Está en la página 1de 1

Estado Actual de Avance

PEMEX EXPLORACION Y PRODUCCION TD-3001


Trampa de Recibo 20” x 24”
Fecha de Inicio de Programa abr/14/2023 (viernes) Display Week 5 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14
Project Lead: Eddy Sven Mireles 8 may 2023 15 may 2023 22 may 2023 29 may 2023 5 jun 2023 12 jun 2023 19 jun 2023 26 jun 2023 3 jul 2023 10 jul 2023
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
WORK
WBS TASK LEAD START END DAYS % DONE M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
DAYS
1 Suministro lun abr/03/23 mié jul/05/23 94 96% 68
1.1 CUBETA DE RECIBO DE DIABLOS 24" X 20" lun abr/03/23 lun abr/17/23 15 100% 11

1.1.1 TUBERIA DE 24", 20", 8" 4" Procura lun abr/03/23 lun abr/17/23 15 100% 11 Cambio Alcance:
1.1.2 VALVULAS 4" Y 3/4" Procura lun abr/03/23 mié abr/12/23 10 100% 8
1.1.3 CONEXIONES Y TAPA ABISAGRADA Procura lun abr/03/23 lun abr/17/23 15 100% 11
• 1 Valv. Comp 20”
1.1.4 BRIDAS Procura lun abr/03/23 vie abr/07/23 5 100% 5
1.1.5 ESPARRAGOS Procura lun abr/03/23 mar abr/04/23 2 100% 2
• 1 Valv. Comp. 4”
1.1.6 PATIN Procura vie abr/14/23 sáb may/13/23 30 100% 21 • 1 TEE Recta 20” x
1.2 MEDIA TRAMPA DE RECIBO 20", ACOMETIDA Y DISPAROS lun abr/03/23 dom may/21/23 49 100% 35 20”
1.2.1 TUBERIA DE 20" (39.5 MTS) lun abr/03/23 mar abr/04/23 2 100% 2 • 1 Valv. Comp. 16”
1.2.2 VALVULAS DE 20" (2), 16" (1) Y 8" (1) vie abr/14/23 dom may/21/23 38 100% 26 • Tuberia 16” API X52
1.2.3 CONEXIONES vie abr/14/23 mié may/03/23 20 100% 14 • 1 bridas WN 20”
1.2.4 MISCELANEOS lun abr/03/23 lun abr/17/23 15 100% 11
• 1 Brida ciega 20”
1.2.5 BRIDAS lun abr/03/23 lun abr/17/23 15 100% 11

1.2.6 EMPAQUES lun abr/03/23 lun abr/17/23 15 100% 11


1.2.7 ESPARRAGOS lun abr/03/23 mié abr/12/23 10 100% 8 Nuevo cambio:
1.2.8 OTROS lun abr/03/23 mié abr/12/23 10 100% 8

1.3 ADICIONALES LLEGADA A MATAPIONCHE lun may/22/23 mié jul/05/23 45 83% 33


• 1 Valv. Comp 4”
1.3.1 TEE RECTA 20X20 lun may/22/23 mié may/31/23 10 100% 8
• 1 Valv. Comp 20”
1.3.2 VALVULA COMPUERTA 20" (2) lun may/22/23 dom jun/11/23 21 100% 15

1.3.3 VALVULA COMPUERTA 16" (1) lun may/22/23 mié jul/05/23 45 0% 33


• 1 Valv. Check 20”
1.3.4 VALVULA CHECK 20" (!) lun may/22/23 lun jun/05/23 15 100% 11 • 1 Brida WN 20”
1.3.5 BRIDAS WN 16, 20 Y CIEGA 16" lun may/22/23 jue may/25/23 4 100% 4

1.3.6 TUBERIA 16" API 52 lun may/22/23 lun jun/05/23 15 100% 11

28/06 29/06
Suministro y Procura: 90% 90%
Alcance Original 100% 100%

Válvula de compuerta 16” en proceso, valvula check 20” (1), valvula compuerta 20” (1) y valvula compuerta 4” (1)

También podría gustarte