PLOT A1 ESC: 1 / 50

I J K L
12.10
.15 .15
4.60 3.60 3.60 7 8 9
.30 3.80 1.30 2.30 1.30 2.80 .30
7.30
.45

.45

.30 3.58 3.72 .15

9 VS_1 (0.30x0.40) M2 VS_1 (0.30x0.40) M2 VS_1 (0.30x0.40)


9 VP_1
1.30

1.30

M3 M3 VP_1
4 Ø 1/2" 4 Ø 1/2"
.75 .75
2 Ø 3/8" .75 .75 2 Ø 3/8"
VIGA VS_1
(0.30x0.40)
.75 .75

.40 .40 .75 .75


C2
VP_1
3.72

3.72

4 Ø 1/2" VS_1 VP_1 VS_1


2.72

2.72

.40 .40
S= 15 %

S= 15 %

S= 15 %

3 Ø 1/2" 3 Ø 1/2" 4 Ø 1/2"


VP_1 (0.30x0.60)

VP_1 (0.30x0.60)

VP_1 (0.30x0.60)

VP_1 (0.30x0.60)

3 Ø 1/2" 3 Ø 1/2" VIGA VS_1


(0.30x0.40)

Ø3/8",1@0.05, 8@.10,r@.20cm VS_1 Ø3/8",1@0.05, 8@.10, r@.20cm VS_1


.40

.40

.40

COLUMNA COLUMNA COLUMNA


8.05

8.05

C1 C2 M3
.30

.30

8 C3 VS_2 (0.30x0.15) VS_2 (0.30x0.15) VS_2 (0.30x0.15) C3 8


.40

.40

.40

DETALLE TIPICO VIGA VP_1 EJE I-I (0.30X0.60)


ESC: 1__50

.40 .40
3.13

3.13

7 8 9
3.88

3.88

.40 .40
VP_1 (0.30x0.60)

VP_1 (0.30x0.60)

VP_1 (0.30x0.60)

VP_1 (0.30x0.60)
S= 15 %

S= 15 %

S= 15 %

7.60

.30 3.58 3.72 .15

.40 .40
Ø 1/2"@ 0.15 Sup. Ø 1/2"@ 0.15 Sup.
.15 .15
.15 .15 .15 .15
.15 .15
.60

.60

.58
C1 VS_1 (0.30x0.40) VS_1 (0.30x0.40) VS_1 (0.30x0.40)
C1 Ø 1/2"@ 0.15 Sup. Ø 1/2"@ 0.15 Sup.
M2 M2 .15 .15
7 7 .15 .15 .15 .15
.15 .15
.30 3.80 1.30 2.30 1.30 2.80 .30 Ø 1/2"@ 0.15 Inf. Ø 1/2"@ 0.15 Inf.
4.60 3.60 3.60 Ø 1/2"@ 0.15 Inf. Ø 1/2"@ 0.15 Inf.

.36
.20

.20
.15 .15
12.10

I J K L .30 3.58 3.58 .30

.30 3.88 3.72 .15

PLANTA DE VIGAS Y LOSA (MODULO COCINA) 7.75


ESC: 1__50
DETALLE TIPICO LOSA MACIZA H=0.15
ESC: 1__25

7 8 9
I J K L .30 3.58
7.30
3.72
.15
VP_1 VP_1
4 Ø 1/2" 4 Ø 1/2"
12.10 2 Ø 3/8" .75 .75
.75 .75 2 Ø 3/8"
VIGA VS_1 Ø3/8", @.10
.15 .15 (0.30x0.40) .98
4.60 3.60 3.60 .75 VS-2 .75
.75 .75
C1 VS_1 4Ø 1/2" M2 4Ø 1/2" M2 VS_1 4Ø 1/2" C1 VP_1 VP_1
4 Ø 1/2" VS-3
3 Ø 1/2" 4 Ø 1/2" VIGA VS_1
.40 3 Ø 1/2" 3 Ø 1/2" 3 Ø 1/2" .40
(0.30x0.40)
VS-3
Ø3/8", 1@.05, 8@.10, r@.15 cm VS_1 Ø3/8", 1@.05, 8@ Ø3/8", 1@.05, 8@ VS_1 M3
Ø 1/4" @ 0.15 Ø 1/4" @ 0.15 Ø 1/4" @ 0.15
.10, r@.15 cm .10, r@.15 cm
Ø8mm, 1@.05, 5@ Ø8mm, 1@.05, 5@
.10 r@.15cm .10 r@.15cm
4 Ø 3/8" 4 Ø 3/8"
4 Ø 3/8" 4 Ø 3/8" 4 Ø 3/8" 4 Ø 3/8" 4 Ø 3/8" 4 Ø 3/8"
3.03 3.03
Ø 8mm 1@0.05, 5@0.10

Ø 8mm 1@0.05, 5@0.10

Ø 8mm 1@0.05, 5@0.10

Ø 8mm 1@0.05, 5@0.10

Ø 8mm 1@0.05, 5@0.10

Ø 8mm 1@0.05, 5@0.10

Ø 8mm 1@0.05, 5@0.10

Ø 8mm 1@0.05, 5@0.10

Ø 8mm 1@0.05, 5@0.10

3.00 3.00
Ø3/8": 01@0.05, 6@

Ø3/8": 01@0.05, 6@

Ø3/8": 01@0.05, 6@

Ø3/8": 01@0.05, 6@

Ø3/8": 01@0.05, 6@

4 Ø 3/8" 2.60 2.60


0.10, r@.20cm

0.10, r@.20cm

0.10, r@.20cm

0.10, r@.20cm

0.10, r@.20cm
r@0.25 cm

r@0.25 cm

r@0.25 cm

r@0.25 cm

r@0.25 cm

r@0.25 cm

r@0.25 cm

r@0.25 cm

r@0.25 cm

4 Ø 3/8"
NPT=+0.30 NPT=+0.30

6.04 6.01 NTN=+0.00


6.04 6.01 NTN=+0.00
1Ø 5/8" 1Ø 5/8" .30 1Ø 5/8" 1Ø 5/8" .30
3Ø 1/2" 3Ø 1/2" 3Ø 1/2" 3Ø 1/2" 3Ø 1/2"

2Ø 3/8" 2Ø 3/8"

Ø3/8",1@0.05, 12@ 3Ø 5/8" Ø3/8",1@0.05, 12@ 3Ø 5/8" Ø3/8",1@0.05, 12@ 3Ø 5/8" Ø3/8",1@0.05, 12@ 3Ø 5/8" Ø3/8",1@0.05, 12@
.10, r@.20cm .10, r@.20cm .10, r@.20cm 2.11 .10, r@.20cm .10, r@.20cm 2.11
3.01 3.01 3.01 3.01

Ø 5/8" @ 0.15 Ø 5/8" @ 0.15 Ø 5/8" @ 0.15 Ø 5/8" @ 0.15 Ø 5/8" @ 0.15
Ø 5/8" @ 0.15

Ø 5/8" @ 0.15 Ø 5/8" @ 0.15 Ø 5/8" @ 0.15 .60 .60 .60


.40

Ø 5/8" @ 0.15 Ø 5/8" @ 0.15 Ø 5/8" @ 0.15


PORTICO EJE 7 (MODULO COCINA)
ESC: 1__50 PORTICO EJE L (MODULO COCINA)
.80
ESC: 1__50
.13
.67

.80 Ø 1/2" @ 0.20


.67
X CUADRO DE VIGAS ESCALA: 1/25
.15 2 Ø 3/8" .08
VP_1 (0.30x0.60) VS_1 (0.30x0.40) VS_2 (0.30x0.15) VS_3 (0.30x0.40)
INTERVENCION EN RECONSTRUCCION MEDIANTE INVERSIONES – IRI – EN LA
.51
Ø 1/2" @.20 .43 .40 INSTITUCION EDUCATIVA N° 1437, CENTRO POBLADO JESUS MARIA, DISTRITO DE TAMBO

.51 .30 GRANDE, PROVINCIA DE PIURA, REGION PIURA – CL 796971” FUR N°2428639
.0
°

.40
60
.00

4 Ø 1/2" UNIDAD:
.30 PLANO:
60

.30 GERENCIA DE RECONSTRUCCIÓN FRENTE DESASTRES PLANTA DE VIGAS Y LOSA DE TECHO (MODULO COCINA)
X 3 Ø 1/2" .18
2 Ø 3/8" 2 Ø 3/8" 3 Ø 1/2"
3 Ø 1/2" COORDINADOR PRONIED: UBICACION
.25 .55 .30 .60 A
,R
UIP D
EAN
C
IO
IR
V
PGA
N
D
ERA
M
O
BT D
EO
T IRTSD
I LD
E.PC
.A
,M
IA
RSUSEJ
3 Ø 1/2" JAVIER EDUARDO ARRIAGA DIAZ CIP.13740
.15

.25 .55 .30 .40 .40 A


.R
UIPO
N
GIER
1.10 .15 3 Ø 1/2"
1.10 4 Ø 5/8" 3 Ø 1/2"
CONTRATISTA: JEFE DE PROYECTOS CONTRATISTA: CODIGO LAMINA
CONSORCIO ALFA UNION ING. HECTOR MIGUEL LOPEZ MORA CIP. 212820
DETALLE TIPICO TAPA
DETALLE TIPICO CANALETA
ESC: 1__25 LATERAL DE CANALETA
8 Ø 1/2"; 2 Ø 3/8" 6 Ø 1/2" 6 Ø 1/2" 4 Ø 1/2"
SUPERVISOR:
CONSORCIO SAN JUAN
ESPECIALISTA EN ESTRUCTURA
ING. BARRY MARSHAL CASTRO AREVALO CIP.104143 E-10 10
Ø3/8", @.10 Ø3/8",11@.10, R@.15 Ø3/8",3@.05, 4@.10, 3@.15, R@.20 Ø3/8",3@.05, 4@.10, 3@.15, R@.20 ESPECIALISTA SUPERVISOR: ESCALA FECHA DIBUJO
ESC: 1__25 ING. LEON MALO IVAN ELISEO INDICADA DICIEMBRE 2022 ------------------

También podría gustarte