GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS

CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS

A.- INFORMACION GENERAL

CONTRATISTA OBRA PLANILLA MONTO INCICE (0) INCICE (1)


ING. JUAN GABRIEL BARRO Alcantarillado El Higuerón REAJUSTE DEF. ANTICIPO 42,844.62 Dec-07 Feb-08

B.- CUADRILLA TIPO.-

SALARIOS (2) COEFIC.(3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.5620 1.780 C.C.QUITO. 1.780 1.000 1.000
CATEGORIA III 0.2830 1.780 C.C.QUITO. 1.780 0.504 0.504
CATEGORIA IV 0.1420 1.780 C.C.QUITO. 1.780 0.253 0.253
MEP I 0.0130 2.030 C.C.QUITO. 2.030 0.026 0.026
SUMAN 1.0000 1.783 1.783

C.- FACTOR DE REAJUSTE.-

COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0) Coef. X Relac.
MANO DE OBRA 0.387 1.783 C.C.QUITO 1.783 1.000 0.387
CEMENTO SACOS 0.305 133.110 IPCO 133.110 1.000 0.305
MATERIAL PETREO 0.198 353.060 IPCO 353.060 1.000 0.198
EQUIPO DE CONSTRUCC. 0.024 117.490 IPCO 118.530 1.009 0.024
MADERA ACERRADA 0.054 305.460 IPCO 311.640 1.020 0.055
SALDOS 0.032 112.180 IPCO 114.710 1.023 0.033

SUMAN TOTALES 1.000 1.0020

D.- VALORES DE REAJUSTE.-

TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE

DEFINITIVO 42,844.62 42,931.45 86.83


ANTICIPO 0.00
TOTAL A PAGAR 86.83

............................................. ................................................
ING. JUAN GABRIEL BARROS L. Ing. Gerardo Bustos L.
Contratista Fiscalizador

...........................................
Ing. Angel Rochina
Director OO.PP.

GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS


CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS
A.- INFORMACION GENERAL

CONTRATISTA OBRA PLANILLA MONTO INCICE (0) INCICE (1)


Arq. Nelson Guamialamá B.SANIT.COL. MERCED REAJUSTE PLANILLA 2 2,404.22 Jun-06 Nov-06

B.- CUADRILLA TIPO.-

SALARIOS (2) COEFIC.(3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.4300 1.305 C.C.QUITO. 1.305 0.561 0.561
CATEG II 0.1020 1.321 C.C.QUITO. 1.321 0.135 0.135
CATEGORIA III 0.3840 1.335 C.C.QUITO. 1.335 0.513 0.513
CATEGORIA IV 0.0450 1.360 C.C.QUITO. 1.360 0.061 0.061
TOP 4 0.0030 0.000 C.C.QUITO. 0.000 0.000 0.000
PRAC 0.0000 0.000 C.C.QUITO. 0.000 0.000 0.000
MEP I 0.0360 1.461 C.C.QUITO. 1.461 0.053 0.053
SUMAN 1.0000 1.322 1.322

C.- FACTOR DE REAJUSTE.-

COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0) Coef. X Relac.
MANO DE OBRA 0.311 1.322 C.C.QUITO 1.322 1.000 0.311
CEMENTO SACOS 0.124 131.900 IPCO 133.500 1.012 0.126
ACERO EN BARRAS 0.090 192.380 IPCO 202.010 1.050 0.095
CERAMICA VITRIFICADA 0.057 141.860 IPCO 143.070 1.009 0.057
INODOROS 0.046 188.390 IPCO 190.740 1.012 0.047
PRODUCTOS ELECTROSOL 0.035 169.750 IPCO 174.860 1.030 0.036
MADERA ACERRADA 0.105 279.770 IPCO 286.330 1.023 0.107
LAVAMANOS 0.043 192.760 IPCO 195.160 1.012 0.044
COMPONENTES NO P. 0.189 190.04 IPCO 192.02 1.010 0.191

SUMAN TOTALES 1.000 1.0131

D.- VALORES DE REAJUSTE.-

TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE

DEFINITIVO 2,404.22 2,435.69 31.47


ANTICIPO 0.00
TOTAL A PAGAR 31.47

............................................. ................................................
Arq. Nelson Guamialamá Ing. Gerardo Bustos L.
Contratista Fiscalizador

...........................................
Ing. Gerardo Bustos L.
Director OO.PP.

GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS


REAJUSTE DE PRECIOS
OBRA: CONSTRUCCION DE UN AUDITORIO EN LA COMUNIDAD LA BARQUILLA
CONTRATO: N° 027- 2011 PARROQUIA: LA BONITA
FECHA DEL CONTRATO: 12/21/2011 FECHA TERMINO: 9/9/2009
CONTRATISTA: ING. JUAN GABRIEL BAR
VALOR 42,844.62 0.00
FACTOR DE REAJUSTE 1.0020 1.0020
VALOR REAJUSTADO 42931.45 0.00
VALOR NETO DE REAJUSTE 86.83 0.00
PLANILLA ANTICIPO PLANILLA
VALOR DEL REAJUSTE 86.83
DESCUENTOS
FISCALIZACION 4% 0.04000 3.47
SERV. ADMINISTR. 1.5% 0.01500 1.30
IMPUESTO RENTA 1 % 0.01000 0.87
LEY ESC. ING. 0 % 0.00000 0.00
INEC 0,5 % 0.00500 0.43
PROCURADURIA 0,25 % 0.00250 0.22
CONTRALORIA 0,125% 0.00125 0.11
SENACYT 0,125 0.00125 0.11

TOTAL DEDUCCIONES 6.51

TOTAL A PAGAR 80.32

SON. CUARENTA Y TRES CON 44/100 DOLARES

ING. JUAN GABRIEL BARROS L. Ing. Gerardo Bustos L.


Contratista Fiscalizador

...........................................
Ing. Angel Rochina
Director OO.PP.

GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS


REAJUSTE PROVISIONAL DE PRECIOS
PROYECTO: ENCAUSAMIENTO DE QUEBRADAS CASANOVA Y NEGRITO
CONTRATO PARROQUIA EL PLAYON
FECHA DEL CONTRATO: DICIEMBRE 2001 FECHA TERMINO: AGOSTO - 2002
CONTRATISTA SERPROING REPRESENTANTE: ING. FRANKLIN FIGUEROA

VALOR DE PLANILLA 20819.64 22534.72


FACTOR DE REAJUSTE 1.038 1.038
VALOR REAJUSTADO 21606.7 23386.62
VALOR NETO DE REAJUSTE 787.06 851.9
PLANILLA DOS TRES
VALOR DEL REAJUSTE 1638.96
DESCUENTOS
FISCALIZACION 4% 0.04 65.56
SERV. ADMINISTR. 1% 0.01 16.39
IMPUESTO RENTA 1 % 0.01 16.39
LEY ESCALAFON ING. 1 0.01 16.39
INEC 0,5 % 0.005 8.19
PROCURADURIA 0,25 % 0.0025 4.10
CONTRALORIA 0,125% 0.00125 2.05
SENACYT 0,125 0.00125 2.05

TOTAL DEDUCCIONES 131.12

TOTAL A PAGAR 1,507.84

SON MIL QUINIENTOS SIETE ..84/100 DOLARES

Ing. Luis Ortiz

Ing. Franklin Figueroa Ing. Marcelo Bustos


Contratista Fiscalizador

...........................................
Ing. Marco Chugá
Director OO.PP.

GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS


REAJUSTE DEFINITIVO DE PRECIOS
PROYECTO: VISERA EN EL ESTADIO EL PLAYON
CONTRATO: 19/2002 PARROQUIA EL PLAYON DE SAN FRANCISCO
FECHA DEL CONTRATO: SEPTIMBRE 2002 FECHA TERMINO: DICIEMBRE - 2002
CONTRATISTA ING. FRANKLIN FIGUEROA

VALOR DE PLANILLA 6683.49 10329.14


FACTOR DE REAJUSTE 17237.54 1.007 1.012
VALOR REAJUSTADO 6729.26 10458.2
VALOR NETO DE REAJUSTE 45.77 129.06
PLANILLA ANTICIPO UNO
VALOR DEL REAJUSTE 174.83
DESCUENTOS
FISCALIZACION 4% 0.04 6.99
SERV. ADMINISTR. 1% 0.01 1.75
IMPUESTO RENTA 1 % 0.01 1.75
LEY ESCALAFON ING. 1 0.01 1.75
INEC 0,5 % 0.005 0.87
PROCURADURIA 0,25 % 0.0025 0.44
CONTRALORIA 0,125% 0.00125 0.22
SENACYT 0,125 0.00125 0.22

TOTAL DEDUCCIONES 13.99

TOTAL A PAGAR 160.84

SON CIENTO SESENTA CON 84/100 DOLARES


Ing. Franklin Figueroa Ing. Marco Chugá
Contratista Fiscalizador

...........................................
Ing. Marco Chugá
Director OO.PP.
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS
CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS

A.- INFORMACION GENERAL

CONTRATISTA OBRA PLANILLA MONTO INCICE (0) INCICE (1)


ING. JUAN GABRIEL BARROS L. Alcantarillado El Higuerón PLAN 1 0.00 Dec-07 Feb-08

B.- CUADRILLA TIPO.-

SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.5620 1.780 C.C.QUITO. 1.780 1.000 1.000
CATEGORIA III 0.2830 1.780 C.C.QUITO. 1.780 0.504 0.504
CATEGORIA IV 0.1420 1.780 C.C.QUITO. 1.780 0.253 0.253
MEP I 0.0130 2.030 C.C.QUITO. 2.030 0.026 0.026
SUMAN 1.0000 1.783 1.783

C.- FACTOR DE REAJUSTE.-

COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.387 1.783 C.C.QUITO 1.783 1.000 0.387
CEMENTO SACOS 0.305 133.110 IPCO 133.110 1.000 0.305
MATERIAL PETREO 0.198 353.060 IPCO 353.060 1.000 0.198
EQUIPO DE CONSTR 0.024 117.490 IPCO 118.530 1.009 0.024
MADERA ACERRAD 0.054 305.460 IPCO 311.640 1.020 0.055
SALDOS 0.032 112.180 IPCO 114.710 1.023 0.033

SUMAN TOTALE 1.000 1.0020

D.- VALORES DE REAJUSTE.-

TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE

DEFINITIVO 0.00 0.00 0.00


ANTICIPO 0.00
TOTAL A PAGAR 0.00

............................................. ................................................
ING. JUAN GABRIEL BARROS L. Ing. Gerardo Bustos L.
Contratista Fiscalizador

...........................................
Ing. Nelson Rubio
Director OO.PP.

GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS


CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS
A.- INFORMACION GENERAL

CONTRATISTA OBRA PLANILLA MONTO INCICE (0) INCICE (1)


Ing. Luis Ortiz Escuela federico G. Suarez UNO 13,444.36 Jun-02 Dec-02

B.- CUADRILLA TIPO.-

SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.2640 8.730 C.C.QUITO. 8.730 2.305 2.305
CATEGORIA II 0.1630 8.850 C.C.QUITO. 8.850 1.443 1.443
CATEGORIA III 0.4230 8.940 C.C.QUITO. 8.940 3.782 3.782
CATEGORIA IV 0.0560 9.130 C.C.QUITO. 9.130 0.511 0.511
MEP 1 0.0940 9.850 C.C.QUITO. 9.850 0.926 0.926

SUMAN 1.0000 8.966 8.966

C.- FACTOR DE REAJUSTE.-

COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.233 8.966 C.C.QUITO 8.966 1.000 0.233
CEMENTO SACOS 0.081 113.330 IPCO-PAG-1 113.400 1.001 0.081
ACERO ESTRUCTUR 0.047 106.130 IPCO-PAG-1 108.850 1.026 0.048
MATERIAL PETRO 0.045 252.200 IPCO-PAG-5 283.670 1.125 0.051
MADERAS 0.003 256.590 IPCO-PAG-2 259.560 1.012 0.003
ETERNIT 0.034 119.600 IPCO-PAG-2 114.470 0.957 0.033
PERFIL ESTRUC. 0.243 96.010 IPCO-PAG-2 100.19 1.044 0.254
EQUIPO 0.104 96.54 IPCO-PAG-1 98.03 1.015 0.106
COMBUSTIBLES 0.016 255.25 IPCO-PAG-2 304.53 1.193 0.019
REPUESTOS 0.052 96.17 IPCO-PAG-3 96.94 1.008 0.052
NO PRINCIPALES 0.142 139.46 IPCO-PAG-4 139.78 1.002 0.142

SUMAN TOTALE 1.000 1.021

D.- VALORES DE REAJUSTE.-

TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE

DEFINITIVO 13,444.36 13,732.90 288.54

............................................. ................................................

...........................................
Ing. Marco Chugá

Director OO.PP.
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS
REAJUSTE PROVISIONAL DE PRECIOS
PROYECTO: AULAS EN ESCUELA FEDERICO G. SUAREZ
CONTRATO: 9/2002 PARROQUIA LA BONITA
FECHA DEL CONTRATO: JULIO 2002 FECHA TERMINO: NOVIMBRE - 2002
CONTRATISTA ING. LUIS ORTIZ

VALOR DE PLANILLA 11449.15 13444.36


FACTOR DE REAJUSTE 0.998 1.017
VALOR REAJUSTADO 11423.57 13674.02
VALOR NETO DE REAJUSTE -25.58 229.66
PLANILLA ANTICIPO UNO
VALOR DEL REAJUSTE 204.08
DESCUENTOS
FISCALIZACION 4% 0.04 8.16
SERV. ADMINISTR. 1% 0.01 2.04
IMPUESTO RENTA 1 % 0.01 2.04
LEY ESCALAFON ING. 1 0.01 2.04
INEC 0,5 % 0.005 1.02
PROCURADURIA 0,25 % 0.0025 0.51
CONTRALORIA 0,125% 0.00125 0.26
SENACYT 0,125 % 0.00125 0.26

TOTAL DEDUCCIONES 16.33

TOTAL A PAGAR 187.75

SON CIENTO OCHENTA Y SIETE CON 75/100 DOLARES

Ing. Luis Ortiz Ing. Marco Chugá


Contratista Fiscalizador

...........................................
Ing. Marco Chugá
Director OO.PP.
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS
CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS

A.- INFORMACION GENERAL

CONTRATISTA OBRA PLANILLA MONTO INCICE (0) INCICE (1)


Ing. Franklin Figueroa Visera Estadio El Playón Anticipo 6,683.49 Aug-02 Sep-02

B.- CUADRILLA TIPO.-

SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.2540 8.730 C.C.QUITO. 8.730 2.217 2.217
CATEGORIA II 0.3090 8.850 C.C.QUITO. 8.850 2.735 2.735
CATEGORIA III 0.3320 8.940 C.C.QUITO. 8.940 2.968 2.968

SUMAN 0.8950 7.920 7.920

C.- FACTOR DE REAJUSTE.-

Coef. X Relac. COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.260 7.920 C.C.QUITO 7.920 1.000 0.260
CEMENTO SACOS 0.128 113.400 IPCO-PAG-1 113.400 1.000 0.128
ACERO ESTRUCTURAL 0.051 106.730 C.C.QUITO 107.560 1.008 0.051
PERFILES EST. 0.148 95.680 IPCO-PAG-1 97.260 1.017 0.150
MATERIAL PETREO 0.056 283.670 IPCO-PAG-5 283.670 1.000 0.056
COMBUSTIBLES 0.014 275.98 IPCO-PAG-1 299.24 1.084 0.015
REPUESTOS 0.046 96.46 IPCO-PAG-3 96.46 1.000 0.046
NO PRINCIPALES 0.076 1119.84 IPCO-PAG-4 1159.71 1.036 0.079
SUMAN TOTALES 0.779 0.786

D.- VALORES DE REAJUSTE.-

TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE

6,683.49 5,251.39 -1,432.10

............................................. ................................................
Ing. Franklin Figueroa Ing. Marco Chugá
Contratista Fiscalizador

...........................................
Ing. Marco Chugá
Director OO.PP.

GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS


CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS
A.- INFORMACION GENERAL

CONTRATISTA OBRA PLANILLA MONTO INCICE (0) INCICE (1)


Ing. Luis Ortiz Aulas Colegio Sucumbios ANTICIPO 10,932.22 Jun-02 Jul-02

B.- CUADRILLA TIPO.-

SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.2230 8.730 C.C.QUITO. 8.730 1.947 1.947
CATEGORIA II 0.2000 8.850 C.C.QUITO. 8.850 1.770 1.770
CATEGORIA III 0.4160 8.940 C.C.QUITO. 8.940 3.719 3.719
CATEGORIA IV 0.0490 9.130 C.C.QUITO. 9.130 0.447 0.447
MEP 1 0.1120 9.850 C.C.QUITO. 9.850 1.103 1.103

SUMAN 1.0000 8.986 8.986

C.- FACTOR DE REAJUSTE.-

Coef. X Relac. COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.210 8.986 C.C.QUITO 8.986 1.000 0.210
CEMENTO SACOS 0.069 113.330 IPCO-PAG-1 113.400 1.001 0.069
ACERO ESTRUCTURAL 0.058 106.130 IPCO-PAG-1 106.130 1.000 0.058
MATERIAL PETREO 0.051 252.200 IPCO-PAG-3 252.200 1.000 0.051
ETERNIT 0.036 119.600 IPCO-PAG-2 110.910 0.927 0.033
PERFILES EST. 0.255 96.010 IPCO-PAG-2 96.010 1.000 0.255
EQUIPO 0.110 96.54 IPCO-PAG-2 96.6 1.001 0.110
COMBUSTIBLES 0.017 255.25 IPCO-PAG-1 255.25 1.000 0.017
REPUESTOS 0.055 96.17 IPCO-PAG-2 96.26 1.001 0.055
NO PRINCIPALES 0.139 139.38 IPCO-PAG-4 139.46 1.001 0.139

SUMAN TOTALES 1.000 0.998

D.- VALORES DE REAJUSTE.-

TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE

10,932.22 10,906.27 -25.95

............................................. ................................................

...........................................
Ing. Marco Chugá

Director OO.PP.
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS
CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS

A.- INFORMACION GENERAL

CONTRATISTA OBRA PLANILLA MONTO INCICE (0) INCICE (1)


Ing. Franklin Figueroa Visera Estadio El Playón Uno 10,329.14 Aug-02 Dec-02

B.- CUADRILLA TIPO.-

SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.2540 8.730 C.C.QUITO. 8.730 2.217 2.217
CATEGORIA II 0.3090 8.850 C.C.QUITO. 8.850 2.735 2.735
CATEGORIA III 0.3320 8.940 C.C.QUITO. 8.940 2.968 2.968

SUMAN 0.8950 7.920 7.920

C.- FACTOR DE REAJUSTE.-

Coef. X Relac. COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.260 7.920 C.C.QUITO 7.920 1.000 0.260
CEMENTO SACOS 0.128 113.400 IPCO-PAG-1 113.400 1.000 0.128
ACERO ESTRUCTURAL 0.051 106.730 C.C.QUITO 108.850 1.020 0.052
PERFILES EST. 0.148 95.680 IPCO-PAG-1 100.190 1.047 0.155
MATERIAL PETREO 0.056 283.670 IPCO-PAG-5 283.670 1.000 0.056
COMBUSTIBLES 0.014 275.98 IPCO-PAG-1 304.53 1.103 0.015
REPUESTOS 0.046 96.46 IPCO-PAG-3 96.94 1.005 0.046
NO PRINCIPALES 0.076 1119.84 IPCO-PAG-4 1159.71 1.036 0.079
SUMAN TOTALES 0.779 0.791

D.- VALORES DE REAJUSTE.-

TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE

PROVISIONAL 10,329.14 8,174.19 -2,154.95

............................................. ................................................
Ing. Franklin Figueroa Ing. Marco Chugá
Contratista Fiscalizador

...........................................
Ing. Marco Chugá
Director OO.PP.

GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS


CALCULO DE REAJUSTE
DIRECCION DE OBRAS PUBLICAS
A.- INFORMACION GENERAL

CONTRATISTA OBRA PLANILLA MONTO INCICE (0) INCICE (1)


Ing. Luis Ortiz Aulas Colegio Sucumbios UNO 10,554.05 Jun-02 Dec-02

B.- CUADRILLA TIPO.-

SALARIOS (2) COEFIC. (3) SALARIO FUENTE (4)SALARIO (2) X (3) (2) X (4)
CATEGORIA I 0.2230 8.730 C.C.QUITO. 8.730 1.947 1.947
CATEGORIA II 0.2000 8.850 C.C.QUITO. 8.850 1.770 1.770
CATEGORIA III 0.4160 8.940 C.C.QUITO. 8.940 3.719 3.719
CATEGORIA IV 0.0490 9.130 C.C.QUITO. 9.130 0.447 0.447
MEP 1 0.1120 9.850 C.C.QUITO. 9.850 1.103 1.103

SUMAN 1.0000 8.986 8.986

C.- FACTOR DE REAJUSTE.-

Coef. X Relac. COMPONENTE (2) COEFIC. INDICE (0) FUENTE INDICE (1) IND(1) /IND (0)Coef. X Relac.
MANO DE OBRA 0.210 8.986 C.C.QUITO 8.986 1.000 0.210
CEMENTO SACOS 0.069 113.330 IPCO-PAG-1 113.400 1.001 0.069
ACERO ESTRUCTURAL 0.058 106.130 C.C.QUITO 107.560 1.013 0.059
MATERIAL PETREO 0.051 252.200 IPCO-PAG-5 283.670 1.125 0.057
ETERNIT 0.036 119.600 IPCO-PAG-2 110.910 0.927 0.033
PERFILES EST. 0.255 96.010 IPCO-PAG-2 100.190 1.044 0.266
EQUIPO 0.110 96.54 IPCO-PAG-2 97.96 1.015 0.112
COMBUSTIBLES 0.017 255.25 IPCO-PAG-1 255.25 1.000 0.017
REPUESTOS 0.055 96.17 IPCO-PAG-3 96.65 1.005 0.055
NO PRINCIPALES 0.139 139.38 IPCO-PAG-4 140.26 1.006 0.140

SUMAN TOTALES 1.000 1.018

D.- VALORES DE REAJUSTE.-

TIPO DE REAJUSTE (Po) PLANILLADO (Pr) REAJUSTADO (R) VALOR DEL REAJUSTE

DEFINITIVO 10,554.05 10,748.71 194.66

............................................. ................................................

...........................................
Ing. Marco Chugá

Director OO.PP.
Coef. X Relac.
Coef. X Relac.
CONTRATO: N° 027- 2011
CONTRATISTA: ING. JUAN GABRIEL BARROS L.
OBRA: CONSTRUCCION DE UN AUDITORIO EN LA COMUNIDAD LA BARQUILLA
MONTO: 85,689.23 usd
PLAZO: 90 días
FECH. CONT: 21-Dec-11

CUARTA: ANALISIS DE PLAZOS

FECHA DE SUSCRIPCION DEL CONTRATO: 12/21/2011


FECHA ENTREGA DE ANTICIPO 12/4/2008
PLAZO CONTRACTUAL: 90 DIAS
RECEPCION PROVISIONAL (oficio) 9/9/2009
TIEMPO DE EJECUCION: 280.00 DIAS

SUSPENSION DE OBRA
Inicio: (oficio # 072-2008-OO.PP.MM.) 12/19/2008
Hasta: (oficio # 072-2008-OO.PP.MM.) 6/8/2009 171.00 DIAS

AMPLIACION DE PLAZO: 0.00 DIAS

PLAZO+SUSPENSION+AMPLIACION: 261.00 DIAS

MORA: 0 DIAS

DIAS A FAVOR DEL CONTRATISTA 0 DIAS

Por lo tanto no existe mora en la ejecución de la obra

SEXTA: LIQUIDACION ECONOMICA

Monto del contrato: 85,689.23


Anticipo 50% : 42,844.62
Planilla unica : 52681.91
Total planillado : 52681.91
Reajuste de precios : 0
Descuento anticipo : 26340.95
Saldo Anticipo : 16503.66
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS
PLANILLA DE INCREMENTOS DE OBRA
OBRA: CONSTRUCCION DE UN AUDITORIO EN LA COMUNIDAD LA BARQUILLA
CONTRATISTA: ING. JUAN GABRIEL BARROS L. PLANILLA No.: 1
MONTO DE LA OBRA: 85,689.23 FECHA DE PLANILLA: 4/26/2012
FECHA DE SUSCRIPCION DEL CONTRATO: 12/21/2011 PERIODO DE EJEC.: DE 28/FEB/12 A 25/ABR/12
NUMERO DEL CONTRATO: 001/2010 PLAZO: 90
TIEMPO DE EJECUCION: 08 DIAS CALENDARIO VALOR DE PLANILLA: 52,681.91
PRORROGA: O Días calendario
RUBROS U P CANTIDADES VALORES
UNIT. CONT EJEC. DIF(+) DIF(-) CONT. EJEC. DIF.
LIMPIEZA DEL TERRENO m2 1.11 308.00 384.00 76.00 0.00 341.88 426.24 84.36
REPLANTEO Y NIVELACION m2 0.94 308.00 240.00 0.00 68.00 289.52 225.60 -63.92
EXCAVACION MANUAL DE PLINTOS Y CIMIENTOS m3 9.15 85.24 16.00 0.00 69.24 779.95 146.40 -633.55
RELLENO CAMPACTADO SUELO NATURAL m3 6.85 51.14 0.00 0.00 51.14 350.31 0.00 -350.31
RELLENO COMPACTADO MEJORAM - Lastre - Piso+Plintos m3 27.98 133.78 0.00 0.00 133.78 3743.16 0.00 -3743.16
REPLANTILLO H.S. DE 180 K/CM m3 179.44 3.90 1.95 0.00 1.95 699.82 349.91 -349.91
PLINTOS H.S. F´c= 210 KG/CM2 m3 204.65 11.70 11.70 0.00 0.00 2394.41 2394.41 0.00
HORM. EN COLUMNAS F¨c = 210 Kg/cm2 m3 293.96 7.80 8.42 0.62 0.00 2292.89 2476.32 183.43
HORMIGÓN CICLÓPEO 180 kg/cm2 m3 188.25 15.30 16.00 0.70 0.00 2880.23 3012.00 131.78
HORM. EN CADENAS F¨c = 210 Kg/cm2 m3 220.46 4.78 8.72 3.94 0.00 1053.80 1922.41 868.61
HORM. EN VIGAS F¨c = 210 Kg/cm2 m3 295.46 11.60 8.52 0.00 3.08 3427.34 2517.32 -910.02
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
ACERO DE REFUERZO f'y = 4200 kg/cm2 Kg 2.16 4324.94 4885.43 560.49 0.00 9341.87 10552.52 1210.65
ACERO ESTRUCTURAL Kg 3.58 2555.52 3082.48 526.96 0.00 9148.76 11035.27 1886.51
CUBIERTA DE ETERNIT m2 16.66 616.00 352.00 0.00 264.00 10262.56 5864.32 -4398.24
MAMPOSTERIA LADRILLO MAMBRON m2 16.84 194.00 182.37 0.00 11.63 3266.96 3071.14 -195.82
H.S. EN CONTRAPISO e=6 cm f'c=210 kg/cm2 - paleteado m2 20.64 240.00 0.00 0.00 240.00 4953.60 0.00 -4953.60
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
ENLUCIDO VERTICAL E=2.5cm. Mor. 1:4 m2 10.98 388.00 465.71 77.71 0.00 4260.24 5113.52 853.28
BORDILLOS H.S. F'c=180Kg/cm2 m3 224.60 6.30 0.00 0.00 6.30 1414.98 0.00 -1414.98
H.S. EN ACERAS e=6 cm f'c=210 kg/cm2 - paleteado m2 20.64 70.00 0.00 0.00 70.00 1444.80 0.00 -1444.80
PROTECTOR DE VENTANA DE HIERRO DE 1/2" inc. Colocad m2 64.05 54.00 0.00 0.00 54.00 3458.70 0.00 -3458.70
FILOS DE VENTANAS m 5.05 240.00 348.12 108.12 0.00 1212.00 1758.01 546.01
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
CERAMICA DE PISO GRAIMAN 40 X 40 CM m2 23.86 240.00 0.00 0.00 240.00 5726.40 0.00 -5726.40
BARREDERA DE CERAMICA m 4.61 70.00 0.00 0.00 70.00 322.70 0.00 -322.70
HORM. MURO ESCENARIO F¨c = 210 Kg/cm2 m3 220.46 13.60 5.51 0.00 8.09 2998.26 1215.48 -1782.77
CERAMICA DE PARED m2 21.03 41.60 0.00 0.00 41.60 874.85 0.00 -874.85
PUERTA DE TOL CON ANGULO , Y ALDABA m2 107.93 2.00 0.00 0.00 2.00 215.86 0.00 -215.86
PUERTA DE HIERRO ACORDION m2 108.76 7.50 0.00 0.00 7.50 815.70 0.00 -815.70
Puerta de madera panelada 0.70x1,80 con Tapamarcos-cerrad UNID 140.78 2.00 0.00 0.00 2.00 281.56 0.00 -281.56
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
LAVAMANOS UNID 69.34 2.00 0.00 0.00 2.00 138.68 0.00 -138.68
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SUMAN #REF! #REF! #REF!
RESUMEN:
DIFERENCIA: #REF!
VALOR DEL CONTRATO: 85,689.23
VALOR DE PLANILLA: 52,681.91
INCREMENTO: #REF!
ADMINISTRADOR CONTRATO FISCALIZADOR CONTRATISTA 0.61
Porcentaje 61.48%
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS
PLANILLA DE RECEPCION DE OBRA
OBRA: CONSTRUCCION DE UN AUDITORIO EN LA COMUNIDAD LA BARQUILLA
PLANILLA 1
PARTIDA N° 3.6.1.7.5.01.04.75 FECHA PLANILLA 4/26/2012
CONTRATO: N° 027- 2011 FECHA CONTRATO 12/21/2011
CONTRATISTA: ING. JUAN GABRIEL BARROS L. MONTO CONTRATO: 85,689.23
ANTICIPO 50% 42,844.62
VALOR PLANILLA 52,681.91
PERIODO: DE 28/FEB/12 A 25/ABR/12

CONTRATO CANTIDADES IMPORTE


PRECIO ESTA TOTAL TOTAL ESTA TOTAL
N° RUBROS UNID CANTIDAD UNITARIO PLANILLA ANTERIOR FECHA PLANILLA ANTERIOR
TOTAL FECHA

1 LIMPIEZA DEL TERRENO m2 308.00 1.11 384.00 384.00 426.24 0.00 426.24
2 REPLANTEO Y NIVELACION m2 308.00 0.94 240.00 240.00 225.60 0.00 225.60
3 EXCAVACION MANUAL DE PLINTOS Y CIMIENTOS m3 85.24 9.15 16.00 16.00 146.40 0.00 146.40
4 RELLENO CAMPACTADO SUELO NATURAL m3 51.14 6.85 0.00 0.00 0.00 0.00 0.00
5 RELLENO COMPACTADO MEJORAM - Lastre - Piso+Plintos m3 133.78 27.98 0.00 0.00 0.00 0.00 0.00
6 REPLANTILLO H.S. DE 180 K/CM m3 3.90 179.44 1.95 1.95 349.91 0.00 349.91
7 PLINTOS H.S. F´c= 210 KG/CM2 m3 11.70 204.65 11.70 11.70 2394.41 0.00 2394.41
8 HORM. EN COLUMNAS F¨c = 210 Kg/cm2 m3 7.80 293.96 8.42 8.42 2476.32 0.00 2476.32
9 HORMIGÓN CICLÓPEO 180 kg/cm2 m3 15.30 188.25 16.00 16.00 3012.00 0.00 3012.00
10 HORM. EN CADENAS F¨c = 210 Kg/cm2 m3 4.78 220.46 8.72 8.72 1922.41 0.00 1922.41
11 HORM. EN VIGAS F¨c = 210 Kg/cm2 m3 11.60 295.46 8.52 8.52 2517.32 0.00 2517.32
12 ACERO DE REFUERZO f'y = 4200 kg/cm2 Kg 4324.94 2.16 4885.43 4885.43 10552.52 0.00 10552.52
13 ACERO ESTRUCTURAL Kg 2555.52 3.58 3082.48 3082.48 11035.27 0.00 11035.27
14 CUBIERTA DE ETERNIT m2 616.00 16.66 352.00 352.00 5864.32 0.00 5864.32
15 MAMPOSTERIA LADRILLO MAMBRON m2 194.00 16.84 182.37 182.37 3071.14 0.00 3071.14
16 H.S. EN CONTRAPISO e=6 cm f'c=210 kg/cm2 - paleteado m2 240.00 20.64 0.00 0.00 0.00 0.00 0.00
17 ENLUCIDO VERTICAL E=2.5cm. Mor. 1:4 m2 388.00 10.98 465.71 465.71 5113.52 0.00 5113.52
18 BORDILLOS H.S. F'c=180Kg/cm2 m3 6.30 224.60 0.00 0.00 0.00 0.00 0.00
19 H.S. EN ACERAS e=6 cm f'c=210 kg/cm2 - paleteado m2 70.00 20.64 0.00 0.00 0.00 0.00 0.00
20 PROTECTOR DE VENTANA DE HIERRO DE 1/2" inc. Coloca m2 54.00 64.05 0.00 0.00 0.00 0.00 0.00
21 FILOS DE VENTANAS m 240.00 5.05 348.12 348.12 1758.01 0.00 1758.01
22 CERAMICA DE PISO GRAIMAN 40 X 40 CM m2 240.00 23.86 0.00 0.00 0.00 0.00 0.00
23 BARREDERA DE CERAMICA m 70.00 4.61 0.00 0.00 0.00 0.00 0.00
24 HORM. MURO ESCENARIO F¨c = 210 Kg/cm2 m3 13.60 220.46 5.51 5.51 1215.48 0.00 1215.48
25 CERAMICA DE PARED m2 41.60 21.03 0.00 0.00 0.00 0.00 0.00
26 PUERTA DE TOL CON ANGULO , Y ALDABA m2 2.00 107.93 0.00 0.00 0.00 0.00 0.00
27 PUERTA DE HIERRO ACORDION m2 7.50 108.76 0.00 0.00 0.00 0.00 0.00
28 Puerta de madera panelada 0.70x1,80 con Tapamarcos-cerradura UNID 2.00 140.78 0.00 0.00 0.00 0.00 0.00
29 LAVAMANOS UNID 2.00 69.34 0.00 0.00 0.00 0.00 0.00
30 INODORO TANQUE BAJO UNID 2.00 108.23 0.00 0.00 0.00 0.00 0.00
31 PINTURA DE CAUCHO VINYIL ACRILICA 2 MANOS (MARFm2 388.00 3.83 0.00 0.00 0.00 0.00 0.00
32 PUNTO DE AGUA POTABLE PVC Ø=½" Pto 4.00 21.53 0.00 0.00 0.00 0.00 0.00
33 SALIDA DE AA.SS. PVC 50 mm. Pto 2.00 8.83 0.00 0.00 0.00 0.00 0.00
34 SALIDA DE AA.SS. PVC 110 mm. Pto 2.00 28.68 0.00 0.00 0.00 0.00 0.00
35 TUBERIA PVC 110 MM DESAGUE m 10.00 6.35 0.00 0.00 0.00 0.00 0.00
36 TABLERO DE CONTROL 4-8 PTOS UNID 1.00 132.68 0.00 0.00 0.00 0.00 0.00
37 ILUMINACION CONDUCTOR # 12 Pto 10.00 34.36 0.00 0.00 0.00 0.00 0.00
38 TOMACORRIENTES DOBLES UNID 10.00 33.53 0.00 0.00 0.00 0.00 0.00
39 BAJANTES A. LLUVIAS PVC 110MM m 20.00 7.43 0.00 0.00 0.00 0.00 0.00
40 CANAL DE TOOL GALVANIZADO 1/32 PINTADO m 44.00 13.66 44.00 44.00 601.04 0.00 601.04
41 CAJA REVISION H.S. 50 X 50cm F'c=180 kg/cm e=10 cm. UNID 2.00 107.20 0.00 0.00 0.00 0.00 0.00
42 TUBERIA PRESION ROSCABLE Ø=1/2" (Acometida) m 20.00 3.33 0.00 0.00 0.00 0.00 0.00
43 ACOMETIDA PRINCIPAL CONDUCTOR # 10 m 30.00 6.48 0.00 0.00 0.00 0.00 0.00
44 HORM. EN RIOSTRAS F¨c = 210 Kg/cm2 m3 0.30 226.06 0.00 0.00 0.00 0.00 0.00
45 VENTANA DE ALUMINIO Y VIDRIO e=4 mmCORREDIZA m2 54.00 66.81 0.00 0.00 0.00 0.00 0.00

TOTAL 52681.91 0.00 52681.91

ADMINISTRADOR CONTRATO FISCALIZADOR CONTRATISTA


ING. MIGUEL BENITEZ ARQ. RUSVEL CARRION ING. JUAN GABRIEL BARROS L.
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS
PLANILLA DE RECEPCION DE OBRA
OBRA: CONSTRUCCION DE UN AUDITORIO EN LA COMUNIDAD LA BARQUILLA
PLANILLA 1
PARTIDA N° 3.6.1.7.5.01.04.75 FECHA PLANILLA 4/26/2012
CONTRATO: N° 027- 2011 FECHA CONTRATO 12/21/2011
CONTRATISTA: ING. JUAN GABRIEL BARROS L. MONTO CONTRATO: 85,689.23

ANTICIPO 50% 26340.95 0.00 26340.95


FISCALIZACION 0% 0.00 0.00 0.00
LEY DE ESCALAFON INGENIEROS 0% 0.00 0.00 0.00
IMPUESTO A LA RENTA 1% 526.82 0.00 526.82
SERVICIOS ADMINISTRATIVOS 0% 0.00 0.00 0.00
MULTAS 0.00 0.00
TOTAL DEDUCCIONES 26867.77 0.00 26867.77
VALOR DE LA PLANILLA 52681.91 0.00 52681.91
TOTAL A PAGARSE 25814.14
SON: VEINTE Y CINCO MIL OCHOCIENTOS CATORCE, 14/100 DOLARES

ADMINISTRADOR CONTRATO FISCALIZADOR CONTRATISTA


ING. MIGUEL BENITEZ ARQ. RUSVEL CARRION ING. JUAN GABRIEL BARROS L.
ILUSTRE MUNICIPIO DE SUCUMBIOS
DIRECCION DE OBRAS PUBLICAS
FISCALIZACION
ANEXO DE OBRA

CONTRATO No: CONTRATO: N° 027- 2011


PLANILLA No: 1
OBRA: OBRA: CONSTRUCCION DE UN AUDITORIO EN LA COMUNIDAD LA BARQUILLA
LUGAR: La Barquilla
CONTRATISTA: Ing. Juan Gabriel Barros L.
FISCALIZADOR: ARQ. RUSVEL CARRION

B= largo C= Ancho D= ProfundE= Número F=BxCxDxE

B C D E F

LIMPIEZA DEL TERRENO M2


DESCRIPCION: B= largo C= Ancho E= Número F=BxCxE
Area total 24.00 16.00 1.00 384.00
1.00 -
1.00 -
1.00 -
TOTAL= 384.00 M2

REPLANTEO Y NIVELACION M2
DESCRIPCION: B= largo C= Ancho E= Número F=BxCxE
Area total 20.00 12.00 1.00 240.00
1.00 -
1.00 -
1.00 -
TOTAL= 240.00 M2

EXCAVACION MANUAL DE PLINTOS Y CIMIENTO M3


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
Para hormigon Ciclopeo 100.00 0.40 0.40 1.00 16.00

1.00 0.00
TOTAL= 16.00 M3

RELLENO COMPACTADO SUELO NATURAL M3


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE

1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 M3

RELLENO COMPACTADO MEJORAM- lastre M3


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
0.00
0.00
0.00 0.00 0.00 1.00 0.00
1.00 0.00

TOTAL= 0.00 M3
REPLANTILLO H.S. DE 180 K/CM M3
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
Base Para Zapatas 2.00 1.50 0.05 10.00 1.50
1.50 1.50 0.05 4.00 0.45
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 1.95 M3

PLINTOS H.S. F´c= 210 KG/CM2 M3


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
Plinto 1 2.00 1.50 0.3 10.00 9.00
Plinto 2 1.50 1.50 0.30 4.00 2.70
1.00 0.00
1.00 0.00

TOTAL= 11.70 M3

HORM. EN COLUMNAS F¨c = 210 Kg/cm2 M3


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
Columna 1 5.40 0.40 0.30 10.00 6.48
Columna 2 5.40 0.30 0.30 4.00 1.94
1.00 0.00
1.00 0.00

TOTAL= 8.42 M3

HORMIGÓN CICLÓPEO 180 kg/cm2 M3


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
Base para cadenas 100.00 0.40 0.40 1.00 16.00
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 16.00 M3

HORM. EN CADENAS F¨c = 210 Kg/cm2 M3


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
Cadena 1 64.00 0.20 0.40 1.00 5.12
Cadena 2 36.00 0.40 0.25 1.00 3.60
Cadena Com. 64.00 0.20 0.20 0.00 0.00
1.00 0.00
TOTAL= 8.72 M3

HORM. EN VIGAS F¨c = 210 Kg/cm2 M3


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxE
Vigas Largas 40 0.50 0.30 1.00 6.00
Vigas Cortas 24 0.35 0.30 1.00 2.52
1.00 0.00
1.00 0.00
TOTAL= 8.52 M3

ACERO DE REFUERZO fy=4200 kg/cm2 KG


MARCA 0 # LONGITUD LONGITUD T.
PLINTOS
100 12 80 2.20 176.00
101 12 100 1.70 170.00
102 12 64 1.70 108.80
CADENA
120 14 4 11.90 47.60
121 14 4 9.25 37.00
122 14 4 10.40 41.60
123 14 4 10.85 43.40
124 8 536 0.90 482.40
125 14 30 8.80 264.00
126 14 30 4.50 135.00
127 8 800 0.90 720.00
Cadena Complementaria 12 4 11.90 47.60
12 4 9.25 37.00
12 4 10.40 41.60
12 4 10.85 43.40
8 268 0.72 192.96
12 8 8.80 70.40
12 8 4.50 36.00
8 160 0.72 115.20
COLUMNA
130 16 40 6.00 240.00
131 14 40 6.00 240.00
132 8 500 1.40 700.00
133 8 500 1.40 700.00
134 8 500 1.20 600.00
135 12 24 6.00 144.00
VIGAS
140 16 6 12.00 72.00
141 16 6 9.35 56.10
142 16 8 10.50 84.00
143 16 8 10.95 87.60
144 14 8 1.70 13.60
145 14 6 2.85 17.10
146 16 14 8.9 124.60
147 16 14 4.60 64.40
148 14 4 2.84 11.36
149 8 476 1.60 761.60
152 8 296 1.30 384.80

Muros escenario
8 113 1.15 129.95
8 3 22.00 66.00
8 3 12.00 36.00
0.00
0.00
0.00
0.00

RESUMEN ACERO DE REFUERZO

O LONGITUD PESO / m PESO T. (KG)


8 4888.91 0.395 1931.12
10 0.00 0.617 0.00
12 874.80 0.888 776.82
14 850.66 1.208 1027.60
16 728.70 1.578 1149.89
20 0.00 2.466 0.00
TOTAL= 4885.43 KG

ACERO ESTRUCTURAL KG
MARCA 0 # LONGITUD LONGITUD T.
U 05 U 150x50x3 10 0.90 9.00
U 09 U 150x50x3 10 1.59 15.90
U 06 U 150x50x3 10 4.37 43.70
U 07 U 150x50x3 10 1.75 17.50
U 08 U 150x50x3 10 7.90 79.00
U 150x50x3 60 0.15 9.00

G 150x50x15x3 12 22.00 264.00


L 25 A 40x40x3 20 1.02 20.40
L 24 A 40x40x3 20 0.69 13.80
L 23 A 40x40x3 20 1.05 21.00
L 22 A 40x40x3 120 0.47 56.40
L 21 A 40x40x3 120 0.93 111.60
L 20 A 40x40x3 20 0.25 5.00

PLACAS 10 1.00 10.00

RESUMEN ACERO ESTRUCTURAL

O LONGITUD PESO / m PESO T. (KG)


U 150x50x3 165.10 5.660 934.47
U 150x50x3 9.00 5.660 50.94
G 150x50x15 264.00 6.130 1618.32
A 40x40x3 228.20 1.860 424.45
PLACAS 10.00 5.430 54.30

TOTAL= 3082.48 KG

CUBIERTA DE ETERNIT M2
DESCRIPCION: B= largo C= Ancho E= Número F=BxCxE
Cubierta 22.00 8.00 2.00 352.00
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 352.00 M2

MAMPOSTERIA LADRILLO MAMBRON M2


DESCRIPCION: B= largo C= Ancho E= Número F=BxCxE
Pared Posterior 11.56 3.05 1.00 35.26
Puerta -1.2 2.40 1.00 -2.88
Pared lateral Escenario 5.68 2.90 2.00 32.94
Ventanas -0.6 0.60 2.00 -0.72
-1.5 0.60 2.00 -1.80
-0.8 2.00 2.00 -3.20
Pared Lateral 13.87 3.80 2.00 105.41
Ventanas -1.00 2.90 4.00 -11.60
-4.70 1.00 2.00 -9.40
-0.80 2.00 2.00 -3.20
Pared Principal 11.56 3.80 1.00 43.93
Puerta -2.60 2.75 1.00 -7.15
-1.00 3.70 3.00 -11.10
-0.80 1.00 2.00 -1.60
Tapa de Culatas 4.40 0.58 4.00 10.12
3.20 1.15 2.00 7.36
1.00 0.00
TOTAL= 182.37 M2

H.S. EN CONTRAPISO e=6cm M2


DESCRIPCION: B= largo C= Ancho E= Número F=BxCxE
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 M2
ENLUCIDO VERTICAL E=2.5cm. Mor. 1:4 M2
DESCRIPCION: B= largo C= Ancho E= Número F=BxCxE
Interior
Pared Posterior 11.56 3.40 1.00 39.30
-1.20 2.40 1.00 -2.88
Tarima 5.68 3.40 2.00 38.62
-0.60 0.60 2.00 -0.72
-1.50 0.60 2.00 -1.80
-0.80 2.00 2.00 -3.20
Pared lateral 13.87 4.30 2.00 119.28
-1.00 2.90 2.00 -5.80
-4.70 1.00 2.00 -9.40
-1.00 2.90 2.00 -5.80
-0.80 2.00 2.00 -3.20
Pared Principal 11.56 4.30 1.00 49.71
-2.60 2.75 1.00 -7.15
-1.00 3.70 1.00 -3.70
-0.80 1.00 2.00 -1.60
-3.70 1.00 2.00 -7.40
Tapa de Culatas 4.40 0.58 4.00 10.12
3.20 1.15 2.00 7.36
Exterior
Fachada Principal 12.43 0.35 1.00 4.35
3.95 3.67 1.00 14.50
-1.00 3.67 2.00 -7.34
-1.00 0.80 2.00 -1.60
Vigas 4.70 0.50 8.00 18.80
Pared lateral 4.70 3.80 2.00 35.72
-0.80 2.00 2.00 -3.20
-2.90 1.00 2.00 -5.80
4.70 3.80 2.00 35.72
-1.00 4.70 2.00 -9.40
4.70 3.80 2.00 35.72
-1.00 2.90 2.00 -5.80
-2.00 0.80 2.00 -3.20
4.70 3.80 2.00 35.72
-1.50 0.60 2.00 -1.80
0.60 0.60 2.00 0.72
Pared Posterior 3.62 3.95 2.00 28.60
3.62 3.95 1.00 14.30
-1.20 2.40 1.00 -2.88
Franjas de columnas esquineras
1.15 4.50 4.00 20.70
Posterior y Principal 0.65 4.15 4.00 10.79
Laterales 0.81 4.50 6.00 21.87
Tapa de Culatas 4.40 0.58 4.00 10.12
3.20 1.15 2.00 7.36
0.00
0.00
TOTAL= 465.71 M2

BORDILLOS H.S. F'c=180Kg/cm2 M3


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE

1.00 0.00
TOTAL= 0.00 M2
H.S. EN ACERAS e=6 cm f'c=210 kg/cm2 - paletea M2
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=B
-
-
-
-
-
-
TOTAL= - M2

PROTECTOR DE VENTANA DE HIERRO DE 1/2 M2


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxE
-
-
-
-
-
TOTAL= - M2

FILOS DE VENTANAS M
DESCRIPCION: B= largo E= Número F=BxE
3.60 1.0 3.60
7.20 1.0 7.20
4.20 1.0 4.20
4.50 1.0 4.50
2.40 1.0 2.40
6.00 1.0 6.00
2.40 1.0 2.40
8.70 1.0 8.70
3.00 1.0 3.00
14.10 1.0 14.10
2.00 1.0 2.00
8.70 1.0 8.70
3.00 1.0 3.00
6.00 1.0 6.00
2.40 1.0 2.40
14.80 1.0 14.80
4.00 1.0 4.00
11.60 1.0 11.60
3.20 1.0 3.20
2.00 1.0 2.00
14.80 1.0 14.80
2.00 1.0 2.00
5.20 1.0 5.20
11.00 1.0 11.00
36.00 1.0 36.00
11.03 1.0 11.03
12.43 1.0 12.43
90.00 1.0 90.00
27.00 1.0 27.00
24.86 1.0 24.86

-
TOTAL= 348.12 M

CERAMICA DE PISO GRAIMAN 40 X 40 CM M2


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 M2
BARREDERA DE CERAMICA M
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 M

HORM. MURO ESCENARIO Fc=210 M3


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
Interiores 9.17 0.90 0.30 1.00 2.48
0.90 1.00 0.15 2.00 0.27
Exteriores 4.70 0.90 0.15 2.00 1.27
3.70 0.90 0.15 3.00 1.50
1.00 0.00
TOTAL= 5.51 M3

CERAMICA DE PARED M2
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 M2

PUERTA DE TOL CON ANGULO Y ALDABA M2


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE

1.00 0.00
TOTAL= 0.00 M2

PUERTA DE HIERRO ACORDEON M2


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=B
-
-
-
TOTAL= - M2

PUERTA DE MADERA PANELADA 0.70X1.80 U


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxE
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 U

LAVAMANOS U
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxE
1.00 0.00
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 U

INODORO TANQUE BAJO U


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 U
PINTURA DE CAUCHO VINIL ACRILICA M2
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE

1.00 0.00
TOTAL= 0.00 M2

PUNTO DE AGUA POTABLE PVC 1/2 PTO


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=B
-
-
-
-
TOTAL= - PTO

SALIDA DE AA SS PVC 50 MM PTO


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 PTO

SALIDA DE AA SS PVC 110 MM PTO


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE

1.00 0.00
TOTAL= 0.00 PTO

TUBERIA DE PVC 110 MM DESAGUE M


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=B
-
-
-
TOTAL= - M

TABLERO DE CONTROL 4-8 PTO U


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 U

ILUMINACION CONDUCTOR # 12 PTO


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE

1.00 0.00
TOTAL= 0.00 PTO

TOMACORRIENTE DOBLES U
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=B
-
-
-
TOTAL= - U
BAJANTES A. LLUVIAS PVC 110MM M
DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 M

CANAL DE TOOL GALVANIZADO 1/32 PINTADO M


DESCRIPCION: B= largo E= Número F=BxE
Laterales 22.00 2.00 44.00

TOTAL= 44.00 M

CAJA REVISION H.S. 50 X 50cm U


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=B
-
-
-
TOTAL= - U

TUBERIA PRESION ROSCABLE Ø=1/2" (AcometidaM


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE
1.00 0.00
1.00 0.00
1.00 0.00
TOTAL= 0.00 M

ACOMETIDA PRINCIPAL CONDUCTOR # 10 M


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=BxCxDxE

1.00 0.00
TOTAL= 0.00 M

HORM. EN RIOSTRAS F¨c = 210 Kg/cm2 M3


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=B
-
-
-
TOTAL= - M3

VENTANA DE ALUMINIO Y VIDRIO e=4 MM M2


DESCRIPCION: B= largo C= Ancho D= ProfundE= Número F=B
-
-
-
TOTAL= - M2

FISCALIZADOR CONTRATISTA
GOBIERNO MUNICIPAL DEL CANTON SUCUMBIOS

REAJUSTE DE PRECIOS UNICO

CONTRATO No: 001/2010

PROYECTO: OBRA: CONSTRUCCION DE UN AUDITORIO EN LA COMUNIDAD LA BARQUILLA

CONTRATISTA: ING. JUAN GABRIEL BARROS L.


N LA COMUNIDAD LA BARQUILLA