05 23.83%
5.64
1.1.9.7 TARRAJEO EN INTERIOR - EXTERIOR C:A 1:5 E=1.5CM m² 1.80 8.43%
23.36
1.1.9.8 SUM. Y COLOC. DE ACCESORIOS VALVULA DE CONTROL 1" und 2.00 8.70%
162.90
1.1.10 RED DE DISTRIBUCION(L=4641M, PVC SAP) - -
-
1.1.10.1 TRABAJOS PRELIMINARES - -
-
1.2.1.5 MUROS DE BLOQUETA CºSº 0.40x0.20x0.15 m C/MEZ. 1:5, E=1.5cm m² 2,177.28 100.00%
80,624.68
1.2.1.6 TARRAJEO EN MUROS MORTERO - INTERIOR C:A 1:5 E=1.5CM m² 946.08 100.00%
11,996.29
1.2.1.7 COBERTURAS - -
-
1.2.1.7.1 COBERTURA DE TECHO CON TEJA ANDINA und 128.00 88.89%
52,551.68
1.2.1.7.2 ESTRUCTURA DE MADERA LISTONES - TECHO und 128.00 88.89%
19,550.72
1.2.1.8 PISO LOSETA DE 0.20X0.20M m² 447.12 100.00%
18,966.83
1.2.1.9 ZOCALO DE PORCELANATO DE O.20X0.20m m² 723.46 100.00%
22,369.38
1.2.1.10 CONTRAZÓCALO DE MAYÓLICA DE H=0.20M m 308.16 100.00%
3,509.94
1.2.1.11 PUERTA DE MADERA TORNILLO PRE-FABRICADA und 144.00 100.00%
40,481.28
1.2.1.12 FALSO PISO - MEZCLA C:H 1:8 E=4" PREPARACION MANUAL m² 447.12 100.00%
12,604.31
1.2.1.13 VEREDA DE CONCRETO DE 4" m² 224.64 100.00%
3,879.53
1.2.1.14 INSTALACIÓN SANITARIA - -
-
SUMINISTRO E INSTALACION DE APARATOS SANITARIOS
1.2.1.14.1 und 144.00 100.00%
INCL/ACCESORIOS 60,554.88
1.2.1.14.2 SUMINISTRO E INSTALACION DE ACCESORIOS PARA AGUA FRIA und 144.00 100.00%
7,521.12
1.2.1.14.3 SUMINISTRO E INSTALACION DE ACCESORIOS PARA DESAGUE und 144.00 100.00%
21,326.40
1.2.2 SUMINISTRO E INSTALACION DE TUBERIAS (16 UND) - -
-
1.2.2.1 TRABAJOS PRELIMINARES - -
-
1.2.2.1.1 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m² 48.00 100.00%
24.96
1.2.2.2 MOVIMIENTO DE TIERRAS - -
-
EXCAVACIÓN DE ZANJA PARA TUBERÍAS APROM=0.60 HMÁX<= 1.00M EN
1.2.2.2.1 m 38.40 100.00%
TERRENO NORMAL MANUAL 787.58
1.2.2.2.2 NIVELACION, REFINE Y COMPACTACION PISON MANUAL m² 80.00 100.00%
203.20
CAMA DE APOYO E= 0.10 M PARA TUBO CON MATERIAL PROPIO
1.2.2.2.3 m 80.00 100.00%
SARANDEADO 188.00
1.2.2.2.4 RELLENO CON MATERIAL PROPIO CON COMPACTACION CON PISON m³ 30.00 100.00%
519.60
1.2.2.2.5 ELIMINACION MATERIAL MANUAL D<30M m³ 8.64 100.00%
143.51
1.2.2.3 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC SAL DE 4" m 24.00 100.00%
279.60
SUMINISTRO E INSTALACIÓN DE TUBERÍA DE PVC-U UF ISO 4422 C 7.5 DN
1.2.2.4 m 64.80 100.00%
63 MM PARA AGUA INC. ANILLO 399.17
1.2.2.5 PRUEBA HIDRÁULICA-ESCORRENTIA TUB. ZANJA TAPADA m 88.00 100.00%
75.68
1.2.3 CAJA DE REGISTRO 12"x24" (16 UND) - -
-
1.2.3.1 TRABAJOS PRELIMINARES - -
-
1.2.3.1.1 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m² 2.88 100.00%
1.50
1.2.3.2 MOVIMIENTO DE TIERRAS - -
-
1.2.3.2.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³ 1.73 100.00%
50.71
1.2.3.3 CONCRETO F'C= 140 KG/CM2 SIN MEZCLADORA m³ 0.99 100.00%
374.00
SUMINISTRO E INSTALACIÓN DE CAJA DE CONCRETO PARA DESAGÜE
1.2.3.4 und 11.00 68.75%
12"X24" INCLUYE MARCO Y TAPA C.A. 1,019.37
1.2.4 BIODIGESTOR (16 UND) - -
-
INFORME FINAL DE LA OBRA: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE SANEAMIENTO BÁSICO EN LA
COMUNIDAD CAMPESINA DE QUIÑER DEL DISTRITO DE HUANCARANI, PROVINCIA DE PAUCARTAMBO, REGION
CUSCO”.
MUNICIPALIDAD DISTRITAL DE
HUANCARANI
“Año del Fortalecimiento de la Soberanía Nacional”
VA LORIZACION A CUMULADA
ITEM DESCRIPCION UND
Metrad Costo %
1. 2 . 1 C O N S TR U C C ION D E S S . HH. ( 15 0 U N D )
1. 2 . 1. 15 C O N C R ETO A R M A D O
1.2 .1.15.1 ACERO EN COLUM NETA FY = 4 2 0 0 KG/ CM 2 kg 2 ,556 .8 2 15,4 17.6 2 10 0
1.2 .1.15.2 ACERO DE REFUERZO FY = 4 2 0 0 KG/ CM 2 - VIGA COLLARIN kg 2 ,6 2 6 .8 9 15,8 4 0 .15 10 0
1.2 .1.15.3 ENCOFRADO Y DESENCOFRADO DE COLUM NETAS M2. 72 5.76 14 ,515.2 0 10 0
1.2 .1.15.4 ENCOFRADO Y DESENCOFRADO - VIGA COLLARIN m² 4 14 .72 8 ,2 9 4 .4 0 10 0
1.2 .1.15.5 ENCOFRADO Y DESENCOFRADO TECHO TIPO LOSA M2. 73 .6 1 1,6 13 .53 10 0
1.2 .1.15.6 CONCRETO F'C= 2 10 KG/ CM 2 - COLUM NETAS m³ 2 4 .6 8 10 ,4 6 2 .10 10 0
1.2 .1.15.7 CONCRETO F'C= 2 10 KG/ CM 2 - VIGAS COLLARIN m³ 2 4 .8 8 10 ,2 3 9 .6 1 10 0
1.2 .1.15.8 CONCRETO F'C= 2 10 KG/ CM 2 - TECHO TIPO LOSA m³ 9 .6 5 3 ,9 18 .19 10 0
1.2 .1.15.9 CURADO DE CONCRETO M2. 2 ,50 2 .72 1,3 0 1.4 1 10 0
1. 2 . 1. 16 A R QU ITEC TU R A - -
1.2 .1.16 .1. FIBROCEM ENTO SUPERBOARD m² 4 79 .17 4 3 ,772 .18 10 0
1.2 .1.16 .2 . PINTURA DERRRAM E EN VENTANA m 3 0 5.2 8 1,9 11.0 5 10 0
1.2 .1.16 .3 . PINTURA DERRAM E EN PUERTA m 648 4 ,0 56 .4 8 10 0
1.2 .1.16 .4 . PINTURA LATEX INTERIOR 2 M ANOS m² 52 6 .9 4 ,13 0 .9 0 10 0
1.2 .1.16 .5. PINTURA LATEX EXTERIOR 2 M ANOS m² 3 8 6 .9 3 3 ,0 3 3 .53 10 0
1.2 .1.16 .6 . VENTANA DE VIDRIO TEM PLADO 4 M M (INCLUYE M ARCO DE ALUM
m² INIO
3 4Y.56
ACCESORIOS)
3 ,4 74 .3 2 10 0
1.2 .1.16 .7. VESTIDUR A DE DERRAM ES A=15 C:A 1:5 E=1.5CM m 9 3 0 .2 4 7,19 0 .76 10 0
1. 2 . 1. 17 IN S TA LA C IO N ES ELEC TR IC A S - -
1.2 .1.17.4 .1 SALIDA DE TECHO PARA CENTRO DE LUZ p to 14 4 2 ,18 1.6 0 10 0
1.2 .1.17.4 .2 SALIDA PARA INTERRUPTOR SIM PLE p to 14 4 2 ,4 2 7.8 4 10 0
1.2 .1.17.4 .3 SALIDA PARA DUC HA ELECTRICA und 14 4 6 3 9 .3 6 10 0
1.2 .1.17.4 .4 INTERRUPTOR TERM OM AGNETICO DE 2 0 A und 14 4 6 ,3 8 7.8 4 10 0
1.2 .1.17.4 .5 ALIM ENTADOR 2 X1 X 2 .5M M N° 12 p to 14 4 3 ,8 72 .16 10 0
C O S TO D IR EC TO S / 16 4 , 6 8 0 . 2 3 10 0 . 0 0 %
NOTA: Se tiene una aprobacion de mayores metrados por un monto total de S/.164,680.23
soles, los cuales se ejecuto a un monto de S/.164,680.23 soles a un porcentaje de 100.00%
teniendo un saldo de S/.00.00 soles.
C.- AVANCE FISICO PARTIDAS NUEVAS
Cuadro N° 04
Valorización Acumulada
Item DESCRIPCION Und
Metrado Costo %
1.2.1.2 MOVIMIENTO DE TIERRAS - - -
1.2.1.2.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³ 42.15 1,235.42 100.00
1.2.1.2.3 ELIMINACION MATERIAL MANUAL D<30M m³ 21.63 359.27 100.00
1.2.1.4 CONCRETO SIMPLE - - -
1.2.1.4.1 CONCRETO CIMIENTO CORRIDO1:6 MEZCLA C:H INC. PREPARACIÓN MANUAL m³ 42.78 14,158.47 100.00
1.2.1.4.3 SOBRECIMIENTO - ENCOFRADO Y DESENCOFRADO m² 74.00 1,647.24 100.00
1.2.1.6 TARRAJEO EN MUROS MORTERO - INTERIOR C:A 1:5 E=1.5CM M2. 2,058.21 30,255.69 100.00
1.1.3 LINEA DE CONDUCCION (L= 2732.72 m, PVC SAP) - - -
1.1.3.2.2 EXCAVACIÓN DE ZANJA PARA TUBERÍAS APROM=0.60 HMÁX<= 1.00M EN TERRENO m³ - - -
NORMAL MANUAL
4.0 4 100.
1.1.2.14 FILTRO DE GRAVA ZARANDEADA Ø 1"-1 1/2" m³
2 53.09 00
4.0 4 100.
1.1.2.15 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.60X3/16" und
0 31.76 00
4.0 100.
1.1.2.16 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.40X0.40X1/8" und
0 311.76 00
1.1.2.17 CERCO PERIMETRICO
- - -
20.0 100.
1.1.2.17.1 EXCAVACIÓN DE HOYOS PARA CERCO 0.40X0.40X0.50M und
0 58.80 00
5.4 2,0 100.
1.1.2.17.2 CONCRETO F'C= 140 KG/CM2 SIN MEZCLADORA m³
9 74.01 00
CERCO DE ALAMBRE DE PUAS (SUMINISTRO Y COLOCACION ALAMBRE Y POSTES MADERA, 72.0 2,00 100.
1.1.2.17.3 m
HILADAS DE ALAMBRE @ 0.30M C/U) 0 0.88 00
1.1.3 LINEA DE CONDUCCION (L= 2732.72 m, PVC SAP)
- - -
1.1.3.1 TRABAJOS PRELIMINARES
- - -
1.1.3.2 MOVIMIENTO DE TIERRAS
- - -
719.6 43.
1.1.3.2.3 NIVELACION, REFINE Y COMPACTACION COMPACTADORA 5.8 HP m2
6 957.15 89
1,152. 2,8 42
1.1.3.2.4 CAMA DE APOYO E= 0.10 M PARA TUBO CON MATERIAL PROPIO SARANDEADO m
76 01.21 .18
531. 9,20 37.
1.1.3.2.5 RELLENO CON MATERIAL PROPIO CON COMPACTACION CON PISON m³
70 9.04 06
165.6 1, 40.
1.1.3.3 SUMINISTRO E INSTALACIÓN DE TUBERÍA DE PVC Ø 2" C-10 m
8 525.91 34
940.4 5 34.
1.1.3.7 PRUEBA HIDRAULICA Y DESINFECCIÓN DE TUBERÍA DE AGUA POTABLE m
8 45.48 42
1.1.4 CAMARA ROMPE PRESION T-7 (05 UND), CONSTRUCCIÓN
- - -
1.1.4.1 TRABAJOS PRELIMINARES
- - -
2.8 42
1.1.4.1.1 LIMPIEZA MANUAL DE TERRENO NORMAL m²
5 3.93 .17
2.8 42
1.1.4.1.2 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m²
5 1.48 .17
1.1.4.2 MOVIMIENTO DE TIERRAS
- - -
2.0 35.
1.1.4.2.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³
4 59.65 46
2.7 38.
1.1.4.2.2 ELIMINACION MATERIAL MANUAL D<30M m³
3 45.41 08
1.1.4.3 TRANSPORTE DE MATERIALES Y AGREGADOS
- - -
18.0 54
1.1.4.3.1 ACARREO DE CEMENTO EN PENDIENTE PRONUNCIADA D > 100M und
0 35.10 .55
2.8 58
1.1.4.3.2 ACARREO DE AGREGADOS D>100M m³
5 111.15 .76
22.9 49 60.
1.1.4.4 ENCOFRADO Y DESENCOFRADO m²
5 6.20 00
4.2 60.
1.1.4.5 SOLADO E=2" MEZCLA 1:10 C:H PREPARACION MANUAL m²
0 70.08 06
1. 7 60.
1.1.4.6 CONCRETO F'C= 175 KG/CM2 CON MEZCLADORA m³
92 28.01 00
30.5 60
1.1.4.7 ACERO DE REFUERZO FY = 4200 KG/CM2 kg
3 171.88 .01
9.9 60.
1.1.4.8 TARRAJEO CON ADITIVO IMPERMEABILIZANTE MORTERO C:A 1:5 E=1.5CM m²
6 161.85 00
13.2 2 60.
1.1.4.9 TARRAJEO DE MUROS EXTERIORES C:A 1:5 E=1.5CM (ANDAMIO METALICO) m²
6 57.24 00
13.2 1 60.
1.1.4.10 PINTURA ESMALTE DOS MANOS EN MUROS EXTERIORES m²
6 02.76 00
3.0 1,3 60.
1.1.4.11 INSTALACION DE ACCESORIOS DE 3/4" PARA CAMARA ROMPE PRESION CRP-07 und
0 65.12 00
1.1.6 LINEA DE ADUCCION (L= 347.35 m, PVC SAP)
- - -
1.1.6.1 TRABAJOS PRELIMINARES
- -
INFORME FINAL DE LA OBRA: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE SANEAMIENTO BÁSICO EN LA
COMUNIDAD CAMPESINA DE QUIÑER DEL DISTRITO DE HUANCARANI, PROVINCIA DE PAUCARTAMBO, REGION
CUSCO”.
MUNICIPALIDAD DISTRITAL DE
HUANCARANI
“Año del Fortalecimiento de la Soberanía Nacional”
-
46.4 22.
1.1.6.1.1 LIMPIEZA MANUAL DE TERRENO NORMAL m²
1 64.05 27
46.4 22.
1.1.6.1.2 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m²
1 24.13 27
1.1.6.2 MOVIMIENTO DE TIERRAS
- - -
EXCAVACIÓN DE ZANJA PARA TUBERÍAS APROM=0.60 HMÁX<= 1.00M EN TERRENO NORMAL 46.7 9 28.
1.1.6.2.1 m
MANUAL 3 58.43 03
257.3 6 74.
1.1.6.2.2 NIVELACION, REFINE Y COMPACTACION PISON MANUAL m²
5 53.67 09
136.5 2,36 74.
1.1.6.2.3 RELLENO CON MATERIAL PROPIO CON COMPACTACION CON PISON m³
6 5.22 88
5.8 74.
1.1.6.2.4 ELIMINACION MATERIAL MANUAL D<30M m³
2 96.67 42
257.3 6 74.
1.1.6.2.5 CAMA DE APOYO E= 0.10 M PARA TUBO CON MATERIAL PROPIO SARANDEADO m
5 04.77 09
257.3 1,3 74.
1.1.6.3 SUMINISTRO E INSTALACIÓN DE TUBERÍA DE PVC Ø 1" C-10 m
5 71.68 09
257.3 1 74.
1.1.6.4 PRUEBA HIDRAULICA Y DESINFECCIÓN DE TUBERÍA DE AGUA POTABLE m
5 49.26 09
1.1.7 VALVULAS DE AIRE (03 UND), CONSTRUCCIÓN
- - -
1.1.7.1 TRABAJOS PRELIMINARES
- - -
1. 100.
1.1.7.1.1 LIMPIEZA MANUAL DE TERRENO NORMAL m²
47 2.03 00
1. 100.
1.1.7.1.2 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m²
47 0.76 00
1.1.7.2 MOVIMIENTO DE TIERRAS
- - -
0.8 100.
1.1.7.2.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³
8 25.79 00
1. 100.
1.1.7.2.2 ELIMINACION MATERIAL MANUAL D<30M m³
10 18.27 00
1.1.7.3 TRANSPORTE DE MATERIALES Y AGREGADOS
- - -
6.0 100.
1.1.7.3.1 ACARREO DE CEMENTO EN PENDIENTE PRONUNCIADA D > 100M und
0 11.70 00
1. 100.
1.1.7.3.2 ACARREO DE AGREGADOS D>100M m³
00 39.00 00
6.0 1 100.
1.1.7.4 ENCOFRADO Y DESENCOFRADO m²
0 29.72 00
0.5 2 100.
1.1.7.5 CONCRETO F'C= 175 KG/CM2 CON MEZCLADORA m³
6 12.34 00
0.0 100.
1.1.7.6 FILTRO DE GRAVA ZARANDEADA Ø 1"-1 1/2" m³
3 3.38 00
2.4 100.
1.1.7.7 TARRAJEO EN INTERIOR C:A 1:5 E=1.5CM m²
0 31.15 00
3.0 6 100.
1.1.7.8 VÁLVULA DE AIRE DE 1" und
0 10.53 00
1.1.8 VALVULAS DE PURGA (5 UND), CONSTRUCCIÓN
- - -
1.1.8.1 TRABAJOS PRELIMINARES
- - -
2.4 100.
1.1.8.1.1 LIMPIEZA MANUAL DE TERRENO NORMAL m²
5 3.38 00
2.4 100.
1.1.8.1.2 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m²
5 1.27 00
1.1.8.2 MOVIMIENTO DE TIERRAS
- - -
1. 100.
1.1.8.2.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³
96 57.45 00
2.4 100.
1.1.8.2.2 ELIMINACION MATERIAL MANUAL D<30M m³
5 40.69 00
1.1.8.3 TRANSPORTE DE MATERIALES Y AGREGADOS
- - -
12.0 100.
1.1.8.3.1 ACARREO DE CEMENTO EN PENDIENTE PRONUNCIADA D > 100M und
0 23.40 00
1.1.8.3.2 ACARREO DE AGREGADOS D>100M m³ 1. 100.
INFORME FINAL DE LA OBRA: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE SANEAMIENTO BÁSICO EN LA
COMUNIDAD CAMPESINA DE QUIÑER DEL DISTRITO DE HUANCARANI, PROVINCIA DE PAUCARTAMBO, REGION
CUSCO”.
MUNICIPALIDAD DISTRITAL DE
HUANCARANI
“Año del Fortalecimiento de la Soberanía Nacional”
90 74.10 00
14.4 3 100.
1.1.8.4 ENCOFRADO Y DESENCOFRADO m²
0 11.33 00
1. 46 100.
1.1.8.5 CONCRETO F'C= 175 KG/CM2 CON MEZCLADORA m³
23 6.38 00
77. 4 100.
1.1.8.6 ACERO DE REFUERZO FY = 4200 KG/CM2 kg
72 37.56 00
7.6 100.
1.1.8.7 TARRAJEO EN INTERIOR - EXTERIOR C:A 1:5 E=1.5CM m²
0 98.65 00
5.0 5 100.
1.1.8.8 SUM. Y COLOC. DE ACCESORIOS VALVULA DE PURGA 1" und
0 50.10 00
1.1.9 VALVULAS DE CONTROL (23 UND), CONSTRUCCIÓN
- - -
1.1.9.1 TRABAJOS PRELIMINARES
- - -
10. 95.
1.1.9.1.1 LIMPIEZA MANUAL DE TERRENO NORMAL m²
78 14.88 69
10. 95
1.1.9.1.2 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m²
78 5.61 .73
1.1.9.2 MOVIMIENTO DE TIERRAS
- - -
7. 2 96
1.1.9.2.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³
37 15.90 .16
9. 1 96.
1.1.9.2.2 ELIMINACION MATERIAL MANUAL D<30M m³
17 52.26 39
1.1.9.3 TRANSPORTE DE MATERIALES Y AGREGADOS
- - -
26.0 89.
1.1.9.3.1 ACARREO DE CEMENTO EN PENDIENTE PRONUNCIADA D > 100M und
0 50.70 66
3.9 90.
1.1.9.3.2 ACARREO DE AGREGADOS D>100M m³
0 152.10 70
40.9 8 89.
1.1.9.4 ENCOFRADO Y DESENCOFRADO m²
6 85.56 04
2.8 1,0 92.
1.1.9.5 CONCRETO F'C= 175 KG/CM2 CON MEZCLADORA m³
2 69.26 76
0. 7
1.1.9.6 FILTRO DE GRAVA ZARANDEADA Ø 1"-1 1/2" m³
16 18.03 6.17
19. 2 9
1.1.9.7 TARRAJEO EN INTERIOR - EXTERIOR C:A 1:5 E=1.5CM m²
54 53.63 1.57
21.0 1, 91
1.1.9.8 SUM. Y COLOC. DE ACCESORIOS VALVULA DE CONTROL 1" und
0 710.45 .30
1.1.10 RED DE DISTRIBUCION(L=4641M, PVC SAP)
- - -
1.1.10.1 TRABAJOS PRELIMINARES
- - -
1,380.7 1,9 39.
1.1.10.1.1 LIMPIEZA MANUAL DE TERRENO NORMAL m²
5 05.44 67
1,380.7 7 39.
1.1.10.1.2 TRAZO, NIVELACION Y REPLANTEO CON EQUIPO (ESTACION) m²
5 17.99 67
1.1.10.2 MOVIMIENTO DE TIERRAS
- - -
1,124.6 4,1 40.
1.1.10.2.1 EXCAVACION PARA ZANJA CON RETROEXCAVADORA. m
0 27.28 39
1,426.7 3,62 40.
1.1.10.2.2 NIVELACION, REFINE Y COMPACTACION PISON MANUAL m²
5 3.95 99
2,331.2 5,4 40
1.1.10.2.3 CAMA DE APOYO E= 0.10 M PARA TUBO CON MATERIAL PROPIO SARANDEADO m
5 78.44 .19
976.5 16,9 40.
1.1.10.2.4 RELLENO CON MATERIAL PROPIO CON COMPACTACION CON PISON m³
3 13.50 08
1,930.2 16,6 41
1.1.10.2.5 ELIMINACION MATERIAL MANUAL D<30M m³
3 77.19 .59
921.8 4,9 38.
1.1.10.3 SUMINISTRO E INSTALACIÓN DE TUBERÍA DE PVC Ø 1" C-10 m
6 13.51 22
2,229.1 19,1 100.
1.1.10.4 SUMINISTRO E INSTALACIÓN DE TUBERÍA DE PVC Ø 1 1/2" C-10 m
4 92.90 00
1,912. 1,1 45
1.1.10.5 PRUEBA HIDRAULICA Y DESINFECCIÓN DE TUBERÍA DE AGUA POTABLE m
16 09.05 .50
1.1.14 ENSAYOS
- - -
1.1.14.1 RESISTENCIA A LA COMPRESIÓN DEL CONCRETO und 8.0 3 100.
0 72.96 00
ADECUADAS CONDICIONES DEL SISTEMA DE ELIMINACION DE EXCRETAS Y TRATAMIENTO DE
1.2
AGUAS RESIDUALES - - -
1.2.1.7 COBERTURAS
- - -
16.0 6,56
1.2.1.7.1 COBERTURA DE TECHO CON TEJA ANDINA und
0 8.96 11.11
16.0 2,44
1.2.1.7.2 ESTRUCTURA DE MADERA LISTONES - TECHO und
0 3.84 11.11
1.2.3 CAJA DE REGISTRO 12"x24" (16 UND)
- - -
1.2.3.2 MOVIMIENTO DE TIERRAS
- - -
SUMINISTRO E INSTALACIÓN DE CAJA DE CONCRETO PARA DESAGÜE 12"X24" INCLUYE 5.0 4 31
1.2.3.4 und
MARCO Y TAPA C.A. 0 63.35 .25
1.2.4 BIODIGESTOR (16 UND)
- - -
1.2.4.2 MOVIMIENTO DE TIERRAS
- - -
26. 31
1.2.4.2.1 EXCAVACION PARA ZANJA CON RETROEXCAVADORA. m³
51 97.29 .25
11. 1 31
1.2.4.2.2 RELLENO CON MATERIAL PROPIO CON COMPACTACION CON PISON m³
36 96.74 .25
11. 1 31
1.2.4.2.3 ELIMINACION MATERIAL MANUAL D<30M m³
98 99.06 .25
1.2.4.3 CONCRETO SIMPLE
- - -
2.4 31
1.2.4.3.1 SOLADO E=2" MEZCLA 1:10 C:H PREPARACION MANUAL m²
5 40.84 .25
5.0 5,66 31
1.2.4.4 SUMINISTRO E INSTALACION DE TANQUE BIODIGESTOR DE 600 LIT (INC. ACCESORIOS) und
0 9.40 .25
1.2.5 POZO DE LODOS (16 UND)
- - -
1.2.5.2 TRANSPORTE DE MATERIALES Y AGREGADOS
- - -
13.0 29
1.2.5.2.1 ACARREO DE CEMENTO EN PENDIENTE PRONUNCIADA D > 100M und
0 25.35 .55
1. 31
1.2.5.2.2 ACARREO DE AGREGADOS D>100M m³
88 73.13 .25
1.2.5.3 MOVIMIENTO DE TIERRAS
- - -
3.3 3
1.2.5.3.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³
5 98.19 1.16
4.4 33.
1.2.5.3.2 ELIMINACION MATERIAL MANUAL D<30M m³
4 73.75 04
17. 3 31
1.2.5.4 ENCOFRADO Y DESENCOFRADO m²
92 87.43 .82
2.0 6 30
1.2.5.5 CONCRETO F'C= 175 KG/CM2 C/MEZCLADORA m³
5 97.97 .81
5.0 4 31
1.2.5.6 SUMINISTRO E INSTALACION DE ACCESORIOS - POZO DE LODOS und
0 77.40 .25
1.2.6 POZO DE PERCOLACION (16 UND)
- - -
1.2.6.2 MOVIMIENTO DE TIERRAS
- - -
9. 29 3
1.2.6.2.1 EXCAVACIÓN MANUAL DE TERRENO SUELTO m³
91 0.46 0.11
13. 2 31
1.2.6.2.2 ELIMINACION MATERIAL MANUAL D<30M m³
14 18.26 .94
7.2 7 31
1.2.6.3 GRAVA PARA LECHO FILTRANTE m³
6 41.83 .25
5.0 1,7 31
1.2.6.4 SUMINISTRO Y COLOCACION MADERA ROLLIZA Ø 4" und
0 08.65 .25
5.0 1 31
1.2.6.5 SUMINISTRO E INSTALACION DE ACCESORIOS - POZO DE PERCOLACION und
0 63.05 .25
SUFICIENTE, CONOCIMIENTO DE GESTION Y ORGANIZACION Y EDUCACION SANITARIA DE LA
1.3
POBLACION - - -
1.3.2 MITIGACION DE IMPACTO AMBIENTAL
- - -
8.0 48 100.
1.3.2.1 LETREROS INFORMATIVOS Y DE REGLAMENTACION und
0 0.00 00
8.0 1,6 100.
1.3.2.2 SEÑALES PREVENTIVAS und
0 00.00 00
1,978.0 5,7 100.
1.3.2.4 SEMBRADO DE CESPED m²
0 55.98 00
4.0 43 100.
1.3.2.5 CONTENEDORES DE RESIDUOS SOLIDOS und
0 6.48 00
14.48
COSTO DIRECTO 152,909.25
%
104 RODOPLAS PVC PARA CERAMICO DE 10 MMDE 2.4M DE LONG. 625 UND 7.41 74.00 548.34
105 CACHIMBA DE 4- 6 656 UND 25.50 15.00 382.50
106 CACHIMBA DE 8 - 4 656 UND 42.00 3.00 126.00
107 UNION DE 1/2 MIXTO 656 UND 3.60 19.00 68.40
108 TUBERIA DE VENTILACION DE 2" 656 UND 95.00 25.00 2,375.00
109 VALVULA DE 2 1/2 656 UND 460.00 1.00 460.00
110 CODO DE 2" X 45° DE AGUA POTABLE 656 UND 12.00 1.00 12.00
111 CURVA DE 3/4" 737 UND 1.40 3.00 4.20
112 TAPON DE 2" 737 UND 4.20 1.00 4.20
113 CODO DE 4" X 90° 737 UND 12.80 8.00 102.40
114 TEE PVC A PRESION DE 2" 737 UND 23.00 1.00 23.00
115 CODO PVC DE 2" X 90° 737 UND 16.80 6.00 100.80
116 TUBOS PVC SAL 2" X 3M 781 UND 21.90 22.00 481.80
117 SILICONA TRANSPARENTE 781 UND 25.00 3.00 75.00
118 CODO PVC SAL DE 2 " X 90° 781 UND 3.20 15.00 48.00
119 GRIFO DE 1/2 781 UND 50.10 3.00 150.30
TOTAL 111,118.38
8.- CONCLUSIONES:
El avance físico TOTAL ACUMULADO APROBADO se tiene S/. 1,122,794.79 soles
equivalente a un porcentaje del 87.15% considerando mayores metrados, partidas
nuevas y deductivos al costo directo teniendo un SALDO ACUMULADO de S/.
165,481.03 equivalente a un porcentaje de 12.85% al COSTO DIRECTO
Se tiene avance fisico total de un monto acumulado de S/. 902,756.16 soles con
porcentaje equivalente de 85.52 % de las PARTIDAS PRINCIPALES con un saldo
total acumulado de S/ 152,909.25 soles equivalente a un porcentaje de 14.48% al
COSTO DIRECTO.
Se tiene avance fisico total de un monto acumulado de S/. 164,680.24 soles con
porcentaje equivalente de 100.00 % de las PARTIDAS NUEVAS , no teniendo un
saldo al COSTO DIRECTO.
Se tiene avance fisico total de un monto acumulado de S/. 55,358.39 soles con
porcentaje equivalente de 81.49 % de las PARTIDAS POR MAYORES
METRADOS con un saldo total acumulado de S/ 12,571.78 soles equivalente a un
porcentaje de 18.51% al COSTO DIRECTO.
Se tiene un avance FINANCIERO TOTAL ACUMULADO de S/. 1,621,670.72 soles
que equivale a un porcentaje de 92.33%. al COSTO TOTAL
Se tiene un SALDO DE MATERIALES que fueron internados a Almacen central por
un monto de S/. 111,118.38 que equivale a un porcentaje de 7.24% al COSTO
DIRECTO.
La falta de personal obrero y mano de obra calificada en la zona fue muy escasa por la
baja renumeracion a comparacion de las renumeraciones particulares, y ello afecto en la
programacion de los trabajos.
9.- RECOMENDACIONES:
Se recomienda realizar la liquidacion correspondiente de la obra.
La entidad debe realizar el tramite correspondiente para la entrega de elorgano que le
corresponde para su operación y mantenimiento.
Se recomienda que el expediente tecnico que elaboran los proyectista deben adjuntar
todos los los planos correspondientes (estructura detalles y calculo, arquitectura y
detalle, instalaciones sanitaria con todo los datelles hojas de calculo, y anexos) para su
ejecucion eficaz.
INFORME FINAL DE LA OBRA: “MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE SANEAMIENTO BÁSICO EN LA
COMUNIDAD CAMPESINA DE QUIÑER DEL DISTRITO DE HUANCARANI, PROVINCIA DE PAUCARTAMBO, REGION
CUSCO”.
MUNICIPALIDAD DISTRITAL DE
HUANCARANI
“Año del Fortalecimiento de la Soberanía Nacional”