Está en la página 1de 5

12

14.5
14.5
10
10
10
5
5
METROS LINEALES 81
VIGA

25 9

STOCK 225

VIGA
324

FALTA 1/2 99
3/8

162

CIMIENTO
0.4 81 0.4 12.96 m3
PIEDRA 5 m3 60 300
HORMIGON 12 m4 40 480
780 S/.

CEMENTO 20 BOLSAS
VIGA 8.1 6 50 BOLSAS
70 BOLSAS FALTA 10 BOLSAS 10

LADRILLO 600 S/.


CEMENTO 50 BOLSAS 4.005
COLUMNAS 30 BOLSAS
SOBRECIMIENTO 20 BOLSAS
FALSO PISO 40 BOLSAS 6
TOTAL CEMENTO 150 BOLSAS

330 30
9900

2.6
0.4
0.3
0.312 9 2.808
18
2.6 7.5
0.3 12
0.3 37.5 CEMENTO
0.234
2.6
0.25
0.25
0.1625 9 1.4625
v
v
v
H
H
H
H
H
0.2 405 10

40.5

400 ESTRIBO 1/4

VIGA HASTA LA VIGA

9 11 VARILLAS 1/2 45 495 S/. FIERRO

9 18 VARILLAS 3/8 25 450 S/. FIERRO

2000 AGREGADOS
780 AGREGADOS
300 CEMENTO
700 GENTE
1100 GENTE
1100 GENTE
TOTAL 6925 10/22/2022
30 300 S/.
PAREDES

LADRILLO 600 S/.


CEMENTO 4350 S/.
ARENA 500
TUBOS 1000
DEUDA FIERRO 3500
GENTE 1100 FALSO PISO
GENTE 1100 LLENADO COLUMNAS
GENTE 2500 ASENTADO LADRILLO
TOTAL 14650
450
30
13500 TOTAL 21575

SUELDO 7.5 OCT.


7.5 NOV.
7.5 BANCO CONT.
5 AFP
27.5

SALDO 6 SOLES
81 0.4 0.25 8.1

650 AGREGADOS
2600 GENTE
500 AG CIMIENTO
1000 ACERO
ZAPATA 4750
CIMIENTO

También podría gustarte