CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS
SALARIOS (2) COEFIC.(3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.5620 1.780 C.C.QUITO. 1.780 1.000 1.000
CATEGORIA III 0.2830 1.780 C.C.QUITO. 1.780 0.504 0.504
CATEGORIA IV 0.1420 1.780 C.C.QUITO. 1.780 0.253 0.253
MEP I 0.0130 2.030 C.C.QUITO. 2.030 0.026 0.026
SUMAN 1.0000 1.783 1.783
COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0) Coef. X Relac.
MANO DE OBRA 0.387 1.783 C.C.QUITO 1.783 1.000 0.387
CEMENTO SACOS 0.305 133.110 IPCO 133.110 1.000 0.305
MATERIAL PETREO 0.198 353.060 IPCO 353.060 1.000 0.198
EQUIPO DE CONSTRUCC. 0.024 117.490 IPCO 118.530 1.009 0.024
MADERA ACERRADA 0.054 305.460 IPCO 311.640 1.020 0.055
SALDOS 0.032 112.180 IPCO 114.710 1.023 0.033
TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE
............................................. ................................................
ING. JUAN GABRIEL BARROS L. Ing. Gerardo Bustos L.
Contratista Fiscalizador
...........................................
Ing. Angel Rochina
Director OO.PP.
SALARIOS (2) COEFIC.(3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.4300 1.305 C.C.QUITO. 1.305 0.561 0.561
CATEG II 0.1020 1.321 C.C.QUITO. 1.321 0.135 0.135
CATEGORIA III 0.3840 1.335 C.C.QUITO. 1.335 0.513 0.513
CATEGORIA IV 0.0450 1.360 C.C.QUITO. 1.360 0.061 0.061
TOP 4 0.0030 0.000 C.C.QUITO. 0.000 0.000 0.000
PRAC 0.0000 0.000 C.C.QUITO. 0.000 0.000 0.000
MEP I 0.0360 1.461 C.C.QUITO. 1.461 0.053 0.053
SUMAN 1.0000 1.322 1.322
COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0) Coef. X Relac.
MANO DE OBRA 0.311 1.322 C.C.QUITO 1.322 1.000 0.311
CEMENTO SACOS 0.124 131.900 IPCO 133.500 1.012 0.126
ACERO EN BARRAS 0.090 192.380 IPCO 202.010 1.050 0.095
CERAMICA VITRIFICADA 0.057 141.860 IPCO 143.070 1.009 0.057
INODOROS 0.046 188.390 IPCO 190.740 1.012 0.047
PRODUCTOS ELECTROSOL 0.035 169.750 IPCO 174.860 1.030 0.036
MADERA ACERRADA 0.105 279.770 IPCO 286.330 1.023 0.107
LAVAMANOS 0.043 192.760 IPCO 195.160 1.012 0.044
COMPONENTES NO P. 0.189 190.04 IPCO 192.02 1.010 0.191
TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE
............................................. ................................................
Arq. Nelson Guamialamá Ing. Gerardo Bustos L.
Contratista Fiscalizador
...........................................
Ing. Gerardo Bustos L.
Director OO.PP.
...........................................
Ing. Angel Rochina
Director OO.PP.
...........................................
Ing. Marco Chugá
Director OO.PP.
...........................................
Ing. Marco Chugá
Director OO.PP.
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS
CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS
SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.5620 1.780 C.C.QUITO. 1.780 1.000 1.000
CATEGORIA III 0.2830 1.780 C.C.QUITO. 1.780 0.504 0.504
CATEGORIA IV 0.1420 1.780 C.C.QUITO. 1.780 0.253 0.253
MEP I 0.0130 2.030 C.C.QUITO. 2.030 0.026 0.026
SUMAN 1.0000 1.783 1.783
COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.387 1.783 C.C.QUITO 1.783 1.000 0.387
CEMENTO SACOS 0.305 133.110 IPCO 133.110 1.000 0.305
MATERIAL PETREO 0.198 353.060 IPCO 353.060 1.000 0.198
EQUIPO DE CONSTR 0.024 117.490 IPCO 118.530 1.009 0.024
MADERA ACERRAD 0.054 305.460 IPCO 311.640 1.020 0.055
SALDOS 0.032 112.180 IPCO 114.710 1.023 0.033
TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE
............................................. ................................................
ING. JUAN GABRIEL BARROS L. Ing. Gerardo Bustos L.
Contratista Fiscalizador
...........................................
Ing. Nelson Rubio
Director OO.PP.
SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.2640 8.730 C.C.QUITO. 8.730 2.305 2.305
CATEGORIA II 0.1630 8.850 C.C.QUITO. 8.850 1.443 1.443
CATEGORIA III 0.4230 8.940 C.C.QUITO. 8.940 3.782 3.782
CATEGORIA IV 0.0560 9.130 C.C.QUITO. 9.130 0.511 0.511
MEP 1 0.0940 9.850 C.C.QUITO. 9.850 0.926 0.926
COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.233 8.966 C.C.QUITO 8.966 1.000 0.233
CEMENTO SACOS 0.081 113.330 IPCO-PAG-1 113.400 1.001 0.081
ACERO ESTRUCTUR 0.047 106.130 IPCO-PAG-1 108.850 1.026 0.048
MATERIAL PETRO 0.045 252.200 IPCO-PAG-5 283.670 1.125 0.051
MADERAS 0.003 256.590 IPCO-PAG-2 259.560 1.012 0.003
ETERNIT 0.034 119.600 IPCO-PAG-2 114.470 0.957 0.033
PERFIL ESTRUC. 0.243 96.010 IPCO-PAG-2 100.19 1.044 0.254
EQUIPO 0.104 96.54 IPCO-PAG-1 98.03 1.015 0.106
COMBUSTIBLES 0.016 255.25 IPCO-PAG-2 304.53 1.193 0.019
REPUESTOS 0.052 96.17 IPCO-PAG-3 96.94 1.008 0.052
NO PRINCIPALES 0.142 139.46 IPCO-PAG-4 139.78 1.002 0.142
TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE
............................................. ................................................
...........................................
Ing. Marco Chugá
Director OO.PP.
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS
REAJUSTE PROVISIONAL DE PRECIOS
PROYECTO: AULAS EN ESCUELA FEDERICO G. SUAREZ
CONTRATO: 9/2002 PARROQUIA LA BONITA
FECHA DEL CONTRATO: JULIO 2002 FECHA TERMINO: NOVIMBRE - 2002
CONTRATISTA ING. LUIS ORTIZ
...........................................
Ing. Marco Chugá
Director OO.PP.
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS
CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS
SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.2540 8.730 C.C.QUITO. 8.730 2.217 2.217
CATEGORIA II 0.3090 8.850 C.C.QUITO. 8.850 2.735 2.735
CATEGORIA III 0.3320 8.940 C.C.QUITO. 8.940 2.968 2.968
Coef. X Relac. COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.260 7.920 C.C.QUITO 7.920 1.000 0.260
CEMENTO SACOS 0.128 113.400 IPCO-PAG-1 113.400 1.000 0.128
ACERO ESTRUCTURAL 0.051 106.730 C.C.QUITO 107.560 1.008 0.051
PERFILES EST. 0.148 95.680 IPCO-PAG-1 97.260 1.017 0.150
MATERIAL PETREO 0.056 283.670 IPCO-PAG-5 283.670 1.000 0.056
COMBUSTIBLES 0.014 275.98 IPCO-PAG-1 299.24 1.084 0.015
REPUESTOS 0.046 96.46 IPCO-PAG-3 96.46 1.000 0.046
NO PRINCIPALES 0.076 1119.84 IPCO-PAG-4 1159.71 1.036 0.079
SUMAN TOTALES 0.779 0.786
TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE
............................................. ................................................
Ing. Franklin Figueroa Ing. Marco Chugá
Contratista Fiscalizador
...........................................
Ing. Marco Chugá
Director OO.PP.
SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.2230 8.730 C.C.QUITO. 8.730 1.947 1.947
CATEGORIA II 0.2000 8.850 C.C.QUITO. 8.850 1.770 1.770
CATEGORIA III 0.4160 8.940 C.C.QUITO. 8.940 3.719 3.719
CATEGORIA IV 0.0490 9.130 C.C.QUITO. 9.130 0.447 0.447
MEP 1 0.1120 9.850 C.C.QUITO. 9.850 1.103 1.103
Coef. X Relac. COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.210 8.986 C.C.QUITO 8.986 1.000 0.210
CEMENTO SACOS 0.069 113.330 IPCO-PAG-1 113.400 1.001 0.069
ACERO ESTRUCTURAL 0.058 106.130 IPCO-PAG-1 106.130 1.000 0.058
MATERIAL PETREO 0.051 252.200 IPCO-PAG-3 252.200 1.000 0.051
ETERNIT 0.036 119.600 IPCO-PAG-2 110.910 0.927 0.033
PERFILES EST. 0.255 96.010 IPCO-PAG-2 96.010 1.000 0.255
EQUIPO 0.110 96.54 IPCO-PAG-2 96.6 1.001 0.110
COMBUSTIBLES 0.017 255.25 IPCO-PAG-1 255.25 1.000 0.017
REPUESTOS 0.055 96.17 IPCO-PAG-2 96.26 1.001 0.055
NO PRINCIPALES 0.139 139.38 IPCO-PAG-4 139.46 1.001 0.139
TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE
............................................. ................................................
...........................................
Ing. Marco Chugá
Director OO.PP.
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS
CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS
SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.2540 8.730 C.C.QUITO. 8.730 2.217 2.217
CATEGORIA II 0.3090 8.850 C.C.QUITO. 8.850 2.735 2.735
CATEGORIA III 0.3320 8.940 C.C.QUITO. 8.940 2.968 2.968
Coef. X Relac. COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.260 7.920 C.C.QUITO 7.920 1.000 0.260
CEMENTO SACOS 0.128 113.400 IPCO-PAG-1 113.400 1.000 0.128
ACERO ESTRUCTURAL 0.051 106.730 C.C.QUITO 108.850 1.020 0.052
PERFILES EST. 0.148 95.680 IPCO-PAG-1 100.190 1.047 0.155
MATERIAL PETREO 0.056 283.670 IPCO-PAG-5 283.670 1.000 0.056
COMBUSTIBLES 0.014 275.98 IPCO-PAG-1 304.53 1.103 0.015
REPUESTOS 0.046 96.46 IPCO-PAG-3 96.94 1.005 0.046
NO PRINCIPALES 0.076 1119.84 IPCO-PAG-4 1159.71 1.036 0.079
SUMAN TOTALES 0.779 0.791
TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE
............................................. ................................................
Ing. Franklin Figueroa Ing. Marco Chugá
Contratista Fiscalizador
...........................................
Ing. Marco Chugá
Director OO.PP.
SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.2230 8.730 C.C.QUITO. 8.730 1.947 1.947
CATEGORIA II 0.2000 8.850 C.C.QUITO. 8.850 1.770 1.770
CATEGORIA III 0.4160 8.940 C.C.QUITO. 8.940 3.719 3.719
CATEGORIA IV 0.0490 9.130 C.C.QUITO. 9.130 0.447 0.447
MEP 1 0.1120 9.850 C.C.QUITO. 9.850 1.103 1.103
Coef. X Relac. COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.210 8.986 C.C.QUITO 8.986 1.000 0.210
CEMENTO SACOS 0.069 113.330 IPCO-PAG-1 113.400 1.001 0.069
ACERO ESTRUCTURAL 0.058 106.130 C.C.QUITO 107.560 1.013 0.059
MATERIAL PETREO 0.051 252.200 IPCO-PAG-5 283.670 1.125 0.057
ETERNIT 0.036 119.600 IPCO-PAG-2 110.910 0.927 0.033
PERFILES EST. 0.255 96.010 IPCO-PAG-2 100.190 1.044 0.266
EQUIPO 0.110 96.54 IPCO-PAG-2 97.96 1.015 0.112
COMBUSTIBLES 0.017 255.25 IPCO-PAG-1 255.25 1.000 0.017
REPUESTOS 0.055 96.17 IPCO-PAG-3 96.65 1.005 0.055
NO PRINCIPALES 0.139 139.38 IPCO-PAG-4 140.26 1.006 0.140
TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE
............................................. ................................................
...........................................
Ing. Marco Chugá
Director OO.PP.
Coef. X Relac.
Coef. X Relac.
CONTRATO: N° 027- 2011
CONTRATISTA: ING. JUAN GABRIEL BARROS L.
OBRA: CONSTRUCCION DE UN AUDITORIO EN LA COMUNIDAD LA BARQUILLA
MONTO: 85,689.23 usd
PLAZO: 90 días
FECH. CONT: 21-Dec-11
SUSPENSION DE OBRA
Inicio: (oficio # 072-2008-OO.PP.MM.) 12/19/2008
Hasta: (oficio # 072-2008-OO.PP.MM.) 6/8/2009 171.00 DIAS
MORA: 0 DIAS
1 LIMPIEZA DEL TERRENO m2 308.00 1.11 384.00 384.00 426.24 0.00 426.24
2 REPLANTEO Y NIVELACION m2 308.00 0.94 240.00 240.00 225.60 0.00 225.60
3 EXCAVACION MANUAL DE PLINTOS Y CIMIENTOS m3 85.24 9.15 16.00 16.00 146.40 0.00 146.40
4 RELLENO CAMPACTADO SUELO NATURAL m3 51.14 6.85 0.00 0.00 0.00 0.00 0.00
5 RELLENO COMPACTADO MEJORAM - Lastre - Piso+Plintos m3 133.78 27.98 0.00 0.00 0.00 0.00 0.00
6 REPLANTILLO H.S. DE 180 K/CM m3 3.90 179.44 1.95 1.95 349.91 0.00 349.91
7 PLINTOS H.S. F´c= 210 KG/CM2 m3 11.70 204.65 11.70 11.70 2394.41 0.00 2394.41
8 HORM. EN COLUMNAS F¨c = 210 Kg/cm2 m3 7.80 293.96 8.42 8.42 2476.32 0.00 2476.32
9 HORMIGÓN CICLÓPEO 180 kg/cm2 m3 15.30 188.25 16.00 16.00 3012.00 0.00 3012.00
10 HORM. EN CADENAS F¨c = 210 Kg/cm2 m3 4.78 220.46 8.72 8.72 1922.41 0.00 1922.41
11 HORM. EN VIGAS F¨c = 210 Kg/cm2 m3 11.60 295.46 8.52 8.52 2517.32 0.00 2517.32
12 ACERO DE REFUERZO f'y = 4200 kg/cm2 Kg 4324.94 2.16 4885.43 4885.43 10552.52 0.00 10552.52
13 ACERO ESTRUCTURAL Kg 2555.52 3.58 3082.48 3082.48 11035.27 0.00 11035.27
14 CUBIERTA DE ETERNIT m2 616.00 16.66 352.00 352.00 5864.32 0.00 5864.32
15 MAMPOSTERIA LADRILLO MAMBRON m2 194.00 16.84 182.37 182.37 3071.14 0.00 3071.14
16 H.S. EN CONTRAPISO e=6 cm f'c=210 kg/cm2 - paleteado m2 240.00 20.64 0.00 0.00 0.00 0.00 0.00
17 ENLUCIDO VERTICAL E=2.5cm. Mor. 1:4 m2 388.00 10.98 465.71 465.71 5113.52 0.00 5113.52
18 BORDILLOS H.S. F'c=180Kg/cm2 m3 6.30 224.60 0.00 0.00 0.00 0.00 0.00
19 H.S. EN ACERAS e=6 cm f'c=210 kg/cm2 - paleteado m2 70.00 20.64 0.00 0.00 0.00 0.00 0.00
20 PROTECTOR DE VENTANA DE HIERRO DE 1/2" inc. Coloca m2 54.00 64.05 0.00 0.00 0.00 0.00 0.00
21 FILOS DE VENTANAS m 240.00 5.05 348.12 348.12 1758.01 0.00 1758.01
22 CERAMICA DE PISO GRAIMAN 40 X 40 CM m2 240.00 23.86 0.00 0.00 0.00 0.00 0.00
23 BARREDERA DE CERAMICA m 70.00 4.61 0.00 0.00 0.00 0.00 0.00
24 HORM. MURO ESCENARIO F¨c = 210 Kg/cm2 m3 13.60 220.46 5.51 5.51 1215.48 0.00 1215.48
25 CERAMICA DE PARED m2 41.60 21.03 0.00 0.00 0.00 0.00 0.00
26 PUERTA DE TOL CON ANGULO , Y ALDABA m2 2.00 107.93 0.00 0.00 0.00 0.00 0.00
27 PUERTA DE HIERRO ACORDION m2 7.50 108.76 0.00 0.00 0.00 0.00 0.00
28 Puerta de madera panelada 0.70x1,80 con Tapamarcos-cerradura UNID 2.00 140.78 0.00 0.00 0.00 0.00 0.00
29 LAVAMANOS UNID 2.00 69.34 0.00 0.00 0.00 0.00 0.00
30 INODORO TANQUE BAJO UNID 2.00 108.23 0.00 0.00 0.00 0.00 0.00
31 PINTURA DE CAUCHO VINYIL ACRILICA 2 MANOS (MARFm2 388.00 3.83 0.00 0.00 0.00 0.00 0.00
32 PUNTO DE AGUA POTABLE PVC Ø=½" Pto 4.00 21.53 0.00 0.00 0.00 0.00 0.00
33 SALIDA DE AA.SS. PVC 50 mm. Pto 2.00 8.83 0.00 0.00 0.00 0.00 0.00
34 SALIDA DE AA.SS. PVC 110 mm. Pto 2.00 28.68 0.00 0.00 0.00 0.00 0.00
35 TUBERIA PVC 110 MM DESAGUE m 10.00 6.35 0.00 0.00 0.00 0.00 0.00
36 TABLERO DE CONTROL 4-8 PTOS UNID 1.00 132.68 0.00 0.00 0.00 0.00 0.00
37 ILUMINACION CONDUCTOR # 12 Pto 10.00 34.36 0.00 0.00 0.00 0.00 0.00
38 TOMACORRIENTES DOBLES UNID 10.00 33.53 0.00 0.00 0.00 0.00 0.00
39 BAJANTES A. LLUVIAS PVC 110MM m 20.00 7.43 0.00 0.00 0.00 0.00 0.00
40 CANAL DE TOOL GALVANIZADO 1/32 PINTADO m 44.00 13.66 44.00 44.00 601.04 0.00 601.04
41 CAJA REVISION H.S. 50 X 50cm F'c=180 kg/cm e=10 cm. UNID 2.00 107.20 0.00 0.00 0.00 0.00 0.00
42 TUBERIA PRESION ROSCABLE Ø=1/2" (Acometida) m 20.00 3.33 0.00 0.00 0.00 0.00 0.00
43 ACOMETIDA PRINCIPAL CONDUCTOR # 10 m 30.00 6.48 0.00 0.00 0.00 0.00 0.00
44 HORM. EN RIOSTRAS F¨c = 210 Kg/cm2 m3 0.30 226.06 0.00 0.00 0.00 0.00 0.00
45 VENTANA DE ALUMINIO Y VIDRIO e=4 mmCORREDIZA m2 54.00 66.81 0.00 0.00 0.00 0.00 0.00
B C D E F
REPLANTEO Y NIVELACION M2
DESCRIPCION: B= largo C= Ancho E= Número F=BxCxE
Area total 20.00 12.00 1.00 240.00
1.00 -
1.00 -
1.00 -
TOTAL= 240.00 M2
1.00 0.00
TOTAL= 16.00 M3
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 M3
TOTAL= 0.00 M3
REPLANTILLO H.S. DE 180 K/CM M3
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
Base Para Zapatas 2.00 1.50 0.05 10.00 1.50
1.50 1.50 0.05 4.00 0.45
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 1.95 M3
TOTAL= 11.70 M3
TOTAL= 8.42 M3
Muros escenario
8 113 1.15 129.95
8 3 22.00 66.00
8 3 12.00 36.00
0.00
0.00
0.00
0.00
ACERO ESTRUCTURAL KG
MARCA 0 # LONGITUD LONGITUD T.
U 05 U 150x50x3 10 0.90 9.00
U 09 U 150x50x3 10 1.59 15.90
U 06 U 150x50x3 10 4.37 43.70
U 07 U 150x50x3 10 1.75 17.50
U 08 U 150x50x3 10 7.90 79.00
U 150x50x3 60 0.15 9.00
TOTAL= 3082.48 KG
CUBIERTA DE ETERNIT M2
DESCRIPCION: B= largo C= Ancho E= Número F=BxCxE
Cubierta 22.00 8.00 2.00 352.00
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 352.00 M2
1.00 0.00
TOTAL= 0.00 M2
H.S. EN ACERAS e=6 cm f'c=210 kg/cm2 - paletea M2
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=B
-
-
-
-
-
-
TOTAL= - M2
FILOS DE VENTANAS M
DESCRIPCION: B= largo E= Número F=BxE
3.60 1.0 3.60
7.20 1.0 7.20
4.20 1.0 4.20
4.50 1.0 4.50
2.40 1.0 2.40
6.00 1.0 6.00
2.40 1.0 2.40
8.70 1.0 8.70
3.00 1.0 3.00
14.10 1.0 14.10
2.00 1.0 2.00
8.70 1.0 8.70
3.00 1.0 3.00
6.00 1.0 6.00
2.40 1.0 2.40
14.80 1.0 14.80
4.00 1.0 4.00
11.60 1.0 11.60
3.20 1.0 3.20
2.00 1.0 2.00
14.80 1.0 14.80
2.00 1.0 2.00
5.20 1.0 5.20
11.00 1.0 11.00
36.00 1.0 36.00
11.03 1.0 11.03
12.43 1.0 12.43
90.00 1.0 90.00
27.00 1.0 27.00
24.86 1.0 24.86
-
TOTAL= 348.12 M
CERAMICA DE PARED M2
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 M2
1.00 0.00
TOTAL= 0.00 M2
LAVAMANOS U
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxE
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 U
1.00 0.00
TOTAL= 0.00 M2
1.00 0.00
TOTAL= 0.00 PTO
1.00 0.00
TOTAL= 0.00 PTO
TOMACORRIENTE DOBLES U
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=B
-
-
-
TOTAL= - U
BAJANTES A. LLUVIAS PVC 110MM M
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 M
TOTAL= 44.00 M
1.00 0.00
TOTAL= 0.00 M
FISCALIZADOR CONTRATISTA
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS