Está en la página 1de 5

FECHA: 12/24/2022 HORA:

PROVEDOR : MARCELO MIRAVA GUIA:


RESPONSABLE: BYRON PLACA:
N° VIAJE SITIO:

MEDIDAS PLANTILLAS LARGO


1 0.5 4
1 1/2 2.5 4
2 16.0 4
2 1/2 3.5 4
3 14.5 4.0
1 2.5
1 3.0 3
1 1/2 6.00 3
2 4.50 3
2 1/2 2.50 3
3 2.50 3.0
2 1/2 2.0
1 1/2 2.5

MADERA AJUSTADA REDUCIDA POR ESPESOR


ESPESOR REAL ESPESOR REDUCIDO PLANTILLAS
1 1/2 1 15.5
2 1 1/2 6.0
2 1/2 2 4.0
3 2 1/2 3.0

MADERA AJUSTADA REDUCIDA POR LARGO (PIE)

LARGO REAL (PIE) ESPESOR PLANTILLAS


4 1 14.5
4 1 1/2 21.5
4 2 11.5
4 2 1/2 12.0
4 3 13.5
PNC: MADERA NO CONFORME
MEDIDAS PLANTILLAS LARGO
1 6.0 4
1 1/2 6.0 4
2 5.0 4
2 1/2 1.0 4
3 3.0 4

VOLUMEN BRUTO 5179.50 VALOR BFT


Volumen PAGADO 3875.75 0.63
Bajada x defectos 756.25 RET
pnc 547.50 anticpo
PORCENTAJE DE PNC 10.57%
PORCENTAJE DE AZUL 0.00% saldo
PORCENTAJE DE PESA 0.00%
WP1477

OGJ-0679
WP1477

VALOR TOTAL BFT


15.00 7.5
22.50 56.3
30.00 480.0
37.50 131.3
45.00 652.5
9.00 0.0
11.00 33.0
16.50 99.0
22.50 101.3
28.00 70.0
33.50 83.8
18.00 0.0
14.00 0.0
VALOR TOTAL 1714.50

JUSTADA REDUCIDA POR ESPESOR


LARGO VALOR TOTAL BFT TOTAL VOL REAL
4 15 232.50 348.75
4 22.5 135.00 180
4 30 120.00 150
4 37.5 112.50 135
37.5 0.00 0
0 0.00
0 0.00 0
0 0.00 0
0 0.00 0
600.00 813.75

USTADA REDUCIDA POR LARGO (PIE)


LARGO REDUCIDO
(PIE) VALOR TOTAL BFT TOTAL VOL REAL
3 11 159.50 217.5
3 16.5 354.75 483.75
3 22.5 258.75 345
3 28 336.00 450
3 33.5 452.25 607.5
22.5 0.00
18.75 0.00
22.5 0.00
7.5 0.00
0 0.00
1561.25 2103.75

E
VALOR TOTAL BFT
15.0 90.0
22.5 135.0
30.0 150.0
37.5 37.5
45.0 135.0
0.0 0.0
0.0 0.0
TOTAL 547.5
MADERA GRUESA
2, 2 1/2, 3 2798.3
VALOR A PAGAR 72%
2441.72
24.417225

2417.31

0.00
12/24/2022 MARCELO MIRAVA 5179.50 3875.75 72% 0.6300

También podría gustarte