Está en la página 1de 6

FECHA H.I H.

F DIFERENCIA UM CANT

18-12-21 9.874.00 9.878.30 4.30


19-12-21 9.878.30 9.879.60 1.30
20-12-21
21-12-21
22-12-21
23-12-21
24-12-21
25-12-21
26-12-21
27-12-21
28-12-21
29-12-21
30-12-21
31-12-21
01-01-22 9,879.60 9,881.30 1.70
02-01-22 9,881.30 9,887.10 5.80
03-01-22 9,887.10 9,893.80 6.70
04-01-22 9,893.80 9,900.80 7.00
05-01-22 9,900.80 9,909.10 8.30
06-01-22 9,909.10 9,910.60 1.50
07-01-22 9,910.60 9,919.70 9.10 m3
08-01-22 9,919.70 9,927.40 7.70
09-01-22 9,927.40 9,934.10 6.70 m3
10-01-22 9,934.10 9,942.00 7.90 m3
11-01-22 9,942.00 9,949.50 7.50 m3
12-01-22 9,949.50 9,955.60 6.10
13-01-22 9,955.60 9,962.90 7.30
14-01-22 9,962.90 9,966.50 3.60
15-01-22 9,966.50 9,974.10 7.60
16-01-22 9,974.10 9,978.30 4.20 m3
17-01-22 9,978.30 9,981.20 2.90
18-01-22 9,981.20 9,986.10 4.90
19-01-22 9,986.10 9,991.70 5.60 m3

20-01-22 9,991.70 9,996.80 5.10 3m

TOTAL 122.80
EXCAVACION RELLENO BERMA OBSERVACION

Conformacion de plataforma
Excavadora problemas de filtro
Excavadora problemas de filtro
Problemas de Covid
Problemas de Covid
Problemas de Covid
Problemas de Covid
Problemas de Covid
Problemas de Covid
Problemas de Covid
Problemas de Covid
Problemas de Covid
Problemas de Covid
Problemas de Covid

Se salió la cadena
Instalación de cadena
510.00

60.00
375.00
300.00

Llave de encendido no apaga

105.00 Conformación de berma con 07 volquetas de tierra


Excavacion de zanja (responsabilidad Cyprom)
Conformación de berma
45.00 45.00 Excavación y de material grueso
Excavadora problemas de flitro
60.00 x Conformaciòn de Berma

1,290.00 60.00 150.00


FECHA H.I H.F DIFERENCIA UM CANT

10-12-21
11-12-21
12-12-21 m3 4.74
13-12-21 m3 5.17
m3 13.20
14-12-21
15-12-21
16-12-21
17-12-21
18-12-21 9.874.00 9.878.30 4.30
19-12-21 9.878.30 9.879.60 1.30
20-12-21 0.00
21-12-21 0.00
22-12-21 0.00
23-12-21 0.00
24-12-21
25-12-21
26-12-21
27-12-21
28-12-21
29-12-21
30-12-21
31-12-21
01-01-22 9,879.60 9,881.30 1.70
02-01-22 9,881.30 9,887.10 5.80
03-01-22 9,887.10 9,893.80 6.70
04-01-22 9,893.80 9,900.80 7.00
05-01-22 0.00
06-01-22 9,909.10 9,910.60 1.50
07-01-22 9,910.60 9,919.70 9.10 VOL
08-01-22 9,919.70 9,927.40 7.70
09-01-22 9,927.40 9,934.10 6.70 m3
10-01-22 9,934.10 9,942.00 7.90 VOL
11-01-22 9,942.00 9,949.50 7.50 VOL
12-01-22 9,949.50 9,955.60 6.10
13-01-22 9,955.60 9,962.90 7.30
14-01-22 9,962.50 9,966.50 4.00
15-01-22 9,966.50 9,974.10 7.60
16-01-22 9,974.10 9,978.30 4.20 VOL
17-01-22 9,978.30 9,981.20 2.90
18-01-22 9,981.20 9,986.10 4.90
19-01-22 9,986.10 9,991.70 5.60 VOL
20-01-22 9,991.80 9,996.80 5.00 VOL

TOTAL 114.80
EXCAVACION RELLENO BERMA OBSERVACION

Excavacion manual de Ducto 4


Excavacion manual de Ducto 4
Excavacion manual de Ducto 4
Excavacion manual de Ducto 3

Conformacion de plataforma
Excavadora problemas de flitro
Excavadora problemas de flitro
Problemas de Covid Asta el dia
Problemas de Covid Asta el dia
Problemas de Covid Asta el dia
Problemas de Covid Asta el dia
Problemas de Covid Asta el dia
Problemas de Covid Asta el dia

Se salió la cadena

34.00

60.00
25.00
20.00

Llave de encendido no apaga

7.00 Conformación de berma con 07 volquetas de tierra


Excavacion de zanja (responsabilidad Cyprom)
Conformación de berma
3.00 3.00 Excavación y de material grueso
Excavadora problemas de flitro
4.00 x Conformaciòn de Berma