COMPUTO MATERIALES - CUBITO PATRI

MATERIALES CANTIDAD $

ARENA 5 m3 $28,000.00
PIEDRA 0.30 5 m3 $32,000.00
CEMENTO 30 $ 2,400.00 $ 72,000.00
HIERRO 8mm 6 $ 2,441.00 $ 14,646.00
HIERRO 6mm 7 $ 1,448.00 $ 10,136.00
MALLA SIMA 6 $ 4,660.00 $ 27,960.00

LADRILLO P. 19cm 120 $ 280.00


LADRILLO MACIZO 600 $ 39.00 $ 23,400.00

TOTAL $ $ 208,142.00
TOTAL U$D 465 $447.62

HORMIGON M3
POZOS 0.064 $33,600.00

9 0.576
$ 148,142.00 PERFIL C
COLUMNAS 1 0.04
3 0.12

COLUMNAS 2 0.03
3 0.09

COLUMNAS 3 0.022
3 0.066

TOTAL M3 COL 0.276

TOTAL M3 POZ 0.576

TOTAL M3 0.852

CONTRAPISO 6x6 3

TOTAL Hº M3 3.852
Columnas Cant. Colun. HIERRO 8mm x ML TOTAL ML HIERRO 6mm x ML TOTAL ML
Columnas 1 3 5 15 5 15
Columnas 2 3 3.4 10.2 4 12
Columnas 3 3 2.6 7.8 3.2 9.6
33 36.6

Base de pozo 9 4 36

HIERRO 8 ML TOTAL BARRAS


12 5.75 69

HIERRO 6 ML TOTAL BARRAS


12 3.08333333333 37

3 100X40
2 80X40

PERFIL C CANTIDAD
80x40x15x1.6x12m 5 BARRAS

ESTRUCTURAL CANTIDAD
50x40x1.6x6m 11 BARRAS

ESTRUCTURAL CANTIDAD
100x100x1.6x6m 3

ESTRUCTURAL CANTIDAD
40x100x1.6x6m 2